Loading...
HomeMy WebLinkAboutSW8990828_COMPLIANCE_19991104STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW SY'Z �OS�G�d DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE- YYWMMDD . Compliance Inspection Report Permit: SW8990828 Effective: 11/04/99 Expiration: 11/04/13 Owner: Racine Center LLC Project: Racine Center For The Arts County: New Hanover 203 Racine Dr Region: Wilmington Contact Person: Mike Goloka Title: Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Spring Branch) (03-06-23 ) ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 03/1612012 Entry Time: 09:30 AM Primary Inspector: Alicia R Lewis Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) G Wilmington NC 28403 Phone: Exit Time: 09:45 AM Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8990828 Owner - Project: Racine Center LLC Inspection Date: 03116/2012 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: The violation listed in the NOV's dated October 26, 2009 and January 19, 2010, have been satisfied and closed out by the submission of the Designer's Certification on March 13, 2012. File Review Yes No NA NE As the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ■ ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ■ ❑ ❑ ❑ Comment: 1. The Designer's Certification was submitted on March 13, 2012 and closes out NOV-2009-PC-0862 Page: 2 ��S 5 Compliance Inspection Report �i Permit: SW8990828 Effective: 11/04/99 Expiration: Owner. Unknown Wiro `� Project: acme Center For The Arts County: New Hanover Region: Wilmington Contact Person: Mike Goloka Title: Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Spring Branch) (03-06-23 } ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 1011512009 Entry Time: 03:30 PM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant W Not Compliant Question Areas: ® State Stormwater (See attachment summary) Exit Time: 04:00 PM Phone: Phone: 910-796-7215 Inspection Type: Stormwater Page: 1 Permit: SW8990828 Owner - Project: Unknown Wiro Inspection Date: 10115/2009 Inspection Type: Stormwater Reason for Visit: Routine Inspection Summary: In order to bring this permit into compliance you must provide the following documentation 1. Submit the Engineer's Certificate. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: No Engineer's Certificate in file. M 0 0 0 ❑E00 m0001 ®nnn Page: 2 rl 0 i I A&Ki199188 Permit No. SLy0�%� (to he provided by 01VO State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Racine Center for the Arts Contact Person: Make Golonka Phone Number: (910 452-2073 For projects with multiple basins, specify which basin this worksheet applies to: N/A elevations Basin Bottom Elevation 31.00 ft. Permanent Pool Elevation 36.00 ft. Temporary Pool Elevation 37.20 ft. areas Permanent Pool Surface Area 3347 sq. ft. Drainage Area 1.71 ac. Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA1 Diameter of Orifice Design Rainfall Design TSS Removal 2 1.00 ac. 4857 cu. ft. 4768 cu. ft. 972 req. t 6 40-1srovi �ea ft. 4- UKka-n41784 1.0 in. 1.0 in. 90 % (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -.rite and off -site drainage to the basin) (combined volume of main basin and forebay) (volume detained above -the permanent pool) (approximately 20% of total volume) (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required) (minimum 85% required) Form SWU-102 Rey' 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85%c TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach ,justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). _ b. The forebay volume is approximaleeit equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. A11, 9 e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. 34'. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Ti�'Xn i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. NA . k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. A portable pump can be provided to drain the basin. 1�I. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin; pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 9 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Pape 2 of 4 7. All components of the wet detention basin system shall be maintained in good working order. j► F I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Mike Colonka Title: ASInt Member/owner Addr 112 North Cardinal Drive, Suite 102 PCC' Phon Sign Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, �� r� a- 7h • Co i-e M 4 V\ , a Notary Public for the State of `A oy-�k Cara U no—, County of .`Af-0 #ano 0C v- , do hereby certify that iM i o (on iCa- T personally appeared before me this 1i0day of u�-gtxS-(- 1 q9 T , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, . &&m&,-SEAL My commission expires 7 ':)-(0 -.)-00 a Form SWU-102 Rev 3.99 Page 4 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. ' 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriafe manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 32.2-, feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 34.50 feet in the forebay, the sediment shall be removed. r BASIN DIAGRAM (fill in the blanLv) Permanent Pool Elevation 36 •Q0 Sediment Re oval El. 34. 50 75 0 -------------- - Sediment Removal Elevation 32.25 75% Bottom Ele ation34.00 Flo---------` ----------------------�-------------------- FOREBAY Bottom Elevation '31'':00 1r 25`7� MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Paae 3 of 4 Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job c For ,e�yc iNE CEn/sL�� Job No. ,Q9G /�/E G'��/T2� � �O � 7tt� �'7•C Tf fM , E C E I V E AUG 181999 D E m PROJ # e Date Design Andrew and Kuske Sheet Sht 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 ! pt (p Check Job For ,�f1Gi�/E C6i./T�i+` .lob No. /,�7pE.[. v/o%l C-y6G Fps 77f i¢-rGT� �� //0 _ � ; --.i�'l.o��-✓io �-c/' ?�C �1f_ �a �C. 77� _.,4ElZrti/77�/ O Ef Gig/ �.t/C e� v o E 7.+,s� /n.G o o/o.rE 0 �dTi7L T.ei9G T/„Q�C /j►7�i�E ��/f � /. %/rjrC.CE,f`�74� ¢88SF 7— /^/c z- d — C o�/G •�-E T� SiO.�i��T G� � TOTAL /�'7.0F. /C.c/lc. c�tJ' //'7/EA-U-0, r..tJ' = I . U'%C x / 00 /.-7/ 4C Z¢� o0o J'c 3Soa .sue 43� Sao.S� � /. o •qG = s8.4$ `%o A % /AG /-,X0 T� !/�j3, .SooSG I Date Design Andrew and Kuske Sheet 81/6/99 �'��- ,INC,Z 902 Market St, CONSULTING ENGINEERSINCWilmington, N.C. 28401 pf Check Job For ,z,fc Job No. foe. 77T�. �9� -r�r' 91 //g STitTJ�-.r%LtiCM L✓?T�/L «GG vG. /T97a�.CJ" -fXLif -= .4 %'/ -'f(f / 7¢, 4 89 SF - i4Tr7G ,/�AEiLvioc.tJ"�.q - /• oa.�c 43, Soo S� R EQy i.0 � a X 7 Z;-C 88S l - 4-3, Soc-, S'oo /TdL-- Ta �/.�Ea S��c L CE rtT �1/���T� /✓ate -... - . ya % T.sl' .P.E.7o v�s-L i9 T S8. 4 8 % G��.-✓sii �7 �+a�--r72Lr' Geed 7:;re ,E X SS . 4-P /a >% x7 60, 0'=:) Y2 4 3 - .3, -5- 1 C S`8 q'8 - 6ca - SQ l ¢. / 78 �EW�/�E/J .1vit��1GE /��i� � O, O•¢/ 78¢ C "7¢� 4B8 SF Date Design Andrew and Kuske Sheet 6p//6/99 zkM-22z- 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.G. 28401 3 Of Check Job SZ-f7257 For ,�y�„vE ��,v�-,� Job No. s7b,G.^�w.prt �C`f�c ✓c�7cr�lS �o,C 7�t� el -e- rl J 9//8 g o' oO -778 % -Tx - /Vd•C ry�tL. po�L = 34'. 00 3347 sF /4 .3 SF _ �oitE9�y QaTTb�l — 34.OD /SRO SF v Er�rnvE -fy 34,33 -714o s� � �E Q✓�.«d S�.«.�-�E ���9 ITT �✓crc�y�-C /�c�o� = 3 P.eo v/OE.o .fv.���7G��,y �T r✓at �'�! A = 33 4-7 .ram -•j(� .�E4 �//�GE.O-�T�•�rJGC �/o L c/ �"1E -A` 10za4.1/,0ED STo.r- Vo[-vo-s E a� t 3347 /. Z') _ -5t768Sof' Z -_ 47653�3I • NDT� : .SiZ� O�G /CAGE' �a2 .CE4'�c�/.GEO .S7b2.y-G,E = �/ 9Z F� /7Z, B po s� ¢/¢z / /�z, eao C'� ZJh a.6a �C3z.z)�o�a) - TT�i Z � o. aca 6 g IL d z O'o 008 Z fT - /l/o�.ti•�. Pc�oL Date Design Andrew and Kuske Sheer 902 Market St, CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 pf Check Job Srq 725 For ,tic „�E C ,� -,L Job No. co,f- r�,,,E .s�.rr %'9//8 .t/oT�: �o EO�r yiY�9 �•� .�� .UE�r��.✓Eo 33 4-7 SS.-=� VEGE 777'T7 v� Sic ` = 34-, 33 pia S� 334 -7 _74o 3 z Z ¢8 S7 `r -3 i �EQv/ � �o2Ec4?y 1/O�vr�E _ l7 7Z �r 3 --7 z Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 s Ot Check Job C�J'tJ For ��1G/NE GE../1� Job No. frn.4.�,. ��,z-,c G1Ccvr ?i7crvS fQ, 777-Z 9 17//B �7'� ._fly.G �7c✓ �7Er1� L r! [G✓�-�'�'T7onl1' 7or•9c ?� �7GT� �77..r�fG.E �9�E.9 = /, 7/�9G �7 ¢" ¢ 88 SF �- CA G. G v 4-?'TE. QP� � c QiaaJr �piC. Tlt� .sib 87 DP I Qo = Zo (7. Z3,C /, 7/, 4 7 CL.r Quo 4 >, z':l C8, s7j C i, -7/ ) = 3, a 3 c.�.r sSC o..S8 -VW d, Zo Cp. g/SZ 4io = O. 6¢-C 7_z3)C/.7/j = 7, 9/ �Fs Qso = 0. (, ¢ (8. $ 7 X/, 7/) 9. 7/ cFs Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 � pt 6 Check Job For ,�,yG �E,�r�.L Job No. GaN77C-o e 'J 7 //8 f�on/Q iiyLE T 46 �� r�G -5-4 V = 4. 8 FPs //-y p.00 C it�J o .P �ioo •�?- ,eE.'G,y, / L z- =- ¢ C/.sJ -A4 /o ' X .OvT' LL �1r1` !f E..Co.s ion/ Goti/T�Lo�. S7L'v./ Q A-" �-irr�-i � i b o a V♦ Z Q LU L.L N cn LU Lu z 0 --i Cn V LL 00 LL z 0 CO V Z �...w 0 NCO ww■r• L LLI ) r� Lt LI a � 4 � 3 � • a Asa i ti ad 00 • a • K CC o� 0 > `• ~� - 3 w E o Sa• a Si• CL E 5 a tia O ko v k0 t� I�a<a A A A n a Y d � q • vi IA H Ov_ d a d a c c Q d. a O - CIS O O O O O O U ��uuyy a d d d d q O Q CL O >. C 7 � e 5 S .S S 5 5?• }I f i i ; R • O P 6 6 b O C- C Vt to W to C to to ton- O aNOZ � nM-- b r. ( I { I { I 1 1 1 I 1 I 1 1 1 1 { 1 1 1 { I 1 I 1 ^ v I I ! I { I i I 1 I i i I 1 I 1 I t 1 i i I"000r 1 i 1 I { I I PwL 1 I 1 I i J I I L i 1I 1 I CV o to N I 'Al H- 15 -9.43 Ln N O N F n Z O U O C1 O U1 v to �, CC � C ~ W Z Z W U U 0 C C Z z Ln 1 W W p z z z < 0 z N U -- Q C C - f r. Y � Z � r m z W U E� 0 In Data for RACINE CENTER FOR THE ARTS Page I TYPE III 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems _ WATERSHED ROUTING OSUBCATCHHENT [].REACH Q PCNJD SUBCATCHMENT I = ENTIRE SITE DRAINAGE AREA REACH 1 = POND OUTLET PIPE POND 1 = SITE DETENTION POND LINK -> POND 1 -> REACH i Data for RACINE CENTER FOR THE ARTS Page 2 TYPE III 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer_ Systems _ SUBCATCHMENT 1 ENTIRE SITE DRAINAGE AREA PEAK= 8.38 CFS @ 12.02 HRS, VOLUME= .58 AF ACRES CN SCS TR-20 METHOD 1.00 98 IMPERVIOUS TYPE III 24-HOUR .71 50 GREEN RAINFALL 7.00 IN 1.71 78 SPAN= 10-20 HRS, dt=.l HRS Method _ Comment - Tc {min)) DIRECT ENTRY Segment ID: 5.0 Data for RACINE CENTER FOR THE ARTS Page 3 TYPE III 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems REACH 1 POND OUTLET PIPE Qin = 2.49 CFS @ 12.38 HRS, VOLUME= .46 AF Qout= 2.48 CFS @ 12.30 HRS, VOLUME= .46 AF, ATTEN= 0%, LAG= 0.0 MIN DEPTH END AREA DISCH (FT) (SQ-FT) (CFS) 18" PIPE 0.0 0.0 0.00 .2 .1 .16 n= .013 .3 .3 .65 LENGTH= 30 FT .5 .4 1.45 SLOPE= .005 FT/FT 1.1 1.3 6.22 1.2 1.5 7.26 1.4 1.7 7.92 1.4 1.7 7.99 1.5 1.8 7.92 1.5 1.8 7.43 STOR-IND}TRANS METHOD PEAK DEPTH= .58 FT PEAK VELOCITY= 3.9 FPS TRAVEL TIME _ .1 MIN SPAN= 10-20 HRS, dt=.l HRS Data for RACINE CENTER FOR THE ARTS Page 4 TYPE III 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 _000479 (c) 1986-199.8_Applied Microcomputer Systems POND 1 SITE DETENTION POND qin = 8.38 CFS @ 12.02 HRS, VOLUME= .58 AF Qout= 2.49 CFS @ 12.38 HRS, VOLUME= .46 AF, ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 31.0 143 0 0 34.3 709 1406 1406 36.0 3347 3448 4853 37.0 4385 3866 8719 37.2 4628 901 9621 38.0 5494 4049 13670 39.0 6669 6082 19751 40.0 7781 7225 26976 # ROUTE INVERT OUTLET DEVICES ATTEN= 70q, LAG= 21.8 MIN STOR-IND METHOD PEAK STORAGE = 15777 CF PEAK ELEVATION= 38.3 FT FLOOD ELEVATION= 40.0 FT START ELEVATION= 36.0 FT SPAN= 10-20 HRS, dt=.1 HRS Tdet= 155.6 MIN (.34 AF) 1 P 36.0' 1" ORIFICE/GRATE Q=.6 PI r"2 SQR(29) SQR(H-r) 2 P 37.2' 1.7' x .3' ORIFICE/GRATE Q=.6 Width 2/3 SQR(29) (H-1.5 - [H-Height]-1.5) 3 P 38.4' 16' SHARP -CRESTED RECTANGULAR WEIR Q=C L H^1.5 C=3.27*.4 H/.5 L=Length-2(.1 H) Data for RACINE CENTER FOR THE ARTS Page 5 TYPE III 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems _ WATERSHED ROUTING O 0 0 { )SNBCATCHMENT REACH Q POND SUBCATCHMENT i = ENTIRE SITE DRAINAGE AREA REACH 1 = POND OUTLET PIPE POND I = SITE DETENTION POND I I LINK -> POND I -> REACH 1 Data for RACINE CENTER FOR THE ARTS Page 6 TYPE III 24-HOUR RAINFALL= 9.00 IN Prepared by ANOREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479_ L7 1986-1998 Applied Microcomputer -Systems SUBCATCHMENT 1 ENTIRE SITE DRAINAGE AREA PEAK= 11.73 CFS @ 12.02 HRS, VOLUME= .81 AF ACRES CN SCS TR-20 METHOD 1.00 98 IMPERVIOUS TYPE III 24-HOUR .71 50 GREEN RAINFALL= 9.00 IN 1.71 78 SPAN= 10-20 HRS, dt=.l HRS Method Comment Tc min DIRECT ENTRY Segment ID: 5.0 Data for RACINE CENTER FOR THE ARTS Page 7 TYPE III 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 H.ydroCAD 5..01 _000479 (c) 1986-1998 Applied Microcomputer Systems REACH 1 POND OUTLET PIPE Qin = 7.37 CFS @ 12.19 HRS, VOLUME= .68 AF Qout= 7.38 CFS @ 12.19 HRS, VOLUME= .68 AF, ATTEN= 0%, LAG= .2 MIN DEPTH END AREA DISCH �(FT) (SQ-FT) (CFSJ 18" PIPE 0.0 0.0 0.00 .2 .1 .16 n= .013 .3 .3 .65 LENGTH= 30 FT .5 .4 1.45 SLOPE= .005 FT/FT 1.1 1.3 6.22 1.2 1.5 7.26 1.4 1.7 7.92 1.4 1.7 7.99 1.5 1.8 7.92 1.5 1.8 7.43 STOR-IND+TRANS METHOD PEAK DEPTH= 1.23 FT PEAK VELOCITY= 4.8 FPS TRAVEL TIME _ .1 MIN SPAN= 10-20 HRS, dt=.l HRS Data for RACINE CENTER FOR THE ARTS Page 8 TYPE III 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 16 Aug 99 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 1 SITE DETENTION POND Qin = 11.73 CFS @ 12.02 HRS, VOLUME= .81 AF Qout= 7.37 CFS @ 12.19 HRS, VOLUME= .68 AF, ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (C_F)_ _. __..(CF) 31.0 143 0 0 34.3 709 1406 1406 36.0 3347 3448 4853 37.0 4385 3866 8719 37.2 4628 901 9621 38.0 5494 4049 13670 39.0 6669 6082 19751 40.0 7781 7225 26976 # ROUTE INVERT OUTLET DEVICES ATTEN= 37%, LAG= 10.0 MIN STOR-IND METHOD PEAK STORAGE = 17255 CF PEAK ELEVATION= 38.6 FT FLOOD ELEVATION= 40.0 FT START ELEVATION= 36.0 FT SPAN= 10-20 HRS, dt=.1 HRS Tdet= 122.8 MIN (.57 AF) 1 P 36.0' 1" ORIFICE/GRATE Q=.6 PI r'2 SQR(2g) SQR(H-r) 2 P 37.2' 1.7' x .3' ORIFICE/GRATE Q=.6 Width 2/3 SQR(29) (H-1.5 - [H-Height]^1.5) 3 P 38.4' 16' SHARP -CRESTED RECTANGULAR WEIR Q=C L H^1.5 C=3.27+.4 H/.5 L=Length-2(.1 H) PiR4!5- 4C46Gv4e-/t77o^%!` c] Outlet Project Title: RACINE CENTER FOR THE ARTS - Project Engineer. JOHN A. KUSKE, III, P.E. cMaestadlstmclracart.stm SITEWORKS DESIGN GROUP StormCAD v1,0 08/12/69 06:18:36 PM ©Haestad Methods, Inc. 37 8rookside Road Waterbury, CT 06706 USA (203) 755-1666 Page 1 of 1 is DOT Report Pipe -Node- Upstream Downstream Inlet Area (acres) Inlet CA (acres) Total CA (acres) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Slope- Energy Constructed (ft/ft) -Section Discharge Capacity (cfa) -Section- Shape Size Length (ft) Average Velocity (ft/s) Description P-3 1-3 0.47 0,45 0.45 39.50 38.46 0.002538 3.25 Circular 58.00 2.65 1-4 39.20 38.31 0.005000 4.57 15 inch P-1 1-1 0.24 0.23 0.23 39.20 38.57 0.000662 1.66 Circular 140.00 1.35 1-2 39.20 38.48 0.003000 3.54 15 inch P-2 1-2 0.21 0.20 0,43 39.20 38,48 0.002133 2.98 Circular 79.00 2.43 1-4 39.20 38.31 0.003038 3,56 15 inch P-4 1-4 0.13 0.12 1.00 39.20 38.31 0.004271 6.86 Circular 50.00 3.88 Outlet 1 40.00 38.10 0.004800 7,28 18 inch Project Title: RACINE CENTER FOR THE ARTS Project Engineer: JOHN A. KUSKE, 111, P.E. c:lhaestadlstmcVacan.stm SITEWORKS DESIGN GROUP SlormCAD 0.0 0e/12l59 06:29:513 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06706 USA (203) 75&1666 Page 1 of 1 EROSION CONTROL AND STORMWATER MANAGEMENT NARRATIVE RACINE CENTER FOR THE ARTS WILMINGTON, NORTH CAROLINA Kelm RACINE CENTER, LLC 112 NORTH CARDINAL DRIVE, SUITE 102 WILMINGTON, NC 28405 910-452-2073 all- NO-` -21 =11 mill T Trio oeceive� AUG 181999 AUGUST 1999 PROD # PREPARED BY: ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 MARKET STREET WILMINGTON, NORTH CAROLINA 28401 910/343-9653 910/343-9604 (FAX) A & K #99118 D E M NARRATIVE PROJECT DESCRIPTION: The project site is located within the Wilmington City Limits on Racine Drive. The total site area is 1.71 acres. Approximately 0.20 acres will be disturbed off site to install an 8" City of Wilmington Sewer main. The site is proposed to be developed into an ark center with paved parking and access. SITE DESCRIPTION: As mentioned above, improvements will take place on the 1.71 acre site as show on the attached plans. The site is currently covered with grass and trees. Grades on the site range from .10% to 2.00%. EROSION CONTROL MEASURES: The attached plans and specifications give the requirements for erosion control measures. Silt fence shall be installed around the site prior to grading as show on the attached plans. The proposed detention pond will be used as a silt basin during construction and restored to the proposed design contours prior to completion of the project. Erosion control measures shall be installed around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain to make repairs as needed. Remove sediment as necessary to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unsuitable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas around the drop inlets. A gravel construction entrance will be provided as noted on the plans. Maintain the gravel construction entrance in a condition to prevent mud or sediment from leaving the site. STORMWATER MANAGEMENT MEASURES: The project site is located within the Wilmington City Limits. Land disturbing on the site will exceed one acre which requires the site to comply with the state stormwater regulations. In addition, the site will also have to comply with the City of Wilmington stormwater ordinance. Therefore, the proposed stormwater detention pond will be designed to meet both state and city design standards. This narrative will focus on the aspects of the state design criteria. The stormwater detention pond will be designed to achieve 90% TSS removal. Critical design elevations are detailed on the plans and in the 2 calculations. The required storage volume will be released within the 2-5 day drawdown period as shown in the calculations. A forebay is provided at the head of the pond. The forebay has been designed to handle 20% of the total pond storage volume. A 10'vegetated shelf has also been provided at a 6:1 slope in the main part of the pond. A vegetated shelf has not been provided in the forebay in accordance with Item 6 on Page 2 of the state stormwater guidance document issued to engineers and developers on February 9, 1998. All stormwater runoff from newly created impervious areas will be directed to the detention pond. CONSTRUCTION SEQUENCE: The contractor will install the gravel construction entrance and new silt fence prior to beginning any grading operations. The existing detention pond will be used as a silt basin during initial grading phases. The detention pond will then be fine graded to the proposed contours shown on the plans and the outlet structure and pipe will be installed with rip rap protection. Disturbed areas will be landscaped or seeded upon completion. 3 SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, sediment basins, check dams, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 15 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 30 pounds carpet grass, 30 pounds Bermuda, 20 pounds Creeping Fescue, and 20 pounds Kentucky 31 per 100 pounds of seed. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. Mixture shall contain 20 pounds rye per 100 pounds if planted November through March. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by wood or metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 4 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 2.11 Wood Stakes for tree protection shall be 4' tall, placed at 6' intervals at the dripline of the tree to be preserved. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion, and for protection of seed beds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 5 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. 3.4 Sedimentation Basins are required for large ditches to provide for settling of sediments prior to the ditch discharging offsite. Basins should be constructed with sufficient surface area, a minimum 2 feet of sediment storage depth, and minimum 2 feet of freeboard to provide for storage of stormwater and settled soil. Stone check dams shall be placed at the discharge of each basin. 3.5 Vegetative Cover: Establish permanent vegetative cover on all unpaved areas disturbed by the work. 3.5.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous, and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer: 17 pounds per 1000 square feet 3.5.2 Seeding: Disturbed areas along roads and ditches shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture during the period from December through January. Seeding performed during the period from March through June does not require Rye seed in the mixture and may be applied at a rate of 1 to 2 pounds per 1000 square feet. Seed shall be worked into the bed to a depth of 114 inch. 3.5.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. 3.6 Construction Entrance: Provide an aggregate drive, 25 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. .A 3.7 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas which fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION 7