DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20180726 Version* 2
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 2/5/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Ed Smail
Contact Email Address* esmail@mbakerintl.com
Project Name* South Terminal Development
Project Owner* Raleigh Executive Jetport
Project County* Lee
Owner Address: Street Address
4425 Belle Oaks Drive
Address Line 2
City State/Rovince/Region
North Charleston SC
Fbstal/Zip Code Country
29405 United States
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
r- 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit rJ Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20180726v1
Do you know the name of the staff member you would like to request a meeting with?
Mr. Rob Ridings
Please give a brief project description below.*
The proposed project is located at the Raleigh Executive Jetport in Lee
County northeast of Sanford, North Carolina(refer to Figure 1).Take Exit
76- Farrell Road(from US 1 South)-Make Left onto Farrell Road-
Travel Approximately 0.5-mile-Make Left onto Rod Sullivan Road-
Travel Approximately 1.0-mile-Arrive at Raleigh Executive Jetport.The
approximate center point of the project is located at 35.576808,-
79.108483.The nearest named waterway is Hughes Creek,which is
located south of the project(all of the project area drains to this named
stream).The project is located within the Cape Fear River Basin,8-digit
Hydrologic Unit Code(HUC)03030004.
The proposed project consists of additional development to the existing
hangar area located to the south of the existing terminal area.The
proposed project includes site preparations for three future box
hangars/associated aprons, improvement of the current taxilane(north of
the existing t-hangars)to accommodate ADG II aircraft,and the
connection of the existing t-hangar taxilanes to a new`end-around'
taxilane.The existing north taxilane would be shifted and widened and
would continue/extend behind the t-hangars.The remaining five taxilanes
would connect to the new pavement to create a complete taxilane system.
Rough grading and installation and re-routing of stormwater drainage
would occur to the north and west of the t-hangars to prepare sites for
hangar development.The proposed improvements are shown on Figure
4.
The project also requires modification to the existing stormwater pond
located at the southern end of the project.The pond requires an increase
in volume, addition of a spillway, and an energy dissipator pad to
accommodate run-off from the additional impervious surfaces for the
previously described improvements(refer to attached Permit Drawings—
Appendix A2). Impacts to Waters of the U.S. (WOUS)would only result
from the improvements required at the pond outfall,the remaining work
areas would not result in impacts to WOUS.
A Section 401 Water Quality Certification (20180726v1 -issued
December 3,2018)and Section 404 Permit(SAW 2009-01114)was
issued for hangar expansion.A modification to these approvals is being
proposed for additional hangar expansion (as described above).
Please give a couple of dates you are available for a meeting.
2/8/2021
2/12/2021
2/15/2021
2/10/2021
2/17/2021
Please attach the documentation you would like to have the meeting about.
5-Appenidx A AllFiguresCombined_080620.pdf 5.05MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 2/5/2021
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No