Loading...
HomeMy WebLinkAboutSW8991141_HISTORICAL FILE_20100317STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW uq11W DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD �A Ail NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 17, 2010 Mr. Fleming Gibson, President Carolina Lodging Group, Inc. 351 Ocean Ridge Parkway SW Ocean Isle Beach, NC 28469 Subject: PERMIT RENEWAL REQUEST Stormwater Permit No. SW8 991141 Hampton Inn, Sunset Beach, NC Brunswick County Dear Mr. Gibson: Dee Freeman Secretary The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8 991141 to Hampton Inn, Sunset -Beach, NC for a High Density Project on June 19, 2001, This permit expires on June 19, 2011. Per 15A NCAC 2H.1003(h) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application prior to December 19, 2010. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the properly has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted stormwater treatment system, a certification of completion be submitted to the Division from an appropriate designer for the type of system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, Georgette Scott, Stormwater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSidwc S:IWQSIStormwaterlRenewal\Requests120011991141.mar10 cc: Wilmington Regional Office File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1.877-623-6748 North Carol i n a Internet: www.ncwaterquality.org //� An Equal Opportunity 1 Affirmalive Action Employer A�tKt�ral 1 r State Stormwater Management Systems Permit No. S W8 991 141 STATE OF NORTH CAIZOLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENTPERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chaptcr 143, General Statutes ofNorth Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS I-IFREBY GRANTED TO Carolina Lodging Group, Inc. Hampton Inn, Sunset Beach, NC Brunswick County FOR THE construction, operation and maintenance of a wet detention basin in compliance with the provisions of 15A NCAC 2I-1 .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 19, 2011 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff'I'rom 203,425 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The built -upon area for the future development is limited to 136,778. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 991141 DIVISION OF WATEAZ QUALITY I'110JECT DESIGN DATA SHEET Project Name: Hampton Inn, Sunset Beach, NC Permit Number: SW8 991 141 Location: Brunswick Comity Applicant: Mr. Fleming Gibson, President Mailing Address. Carolina Lodging Group, Inc. 351 Ocean Ridge Parkway SW Ocean Isle Beach, NC 28469 Application Date: Name of Receiving Stream/index #: Classification of Water Body: If Class SA, chloride sampling results Pond Depth, feet: Permanent Pool Elevation, FMSI-: Drainage Area, acres: Total Impervious Surfaces, ft2: OFfsite/Outparcel Area entering Pond, W: Required Surface Area, ft': Provided Surface Area, W: Required Storage Volume, ft3: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSIL: Controlling Orifice: .Lune 7, 2001 Lumber / Shallotte River / 15-25-2-(1) "C Sw I-IQW" n/a 4.00 37.00 8.72 203,425 136,778, per Engineer 17,684 51,210 16,939 18,333 37.35 2 X 1.75"� pipe 3 State Stormwater Management Systems Permit No. SW8 991141 H. SCHEDULE OF COMPLIANCE ']'lie stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catell basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will not be allowed in the stormwater treatment system. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. I f the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A modification must be permitted prior to any construction. The following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. "Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale ofthe project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11 State Stormwater Management Systems Permit No. SW8 991 141 11. The permitter shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the pemitted amount, a modification to the permit must be submitted and approved prior to construction. 12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittec is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements ofthe permit. Within the time frame specified in the notice, the permittee sliall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittec shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 16. Deed restrictions must be recorded prior to the sale of any outparcel or future area shown on the approved plans to ensure that future owners are made aware of the built -upon area limitations. The following statements must be recorded: a. "To ensure continued compliance with the NC Division of Water Quality Stormwater Management Permit Regulations, 15A NCAC 2H.1000, the maximum built -upon area for outparce](s) and future areas shown on the approved plans is 136,778 square feet. This allotted amount includes any built - upon area constructed within the property boundaries, and that portion of the right-of-way between the lot lines and the edge of the pavement. Built upon area includes, but is not limited to, structures; asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools." b. "The runoff from all built -upon area on the outparcel or future area must be directed into the permitted stormwater control system." C. 'Built -upon area in excess of the permitted amount will require a permit modification." "The connection into the stormwater control shall be made such that short-circuiting of the system does not occur." 17. A copy of the recorded deed restrictions with all statements as listed above, must be submitted to the DWQ within 30 days of the date of the recording. The recorded copy must be signed by the permittee, dated, stamped with the deed book number and page, and bear the stamp/seal of the Register of Deeds. lit. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5 State Stormwater Management Systems Permit No. SW8 991 141 3. The issuance of this permit does not preclude the Permittee from complying; with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including; the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing; of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the i 9th day of .tune, 2001. NORTH CAROLINA ENVIRONMENTAL MANAGEMBN`I` COMMISSION Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 991141 C: East Coast 'IN 20�t Engineering Company, P.A. BY-wuzmzj treet Fax: 910.754.8049 Consulting Engineers Post Office Box 2469 Officc: 910.754.8029 Shallotte, NC 28459 June 6, 2001 Mr. Scott Vinson, Environmental Engineer North Carolina Department of Environment, Health and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Hampton Inn Carolina Lodging Group, Inc. Brunswick County, North Carolina Stormwater Project No. SW8 991141 Dear Mr. Vinson: Enclosed are copies of letters dated May 1, 2000 and June 5, 2001 from Mr. Paul M. Farley of Land Management Group regarding the issue of wetlands on the subject project. As you will note, Mr. Farley's May 1, 2000 letter stated that Allen Davis of the Corps of Engineers was severely backed up and "we could not expect confirmation any time soon". Mr. Farley also stated that Mr. Rob Moul of their office would confirm Mr. Farley's earlier delineation that no jurisdictional wetlands are present on the Hampton Inn property. Also, Mr. Farley states that the pond that we desire to divert stormwater was excavated from non- hydric soil and is not therefore considered a wetland, Mr. Farley's June 5, 2001 letter states that Allen David continues to have a backed up schedule and that he (Mr. Farley) and Rob Moul both have visited the site and found that no wetlands are present on the site. It is our understanding that this additional information will allow you to issue the stormwater permit for this project. Since I am forwarding you this information today via facsimile, the originals will follow by mail. Again, we appreciate your attention to this matter. Should you have any questions or comments, please do not hesitate in contacting our office at your convenience. Sincerely, Agn�,Lewis, Vice -President AProject Manager Enclosures pc: Mr. Fleming Gibson, Carolina Lodging Group, Inc. w/Enclosures File: 99-0338 (Hampton Inn) C Received May-01-00 11:30am from 910 452 0060 EAST COAST ENGINEERI rent By: LAND MANAGEMENT; 910 452 0060; May -1-0"" ')1:26AM; �iukeon� ���a RE V/'2oe SO= AM %&&, V", ,Xrd. W64- wa ,ea402 —q-6 ,91a-4s1-aoor May 1, 2000 Mr. Alan Lewis East Coast Engineering P.O. Box 2869 Shallotte, NC 28459 Dear Alan: page 2 Page 2/2 964 # V.96h 3806 WMx4V&,, .M 19401 I am writing to follow up with you on the Hampton Inn Tract at Grlssettown. Unfortunately, Allen Davis of the Corps remains severely backed up and I do not believe that we can expect a confirmation any time soon. Rob Moul of our office will confirm the delineation this morning. As you recall, that delineation was that no jurisdictional wetlands are present on the property. The pond that you wish to divert stormwater was excavated from non- hydric soil and is not therefore considered a wetland. I apologize for the delay in getting this to you. Please call Rob or me if you have questions, Sincerely: Paul M. Farley Wetland Scientist 26612. Z.rqr 9F: 5 '�W? 961 19�IVIM4( 2�Wtq , AS &AtaWWWnzd 1&nUn& T64 Jan Lewis Coast Engineering Box 2869 otte, NC 28459 x 910-754.8048 9106614 2A— 'Ims I am sending this to follow up on our telephone conversation yesterday Ton regarding the Hampton Inn Tract In Shallotte. As we discussed, Alan Davis Cops continues to have a backed up schedule. Rob Moul and I both visited the for to May 1, 2000. We found that no wetlands are present on the site. Thank you for your assistance in this matter. Please contact me if you have M. Farley ind Scientist Ve Obed .1VgVt0:8 G0-9-unf! 0900 ZGV M `1N2N39dM4W ONVI :AS lugg 0 06ed I833NION3 _I.SVOO iSV3 +- 0900 Z9V 0l6 m0JI Lue9E:80 l0--90—unr pen10308 Sent by:EAST COAST ENGINEERI i .Jun-06-01 09:48aM from 910754802939103502004 Page ! East Coast Engineering Company, P.A. Consulting Engineers PAGE 1 OF 4 (including cover page) TO; __ Mr. .Scott Vinson_ o� NQDENR - Division of Water (duality �T 127 Cardinal Drive Extension Wilmington, NC 29405 PHONE # 395-3900 Fa V & 350-2004 SUBJECTS: Hampton Inn Original via US Mail. FROM: Alan C. Lewis of: East Coast Engineering Company, P.A. 4918 Main Street Post Office Box 2459 Shailotte., NC 28459 PHONE # 910.754.8029 FAX # 910.754.8049 The information contained in this transmission is privileged, confidential, and is intended only for the use of the individual or entity named above. You are not permitted to copy of distribute this communication if you are not the intended recipient named above or the agent of the intended recipient authorized to receive this communication or responsible for delivering it to the intended recipient. If you have received this communication in error, please notify our office immediately by telephone. Thank you. Sent by:EAST COAST ENGINEERI Jun-06-01 09:48am from 910754802949103502084 Page 2 71L East Coast Engineering Company, P.A. 4918 Main Street Fax' 910.754.8049 Consulting Engineers Post Office Box 2469 Office: 930.754,8029 Shallotte, NC 28459 June 6, 2001 Mr. Scott Vinson, Environmental Engineer North Carolina Department of Environment, Health and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Hampton Inn Carolina Lodging Group, Inc. Brunswick County, North Carolina Stormwater Project No. 5W8 991141 Dear Mr. Vinson: Enclosed are copies of letters dated May 1, 2000 and June 5, 2001 from Mr. Paul M_ Farley of Land Management Group regarding the issue of Wetlands on the subject project. As you will note, Mr. Farley's May 1, 2000 letter stated that Allen Davis of the Corps of Engineers was severely backed up and °wc could not expect confirmation any time soon". Mr. Farley also stated that Mr. Rob Moul of their office would confirm Mr. Farley's earlier delineation that no jurisdictional wetlands are present on the Hampton Inn property. Also, Mr. Farley states that the pond that we desire to divert stormwater was excavated from non- hvdric soil and is not therefore considered a wetland. Mr. Farley's June 5, 2001 letter states that Allen David continues to have a backed up schedule and that he (Mr. Farley) and Rob Moul both have visited the site and found that no wetlands are present on the site, It is our understanding that this additional information will allow you to issue the stormwater permit for this project_ Since I am forwarding you this information today via facsimile, the originals will follow by mail. Again, we appreciate your attention to this matter, Should you have any questions or comments, please do not hesitate in contacting our office at your convenience_ Sincerely, A an w.s, Vice -President Project Manager Enclosures pc: Mr. Fleming Gibson, Carolina Lodging Group, Inc. w/Enclosures File_ 99-0338 (Hampton Inn) Sent,by:EAST COAST ENGINEERI Jun-05-01 99:49 RecelVed May -di -ud 11:AM ii aM front 9,107546029)9103502004 Page 3i 4 9 nt By: LAND MANAGEMENT; 910 A52 0080; May -1-0' 1:28AM; Page V 2 -F +1001 [DtYl�tbfL�d4l� ji"40r 9 ar Ad ego AM mu a.fr, "" ,ins 1Q. 9vo-45j•ooay May 1, 2000 Mr. Alan Lewla East Coast 8nglneer+ng P.O. Box 2869 Shallotte, NC 28459 ❑ear Alan: Ado W964 M WN I am writing to follow up with you on the Hampton Inn Tract at GrissettoMm. Unfortunately, Allen Davis of the Corps rernains severely backed up and i do not believe that we can expert s confirmation any time noon. Rob Maul of our office will confirm the delineation this moming. As you recati, that deiinesban was that no Jurisdictional wetlands. are present on the property. The pond that you wish to divert storrnwater was excavated from non- hydric soil and is not therefore considered a wetland. I apologize for the delay in getting this to you. Please call Rob or me if you have questions. Sincerely. Paul M. Farley Wetland Scientist Sent by:ERST COAST ENGINEERI Jun-06-01 09:49am from 9107548029-)9163502004 Page 4i 4 a"3T i O7i!%1C it4i &Wd&n& Ad coo 1Q6z fin 5, 2001 Ian Lewis Coast Engineering Box 2BB9 otte, NO 28459 x 910-754.8049 9" a WAiV*'W -AWLI I am sending this to follow up on our telephone conversation yesterday icon regarding the Hampton Inn Tract In Shsliatte. As we discussed, Alan Davis Corps continues to have a backed up schsduis. Rob Maui and I both viefted the rlor to May 1, 2000. We found that no wettands arc present on the site, Thank you for your assistance in this matter. Please contact me if you have M, Farley ino Scientist Ve gUBd Z a6ed ;Wi1l6�B GO-g•un� � 0904 d5tr O�FJ •1N3i�30tiN'dW ON111 :fie luag I833NIJN3 SSd00 ISd3 F 0900 ZGV @L6 W0,14 111e96:80 L0-90-unf Paniaaaa State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality April 26, 2000 Mr. Fleming Gibson, President Carolina Lodging Group, Inc. 351 Ocean Ridge Parkway SW Ocean Isle Beach, NC 28469 AN FqCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANo NATURAL RESOURCES Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 991141 Hampton Inn, Sunset Beach, NC Brunswick County Dear Mr. Gibson: The Wilmington Regional Office received a Stormwater Management Permit Application for Hampton Inn, Sunset Beach, NC on November 29, 1999 with additional information on March 27, 2000. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: When information regarding wetlands becomes available from Mr. Allen Davis, of the U.S. Army Corp of Engineers, please forward copies of the correspondence from both Mr. Davis and Mr. Paul Farley, of Land Management Group, Inc., to this Office and provide copies of plans noting either the delineation of wetlands or the note that no wetlands exist within the project area. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 5, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Scott Vinson Environmental Engineer RSS/sav: S:IWQSISTORMWATIADDINFO\991141.APR cc: Wilmington Regional Office Don Covil, P.E. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper 7FF�I�TED 2040 STO.RM.WATER' East Coast Engineering Company, P.A. 4918 Main Street Pax: 910.754.8049 Consulting Engineers Post Office Box 2469 Office: 910.754,8029 Shallntte, NC 2$459 March 23, 2000 Mr. Scott Vinson Water Quality Section NC Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Hampton Inn Sunset Beach, NC Stormwater Project No. SW8 99.1141 Dear Mr. Vinson: Your January 5, 2000 letter to Mr. Fleming Gibson listed four comments relative to your review of the subject project. Our responses follow and are numbered to correspond to the number of your comments. 1. Mr. Paul Farley of Land Management Group, Inc. has provided us with a written statement that he does not believe that there are wetlands on the subject site. He is in the process of obtaining concurrence from Mr. Allen Davis of the US Army Corps of Engineers. Once we get subject concurrence, we will be able to specifically address this issue with a note on the plans. 2. Plan Sheet C3 has been revised to show the patio areas as being concrete. The resultant BUA is already included in the calculations. 3. Plan Sheet C5 has been revised by adding a trash screen to the top of the trash guard. 4. Your request to reference the project number on all correspondence is noted. Enclosed are two copies each of Plan Sheets C4 and C5. As soon as we receive written documentation from Mr. Farley about wetlands, we will add a note to the plans which present the findings. We will at that time send two copies of the affected plan sheet to you for review. As always, your prompt attention to this matter is greatly appreciated. Please do not hesitate to contact our office should you have any further questions or comments. Sincerely Alan C. is, Vice President Enclosures pc: Mr. Paul Farley, Land Management Group Mr. Fleming Gibson, Carolina Lodging Group, Inc. Mr. Keith Hubbard, AIA, Isom Associates, P.A. File: 994700.01 (Hampton Inn) State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality January 5, 2000 Mr. Fleming Gibson, President Carolina Lodging Group, Inc. 351 Ocean Ridge Parkway SW Ocean Isle Beach, NC 28469 A4 0 NCDENR NORT}i CAROLINA DEPARTMENT OF ENVIRONMENT ANp NATURAL RESOURCES Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 991141 Hampton Inn, Sunset Beach, NC Brunswick County Dear Mr. Gibson: The Wilmington Regional Office received a Stormwater Management Permit Application for Hampton Inn, Sunset Beach, NC on November 29, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Delineate all wetlands on site, or note on the plans that none exist. 2. Please note wether the patio areas on the eastern and southern sides of the Inn are to be grassed, paved, or open wood decking. If they are to be impervious areas please show on plans and include in application and calculations. 3. For the pond outlet structure detail please include a trash screen on top of the 48" trash guard. 4. ' Please reference the project number above on all correspondence. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. Gibson January 5, 2000 Stormwater Project No. SW8 991141 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 5, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation ofNCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you'have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Scott Vinson Environmental Engineer RSS/sav: S:IWQSISTORMWATIADDINFO1091141.JAN cc: Wilmington Regional Office Don Covil, P.E. East Coast Engineering Company, P.A. 4918 Main street Fax: 910.754.8049 Consulting Engineers Post Office Box 2869 Office: 910.754.8029 q Shallotte, NC 28459 November 23, 1999 YR NOV 2 9 1999 Ms. Linda Lewis Water Quality Section $Y' NC Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Hampton Inn N Sunset Beach, NC Stormwater Plan Submittal Dear Ms. Lewis: We are pleased to submit the subject project for your review and approval. Enclosed are two sets of Plan Sheets C I through C8 and two (2) sets of the hydrologic and hydraulic calculations. Also enclosed is one (1) original executed Stormwater Management Permit Application Form (stamped "original") and one (1) copy (stamped "copy"), one (1) original executed Wet Detention Basin Supplement form (stamped "original") and one (1) copy (stamped "copy"). Enclosed is a check in the amount of $420 we are providing on behalf of our Client to cover the required application fee. Your review of this project will show that we propose to convert an existing golf course (Lion's Paw at Ocean Ridge Plantation) pond to a stormwater detention pond. We request that the pond be approved for use as a stormwater detention pond even though it does not have a 6:1 vegetated shelf around its perimeter. Our basis for making this request lies in three factors which will lead to stormwater treatment superior to that which would otherwise be accomplished with strict conformance with the "rules". These three factors are: 1) the existing pond has almost three times the surface area required by the "rules"; 2) the pond is upstream of a larger, well -maintained golf course pond; and, 3) the pond has existing stabilized banks which if disturbed would result in greater contribution of sediment to the pond than if left in their current condition. It is important to note that our Client, Carolina Lodging Group, Inc. is closely affiliated with the owner of Lion's Paw Golf Course, Ocean Ridge Corporation. Mr. Fleming Gibson is president of both corporations. Ocean Ridge Corporation will provide to Carolina Lodging Group, Inc. any necessary easement for perpetual operation and maintenance as required for the stormwater detention pond (see Special Note #3 on Sheet C5). We trust that you will find the information contained within this submittal package to be in order and the project warrants approval by your department. Please note that we are also making submittal today to Mr. Dan Sams, P.E. of the NCDENR - Land Quality Section regarding the required Sedimentation and Erosion Control approval. Ms. Linda Lewis Page 2 Hampton Inn November 23, 1999 Stormwater Plan As always, your prompt attention to this matter is greatly appreciated. Please do not hesitate to contact our office should you have any questions or comments. Sincerely, �1 Alan C. Lewis, Vice President (� k "'-' � �' , '/-)� Donald M. Covil, P.E. Enclosures pe: Mr. Fleming Gibson, Carolina Lodging Group, Inc. Mr. Keith Hubbard, AIA, Isom Associates, P.A. File: 99-1700.01 (Hampton Inn) S /ot0 p p .rT ri-►► T �1° �i - S J m��1 4a5�