Loading...
HomeMy WebLinkAboutSW8991141_COMPLIANCE_20010619STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION ZIP DOC DATE ,gyp) lU',�z f YYYYMMDD Permit: SW8991141 County: Brunswick Region: Wilmington Compliance Inspection Report Effective:06/19/01 Expiration Contact Person: Fleming Gibson Title: Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Shallotte River) (03-07-59) ( C;Sw,HOW) On -Site Re prosentative(s): Related Permits: Inspection Date: Entry Time: Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Other (See attachment summary) Owner: Carolina Lodging Group Inc Project: Hampton Inn Sunset Beach Exit Time: Phone: 910-287-1721 Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 ,., Permit: SW8991141 Owner - Project: Carolina Lodging Group Inc Inspection Date: Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site not constructed as of 04/15/2010 Other Comment: Yes No NA NE Page: 2 East CoJ AN 0 6a'o ast Engineering Company, P.A. 4918 Main Street Fax: 910,754.8049 Consulting Engineers Post Office Box 2869 Office: 910.754.8029 Shallotte, NC 28459 January 5, 2000 Mr. Scott Vinson Water Quality Section E C, P. ' e NC Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 JAW&S 20 Re: Hampton Inn yaw& Dwo Sunset Beach, NC Stormwater Plan -Supplemental Information � T®� [� f �'���' �l'" ER � �V Dear Mr. Vinson: As you requested during your telephone call to our office today, we have prepared a map which illustrates the flow path of the water which will be discharged from the proposed stormwater detention pond. As illustrated on the map, once water exits the Stormwater pond, it will flow through two downstream ponds and thence be discharged to the roadside Swale within the southern right-of-way of US Highway 17. I personally walked the site today to confirm that the flow path is accurately illustrated. Enclosed are two copies of the subject map for your review. Your prompt attention to this matter is appreciated. Please do not hesitate to contact our office should you have any further questions or comments. Sincerely, Donald M. Covil, P.E. Enclosures pe: Mr. Fleming Gibson, Carolina Lodging Group, Inc., w/map enclosure Mr. Keith Hubbard, AIA, Isom Associates, P.A., w/map enclosure File: 99-1700.01 (Hampton Inn) w C- HAMPTON INN Sunset Beach HYDROLOGIC AND HYDRAULIC CALCULATIONS for Erosion Control and Stormwater Management October 1999 P11. Urn," "'t" " FARO! ; ' _ SEAL 9499 G1 4" D M o, '��� II rl/ rl 11 N 11111111, East Coast Engineering Company, P.A. Shallotte, North Carolina C on HAMPTON INN Q10 HYDROLOGY FOR STORM DRAINS AND INLET STRUCTURES STRUCTURE DRAIN I.D. CONTRIBUTING SUB -BASINS TOTAL D.A. ac. WEIGHTED "C" VALUE RAINFALL INTENSITY in/hr 010 PEAk FLOWRATE cfs SD I b,c,k,l,m,.7n 2.073 0.82 7.0 I 11.9 SD2 c,k,l,m,.7n 1.799 0,81 7.0 10.2 SD3 k,l,m,.7n 1.595 0.81 7.0 9.0 SD4 I,m,.5n 1.111 0,81 7.0 6.3 SD5 .2n 0.379 0,80 7.0 2.1 SD6 ! .5n 0.949 0.80 k 7.0 I 5.3 SD7 d,e,f,g,h,i,.5n _ 2.183 0,84 7.0 12.8 SD8 e,i,g,i,.5n 2.108 0.74 7.0 11.0 SD9 f,g,i,.5n 1.642 0.83 7.0 9.5 SD I O g,.5n 1.117 0.81 7.0 6.3 OP1 a,b,c,d,e,f,g,h,i,k,l,m,n 4.030 0.83 7.0 23.5 OP2 i 0.464 0.30 7.0 1.0 RD 1 h 0.218 0.95 7.0 1.4 RD2 h 0.218 0.95 7.0 1.4 RD3 .5h 0.109 0.95 7.0 0.7 RD4 .5i 0.109 0.95 7.0 0.7 RD5 i 0,218 0.95 7.0 1.4 CI1 a 0.154 0.85 7.0 0.9 C12 b 0,274 0.85 7.0 I 1.6 C13 c 0.204 0.85 7.0 I 1.2 C14 I k 0.105 0.85 7.0 0.6 CI5 I I 0.071 0.85 7.0 0.4 CI6 m 0.091 0.85 7.0 0.5 CI7 d 0.075 0.80 I 7.0 0.4 CI8 a 0,248 0.85 7.0 1.5 CI9 t 0.307 0.80 7.0 1.7 CI10 g 0.168 0.85 7.0 I 1.0 YII ] 0.464 0.30 7.0 1.0 Pond outlet a thru o 8.719 0.52 7.0 II I 31.9 NOTE: Time of Concentration is estimated at 5 minutes or less for all drainage basins; therefore, the 10 ear rainfall amount is assigned a value of 7.0 in./hr. 0 .Q M o O co U N N Q c0 v to n m a W Nw o ': � !r v M i0 o v e :vE , n� N N v m n cmi cC ip: a]i rn cn coU cy o a m Q o o M a d o o N cpO O N Lo w ,Cr M M ��e1 U O O O M M c6 }'+ Q N N N _ C ccp O O M V m Ln W N O O NI g cm t• M � co O n O ODN co c0 O O a) M O O 011 Mi E eQ Ch co co to co a U N O O NM O v rmi v o O NNI .2 O p - - - :� • ii ;i I I I I � I i W o! . 11 o M� ! CJ _N I O I N rQ 1 0 O p �• N r• td m c) n V O O E - M 'Mi I IU IO i O v v o v O E g • �i I � � I I � � S m � `x� � t: c E s I d' co co coO U N O N cm n m cp +- m O p i!•ap �, _ .:: vN O O�?s' p a E• � u, m a y Y 4 m` �s a O Ln 7� N N to O O to .t- :2 co Cj n O O rvG `+ h" W N 5 5xx S. i 4 4I ^ U U O O O 7 Obi ^ n 7 . Q . O O rn I S Cl) Cl) M 5 GLn p C� U (D O p p ID n; .Ln Cl) p O C;l to a N M MCI) O Ocy ,m Z gw O w !! T j M m aQ I v U j M v N [b Q O O O v ! rT r co a O n? u� � cD o N o- tp p m ,cn. . 5 n o M C1 c� a c•) ,� n o w m m I ` m v m tc �p o •x� m a S z a iY 5 y�j r—�--- j _ z `m S L IIc�I LL! > W Q i ¢ Z I- am Q y W Q 3 Sr o~e w `m ¢ a �I = 3 3 0 pzi p O O w i� Z -j I u r w d t� ¢ 14 EL.m = n cv m `° a m a _ j z 0 d f] W Q m 0. m m u0.! v S a Z Q U c ` +, U wix �I U _n ilkLL i 0 �. V N O Ln O Q_ U OZ cm O O CC)CDQcq O O O J O co .N 't Q U o o rj o p O 0 r�A I� coLO O Ut U O (ND O O O .,Q p m00 !A p .O N O O v� P�.�. O 7 IT Q O 7 O 7 � Q p 7 OLn O O h-[f71 rn p n i4, .M n O LO O u7 U N cN 8 O n CD O v7 Q C`) O O O O Q V � to :O Q O a O O fwi p O Q N MIX. - �: �. N� v O O in O o U N IC!o n o Cl)!n C° v r� :w ti C7 (I CD CD[rfl CD I V N O O O N () N r O u) I N [D O O Q N LO !n .O LO Cl) U 4 O O c0.) m O p M CS m'[ €< � N O O (D O O O co _ O rn ro Ln co 22 0 O o 7 1` (v .n o c i Q o O coo o� ;-api 5 !n (D Go tD CD O r O c o o O QI N n Q O O Cam' p Cl) N c) < Cl) v CO O o v o n a c �' o o m M o c co! CURB INLETS CALCULATIONS SUMMARY Curb inlet I.D. 10-Year Peak O cfs Minimum Number of Neenah R-3246 Inlets Re 'd Based on Number of Neenah R-3246 Inlets Proposed Orifice Flow I Weir Flow CI1 0.9 0.34 1.66 1 C12 1.6 0.61 2.95 1 C13 1.2 0.45 2.21 1 CI4 0.6 0.23 1 .1 1 1 CI5 0.4 0.15 0.74 1 C16 0.5 0.19 0.92 1 CI7 0.4 0.15 0.74 1 CI8 1.5 0.57 2.77 1 C19 1.7 0.64 3.13 1 CI10 1.0 0.38 1.84 1 NOTE: Number of Neenah R-3246 inlets required is based on 4.3' ft. head. '0riflce" capacity with this head Is estimated = 5.7 cis. "Weir' capacity with this head is estimated = 3.1 cis. Thus, 'weir' flow controls. ('Orifice' capacity of inlet is based on orifice flow through 1.6 SF of rectangular openings plus weir flow over rear 33' of grate. "Perimeter" capacity Is based on weir flow over 5.8' of grate perimeter. "Orifice" C value = 0.6. "Weir" C vaiue = 3.3.) NOTE: When specifying or ordering grates - Please refer to "CHOOSING THE PROPER INLET GRATE" on pages 108 and 109. -3246 urb Inlet Frame, Grate, Curb Box tavy Duty �e r ,.. c -4 S. 8 F-t. 0o available with Type L or Type V grate. Also available with square, f " radius 2" radius or 0-shaped rb face. ,o available with flat mountable curb plate, grated or solid, 6•.a f%4- G� shown on R-3246-1, in place of curb box. cuna —.--n...• m.. 3246-1 r ne as R-3246 except with plate over curb box ning. See illustration. :her type R-Diagonal nor type V grates recom- ided for bicycle traffic when used with curbplate, R-3246-4 with Curb Plate 1246-A rb Inlet Frame, Grate, Curb Box y Duty available with Type R-Diagonal Reversible grate. 39 112' CURB BOX HEIGHT ADJ. 5' TO 1U" 35 31.' g 23 718' — 33112, 43, - 0 R-32d Same a, opening Diagona Neither 1 ed for bi R-32Z Curb Heavy C Also ava R-324 Curb Heavy [ NEENAHINV POUNDRY COMPANY no STORMWATER DETENTION POND CALCULATIONS SUMMARY Project Name Hampton Inn Designer DMC Date 1 0/ 2 2/ 9 9 Area Draining to Pond (ADP) Hampton Project, Out Parcel, SW pond, & Portion of FW #5 379800 T 8.71 9 AC SF 0.000IAC Total 379800ISF 8.7191 _ AC . Built -Upon Area!_(BUA Hampton Motel Building 19320 SF 0.444 AC Hampton Drive and Parking 43980 SF 1 .010 AC�_ Hampton Walkways 3300 0.076IAC Out Parcel Future Development) & Contingency 1 1 36800 g 3.1401AC Total 203400�SF I ! 4.6691AC BUAIADP 0.536 Runoff from 1" Rainfall 1 6838 CF 85% or 90% TSS Removal 901 Pond Depth 41 FT SA/ADP Ratio 0.Q466 `� Water Surface Areas I Minimum Required at Normal Pool ! 176991SF Amount Proposed at Normal Pool 512110!;� SF Amount at Storage Pool 5355F Elevations Bottom I 33.00 1 FT MSL Normal Pool 37.00 FT MSL Storage Pool 3 7.3 5 FT MSL 3 Flood Pool} 1 37.90 FTMSL U STORMWATER POND DRAWDOWN CALCULATIONS PROJECTNAME Hampton Inn POND I.D. (Only one pond) DE5tGNER DMC DATE 1 W22/99 NORMALPOOLI elevationl 37.001 surface areal 51210 sf I I E I I STORAGE POOL elevalionj 37.35 ff. msl I surface areal 53550 sf I I I I ORIFICE: elevation 37.00 ft. msl I diameter 1 .751 inches # of ORIFICES 2 Time Increment for Drawdowmi 2 hr Drop in End Begin Water Orifice I Incremental Drop in Water I End Water Time Hr. Elev.(it msl Head 1t Q�cfs Vol. cf Surface it Eiev, ft msl 0 37.35 0.35 0.0952 685 0.0131 37.34 2 37.34 0.34 0.0934 672 0.0126 37.32 4 37.32 0.32 0.0916 660 0.0124 37,31 6 37.31 0.31 0.0898 647 I 0.0121 I 37.30 8 37.30 0.30 0.0881 634 0.0119 37.29 10 37,29 1 0.29 I 0,0863 621 0,0117 12 37,28 0.28 I 0.0845 609 0.0115 I _37.28 37,26 14 37.26 0.26 I 0.0828 596 0.0112 37.25 16 37.25 0.25 0.0810 583 0.0110 37.24 18 37.24 0.24 0.0792 570 0.0108 37.23 20 I 37.23 0.23 0.0774 557 0,0106 37.22 22 37.22 0.22 0.0756 545 0.0103 37.21 24 37.21 0.21 0.0738 532 4.0101 37.20 26 37.20 0.20 D.0721 519 0.0099 37.19 28 37.19 0.19 0.0703 506 0.0096 37,18 30 37.18 0.18 I 0,0685 493 0.0094 37.17 32 37.17 0.17 0.0667 480 0.0092 37.16 34 37.16 0.16 0.0649 467 0.0089 37.15 36 I 37.15 0.15 0.0631 454 0.0087 37.14 38 37.14 0.14 0.0612 44i 0.0085 37.14 40 I 37.14 0.14 0.0594 428 0.0082 37.13 42 37.13 0.13 0.0576 415 0.0080 37.12 44 37.12 0.12 0.0558 402 0.0077 37.11 46 37.11 I 0.11 _0.0540 j 389 1_ 0,0075 37.11 48 -37A, 0.111 0.0522 � 376 0.00772 37,10 50 37.10 0.10 I 0.0503 362 0_0070 l- 37.09 _ 52 I 37.09 0.09 L0.0485 I 349 I 0.0067 i 37.08 54 37.08 0.08 0.0467 I 336 0.0065 37.08 56 37.08 0.08 0.0448 323 O.QOfi2 37.07 58 37.07 0.07 0.0430 I 310 0.0060 37.07 60 I 37.07 0.07 0.0412 296 0.0057 37.06 62 37.06 0.06 0,0393 283 0.0055 37.05 64 37.05 0.05 0.0375 270 0.0052 37.05 66 37.05 0.05 0,0356 256 0.0050 37.04 68 37.04 0.04 0.0338 243 0.0047 37.04 70 37.04 0.04 0.0319 230 0.0045 37.03 72 37.03 1 0.0300 216 0.0042 37.03 74 37.03 I 0.03 0.0282 203 0,0039 37,03 76 37,03 0.03 0,0263 189 0.0037 37,02 78 37.02 0.02 0.0244 176 0.0034 37.02 80 37.02 0.02 0.0225 162 0.0032 37.02 82 37.02 0.02 0.0206 149 0.0029 37.01 84 I 37.01 0.01 0.0187 135 O.D026 37.01 86 I 37.01 i 0.01 0.0168 121 1 0.0024 I 37.01 88 37.01 I 0.01 I 0,0149 107 _ I 0.0021 I 37.01 90 37.01 I^ 0.01 I 0.0129 1 93 I 0.0018 37.00 FOREBAY VOLUME COMPARED TO TOTAL POND VOLUME ELEVATION FT MSL SURFACE AREA S INCREMENTAL VOLUME C ACCUMULATED VOLUME CF FOREBAY MAIN POND FOREBAY MAIN POND_j FOREBAY MAIN POND 33 j 1216 15654 1 2385 18920 2385 18920 34 3554 22186 4764 25285 7149 44205 35 5973 28384 _ 7188 31375 1 14337 75580 36 8403 34365 _ 9751 37240 24087 112819 37 11098 40114 4004 14330 28091 127149 37.35 11780 41770 FOREBAY VOLUME/TOTAL POND VOLUME = 28091/(28091+127149) 0.181 ■ G10 PIPE HYDRAULICS PROJECT NAME j HAMPTON INN Designer DMC Dated 1 0122/99 I i I BACKWATER STRUCTURE I.D. SW POND OUTLET TYPE FLOW HEAD ELEV. I FLOWRATE cfs ,' PPE 2.03 37.03 I PIPE DIAMETER in- >;';- u;;''`;a;'?30 WEIR 0.90 38.25 INVERT -IN I ACCEPTED BACKWATER ELEVATION IS THE HIGHER OF THE TWO CALCULATED. 3,31 _ TYPE PIP E .:., ; • .,. • HDPE MAN NING'S N VALUE ` :a`%>°>,-.'.•=001.2 � I � PIPE LENGTH Cd (Discharge Coe€. •'ii:=: r:'x:'062 I RISER DIAMETER in. "'<< =.:736 Pipe Area sf 4.909375 RISER ELEVATION �"'':;� ';'%� 37.39 Wetted Perimeter (€t) ­7-.855 I I I I WEIR FLOW COEF. '" `''' ;ifs' : 4: Hydraulic Radius O:63 TAILWATER ELEV. I REFERENCE: Civil Engineering Reference Manual, pages 5-19 & 5-20. 7YPE 4 PIPE FLOW (submerged outlet) is conservatively assumed due to the fact that flood conditions are being considered. N Values: Use 0.12 for smooth wall HDPE or concrete. See manufacturers literature for CMP. Cd Values: Use 0.62 for square -edged openings unless know that opening will be rounded or projecting outward. Page No, Project Name Sheet Title lvef-.+, Designer C671y— Date -1b 121 42 7 MANNING'S FULL FLOW IN PIPE Pipe Diameter (in.) Type Pipe " n Value Slope Flow Area (SF) Wetted Perimeter (FT.) Hydraulic Radius (FT.) Velocity (FPS) Flowrate (CFS) 18' Concrete 0,012 0'.0100 1.7663 4.7100 0.3750 6.44 11.37 ii —7 East Coast Engineering Co., P.A. Shallotte, North Carolina ps,! 4CY Page No. @ Project Name Designer(�� Sheet Title T",1,4 1, Date T,11,4-! 6T 1.0 PROJECT NAME: Ham eton Inn CHANNELI.D. Swale Behind Motel Designer: DUC Date: 10/26199 COMPUTED a (CFS) Target 0 (cfs) —4t70 F 1,0 Left Bank SI pe (H/V) Right Bank Slope (HfV) Bottom Width (ft) Mannino' n Channel Slope Jft/ft) 01013 FLOW DEPTH l AVERAGE VELOCITY (FPS)1.9 Flow Area (sf) 0.5292 Wetted Perimeter (f t) 2,656 Hydraulic Radius (f t) 0.199 — --- ------ _ 1 k I � i E I i i . East Coast Engineering Co.. P.A. Shallotte, North Carolina SCS PEAK DISCHARGE METHOD (Reference: EC Manual, Section 8) PROJECTNAME Hampton Inn PONWCHANNEUPIPE I.D. Stream along north property line DESIGNER DMC DATE 1 0/ 2 0/ 9 9 STEP i Drainage Area (ac.) 300 Hydraulic Length (ft.) 7300 Average Slope (%) 0.0021 STEP Soil Group B/C CN Value 82 (Table 8.03b) STEP 3 a) Storm Frequency (yr.) 10 24-hr.Rainfall Amount (in.) 7,0 (Fig 8.03h thru 8.03m) b) Runoff Depth (in.) 2.8 (Table 8.030) STEP 4 a) Equivalent D.A. (ac.) 378 (Figure 8.03n) b) Disharge per inch of 80 01 (cfs) 224 of Runoff (cfs/in.) (Fig 8.03o, 8.03p, or 8.03q) �) 02 (cfs) 178 STEP 5 a) % Impervious Area 15 Factor IMP 1,11 (Fig 8.03r) b) % Hyd. Length Modified 0 Factor HLM 1.08 (Fig 8.03r) c) 03 (cfs) 211 STEP& Avg. Watershed Slope (%) 0.0021 Slope Factor 0.54 (Table 8.03d) 04 (cs) 114 STEP Ratio of D.A. to Ponding 2 Ponding Factor 0.53 and/or Swampy Areas 0 peak (cfs) 6 0 M?TL't '7'++•� u; lac sys.... WA j `IF pd. k, v4tj .irt 901p o(-& It,�� • L.✓�W�,t j CVi� I "a4- 41i{ (►C Jlcx fa Ld Go ++krva f 11AG Al— I 'f-- !�' /~�"'�� L\ ' ' S `..fin , ` '• _ � Grissettawn I� ! • �,� /,; nsel , •• 'Isles-. '•�` ,�_--_;+ .� ,,,,��^!'r D '� • 9. 61ede 4,044 fr �.... �I �.Lfs "�_r• o . ;y- r �� eJ.- _�; 1 �/ � � t. •je+„"-'.'•.%. . Ate., � �" .. 1� /1 - �,� � � �r•- — •.r.- .. / ./ . -._ ' S � �. � - - III V 47 '\ ' t -.w.`-mow- ;.. y�,.• ""•- «. �• — • - � , � _,,,_ ter. Jr. � -«- „� � _ • Pieasant Vie n.- 4i- -7 =i L ,l 52 1163 52 Cern J • 20 -',n•.. �, . � . � � . ram-; - �- - PROJECT NAME: Hampton Inn CHANNEL I.D. Ditch along northern property line Designer; DW Date: 10/20/99 COMPUTED Q (CES Target Q (cfs) 60.0; F 60.5 Leff Bank Slope HN) 3 Riaht Bank Slope (HN) 1 Bottom Width ft 0 Manning' n OQ3 Channel Sloe ft/ft 0005 . FLOW DEPTH (FT) 2.7.6 AVERAGE VELOCITY (FPS ' 3.97 f Flow Area sf 15.2352 Wetted Perimeter ft 12.631 Hvdraulic Radius (fi) 1.206 o-f r H �-- G„ J 9 PROJECT NAME: Hampton inn CHANNEL 1.11. Diversion Ditch North of Stormwater Pond Designer: DMC Date: 10/26/99 COMPUTED Q (CFS) Target O (cts) .60�0 60.7 Leit Bank Slope (HN).. 3 . Right Bank Sloe HN 3 Bottom Wldth ft 5 Manning' n 0.03 Channel Sloe ft/ft} 0.005 FLOW DEPTH (FT) i 66 AVERAGE VELOCITY (FPSj' 1 M61__ Flow Area (s1) 16.5668 Wetted Perimeter (ft) 15.499 Hydraulic Radius (ft) 1.069