Loading...
HomeMy WebLinkAboutNCC200703_NOT Closeout Documents_20210208North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 29301-5094 (910) 433-3300 Turnberry, Section Two, Part Two - Lots County: Hoke Project: 204 & 205 River basin: Cape Fear Person financially responsible: Caviness and Cates Building and ā¯‘evelopmenl. Project #: HOKE-2020-029 Inc. - Patrick Raynor, CFO Address: 639 Executive Place. Suite 400. Fayetteville. NC 1. Project Location. Bridgehaven Drive, McLauchlin Pictures: No 2. Weather and soil conditions: sunny/workable soils J. Is site currently under notice of violation:' No 4. is the site in compliance with 5.P.C.A. and rules? Yes 5. Violations: b. Is the site in compliance with the NPDES Permit'. Ycs Describe: Initial inspection: No If Tic, check violations below: 7. Has sedimentation damage occurred since last inspection? No 1f Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: August 28. 2020 1p_ Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPI}ES General Storm water Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: August 24, 2020 Time arriving on site: 4:00 pM Time leaving site: 4:45 PM cc: