HomeMy WebLinkAbout540002_30-Day POA_20210114PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name: 54 - 2 County: Lenoir Owl Pond, Heath Farm, & Hog City Danny Grant Operator #: 17676 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): Owl Pond Old Owl Pond New Heath Farm Hog City 1 & 2 Spillway (Yes or No): No No No No Level (inches): 17" 17" 18" 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: As weather permits I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Raymond Collier Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: Date: 1/14/2021 Cover Page Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 1 of 6 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Owl Pond Old Owl Pond New Heath Farm Hog City (1) Hog City (2) n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 159.3 Ib PAN line m= 210.1 lb PAN line m = 327.1 Ib PAN line m = 1817.4 Ib PAN line m = 341.7 Ib PAN line m = Ib PAN 2855.7 Ib PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining 'RR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 2853 3 Wheat, Grain 24.60 115.00 2829.0 9/1 - 4/30 2853 4 Wheat, Grain 5.80 84.00 487.2 9/1 - 4/30 2853 5 Wheat, Grain 2.70 84.00 226.8 9/1 - 4/30 4052 7 Wheat, Grain 9.90 136.00 1346.4 9/1 - 4/30 4053 8 Wheat, Grain 6.60 136.00 897.6 9/1 - 4/30 'State current crop ending application date or next crop application beginning datf e or available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section 11I) = y. Overall PAN balance (w - x) = 5787.0 Ib. PAN 2855.7 Ib. PAN 5787.0 Ib. PAN -2931 Ib. PAN SUMMARY Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 2 of 6 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Waste will be applied as soon as weather permits. SUMMARY Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 3 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Owl Pond Old 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 600 certified herd # 17.0 19.0 inches inches 2.0 inches 61776 ft2 77014 gallons 180 63444.9 600 days ft3 actual waste produced = current herd # x line g = 63445 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/4/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 38623.2 ft3 127245 gallons 0.78 Ibs/1000 gal. 159.3 Ibs. PAN Structure 1 Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 4 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Owl Pond New 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 600 certified herd # 17.0 19.0 inches inches 2.0 inches 94996 ft2 118428 gallons 180 63444.9 600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/4/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 63445 ft3 0 57633.3 ft3 ft3 150944 gallons 0.78 Ibs/1000 gal. 210.1 Ibs. PAN Structure 2 Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 5 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Heath Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 5200 certified herd # 18.0 19.0 inches inches 1.0 inches 209024 ft2 130292 gallons 180 171850 5200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/4/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 171850 ft3 0 121205.7 ft3 ft3 365343 gallons 0.66 Ibs/1000 gal. 327.1 Ibs. PAN Structure 3 Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 6 of 6