Compliance Inspection Report
Permit: SW8991224 Effective: 03/31/00 Expiration: 03/31/10 Owner: Rtmsc Inc
Project: Arbys Restaurant
County: New Hanover
Region: Wilmington
Contact Person: Doug Potter
Directions to Project:
Title: President
Type of Project: State Stormwater - High Density
Drain Areas: 1 - (Hewletts Creek) (03-06-24) ( SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 02/22/2011 Entry Time: 09:00 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ® Not Compliant
Question Areas:
■ State Stormwater
(See attachment summary)
Phone:
State Stormwater - Infiltration System
Exit Time: 09:30 AM
Phone: 919-796-7215
Ext.7317
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW8991224 Owner - Project: Rtmsc Inc
Inspection Date: 02/22/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The following deficiencies were doted during the inspection:
1. A copy of the engineers certification was not found in the file.
To bring this system into compliance, the following must be completed:
1. Submit a copy of the engineers certification of the stormwater system to this office.
It is noted:
1. Any transfer of ownership requires modification/notification of this office as stated in permit condition (II. Schedule of
Compliance, No. 9).
2. Operation and Maintenance shall be provided at all times to assure the stormwater system functions at optimum
efficiency as stated in permit condition (II. Schedule of Compliance, No. 3) and Records of maintenance activities must be
kept and made available upon request (Il. Schedule of Compliance, No. 4).
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
❑
Signed copy of the Engineer's certification is in the file?
Q
■
Q
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
E
❑
Q
❑
Copy of the recorded deed restrictions is in the file?
n
n
■
n
Comment: A copy of the engineers certificate of the stormwater system was not found
in the file.
Page: 2
Compliance Inspection Report
Permit: SW8991224 Effective: 03/31/00 Expiration
County: New Hanover
Region: Wilmington
Contact Person: Doug Potter Title: President
Directions to Project:
Type of Project: State Stormwater - High Density
Drain Areas: 1 - (Hewletts Creek) (03-06-24) ( SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 06/29/2010 Entry Time: 09:15 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Vincent Lewis
Reason for Inspection: Follow-up
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
■ State Stormwater
(See attachment summary)
Owner: Rtmsc Inc
Project: Arbys Restaurant
Phone:
State Stormwater - Infiltration System
Exit Time: 09:45 AM
Phone: 919-796-7215
Ext.7317
Phone:
Inspection Type: Stormwater
Page: 1
Permit: SW8991224 Owner - Project: Rtmsc Inc
Inspection Date: 06/29/2010 Inspection Type: Stormwater Reason for Visit: Follow-up
Inspection Summary:
The following deficiencies were noted during the inspection:
1. No PE was found in the file.
2. A build-up of sediment was observed at the pervious pavement area.
To bring this system into compliance, the following must be completed:
1. Submit an engineer's certification to this Office.
2. Remove sediment from the pervious pavement area.
3. Submit a transfer of ownership form to update the Permittee for this state stormwater permit.
Transfer of ownership form weblink:
httpi//h2o.en r.state.nc. us/su/documents/NameOwnershipChangeForml 6Nov2009.pdf
File Review
Yes
No
NA
NE
Isthe permit active?
S
❑
❑
❑
Signed copy of the Engineer's certification is in the file?
❑
■
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the tile?
®
❑
❑
❑
Copy of the recorded deed restrictions is in the file?
❑
❑
■
❑
Comment: No PE certification found in the file.
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
❑
■
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ
❑
01
❑
■
upon request?
Comment: A build up of sediment was observed at the pervious pavement area.
Other Permit Conditions
Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
❑
■
❑
0
Comment: Permit condition requires that a transfer of ownership to modify the permit.
The inspection report sent to the state stormwater permit current Permittee (Mr. Doug
Potter, RTM SC, Inc.) on February 17, 2010 was returned to this Office.
Page: 2
SW8 991224 - Arby's Restaurant
111312010
Note to File:
Received call from Kevin Rainey at Stantec on 111212010-they have been hired to help
resolve all outstanding deficiencies with this project.
Requested copy of permit/calculations on this project - I sent all info to him as they are
located in Florida.
Contact info for consultant:
Kevin Rainey
Stantec
1777 Tamiami Trail, #206
Port Charlotte, FL 33948
Phone: 941-255-0655
Fax: 941-255-1755
Email: Kevin.. rainey(a stantec.com
Jo
Hammers, Angela
From: Hammers, Angela
Sent: Monday, March 01, 2010 3:29 PM
To: 'jsiano@arbys.com'
Subject: Arby's Restaurant - Shipyard, SW8 991224
Attachments: 9912241h.feb10.doc; 991224.feb10.pdf
Hello Mr. Siano,
have attached a cover letter and the inspection report of the stormwater infiltration system for the Arby's Restaurant
at Shipyard. The state stormwater permit was originally issued to Mr. Doug Potter of RTM SC, Inc. on March 31, 2000. If
the ownership of the permit has changed, a transfer of ownership form should also be completed. The weblink for that
is
http://h2o.enr.state.nc.us/su/documents/NameOwnershipChanpeForml6Nov2.009.pdf
Please don't hesitate to contact me with any questions. My direct number is 910-796-7317.
Thank you.
Sincerely,
Angel Hammers (Please note my new email address is angela.hammersencdenr.9ov)
Environmental Specialist
NC Department of Environment and Natural Resources
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Office: 910.796.7215
Fax: 910.350.2004
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
Compliance Inspection Report
Permit: SW8991224
County: New Hanover
Region: Wilmington
Effective:03/31/00 Expiration
Contact Person: Doug Potter
Directions to Project:
Title: President
Type of Project: State Stormwater - High Density
Drain Areas: 1 - (Hewletts Creek) (03-06-24) (SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 02109/2010 Entry Time: 11:30 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Vincent Lewis
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Owner: Rtmsc Inc
Project: Arbys Restaurant
Phone:
State Stormwater- Infiltration System
Exit Time: 12:00 PM
Phone: 919-796-7215
Ext.7317
Phone:
Inspection Type: Stormwater
Page: 1
Permit: SW8991224 Owner - Project: Rtmsc Inc
Inspection Date: 0210912010 Inspection Type: Stormwater
Reason for Visit: Routine
Inspection Summary:
The following deficiencies were noted during the inspection:
1. A PE was not found in the DWQ file.
To bring this system into compliance, the following must be completed:
1. Submit a certification of the stormwater system by a professional engineer to this Office.
Records of maintenance activites must be kept and made available upon request to authorized personnel of DWQ. The
records will indicate the date, activity, name of person performing the work and what actions were taken.
If you have questions, please contact me at 910-796-7317 or angela.hammers@ncdenr.gov.
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
0
Signed copy of the Engineer's certification is in the file?
❑
■
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
❑
❑
Copy of the recorded deed restrictions is in the file?
❑
❑
■
❑
Comment: No PE found in the file.
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
❑
❑
❑
■
Are the inlets located per the approved plans?
■
❑
❑
n
Are the outlet structures located per the approved plans?
■
n
n
n
Comment: PE required to verify SW measures.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ■ 0 ❑ 0
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■
upon request?
Comment:
Page: 2
r
0 0 ,n
��Q
CD
�q Oq— O
�d w V
L a
U1 N
� IX
ll7 {L
N
0
�s' N C, Q
:L 031INn o o M
c c
CD
0 o a> cn
a
w.
LU
U
0
a
.+
a
IN
ri
IN
0
0
z
c
=
11 0
oa
• .�
rx z aa�
rr
-
g�
wya
M1
z�-(r
m
-
woo
'
`_
MzLL
'X
-
r
0t0
LO
a
-
zww
r-
(rFJ
(4
--
t
Dim
to
Fma0
-
N
wwz
wwz
o
=
!C F 7
LA
F
U)
=_
a
o
w
IN
-
H
x
--
H
U
_
C z
N
-U
m
� I
a = c.;
to
0
0
0
ImUx�
0
o fA W (D
1
C'
M M
L)
4mm1
\�
\Jj1
`'•yl•
n
_
_
--
_
_
--'
_
_
_
_
_
_
c�
_
_
--
~
_
---
_
_
_
--
--
--
_
_
` .`
YAF
NCD NR 5'T = q,o
North Carolina Department of Environment and Natural Resources �Pl �i440
Division of Water Quality
Beverly Eaves Perdue
Governor
February 17, 2010
Mr. Doug Potter, President
RTM SC, Inc.
2090 Executive Hall Road, #100
Charleston, SC 29407
Coleen H. Sullins Dee Freeman
Director Secretary
5 tc, ✓�o c�r�r 5`, c.arn
Subject: NOTICE OF INSPECTION
Arby's Restaurant — Shipyard Blvd
Permit No. SW8 991224
New Hanover County
Dear Mr. Potter:
On February 9, 2010, Angela Hammers, with assistance of Vincent Lewis, of the Wilmington
Regional Office of the Division of Water Quality (DWQ) inspected Arby's Restaurant on
Shipyard Boulevard in Wilmington, New Hanover County to determine compliance with
Stormwater Management Permit Number SW8 991224 issued on March 31, 2000. DWQ file
review and site inspection revealed that the site is not compliant with the terms and conditions
of this permit. Please find a copy of the completed form entitled "Compliance Inspection
Report" attached to this letter, which summarizes the findings of the recent inspection.
As indicated in the attached inspection report, the following deficiencies must be resolved:
A certification of the stormwater system from a professional engineer was not found in
the file. Submit the certification to this Office.
Please inform this Office in writing before March 19, 2010, of the specific actions that will be
undertaken and the time frame that will be required to correct the deficiencies. Failure to provide
the requested information, when required, may initiate enforcement action including the
assessment of civil penalties of up to $25,000 per day. If a written plan of action is not
submitted to this office by March 19, 2010 then DWQ staff will re -inspect the site and issue a
Notice of Violation if the listed deficiencies have not been addressed.
Please be reminded that if any ownership or name change has occurred it is the permittee's
responsibility to notify this office in writing. If you have any questions please contact me at the
Wilmington Regional Office, telephone number (910) 796-7215.
Sincerely,
" AACOU�
Angela Hammers
Environmental Specialist
Enclosure: Compliance Inspection Report; PE form
GDSlakh: S:IWQSISTORMWATERIINSPECT1991224.feb10
cc: New Hanover County Engineering Dept
John Hennessy-NPS-ACOU
WiRO; DWQ Central Files
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One
Phone: 910-796.72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 North Carol 1 n a
Internet: www.ncwaterquality.org Natmra //#
An Equal Opportunity I Affirmative Action Employer "
". ....... ... .i .. .�.�t' � � ., .
r; n
� M
1
Compliance Inspection Report
Permit: SW8991224 Effective: 03/31/00 Expiration: Owner: Rtmsc Inc
Project: Arbys Restaurant
County: New Hanover
Region. Wilmington
Contact Person: Doug Potter
Directions to Project:
Title: President
Type of Project: State Stormwater - High Density
Drain Areas: 1 - (Hewletts Creek) (03-06-24) ( SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 02/09/2010 Entry Time: 11:30 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Vincent Lewis
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
E State Stormwater
(See attachment summary)
Phone:
State Stormwater - Infiltration System
Exit Time: 12:00 PM
Phone: 919-796-7215
Ext.7317
Phone:
Inspection Type: Stormwater
Page: 1
Permit: SW8991224 Owner - Project: Rtmsc Inc
Inspection Date: 02109/2010 Inspection Type: Stormwater Reason for Visit: Routine
Inspection Summary:
The following deficiencies were noted during -the inspection:
1. A PE was not found in the DWQ file.
To bring this system into compliance, the following must be completed:
1. Submit a certification of the stormwater system by a professional engineer to this Office.
Records of maintenance activites must be kept and made available upon request to authorized personnel of DWQ. The
records will indicate the date, activity, name of person performing the work and what actions were taken.
If you have questions, please contact me at 910-796-7317 or angela.hammers@ncdenr.gov.
File Review
Yes
No
NA NE
Is the permit active?
■
❑
❑ ❑
Signed copy of the Engineer's certification is in the file?
❑
■
❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
❑ ❑
Copy of the recorded deed restrictions is in the file?
❑
❑
■ ❑
Comment: No PE found in the file.
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? ❑ ❑ ❑ ■
Are the inlets located per the approved plans? ■ ❑ ❑ ❑
Are the outlet structures located per the approved plans? ■ Q ❑ ❑
Comment: PE required to verify SW measures.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■
upon request?
Comment:
Page: 2
Compliance Inspection Report
Permit: SW8991224 Effective: 03/31/00 Expiration
County: New Hanover
Region: Wilmington
Contact Person: Doug Potter Title: President
Directions to Project:
Type of Project: State Stormwater - High Density
Drain Areas: 1 - (Hewletis Creek) (03-06-24 ) (SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 02/0912010 Entry Time: 11:30 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Vincent Lewis
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant i Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Owner: Rtmsc Inc
Project: Arbys Restaurant
Phone:
State Stormwater - Infiitration System
Exit Time: 12:00 PM
Phone: 919-796-7215
Ext.7317
Phone:
Inspection Type: Stormwater
Page: 1
Permit: SW8991224 Owner • Project: Rtmsc Inc
Inspection Date: 02/09/2010 Inspection Type: Stormwater Reason for Visit: Routine
Inspection Summary:
The following deficiencies were noted during the inspection:
1. A PE was not found in the DWQ file.
To bring this system into compliance, the following must be completed:
1. Submit a certification of the stormwater system by a professional engineer to this Office.
Records of maintenance activites must be kept and made available upon request to authorized personnel of DWQ. The
records will indicate the date, activity, name of person performing the work and what actions were taken.
If you have questions, please contact me at 910-796-7317 or angela.hammers@ncdenr.gov.
File Review
res
No
NH
rvt
Is the permit active?
®
0
0
n
Signed copy of the Engineer's certification is in the file?
Cl
®
Q
0
Signed copy of the Operation & Maintenance Agreement is in the file?
W
0
D
❑
Copy of the recorded deed restrictions is in the file?
❑
❑
®
❑
Comment: No PE found in the file.
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
❑
❑
❑
Are the inlets located per the approved plans?
®❑
❑
11
Are the outlet structures located per the approved plans?
®0
0
Q
Comment: PIE required to verify SW measures.
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
0
❑
Cl
171
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ
n
❑
n
upon request?
Comment:
Page: 2
Stormwater Drainage
STORMWATER
Calculations
DECEIVE -for
MAR 2 7 2000
D
PROJ IZZg Arby's. Restaurant
Shipyard Boulevard
Wilmington, North Carolina
T&R Proj. # 5381-029
.%"*\ I%IIIII,j,11.
Prepared By:
i
TR[BBLE & RICHARDSON, INC.
A DSAtlantic Company
51 Century Blvd. Suite 100, Nashville, Tennessee 37214
12-07-99
REV. 03-13-00
y4&v. 3 - 72-av
`` 41,
Site Description
The project site is located on the south side of Shipyard Boulevard, between 171h
Avenue and New Kirk Boulevard in Wilmington, New Hanover County, North
Carolina. The site is bounded to the north by Shipyard Boulevard, to the east by
New Kirk Boulevard, to the west by an existing Wendy's Restaurant, and to the
south by Shipyard retail shopping center.
The site is currently undeveloped with a fair stand of grass vegetation with
several mature pines trees.
Ground surface topography is nearly level with gentle downward slope of less
than 1 percent across the site in the east west direction.
Design Parameters
• Peak Runoff by Rational Method Q = CIA
• C - Runoff Coefficient
Roof Inclined
1.00
Paved Parking 0.90
Lawn, sand (ave. 2-7%) 0.15
Unimproved Cleared Area 0.35
• 1 - Rainfall Intensity (in/hr)
Rainfall intensity values were taken from Intensify-Duration-
Freguency Table for Wilmington, N.C.,
Tr_ - Time of Concentration (minutes)
Minimum
5
Design Storm Frequency (years) 10 & 50
• A — Drainage Area (acres)
See Drainage Map
• Runoff Calculations by SCS Method
Q = (P-0.2S)2/(P+0.8S)
• S = (1000/CN) -- 10
• Rainfall `P' ( from Table)
Pio = 4.82 inches for 10 yr - 6 hr storm
PW = 6.40 inches for 50 yr — 6 hr storm
T&R Proj. No. 5381-029 lof 3
Arby's —Wilmington, N.C.
REV. 03-13-00
F:1DRAWING515381ARBY1029Wrlmlcalcldesign calcs.doc
T; • Runoff curve Number `CN'
Native soil is sandyHydrologic Soil Group `A'
Paved Area 98
Gravel Area 76
Grass Area, good condition 39
• City Design Requirements
The peak storm runoff from the 10-yr.,6-hr. rainfall after development
shall not exceed the peak discharge for the same rainfall event before
any development has occurred.
2. Check the 50-yr., 6 hr. event to insure no flooding of buildings is
induced by the facilities to be built.
Storm Design Concept
There is no storm sewer system on this site, which can serve as outlet for
the proposed pond. However, the general characteristic of the soil is
sandy with high percolation rate. Therefore, the concept of providing
enough storage volume to detain the storm runoff, and allow it to exfiltrate,
or exit the basin by infiltrating into the soil ground is the main basis for the
storm design. Thus, the assumption used is detain the entire volume
generated by a 10 year - 6 hour storm duration.
Based on the information provided to us by the Geotechnical Engineer,
the native sandy soils has a percolation rate of 2.2 to 2.5 inches per
minute (or 0.12 gals/min/sq.
First Flush Volume Calculations
On a typical storm routing design i.e. detention pond with outlet structure,
the first inch of storm is not allowed to drain to the structure. Thus, the
detention pond volume is increased the first flush volume.
• In this particular design however, there is no storm outlet for the pond
except by percolation, detaining not only the first inch of rain but also the
entire storm runoff. Thus, the first flush volume was considered part of the
detention storage volume.
T&R Proj. No. 5381-029
Arby's — Wilmington, N.C.
REV. 03-13-00
2of 3
F:kDRAW1NGS15361ARBY10291MIm1calcldesign calcs.doc
PROJECTNAME 14'e,BY5 "'�rl ff4l 1r
PROJECT NO. � �8� - o z9 SHEET OF 6-
TRIBBLE RICHARDSON, INC. BY _4Lr&/-17 DATE_/7-# q
A i '�Atlantic Company CHECKED BY DATE XWt 3 ' zZ- dO
eaxlipIa` AY 2,fTlo1,r.1L �a
Q = G /A
/7/ G/I• -7 [-
7� Z7 Ar,
�---
/.zi
(e'3S)
J
A 27
TZve a/ Co.,/cL-,vrl4.F noti/
72, L3 D, ��S
106
Tc
/4/,,c,4GL l/lr&NS/Ty T76lt ,
0
ev�U 4�5 ``. ,r�%I/¢X//j�Url? .4GGdYlJ/�54E iQ�LFhS� �jzam sib
PROJECT NAME
PROJECT NO. SHEET?04 O�
TRIBBLE & RICHARDSON, INC. BY �J7,L-DATE
A P,.-Atlantic Company CHECKED BY DATE 3! 1GG
z,4 , 1c'DST D� y�Gp� y�,�5 S %ZG�n�a�i� y
�3Qf5
D O x7.z�a.a3
Aw 0 frl)
N�
PROJECT NAME
MOVE RMIERUR
TRIBBLE : RICHARDSON, INC.,
A I' )SA Company
PROJECC_TgNO. �f/ - Q 29 SHEET 2 OF 6
BYDATE / 7'
CHECKED BY DATE 1-4 d Dd'
2 , A0 5 T DAY �E� ,e.�N4��' ,d 'y AU-7�b /4Y
o, v 7 Irr.
d9
-9-� o .3
G - 4 , 4 / Cl .U, ./ 40-tG,9 C, &� -749,
� 7' n/� /, Z 7
O F C4 N G�ic/77� 47 �/ L = 3 yD f� - G / - S9- D < z. U
3
o, 3�s �
3 94 S", g8 rzt'h s ,
z
%—) l o= Z 5z
7 Dz
7,4
/,27 7,79
0.7o ;ram ,-ems'
GQ 63-6 = 6:r-�X S I / 9 �C 14r% - -191: p-1
�s
G�= S
PROJECTNAME 6—"S /aE67AW124Wr
S tr
TRIBBLE & RICHARDSON, INC.
A D _Atlantic Company
•3 , S Tb/z,� /2lCCVDG�• C�-s
�QM17/TT Dn! )
2
PROJECT NO. ' 6"�g/ I -SHEET OF
BYf2l_te DATE _-///-/ % 9%
CHECKED BY _ DATE 1614711
,B y SC 5 /lD 4 �PDb7
��
-------- �Q sprt/ of /z{tnlar-F /n/ lAuceews�
P �VA-6,4_
e,07 O�t
Zi,,Q'Sele o,3
�%liOl��1i G/U d &D
r 0,o7&g) t d,a6(6) 0 9�
1 / 7- 741:9 4 /. Z 7
QD6�Drx ar ae!(NDif 1 GQ /
z
7.3s
(zZ)
6 67,MM
y -Z-741� !NGfps
z
7
C �a +
z•�,�
g��
Mi
PROJECTNAME
�L-7 r
�. A PROJECT NO. �� rQ Zq SHEET OF d6
TRIBBLE T RICHARDSON, INC. BY, DATE.//` 1"7: 9
A D' Atlantic Company CHECKED BY DATE'(e-'' `BA4100
/3.ao0 cul ol.
,bc&-rM--A1770Al
s- (41c-a') r, x/'3
vI P,�a�DS DET NTLaA4 PoAI d IVII-G /,107-
<5 nA e7UI2-E 570),t l lZaNaiF iS is 196
/'�Ex 04 LA-T2,d-� , 7;a,5 46 z Q
�c GC.t L 7'0 57I1lL44 /lu4/D�f UDLdlitC
,e57677 44 4-7-&6 wit-7ZW- s A',eie- rc4--
6'9,
/a 10r- s" rt M
Ai*V•' Theme Wes G-+► �ti y error n-, Bndl/i✓u S`/•79�$
Cp/es .( �tsrGli �� 2no) 7��s .e��y �'/sa. /+✓
J/dL 4,wAAars ?so /cad
i . PROJECT NAME Alef3YS IL-�S72WXA 7-
ma's PROJECT NO. Z9 SHEET S OF Co
TRIBBLEr RICHARDSON, INC. BY-Z- 2'J DATE Ui:
A [!_`Atlantic Company CHECKED BY DATE 3
/'&iC6d1-,4770d 1641,Z� 2.2 7� 2,5 //1/iyy�'/7 / 7 /h/, �/hpu/iN�scrr..'s;�.,
S� 79-7 ss, o
S~7. o _ Z7, - / - 5 7, 4o
3 *Z 7 _�
e" I
/eotk
/3" ao 0
z4z��
g-1 ins or ; Z3 h�dr5
�%s93
�r
3�z.sG
0.1Z X S,Gf X L z 0-q(0 eW114r xv 5.F
7 q 8It oww
174t-X1-'6
PROJECT NAME !��O_ yS
+E, . MWIMSENE'Ami 4 N = _T`_1
TRIBBLE & RICHARDSON, INC.
A i;,:=Atlantic Company
12 a.68'
PROJECT NO. _ 53-�`� _� _ SHEET OF
6Y I_2� /DTEE
/
CHECKED 9Y DATE" Z' Z Z-O(f f
YO �1(/WE r /'�� tN%/i-LG ,� �Y. 7� Qi�f4'CNtG� /l-Tf�i$•
/yl6�C ,' S'fiVGE y7rC- ,piu�oOsG?, I.AQn/fj 6th,< 1,l6
Gu/r2,trr ,9 7�i� �ThL /l.t/DFF DN SST /S �'Gtc.T�'ka
7D Xh1 /TS Td
/Gbv� /l
(¢3SL4)
l� D lL! /S1l 2 • • � � � f �Eh % flll � i1�i �� /0 L,i' � � �7 /r STZ� ram,-! )
-7
A x/ /
79 cu� fr
TABLES
, POND,- 2, Version: 5.21
S/N.
ARBY'S WILMINGTON, NC
DETENTION POND VOLUME
MARCH 22, 2000
CALCULATED 03-24-2000 . 11:39:59
DISK FILE: 9:\5381arby\029wilm\talc\VOL3 VOL
Planimeter scale: 1 inch = 1 ft.
*
Elevation
-Planimeter
Area Al+A2+sgr(A1*A2)
Volume
Volume Sum
(ft)
(sq.in.)
(sq.ft)
(sq.ft)
(cubic-ft)
(cubic-ft)
--------------------------------------------�---------------------------------
55.00
1,320.00
1, 320 �- 1335
0
0
0
56.00
1,956.00
1,956'ef-VS
4,883
1,628
1,628
56.68
*I*
2,521
6,697
1,518
3,146
57.00
2,811.00
2,8110105)
7,112
2,371
3,998
Aye.PeAli 57.40
*1*
3,278
9,125
1,217
5,215
58.00
4,046.00
4,046C341O)
_ _
10,229
3,410
7,408
59.00
6,420.00
6,420(4290
15,563
5,188
12,596
y 5 :07
*I*
6 7,4.6C4946
19,747
428
13,023
59.50
9,133.00
9,133
23,210
3,'868
16,464
\/ft _ 52 72
I* --
12,456_-
32,255
3.129---
191_593
60.00
15,160.00
15,160
36,060
6,010
22,474
*I* ---> Interpolated area from closest two planimeter readings.
2
IA = (sq. rt (Areal) + ( (Ei-El) / (E2-El)) * (sq. rt (Area2) -sq. rt (Areal)) )
where: El, E2 = Closest two elevations with planimeter data
Ei = Elevation at which to interpolate area
Areal,Area2 = Areas computed for El, E2, respectively
IA = Interpolated area for Ei
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2))
1
where: EL1, EL2 = Lower and upper elevations of the increment
Areal,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between EL1 and EL2
POND-;1' Version: 5.21
SIN:
ARBY'S WILMINGTON, NC
DETENTION POND VOLUME
MARCH 10, 2000
CALCULATED 03-13-2000 08:50:09
DISK FILE: g:\5381arby\029wilm\calc\VOL2 VOL
Planimeter scale: 1 inch = l ft.
*
Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum
(ft) (sq.in.) (sq.ft) (sq.ft) (cubic-ft) (cubic-ft)
---------------------------------------------------------------------------
55.00 1,320.00 1,320 0 0 0
56.00 1,956.00 1,956 4,883 1,628 1,628
56.68 *I* 2,521 6,697 1,518 3,146
57.00 2,81.1..00 2,811 7,112 2,371 3,998
1 57.29 *I* 3,146 8,931 863 4,862
;EVe, �r /Ir *I* 3,327 9,196 1,349 5,347
58.00 4,046.00 4,046 10,229 3,410 7,408
r%ra 58.83 *I* 5,980. 14,946 4,140 11,548
59.00 6,420.00-5-96
59.50 9, 0 9,133- 23,210 3,868 16,464
�SU 59.87 r. 0 3 9,302 1,135 17,599
60.00 1 ,1 0 15,160 15,376 1 687 18,286
*I* ---> Interpolated area from closest two plan imeter readings.
2
IA = (sq.rt (Areal) + ( (Ei-El) /. (E2-E1)) * (sq.r ( e 2) -sq.rt (Areal)) )
where: El, E2 = Closest two elevations th planimeter data
Ei = Elevation at which o erpolate area
Areal,Area2 = Areas computed for El, respectively
IA = Interpolated area Ei
* Incremental volume computed by the Conk Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Are 1 + Area2 + sq.rt.(Area1*Area2))
where: ELI, EL2 - ower d upper elevations of the increment
Areal,Area2 A eas m uted for ELI, EL2, respectively
Volume = I creme al volume between ELI and EL2
1'.
59.8
60.8
60.3
C�)
275 SF
c.o.
I.E.58�DP�
6
.JOB NUMBER DRAWN BY Ps DETENTION POND
5381-029 CHECKED BY RBP
ARBY'S RESTAURANT
SHEET NUMBER DATE 12-07-99 SHIPYARD BOULEVARD
REV 03-13-00 WILMINGTON, NORTH CAROLINA
G,\5381ARBY\029Wilmlcalcldmap.dwg Man Mar, 13 09:17'.31 2000 RBP
1.5
61.3 611
C,0.
I.E.59.5
62.0
1 GRASS-
354 SF
o- JLA
D S A dan tioc
51 C D AY BOULEVARD, SUITE 100
NASHVILLF, 7ENNBSSPE 37214
phooe:(61S)SM-1144 fµ :(615)885-1102
wcbdic: www. DSAdwdzmm
Exhibit 1
Table of Rational runoff coefficients
Description C
Source
Roof, inclined
1.00
Malcom
Street, driveway, sidewalk
0.95
Chow, 1964
Parking lot
0.90
Malcom
Roof, flat
0.90
Malcom
Commercial, generalized
0.85
Malcom
Apartments, schools, churches
0.60
WSSC, c.1968
Residences, 10 dwellings/acre
0.60
Malcom
Residences, 6 dwellings/acre
Residences, 4 dwellings/acre
0.55
0.50
Malcom
Malcom
Residences, 2 dwellings/acre
0.40
Malcom
Unimproved cleared area
0.35 •--
Malcom
Lawn, dense soil, steep >7%
0.35
Chow, 1964
Playground
0.35
Chow, 1964
Park, cemetery
0.25
Chow, 1964
Lawn, dense soil, avg 2-7%
0.22
Chow, 1964.
Wooded, sparse ground litter
0.20
Malcom
Lawn, dense soil, flat 2%
0.17
Chow, 1964
Lawn, sandy, avg 2-7%
0.15
Chow," 1964
Lawn, sandy, flat <2%
0.10
: Chow, 1964
Wooded, deep ground litter
0.10
Malcom
0
Gb�i 1Zer�-� ; �c iu �NTs a ,= 672RIW ✓?r-s/ 6 ti/
vl-2 e°�
CH kRT E-5
Depth - Duration - Frequency Tnble
Location: Wilmington, NC
Return Pericd
Duradan 2-yT 5-yr 10-yr 25-yr 50-yr 100-yr
in] [inj finiin in in
5 min
0.49
0.55
0.60
0.68
0.74
0.90
10 min
0.84'
0.96
1.05
1.19
1.30
1.41
15 min
1.09
1.24
1.36
1.54
1.69
1.83
30 min
1.58
1.90
2.12
2.46
2.72
2.98
60 min
2.10
2.58
2.92
3.41
3.80
4.19
2 hr
2.36
2.93
3.34
3.92
4.37
4.82
3 hr
2.63
3.29
3.76
4.42
4.94
5.46
6 hr
3.30
4.20 _
4.8
5.71
6.40
7.09
12 hr
190
5.00
5.77
6.86
7.70
8.55
24 hr
4.50 ,
5.81
6.72
8.01 .
9.01
10.00
Intensity - Duration - Frequency Tnble
I\ . 1 Location: Wilmington, NC
Retum Period
'Duration 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr
rh1hr] f ia&rj-[ir h ] ---. LiE&r] f in/hr] TiinAr] _-
5 min
5.89
6.63
r-7.233
8.15
8.87
9.60
10 min
5.06
5.76
'630
7.13
7.79
8.45
15 min
4.36
4.97
5.45
6,I7
6.75
7.32
30 nun
3,17
3.79
4.25
4.92
5.44
5.96 _
60 min
2.10
2.59
2.92.
3.41
3.80
4.18
2 hr
1.18
1.47
1.67
1.96
2.19
2.41
3 hr
0.88
1.10
1.25
1.47
1.65
1,82
6 hr
0.55
0,70
0,8
0.95
1D
1.18
12 hr
0.33
0,42
0.48
0.57
0.64
0.71
24 ht
0.19
0.24
0,28
0.33
0.38
0.42
'Source: Master Drainage improvement and Stormwater Management Plan, Vol. 1, McKim &
Creed, June 1988
�
intensity -Duration -Frequency Equation
I=G/(H+T)
for T from 5 to 120 minutes
1 • .e,
Z
_Q
.H
2
171
24
5
219
28
10
252.
30.
25
300
32
50
338
33
100
.376
34
Where R is return period in years
Source; Master Drainage Improvement & Stotmwater Management Plan.,
Vol. 1, McKim & Creed, June 1988,
F. PIPE SYSTEM DE 1GN
1. Cmrb Inlet D. es
The curb inlet design procedure is based on a standard City of Wilmington curb inlet
with a 4-foot opening. The following procedure is used to locate inlets, however,
other factors shall be considered such as location -of low points, intersection and
layout of pipe system.
a. Determine maximum gumer flow from the nomograph "Flow in triangular gutter
sections_" The known values of street longitudinal slope, S; street cross slope,
Sx; allowable spread, T=8 feet; and roughness coefficient, n: are used to solve for
the gutter capacity, Q.
b. Determine location of inlet using the rational formula rearranged such that:
A - Q/CI
Locate first inlet. by trial and error with planimeter and topograpbic map such that
gutter flow does not exceed capacity determined above. Check selection of "C"
and "I" for the actual area determined.
c. The next inlets are located utilizing Charts F-1 and F-2. Determine the required
curb opening length, Lt and enter in Chart F-2, with the ratio L/Lt where L is the
5-16
JUL
® Information
r''�..To Build 4n
Engineering - ConsulUng - Testing
July 8, 1999
Mr. Todd Jackson
RTM - Atlantic Coast Region
29 Leinbach Drive
Suite A-3!� -'
Charleston, South Carolina 29407
Soil Percolation Testing %
Arby's Restaurant -- Shipyard Boulevard
Wilmington, North Carolina
PSI Report 458-90065-1
Dear Mr. Jackson;
Professional Service Industries, Inc. (PSI) has completed the requested testing of the in -place
soils at the proposed Arby's Restaurant located,along Shipyard Boulevard in Wilmington, North
Carolina. Our role on this site was to perform soil percolation testing to be used in the design of
an effective storm water sewer system.
Our testing consisted of performing one hand auger boring to a depth of three feet in four
locations, as outlined in DS Atlantic's request dated June 18, 1999. 'Our hand auger borings
were performed using a four -inch diameter hand auger. Groundwater levels, soil types, and soil
percolation rates can be found in the following chart.
LOCATION
PERCOLATION
GROUND
SOIL CLASSIFICATION
(INCHES/MINUTE)
WATER
ELEVATION
(FT)
1
2.2
(1)
-0.0'
to -1.0'
Light Tan Fine Sand
-1 .0'
to -2.0'
Tan Fine Sand
-2.0'
to -3.0'
Dark Brown Fine Sand
2
2.5
(1)
-0.0'
to -3.0'
Tan Fine Sand
3
2.2
(1 }
-0.0'
to -3.0'
Tan fine Sand
4
2.2
(1}
-0.0'
to -1.0'
Brown Fine Sand
-1.0'
to -2.0'
Tan Fine Sand
-2.0'
to -3.0'
Brown Fine Sand
Protassienal Service Industries, Inc, - 4733 Northgate Boulevard - Myrtle Beach, SC 29577 - Phone 843/448-4446 - Fox 8431626-5500
J Ul_ 1G 77'.L-4•U'.] rM i--.)i I'I1M I LG rJCri"r-1
(1) No groundwater was encountered to a depth of six feet.
PSI is pleased to have been of service on this portion of the project. If you should have any
questions or require any further assistance, please do not hesitate to contact our office.
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC
Mon D. Hill
(Manager
C ��+J es C. P.E.
Chief Engineer
Table 2-2a.—Itunoff curve numbers for urhan areas]
Curve numbers for
Cover description hydrologic ;oil group—
. Average percent
Cover type and hydrologic condition impervious areal A 8 C D
Fully developed urban oreaa (vegetation established)
Open space (lawns, parks, golf courses, cemeteries,
etc.)":
Poor condition (grass'cover < 5041v) ..............
Fair condition (grass cover 50% to 75%)...........
Good condition (grass cover > 75%) ..............
Impervious areas:
Paved parking lots, roofs, driveways, etc.
(excluding right-of-way)....... ................
Streets and roads:
Paved: curbs and storm sewers (excluding
right-of-way). .........
Paved: open ditches (including right-of-way) .......
Gravel (including right-of-way) ...................
Dirt (including right-of-way) .....................
Western desert urban areas:
Natural desert landscaping (pervious areas only)'...
Artificial desert landscaping (impervious weed
barrier, desert shrub with 1- to 2-inch sand
or gravel mulch and basin borders) ...............
Urban districts:
Commercial and business ..........................
Industrial........................................
Residential districts by average lot size:
113 acre or less (town houses)............ .......
114 acre .........................................
1/3 acre .........................................
112 acre .........................................
1 acre ...........................................
2 acres ..........................................
Developing urban aremi
Newly graded areas (pervious areas only,
no vegetation)3...................................
Idle lands (CN's are determined using cover types
similar to those in table 2.20.
G8 79 86 89
49 ' 69 79 84
61 i�:: 80
98 98 G 98
98 98 9s
83-
89 '
92
93
(IbD
85
89
91
72
32
87
59
63
77
85
88
96
96
96
96
85
89
92
94
95
72 '
81
88
91
93
65
77
85
90
92
'18
fit
7.
8.3
.97
130
57
T?
81
;tr;
25
54
70
80
11.5
20
51
68
7 9
.94
12
46
65
77
82
77 81; 91 94
'Average runuff condition. and 1, - O.2.S.
°the aver.+Ke percent iml*rviflus area Khuu•n was tined to Aevel+q+ the cnmin)site Ms. [)the+' assure bins :are as fnllnc+ inq++•n•i.skis ;+ryas
:+re dirvctly c'+narerte+l to the iltain;+Ke systent. impwrvious arras have. a CN nr!N..Lild lxn i,+u, an:+s are conside-rc+( e,1+tivalrw In 1.1,r11
si+ac•e in g+NHI hrrlmlovic eun+litiun. CN's for ether comhin;+tions of c+avlitiun:+ m;a'• he cvrnpuLed using! fivun• 2-3 nr'°••1.
."CN's shown are equivalent to th++se of paKture. Cnmlwsite (:N's may be viinpute+l for other c.+mhinatinns nr++ibun sir.+ce ti.v+•r 1}'1+e.
'C nmlw+site CN's for n;+tur l +le,erY land,c:+[aioK should he computed u,inK f+ynrres 2-:1 m- 2.4 has, -,I nit the imi+er vino, an•a hcrcvntaigc WN
1,18) ;u+,l the Irerviuu, area C'icI. The petviou, area CN•, are a,suale+l egoivaleot to desert sh+t+h in IN-+r hv+lrntflltic co+tdition.
10m) >,+site CN's to u;e ftar the aleeil;n of temlKrntry measure+ dminv KrnlinK and cimstructinn .shnnhl he +,nq+u(r.l u,ilig tiKure Y•a ur •'•a,
ha -led flit the degree of development 6mlaerviuu;+ Area Iren'entat;e) ;red the C.4s for the newly gr.uled pc+'yio+ls
(210-VI-TR-55, Second Ed., June 198G) 2.5
DRAINAGE MAPS
' r' " • Water Surface Elevations
10-yr Storm sq, 4(,r . Storm wafer is contained within
—]
Elevation = ± ISM feet I the detention Pond.
50-yr Storm �p,�q
Elevation ± 6947 feet
• Storm water is 2.5 feet below
finish floor of proposed building.
• Storm water will start to overflow
the detention pond and exit the
site through the entrance drive.
C
T&R Proj, No. 5381-029 3of 3
Arby's — Wilmington, N.C.
REV. 03-13-00
F.IDRAWlNGSl5381ARBY1029W+Imtcalcldesign calmdoc
STORM RUNOFF CALCULATIONS
M.
m
......... I L_
DIVISION PART OF NEWKIRK LAND
2C i
.lLkIIAN N. ECHOLS, SR.
------------------
----- -----` ------ / ----- —-------'-
j
SHIPY_A_ O
----r------ —-
— x-------------- —-- P
.................` ..................x 750
i
._Y
Y ,
�I 1
1
I
I� 1
I� 1B I� 1
1
I �
i 1 '
1 1 �
1 1
1 f�J I 1
1 1
' I 1
j I �
7 t
1 1 1
r �
/ 1 1
av ,
i�
� r t
to '
1 1
1
1 1
' I
1 1.
"Ills-
. .............. ........ ....... J........................a7......................
---------I
-------4— -----------------------
-BLVD. �
---------------------
\ -
ODRAINAGE AREA TABLE
S
SUBAREA GRASS PAVED TOTAL
ACRE ACRE ACRE
3
1 1.21 0.06 1.27
2 0 0 0
M
3 0 0 0
CMQS DD G1Gi[l>�1G°a� (1vl1Ga° I�
4 0 0 0
SCALE: 1' = 40' 0'
0 0 0
NEV:-
N
TOTAL 1.21 0.06 1.27
03-21-00
REV: 03-13-00
REV: 02-07-00
R R R
5381-029
DSAtlahtic
DD0\ -
�/��D7 �L�J�I�n�IL-�V�1�=1�4�JDDI�I�Ly�IvL�JL�rlI�I//L�=1WLJ
Vl/ES�IVILI J E l�Al�lp llth�rJ E Ir-0 �(:-.1 0
51 CINNRY BOULEVARD, SURE 100
NASHVIII$iENNBSSEE 37214
ll
12-07-99
perc:(6u1au-1(u tu:(6t3)ets-itm
G\93AIARRY\OP9Wilm\ralr\dm03PP00.dwo Fri Mar P4 10 11 OP POGO RRP
q
R
}
1
ibo S
- --;I,
1
1 O I i
IN
1 A 1 I h
1 AySS
339 SF
1 I
� 1
1
1 1502 SHIPYAID I ;I
1
i I it
1 I
1 �
1
1 1�5
1
1
1
1
1
1
t
;
L- - ---------�-
PR0.IE 1 WBEIIClI K"
V ft. Ee.P
l reafed 81/ Qehd
O DRAINAGE AREA TABLE S
SUBAREA SURFACE AREA
1 GRASS 0.34 3 ��
2 BUILDING 0.07 ACRE M
3 GRAVEL 0.06 ACRE oa3 a< C�Co�4 ❑ ❑ ❑ 9R62\ n @9 MQp
4 PAVED 0.80 SCALE: F = 40'-0'
TOTAL 1.27 .9 NEV: 03-21-00
REV: 03-13-00
REV: 02-07-00
as 5381-029
4dQ o DSAtlant1C
V�/ILSUVLLLVIJ Il LNVD II V.:JW IJ V'U �G=.1� ❑ ° S1 CENTURY BOULEVARD. 111'I8100
HASHVnLE, TENNESSEE 372t
pEme a615)eu-uu e.:(s1s)eas-um 12-07-99
62
60
58
56
54sz
52
DATUM ELEV
50.00
0+00
GROUND
1 +00
O
�
-
ROPOS
D PO
D
-
EXISTING
PROP
FINISHED
SED
80TT
M EL.
55. 0
AP
ROXIM
TE
SH
WT t5
. 7
N
�
�
u7
JOB NUMBER
5381-029
DRAWN BY Ps
CHECKED BY ReP
POND CROSS SECTION
1502 SHIPYARD BLVD.
iC)
DSAthntSHEET
NUMBER
SK_1
DATE
03-01-00
AT NEWKIRK AVENUE
510ENTURYBOULEVARD,SUM100
NASHVBS$TENNBSSEE37214
15)885-110Z
WILMINGTON, NORTH CAROLINA
etc: �.DSA mdamm
G: 15389ARBY\029Wi lmlpond , dwg Wed Mar 01 96: 22: 36 2000 PS