Loading...
HomeMy WebLinkAbout310148_30 day poa_20210208PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31_ - _148 County: Duplin Facility Name: Stephen M Williamson Certified Operator Name: _Stephen M Williamson Operator # 19128 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 1 2 Spillway (Yes or No): _No No Level (inches): _18 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 03/01/2021 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Stephen M Williamson Jr. Phone: _(910)296-1513 Facility Owner/Manager (print) S t4 . H. tv [L:�, Jz. Facility Owner/Manager (signature) Date: 2/06/2021 PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): _31-148 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 1 inches d. top of dike surface area according to design _74000 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = _46127 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80307 ft3 h. actual waste produced = current herd # x line g = 80307 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = _ line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/21/2020 m. (lines e + k) x line 1 = 390 1000 43167 ft3 153931_ gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE 1.95 1•20 Ib/1000 gal. PoA Cover Page 2/21/00 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31-148 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 4 inches d. top of dike surface area according to design _37600 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = _93749 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40153 ft3 h. actual waste produced = current herd # x line g = 40153 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design _21933 k. (lines h + i +i) x 7.48 x 30 days = _77401_ line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/21/2020_ 1.95 ft3 gallons Ib/1000 gal. m. (lines e + k) x line 1 = 334 lb PAN 1000 PoA Cover Page 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD 1. structure ID: 1 line m = 390 lb PAN 2. structure ID: 2 line m = 334 lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = 724 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 3255 11 BP 2.98 206 613 Sept -May 3255 12 BP 1.00 206 206 Sept -May 3255 21 BP 3.05 206 628 Sept -May 3255 22 BP 4.36 206 898 Sept -May 3255 23 BP 4.78 206 984 Sept -May 3255 24 BP 5.72 206 1178 Sept -May 3255 25 BP 4.32 206 889 Sept -May 3255 32 BP 2.25 206 463 Sept -May 3255 33 BP .89 206 183 Sept -May 3255 41 BP 2.18 206 449 Sept -May 3255 43 BP 3.96 206 815 Sept -May Sept -Mar Sept -Mar Sept -Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 7306 lb. PAN PoA Cover Page 2/21/00 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 724 lb. PAN x. Crop's remaining PAN balance (line v from section III) _ _7306 lb. PAN y. Overall PAN balance (w - x) _ <6582> lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: We are working diligently to reduce lagoon levels back below 19" as soils, crops and weather allow. PoA Cover Page 2/21/00