HomeMy WebLinkAbout20210225 Ver 1_PreFiling Acknowledgement Email_20210205Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, February 5, 2021 4:57 PM
To: eric.mularski@hdrinc.com
Cc: Yankura, Kaylie
Subject: Pre -Filing Meeting Request Acknowledgement - Webster Tie Reliability Upgrade
Project - 20210225 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Webster Tie Reliability Upgrade
Project that you submitted on 2/1/2021. The ID number for that project is 20210225, Version 1.
Reviewer Contact Information:
Reviewer: Kaylie Yankura
Email: kaylie.yankura@ncdenr.gov
Reviewing Office: Asheville Regional Office - (828) 296-4500
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20210225
Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Kaylie Yankura
Pre -Filing Meeting Request submitted 2/1/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Eric Mularski
eric.mularski@hdrinc.com
Webster Tie Reliability Upgrade Project
Duke Energy
Jackson
Street Address
526 S. Church Street
Address Line 2
aty
Charlotte
Rbstal / Zip Code
28202
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Frovince / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The proposed project consists of a reliability upgrade of existing
electrical equipment, replacement of storm drainage structures and
pipes, and the new construction of a control enclosure for the site.
The proposed project will result in unavoidable permanent impacts
below the ordinary high water mark of an unnamed tributary to
Savannah Creek.
Please give a couple of dates you are available for a meeting.
2/15/2021
Please attach the documentation you would like to have the meeting about.
Webster Tie —TB Waiver Report —Sealed
10.28MB
2021.01.11.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
i9lic 44VL4�#f
Submittal Date 2/1/2021