Loading...
HomeMy WebLinkAbout20210036 Ver 1_Pre-Filing Meeting Information_20210205Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Tony Nardo anthony.nardo@hdrinc.com Duke Energy Carolinas James 44kV Line Re -build Project Burke Street Address 526 South Church Street Address Line 2 aty Charlotte Postal/ Zip axle 28202 C Yes c: No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express F Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* C Yes c: No State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The James 44kV Line Re -build Project (Project) consists of rebuilding approArnately 5 miles of Duke Energy Carolinas, LLC 44kV electric transmission line in Burke County, NC. All wetlands impacts are temporary in nature due to matting, and will be returned to pre - construction conditions. A culvert installation will take place on Stream 8 (Sheet P5b) and will be permanent in nature. The culvert installation is the only permanent impacts proposed for the Project. The Project is seeking a 401 Water Quality Certification (No. 4133) for the culvert installation. Please give a couple of dates you are available for a meeting. 1 /26/2021 1 /25/2021 1 /27/2021 Please attach the documentation you would like to have the meeting about. James 100% to Client 20201223.pdf 76.46MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 1/5/2021