Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
670063_Compliance Evaluation Inspection_20210128
t. Division of Water Resources Facility Number - O Division of Soil and Water Conservation O Other Agency of Visit: ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance in for Visit: (9 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: J Departure Time: L�.J County: Farm Name: }� To-'r--L 6u-r". Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: V1 thcc Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Region: Phone: �1� �2 J �-3 Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Pnultry Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No E NA ❑ NE Q-A ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No [3"kA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [:]Yes Q'<o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes /0 No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - Date of Inspection: 'Zi Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o ❑ IAA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No � NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):V / 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes dNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ElYes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or envir nmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 04 o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes '❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes © No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Q No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E31 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes / o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 0 Noa ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EZNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ©No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections %❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of InspectioA: r Z Z Did the facility fail to calibrate waste application equipment as re required b the permit? 24. D Y pPq Y p ❑ Yes &Y� ,� ❑ 'No NA NE ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check es [ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon s List structure(s) and date of first survey indicating non-compliance:_ 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ©INo ❑ NA/❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No EINA ❑ NE Other Issues / No 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [:]Yes Q ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ! No, ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes © No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) A 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA / NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑Yes D,;,�o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes © No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facilitv to better explain situations (use additional pages as necessary). NO t-�- S+V- L4 Z kj Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 3 S c) U � (� �' "� Phone: f_ Date: 2I 21JI201 S 1