Loading...
HomeMy WebLinkAboutSW8991003_HISTORICAL FILE_20041230STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT N0. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD r , t State Stormwater Management Systems Permit No. SW8 991003 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Jon W. Rosborough, Wilmington International Airport Wilmington International Airport T-Hanger Project - Phase 111 New Hanover County FOR THE construction, operation and maintenance of a dry detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until Deember 30, 2014, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 88,840 square feet of impervious area. This basin must be operated with a vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 991003 Modification A The following design criteria have been provided in the dry detention basin and must be maintained at design condition: a. Drainage Area, acres: 4.29 Onsite, ft2: 186,853 Offsite, ft2: None b. Total Impervious Surfaces, ft2: 88,840 C. Bottom Elevation, FMSL: 18.5 d. Permitted Surface Area, ft2: 3,138 e Storage Elevation, FMSL: 20.0 f. Required Storage Volume, ft3: 9,037 g. Permitted Storage Volume, ft3: 9,183 h. Controlling Orifice: 1"0 pipe i. Additional BMP: Grassed Swale j. Receiving Stream/River Basin: Smith Creek/Cape Fear k. Stream Index Number: 18-74-63 I. Classification of Water Body: "C.Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at ail times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3of7 State Stormwater Management Systems Permit No. SW8 991003 Modification 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not Page 4 of 7 State Stormwater Management Systems Permit No. SW8 991003 Modification be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 30t' day of December, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 NORRIS, KUSKE TU NSTALL CONSULTING ENGINEERS, INC. November 23, 2004 Ms. Rhonda Hall NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Submittal Wilmington International Airport T-Hangar Project — Phase III Wilmington, NC NKT Project No. 04221 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, PE. J.A. Kuske, P.E. of Counsel Enclosed are two (2) sets of plans for the subject project, one (1) set of calculations, the original Division of Water Quality Stormwater Management Permit application, the original Dry Pond Maintenance form, the original Swale Maintenance Requirements form, one (1) copy of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE, & TUNSTALL r CONSULTING ENGINEERS, INC. J. hp illi Norris, P. JPN/asn 04221 11-23-04-s-sw-itr Enclosures CC" Peter Davis RECEIVED NOV 3 2004 BY:, /O d 902 Market Street • Wilmington, NC 28401-4733 0 Phone: 910.343.9653 0 Fax: 910.343.9604 NORRIS, KUSKE &TU NSTALL CONSULTING ENGINEERS, December 28, 2004 Ms. Rhonda Hall NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 INC. Re: State Stormwater Permit — Review Comments Wilmington International Airport T-Hangar Project — Phase III Wilmington, NC NKT Project No. 04221 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel Enclosed are two (2) sets of revised plans for the subject project, revised Division of Water Quality Stormwater Management Permit application page 2, and the revised Extended Dry Detention Basin form. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE, & TUNSTALL CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E. JPN/asnfjmc 04221 12-28-04-s-sw-ttr reply comments Enclosures DEC 2 9 2004 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S, Tunstall, P.E. J.A. Kuske, P.E. CONSULTING ENGINEERS, INC. James T. Pyrtle, P.E. C. Lawrence Sneeden, Jr., P.E. 902 Market Street * Wilmington, NC 28401-4733 e Phone (910) 343-9653 • Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OF TRANSMITTAL To: Rhonda Hall Date: December 29, 2004 Job No. 04221 NC DENR Subject: T-Hangar Project - Phase III Wilmington International Airport WE ARE SENDING YOU VIA FAX ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ❑ PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL 4 Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION Extended Dry Detention Basin Supplement (drawdown orifice 1" pipe revision page 1) ( Required Items Checklist - revised page 2) (signed page 3) Revised Stormwater Calcs 2 C2 Detail Sheet ❑ ® AS REQUESTED FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: CC: 909-XV-2n DEC 3 0 2004 SIGNED J. Phillip Norris, P.E., 1 asnfmc CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. r } ._ .— _ _ '. .' +�� ems, �• ;., i.. �') i +li If 3;y _ ._. 'J 1 1 i - NLw ILUIN T Vrt CW-NC^ .,avoal %(l.BLiPi �F 6iY%Gf/T, G3'C. wiWINGfCN, I+CR:N C�Clvu ,..sa .. •m � v N F s MODIFIED n N•� or.(•~ �] • AIRPORT LAYOUT PLAN State Stormwater Management Systems Permit No. SW8 991003 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable I-aws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Wilmington International Airport Wilmington International Airport T-!langar Project New Hanover County FOR THE construction, operation and maintenance of a 30% low density development in compliance with the provisions of 15A NCAC 2H .l 000 (hereafter referred to as the "stormwater rules ") and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for Wilmington International Airport T-1-langar Project. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS This permit covers the construction of 89,298 square feet of built -upon area. 2. The overall tract built -upon area percentage for the project must be maintained at 30%, as required by Section .1005 of the stormwater rules. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. S. No piping is allowed except: a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road. b. That minimum amount needed under driveways to provide access. G. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. W State Stormwater Management Systems Permit No. SW8 991003 Modification Roof drains must terminate at least 30' from the Mean High Water line. 11. SCHEDULE OF COMPLIANCE I. Projects covered by this permit will maintain a minimum 30 foot wide vegetative buffer between ail impervious areas and surface waters. 2. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. Prior to the sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds and submitted to DWQ: "Construction of additional built -upon area in excess of 99,299 square feet will require a permit modification." b. "Construction of additional impervious areas such that low density requirements are no longer met must be submitted to DWQ and a permit modification must be issued prior to construction. An engineered system will be required to collect and treat the runoff from all built -upon area associated with the project, including that area permitted under the low density option." C. "Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons." d. "A minimum of 30' of vegetated buffer area shall be provided between surface waters and all impervious surfaces." Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. 6. Projects within CAMA's Area of hnvironmental Concern (AEC) are subject to a reduction of the permitted amount of built -upon area due to CAMA jurisdiction within the AEC. 7. A copy of the recorded restrictions must be received by this Office within 30 days ofthe date of sale. 8. The following items will require a modification to the permit. Revised plans, specifications and calculations must be permitted prior to the permittee beginning construction on the modification: a. Any revision to the approved plans, regardless of size. b. Project name change. C. "Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. i State Stormwater Management Systems Permit No, SW8 991003 Modification 9. The Director may determine that other revisions to the project should require a modification to the permit. 10. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. I I During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 12. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. C. Maintenance of side slopes in accordance with approved plans and specifications. 13. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 14. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. M. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until revoked or terminated. 3. '['he permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 21-1.1000; and North Carolina General Statute 143-215.1 et. al. The permit is not transferable to any person except after notice to and approval by the Director. The Director may req uire modi fication or revocation and reissuance o f the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted, to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. 6. The permittee grants permission to DLNR Staff to enter the property for the purpose of inspecting all components of the stormwater management facility. 4 State Stormwater Management Systems Permit No. SW8 991003 Modification 7. The permitter shall notify the Division of any name; ownership or mailing address changes within 30 days. 8. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. Permit issued this the 9th day of March, 2001. NORTH CAROLINA I�NVIRONMI7-N,rAL MANAGEMENT COMMISSION ---------- -- ` Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 991003 Modifieation State of North Carolina Department of Environment Ir and Natural Resources Wilmington Regional Office ,James B. Hunt, ,Jr., Governor Bill Holman, Secretary Division of Water Quality Mr. William G. Plentl, Jr., Airport Director Wilmington International Airport 1740 Airport Blvd. Wilmington, NC 28405 Dear Mr. Plentl: ®III`. NCDENR NORTH CA.ROLINA DEPARTMENT Or ENVIRONMENT AND NATURAL RESOUROeS October 19, 1999 Subject: Permit No. S r 99 03 Wilmington lnte ional Airport T-Hanger Project Low Density Sto water Project New Hanover douAty The Wilmington Regional Office received a complete Stormwater Management Permit Application for Wilmington International Airport T-Hanger Project on October 18, 1999. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 991003 dated October 19, 1999, for the construction of Wilmington International Airport T-Hanger Project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements; or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless'such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Noelle Lutheran or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/n nl: S:IWQSISTORMWATIPERMIT1991003.00T cc: Phil Norris Tony Roberts, Ne�v Hanover County Inspections Wilmington Regional Office Central Tiles Noelle Lutheran 127 Cardinal Dr. Eat., Wilmington, North Carolina 284t}5 Telephone 910-395-3900 rAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10` , post -consumer paper State Storm water Management Systems Permit No. SW8 991003 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL, RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Wilmington International Airport Wilmington International Airport T-Hanger Project New Hanover County FOR THE construction, operation and maintenance ofa 30% low density development in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules ") and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for Wilmington International Airport T-Hanger Project. The Permit shall be effective from the date of issuance until rescinded and shall be subjeetto the following specific conditions and limitations: 1. DESIGN STANDARDS This permit covers the construction of 8,801,210 squarefeet of built -upon area. The overall tract built -upon area percentage for the project must be maintained at 30%, as required by Section .1005 of the stormwater rules. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceabiq parts of the permit. 4. 'rhe only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. No piping is allowed except: That minimum amount necessary to direct runoff beneath an impervious surface such as a road. That minimum arnount needed under driveways to provide access. 2 State Stormwater Management Systems Permit No. SW8 991003 11. SCHEDULE OF COMPLIANCE Projects covered by this perm it will maintain a minimum 30 foot wide vegetative buffer between all impervious areas and surface waters. 2. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable bunt -upon area. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Prior to the sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds and submitted to DWQ: "The built -upon area is limited to 8,801,210 square feet. Construction of additional built -upon area will require a permit modification." "Construction of additional impervious areas such that low density requirements are no longer met must be submitted to DWQ and a permit modification must be issued prior to construction. An engineered system will be required to collect and treat the runoff from all built -upon area associated with the project, including that area permitted under, the low density option." "Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons." "A minimum of 30' of vegetated buffer area shall be provided between surface waters and all impervious surfaces." 5. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. Projects within CAMA's Area of Environmental Concern (AEC) are subject to a reduction of the permitted amount of built -upon area due to CAMA jurisdiction within the AEC. A copy of the recorded restrictions must be received by this Office within 30 days of the date of sale. The following items will require a modification to the permit. Revised plans, specifications and calculations must be permitted prior to the permittee beginning construction on the modification: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. The Director may determine that other revisions to the project should require a modification to the permit. 10. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. 1 1 During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. State Stormwater Management Systems • Permit No. SW8 991003 12. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 13. Within 30 days of completion of the project, the permittee shall certify in writing that'the project has been constructed in accordance with the approved plans. 14. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 111. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143- 215.6A to 143-215.6C. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. The permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. 6. The permittee grants permission to.DENR Staff to enter the property for the purpose of inspecting all components of the stormwater management facility. - 7. The permittee shall notify DWQ of any mailing address changes within 30 days of such change. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. T Permit issued this the 19th day of October, 1999 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SWS 991003. 4 A&K#99254 OFFICE USE ONLY Date Received Fee Paid Permit Number Ile /- ::�� 1 e-991-le09 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION I. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Wilmington International Airport 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Willard G. Plentl, Jr., Airport Director 3. Mailing Address for person listed in item 2 above: 1740 Airport Blvd. City Wilmington State: NC Zip: 28405 Telephone Number: { 91a ) 3L3-4333 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wilmington International Airport T-Hangar Project 5. Location of Project (street address): 1740 Airport Blvd. City: Wilmington County: New Hanover 6. Directions to project (from nearest major intersection): Located approximately 1/2 mile north of Kerr Ave. entrance to airport on to the end of easternmost Taxi. way. 7. Latitude: 34� 16' 02" Longitude: 77' 53' 35!� of project 8. Contact person who can answer questions about the project: Name: Willard G. Plentl, fir. Telephone Number: ( 910 ) 343-4333 lI. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Page I of 4 C 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the permit existing number n a and its issue date (if known) 3. Specify the type of project (check one): X Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): ^CAMA Major X Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Stormwater runoff will be collected by swales which will direct the stormwater to an existing storm sewer system. Project consists of new airplane T—Hangar with associated drives and parking areas. 2. Stormwater runoff from this project drains to the Cape Fear Raver basin. 3. Total Project Area: 1,435 acres 4. Project Built Upon Area: 14.08 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin>Infoi�niatson Drainage°Area 1 "i ..Drainage Area 2 Receiving Stream Name Smyth Creek Receiving Stream Class C—SW Drainage Area 1 Existing Impervious* Area 200.9 acres Proposed Im ervious*Area 1.18 ac % Irn ervious` Area (total) 14.08 N e`A' k; im ervious Surface, Area.;v Dralnag *„3 rea 1 a Drainage Area 2 r.. On -site Buildings 0.27 ac On -site Streets 0.87 ac On -site Parking U. 04 ac On -site Sidewalks 0 Other on -site 0 Off -site 0 Total: Xj ,BX 1.18 ac Total: * Impervious area is defined as the built upon: area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? n/a IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by strictures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the perritted storrwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form 9* • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of S420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. J. Phillip Norris, P. E. Designated agent (individual or firm): Andrew & Kuske Consulting Engineers. Inc. Mailing Address: 902 Market Street City: Wilmington State: NC Zip:28401 Phone.( 910 1 343-9653 Fax: ( 910 343-9604 VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Willard c_ Plenti_ dr. certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: Date: Form SWU-101 Version 3.99 Page 4 of 4 ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, NC 28401-4733 RECEIVED OCT 1 8 1999 BY: LETTER OF TRANSMITTAL John R. Andrew, P.E. J.A. Kuske, P.E. J. Phillip Norris, P.E. 910-343-96531 FAX 910-343-9604 To:n &a,&- � Date: � n f� � � lJ • } Job No. Subject: 6 E RE SENDING YOU VIA ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ❑ PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION &OL,4 ZA ❑ ❑ AS REQUESTED ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL FOR YOUR USE ❑ FORBIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: - CC: n /f SIGNED CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. r .' � _� ._� � • _. • _ � . w�.r- +. - - - • .r- _ .. w � • _ •. —. w. � .. ram. • 1. .. _ A� a ti �r • -�rfi �w .cae.• Y' • e ixanz•:.r • - John R. Andrew, P.E. Andrew & Kuske J,A, Kuske, P.E. CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 + akengnrs®wilrnington.net WILMINGTON INTERNATIONAL AIRPORT T-HANGAR PROJECT NEW HANOVER COUNTY LOW DENSITY STORMWATER MANAGEMENT PLAN A&K PROJECT NO. 99254 The proposed development is in New Hanover County and the land disturbance will be over an acre. Therefore, the development will be designed to comply with the State stormwater requirements. The total site area is 1,435 acres. The impervious areas include 200.9 acres of existing impervious surfaces and 1.18 ac of proposed impervious surface. With the proposed impervious surface to impervious coverage will be 14.08 percent Stormwater runoff will be collected by a series of swales and will be conveyed by swales to an existing drainage system. This submittal is for a low -density permit. JPN/tsm 99254awn John P. Andrew, P.E. Andrew & Kuske J.A. Kuske, P.E. CONSULTING ENGINEERS, INC. J. Phillip Norris, RE, 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 • okengnrs0wilmington.net =BY: September 30, 1999 NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Attn: Ms. Linda Lewis RE: Wilmington International Airport T-Hangar New Hanover County A&K Project No. 99254 Dear Ms. Lewis: Enclosed are two sets of plans for the subject project, two sets of calculations, the original Division of Water Quality stormwater management permit application and one copy, two copies of the SWU-104 supplement form, two copies of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CON ENGINEERS INC. 6JPJ Philli Norris, P. Nltsm Enclosures CC" Mr. Willard G. Plentl, Jr.IWilmington International Airport ss254sw! A&K #00196 State of North Carolina �o Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Wilmington International Airport 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Jon W. Rosborough, Acting Airport Director 3. Mailing Address for person listed in item 2 above: 1740 Airport Blvd. City: Wilmington _ _— Telephone Number: (910) 343-4333 State: NC Zip: 28405 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wilmington International Airport T-Hangar Project - Phase It 5. Location of Project (street address): 1740 Airport Blvd. _ City: Wilmington County: New Hanover 6. Directions to project (from nearest major intersection): Located approximately 112 mile north of Kerr Avenue entrance to airport on to the end of eastermost taxi way. 7. Latitude: 341 16' 02" Longitude: 770 53' 35" of project 8. Contact person who can answer questions about the project: Name: Jon W. Rosborou h Telephone Number: (910) 343-4333 Il. PERMIT INFORMATION 1. Specify whether project is (check one): X New Form SWU-101 Version 3.99 Page 1 of 4 Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number N/A And its issue date (if known) N/A 3. Specify the type of project (check one): X Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major _X Sedimentation/Erosion Control _ __ 404/401 Permit _ NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. 111, PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runoff will be collected by swales which will direct the stormwater to an existing storm sewer system. Project consists of new airplane T-Hangar with associated drives and parking areas. 2. Stormwater runoff from this project drains to the Cape Fear River Basin. 3. Total Project Area: 1,435 4. Project Built Upon Area. 14,30 5, How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drama a Area I Drainage Area 2 Receiving Stream Name Smith Creek Receiving Stream Class C-SW Drainage Area 1,435 acres Existin Im ervious ` Area 204A acres Proposed Impervious* Area 0,87 acres % Impervious* Area (total) 14.30 Im'' envious* Surface Area : "'Drains' e''Area 1 Drains e.Area 2 On -site Buildings 0.36 acres On -site Streets 0.25 acres On -site Parking 0,26 acres On -site Sidewalks 0 Other on -site 0 Off -site 0 Total: 0.87 acres Total; * Impervious area is defined as the built upon area inchrding, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 How was the off -site impervious area listed above derived? NIA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued bv the Division of Water Quality. These covenants ma_v not be changed or deleted without the consent of the State_ 2. No more than square feet of anv lot shall be covered by sinictures or impen ions materials. Impervious materials include asphalt, gravel, concrete, brick, stone, .slate or similar material but do not include x°ood decking or the water surface of swimming pools. Svt,ales shall not be filled in, piped, or altered except as necessary to provide drivewcry crossings. 4. Built -upon area in excess of the permitted amount requires a .state stormwater management permit modification prior to construction. All permitted ninofffrom outparcels or future development shall be directed into the permitted stormwater control system. 7hese connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the sustem as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Form SWU-103 Form SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off Site System Supplement Underground Infiltration Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable supplement form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) Detailed narrative description of stormwater treatment / management Two copies of plans and specifications, including: - Development 1 Project name Engineer and firm Legend North arrow Scale - Revision number & date - Mean high water line - Dimensioned property 1 project boundary - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sixes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. J. Phillip Norris. P. E. Designated agent (individual or firm): Andrew & Kuske Consulting Ent sneers, Inc. Mailing Address: 902 Market Street City: Wilmington �^ State: NC . Zip: 28401 Phone: (910) 343-9653 VIII: APPLICANT'S CERTIFICATION Fax: (910) 343-9604 1, (print or type name of person listed in General Information, item 2) _]on W. R_osborough Certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Date: 1 [ 3 /J V/ Form SWU-101 Version 3.99 Page 4 of 4 A&K ;i00196 Permit No. -ZP23 2 40 / 1 6 a ^ Oh _ (to be provided by DiVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original W10k-f A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007. I. PROJECT INFORMATION Project Name: Wilmington International Airport T-Hangar Project - Phase I1 Contact Person: don W. Rosborough Phone Number: (910 343-4333 Number of Lots: N/A Allowable Built Upon Area Per Lot*: N/A *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. II. BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. For uniform lot sizes, complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. Form SWU-104 Rev 3.99 Page 1 of 2 Calculation: (SA x DF) - RA - OA = BUA No. Lots Lot See attached calculations. III. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. Applicants itials a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse River basin may require additional buffers. N/A b. Deed restriction language as required on form SWU-10I shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to sale of any lots. Built upon area calculations are provided for the overall project and all lots. Project conforms to low density requirements within the ORW AEC (if applicable). [15A NCAC 2H .1007(2)(b)j Form SWU-104 Rev 3.99 Page 2 of 2 RECEIVED - - _- FEB 12 2001 John R. Andrew, PE, -- Andrew & Kuske gy. J. A, Kuske, P.E. -- = CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E, 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343--9653 • Fax 910/343-96 A + www,ondrewandkuske.com 1��2 February 2, 2001 �u Ms. Linda Lewis NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Wilmington International Airport T-Hangars — Phase II New Hanover County State Stormwater Permit Submittal A&K Project No. 00196 Dear Ms. Lewis: Enclosed are two sets of plans for the subject project, one set of calculations, the original Division of Water Quality stormwater management permit application, and one copy, one copy of the SWU-104 supplement form, one copy of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONSUL ENGINEE 0 J. Phil orris, P. J N/cjf 00196-02-02-01 swl Enclosures cc: Julie Wilsey INC. Andrew & Kuske CONSULTING ENGINEERS, INC. John P. Andrew, P.E. J.A. Kuske, P.E. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 . okengnrs®wilmington.net WILMINGTON INTERNATIONAL AIRPORT T-HANGAR PROJECT PHASE II NEW HANOVER COUNTY LOW DENSITY STORMWATER MANAGEMENT PLAN A&K PROJECT NO. 00196 The proposed development is in New Hanover County and the land disturbance will be over an acre. Therefore, the development will be designed to comply with the State stormwater requirements. The total site area is 1,435 acres. The impervious areas include 204.4 acres of existing impervious surfaces and 0.87 acres of proposed impervious surface. With the proposed impervious surface to impervious coverage will be 14,30 percent. Stormwater runoff will be collected by a series of swales and will be conveyed by swales to an existing drainage system. This submittal is for a low - density permit. JPN/cjf 00196.1-15-01 swnar ' �• + ? �` �M1 � r � �; ''� 1 h' s� t Y }ti stiff s1, ti, }� Y�.,y'� ts"r s ti � ~ r. �, � � i -n tr r 'j� i �1�f` `{` .t,; • ; �; Yv'� t'L+ Ys'"Y,• r 1} _ 14� ti I�:. � .. • 1 :Y - :.+; :;i.%: .,v;��,x.};x�5'rrr:•.:�v�:^.:r;�.htii:�;•;••.;{.rJ�.,•�.,:�Y:ti.:,, qt'.: ti��t;..{Yir rt+ ; I ti h1. Y 5k�1t y _ ' - 1• lti r4 } 1 _, Y 1 .5 5 yy�Y• 5 �`.1 • • ? v I r yY 5 1:[ �Ny trr 1 I rysrk ty,. �ti cryW o- ,' . M. N. 0 m N O O O z Z� QZ :a.7 UJ olU �M OW ZO Z Y ZZ Mtn mO N C SC) �O UZ 7w QJ W uD a7 N d cr z cc j ;oaLu° " H J � U zZm- r cx Oo0 ¢z 3zC � � z Z � 3 Z z O�- za� � 7�a 7 a 0 Q 0 0 r+ 0 0 L6 Z W L -•3 W Q x O w -k -k a rm LA Lri Ir Ln a Ln .. .70 ti r� rrl a CO CO Er ru O S :lytiti' �I y t M ri- is t ' 1 t •'t . � '4i