Loading...
HomeMy WebLinkAbout20180726 Ver 2_Meeting Request Review_20210205 (2) tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20180726 Version* 2 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 2/5/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Ed Smail Contact Email Address* esmail@mbakerintl.com Project Name* South Terminal Development Project Owner* Raleigh Executive Jetport Project County* Lee Owner Address: Street Address 4425 Belle Oaks Drive Address Line 2 City State/Rovince/Region North Charleston SC Fbstal/Zip Code Country 29405 United States Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: r- 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit rJ Modification r- Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20180726v1 Do you know the name of the staff member you would like to request a meeting with? Mr. Rob Ridings Please give a brief project description below.* The proposed project is located at the Raleigh Executive Jetport in Lee County northeast of Sanford, North Carolina(refer to Figure 1).Take Exit 76- Farrell Road(from US 1 South)-Make Left onto Farrell Road- Travel Approximately 0.5-mile-Make Left onto Rod Sullivan Road- Travel Approximately 1.0-mile-Arrive at Raleigh Executive Jetport.The approximate center point of the project is located at 35.576808,- 79.108483.The nearest named waterway is Hughes Creek,which is located south of the project(all of the project area drains to this named stream).The project is located within the Cape Fear River Basin,8-digit Hydrologic Unit Code(HUC)03030004. The proposed project consists of additional development to the existing hangar area located to the south of the existing terminal area.The proposed project includes site preparations for three future box hangars/associated aprons, improvement of the current taxilane(north of the existing t-hangars)to accommodate ADG II aircraft,and the connection of the existing t-hangar taxilanes to a new`end-around' taxilane.The existing north taxilane would be shifted and widened and would continue/extend behind the t-hangars.The remaining five taxilanes would connect to the new pavement to create a complete taxilane system. Rough grading and installation and re-routing of stormwater drainage would occur to the north and west of the t-hangars to prepare sites for hangar development.The proposed improvements are shown on Figure 4. The project also requires modification to the existing stormwater pond located at the southern end of the project.The pond requires an increase in volume, addition of a spillway, and an energy dissipator pad to accommodate run-off from the additional impervious surfaces for the previously described improvements(refer to attached Permit Drawings— Appendix A2). Impacts to Waters of the U.S. (WOUS)would only result from the improvements required at the pond outfall,the remaining work areas would not result in impacts to WOUS. A Section 401 Water Quality Certification (20180726v1 -issued December 3,2018)and Section 404 Permit(SAW 2009-01114)was issued for hangar expansion.A modification to these approvals is being proposed for additional hangar expansion (as described above). Please give a couple of dates you are available for a meeting. 2/8/2021 2/12/2021 2/15/2021 2/10/2021 2/17/2021 Please attach the documentation you would like to have the meeting about. 5-Appenidx A AllFiguresCombined_080620.pdf 5.05MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 2/5/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No