HomeMy WebLinkAboutSW8991125_CURRENT PERMIT_20000307STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT N0. SW2p4�7
DOC TYPECURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
State of North Carolina
Department of Environment
sand Natural Resources
Wilmington Regional Office
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Division of Water Quality
March 7, 2000
Mr. Cameron W. Lee, Jr., P.E., Director
NCDOT General Services Division
PO Box 25201
Raleigh, NC 27611
1 � •
ODEP14
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NKrURAL RESOURCES
Subject: Permit No. SW8 991125
NCDOT Division 3 Maintenance Yard
High Density Stormwater Project
New Hanover County
Dear Mr. Lee:
The Wilmington Regional Office received a complete Stormwater Management Permit Application for NCDOT
Division 3 Maintenance Yard on February 23, 2000. Staff review of the plans and specifications has determined
that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000.
We are forwarding Permit No. SW8 991125 dated March 7, 2000, for the construction of NCDOT Division 3
Maintenance Yard.
This permit shall be effective from the date of issuance until March 7, 2010, and shall be subject to the conditions
and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements
in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or
me at (910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Regional Supervisor
RSS/arl: S:1WQSISTORMWATIPERMIT1991125.MAR
M. Warren Mitchell, F.E.
Tony Roberts, New Hanover County Inspections
Beth Easley, New Hanover County Engineering
Linda Lewis
Wilmington Regional Office
Central Files
127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
State Stormwater Management Systems
Permit No. SW8 991125
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
NCDOT General Services Division
NCDOT Division 3 Maintenance Yard
New Hanover County
FOR THE
construction, operation and maintenance of 3 wet detention ponds in compliance with the provisions of 15A NCAC
2H .1000 (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a pan of this permit.
This permit shall be effective from the date of issuance until March 7, 2010 and shall be subject to the following
specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in the
application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from
185,896 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per
approved plans.
4
U
State Stormwater Management Systems
Permit No. SW8 991 125
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
Name of Receiving Stream/Index #:
Classification of Water Body:
Pond Number:
Pond Depth, feet:
Permanent Pool Elevation, FMSL:
Drainage Area, acres:
Total Impervious Surfaces, ft2:
Offsite Area entering Pond, ft2:
Required Surface Area, ft2:
Provided Surface Area, ft2:
Required Storage Volume, ft3:
Provided Storage Volume, ft3:
Temporary Storage EIevation, FMS
Controlling Orifice:
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
NCDOT Division -)Maintenance
Yard
SW8 991125
New Hanover County
Mr. Cameron W. Lee, Jr., P.E., Director
NCDOT General Services Division
PO Box 25201
Raleigh, NC 27611
February 23, 2000
Prince George Creek / (CFR 18-74-53)
"C Sw"
POND I POND 2
POND 3
4 3
5
27 26.
27
10.31 6.66
12.23
185,896 134,341
306,220
None, per Engineer
16,218 15,068
21,834
16.229 15,745
22,109
15,813 11,285
25,186
17,931 16,730
25,537
L: 28 27
28
1.5" � 1.5114)
2"(� pipe
3
State Stormwater Management Systems
Permit No, SW8 991125
H. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in it's. entirety, vegetated and operational for its
intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired
immediately.
The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must
be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited
to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel
of D W Q. The records will indicate the date, activity, name of person performing the work and what actions
were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of
this permitted facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit,,the approved plans
and specifications, and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification.
If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior
to operation as a stormwater treatment device, and prior to occupancy of the facility.
9. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
C. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
10. The Director may determine that other revisions to the project should require a modification to the permit.
State Stormwater Management Systems
Permit No. SW8 991125
11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the completion of construction.
12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities
shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale
of any portion of the property.
13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable
built -upon area.
14. The runoff from all built -upon area on the project must be directed into the permitted stormwater control
system.
15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may or
may not be approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute
143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and all -statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construction of additional or replacement stormwater management systems.
The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all
components of the permitted stormwater management facility.
The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
Permit issued this the 7th day of March, 2000.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Kerr T. Stevens cCor
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW8 991125
State Stormwater Management Systems
Permit No. SW8 991 125
NCDOT Division 3 Maintenance Yard
Stormwater Permit No. SW8 991125
New Hanover County
Designer's Certification
as a duly registered in
the State of North Carolina, having been authorized to observe (periodicallylweekly/full time) the construction of
the project,
(Project)
for (Project Owner) hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL -
on
State Stormwater Management Systems
Permit No, SW8 991 125
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack. is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:I .
9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
1 o. The permitted amounts of surface area and/or volume have been provided.
l l . Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a forebay.
14. The overall dimensions of the system, as shown on the approved plans, are provided.
cc: NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspector
1.3
1
OFFICE USE ONLY
Date Received Fee Paid Permit Number
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may he photocopied for use as an original
L GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
NCDOT
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Cameron W. Lee, Jr. PE Division Director
3. Mailing Address for person listed in item 2 above:
Transportation Bldg., 1 South Wilmin tort Street, PO Box 25201
City: Raleigh State: NC Zip: 27611
Telephone Number: ( 919 715-0400
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Division 3 Maintenance Yard
5. Location of Project (street address):
Barbados Drive
City: Castle Hayne
County: New Hanover County
6. Directions to project (from nearest major intersection):
1-40 West to Holly Shelter Rd. (Castle Hayne Exit) Go East
on Holly Shelter Rd., Take First right on Barbados Drive to Dead End
7. Latitude:— _ Longitude: of project
8. Contact person who can answer questions about the project:
Name: Warren D._Mitchell, PE Telephone Number: (_919 ) 380-8750
II. PERMIT INFORMATION:
1. Specify whether project is (check one)
X New
Renewal Modification
Form SWU-101 Version 3.99
Page 1 of 4
r l
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit nurnber_Cr& and its issue date (if known)
3. Specify the type of project (check one):
x Low Density High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing Stormwater management for the project .
2. Stormwater runoff from this project drains to the Cape Fear River -basin,
3. Total Project Area: *14 . 5-14 acres 4. Project Built Upon Area:
5. How many drainage areas does the project have? 3
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
See Attachment
Basin Iiiformafion .
Drainage Area. l „
Drainage Area 2
Receiving Stream Name
Receiving Stream Class
Drainage Area
Existing Impervious* Area
Proposed Impervious*Area
% Impervious* Area (total)
Im eryious Surface Area.p
Dainage rea 1
rainage. rea 2
On -site Buildings
On -site Streets
On -site Parking
On -site Sidewalks
Other on -site
Off -site
Total:
Total:
* Impervious area is defined as the built Upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
C
O
E
w
C
C
cd
PZ
au
w
cli
4
A
c
O
C
O
U
61
C/]
N
O
O
O
t—
v-y
ID
M
O
O
D
�G
N
O
t
r,
r
O
-�
O
Q.
a�
N
O
O
O
Ch
�O
[V
r1
N
O
O
O
�}
O�
r
N
N
P
—
O
N
tCj
r�
U
M
O
O
N
O
N
O
fn
N
[�1
F+-f
o
o
N
o
0
o
ri
a�
"It
L
N—
O
—
7
V
w
o0
Ol
"
Vo
i
C,
m
V
In
N
'•I,
1-4
M
OM-ql-
O
O
M
0
0
1;11
O
O
N
0
0
0
�t
�
L.
U
a�
t6
V'>
O
�O
00
r-
O
fi
w
In
w
ON.
N
w
U
00
m
h
ao
00
m
N
m
m
C`
[�
Inect
00
a�
a.s
En
En
¢
p
z
v
cd
�,-
o
E
ECU
-'
x
s..
O'
7ti
fYa
C/)
Q.
C-0
i!
'
W
c3
chi
d
a
G
o
o
0
0
0
0
0
�
7. How was the off -site impervious area listed above derived? Site Visit and County
topographic maps.
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following. covenants are intended to ensure ongoing compliance with state stormwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Farm SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SW0-101 Version 3.99 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initi
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP ter/
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of Stormwater treatment/management
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
-Legend
- North arrow
Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwa[er control measures
Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to 1rEAndividual or firm so that they may provide information on your
behalf, please complete this section. ( v
Designated agent (individual or firm): %�wZIW i . mvrckal 9.V-. STF_%JNiLK0 W
Mailing Address:_ 0
City: 46WT4 I-V.A W( W-" ?NIUL State: 0L Zip:
Phone: ( 9 l o! } 3 :5O Fax: )
VIII. APPLICANT'S CERTIFICATION
I. (print or type name of person listed in General Information, item 2) 69,m2/)5�i W , L ee_ , Jr
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000. X2 I I
Si
Date: u Z/
Form SWU-101 Version 3.99 Page 4 of 4
. ,;.
�..���{+�,14�',�e,5.� l�r���'.ti������ '�.ti �.F�I`�' '%il��r .�.� r,t j.,1r:�11
1
� �' • �t
::G.• i � It '' ' r*1'l �� � �
� ,
. - s
� � ,
Permit No. S W S 9�1 i 1 Z S.
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROTECT INFORMATION
Project Name: tJC.►�07 � N i s i o u ]M a ti+� en0.nc �, Ya f_d
Contact Person: W Ole-ren _ M , Phone Number: ( Q II )380 — a150
For projects with multiple basins, specify which basin this worksheet applies to: --* i
elevations
Basin Bottom Elevation _ Z3 .0 ft. (floor of the basin)
Permanent Pool Elevation Z7 •O ft. (elevation of the orifice)
Temporary Pool Elevation � 2$, O ft. (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area (or ZZ9 sq. ft.
Drainage Area ) 0.3 ac.
Impervious Area • 3 ac.
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
S A/DA I
Diameter of Orifice
Design Rainfall
Design TSS Removal 2
Form SWU-102 Rcv 3.99
3 �$ cu. ft.
cu. ft.
cu. ft.
(water surface area at the orifice elevation)
(on -site and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
(combined volume of main basin and forebay)
(volume detained above the permanent pool)
(approximately20% of total volume)
3 • (a 0)0 (surface area to drainage area ratio from DWQ table)
I I Z in. (2 to 5 day temporary pool draw -down required)
in.
130 % (minimum 85% required)
Page I of 4
Footnotes:
i When using the Division SAIDA tables, the correct SAMA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90`16 TSS removal. The NCDENR BMP manual provides design tables for both 95% TSS removal and 90% TSS removal.
11. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC.2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applica Initials
a.
b.
C.
d.
e.
. 6�� - - f.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The forebay volume is approximately equal to 20% of the basin volume.
The temporary pool controls runoff from the design storm event.
The temporary pool draws down in 2 to 5 days.
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
The basin length to width ratio is greater than 3:1.
The basin side slopes above the permanent pool are no steeper than 3.1.
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail)..
Vegetative cover above the permanent pool elevation is specified.
A trash rack or similar device is provided for both the overflow and orifice.
A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
m.- A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does ,does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does Xdoes not' incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
1. After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads Z - O feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads 2,9 i5feet in the forebay, the sediment shall be removed.
Sediment Re oval El. 24.E S 7S o
Bottom Ele ation 2 •0 ' S
FOREBAY
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation Z 7, 4
----------------------------------------
Sediment Removal Elevation
Bottom Elevation 23 , o
MAIN POND
75 %
25%
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of 4
7. All Components of the wet detention basin system shall be maintained in good working order.
1 acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: �� �� -� LJ • Lam- ' P,
Title: p! dret• D, �u.�
Address: 'Trans_-- $1 a)f _ Scw!, ��l ,� {a� S-fr•� 4- }�C� �3oto2,S'Z. a 1
Phor
Sign
7 ` 1(
Note: The legally responsible party should not be a Homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I, , a Notary Public for the State of lldrt� Casa h:+e�_
County of _ _Ia1.Q1se , do hereby certify that
personally appeared before me this 15 jkday of vt-_ it,r _ ,1 g 9l and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
tttitl%IIIIIfll!!�f
'NOTAR ''`p
LIC
•CCjj
SEAL
My commission expires_ A,,204 Z.
Form SWU-102 Rev 399 Page 4 of
e r •'
1 +fir
0
Permit No. 5LA-) 899 11 ZS
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form.may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name: N C DOT i] I Vi 5 i o" IIE Ma ct r-d
Contact Person: �GI rTey - rlA i e l� _ Phone Number: ( 911) 3 SO — a 7_r,_0
For projects with multiple basins, specify which basin this worksheet applies to: jrk:� Z -
elevations
Basin Bottom Elevation
Permanent Pool Elevation
Temporary Pool Elevation
areas
Permanent Pool Surface Area
Drainage Area
Impervious Area
volumes
Permanent Pool Volume
Temporary.Pool Volume
Forebay Volume
Other parameters
SA/DA1
Diameter of Orifice
Design Rainfall
Design TSS Removal 2
23.E ft.
Zln • o ft.
z � • ° ft.
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
l S 7 -• S sq. ft. (water surface area at the orifice elevation)
Co . ac.
3 - 1 ac.
O(el cu. ft.
! (o 730 cu. ft.
8 `7 Z1- cu. ft.
5:z
! - 5 in.
in.
90
(on -site and of -site drainage to the basin)
(on -site and of -site drainage to the basin)
(combined volume of main basin and forebay)
(volume detained above the permanent pool)
(approximately 20% of total volume)
(surface area to drainage area ratio from DWQ table)
(2 to S day temporary pool draw -down required)
(minimum 85% required)
Form SWU-102 Rev 3.99 Page 1 of 4
Footnotes:
t When using the Division SA/DA tables, the correct SAfDA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non.
standard table entries.
2 1n the 20 coastal counties, the requirement for a vegetative filter may be waived if the vet detention basin is designed to provide
90% TSS removal. The NCDENR BUT manual provides design tables for both 85% TSS removal and 90% TSS removal.
IL REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated- an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The forebay volume is approximately equal to 20% of the basin volume.
The temporary pool controls runoff from the design storm event.
The temporary pool draws down in 2 to 5 days.
If.required, a 30-foot vegetative filter is provided at the outlet (include non-crosive flow
calculations)
f. The basin length to width ratio is greater than 3:1.
g.
h.
J-
The basin side slopes above the permanent pool are no steeper than 3:1..
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail)..
Vegetative cover above the permanent pool elevation is specified. '
A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each. basin including access to nearest right
of -way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin_
m: A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does )(does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does Xdoes not' incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.). -
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments:
When the permanent pool depth reads 2375-feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads Z `l • S feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
0 Permanent Pool Elevation 2 G O
Sediment R\Elevation
al El. 2`l 5 75 0
_____ Sediment Removal Elevation Z 3 .S 75%
BottomZ4 • Q %--------------------------------------------- ------
Bottom Elevation 2 3, 0 125% 1
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of 4
7: All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name:
Title: D I vif ?) /rec ,-
Address: Truna_.. fis,'-i61 81d�. -- �- So✓ iNi�� �,. TI� ` - 6 �oX Z5-20
Phone
Signati
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I, TG ry'y F. IRIS , 5,► , a Notary Public for the State of?letk Cawo j r ,
County of _ U9, iy _ _, do hereby certify that ,►, a• o.4 i e! Lee- .
personally appeared before me this Iday of _ .12 . n hLer I Ot OtS , and acknowledge the dtie
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
SEAL
My commission expires °l ZOO Z
form SWU-102 Rev 3.99 Page 4 of 4
t
! � � Y, .'i � a'. 1 l
. l � .'
,,� ,.�
y '� � �
i k y ,�
,� �
a
,� �. ti y!
Permit No. S (JJ S '�9 11 Z S
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
L PROJECT INFORMATION
Project Name: t1GDoT— 'j] 1 v I S I o�►
Contact Person: W Ckrr-eA \ M; 4cle_.1 t Phone Number: ( 9 lc)) 3$0 — S 7S0
For projects with multiple basins, specify which basin this worksheet applies to:, , --0-- 3S
elevations
Basin Bottom Elevation
Permanent Pool Elevation
Temporary Pool Elevation
areas
Permanent Pool Surface Area
Drainage Area
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SA/DA 1
Diameter of Orifice
Design Rainfall
Design TSS Removal z
Form SWU-102 Rev 3.99
Z-Z ft. (floor of the basin)
Z 7 •0 ft. (elevation of the orifice)
2,S . d ft. (elevation of the discharge structure overflow)
ZZ l O'j sq. ft.
(water surface area at the orifice elevation)
_ I Z : Z ac.
(on -site and off -site drainage to the basin)
r�L. b ac.
(on -site and off -site drainage to the basin)
3 G61 cu. ft.
(combined volume of main basin and forebay)
ZS 5 3-7- cu. ft.
(volume detained above the permanent pool)
S &5 cu. ft.
(approximately 20% of total volume)
-4. 1 (surface area to drainage area ratio from DWQ table)
e" in. (2 to 5 day temporary pool draw -down required)
i in.
% (minimum 85% required)
Page 1 of 4
Fodtriotes:
When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non.
standard table entries.
In the 20 coastal counties, the requirement for a vegetative filter may be waived if true wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for boat &596TSS removal and 90% TSS removal. .
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A .NCAC. 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the •Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applica Initials
a.
- � b-
c-
d-
e.
� f.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The forebay volume is approximately equal to 20% of the basin volume.
The temporary pool controls runoff from the design storm event
The temporary pool draws down in 2 to S days.
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow.
calculations)
The basin length to width ratio is greater than 3:1.
The basin side slopes above the permanent pool are no steeper than 3:1.
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail)..
Vegetative cover above the permanent pool elevation is specified.
A trash rack or similar device is provided for both the overflow and orifice.
k- A recorded drainage easement is provided for each. basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
m. A mechanism is specified which will drain the basin for maintenance or an emergency.
III. 'WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided -
This system (check one) 0 does ,does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does does not incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads Z3.25 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads Z . o feet in the'forebay, the sediment shall be removed.
BASIN DIAGRAM
ill in the blanks)
0 Permanent Pool Elevation �d
Sediment R\Ele
al El. 2-4, 0 75 0
__------- o _ -- Sediment Removal Elevation 2 3, Z 75%
Bottomanon
23• %-----------------------------------------------------
Bottom Elevation 7 L • 25%
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of 4
1., All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for tie performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name:_ fa-ptc eo, VI) �L-e-Q— ,1
Title: 1-,) I Vi 5' 0
Address: T r1k76?a. �--� he -- B I c�g So�l� �,s,�,,,,� „ S '�` 6 Q�� Z° 1
-- r- - -
Phone
Signatt
-7 �. 1)
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I, Te_r r v E R us s e r . Sr . , a Notary Public for the State ofMort:k
County of CAI is �ce , do hereby certify that W
personally appeared before me this JEL_ day of j� r , j19 , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
10%% it III III
' 0NO A N
s�
C
SEAL
My commission expires_ 'dp �" . 9 z
Form SWU-102 Rev 3.99 Page 4 of 4