HomeMy WebLinkAbout310390_30 day poa_20210208PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31_ - _390 County: Duplin
Facility Name: Earth Right Farms, Inc. — Goshen Farm
Certified Operator Name: _Stephen M Williamson Operator # 19128
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 1
Spillway (Yes or No): _No
Level (inches): _18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 02-10-2021
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Earth Right Farms, Inc. / Stephen M Williamson
Facility Owner/Manager (print)
Phone: _(910)296-1513
PoA Cover Page 2/21/00
Sze. M. W:C., J", Date: Feb. 6, 2021
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): _31-390 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19 inches
c. line b - line a (inches in red zone) = 1 inches
d. top of dike surface area according to design _52796 ft2
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons = _33022 gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71384 ft3
h. actual waste produced = current herd # x line g = 35692 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days = _
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/21/2020
m. (lines e + k) x line 1 = 140
1000
0 ft3
32667 ft3
85220_ gallons
1.19
lb PAN
Ib/1000 gal.
PoA Cover Page 2/21/00
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF
ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
1. structure ID: 1 line m = 140 lb PAN
2. structure ID: line m = lb PAN
3. structure ID: line m = lb PAN
4. structure ID: line m = lb PAN
5. structure ID: line m = lb PAN
6. structure ID: line m = lb PAN
n. lines 1 +2+3+4+5+6 = 140 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
u.
application
window'
3879
1
BH
1.75
275
481
Mar -Oct
3879
2
BH
2.54
275
698
Mar -Oct
3879
3
BH
2.94
275
808
Mar -Oct
3879
4
BH
.89
275
245
Mar -Oct
3879
5
BH
.46
270
124
Mar -Oct
3879
6
BH
.84
270
226
Mar -Oct
3879
7
BH
1.45
270
391
Mar -Oct
73874
1 HW
BH
.87
275
239
Mar -Oct
73874
2HW
BH
4.9
275
1347
Mar -Oct
73874
3HW
BH
1.08
275
297
Mar -Oct
73843
2
BH
9.89
205
2027
Mar -Oct
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 6883 lb. PAN
PoA Cover Page 2/21/00
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 140 lb. PAN
x. Crop's remaining PAN balance (line v from section III) _ _6883 lb. PAN
y. Overall PAN balance (w - x) _ <6743> lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
We have been working diligently to keep the lagoon out of red but the recent weather pattern
has made it difficult to make significant gains. We will continue to reduce lagoon to
acceptable level as the weather, soils and crops allow.
PoA Cover Page 2/21/00