Loading...
HomeMy WebLinkAboutNCC200053_Notice of Termination_20210205Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/5/2021 1:43:50 PM (NOT Submittal) Approve by Morman, Alaina 2/8/2021 11:57:04 AM (NOT Request Review- NCC200053) • The task was assigned to Morman, Alaina. The due date is: February 10, 2021 5:00 PM 2/5/2021 1:44 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200053 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN May be blank (if not yet billed). Information associated with this permit: Project Name The Cove at Mackintosh Address 4595 Bonner Bridge Parkway, Burlington, NC County Guilford Latitude 36.0568 Longitude -79.5416 Permittee Listed DR Horton, Inc. Legally Responsible Jessica Meyer Individual NC Reference No. NCG01-2020-0053 E&SC Plan ID 652, 621, 634, 585 Original NOI 20220 Tracking No. Date COC Issued 1/7/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * r Mistake or Invalid Coverage r Other Add ional We information about the basis of this request, if needed. Explanation All 4 permits are listed separately. Phases 1 A and 21B were closed out on 2-2-21 and Phases 1 B and 2A were closed out on 3-8- 20. 1 have included all 4 final inspections from Burlington so there is no confusion. This COC was modified after the first two permits were closed. I used the last date as the close out date. Supporting Upload Supporting DDcurrentation if applicable. Documentation Mist beFCFform3t Project Close-out Information: Final Close-out 2/2/2021 Inspection Approval Project Close-out The Cove at Mackintosh Phases 1A, 1B, 2A, 213 Approval Close Out Reports.pdf Documentation Mist be FCFforrrat North Carolina General Statute 143-215.66 (1) provides that: 1.39MB Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Atcle; orwho falsifies, tampers with, or knowinglyrenders inaccurate anyrecording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Atcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Jessica Meyer Title * NPDES Technical Compliance Administrator Organization* DR Horton, Inc. Date * 02/05/2021 Email for jameyer@drhorton.com Confirmation * Contact Telephone* 919-215-6561 NOT Certification The Cove at Mackintosh NOT Form.pdf 378.7KB Form Mast be FDF Forrret Is this COCAlready Ensure this OOChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Emils (Optional) kanspach@drhorton.com Original Permittee CCd on Notification Errails Email jameyer@drhorton.com Original Site Contact CCd on Notificaiton Errails Email jameyer@drhorton.com