HomeMy WebLinkAbout20190210 Ver 2_Compliance Evaluation Inspection_20210208Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
2/8/2021
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 8, 2021. Reid
Whitehead, Jason Chastain, and Nick Adams were present during the inspection. The following are items that require
attention:
~ Station 188+00 L (Site 15) - Stabilize around inlet of temporary pipe.
~ Station 179+50 L (Blair Creek Site 14)- Temporary ground cover needed.
~ Station 118+00 L (Site 8) - Repair rill on slope and address silt fence outlet above JS.
~ Station 69+00 L - Sediment observed in JS - Removed on 2/8; Need additional erosion control in ditch line above JS.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
2/8/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2