HomeMy WebLinkAbout540002_30-Day POA_20210114PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
Certified Operator Name:
54 - 2 County: Lenoir
Owl Pond, Heath Farm, & Hog City
Danny Grant
Operator #: 17676
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID): Owl Pond Old Owl Pond New Heath Farm Hog City 1 & 2
Spillway (Yes or No): No No No No
Level (inches): 17" 17" 18"
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As weather permits
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Raymond Collier
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
Date:
1/14/2021
Cover Page
Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 1 of 6
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
Owl Pond Old
Owl Pond New
Heath Farm
Hog City (1)
Hog City (2)
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 159.3 Ib PAN
line m= 210.1 lb PAN
line m = 327.1 Ib PAN
line m = 1817.4 Ib PAN
line m = 341.7 Ib PAN
line m = Ib PAN
2855.7 Ib PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining 'RR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
2853
3
Wheat, Grain
24.60
115.00
2829.0
9/1 - 4/30
2853
4
Wheat, Grain
5.80
84.00
487.2
9/1 - 4/30
2853
5
Wheat, Grain
2.70
84.00
226.8
9/1 - 4/30
4052
7
Wheat, Grain
9.90
136.00
1346.4
9/1 - 4/30
4053
8
Wheat, Grain
6.60
136.00
897.6
9/1 - 4/30
'State current crop ending application date or next crop application beginning datf e or available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) =
x. Crop's remaining PAN balance (line v from section 11I) =
y. Overall PAN balance (w - x) =
5787.0 Ib. PAN
2855.7 Ib. PAN
5787.0 Ib. PAN
-2931 Ib. PAN
SUMMARY Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 2 of 6
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Waste will be applied as soon as weather permits.
SUMMARY Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 3 of 6
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Owl Pond Old
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
600
certified herd #
17.0
19.0
inches
inches
2.0 inches
61776
ft2
77014 gallons
180
63444.9
600
days
ft3
actual waste produced = current herd # x line g = 63445 ft3
certified herd #
i. volume of wash water according to structural design
ft3
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
12/4/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0
38623.2
ft3
127245 gallons
0.78
Ibs/1000 gal.
159.3 Ibs. PAN
Structure 1 Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 4 of 6
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Owl Pond New
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
600
certified herd #
17.0
19.0
inches
inches
2.0 inches
94996
ft2
118428 gallons
180
63444.9
600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
12/4/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
63445 ft3
0
57633.3
ft3
ft3
150944 gallons
0.78
Ibs/1000 gal.
210.1 Ibs. PAN
Structure 2 Owl Pond, Heath, & Hog City (PoA30day) 1-14-2021 Page 5 of 6
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Heath Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
5200
certified herd #
18.0
19.0
inches
inches
1.0 inches
209024
ft2
130292 gallons
180
171850
5200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
12/4/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
171850 ft3
0
121205.7
ft3
ft3
365343 gallons
0.66
Ibs/1000 gal.
327.1 Ibs. PAN
Structure 3