HomeMy WebLinkAboutNCC200703_NOT Closeout Documents_20210208North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 29301-5094
(910) 433-3300
Turnberry, Section Two, Part Two - Lots
County: Hoke Project: 204 & 205 River basin: Cape Fear
Person financially responsible: Caviness and Cates Building and ā¯‘evelopmenl. Project #: HOKE-2020-029
Inc. - Patrick Raynor, CFO
Address: 639 Executive Place. Suite 400. Fayetteville. NC
1. Project Location. Bridgehaven Drive, McLauchlin
Pictures: No
2. Weather and soil conditions: sunny/workable soils
J. Is site currently under notice of violation:' No
4. is the site in compliance with 5.P.C.A. and rules? Yes
5. Violations:
b. Is the site in compliance with the NPDES Permit'. Ycs
Describe:
Initial inspection: No
If Tic, check violations below:
7. Has sedimentation damage occurred since last inspection? No 1f Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 28. 2020
1p_ Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPI}ES General Storm water Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Penny Markle Others present:
Date of inspection: August 24, 2020 Time arriving on site: 4:00 pM Time leaving site: 4:45 PM
cc: