HomeMy WebLinkAboutSW5210201_SUPPLEMENT EZ - ALL PAGES_20210209SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 lProiectName
Project Area (ac)
Coastal Wetland Area (ac)
Surface Water Area (ac)
Is this project High or Low Density?
Does this protect use an off -site SCM?
Essex Townes/Essex
37.35
0
1.22
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
50
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1003 4 c-d out of the setback?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
2
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Ba filter
IFilterra
0
26
0
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Jonathan Eakins, PE
28
Organization:
The Nau Company, PLLC
29
Street address:
PO Box 810
30
City, State, Zip:
Rolesville, NC 27571
31
Phone numbers :
919-435-6394 x4
32
Email:
Ieakins(a)thenauco.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
Signature of D signer
1 /28/2021
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
T pe of SCM
Wet pond
Wet pond
5
Total BUA in project (sq ft
436678 sf
389123 sf
6
New BUA on subdivided lots (subject to
ermitting) (sq ft
297575 sf
244906 sf
7
New BUA outside of subdivided lots (subject to
ermittin s
139103 sf
144217 sf
8
Offsite -total area (sq ft
sf
sf
9
Offsite BUA (sq ft
sf
sf
10
Breakdown of new BUA outside subdivided lots:
- Parking (sq ft
sf
sf
- Sidewalk (sq ft
sf
sf
- Roof (sq ft
sf
sf
- Roadway s ft
139103 sf
144217 sf
- Future (sq ft
sf
sf
- Other, please specify in the comment box
below (sq ft
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
sf
13
Exisitng BUA that will remain (not subject to
ermitting) (sq ft
sf
sf
14
lExistina BUA that is already ermitted (sq ft
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
16
Percent BUA
55%
55%
17
Design storm inches
1 in
1 in
18
Design volume of SCM cu ft
36039 cf
32142 cf
19
Calculation method for design volume
Simple method
Simple method
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
WET POND
1 Drainage area number
21 Design volume of SCM (cu ft)
GENERAL MDC FROM 02H .1050
1 (North) 2 (South)
36039 cf 32142 cf
31
Is the SCM sized to treat the SW from all surfaces at build -out?
Is the SCM located away from contaminated soils?
Ye6
Yes
4
Yes
3:1
Yes
3:1
5
What are the side slopes of the SCM (H:V)?
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
Yes
IWFT POND MDC FROM 02H _1053
18
Method used
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
368.00
314.00
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
367.00
313.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
372.00
317.00
23
Elevation of the permanent pool (fmsl)
373.00
318.00
24
Elevation of the top of the vegetated shelf (fmsl)
373.00
318.00
25
Elevation of the temporary pool (fmsl)
374.80
319.80
26
Surface area of the main permanent pool (square feet)
18350:1
16296:1
27
Volume of the main permanent pool (cubic feet)
54266 cf
39448 cf
28
Average depth of the main pool (feet)
3.00 ft
3.00 It
29
Average depth equation used
Equation 2
Equation 3
301
If using equation 3, main pool perimeter (feet)
653.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
6.0 ft
32
Volume of the forebay (cubic feet)
10536 cf
6428 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
34
Clean -out depth for forebay (inches)
12 in
12 in
35
Design volume of SCM (cu ft)
36039 cf
32142 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
371
If orifice, orifice diameter (inches)
4 in
3 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.8
4.7
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
No
No
431
Depth of forebay at entrance (inches)
72 in
44
Depth of forebay at exit (inches)
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
6 It
6 It
47
Slope of vegetated shelf (H:V)
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
Species of turf that will be used on the dam and embankment
fescue/bermuda
fescue/bermuda
Has a planting plan been provided or the vegetate shelf.?
es Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 11:36 AM 1/28/2021