HomeMy WebLinkAboutUPDATE_Sheet3S_Only_I5987_PJD_Figure 3S_Topo_Features_20210204.pdf Legend
Original Study Area
Extension Study Area
OExtension Study Area
Potential Jurisdiction Features
Perennial Stream
—•••—•••• Intermittent Stream
���`/�^✓ • •� —•••— Tributary Waters of US
® Wetland
1 Ponds
Data Points
Up
+ W
Wet
Field Visits
/ Crew:
J. Merritt,T. Fox, M.DesChamps,
J. Harrod,B.Levan,T.Hall
Dates:
April 25-27,June 20,July 6&20,
August 3,7-9& 13-14,
October 5, November 1 &8-9,2018
and February 12,March 20-22,
' April 19,May 10& 14-15,
October 14,2019.
FIGURE
3S
Field Verification Map
. �•r 1-95 Widening from NC 211
v in Robeson County (Exit 20)
to 1-95 Business (Exit 40)
1 101 in Cumberland County
TIP Project 1-5987
'J' Robeson and
! Cumberland Counties, NC
' �._ —.. • ��. Map Date: 12/4/2019
1 inch = 400 feet
1 j GRAPHIC SCALE
0 200 400 800
1 Feet
• ' mhc rt Th.St formlanning purposes only antl informanion shown h1—(21 N not
eet The Sh.Exh of Practice for Lantl Surveying N h Carolina(21 NCAC
56.1600). The Exhibit was compiletl hom available information obta inetl from ttie
fes listetl below.Streams antl—1.tls:All feaNms 1000 G in ttie fieltl were
ortletl us ng apping gratle Tumble GeoXT or Geo6000 GPS witti
supposetl sub-meter accuracy.
Sources:NCOOT,NV5 Engineers+C—ltants(f0—ly Ca lyx)
TTT A.-Ph-g.phy:NCOOT