Loading...
HomeMy WebLinkAboutNC0024112_Pretreatment Compliance Inspection_20210205ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH NORTH CAROLINA Director Environmental Quality February 5, 2021 Misty Conder Pretreatment Coordinator City of Thomasville P.O. Box 368 Thomasville, NC 27361 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Thomasville NPDES# NC0024112 Davidson County Dear Ms. Conder: On January 21, 2021 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Misty Conder was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 6 MGD permitted facility. The City has five (5) Significant Industrial Users (SIUs), four (4) of which are categorical. The publicly owned treatment works (POTW) has had exceedances of BOD and TSS in 2019 and 2020 due to hydraulic issues caused by the weather. An exceedance of Ammonia from an unknown source was also noted in 2020. POTW Interview There are no plant problems related to pretreatment issues and, other than BOD, Ammonia, and TSS, there are no NPDES permit limit or monitoring violations recorded from December 2018 through December 2020. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on November 11, 2020. This HWA renewal is currently under review. North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 The last Industrial Waste Survey (IWS) was submitted on July 3, 2015. This IWS was approved on September 11, 2015. The next IWS was due on December 31, 2020. A request for extension was submitted. The Sewer Use Ordinance (SUO) was approved on March 25, 2013. The Enforcement Response Plan (ERP) was approved on February 14, 2020. The Long Term Monitoring Plan (LTMP) was approved on March 5, 2019. LTMP File Review The Long Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review Three (3) of the five (5) SIUs were in noncompliance in 2020. A review of the file for Finch (#0018) revealed that the monitoring data was well organized and compliant. A review of the file for McIntyre Metals (#0031) revealed that the monitoring data was well organized and compliant. A review of the file for Custom Drum (#0029) revealed that the monitoring data was well organized and compliant. The slug control plan for Finch (#0018) was in good order. The slug control plan for McIntyre Metals (#0031) was not available. The POTW has requested a revised plan. The slug control plan for Custom Drum (#0029) was in good order. Action Items Due to the pandemic, none of the SIUs were physically inspected. However, Ms. Conder maintained contact with the SIUs throughout the year. The pretreatment program is considered satisfactory. Ms. Conder runs an excellent pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sino euSigneb by: CLoti `C SMRCf Lon $1..°gni er Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Enclosure: PCI Report cc: PERCS Unit — Mike Montebello (Electronic Copy) WSRO Electronic Files Laserfiche Files NORTH CAROLINA DIVISION OF WATER RESOURCES . PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL DUALITY BACKGROUND INFORMATION (Complete Prior To PCI; Review Program Info Database Sheet(s)1 1. Control Authority (POTW) Name: City of Thomasville -Hamby Creek WWTP 2. Control Authority Representative(s): Misty Conder 3. Title(s): Lab Supervisor — Pretreatment Coordinator 4. Last Inspection Date: _ 12/19/18 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY 1 NICI0 10 1 2 14 1 1 11 12 I 1 011 21 121 7. Current Number Of Significant Industrial Users (SIUs)? 5 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 5 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 1 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 4 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) SNC for SNC for Not Put 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? r YES ❑ NO BOD, TSS - Flow related Ammonia- unknown source ❑ YES // NO Limits: None Reporting: Custom Drum lished: Will publish in 2/21 None ❑ YES // NO McIntyre Metals made a verbal request for relief of fines. LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. 24. 25. 26. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself! If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page I 28. PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 11/01/2020 /4 Yes ❑ No ❑ Yes /1 No In Review Industrial Waste Survey (IWS) 07/03/2015 /1 Yes ❑ No 09/11/2015 /1 Yes ❑ No 12/31/2020 - Requested Extension Sewer Use Ordinance (SUO) 01/31/2013 /1 Yes ❑ No 03/25/2013 a Yes ❑ No Enforcement Response Plan (ERP) 02/11/2020 /1 Yes ❑ No 02/14/2020 ►1Yes ❑ No Long Term Monitoring Plan (LTMP) 01/25/2019 /1 Yes ❑ No 03/05/2019 /1 Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION 29. User Name 1. Finch 2. McIntyre Metals 3. Custom Drum 30. IUP Number 0018 0031 0029 31. Does File Contain Current Permit? /1 Yes ❑ No /1 Yes ❑ No /1 Yes ❑ No 32. Permit Expiration Date 01/31/22 06/30/22 01/31/21 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 433 433 --- 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No /1 Yes ❑ No /1 Yes ❑ No 35. Does File Contain an Inspection Completed Within Last Calendar Year? ❑ Yes /1 No ❑ Yes /1 No ❑ Yes ►1 No 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. • Yes ■ No b. ■Yes ■ No a. ■ Yes • No b. - Yes Yes ■ No a. ►5 Yes ■ No b. ■ Yes ■ No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ®Yes❑No❑N/A ❑Yes®No❑N/A Requested ❑Yes❑NoON/A 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ►iYes •No b.❑Yes❑NotaN/A a. ►SYes ■No b.❑Yes❑No®N/A a. Yes •No b.❑Yes❑Not31N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? /1 Yes ❑ No ►1 Yes ❑ No /1 Yes ❑ No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? /1 Yes ❑ No L Yes ❑ No ►1 Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes®No❑N/A Problem with city sewer. No flow. 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes®No❑N/A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑NoON/A ❑Yes❑No®N/A ❑Yes❑No®N/A 42b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑No®N/A ❑Yes❑NoON/A ❑Yes❑No®N/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? Yes ❑ No I Yes ❑ No /1 Yes ❑ No 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑Yes®No❑N/A ❑Yes®No❑N/A ®Yes❑No❑N/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? a.❑Yes®No❑N/A NO r s N DN/A c.❑Yes❑No®N/A a.❑Yes®No❑N/A b.❑YestEINo❑N/A c.❑Yes❑No®N/A a.®Yes❑No❑N/A b.❑Yes®No❑N/A c.❑Yes❑No®N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ►1 No ❑ Yes // No ❑ Yes // No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? ®Yes❑No❑N/A Fine issued ®Yes❑No❑N/A Fine issued ❑Yes®No❑N/A 48. Does the File Contain Penalty Assessment Notices? ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No®N/A 49. Does The File Contain Proof Of Penalty Collection? ❑ Yes ®No❑N/A ❑Yes®No❑N/A ❑Yes❑No®N/A 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yesi33No❑N/A b.❑Yes❑NoEIN/A a.❑Yes®No❑N/A b.❑Yes❑No®N/A a.❑Yes❑No®N/A b.❑Yes❑NoE1N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes /1 No ❑ Yes /1 No ❑ Yes // No NC DWR Pretreatment Compliance Inspection (PC1) Form Upda ed December 2016 Page 2 FILE REVIEW COMMENTS: The files are in good order and well organized. Custom Drum has requested to be dropped from the program (the permit expired on 1/31/2021). Two new SIUs (both are centralized waste treatment facilities) may begin operation in 2021. Finch had one copper exceedance in November 2020. McIntyre Metals had zinc exceedances in April and May 2020, a BOD, pH and zinc exceedance in September 2020, and a TSS exceedance in May 2020. Custom Drum was in SNC for reporting in 2020. There was a problem with the city sewer and the facility had no flow for several weeks. The SIUs were not physically inspected due to the pandemic. The Thomasville City Hall is closed to visitors, so the collection of the required information for the IWS is taking longer than normal and the POTW requested an extension for completion of the survey. INDUSTRY INSPECTION ICIS CODING: Main Program PermitNumber MM/DD/YY J I I l 1 I I I I l 1 I I 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Phone: Fax: Title: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory X Marginal PCI COMPLETED BY: Jim Gonsiewski Unsatisfactory DATE: 2/5/2021 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yrlmo/day Inspection Type Inspector Fac Type 1 1ti 1 2 u 3 1 NC0024112 111 121 21/01/21 117 18I , I 1912 i 20[J 21111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 r6 Inspection Work Days Facility Self -Monitoring 671 I 7013 Evaluation Rating I 711 B1 I QA 72 LJ 1 ry I 73 Reserved 74 71 1 1 1 1 1 1 1 1 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number). Hamby Creek WWTP 110 Optimist Park Rd Thomasville NC 27360 Entry Time/Date 10:05AM 21/01/21 Permit Effective Date 14/10/01 Exit Time/Date 11:45AM 21/01/21 Permit Expiration Date 19/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Roger G Bryant/ORC// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Michael Brandt,PO Box 368 Thomasville NC 273610368/Assistant City Manager/336-475-4220/3364754283 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Records/Reports Compliance Schedules Pretreatment Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Jim J Gonsiewski of Inspector(s) Agency/Office/Phone and Fax Numbers Date Docusignedby: LDWR/Division of Water Quality/336-776-9704/ aoe-i 2/5/2021 E197B66f179D45F... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date FDocuSigned by: L-0, "T ,,,i'le.r. 2/5/2021 �— 145B49E225C94EA... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 NPDES yr/molday 31 NC0024112 111 121 21/01/21 17 Inspection Type 18101 (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The files are in good order and well organized. Custom Drum has requested to be dropped from the program (the permit expired on 1/31/2021). Two new SIUs (both are centralized waste treatment facilities) may begin operation in 2021. Finch had one copper exceedance in November 2020. McIntyre Metals had zinc exceedances in April and May 2020, a BOD, pH and zinc exceedance in September 2020, and a TSS exceedance in May 2020. Custom Drum was in SNC for reporting in 2020. There was a problem with the city sewer and the facility had no flow for several weeks. The SlUs were not physically inspected due to the pandemic. The Thomasville City Hall is closed to visitors, so the collection of the required information for the IWS is taking longer than normal and the POTW requested an extension for completion of the survey. Page# 2 Permit: NC0024112 Inspection Date: 01/21/2021 Owner - Facility: Hamby Creek VwVTP Inspection Type: Pretreatment Compliance Compliance Schedules Is there a compliance schedule for this facility? Is the facility compliant with the permit and conditions for the review period? Comment: Yes No NA NE ❑ ❑ ❑ • • ❑ ❑ ❑ Page# 3