HomeMy WebLinkAbout20210036 Ver 1_Pre-Filing Meeting Information_20210205Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:*
Is this a transportation project?*
Tony Nardo
anthony.nardo@hdrinc.com
Duke Energy Carolinas
James 44kV Line Re -build Project
Burke
Street Address
526 South Church Street
Address Line 2
aty
Charlotte
Postal/ Zip axle
28202
C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
F Individual Permit F Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes c: No
State / Province / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below.*
The James 44kV Line Re -build Project (Project) consists of rebuilding
approArnately 5 miles of Duke Energy Carolinas, LLC 44kV electric
transmission line in Burke County, NC. All wetlands impacts are
temporary in nature due to matting, and will be returned to pre -
construction conditions. A culvert installation will take place on
Stream 8 (Sheet P5b) and will be permanent in nature. The culvert
installation is the only permanent impacts proposed for the Project.
The Project is seeking a 401 Water Quality Certification (No. 4133)
for the culvert installation.
Please give a couple of dates you are available for a meeting.
1 /26/2021
1 /25/2021
1 /27/2021
Please attach the documentation you would like to have the meeting about.
James 100% to Client 20201223.pdf 76.46MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 1/5/2021