HomeMy WebLinkAboutNCC200053_NOT Closeout Documents_20210205CITY OF BURLINGTON
ENGINEERING DEPARTMENT
W. Todd Lambert, PJ-'_
City C?eiginccr
February 2, 2021
EROSION CONTROL PERMIT CLOSEOUT NOTIFICATION
D. R. Horton
4008 Mendenhall Oaks Pkwy, Suite 101
High Point, NC 27265-
Subject: The Cove at Mackintosh - Phase 1A
Bonnar Bridge Pkwy
Guilford Tax Map:
Land Disturbing Permit Number: 621
Dear Ms. Jessica Meyer:
On January 26, 2021, personnel of this office inspected the above referenced project located off Bonnar
Bridge Pkwy in Alamance County, North Carolina. This inspection was performed to determine
compliance with the City of Burlington Soil Erosion and Sedimentation Ordinance. The inspection
involved a land -disturbing activity of approximately 6 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The
purpose of this letter is to inform you that per City of Burlington Code of Ordinances Section 32-6.f your
approval issued 02/23/2018 is closed due to expiration or permanent ground cover sufficient to restrain
erosion has been established. No additional self -monitoring or self -inspections are required and the
project is being released from further erosion control inspection requirements. Please note that any
future land disturbing activity on the subject parcel will require submission of a new plan and permit
issuance prior to commencement of the land disturbing activity.
Please contact the Engineering Department if you have questions or concerns relating to the close out
process.
Sincerely,
David B. Bowman, PE, CFM
Erosion Control Administrator
cc: Mr. W. Todd Lambert, PE
City Engineer
Chief Inspector
MAILING ADDRI,:S5:
425 S. LI?\IN(;"I'ON AVI..
RWRI.IN(;TON, N(: 27215
Ms. Carolyn Buckner
Environmental Specialist
'1'FU-'I'I IONI�': (336) 322-5050
FAN:(i30) 513-5467
\YWW.BLIRI.IN(;'I'ONN(:.(,( )V
CITY OF BURLINGTON
ENGINEERING DEPARTMENT
\w'. Todd Lambert, P.E.
City I ngincer
May 8, 2020
EROSION CONTROL PERMIT CLOSEOUT NOTIFICATION
DR Horton
4008 Mendenhall Oaks Parkway, Suite 101
High Point, NC 27265-
Subject: MOTL Parcel I, Phase 1 B "The Cove"
Bonnar Bridge Parkway
Guilford Tax Map:
Land Disturbing Permit Number: 634
Dear Ms. Jessica Meyer:
On May 5, 2020, personnel of this office inspected the above referenced project located off Bonnar
Bridge Parkway in Alamance County, North Carolina. This inspection was performed to determine
compliance with the City of Burlington Soil Erosion and Sedimentation Ordinance. The inspection
involved a land -disturbing activity of approximately 8.85 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity_ The
purpose of this letter is to inform you that per City of Burlington Code of Ordinances Section 32-6.f
your approval issued 10/01/2018 is closed due to expiration or permanent ground cover sufficient to
restrain erosion has been established. No additional self -monitoring or self -inspections are required
and the project is being released from further erosion control inspection requirements. Please note
that any future land disturbing activity on the subject parcel will require submission of a new plan and
permit issuance prior to commencement of the land disturbing activity.
Please contact the Engineering Department if you have questions or concerns relating to the close out
process.
Sincerely,
David-B. Bowman, PE, CFM
Erosion Control Administrator
cc: Mr. W. Todd Lambert, PE Ms. Carolyn Buckner
City Engineer Environmental Specialist
Mr. Jay Mebane
Chief Inspector
MAILING AI)DRE'S5: I'I:IJ.I�IION1:: (336) 222-5050
425 S. U;'XING,R)N ;1\'I . FAX: (336) 513-54G7
BURLING ON,N(: 27215 IC1�`It'.liL�ltl,l�(�'l'c)NNc;,(inl'
CITY OF BURLINGTON
ENGINEERING DEPARTMENT
W. "Todd Limber, P.F.
Ciry Engineer
May 8, 2020
EROSION CONTROL PERMIT CLOSEOUT NOTIFICATION
D. R. Horton, Inc.
4008 Mendenhall Oaks Pkwy, Suite 101
High Point, NC 27265-
Subject: The Cove at Mackintosh Phase 2A
Bonnar Bridge Parkway
Guilford Tax Map: 12-58-1
Land Disturbing Permit Number: 648
Dear Ms. Jessica Meyer:
On May 5, 2020, personnel of this office inspected the above referenced project located off Bonnar
Bridge Parkway in Alamance County, North Carolina. This inspection was performed to determine
compliance with the City of Burlington Soil Erosion and Sedimentation Ordinance. The inspection
involved a land -disturbing activity of approximately 7.97 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The
purpose of this letter is to inform you that per City of Burlington Code of Ordinances Section 32-6.f
your approval issued 05/15/2019 is closed due to expiration or permanent ground cover sufficient to
restrain erosion has been established. No additional self -monitoring or self -inspections are required
and the project is being released from further erosion control inspection requirements. Please note
that any future land disturbing activity on the subject parcel will require submission of a new plan and
permit issuance prior to commencement of the land disturbing activity.
Please contact the Engineering Department if you have questions or concerns relating to the close out
process.
Sincerely,
David B. Bowman, PE, CFM
Erosion Control Administrator
cc: Mr. W. Todd Lambert, PE
City Engineer
Mr. Jay Mebane
Chief Inspector
MAILING, ADDREISS:
425 S. 1.1SX[NG'T0N AV1;.
BURLINGTON, NC 27215
Ms. Carolyn Buckner
Environmental Specialist
TFIL[i111 [C )Nk� (336) 222-5050
PAX: (336) 513-5-167
CITY OF BURLINGTON
ENGINEERING DEPARTMENT
W. Todd ].,imhcrr, P.I ..
C6.I":n hovel.
February 2, 2021
EROSION CONTROL PERMIT CLOSEOUT NOTIFICATION
D. R. Horton, Inc.
4008 Mendenhall Oaks Parkway, Suite 101
High Point, NC 27265-
Subject: The Cove at Mackintosh Phase 2B
Bonnar Bridge Parkway
Guilford Tax Map:
Land Disturbing Permit Number: 652
Dear Ms. Jessica Meyer:
On January 26, 2021, personnel of this office inspected the above referenced project located off Bonnar
Bridge Parkway in Alamance County, North Carolina. This inspection was performed to determine
compliance with the City of Burlington Soil Erosion and Sedimentation Ordinance. The inspection
involved a land -disturbing activity of approximately 5.78 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The
purpose of this letter is to inform you that per City of Burlington Code of Ordinances Section 32-6.f your
approval issued 12/11/2019 is closed due to expiration or permanent ground cover sufficient to restrain
erosion has been established. No additional self -monitoring or self -inspections are required and the
project is being released from further erosion control inspection requirements. Please note that any
future land disturbing activity on the subject parcel will require submission of a new plan and permit
issuance prior to commencement of the land disturbing activity.
Please contact the Engineering Department if you have questions or concerns relating to the close out
process.
Sincerely,
David B. Bowman, PE, CFM
Erosion Control Administrator
cc: Mr. W. Todd Lambert, PE Ms. Carolyn Buckner
City Engineer Environmental Specialist
Chief Inspector
,N1:VI.IN(; ADDRV. S5 'I'FIX.I'IIUNI?: (330) 222-5050
425 S. I.F'AIN(;'1'()N .AV'I{, FAN: (336) 513-5467
131i]tI,IN( 'fON, Nl: 27215 \r1�'1X%.k3lIR1AN(,'I'ON'N(:.(;O\'