HomeMy WebLinkAbout310148_30 day poa_20210208PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31_ - _148 County: Duplin
Facility Name: Stephen M Williamson
Certified Operator Name: _Stephen M Williamson Operator # 19128
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 1 2
Spillway (Yes or No): _No No
Level (inches): _18 15
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 03/01/2021
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Stephen M Williamson Jr. Phone: _(910)296-1513
Facility Owner/Manager (print)
S t4 . H. tv [L:�, Jz.
Facility Owner/Manager (signature)
Date: 2/06/2021
PoA Cover Page 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): _31-148 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19 inches
c. line b - line a (inches in red zone) = 1 inches
d. top of dike surface area according to design _74000 ft2
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons = _46127 gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 80307 ft3
h. actual waste produced = current herd # x line g = 80307 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days = _
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/21/2020
m. (lines e + k) x line 1 = 390
1000
43167 ft3
153931_ gallons
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
1.95
1•20
Ib/1000 gal.
PoA Cover Page 2/21/00
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 31-148 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19 inches
c. line b - line a (inches in red zone) = 4 inches
d. top of dike surface area according to design _37600 ft2
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons = _93749 gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 40153 ft3
h. actual waste produced = current herd # x line g = 40153 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design _21933
k. (lines h + i +i) x 7.48 x 30 days = _77401_
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/21/2020_ 1.95
ft3
gallons
Ib/1000 gal.
m. (lines e + k) x line 1 = 334 lb PAN
1000
PoA Cover Page 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF
ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
1. structure ID: 1 line m = 390 lb PAN
2. structure ID: 2 line m = 334 lb PAN
3. structure ID: line m = lb PAN
4. structure ID: line m = lb PAN
5. structure ID: line m = lb PAN
6. structure ID: line m = lb PAN
n. lines 1 +2+3+4+5+6 = 724 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
u.
application
window'
3255
11
BP
2.98
206
613
Sept -May
3255
12
BP
1.00
206
206
Sept -May
3255
21
BP
3.05
206
628
Sept -May
3255
22
BP
4.36
206
898
Sept -May
3255
23
BP
4.78
206
984
Sept -May
3255
24
BP
5.72
206
1178
Sept -May
3255
25
BP
4.32
206
889
Sept -May
3255
32
BP
2.25
206
463
Sept -May
3255
33
BP
.89
206
183
Sept -May
3255
41
BP
2.18
206
449
Sept -May
3255
43
BP
3.96
206
815
Sept -May
Sept -Mar
Sept -Mar
Sept -Mar
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 7306 lb. PAN
PoA Cover Page 2/21/00
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 724 lb. PAN
x. Crop's remaining PAN balance (line v from section III) _ _7306 lb. PAN
y. Overall PAN balance (w - x) _ <6582> lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
We are working diligently to reduce lagoon levels back below 19" as soils, crops and weather
allow.
PoA Cover Page 2/21/00