HomeMy WebLinkAbout730002_Sludge Survey_20210209ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANI£L SMITH
Director
James L. Thomas
James Thomas Farm
8109 Oxfod Road
Timberlake, NC 27583
Dear James L. Thomas:
NORTH CAROLINA
Environmental Quality
February 9, 2021
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS730002
James Thomas Farm
Animal Waste Management System
Person County
The Division of Water Resources (Division) received your sludge survey information on
February 8, 2021. With the survey results, you requested an extension of the sludge survey
requirement for the two lagoons at the James Thomas Farm facility. Due to the amount of
treatment volume available, and the rate of sludge accumulation for the lagoon, the Division
agrees that a sludge survey is not needed until December 31, 2024 for Secondary (211d stage)
lagoon. However, due to the amount of treatment volume available, and the rate of sludge
accumulation, the Division feels that an extension is not appropriate for the Primary (1st
stage) lagoon at this facility.
The next sludge survey for Primary (1st stage) lagoon at James Thomas Farm should be
performed before December 31, 2021, and for the Secondary (211d stage) lagoon should be
performed before December 31, 2024. Please retain this letter and keep it with your farm records
for reference.
Please call me at (919) 707-3665 if you have any questions.
Sincerely,
DocuSigned by:
�vLG2?A, �Ntita'ri�A.
1697B2C85B41418...
Miressa D. Garoma
Animal Feeding Operations Program
cc: Raleigh Regional Office, Water Quality Regional Operations Section
Permit File AWS730002
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
N11H fH (:Ai(1!.INA �
0O'torenwm—talQ"I 919,707.9000