Loading...
HomeMy WebLinkAbout20181694 Ver 1_More Info Received_20210208ID#* 20181694 Version* 1 Select Reviewer:* Erin Davis Initial Review Completed Date 02/08/2021 Mitigation Project Submittal - 2/8/2021 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* V Stream r Wetlands r- Buffer r- Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Angela Allen Project Information .............................................................................................................................................................................. ID#:* 20181694 Existing IDr Project Type: r DIMS r Mitigation Bank Project Name: Dudley Mill Pond Mitigation Site County: Cumberland Document Information Email Address:* aallen@Wldlandseng.com Version: *1 Existing Version Mitigation Document Type:* Mitigation Information File Upload: 005-45021-Dudley Pond.pdf 16.02MB Dudley Impacts Memo.pdf 977.2KB Rease upload only one RDFof the corrplete file that needs to be subrritted... Signature Print Name:* Angela Allen Signature:* &t1�r� 0s % P WILDLANDS F NCI N F F R I N C February 5, 2021 Jordan Jessup U.S. Army Corps of Engineers Regulatory Division 69 Darlington Avenue Wilmington, NC 28403 Subject: Action ID No. SAW-2016-02160 Wildlands Cape Fear 05 Umbrella Mitigation Bank Dudley Mill Pond Mitigation Site Revised Wetland Impacts Dear Mr. Jessop, This letter is in reference to the Dudley Mill Pond Mitigation Site (Site), part of the Wildlands Cape Fear 05 Umbrella Mitigation Bank. The 47-acre bank Site is in the Cape Fear 05 Cataloging Unit (03030005) and is located along Stedman -Cedar Creek Road and John Hall Road in Cumberland County, North Carolina. The purpose of this letter is to outline changes that were made to the design and subsequent changes to wetland impacts at the Site. There were no changes to stream and open water impacts. The original pre -construction notification (PCN) form was submitted to the U.S. Army Corps of Engineering (USACE) on June 4, 2020 seeking approval for the Section 404 permit for impacts to streams and wetlands. The 401 and 404 permits were approved on August 3, 2020 and July 17, 2020, respectively. The PCN documented a total wetland impact area of 9.493 ac. Impacts were due to channel relocation, floodplain grading, haul roads, and spoil areas. Wetland impacts mostly occurred along Cedar Creek Reach 2 where a priority 2 stream restoration approach was proposed for approximately 2,200 linear feet (LF). This approach involved gradually dropping the stream through an old pond and grading out a new floodplain where a failed dam used to be. The revised design splits Cedar Creek Reach 2 in two separate reaches with new channel dimensions and varying restoration approaches. Reach 2 will begin at the confluence of Cedar Creek and T2 and gently meander through the old pond bed with an average slope of 0.2%. A priority 1 restoration approach through the reach will allow the stream to remain hydrologically connected to the existing floodplain and wetlands while also minimizing earthwork in sandy soils at the cut depth. Reach 3 will begin approximately 550 LF upstream of the dam and will have a slightly steeper slope of 1%. This short reach was designed with a priority 2 restoration approach where a new floodplain will be graded through the old dam to allow the reach to reconnect with Cedar Creek downstream. Shortening the priority 2 section by almost 1,500 LF in the revised design has significantly reduced the amount of earthwork and limited the overall total disturbance to natural systems on the Site. The updated channel dimensions and grading can be found in the revised plans attached to this letter. In addition to stream design changes, a temporary channel diversion system is proposed along Reaches 2 and 3 during construction, instead of a pump around system. This will allow the 6.5 square mile stream to be built in the dry and prevent damage to the newly built stream during construction should there be severe storm events. The location of the channel diversion can be found in the revised plans. Wildlands Engineering, Inc. • phone 919-851-9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 A reduction in the floodplain grading footprint eliminated the need for one of the two originally proposed spoil areas, therefore reducing both permanent and temporary wetland impacts. Table 1 below compares the original and revised temporary and permanent impacts to wetlands at the Site and Table 2 itemizes the revised wetland impacts. All proposed stream, wetland, and open water impacts are displayed in Figure 1. There were no changes to stream and open water impacts, so those impacts have not been provided int the tables below. Table 1. Wetland Impacts Comparison Table Design Temporary Impacts (ac) Permanent Impacts (ac) Total Wetland Impacts (ac) Original 7.280 2.216 9.496 Revised 5.288 2.102 7.390 Difference -1.991 -0.114 -2.106 Table 2. Revised Wetland Impacts Impact Type of Wetland Type of Impact Site Reason for Impact Forested Type Wetland Name Jurisdiction Area (ac) W1 Access Path T Floodplain Pool A Yes Both 0.054 W2 Haul Road T Floodplain Pool B Yes Both 0.002 Access Path/Floodplain W3 T Floodplain Pool C Yes Both 0.061 Grading W4 Channel Relocation P Floodplain Pool C Yes Both 0.017 Linear W5 Channel Relocation P NA Yes Both 0.009 Conveyance Riverine Swamp W6 Floodplain Grading T E Yes Both 0.008 Forest Riverine Swamp W7 Channel Relocation P E Yes Both 0.028 Forest Floodplainding/Haul Riverine Swamp W8 T F Yes Both 0.379 Road Riverine Swamp W9 Channel Relocation P F Yes Both 0.641 Forest Riverine Swamp W10 Floodplain Grading T G Yes Both 0.033 Forest Riverine Swamp W11 Channel Relocation P G Yes Both 0.031 Forest Channel Diversion/Haul Riverine Swamp W12 T H Yes Both 2.282 Road/Floodplain Grading Forest Riverine Swamp W13 Channel Relocation P H Yes Both 0.676 Forest Staging Area/Haul W14 Road/Floodplain T Riverine Swamp I Yes Both 2.469 Grading/Channel Diversion Forest Riverine Swamp W15 Channel Relocation P I Yes Both 0.700 Forest Total Temporary Impacts 5.288 Total Permanent Impacts 2.102 Total Wetland Impact 7.390 Wildlands Engineering, Inc. • phone 919-851-9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 With the re -design, there is a loss of 20.64 stream credits in comparison to the Final Mitigation Plan. Table 3 shows a comparison of credits. All Credit loss is in stream length on Cedar Creek (initially Reach 2, now Reaches 2 and 3). A copy of the most up to date Wilmington District Stream Buffer Credit Calculator is attached. Table 3. Stream Credit Comparison Table Total Baseline Credit Loss in Buffer Additional Buffer Total Credit Original 6,623.79 -134.89 1,018.99 7,507.89 Revised 6,556.37 -79.14 1,010.02 7,487.25 Difference -20.64 With this letter, we are seeking a permit modification to the 401 and 404 should one be required by USACE and NCDWR based on these design updates. Please contact me at 919-851-9986 x106 if you have any questions. Thank you, Angela Allen Project Manager Wildlands Engineering, Inc. • phone 919-851-9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 ' S1'Relocation � \ `. Relocation Grading W2 - Haul Road W9 - Channel Relocation W1 - Access Path 'w -Channel Grading W9 IV Relocation Beave Imp Grading W14 - Haul Road Relocation Relocation Grading W13 - Channel M12 - Haul Road Relocation Relocation Diversion Gra Div rial Photography 10. Site Name: Dudley Pond Mill Mitigation Site USACE Action ID: 2016-02160 NCDWR Project Number: 100024 Sponsor: NCDMS Number of Exempt Terminal Stream Ends': 4 County: Cumberland Minimum Required Buffer Width: 50 Mitigation Type Restoration (1: 1) Enhancement 1(1.5:1) Enhancement 11(2.5:1) Preservation(5:1) Other (7.5:1) Other (10:1) Custom Ratio 1 Custom Ratio 2 Custom Ratio 3 Custom Ratio 4 Custom Ratio 5 Totals Buffer Zones Max Possible Buffer (square feet)' Ideal Buffer (square feet)° Actual Buffer (square feet)' Zone Multiplier Buffer Credit Equivalent Percent of Ideal Buffer Credit Adjustment Total Baseline Credit 6556.37 Mitigation Ratio Creditable Stream Include in Buffer 6556.37 Wilmington District Stream Buffer Credit Calculator Baseline Stream Credit Buffered Stream Credit From Buffered Length Streams 6556.37 6556.37 6556.37 6556.37 6556.37 6556.37 Buffer Width Zone (feet from Ordinary High Water Mark) less than 15 feet >15 to 20 feet >20 to 25 feet >25 to 30 feet >30 to 35 feet >35 to 40 feet >40 to 45 feet >45 to 50 feet >50 to 75 feet >75 to 100 feet >100 to 125 feet >125 to 150 feet 198104.1 66662.7 66976.7 67290.7 67604.7 67918.7 68232.7 68546.7 347443.5 355293.5 363143.5 370993.5 192476.25 64322.31 64387.55 64492.69 64617.99 64692.70 64643.19 64544.16 321190.78 316538.52 310780.08 306319.46 190140.09 63032.27 62945.10 62696.24 62567.12 62389.80 62080.59 61520.27 294673.04 252997.95 209137.35 175752.53 50% 10% 10% 10% 5% 5% 5% 5% 7% 5% 4% 4% 3278.19 655.64 655.64 655.64 327.82 327.82 327.82 327.82 458.95 327.82 262.25 262.25 99% 99% 99% 99% 98% 98% 98% 98% 92% 80% 67% 57% -27.86 -7.61 -8.61 -9.61 -5.31 -5.81 -6.36 -7.97 421.05 262.01 176.48 150.47 Credit Loss in Required Credit Gain for Net Change in Total Credit Buffer Additional Buffer Credit from Buffers -79.14 1010.02 930.88 7487.25 'Number of terminal stream ends, including all points where streams enter or exit the project boundaries, but not including internal crossings even if they are not protected by the easement. Minimum standard buffer width measured from the top of bank (50 feet in piedmont and coastal plain counties or 30 feet in mountain counties) 'Use the Custom Ratio fields to enter non-standard ratios, which are equal to the number of feet in the feet -to -credit mitigation ratio (e.g., for a perservation ratio of 8 feet to 1 credit, the multiplier would be 8). °Equal to the number of feet of stream in each Mitigation Type. If stream reaches are not creditable, they should be excluded from this measurement, even if they fall within the easement. 'This amount is the maximum buffer area possible based on the linear footage of stream length if channel were perfectly straight with full buffer width and no internal crossings. This number is not used in calculations, but is provided as a reference. `Maximum potential size (in square feet) of each buffer zone measured around all creditable stream reaches, calculated using GIS, including areas outside ofthe easement. The inner zone (0-15') should be measured from the top of the OHWM or the edge of the average stream width if OHWM is not known. Non -creditable stream reaches within the easement should be removed prior to calculating this area wtih GIS. 7Square feet in each buffer zone, as measured by GIS, excluding non -forested areas, all other credit type (e.g., wetland, nutrient offset, buffer), easement exceptions, open water, areas failing to meet the vegetation performance standard, etc. Additional credit is given to 150 feet in bufferwidth, so areas within the easement that are more than 150 feet from creditable streams should not be included in this measurement. Non -creditable stream reaches within the easement should be removed prior to calculating this area wtih GIS. Cape Fear 05 Umbrella Mitigation Bank Dudley Mill Pond Mitigation Site Cape Fear River Basin 03030005 Cumberland County, North Carolina Project Area Suns pines PI i r t Caterwaul Dr v u S4rrey`h `a Stedman Cedar Creek Rd Vicinity Map Not to Scale ISSUED FOR PERMITTING BEFORE YOU DIG! CALL 1-800-632-4949 JANUARY 29/ 2021 N.C. ON E-CALL CENTER IT'S THE LAW! Sheet Index Title Sheet 0.1 Project Overview 0.2 General Notes and Symbols 0.3 Stream Plan and Profile 1.1-1.17 Additional Grading and Fencing 2.1-2.5 Planting Sheets 3.1-3.2 Erosion and Sediment Control Plan 4.1-4.7 Details 5.1-5.7 Project Directory Engineering: Wildlands Engineering, Inc License No. F-0831 312 W. Millbrook Rd, Suite 225 Raleigh, NC 27609 Angela Allen, PE, Project Manager Abigail Vieira, PE, Project Engineer 919-851-9986 Surveying: AECOM 4016 Salt Pointe Parkway North Charleston, SC 29405 Richard L. Wooten Jr., PLS 843-767-4602 Sank Sponsor: Wildlands Holding VI, LLC 1430 S. Mint St, Suite 104 Charlotte, NC 28203 704-332-7754 USACE Action ID No. 2016-02160 NCDEQ No: �- O 0 U O O U 40 U �0 z Z 0' 200' 400' 600' (HORIZONTAL) PARCEL 11 OWNED BY RACHELLEQUITASTINSON, HEIRS TMS O474-52-1580 DEED BOOK 5871 PG 0278 PLAT BOOK 0107 PG, 0122 PARCEL 10 OWNED BY LIEBURN RALPH & WIFE SHELBY F. STRICKLAND TMS O474-53-8246 DEED BOOK 5632 PG 0600 PLAT BOOK 0087 PG, 0021 PARCEL 9 OWNED BY BERTIE N. JESSUI TMS O474-34-6109 DEED BOOK 3740 PG, 0681 PLAT BOOK 0061 PG, 052/ PARCEL 14 — TMS O474-50-9537 SEE TABLE JOHN HALL RD. BEGIN T2 (RESTORATION) STA.300+00 PARCEL 12 J� OWNED BY LIEBURN RALPH & WIFE SHELBY F. STRICKLAND, LIFE ESTATE TMS O474-52-5114 PARCEL 13 DEED BOOK 5626 PG 0530 OWNED BY PLAT BOOK 0105 PG, 0107 LIEBURN RALPH & WIFE f I SHELBY F. STRICKLAND 6' TMS O474-51-8520 DEED BOOK 4679 PG 0891 BEGIN T1 PLAT BOOK 0066 PG, 0043 (RESTORATION) STA.200+00 T1 w� 5 1.4 — 1.6 13 _ 1.5 END T1 (RESTORATION) END CEDAR CREEK STA.200+86 REACH 1 (RESTORATION) BEGIN CEDAR CREEK REACH 2 (RESTORATION) STA. 125+65 I 'Y PARCELS OWNED BY STEVEN C. & WIFE GEORGIANN A. LAWRENCE / I TMS 474-31-9435 DEED BOOK 4470 PG 0590 \ PLAT BOOK 0066 PG 044 BEGIN CEDAR CREEK / REACH 1 (RESTORATION) J PARCEL 7 STA.100+00 OWNED BY STEVEN C. & WIFE GEORGIANN A. LAWRENCE I TMS 474-32-8389 DEED BOOK 5646 PG 0354 PLAT BOOK 0105 PG 174 I PARCEL 8 TMS O474-33-6022 SEE TABLE I PARCELS OWNED BY STEVEN C. & WIFE GEORGIANN A. LAWRENCE TMS 474-41-7142 DEED BOOK 4236 PG 0064 PLAT BOOK 0066 PG 044 I CATERWAUL DR. —PARCEL 15 TMS O474-50-9359 SEE TABLE PARCEL 16 TMS O474-50-9263 / / � 7SEE TABLE I I /___ PARCEL 17 TMS O473-59-8967 SEE TABLE I I PARCEL 18 TMSO473-59-5979 I SEE TABLE � I — m ENDT2 (RESTORATION) STA.313+82 PARCEL 1 OWNED BY cF RAMLONGHORN LLC \ TMS O474-40-7329 c DEED BOOK 10511 PAGE 0211 F \ DEED BOOK 10460 PAGE 727 DEED BOOK 7778 PG, 0161 cF PLAT 0107, PG 0139 1 � — PARCEL 19 TMS O473-59-3982 CRP TARI R PARCEL OWNERS TMS No PLATBOOK DEEDBOOK 1 RAMLONGHORN LLC 0474-40-7329 0107 PG 0139 7778 PG 0161 2 REAL, BESSIET 0473-38-2847 066 PG 0033 3410 PG 0105 3 DUDLEY, DANIELDUKE 0473-39-5393 0066 PG 0063 5739 PG 0479 4 DUDLEY, DANIELDUKE 0474-30-3330 0107 PG 0139 5858 PG 0103 5 LAWRENCE, STEVEN C & WIFE GEORGIANNA 0474-41-7142 0066 PG 0044 4236 PG 0064 6 LAWRENCE, STEVEN C & WIFE GEORGIANNA 0474-31-9435 0066 PG 0044 4470 PG 0590 7 LAWRENCE, STEVEN C & WIFE GEORGIANNA 0474-32-8389 0105 PG 0174 5646 PG 0354 8 WI LLIAMSON, AMMYA & WIFE, PATRICIA B &JAMES C BRISSON 0474-33-6022 0061 PG 0052 4747 PF 0771 9 JESSUP, BERTIE N 0474-346109 0061 PG 0052 3740 PG 0681 10 STRICKLAND, LIEBURN RALPH & WI FE SHELBYF 0474-53-8246 0087 PG 0021 5632 PG 0600 11 STINSON, RACHEL LEQUITA HEIRS O474-52-1580 0107 PG 0122 5871 PG 0278 12 STRICKLAND, LIEBURN RALPH & WI FE SHELBY F, U FE ESTATE 0474-52-5114 0105 PG 0107 5626 PG 0530 13 STRICKLAND, LIEBURN RALPH & WI FE SHELBYF 0474-51-8520 0066 PG 0043 4679 PG 0891 14 WOOLARD TROY & WI FE PAU LA P 0474-50-9537 0083 PG 0031 5138 PG 0119 15 WOOLARD TROY & WI FE PAU LA P 0474-50-9359 0083 PG 0031 6790 PG 0715 16 HORNE, ROBERT LEE, JR & WIFE CAROL B 0474-50-9263 0083 PG 0031 4491 PG 0607 17 HORNE, STEPHEN RICHARD 0473-59-8967 0083 PG 0031 5627 PG 0700 18 HORNBURGER, MI MA JANE M & LONN I E ROY MELVIN, etal 0473-59-5979 0100 PG 0037 0475 PG 0197 19 COUNCIL, BRENDA REGINA 0473-59-3982 NONE LISTED 778 PG 0586 20 DUDLEYAMYG 0473-49-3080 0107 PG 0046 5169 PG 0818 21 GRIMES, AMY B 0743-48-2954 0107 PG 0046 7348 PG 0828 22 V I N SON, CATHY TATUM 0473-38-6323 1 1,17R? PG 0241 cF PARCEL20 TMS O473-49-3080 ^ SEE TABLE 19 CE - CE - CE - CE - CE / —PARCEL 21 TMS O473-48-2954 SEE TABLE 1.12 i END CEDAR CREEK PARCEL 22 REACH 2 (RESTORATION) OWNED BY BEGIN CEDAR CREEK I REACH 3 (RESTORATION) CATHY TATUM VINSON STA. 143+13 TMS O473-38-6323 DEED BOOK 4782 PG 0241 END CEDAR CREEK PLAT BOOK NOT FOUND REACH 3 (RESTORATION) \ STA.150+89 _ PARCEL 2 �/ OWNED BY BESSIE T. BEAL PARCEL 4 TMS O473-38-2847 DEED BOOK 3410, PAGE 0105 OWNED BY PLAT BOOK DANIEL DUKE DUDLEY I TMS O474-30-3330 DEED BOOK 5858 PG 0103 I PLAT BOOK 0107 PG 0139 PARCEL 3 TMS O474-03-4059 SEE TABLE b U� O U IN U General Notes for All Construction Reaches 3. Contact Division of Energy, Mineral and Land Resources (919-791-4200) before any work begins on the project and 10. Install in -stream structures (riffles, angled IogsiII, Iogvane, Iunker log, and boulder sill) and in -bank bioengineering notify them of the start date. such as brush toe and sod mats after channel grading is completed according to details and specifications. 4.Mobilize equipment and materials to the Site. 11. Seed (with specified temporary seed and permanent seed mix) and straw mulch areas where the coir fiber matting is 1. All erosion and sediment control practices shall comply with the North Carolina Erosion and Sediment Control Planning 5.Identify and establish construction entrance, staging and stockpile areas, access routes, silt fence, tree protection to be installed. and Design Manual. fencing, safety fencing, and temporary stream crossings as indicated on the Plans for work areas. 12. Install coir fiber matting according to plans and specifications. 2.Contractor will install pump -around systems to divert flow while working in live, flowing channels. The Contractor shall 6. All access routes shall be monitored for sediment loss daily. In the event of sediment loss, silt fence or other acceptable 13. Sod mats may be used in lieu of coir fiber matting, where available, to stabilize all stream banks as the preferential operate and maintain the pump -around system 24 hours a day until all disturbed areas are stabilized. The disturbed P P P Y Y sediment and erosion control practices shall be installed. Silt fence outlets shall be located at points of low elevation or stabilization method. Coir fiber matting may be used where sod mats are not available or if coir fiber matting is the area within the um around must be stabilized with temporary seeding, mulch and erosion control matting b the end pump P Y g� g Y a minimums spacing of 150 ft. P g referred at the discretion of the Engineer. P g of each workday. shall not remove pump -around systems and advance to the next work area until the Y P P Y current work area is completed and stabilized. 7. Set u temporary facilities, locate equipment within the staging area, and stockpile materials needed for the initial P P rYg g P 14. Backfill abandoned channel sections with stockpiled soil according to the grades shown on the Plans. Non-native and P g 3.No material from the off-line proposed stream channel excavation may be backfilled into the adjacent existing stream stages of construction within the stockpile area(s). invasive vegetation (e.g. Chinese privet and multiflora rose) shall be removed from the existing channel prior to channel until the newly constructed proposed stream section is completed, stabilized, and the stream flow has been 8.Install and maintain an onsite rain gauge and logbook to record the rainfall amounts and dates. Maintain an approved backfilling. diverted into it, not even if that section of old/ existing stream is being pumped. copy of the E&SC plan with placard and approval letter and a copy of the NPDES permit with a minimum of 30 days of 15. Prepare floodplain for seeding by applying stockpiled topsoil to the floodplain between bankfull elevation and the 4.In areas without a pump -around system, Contractor shall disturb only as much channel bank as can be stabilized with P P Y Y self inspection reports on site until project closure by NCDEQ. Complete the self inspection as required by NCDEQ grading limits, ripping, and raking/smoothing. Seed with specified temporary and permanent seed mix and mulch. Any temporary seeding, mulch, and a sod mat or erosion control matting by the end of each workday. permit. Rainfall records, completed self -inspection forms, and permits should be maintained on site. areas within the conservation easement that have not been graded shall be treated according to the planting plan. S.Clearing and grubbing activities shall not extend more than 150 linear feet ahead of in -stream work. 9.Monitor site for sediment loss and inspect all erosion control features after each rain event. Maintain erosion control 16. If at any time circumstances should arise where water has been turned into the new channel and additional work must features according to the North Carolina Erosion and Sediment Control Manual. be done on the floodplain, erosion control devices will be installed to protect the new channel from sedimentation. 6. When crossing an active section of new or old stream channel, a Timber Mat shall be installed according to the details 17. Once all phases of channel and floodplain construction are complete, prepare the floodplain areas for planting per the and specifications. Construction Sequence specifications. 7. All graded areas with slopes steeper than 3:1 will be stabilized within seven (7) working days. 18. Install live stakes and herbaceous plugs along the stream banks according to the plans and specifications. 8.Permanent groundcover will be installed for all disturbed areas within 15 working day or 90 calendar days (whichever is 19. When the project is complete, the permittee shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the shorter) following completion of construction. 1. Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before land permittee of the project close out, via inspection report, the permittee shall visit deq.nc.gov/NCg01 to submit an 9.1-ocations for staging and stockpile areas and temporary stream crossings have been provided on the Plans. Additional disturbing activities occur. The COC can be obtained by filling out the Electronic Notice of Intent (e-NOI) form at electronic notice of Termination (e-NOT). A $100 annual general permit fee will be charged until the e-NOT has been or alternative staging and/or stockpile areas and stream crossings may be used by the Contractor provided that all deq.nc.gov/NCG01. Please note, the e-NOI form may only be filled out once the plans have been approved. A copy of filled out. practices comply with the North Carolina Erosion and Sediment Control Planning and Design Manual and that the areas the E&SC permit, the COC and a hard copy of the plans must be kept on site, preferably in a permit box, and accessible are approved by the Engineer prior to implementation. Short-term stockpile areas are those that will remain in place for during inspection. a short period of time so that the disturbed area can be stabilized within the timeframes in item #7 of the General 2. This project may be constructed in phases according to construction entrances. The Contractor shall not start Construction Demobilization Construction Notes. Additional stockpile areas and other short-term stockpiles, staging areas, and stream crossings not construction on one phase and move to another phase before stabilizing the first, unless a crew is continuing work on shown on the plans will require approval of the Division of Energy, Mineral, and Land Resources. the initial phase. 1. Remove temporary stream crossings. 10. Vegetation on -site to be used as transplant material (juncus, small trees, and sod mats) shall not be disturbed until 3. The are two construction entrances. One construction entrance is located off Stedman Cedar Creek Rd., and the other 2. The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of equipment Contractor is prepared to install transplants. construction entrance is located off Culbreth Rd. from the site. 11. Various types of constructed riffles are specified on the plans. Contractor shall build the specific types of constructed 4.Perform any necessary clearing and grubbing in phases as work progresses. Bank vegetation and vegetation 3.Complete the removal of any additional stockpiled material from the site. riffles at locations shown on the Plans. Changes in constructed riffle type must be approved by the Engineer. immediately adjacent to live channels shall be left undisturbed as long as possible. Remove all non-native and invasive 4.R1p soils along access routes and staging areas where soils have been compacted to a depth of 4 inches using a subsoiler 12. Existing fence located inside the conservation easement shall be removed during construction. vegetation prior to beginning the channel construction. Take care with vegetation marked for transplant from the old or ripping shanks. 13. Contractor is to make ever effort to avoid damaging or removing existing trees. Y g g g g channel to new channel. Do not disturb transplant vegetation until time of transplant. S.Demobilize grading equipment from the site. 14. Under no circumstances will the Contractor exceed the limits of disturbance and/or o outside of temporary g P Y 5.Construction of all channels are to be done in the dry. Construction should generally progress from upstream to downstream to prevent sediment runoff from upstream construction affecting completed downstream reaches. Use a 6. All rock and other stockpiled materials must be removed from the limits of disturbance and conservation easement. All construction access areas shown on the plans. pump around as shown on the plans and discussed in the General Notes. areas outside the conservation easement shall be returned to pre -project conditions or better. 6. Where feasible, more than one offline section may be constructed concurrently. Offline sections shall be tied online 7. Seed, mulch, and stabilize staging areas, stockpile areas, access routes, and construction entrances. Pasture seed mix is Initial Site Preparation sequentially from downstream to upstream. to be applied to areas of disturbance outside of the conservation easement. 7. As work progresses, remove and stockpile the top three inches of soil from the active grading area. Stockpiled topsoil 8. Remove all temporary erosion control measures once permanent stabilization has been achieved. shall be kept separate for onsite replacement prior to floodplain seeding. 1. Call NC DEC. LOS at the Fayetteville Regional Office at 919-433-4300 to schedule a pre -construction meeting at least 48 8.Construct the proposed stream channel to the grade specified in the cross -sections and profile. Transfer coarse material hours prior to project activation. from abandoned channel riffles to new channel riffles utilizing a pump -around when doing so. 2.Contact North Carolina "One Call" Center (1.800.632.4949) before any excavation. 9.Grade the adjacent floodplain area according to grades shown on the plan. Existing Features Proposed Features Erosion Control Features - - EXISTING PROPERTY BOUNDARY CE CE PROPOSED CONSERVATION EASEMENT PROPOSED LOG VANE 10+0 SEE DETAIL 4, SHEET 5.2 R/w EXISTING NCDOT RIGHT-OF-WAY PROPOSED STREAM ALIGNMENT PROPOSED BRUSH TOE -----540- - - - - EXISTING 5- MAJOR CONTOUR -• • • • ..... ..... - PROPOSED BANKFULL SEE DETAIL 1, SHEET 5.3 PROPOSED ROCK FLOODPLAIN OUTLET EXISTING V MINOR CONTOUR s4o PROPOSED 5- MAJOR CONTOUR SEE DETAIL 2, SHEET 5.7 - - - - - EXISTING THALWEG PROPOSED V MINOR CONTOUR D / /-/ /-/ jJ PROPOSED PERMANENT ACCESS PATH TOB EXISTING TOP OF BANK PROPOSED NATIVE MATERIAL RIFFLE CR-NM SEE DETAIL 1, SHEET 5.1 PROPOSED EMBANKMENT STABILIZATION EXISTING EDGE OF PAVEMENT SEE DETAIL 1, SHEET 5.7 PROPOSED ANGLED LOG RIFFLE x EXISTING FENCE CR-ALR O SEE DETAIL 3, SHEET 5.1 E E EXISTING STORMWATER EASEMENT PROPOSED WOODY RIFFLE cR-wD SEE DETAIL 2, SHEET 5.1 OHE OHE EXISTING UTILITY PROPOSED CHUNKY RIFFLE EXISTING TREE LINE CR-CH O SEE DETAIL 4, SHEET 5.1 PROPOSED LUNKER 5. EXISTING TREE SEE DETAIL 2, SHEET 5.3 �����IJJJ•••___JJJ \ PROPOSED LOG 1-SILL WITH LUNKER EXISTING STORMWATER PIPE / STRUCTURE SEE DETAIL 3, SHEET 5.3 EXISTING WETLAND PROPOSED ANGLED LOG SILL SEE DETAIL 1, SHEET 5.2 00000000 EXISTING RIPRAP OUTLET PROTECTION PROPOSED BOULDER SILL 0 0 0 o SEE DETAIL 2, SHEET 5.2 PROPOSED LOG SILL WITH ROOT WAD \ SEE DETAIL 3, SHEET 5.2 PROPOSED CONSTRUCTION ENTRANCE SEE DETAIL 1, SHEET 5.6 PROPOSED PUMP AROUND SEE DETAIL 2, SHEET 5.6 [X] (xj PROPOSED SILT FENCE SEE DETAIL 1, SHEET 5.5 Q z� �o �w z ° s� Q H W � U PROPOSED SILT FENCE GRAVEL OUTLET SEE DETAIL 2, SHEET 5.5 J PROPOSED TEMPORARY STREAM CROSSING WITH SILT FENCE -TIMBER MAT SEE DETAIL 4 SHEET 5.5 PROPOSED ACCESS PATH PROPOSED STOCKPILE/STAGING AREA -LOD-LOD- PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCING - -SAF SAF SEE DETAIL 3, SHEET 5.5 c I1 J Li Li Li Li PROPOSED TEMPORARY ROCK SEDIMENT DAM 1 ❑ ❑ ❑ ❑ SEE DETAIL 4, SHEET 5.6 R ¢ z N \ \ \ \ \ PROPOSED TEMPORARY CHANNEL DIVERSION \ \ \ \ SEE DETAIL 4, SHEET 5.7 O O E � Z _ c 3 O u 110 105 100 95 m o 0 W Ol o o + + W o o 0 + m o W o o ti W m + o Ol io o N �n d Ol io o 0 + o 0 m o u u ii ii ii ii EXISTING GROUND N J N J ¢> — -- --- -- �� -- 0.1°°� BANKFULL ... ... ... ...... . _. PROPOSED .. _. I I I I I I PROPOSED GRADE �I 93 ; 108+20 108+50 109+00 BANKFULL WIDTH = 18.2' TOP OF BANK 5.5' 7.2. 5.5' ...._...._...._.... ...._.. ._...._. PROPOSED 2g.1 Dmax=2.2' BANKFULL PROPOSED 25.1 GRADE 9.1, CEDAR CREEK - REACH 1 TYPICAL SECTION: RIFFLE STA: 100+00 TO 125+65 SCALE: 1" = 4' f 109+50 110+00 110+50 111+00 111+50 BANKFULL WIDTH = 25.1' TOP OF BANK 10.8' 7.1' 7.2' PROPOSED Dmax= 3.6' BANKFULL PROPOSED 3•Z 2'1 GRADE 10.75' CEDAR CREEK- REACH 1 TYPICAL SECTION: SHALLOW POOL STA: 100+00 TO 125+65 SCALE: 1" = 4' 110 0' 2' 4' 6' (VERTICAL) (� Q � 0' 20' 40' 60' z� �o (HORIZONTAL) U Qoz� z u Pv 105 w m 100 95 93 112+00 112+30 TOP OF BANK BANKFULL WIDTH = 25.1' 2 1' ..._ 20.7:_ 2.3 ... _...._...._. ..._...._...._...._.. PROPOSED q.5:1 D ax- 4 / 0 GRADE CEDAR CREEK- REACH 1 TYPICAL SECTION: POOL WITH STRUCTURE STA: 100+00 TO 125+65 SCALE: 1" = 4' CEDAR CREEK -- - ---- lOq I \ m------'�,-- 111+00 Lo EXISTING FENCE TO BE l�,illj '•` /� REMOVED WITHIN _ CONSERVATION EASEMENT Il;}i '\• _____------ ' � ' � ,y'y -�' � � �lol ill 11 ` • �. .•' • • -- ' Ill ` _` _ i K ..... ..... Op 103 ill \ •/ ` I _ FILL EXISTING I;li I i' ' • .... •• CHANNEL (TYP)i lill 103v—• •" ' REMOVE EXISTING 12" RCP INV EL U/S: 101.87' ' II �y I i' i — — 103 — INV EL D/S: 101.83' a �, ______---- --- 3.35' NOTE: GRADING EXTENTS OF FLOODPLAIN ARE SHOWN ON ADDITIONAL GRADING SHEETS 2.1-2.5 o U ct bA � PROPOSED O BANKFULLo Z U 105 100 95 90 o m + ti a m i6 o _ti a EXISTING GROUND m m m O1 m °1 ... -.... ..... ..... ..... -.... - ... .... .... .. -.. -. -. . -. - .. -. - -0.2% - ..... - ..... - I PROPOSED BANKFULL -0.3 -0.5% � I I FT PROPOSED GRADE � I - ti Q ti Q m > �� ti ,n w ti a io m m m > 105 0' 2' 4' 6' (VERTICAL) (� Q � 0' 20' 40' 60' z� �o (HORIZONTAL) U oz� Q Z s l7 ao a v 100 m 2 90 88 88 132+80 133+00 133+50 134+00 134+50 135+00 135+50 136+00 136+50 136+90 BANKFULL WIDTH = 25' BANKFULL WIDTH = 33' BANKFULL WIDTH = 33' TOP OF BANK 6' 13' 6' TOP OF BANK 10.5' 15.5' 7' TOP OF BANK 20.25' 10.5' 2.25' -Z...-....-....-....-....-....-....-. ....-.... - .... -.-....-.... �.- .... ..... .. . 2' Dmax=2' PROPOSED ti 3' BANKFULL 3.5' Dmax=3.5' PROPOSED PROPOSED PROPOSED 3;Z 2:1 BANKFULL PROPOSED q.5: Dmax=4.5' o GRADE 12.5' GRADE 1 GRADE I� 14.75' CEDAR CREEK - REACH 2 CEDAR CREEK - REACH 2 CEDAR CREEK - REACH 2 I� 7.5' TYPICAL SECTION: RIFFLE TYPICAL SECTION: SHALLOW POOL TYPICAL SECTION: POOL WITH STRUCTURE STA: 125+65 TO 143+14 STA: 125+65 TO 143+14 STA: 125+65 TO 143+14 SCALE: 1" = 4' SCALE: 1" = 4' SCALE: 1" = 4' { ,CEDAR CREEK : NOTE: GRADING EXTENTS OF / - ADDITIONAL GRADING SHEETS 2 1-2 5 FLOODPLAIN ARE SHOWN ON k 00 T / � `C � 11 I Iliii I� � • • � � � � oj� (�c pl ' CR�W D\j� \ �\< �9„ •� •Al'per '�` �9„ �o/,. • • \ \ '� f�1 \ �i 99 'di„ i� i �n 'dil, �n '9i^ • \• fan A'� ' , �, ---' CR-NM ' 133xoo �„ /•^'-\\ .'„-9s, \ �`` — ``�^ FILL EXISTING'' CR-WD CHANNEL (TYP) \ �---�F---� ��in_ —. / �n � -_" '__'_- __ __ =___ -- \ \ 9 `:;:. 'per '9i4; ' �" '•. -_ � � • , � _ -'''yam �n `_- __ � / � � � ' • •� .. —... f� g9 ---- �' � � � ' fin. ` `� �_�----- / /--/ � i� : '---------` ` __- 98 t� t� o U (t +j PROPOSED 0 BANKFULL o an 105 0 O Q 100 98 200+00 EXISTING GROUND PROPOSED BANKFULL i i I i .... _.N i o O O • .. _ II N II + O O O O w II Q W O Oo N ci + O W V~t W W II � II II O o N W Q J II \\ N F- I \ I \ I \ -0.6% I -0 7% PROPOSED GRADE \ 0.3 % N N c-I O N O—O O O O r + W N W O N O ci N ci O O N Oi O O N Oi II II II W ¢ II W Q II W Q II W N W N W N W N W BANKFULL WIDTH =6.8' TOP OF BANK 2' 2.8' 2' PROPOSED Dmax=0.8' PROPOSED GRADE �'S.1 15' BANKFULL Ti TYPICAL SECTION: RIFFLE STA: 200+00 TO 200+86 SCALE: 1" = 2' i/ r i BEGIN T1 � (RESTORATION) � STA.200+00 200+50 BANKFULL WIDTH = 9.3' TOP OF BANK 3.9' 2.8' 2_6' ..... ..... ...._ ..._ ...._ ... PROPOSED PROPOSED 3, p;1 Dmax= 1.3' 1 BANKFULL GRADE 4' T1 TYPICAL SECTION: SHALLOW POOL REMOVE EXISTING FENCE WITHIN CONSERVATION EASEMENT "o STA: 200+00 TO 200+86 SCALE: 1" = 2' FILL EXISTING DITCH T1 0' 1' 2' 3' 105 (VERTI—) 0' 10' 20' 30' (HORIZONTA) z Y Z d Qz m T y VV 100 98 200+86 `V �r O BANKFULL WIDTH =9.3' 0.8 O r , U TOP OF BANK 7.65' .. ._...._...._...._...._...._. 0.85' PROPOSED a--r Dmax-1.7' BANKFULL PROPOSED 4.S:1 h O GRADE Z 1.25' � Ti TYPICAL SECTION: POOL WITH STRUCTURE O r, STA: 200+00 TO 200+86 SCALE: 1" = 2' U / NOTE: GRADING EXTENTS OF �^ FLOODPLAIN ARE SHOWN ON 2 ADDITIONAL GRADING SHEETS 2.1-2.5 CR-WD j '. _ ____________ ----------------- i' i' �SIIB TOB '--- __ - - - -_==--- --- i — — — — _ - --- --- -_--__- - - i --- - -- ----- '- �•- x x I x x x x FILL EXISTING X - CHANNEL (TYP) �. END T1 (RESTORATION) STA. 200+86 N 0' 2' 4' 6' 110 110 (VERTICAL) 0' 20' 40' 60' EXISTING GROUND (HORIZONTAL) O p + m N N m O m O m O o 0 O 0 O O o m o o 0 0 N 0 0 N 0 + N m N m o� + Oo o 0 .ti o o .ti + M o m 0 m O N O. -- -- — N o + `Ii' a ¢ w �� w �� w "' Il a "' a t o m u — — -o m u — m o o a 0 o + 0 0 J ¢ __ ¢ w — w -- -- v~i ¢ w w Q N �_ N J Q w 105 w w N w105 -0.2% I .. _.... i .. .... .... .... _... _.... _.. . _.... _. .. _.... _ ... .... .... .... _.. . _. .. _. . _ . .... _ . . _ . ... . _ . .. . .. _.. ..... PROPOSED BANKFULL -0.5% -0.7 % 0.5% -0.6% -os % PROPOSED GRADE 100 100 io o ti o m o m + m + w + o o `-' a + o—o 0 0 a o 0 `-' io o� a + N o� io + o� N o m + a + a io m m a m o o 0 o o m m 0 0 0 o N o 0 N o 0 0 +� +� ¢ w ¢ w ¢ w ¢ w ~ J N w ~ J N w `^ 95 `^ 95 94 94 300+00 300+50 301+00 301+50 BANKFULL WIDTH = 14' TOP OF BANK 4.5' S' 4.5' PROPOSED Dmax = 1.8' PROPOSED GRADE �'S:1 2`''1 BANKFULL 7' T2 TYPICAL SECTION: RIFFLE STA: 300+00 TO 313+82 SCALE: 1" = 3' ------------------ ------- EXISTING PIPE INV. U/S: 102.96' ; INV. D/S: 101.29' -- -- ------ ---------- - ------ - 108 \. ----------- _ BEGIN T2 --- (RESTORATION) •---____ STA.300+00 n4� 303+50 304+00 304+50 304+70 BANKFULL WIDTH = 19.2' 1 7' TOP OF BANK 15.75' 1.75' ...._.... _.... _.... _.... _.... _.... _.... _...._...._ 'OSED PROPOSED 1 KFULL GRADE 4S.1 Dmax=' 3.5o T2 T2 2.6' TYPICAL SECTION: SHALLOW POOL TYPICAL SECTION: POOL WITH STRUCTURE STA: 300+00 TO 313+82 STA: 300+00 TO 313+82 SCALE: 1" = 3' SCALE: 1" = 3' -------------------- STA 304,� 1o6 _ 105 _-- _ TZ 1pR CR-WD ..... ..... L - . '.: _ ________ \ • �• . i Off` ? 6 -' �` 302+00 302+50 303+00 BANKFULL WIDTH = 19.2' TOP OF BANK 8.7' 4.7' 5.8' — ...._...._...._...._.... ...._.�..._... _...._...._.. PROPOSED GRADE Dmax= 2.9' 3:1 ti1 8.15' w =�0,(, FILL EXISTING CHANNEL (TYP) a NOTE: GRADING EXTENTS OF FLOODPLAIN ARE SHOWN ON ADDITIONAL GRADING SHEETS 2.1-2.5 w ">o 'o �o U N 110 105 100 95 94 304+70 305+00 305+50 306+00 BANKFULL WIDTH = 14' TOP OF BANK 4.5' S' 4.5' PROPOSED Dmax = 1.8' PROPOSED GRADE �'S:1 2`''1 BANKFULL 7' T2 TYPICAL SECTION: RIFFLE STA: 300+00 TO 313+82 SCALE: 1" = 3' 0 m m o m o .-I II n o II + o ^ O Om `-' + W `-' o O 0 _ m II 0 m 0 .-I m + O N w W W EXISTING GROUND r JI_ - -- 1 _... _ -- — -- --- _.... _ ... I � 0.5% PROPOSED BANKFULL -0.5% 0.4% I / PROPOSED GRADE D O N O m O + m Ol m Ol vt N N W O O M II 0 m II II II a W II a II W O J w O> Q Q N in Q w ¢ w ¢ w ¢ 306+50 307+00 307+50 308+00 BANKFULL WIDTH = 19.2' TOP OF BANK 8.7' 4.7. S.8' ...._.... _.... _...._.... ...._...._... _...._...._.... PROPOSED f PROPOSED GRADE 31 Dmax= 2.9' 2N BANKFULL 8.15' T2 TYPICAL SECTION: SHALLOW POOL STA: 300+00 TO 313+82 SCALE: 1" = 3' \, Ids ------------- 305+00 -- 105_ �. 74jr ` 'fin' 7$r ' — ----- - ------ ••\ •\ $r CR-WD 79n' 'An' ==__= fl_O------------------ _- _- - - % ___ __ \ �m _ -__ ^x m \ 7m,- m � 'm- am TOP OF 110 0' 2' 4' 6' (VERTICAL) (� Q � 0' 20' 40' 60' z� �o (HORIZONTAL) U Qoz� z 0 ao rn v �z 3��a HW m 105 N 0 100 95 94 308+50 309+00 309+30 BANKFULL WIDTH = 19.2' 1 7' ... 15.75' . ...— 1.1.75- ...._...._...._. ... _.... _.... _.... _. PROPOSED 1 GRADE Dmax = 3.5' Z T2 If 2.6' TYPICAL SECTION: POOL WITH STRUCTURE STA: 300+00 TO 313+82 SCALE: 1" = 3' a /1 --tip5� 7� ,� � - - - - - - - ---_ NOTE: GRADING EXTENTS OF FLOODPLAIN ARE SHOWN ON $r ; - 17#1 ADDITIONAL GRADING SHEETS 2.1-2.5 74, 308+00 77p' 71)7c t `'o 11fr ' -14rt- gym- �• \ �p �1 An � 103 ` ..... y. ti+0p ----..-------------``` 1p,.•' --------------------- --------------------100-------- - 100- _ ------------- ----------get-----------gOI----------=zrri�====_. 71)71 'm* FILL EXISTING CHANNEL (TYP)-------- 74, 747r 19, —---.----- 79ir 7$r x m m u1 U� ------------- ------- __V, '71, / \ U N 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' (HORIZONTAL) + o m o 105 -¢ w o u u o o 105 u u in w ii ^� ° ii � EXISTING GROUND < w w w v~i w m ii -- r \YI-0.2% N� - - \ \ _.. _. _. 0.5% - .— -0.7% PROPOSED BANKFULL V "- 1.5 100 1.0 % 100 PROPOSED GRADE o io o m W D1 n W D1 + m a m m ± m a m o I� vl m vl ti 95 m m + cd + cd 11 w 95 N w N N N w w ii w ii w w ¢ ~ w ¢ ~ w 93 93 309+30 309+50 310+00 310+50 BANKFULL WIDTH = 14' TOP OF BANK 4.5' S' 4.5' PROPOSED Dmax = 1.8' PROPOSED BANKFULL GRADE1 7' T2 TYPICAL SECTION: RIFFLE STA: 300+00 TO 313+82 SCALE: 1" = 3' 7TI '— ---------- 7VI ; 7r 7r - 7r 7r - IN 7TF X, c+ �'it JN�t • ` .103 -103 ------------------- 09+00 . . . . . . . . . . ----------------- - >.;. ----------------- --=--1oo---F-- zo3 ; -- ---__ -__ _-=_ `I�3_ 901 ---- - ' - 311+00 311+50 312+00 312+50 313+00 313+50 313+90 y R� ' O BANKFULL WIDTH = 19.2' BANKFULL WIDTH - 19.2'�y 1.T U TOP OF BANK 8.7' 4.7' 5.8' TOP OF BANK 15.75' 1.75' ' ...._...._...._...._.... PROPOSED ...._...._... _...._...._.... f PROPOSED ...._...._...._...._...._...._...._...._...._...._ PROPOSED R� � PROPOSED GRADE Dmax- 2.9' 3:1 BANKFULL GRADE BANKFULL ti Dmax=3.5 ti1 4.S:1 0 8.15' T2 T2 2.6' TYPICAL SECTION: SHALLOW POOL TYPICAL SECTION: POOL WITH STRUCTURE O STA: 300+00 TO 313+82 STA: 300+00 TO 313+82 SCALE: 1" = 3' SCALE: 1" = 3' U --- m 7W 7r 7V ° 7T, ---' 7, 7r 7r 7r 7W 7V�n7r 7r7W 7' `--- 7r NOTE: GRADING EXTENTS OF —� -103' 7r 7r 7r 7r FLOODIPLAIN ARE SHOWN ON ; .yo3 ', 7,7W ADDITIONAL GRADING 2.1-2.5 74' 7r7r7r 7W 7r 7r — — 7r 7W 7V T2 7V 7r 7r 7r 7r 7V 7r 7V 7V 7V 7WU 7W 7W 7r m 7r 7W 7r �" m 7V 7r 7W 7W 7V �------- 7V ----- I 7r EXISTING WELL TO 7r "'N'_-___7� 7,n BE ABANDONED 7Y104-77V 7V -7V7M, „ m 7r 7*r 7mr 7Tr 7" ° Ty, 7JJK --- 1oz 7,, " 7,�';'; ' " 7 7,F g, I. R ` ..-........� 7F ' CR N Y' ` -----------------/ ; �•. ,�y'L -�.801 CR-NMI' 7mc i - - - --- --------- - ---- - - - FOB---------- ----------------------' •. - --- ------------ -- -- --------- - -- _ — 1 O — ------- I _ —- — c _ -- ------------------------------------ ----- -- 00 »f31 ---------------- _ _ ')IR 7� 'm` 7VEND T2 ' 7r 7r c �` 7r 7r 7F, 7F, 7r 7r�\ 7�ri �')IR 7 (RESTORATION) 7F 77 FILL EXISTING :'; `•'i STA.313+82 7r 7r CHANNEL (TYP) 7m` 7W ,r a 7mr 7r 7mr� ` v 7F 7F m ')Ac 7mr 7*1 7mr i O 9 c O u N r 4 0' 150' 300' 450' Zone 1 -Stream bank Planting Zone -Cedar Creek & T2 (See Detail 2, Sheet 6.4) Zone 2 - Streambank Planting Zone - T1 (See Detail 2, Sheet 6.4) Zone 3 - Floodplain and Wetland Planting Zone (See Detail 1, Sheet 6.4) U I I I I I I / eatures NOTE: PROPOSED CONSTRUCTION ACCESS PATHS ARE POTENTIAL ROUTES AND WILL NOT BE x CONSTRUCTED IF NOT NEEDED. Q PROPOSED CONSTRUCTION ENTRANCE SEE DETAIL 1, SHEET 5.6 �' �z Yz�v / PROPOSED PUMP AROUND z VVV"' SEE DETAIL 2, SHEET 5.6 z H a PROPOSED SILT FENCE H W � (X) SEE DETAIL 1, SHEET 5.5 PROPOSED SILT FENCE GRAVEL OUTLET SEE DETAIL 2, SHEET 5.5 L PROPOSED TEMPORARY STREAM CROSSING WITH SILT FENCE -TIMBER MAT SEE DETAIL 4 SHEET 5.5 PROPOSED ACCESS PATH �1_LLL/J PROPOSED STOCKPILE/STAGING AREA —LOD— PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCING SAF SEE DETAIL 3, SHEET 5.5 ❑ 0 ❑ PROPOSED TEMPORARY ROCK SEDIMENT DAM ❑ ❑ ❑ SEE DETAIL 4, SHEET 5.6 SEE GENERAL NOTES AND SYMBOLS (SHEET 0.3) FOR OTHER SYMBOLS NOT IN THIS LEGEND and Stabilization Requirements per NCGO1 Stabilization Time Stabilization Time Frame Exceptions Frame gales, ,es 7 days None =_r 7 days None n 3:1 7 days If slopes are 10:1 or less in length and are not steeper to 2:1, 14 days are allowed 1 3:1 14 days 7 days for slopes > than 50' in length th 14 days None (except for perimeters and HOW) ime may be approved by the permitting authority based on ite-specific conditions that make compliance practicable. Erosion Control Measures shall be inspected once per 7 calendar days and within 24 hours of a rainfall event greater than >_ 1.0" per 24 hour period. Corrective actions shall be performed as soon as possible before the next storm event. Records must be kept on -site and available for review during construction and must be maintained for 3 years and available upon request. A rain gauge must be installed at the site. LOD = 51.11 ACRES U O s~ 0 U vv E v7� oLA PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event> 1.0 inch in properly, 24 hours S. Description of maintenance needs forthe measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 Inch in sheen, floating or suspended solids or discoloration, 24 hours S. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the se limentthat has left hours of a rain the site limits, event, 1.0 inch in 2. Description, evidence, and date ofcorrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per Ifthe stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records ofthe required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment . Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the INC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and . Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated . Within 24 hours, an oral or electronic notification. bypasses [40 CFR . Within 7 calendar days, a report that includes an evaluation of the 122.41(1 quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/191 U N d� GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Im lementin the details and specifications on this Ian sheet will result in the construction p g p p activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A a0 a"do a 0o A I I xa c ocua (�eacx�¢ x.) SECnOry n- uix ix xE� 1E 1,n ,xE 1-1xE�"" n. PLnry Ems. x�x� .m sa„rE xon®"Eu� BELOW GRADEWASHHOOUT STRUCTURE ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER x.cs aw., 0 0 0 usk� x a o ®" 0 0 GO sEcnory a-e Trall PLpry ixwEs ar nemoum. cE. ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 IN U TOP OF BANK (TYP) z HEAD OF RIFFLE TAIL OF RIFFLE RIFF E POOL SEE NOTE 3 FOR DEPTH OF RIFFLE MATERIAL Profile A -A' RIFFLE MATERIAL TABLE REACH BOTTOM WIDTH (FT) RIFFLE THICKNESS (IN) RIFFLE MATERIAL STONE SIZE (% OF MATRIX) CEDAR CREEK REACH 1 & REACH 2 7.2 24 CLASS A (70%), CLASS B (30%) CEDAR CREEK REACH 3 16.3 24 CLASS A (30%), CLASS B (50%), CLASS 1 (20%) T1 2.8 6 CLASS A (60%), #57 STONE (40%) T2 5.0 12 CLASS A (50%), CLASS B (30%), #57 STONE (20%) NOTES: 1. ALL RIFFLE MATERIAL SHALL BE COMPACTED IN LIFTS AT A THICKNESS NOT TO EXCEED DMAX. MICRO POOL HABITAT DOWNSTREAM TOLERANCE IN NOTE 2 NOTES: OF LARGER WOODY DEBRIS 3" TO 6" DIAMETER WOODY 1. WOOD SHALL COMPRISE 20% TO 50% OF THE DEBRIS WORKED INTO RIFFLE REMAINDER OF ROCK RIFFLE SURFACE AREA. SUBSTRATE TO RIFFLE ELEVATION 2. BRUSH SHOULD BE PLACED PERPENDICULAR TO Q y CHANNEL UP TO A 15° ANGLE DOWNSTREAM. Z 0 o m 3. ANY MATERIAL GREATER THAN 1" DIAMETER Z HEAD OF RIFFLE THAT IS NOT PERPENDICULAR TO THE CHANNEL TOP OF BANK (TYP) SHALL BE INSTALLED SUCH THAT THE EXPOSEDIL END IS POINTING DOWNSTREAM. GLIDE RIFFLE TAIL OF RIFFLE 4. WOODY MATERIAL SHOULD NOT PROTRUDE Z H a RUN GREATER THAN 3" ABOVE RIFFLE BED. 5. BRUSH CUTTERS OR OTHER DEVICE MUST BE m SEE NOTE FOR DEPTH OF RIFFLE MATERIAL USED TO ENSURE PROTRUSION LIMITED TO 5 MIN WOVEN FILTER FABRIC i A PP nF Wr)nn 6. SEE TABLES ON SHEET 5.1 FOR RIFFLE MATERIAL SEE PROFILE RECOMMENDED LOG MATERIAL TABLE - ALL LOG STRUCTURES SIZING. FOR LENGTH OF RIFFLE REACH MINIMUM REQUIRED LOG DIAMETER (IN) B Profile A -A' CEDAR CREEK 18 A A' T1 12 T2 12 3" TO 6" DIAMETER WOODY I� r^n SEE PROFILE aunt rcirrLt rcury DEBRIS VVORKEU iry O rcirrLt I SUBSTRATE, G IFFLE BOTTOM REMAINDER OF PREDOMINANTLY LOCALLY MINED PEA FLOW !-_4 THALWEG 0.1-0.2' DEEPER GRAVEL/COBBLE MIXTURE WIDTH PER ROCK TO RIFFLE THAN REST OF RIFFLE TO PERPENDICULAR TO FLOW BTHALWEG HEAD OF PICAL SECTIONS ELEVATION 3" TO 6" BRUSHY MATERIAL APROVIDE LOW FLOW PATHRIFFLE ELEVATION TOE OF SLOPE (TWORKED INTO ROCKY GLIDE RIFFLE RUN POINT PER PROFILE THALWEG TAIL OF RIFFLE ELEVATION THALWEG 0.1-0.2' DEEPER SUBSTRATE POINT PER PROFILE THAN REST OF RIFFLE TO PROVIDE LOW FLOW PATH TOP OF BANK TOP OF BANK (TYP) RIFFLE BOTTOM LOCALLY MINED PEA FLOW THALWEG 0.1-0.2' DEEPER B GRAVEL/COBBLE MIXTURE iT WIDTH PER TOP OF BANK (TYP) TYPICAL SECTIONS THAN REST OF RIFFLE TO LOG EXPOSED PROVIDE LOW FLOW PATH Plan View F 1" TO 3" i ,i i X P TR 0 ABOVE TOE OF SLOPE (TYP) ��• { RIFFLE MATERIAL TO EXTEND MAX 3" PROTRUSION FINISHED 3" UP TOE OF BANK AT TOE OF RIFFLE NOTES: ` F ANCHOR 5' ELEVATION g� TOP OF BANK (TYP) A DEPTH OF 4" SLOPE 1. RIFFLE MATERIAL MASHED INTO BANK AND Section B-B' INTO STREAM HEAD OF RIFFLE OVERLAPS MATTING. MICRO POOL H BANK ELEVATION POINT MICABITAT 2. SEE DETAIL 4, SHEET 5.1 FOR DEPTH OF RIFFLE Section B-B' PER PROFILE DOWNSTREAM OF LARGE O MATERIAL. WOODY DEBRIS, 3. THE MINIMUM INTERMEDIATE AXIS OF THE b U RIFFLE MATERIAL SHALL MEET THE DIMENSIONS �NatiVe Material Riffle CR-NM cR-wD 2 Wood Riffl e Plan View SPECIFIED IN THE TABLE ON SHEET 5.1. 5.1 Not to Scale 5.1 Not to Scale CR-ALR CR-CH O BURY INTO BANK 3' MIN. (TYP) A SEE PLAN/PROFILE FOR LENGTH O I -I o 55° TO 65° ,� U (TYP) THALWEG LOCALLY MINED PEA TOP OF BANK (TYP) B TOP OF BANK NORMAL WATER GRAVEL/COBBLE MIXTURE BANKFULL FLOW SURFACE 0.5' MAX. NOTES: 12" DIAMETER OR GREATER (TYP) 1. LARGER MATERIAL SHALL CONSIST OF CLASS 1 HEAD OF RIFFLE TAIL OF RIFFLE STONE OR SALVAGED ONSITE BOULDERS OF ELEVATION _ ELEVATION 0.3' MINIMUM SIZE 0.5'X1.0'X1.5'. PER PROFILE -t-9- - PER PROFILE Q 5' MIN. 2. THE MAXIMUM DIMENSION OF THE BOULDER WOVEN HERBACEOUS PLUG (TYP) FLOWU (TYP) FILTER FABRIC SHALL NOT EXCEED THREE TIMES THE MINIMUM - - - DIMENSION. A -- A' LOCALLY MINED PEA 3. THE LAYOUT OF THE BOULDERS IS SHOWN IN THE Profile View A -A' DETAIL. MAXIMUM 3" OF BOULDER SHALL BE TOE OF SLOPE (TYP) V GRAVEL/COBBLE MIXTURE PLACED ABOVE THE RIFFLE BED MATERIAL TO CREATE CONCENTRATED FLOW PATHS AND EXCAVATE SMALL POOLS MICRO -POOLS THROUGH THE RIFFLE TO MICRO -POOL 1/2 TO 2/3 0.3' IN DEPTH DOWNSTREAM ENHANCE INSTREAM HABITAT. FORMATION OF IMBEDDED LOGS / -' ONSITE SALVAGED STONE TOE OF BANKFULL 4. SEE SHEET 5.1 FOR RIFFLE STONE SIZING AND DOWNSTREAM OF g SLOPE TOP OF BANK THICKNESS. LARGER MATERIAL Plan View 5. COBBLE/GRAVEL CAN BE SALVAGED ON -SITE OR CONSIST OF ROUGH UNHEWN QUARRY STONE. mNk/ 2% - 4% 3 B THALWEG 0.1-0.2' DEEPER EXTEND RIFFLE MATERIAL TOE OF SLOPE (TYP) o THAN REST OF RIFFLE TO 0.3' UP BANK 3' MIN. 3' MIN. OR TO PROVIDE LOW FLOW PATH ONSITE SALVAGED SEE NOTE FOR SEE PLAN/PROFILE FOR RIFFLE (TYP) Log Section B-B' BANKFULL ELEVATION, - STONE LARGER MATERIAL ELEVATION WHICHEVER IS ` SIZE TOP OF BANK (TYP) GREATER. (TYP) HERBACEOUS PLUG (TYP)',\ FLOW + 3 A B' PLACE LOG AT END OF RIFFLE 3" MAX RIFFLE MATERIAL: PLACE LARGER MATERIAL o O TO N < z NOTES: WHERE THERE IS A DROP OVER MAINTAIN THALWEG MIN. 1' FROM N R, DOWNSTREAM POOL. TOE OF SLOPE WITHIN CENTRAL 2/3 OF 1. MINIMUM THREE LOGS PER STRUCTURE. Plan View Profile View A -A' CHANNEL Section B-B' • 2. JUNCUS PLUGS TO BE PLACED DOWNSTREAM OF EACH LOG ON LOW SIDE AT TOE OF SLOPE. 3. SEE TABLES ON SHEET 5.1 FOR MINIMUM LOG 3 Angled LO Riffle q Chunk Riffl e 1 - DIAMETER. 5.NottoScale 5.1 Not x 4. SEE TABLES ON SHEET 5.1 FOR RIFFLE MATERIAL SIZING. a u y 0 0` us z 10° - 15°ANGLE SILL ELEVATION PER PROFILE (TYP) I' FLOW POOL BACKFILL �` " OE EXTEND FILTER FABRIC TOP ENTIRE LENGTH OF LOG A' NOTES LOCALLY MINED PEA GRAVEL/COBBLE MIXTURE TO DEPTH OF FOOTER LOG EXCAVATE BANK AROUND POOL 25% OF BAN KFULL WIDTH AND INSTALL SOD MAT ON SLOPE STREAK A WOVEN FILTER FABRIC HERBACEOUS PLUG (TYP) OF SLOPE (TYP) RIFFLE BOTTOM WIDTH PER TYPICAL SECTIONS SILL ELEVATION `PER PROFILE FLOW / EXCAVATED SCOUR POOL EXTEND FILTER FABRIC 5' MIN. • UPSTREAM EXTEND FILTER FABRIC Profile A -A' 5' MIN. UPSTREAM SOD MAT 0.2' • HEADER LOG - SEE NOTE FOR LOG SIZE EMBED LOG SILL ELEVATION FOOTER LOG - SEE NOTE FOR LOG SIZE 5' (MIN.) PER PROFILE (TYP) Section A - A'- FACING DOWNSTREAM 1. SEE DETAIL 4, SHEET 5.1 FOR MINIMUM LOG DIAMETER. 2. ONE 24"-30" LOG MAY BE USED IN PLACE OF TWO 12" LOGS. 3. LOG IS TO BE AT GRADE IN CENTER OF CHANNEL. 4 JUNCUS PLUGS TO DOWNSTREAM OF BE DROP ABUTTING LLOGLOPE UP AND Angled Log Sill 5. TOP EDGE OF FILTER FABRIC SHALL BE FOLDED OVER AND / 5.2 , Not to Scale NAILED TO HEADER LOG. EXTEND FILTER FABRIC ENTIRE LENGTH OF LOG HERBACEOUS PLUGS IN AREAS WITH NO ROOT WAD (TYP) SILL ELEVATION PER PROFILE (TYP) FLOW LOCALLY MINED PEA GRAVEL/COBBLE MIXTURE SEE NOTE 1 FOR LOG SIZ LOCALLY MINED PEA GRAVEL/COBLE MIXTURE TOP OF BANK (TYP) PSTREAMBED p f TOE OF SLOPE (TYP) A' EXCAVATE BANK AROUND POOL 25% OF BANKFULL WIDTH AND INSTALL SOD MAT ROOT WAD Plan View 0 u NOTES: ❑' 1. SEE DETAIL 4, SHEET 5.1 FOR MINIMUM LOG DIAMETER. 2. ON STREAMS WITH BOTTOM WIDTH LESS THAN 5', BRUSH SHOULD BE USED IN PLACE OF ROOT WAD. BRUSH SHOULD BE EMBEDDED AT A MINIMUM OF 3' INTO BANK. 3. TOP EDGE OF FILTER FABRIC SHALL BE FOLDED OVER x AND NAILED TO HEADER LOG. SILL ELEVATION PER PROFILE FLOW POOL LENGTH PER PROFILE POOL DEPTH PER PROFILE WOVEN FILTER FABRIC EXTEND FILTER FABRIC 5' MIN. UPSTREAM RIFFLE BOTTOM WIDTH SOD MAT PER TYPICAL SECTIONS SILL ELEVATION PER PROFILE (TYP) SEE NOTE 1 FOR LOG SIZE EMBED LOG EMBED LOG 5' (MIN.) 5' (MIN.) n Log Sill With Root Wad 5.2 Not to Scale LOCALLY MINED COBBLE/GRAVEL MATERIAL SIMILAR IN SIZE TO ABC, CLASS A AND CLASS B MIX. FILTER FABRIC F B' HERBACEOUS PLUG SILL ELEVATIC PER PROFILE Y Z 2 O (Y) 1 `^ �OF LOG p\ O O EXTEND SALVAGED ONSITE ~ COBBLE/GRAVEL BED MATERIAL g B TOWARDS BANK PARALLEL WITH LOG ELEVATION ,Z A 1 I �mJ�O !B, DIMENSIONS (TYP) DIMENSIONS CEDAR CREEK T2 X (FT) 14.8 13.9 Y (FT) 3.6 3.3 H (FT) 0.6 0.5 B (DEGREE) 25 25 S (%) VARIES 3.0 - 5.0 MINIMUM REQUIRED LOG DIAMETER DIMENSIONS CEDAR CREEK T2 (INCHES) 18 12 SCOUR POOL HERBACEOUS PLUG TOP OF BANK SILL ELEVATION HEADER ROCK PER PROFILE FOOTER ROCK 2 MIN, _ IFFOOTERE } EMBED 5' INTO BANK (TYP) Section B-B' 2 Boulder Sill 5.2 J Not to Scale BURY LOG INTO STREAMBED BACKFILL (LOCALLY MINED PEA GRAVEL/COBBLE MIXTURE) STABILIZE VANE \ WITH ONE BOULDER ON EACH SIDE EXCAVATE POOL PER PROFILE MINIMUM BOULDER REACH DIAMETER (IN.) CEDAR CREEK 18 T1 9 T2 12 NOTES: b U 1. REFER TO TABLE FOR SILL MATERIAL SIZING. c 0 o^ -� U rl HEADERLOG FOOTER LOG WOVEN FILTER FABRIC EXTEND FILTER FABRIC U 5' MIN. UPSTREAM INVERT ELEVATION PER PROFILE TOP OF BANK FLOW *o/o TOE OF SLOPE SEE NOTE FOR HEADER LOG LOG SIZE FOOTER LOG c LogVane NOTES: 4 5.2 Not to Scale 1. SEE TABLE FOR SIZING. 2. ON SMALLER STREAMS THE STABILIZATION BOULDERS MAY BE REMOVED PER ENGINEER'S DISCRETION 'Ti N u J L ELEV. 0.3' ABOVE DOWNSTREAM RIFFLE INVERT ELEV.0.5' BELOW POOL DEPTH BACKFILL EROSION CONTROL MATTING TOP WITH SOD MAT IF AVAILABLE DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL ',- NATIVE SOIL Section A -A' NOTES: 1. OVEREXCAVATE 3' OUTSIDE OF TOP OF BANK (BANKFULL). 2. INSTALL A LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON -SITE. LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER. 3. BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS INSTALLED POINTING SLIGHTLY UPSTREAM. 4. LAY EROSION CONTROL MATTING OVER BRUSH/WOODY LAYER. 5. INSTALL EARTH BACKFILL OVER MATTING ACCORDING TO TYPICAL SECTION DIMENSIONS. 6. WRAP MATTING AROUND COMPACTED SOIL AND STABILIZE. 7. TRIM BRUSH SUCH THAT IT IS FLUSH WITH BANK. 8. TOP MATTING WITH SOD MAT IF SOD MAT AVAILABLE. TC Ll FL( (a:) Brush Toe 5.3 Not to Scale SOIL BACKFILL LOG SILL ANCHORE OPPOSITE LOG SILL INVERT ELEVATIOI PER PROFIL FLO' 21 c BACKFILL BEHIND LOGS Section B-B' WITH SALVAGED ONSITE COBBLE/GRAVEL MIN. 18" LOG DIAMETER - BED MATERIAL FOOTERLOG ti NOTES: 1. LUNKER STRUCTURE MADE FROM LOGS 2. SEE DETAIL 4, SHEET 5.1 FOR MINIMUM LOG DIAMETER. 3 Log J-Sill With Lunker Structure 3. FOOTER LOG NOT NEEDED IF LOG SILL IS 24" OR GREATER 5.3 Not to Scale 4. WHEREVER POSSIBLE, USE SOD MATS ABOVE STRUCTURE 5. IF SOD MAT UNAVAILABLE, USE SOIL LIFT WITH COIR FIBER MATTING Plan View TOP OF BANK (BANK OL MATTING 'ACKED WOODY DEBRIS MATERIAL TO BE LED FLUSH WITH BANK XCAVATE POOL 'ER PROFILE EMBED 5' INTO BANK COMPACT ANY BACKFILL IN OVER -EXCAVATED PORTION OF BANK COVERLOG FOOTER LOG BURIED 6" BELOW - MAX POOL DEPTH WOVEN FILTER FABRIC Plan View 2 Lunker Log 5.3 Not to Scale USE SOD MAT WHEREVER AVAILABLE TOP OF COVER LOG TO BE PLACED 0.3' ABOVE DOWNSTREAM RIFFLE TRANSPLANT/ BRUSH TOE C H A N N E L �O OS Q O f Q FLOW ice. ABBANDAND ONE ED i..�CHAN NEL EROSION CONTROL MAT COMPACTED SELECT MATERIAL SIDE SLOPE PER TYPICAL SECTION ... . . . . ... . . . . ... . . . . .. . . . Section A -A' 4 Channel Plug 5.3 Not to Scale Q zzo s 1 Qz 0 0 � v HW m 1�j CP NOTES: O 1. SEE DETAIL 4, SHEET 5.1 FOR MINIMUM LOG DIAMETER. O U 2. WHEREVER AVAILABLE, USE SOD MATS ABOVE LUNKER LOG. 3. IF SOD MAT UNAVAILABLE, USE A SOIL LIFT WITH COIR FIBER MATTING O �o �U NEL BACKFILL BUFFER WIDTH DIBBLE BAR VARIES BANKFULL ' PLANTING BAR SHALL HAVE BLADE WITH A TRIANGULAR CROSS-SECTION, AND SHALL BE 12 NOTES: w o 'z z INCHES LONG, 41NCHES WIDE AND RESTORED 11 NCH THICK AT CENTER. 1. ALL SOILS WITHIN THE BUFFER Q� -2.?o_ CHANNEL PLANTING AREA SHALL BE DISKED, AS w — _ REQUIRED, PRIOR TO PLANTING. 2. ALL PLANTS SHALL BE PROPERLY �^ HANDLED PRIOR TO INSTALLATION TO ROOTING PRUNING INSURE SURVIVAL. SPACING PER ALL ROOTS SHALL BE PRUNEDTO PLANTING PLAN AN APPORIATE LENGTH TO Section View PREVENT J-ROOTING. O INSERTTHE DIBBLE, OR REMOVE THE DIBBLE, OR INSERTTHE DIBBLE, OR SHOVEL, STRAIGHT DOWN SHOVEL, AND PUSH THE SHOVEL, SEVERAL I NCHES IN INTOTHE SOILTOTHEFULL SEEDLING ROOTS DEEP INTO FRONTOF THE SEEDLING DEPTH OF THE BLADE AND THE PLANTING HOLE. PULLTHE AND PUSH THE BLADE PULL BACK ON THE HANDLE SEEDLING BACK UP TO THE HALFWAY INTO THE SOIL. TO OP EN THE PLANTING CORRECT PLANTING DEPTH TWISTAND PUSH THE HOLE. (DO NOT ROCK THE (THE ROOTCOLLAR SHOULD BE HANDLE FORWARD TO SHOVEL BACK AND FORTH 1 TO 3 INCHES BELOWTHE SOIL CLOSE THE TOP OF THE SLIT AS THIS CAUSES SOIL IN THE SURFACE). GENTLY SHAKE THE TO HOLD THE SEEDLING IN PLANTING HOLE TO BE SEEDLING TO ALLOW THE PLACE. COMPACTED, I NHIBITING ROOTS TO STRAIGHTEN OUT. ROOTGROWTH. DO NOTTWIST OR SPIN THE SEEDLING OR LEAVE THE ROOTS J-ROOTED. For Stream Top Width > 8' TOP OF BANK X TOE OF SLOPES AV LINEAR SPACING vp 6' SPACING FOR LIVE STAKES HERBACEOUS PLUGS INSTALLED _ ACCORDING TO STRUCTURE DETAIL 3' SPACING FOR LIVE STAKES 3' SPACING FOR HERBACEOUS PLUGS Plan View EVERY OTHER LIVE STAKE AT HALF - RIFFLE DEPTH EROSION CONTROL MATTING (SEE DETAIL 3, SHEET4.6) TOE OF SLOP[ Section View - RIFFLE EROSION CONTROL MATTING (SEE DETAIL 3, SHEET4.6) JUNCUS PLUG ATNORMAL BASEFLOW TOE (TYP)� TOE OF SLOPE BASEFLOW W.S. EVERY OTHER LIVE STAKE AT TOP OF BANK LIVE STAKE AT TOP OF BANK PUSH THE DIBBLE, OR SHOVEL, DOWN TO THE FULL DEPTH OF THE BLADE. Bare Root Planting 5.4 Not to Scale PULL BACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLD. THEN PUSH FORWARD TO CLOSE THE TOP, ELIMINATING AIR POCKETS AROUNDTHE ROOT. For Stream Top Width < 8' TOE OF SLOPE Plan View TOP OF LINEAR SPACING 6' SPACING FOR LIVE STAKES HERBACEOUS PLUGS INSTALLED _ ACCORDING TO STRUCTURE DETAIL 3' SPACING FOR LIVE STAKES EROSION CONTROL MATTING (SEE DETAIL 3, SHEET4.6) TOE OF LIVE STAKE ATTOP OF BANK Section View - RIFFLE and POOL � Streambank Planting S A Not to Scale L REMOVE THE DIBBLE, OR SHOVEL, AND CLOSE AND FIRM UP THE OPENING WITH YOUR HEEL. BE CAREFULTOAVOID DAMAGING THE SEEDLING. BUDS (NODES) POINTED U UPWARD TO DIAMETER DIA I LIVE STAKE BASE CUT TAPERED ATBOTTOM AT 45' NOTE: 1. CONTRACTOR RESPONSIBLE TO FOLLOW PLAN VIEW DETAILS BY REACH SHOWN ABOVE. 2. REFER TO SPECIFICATIONS FOR PROPER STORAGE, HANDLING AND INSTALLATION. 3. FORM PILOT HOLE IN HARD SOIL OR STONY CONDITIONS TO PREVENT DAMAGE TO LIVE STAKES. 4. LIVE STAKES TO BE PLANTED IN AREAS AS SHOWN ON PLANS AND DIRECTED BY THE ENGINEER. 5. INSTALL DORMANT PRIORTO LEAF OUT. DEPICTED CONDITION WITH LEAVES NOT REPRESENTATIVE OF STAKES ATTIME OF INSTALLATION. 6. ALL HERBACEOUS PLUGS ARE TO BE INSTALLED IN LOCATIONS REFERENCED IN INDIVIDUAL IN -STREAM STRUCTURE DETAILS. T v Q NOTES: 1. USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING. 2. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRES AS DIRECTED BY THE ENGINEER. 3. FILTER FABRIC WILL BE BURIED A MINIMUM OF 8" IN THE GROUND WITH A 4" SKIRT. 4. PROVIDE 5' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. 5. INSPECT AFTER EACH RAIN EVENT AND MAINTAIN ACCORDING TO NCDEQ DESIGN MANUAL. A. SHOULD FABRIC COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IMMEDIATELY. B. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. C. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 6' MAX. FILTER FABRIC u u FILTER FABRIC COMPACTED FILL FLOW 8„ � I I III EXTEND FABRIC 4" rI�I��ST�EEEL POST INTO TRENCH �DEPTH 1 Temporary Silt Fence 5.5 Notto Scale EXISTING GROUND MATERIAL SPECIFICATIONS PHYSICAL PROPERTY TESTS REQUIREMENTS MATERIAL N/A POLYETHYLENE RECOM MEN DE D COLOR N/A "INTERNATIONAL ORANGE" TENSILE YIELD ASTM D638 AVE. 2000 LBS. PER 4' WIDE ULTIMATE TENSILE STRENGTH ASTM D638 AVE. 2900 LBS. PER 4' WIDE ELONGATION AT BREAK 1%) ASTM D638 GREATER THAN 1000% CHEMICAL RESISTANCE N/A INERTTO MOST CHEMICALS AND ACIDS 6' MAX. WITH WIRE ATTACH SAFETY FENCE TO METAL POSTS USING METAL WIRE TIES ORANGE SAFETY FENCE "T" OR"U" POST ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ DRIVEN MININ IMUM OF 18"INTOGROUND ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ II II II II u u -, Tree Protection Fencing 5.5 Not to Scale FILTER OF 1" FLOW DIA. WASHED STONE 3 SILT FENCE END OF FILTER FABRIC Plan View STEEL FENCE POST WIRE FENCE HARDWARE CLOT FILTER OF 1" DIA. WASHED STONE FILTER FABRIC FLOW ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH INSTALLATION REFER TO THE PLANS FOR LOCATIONS AND SPECIFICATIONS. DURING INSTALLATION OF THE SILT BARRIER OR SILT FENCE, INSPECTTHE INSTALLATION TO DETERMINE IF OUTLETS ARE NEEDED ACCORDING TO THE CRITERIA SET FORTH IN THE SPECIFICATIONS FOR THE BARRIER AND FENCE. IF THERE ARE QUESTIONS OR PROBLEMS WITH THE LOCATION, EXTENT, OR METHOD OF INSTALLATION, CONTACTTHE ENGINEER, ARCHITECT, OR RESPONSIBLE PERSONNEL ON THE SITE FOR ASSISTANCE. EROSION CONTROL PERSONNEL HAVE COPIES OF INSTRUCTIONS AND MAY HAVE PHOTOGRAPHS OF PROPERLY INSTALLED OUTLETS AS AN AID TO INSTALLATION. IF THE SILT FENCE OUTLET IS NOT INSTALLED CORRECTLY THE FIRSTTIME, IT WILL HAVE TO BE REBUILT DETERMINE THE EXACT LOCATION ON THE GROUND BEFORE COMPLETING INSTALLATION OF THE SILT FENCE, TAKING INTO CONSIDERATION: INSTALLTHE OUTLETATTHE LOWEST POINT (S) IN THE BARRIER OR FENCE WHERE WATER WILL POND. INSTALLTHE OUTLET WHERE IT IS ACCESSIBLE FOR INSTALLATION, MAINTENANCE, AND REMOVAL. ALLOW AT LEAST: 15 FEET BETWEEN THE BARRIER OR FENCE AND SINGLE -STORY BUILDINGS. 25 FEET FOR FORK LIFTS BETWEEN THE BARRIER OR FENCE AND MULTIPLE -STORY BUILDINGS. 10 FEET BETWEEN THE BARRIER OR FENCE AND THE TOE OF FILL SLOPES. FOR A SILT BARRIER: FOR A SILT FENCE: JUST BELOW THE GAP IN THE BARRIER, PLACE A LAYER OF JUST BELOW THE GAP IN THE BARRIER, PLACE A LAYER FILTER FABRIC ON THE GROUND TO PROTECTTHE SOIL OF FILTER FABRIC ON THE GROUND TO PROTECTTHE FROM EROSION BY OUTFLOW FROM THE OUTLET, PLACE SOIL FROM EROSION BY OUTFLOW FROM THE OUTLET 61NCHES OF THE UPPER EDGE IN THE TRENCH. STAKE THE PLACE 61NCHES OF THE UPPER EDGE IN THE TRENCH. REMAINING EDGES OF THE FABRIC TO HOLD IT IN PLACE. STAKE THE OTHER EDGES OF THE FABRIC TO HOLD IT IN PLACE. ALONG THE GAP WHERETHE OUTLET WILLGO, PLACE STEEL FENCE POSTS FOR STRENGTH. THE POSTS MUST BE ALONG THE GAP WHERE THE OUTLET WILL GO, PLACE A MAXIMUM OF 2 FEETAPARTAND DRIVEN INTO SOLID ADDITIONAL STEEL FENCE POSTS FOR STRENGTH. THE GROUND AT LEAST 181N CH ES. POSTS MUST BE A MAXIMUM OF 2 FEETAPARTAND DRIVEN INTO SOLID GROUN D AT LEAST 18 INCHES. PLACE HARDWARE CLOTH (WELDED GALVANIZED SCREEN WITH SQUARE I/4-1/2-INCH HOLES) ON THE UPHILL SIDE PLACE HARDWARE CLOTH (WE LDE D GALVAN IZED OF THE POSTS TO HOLD THE WASHED STONE IN PLACE. SCREEN WITH SQUARE 1/4- 1/2-INCH HOLES) ON THE PUT 6 INCHES OF THE BOTTOM OF THE CLOTH IN THE UPHILL SIDE OF THE POSTS TO HOLDTHE WASHED TRENCH AND FASTEN ITTO THE POSTS WITH LENGTHS OF STONE IN PLACE. PUT6 INCHES OF THE BOTTOM OF WIRE. THE CLOTH IN THE TRENCH AND FASTEN IT TO THE POSTS WITH LENGTHS OF WIRE. BURY THE BOTTOM OF THE HARDWARE CLOTH AND THE UPPER EDGE OF THE FILTER FABRIC BELOW THE OUTLET BURY THE BOTTOM OF THE HARDWARE CLOTH, THE IN THE TRENCH AND COMPACTTHE FILL. UPPER EDGE OF THE FILTER FABRIC BELOW THE OUTLET, AND THE WIRE FENCE IN THE TRENCH AND PLACE THE OUTLET SO THAT WATER FLOWING THROUGH IT WILL NOT CREATE AN EROSION HAZARD PLACE A FILTER OF I -INCH DIAMETER WASHED STONE ON COMPACTTHE FILL. BELOW: AVOID STEEP SLOPES BELOW THE OUTLETANDAREAS WITHOUT PROTECTIVE VEGETATION. USE THE UPHILLSIDE OFTHE OUTLET. PILE THE STONE UP TO SLOPE DRAINS IF NECESSARY. THE TOP OFTHE HARDWARE CLOTH AND OVERTHE JOINT PLACE A FILTER OF I -INCH DIAMETER WASHED STONE BETWEEN THE OUTLETANDTHE BARRIER. ON THE UPHILLSIDE OFTHE OUTLET. PILE THE STONE DETERMINE THE LOCATION OFTHE OUTLET: FORA SILT BARRIER, WHEN THE TRENCH IS DUG TO BURY THE UP TO THE TOP OFTHE HARDWARE CLOTH AND OVER BOTTOM OF THE FABRIC BECAUSE THE BARRIER WILL BE OMITTED AT THE OUTLET, FOR A SILT FENCE, THE JOINT BETWEEN THE OUTLETAND THE SILT WHEN THE WIRE FENCE IS IN PLACE BECAUSE THE FILTER FABRIC WILL BE OMITTEDATTHE OUTLET. FENCE. REFER TO THE ILLUSTRATIONS OFTHE OUTLET IN THE PLAN. CLEAR STUMPS AND ROOTS FROM THE LOCATION OFTHE OUTLET. CLEAR ADEQUATE ACCESS FOR THE EQUIPMENT NEEDED FOR INSTALLATION, MAINTENANCE, AND REMOVAL. [X] SAF NOTES: GTemporary Silt Fence Gravel Outlet Not to Scale 12" 0 MIN. SUPPORT LOG OR MUD MAT PLACED PARALLEL TO BANKS 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 2. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 3. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 4. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 5. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE TIMBER MAT. 6. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED. 7. TIMBER MAT IS TO BE WIDER THAN BIGGEST PIECE OF EQUIPMENT CROSSING IT WITH A SOLID DECK & SIDEBOARD TO PREVENT SEDIMENT LOSS TO STREAM. 8. ALL MATS SHALL HAVE NO GAPS BETWEEN TIMBERS. 9. SILT FENCE TO BE INSTALLED AT 45° ANGLE TO THE ROAD WITH STONE OUTLET AT EACH CORNER OF THE TEMPORARY CROSSING TO FILTER ANY SEDIMENT AND DEBRIS FROM HAUL ROAD FROM ENTERING THE STREAM. TIMBER MATS CLASS B STONE n— c ".,tin Vi.­ [X] MAINTENANCE: CHECK OUTLET FOR EROSION, PIPING, AND ROCK DISPLACEMENT WEEKLY AND AFTER EACH SIGNIFICANT (2' INCH OR GREATER) RAINFALL AND REPAIR IMMEDIATELY. REMOVE THE STRUCTURE AND ANY UNSTABLE SEDIMENT IMMEDIATELY AFTER CONSTRUCTION SITE HAS BEEN PERMANENTLY STABILIZED. &' WATER DIVERSION CHANNEL FILTER FABRIC SILT FENCE INSTALLED ATTOP OF BANKON ALL CORNERSNERS OF OF TIMBER MATS X X [XI TIMBER MATS Plan View TOP OF STREAM BANK InPI [X] [X1 X X Temporary Stream Crossing with Silt Fence - Timber Mat Not to Scale Q Z � Qz 'z HW m IN U T N Q HIGH STRENGTH INTAKE HOSE DOUBLE STITCHED "J"TYPE SEAMS. 2"-3" DIAMETER COARSE AGGREGATE STONE 8" MIN. DEPTH NOTES: 1. PRO VIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 2. LOCATE CONSTRUCTION ENTRANCE ATALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENTTRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE N ECESSARY. 4. ENTRANCE WILL BE EXTENDED AS NEEDED TO PROVIDE ADEQUATE SEDIMENT REMOVAL. 5. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED IM MEDIATELY. 6. USE CLASS A STON E OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. 7. PLACE FILTER FABRIC BENEATH STONE. 8. AFTER EACH RAINFALL, INSPECTANY STRUCTURE USED TO TRAP SEDIMENTAND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 9. REMOVE CONSTRUCTION ENTRANCE UPON COMPLETION OF THE PROJECTAND RETURN TO PRE -PROJECT GRADES, ELEVATIONS, AND CONDITIONS, UNLESS DIRECTED TO KEEP CONSTRUCTION ENTRANCE BY LANDOWNER. Materials Coir Fiber Matting is to be machine -produced mat made of 100% c.con utfiberand must adhere to the specifications listed in the table above. A hardwood Eco-STAKET" or similar biodegradable stakes shall be used to secure matting. No metal staples will be used on this project. Construction Methods The Contractor will install Coir Fiber Matting in locations and to the widths and lengths as shown on the plans and details or as directed. Coir Fiber Matting will be secured with wooden stakes and installed at three (3) feet on center in offset rows to affect a diamond pattern. Overlap the Coir Fiber Matting at seams a minimum of six inches. Coir Fiber Matting will be overlapped so that the upstream mat end is on top of the downstream mat start. Stakes will secure matting at three foot spacing on the overlapping seams. Coir Fiber Matting will be dry when installed placed on slopes not too loosely but not in tension. Prior to mat placement, proposed grades shall be achieved and no voids will occur in the slope. The area will be treated with soil amendments and seeding as specified elsewhere in the plans and specifications. Straw mulch will be used to cover the finished grade to achieve a 60%coverage on the soil. / IMPERVIOUS DIKE � (SEE INSET "B"�/O//' 12' Maintenance 1. Inspect coir fiber matting at least weekly and after each sign:icant I inch rain event and repair immediately. 2. Good contact with the ground must be maintained and erosion must not occur beneath the matting 3. Any areas of the matting that are damaged or not in close contact with the ground shall be repaired and staked. 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair matting as necessary until ground cover is established. 3 Erosion Control Matting 5.6 Not to Scale Typical Stake ACTIVE WORK AREA 1000000: I 000000 ON\ SEWN -IN SPOUT Q DEWATERING BAG HIGH STRENGTH �i �9 ❑ o m STRAPPING EXISTING TERRAIN STREAM BE FOR HOLDING HOSE _ °� w 0 DEWATERING IN PLACE w Y BAG ^ Z L s a 15' WATER FLOW FILTER FABRIC ~ w FROM PUMP m FLEXIBLE B" of CLASS B RIPRAP DISCHARGE HOSE 15'to 20' Inset "An NOTE: Dewatering Bag 1. PROVIDE STABILIZED OUTLET TO STREAMBED. 2. DEWATERING BAG SHALL BE INSPECTED 3' MIN TOP WIDTH AFTER 1/2" OR GREATER RAINFALL EVENT —� SAND BAG (24" X 12" X 6") ORSTONE. 0�'�O� IMPERVIOUS ��0���� SHEETING FLOW IMPERVIOUS DIKE Inset "B" (SEE INSET "B") I I Impervious Dike 10' X 5STABILIZED OUTLET USING CLASS B RIPRAPAND 10' MIN. DISCHARGE HOS NCDOTTYPE 2 FILTER FABRIC. DEWATERING BAG (SEE INSET "C") (SEE INSET "A") Plan View \ FILTER FABRIC a a,a fi/ Inset "C" 2 Pump Around System Stabilized Outlet 5.6 Not to Scale zt. Plan View INSTALL AND MAINTAIN THREE CHECK DAMS LOCATED AT DOWNSTREAM LIMITS OF DISTURBANCE 20' 20' WORK FLOW AREA ti CONTRACTOR SHALL REMOVE Profile View SEDIMENT WHEN DEPTH REACHESI2" NOTES: 1. CHECK DAM TO BE INSTALLEDAS DIRECTED BY ENGINEER, DEPENDING ON FLOW CONDITIONS IN THE CHANNEL. 2. INSPECT CHECK DAM WEEKLY AND AFTER 1/2" OR GREATER RAINFALL EVENT. REMOVE ANY ACCUMULATED SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS. 3. USE PROTECTIVE RIP RAP LINER TO REPAIR EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM 4. ADD MATERIAL, AS NECESSARY, TO MAINTAIN DESIGN HEIGHTOF DAM STABILIZE OUTLET USING CLASS B RIPRAP TRENCHED INTO EXISTING GROUND MINIMUM OF6". SIZE AND LOCATION TO BE DETERMINED IN THE FIELD BY THE ENGINEER. FLEXIBLE DISCHARGE HOSE FROM PUMP AROUND PUMP HELD IN PLACE WITH SANDBAGS AS NEEDED. Plan \/i.- SPILLWAY CREST 1.5' MIN. NO.57STONE4 INCHES WIDE ON UPSTREAM FACE FLOW r> CLASS B RIPRAP I Z�1 TOP OF BANK Section A -A' 9" MIN. FILTER CLOTH 2' CLASS B RIPRAP MAX. Section B-B' TOE OF SLOPE Temporary Rock Sediment Dam 5.6 Not to Scale IN U T v Q Q zZo Z COBBLE/GRAVEL MATERIAL �'"� Z r v TO BE APPROVED BY THE ENGINEER. H a 6, H W TOP OF EMBANKMENT FLOW m (EXISTING) �A PROPOSED GRADE LENGTH VARIES _ 4.1 SEE PLAN SHEETS _ ____— / . -" . --- Section A -A' �COMPACTED FILL COBBLE/GRAVEL MATERIAL MATERIAL TO BE APPROVED BY THE �- ENGINEER. EXISTING GRADE COBBLE/GRAVEL Q`� LENGTH VARIES MATERIAL TO BE 0 Q�-'S�O SEE PLAN SHEETS APPROVED BY THE �'�� ENGINEER.- Cross Section View B B' VARIES GQ 0.5' PLANS NONWOVEN FILTER FABRIC NOTES: A' Section B-B' 1. FILL MATERIAL SHOULD COME FROM ON SITE DAM REMOVAL AREAS Plan View k1 Embankment Stabilization Rock Floodplain Outlet b U 5.7 Not to Scale c 5.7 Not to Scale USE A USE A MINIMUM U MINIMUM OF 2 OF 4 STAKES ON STAKES ON B DOWNSLOPE UPSLOPE SIDE SIDE MIN. 2 STAKES ON UPSLOPE MINIMUM 4 STAKES ON DOWNSLOPE ^� GROUND FLOW ` DOWNSLOPE "'�1=III-ICI L�� _ ICI=III=III-III-1' STABILIZE EXCAVATED MATERIAL U CHANNEL — — — — — — — — — — ------- _ 11=III' 11=1 i' DIVERSION MATTING TEMPORARY SILT FENCE SEE DETAIL 1, SHEET 5.5 GROUND Section B-B' TOP OF BANK (TYP) \T7 MATTING Plan View 1310 MM WATTLE POLYETHYLENE PROPOSED PLASTICLINER CHANNEL CHANNEL NOTES: 1. USE A MINIMUM 121NCH DIAMETER WATTLE 2. WATTLES SHALL BE FILLED WITH STRAW OR OTHER APPROVED MATERIAL. NOTES: 3. USE 241NCH LONG WOODEN STAKES WITH A 2"X2" NOMINAL CROSS SECTION 1. LINE THE CHANNEL DIVERSION WITH LINER UNROLLED IN THE DIRECTION OF FLOW 4. INSTALL WATTLES TO HEIGHT OF SLOPE SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR SLOPES 2. OVERLAP LINER MINIMUM OF 16 INCHES LONGITUDINALLY ON THE UPGRADIENTAND -_ 5. SPACING FOR WATTLES SHALL BE DETERMINED BY THE ENGINEER. DOWNGRADIENT ENDS. S WATTLE IN DITCH, GRADE OF DITCH MUST BE . INCHES DEEP AND TAMPED SECURELY 3. BURY THE LINER EDGES IN ATRENCH (PARALLELTO DIRECTION OF FLOW)A MINIMUM OF 5 6. FOR USE 7. WATTLES SHALL BE INSPECTED AFTER AN 1/2" OR GREATER RAINFALL EVENT. 4. SECURE THE LINER WITH 11 GAUGE WIRE STAPLES. STAPLES SHOULD BE U-SHAPED WITH A MINIMUM LENGTH OF 61NCHES AND MINIMUM THROAT WIDTH OF 11NCH 5. 1-1 NER STAPLES ALONG OUTER EDGES AND THROUGHOUTTHE LINER ATA MAXIMUM OF 3 z FEET LATERALLY AND LONGITUDINALLY 6. EXCAVATED MATERIAL SHOULD BE STABILIZED IMMEDIATELY I� 7. SILT FENCE SHALL BE INSTALLED WHERE CHANNEL DIVERSION IS CLOSE TO PROPOSED L \ GRADING ACTIVITI ES OR AS DIRECTED BYTHE ENGINEER ' ^• u / 3 Wattle 4 Tem orar y Channel Diversion m 53 Not to Scale 5.7 Not to Scale -'