HomeMy WebLinkAboutNCC210711_ESC Approval Submitted_20210209ROY COOPER
Governor
MICHAEL S. REGAN
Secretory
BRIAN WRENN
Director
NORTH CAROLINA
£nvironmen raI Quo tity
J,111uitrV 11, 2 02 1
I,ET EIt OF API'll0VAI.
Eastwood Construction, LLC
Alien Iion: Mark 13attiste, Vice President of Construction
2857 Westport Road
Charlotte, North Carolina 28208
R-L: Project Name: Park view Estates (Lots 127,128, & 196
Acres Approved:.86
Project ID: CABAR-2021-037
County: Cabarrus
City: Concord
Address: 421 O Falls Drive SW
River 13asin: Yadkin-PecDcc
Stream Classification: Other
Submitted 13y: Eastwood Construction, LLC
Date Deceived by LQS: December 17, 2020
Plan Type: New
Dear Mr. I3altisic:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
ai the job site. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC413.0129.
As ❑f March 1, 2019, a I I new construction activities are required to complete and submit an clecimnic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGOl0000
Construction Stormwatcr General Permit. This form MOIST be subinitted prior to the commcncemctlt of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/N`0001. Please direct questions about the NO1 form to Annette Lucas at
A n n c tic. luca sL ncden r.gov or Paul Clark at Pau l.clark Oanedenngov. Aftcr you submit a complete and
correct NO] Form, a CDC will be emailed to you within three business days. Initially, ❑}:MLR will not
charge a fee for coverage under the NCG01 permil. I iowcvcr, on or after May 1, 2019, a $100 fix; will be
charged annually. This fee is to be sent to the DEMLR Storinwatcr Central Office in Raleigh.
Title 15A NCAC 4I3.0118(a) and the NCGO 1 permit require that the following doewnentat ion be kept an
file at the job site:
The approved E&SC plan as well as any approved deviation.
The NCGO I permit and the COC, once it is received.
may, North Carolina Department of Environmental Quality f Division of Energy. kilneral and Land Resources
E Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville. North Carolina 28115