HomeMy WebLinkAbout20180726 Ver 2_Pre-Filing Acknowledgement Email_20210208Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, February 8, 2021 8:27 AM
To: esmail@mbakerintl.com
Cc: Ridings, Rob
Subject: Pre -Filing Meeting Request Acknowledgement - South Terminal Development -
20180726 Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for South Terminal Development that you submitted on (date). The ID number for that project is
20180726, Version 2.
Reviewer Contact Information:
Reviewer: Robert Ridings
Reviewer Email: rob.ridings@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20180726
Version* 2
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rob Ridings
Pre -Filing Meeting Request submitted 2/5/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Ed Smail
esmail@mbakerintl.com
South Terminal Development
Raleigh Executive Jetport
Lee
Street Address
4425 Belle Oaks Drive
Address Line 2
aty
North Charleston
Rbstal / Zip Code
29405
Is this a transportation project?* r Yes r No
State / Frovince / Region
SC
Country
United States
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit W Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
20180726v1
Do you know the name of the staff member you would like to request a meeting with?
Mr. Rob Ridings
Please give a brief project description below.*
The proposed project is located at the Raleigh Executive Jetport in
Lee County northeast of Sanford, North Carolina (refer to Figure 1).
Take Exit 76 - Farrell Road (from US 1 South) - Make Left onto
Farrell Road - Travel Approximately 0.5-mile - Make Left onto Rod
Sullivan Road - Travel Approximately 1.0-mile - Arrive at Raleigh
Executive Jetport. The approximate center point of the project is
located at 35.576808,-79.108483. The nearest named waterway is
Hughes Creek, which is located south of the project (all of the project
area drains to this named stream). The project is located within the
Cape Fear River Basin, 8-digit Hydrologic Unit Code (HUC)
03030004.
The proposed project consists of additional development to the
existing hangar area located to the south of the existing terminal
area. The proposed project includes site preparations for three future
box hangars/associated aprons, improvement of the current taxilane
(north of the existing t-hangars) to accommodate ADG II aircraft, and
the connection of the existing t-hangar taxilanes to a new `end -
around' taxilane. The existing north taxilane would be shifted and
widened and would continue/extend behind the t-hangars. The
remaining five taxilanes would connect to the new pavement to create
a complete taxilane system. Rough grading and installation and re-
routing of stormwater drainage would occur to the north and west of
the t-hangars to prepare sites for hangar development. The
proposed improvements are shown on Figure 4.
The project also requires modification to the existing stormwater pond
located at the southern end of the project. The pond requires an
increase in volume, addition of a spillway, and an energy dissipator
pad to accommodate run-off from the additional impervious surfaces
for the previously described improvements (refer to attached Permit
Drawings — Appendix A2). Impacts to Waters of the U.S. (WOUS)
would only result from the improvements required at the pond outfall,
the remaining work areas would not result in impacts to WOUS.
A Section 401 Water Quality Certification (20180726v1 - issued
December 3, 2018) and Section 404 Permit (SAW 2009-01114) was
issued for hangar expansion. A modification to these approvals is
being proposed for additional hangar expansion (as described
above).
Please give a couple of dates you are available for a meeting.
2/8/2021
2/12/2021
2/15/2021
2/10/2021
2/17/2021
Please attach the documentation you would like to have the meeting about.
5-AppenidxAAllFiguresCombined_080620.pdf 5.05MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
611 -It W41 ee�l
Submittal Date 2/5/2021