Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8990421_HISTORICAL FILE_20091207
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE- YYYYMMDD MI0 A NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor December 7, 2009 Mr. Sterling Cheatham, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402-1810 Division of Water Quality Coleen H. Sullins Director Subject: Session Law 2009-406 Stormwater Permit #SW8 990421 Park Avenue Right -of -Way New Hanover County Dear Mr. Cheatham: permit. Dee Freeman Secretary Thank you for submitting the Designer Certification on October 28, 2009 as requested for this The General Assembly passed and the Governor signed Session Law 2009-406 on August 5, 2009. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to 3 years from its current expiration date. Accordingly, Stormwater Permit # SW8 990421, which was set to expire on January 4, 2010, is now in effect until January 4, 2013. The Division requested the renewal application in a memo dated July 24, 2009 from Georgette Scott. This memo is to let you know of the renewal extension. Please resubmit the renewal application and fee at least 180 days prior to January 4, 2013, which would be June 4, 2012. If you have any questions, please contact the Division of Water Quality -State Stormwater in the Wilmington Regional Office at 910-796-7215. Sincerely, Mar J A�=Na gle GDSlmjn S:1WQSISTORMWATERIRENEWAL1SL2009-4061990421 dec09 Cc: Wilmington Regional Office Stormwater File Angela Hammers — WiRO M.J. Naugle Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Ole Phone:910-796-72151FAX: 910-350.20041Customer Service:1-877-623-6748 NorthCaro ina Intemel: www.ncwaterquality.org Naturally atura ly An Equal Opportunity 1 Atfirmalive Action Employer �/ Naugle, Mary From: Naugle, Mary Sent: Monday, October 26, 2009 10:07 AM To: 'Jim.Quinn@wilmingtonnc.gov'; David.W.Cox@ncmail.net Cc: Dave.Mayes@wiImingtonnc.gov Subject: RE: Park Avenue Right -of -Way Improvements Mr. Quinn; Thank you for your reply. I will document the time extension that you requested below. We appreciate your information. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mLqrX 12Egle@ncdenr go Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jim.Quinn@wilmingtonnc.gov[mailto:Jim.Quinn@wilmingtonnc.gov] Sent: Friday, October 23, 2009 4:29 PM To: Naugle, Mary; David.W.Cox@ncmail.net Cc: Dave.Mayes@wiImingtonnc.gov Subject: Re: Park Avenue Right -of -Way Improvements This came back to me so I'm resending it. Jim Quinn Stormwater Specialist Stormwater Services City of Wilmington 910.341.4694 (fax) 910.341.0099 Jim Quinnlwilm To mary.naugle@ncdenr.gov David.W.Cox@nunail.net cc Dave Mayestwilm@wilmington 10123/2009 04:09 PM Subject Park Avenue Right-of-way Improvements Good Afternoon, We are currently working on getting a designers certification completed for the Stormwater improvements (permit # SW8990421) that were constructed along Park Avenue. The original engineer's certification was never supplied to the City at the end of the project. We are finishing up completing an as -built survey of the improvements and will have it certified. As soon as this is completed we will submit the appropriate documentation to your office for your review. This documentation will not likely be completed before the October 30, 2009 deadline as stated in your letter dated October 8, 2009. If a separate letter to your office requesting an extension is needed on our part, or if this e-mail will suffice, then please then let myself or Dave Mayes know. Thanks for your help. Jim Quinn Stormwater Specialist Stormwater Services City of Wilmington 910.341.4694 (fax) 910.341.0099 AGA lo 43-p NC®ENR m t, Icy North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Dee Freeman Governor Director Secretary October 8, 2009 Mr. Sterling Cheatham, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402-1810 Subject: REQUEST FOR DESIGNERS CERTIFICATION Stormwater Project No. SW8 990421 Park Avenue Right -of -Way Improvements New Hanover County Dear Mr. Cheatham - On January 4, 2000, the Division of Water Quality issued a Stormwater Management Permit to you for the subject project. Per the terms and conditions of the permit, and Stormwater Regulation 15A NCAC 2H.10080), which stipulates the following: "Upon completion of construction, the designer for the type of Stormwater system installed must certify that the system was inspected during construction, was constructed in substantial conformity with plans and specifications approved by the Division and complies with the requirements of this Section prior to issuance of the certificate of occupancy." As of this date, our records indicate the required designer's certification has not been received. Operation of the stormwater system prior to submission of the required certification is a violation of NCAC 2H.10080) in accordance with NCGS 143-215.6. Construction is considered complete at the time the project is occupied by an owner or tenant for its intended use. Please submit the required certification by October 30, 2009. Failure to submit the certification is considered a violation of the permit, and is subject to enforcement action, per NCGS 143-215.6A. This permit expires on January 4, 2010. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application before the expiration date. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. A request for renewal application was sent to your office on July 24, 2009. As of this date no response has been received by the Division. Failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and 6A. If you have any questions please call David Cox or me at (910) 796-7215 or e-mail at mare. Nauqle@ncdenr.gov. Sincerely, Mary J �naugle Wilmington Regional Office 127 Cardinal Drive ExtensRon, Wilmington, North Carotirta 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1.877-623-6748 North Caro f i na Internet: www.ncwaterquality.org Aaturallff An Equal Opportunity 1 Affirmative Action Employer GDS/mjn: S:IWQSISTORMWATERIPEREQ1990421 oct09 cc: Robert Gordon, P.E., McKim and Creed Engineers, w/enc., project # 0824-0055.OW (40). Phone 910-343-1048 David Mayes, P.E., City of Wilmington 305 Chestnut Street, To Floor, Wilmington, NC 28402 (910)-341-3258 Wilmington Regional Offices Central Files C-MJ.Naugle 1 Page 2 of 2 State Stormwater Management Systems Stormwater Permit Number SW8 990421 October 8, 2009 Stormwater Permit No. SW8 990421 Park Avenue Right -of -Way Improvements New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Park Avenue Right -of -Way Improvements, for The City of Wilmington, (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 3 of 4 State Stormwater Management Systems' • . 3 Stormwater Permit Number SW8 990421 October 8, 2009 Certification Requirements- 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 11. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required draw down devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, forebay. and vegetated filter. 14. The dimensions of the system, as shown on the approved plan are provided. cc: New Hanover County Building inspections NCDENR DWQ Regional Office Page 4 of 4 ? dm NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor October 8, 2009 Mr. Sterling Cheatham, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402-1810 Division of Water Quality Coleen H. Sullins Director Subject: REQUEST FOR DESIGNERS CERTIFICATION Stormwater Project No. SW8 990421 Park Avenue Right -of -Way Improvements New Hanover County Dear Mr, Cheatham: Dee Freeman Secretary On January 4, 2000, the Division of Water Quality issued a Stormwater Management Permit to you for the subject project. Per the terms and conditions of the permit, and Stormwater Regulation 15A NCAC 2H.10080), which stipulates the following: "Upon completion of construction, the designer for the type of Stormwater system installed must certify that the system was inspected during construction, was constructed in substantial conformity with plans and specifications approved by the Division and complies with the requirements of this Section prior to issuance of the certificate of occupancy." As of this date, our records indicate the required designer's certification has not been received. Operation of the stormwater system prior to submission of the required certification is a violation of NCAC 2H.10080) in accordance with NCGS 143-215.6. Construction is considered complete at the time the project is occupied by an owner or tenant for its intended use. Please submit the required certification by October 30, 2009. Failure to submit the certification is considered a violation of the permit, and is subject to enforcement action, per NCGS 143-215.6A. This permit expires on January 4, 2010. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application before the expiration date. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. A request for renewal application was sent to your office on July 24, 2009. As of this date no response has been received by the Division. Failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and 6A. If you have any questions please call David Cox or me at (910) 796-7215 or e-mail at mar .Nau le ncdenr. ov. Sincerely, I�VA u� Mary�na Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 4 FAX: 910.350-20041 Customer Service: 1-877-623-6748 NorthCarolina Internet: www,ncwaterqualit .org Naturally N An Equal Opporlunity l Affirmative Action Employer GDS/mjn: S:IWQSISTORMWATERIPEREQ1990421 oct09 t CC' Robert Gordon, P.E., McKim and Creed Engineers, wlenc., project # 0824-0055.OW (40). Phone 910-343-1048 David Mayes, P.E., City of Wilmington 305 Chestnut Street, 3"d Floor, Wilmington, NC 28402 (910)-341-3258 Wilmington Regional Offices Central Files MJ.Naugle Page 2 of 2 i State Stormwater Management Systems Stormwater Permit Number SW8 990421 October 8, 2009 Stormwater Permit No. SW8 990421 Park Avenue Right -of -Way Improvements New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Park Avenue Right -of -Way Improvements, for The City of Wilmington, (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 3 of 4 State Stormwater Management Systems t! Stormwater Permit Number SW8 990421 October 8, 2009 Certification Requirement& 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required draw down devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, forebay. and vegetated filter. 14. The dimensions of the system, as shown on the approved plan are provided. cc: New Hanover County Building Inspections NCDENR DWQ Regional Office Page 4 of 4 .�..� 'ZI .-.- KNEW North Carolina Department of Environment and Natural Resources Division of Water Quality S �• veriy Eaves Perdue Coieen H. Sullins Dee Freeman Governor Director Secretary e� July 24, 2009 Ms.-Gorritcfty 9 Ci Manager City of Wilmington ]� - �- r✓ P. 0. Box 1810 Y) } `� Wilmington, NC 28402— jg(D t�" 4;1 Subject: Stormwater Permit No. SW8990421 Park Avenue Right -of -Way Improvements New Hanover County Dear Ms. Gornto: The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8990421 to Park Avenue Right -of -Way Improvements for a High Density Project on January 4, 2000. This permit expires on January 4, 2010. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application before the expiration date. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215-1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, Georgette Scott, Stormwater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDS1dwc S:IWQS1Stormwater\RENEWALSIRequests120001990421.ju109 cc: Wilmington Regional Office Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service:1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity) Affirmative Action Employer o e NCarolina vAlaturally 47-�• OD � Z� � ej va a �F CLt l►Lz� �+' w Nc®E� North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 24, 2009 Ms. Mary Gornto, City Manager City of Wilmington P. O. Box 1810 Wilmington, NC 28402 Subject: Stormwater Permit No. SW8990421 Park Avenue Right -of -Way Improvements New Hanover County Dear Ms. Gornto: Dee Freeman Secretary The Division of Water Quality issued a Coastal Stommwater Management Permit, Number SW8990421 to Part: Avenue Right -of -Way Improvements for a High Density Project on January 4, 2000. This permit expires on January 4, 2010. Section .1003(h) of 15 A NCAC. 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application before the expiration date. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded- If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit- Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed- This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stommwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, Georgette Scut, Stormwfater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSldwc S:1WQS1StormwaterlRENEWALS1Requests120001990421.ju109 cc: Wilmington Regional Office Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 N6 Carolina, Internet: www.ncwaterquality.org Atura!!� An Equal Opportunity 1 Affirmative Action Employer "LU/ NCDEW North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 24, 2009 Ms. Mary Gornto, City Manager City of Wilmington P. O. Sox 1810 Wilmington, NC 28402 Subject: Stormwater Permit No. SW8990421 Park Avenue Right -of -Way Improvements New Hanover County Dear Ms. Gornto: Dee Freeman Secretary The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8990421 to Park Avenue Right -of -Way Improvements for a High Density Project on January 4, 2000. This permit expires on January 4, 2010. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwaterrules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. 1f this is still an active project please complete and submit the enclosed renewal application before the expiration date. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, Georgette Scoff, Stormwater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSldwc S:IWQSIStormwaterlRENEWALSIRequests120001990421.jui09 cc: Wilmington Regional Office) Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 1 FAX: 910.350-20041 Customer Service: 1-877-623-6748 No Carolina tntemet•, www.ncwaterquality.org atura!lff An Equal Opportunity 4 Affirmative Action Employer ' State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality Date: July 28,2000 CERTIFIED MAIL 7000 0600 0023 4229-9954 RETURN RECEIPT REQUESTED Ms. Mary Gornto, City Manager City of Wilmington Post Office Box 1810 Wilmington, North Carolina 28402 Subject: Notice of Violation and Notice of Intent to Enforce Turbidity Stream Standard Violation Park.S+nMr Extension Project /W g9 O�a New Hanover County Ave Dear Ms. Gornto: This letter is to advise you that the City of Wilmington is in violation of North Carolina General Statute 143-215.1(a)(6) for exceeding turbidity standards by dewatering a storm sewer conduit at the subject project into an unnamed tributary of Hewletts Creek. The discharge activity was not covered under soil sedimentation and erosion control plan and it exceeded water quality standards for turbidity. The Division responded to a complaint concerning pumping turbid water into an existing drainage ditch adjacent to the subject project on July 26, 2000. The inspection revealed that the storm water conduit under construction was being dewatered using, a portable pump. The discharge outlet was downstream of approved soil sedimentation and erosion control structures. Specifically, the land management activity concerning best management practices for minimizing soil sedimentation and erosion control was considered as noncompliant by the Division of Land Quality. Three water samples for turbidity analysis were taken to assess stream degradation. Visual aids are presented for your convenience which depict the sample points and photographic documentation of the turbid stream. The upstream sample (U) measured 6 NTU's, the sample of the stream at the discharge pipe (P) measured 385 NTU's and the downstream sample measured 87 NTU's. The turbidity water quality standard for the unnamed freshwater tributary to HewIetts Creek (Class C waters) is 50 NTU's, maximum. 127 North Cardinal Dr., Wilmington, North Carolina 29405 Telephone 910-395-3900 An Equal Opportunity Affirmative Action Employer FAX 9I0-350-2004 50% recyckxW0% post -consumer piper Ms. Mary Gornto July 28, 2000 Page Two Please be advised that such water quality violations may result in a maxunum civil penalty assessment of $25,000 per violation in accordance with North Carolina General Statute 143-215.6A(t). Sediment discharges are the most common type of water pollution in the State. Sediment discharges can cause fish kills and can damage the stream's benthic community (detrimentally affecting aquatic life propagation). The Division applauds the City's proactive stormwater control program. However, the City's construction inspection and project management personnel should be educated on pollution control and construction contracts should include standard practices or other language to abate future occurrences similar to this case. If you have question concerning this letter or if the City's staff require technical assistance concerning rule interpretation, please do not hesitate to contact either Jim Bushardt or myself at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor JB: RS : CITYWIL.700 cc: Wilmington Files (enf) Central -Files �� •,�' `:. � \ ` '` �rji [.ECFS;J rr r1 !.il+.:I ''� ;f :��;�:��C_=�' � �- f �i� � � •, ' �v • � o+ 1 j ':':�\ j'� r/�>�i� 'r . / ) / \� r{ c r '. r (,,/ }. ,�_ �r lic J U\['i 1 {"- �;-,?=:`:_`:�..r'a� ',!`/Jr� 4. i(^'t 1''l % •jJ �'.. \1 ./"�_lc1.'f t�\\r';',•i, \\ µ r'�,'�' -,i.11•] i]' t � .\at } `1, 1-'v�s,:' t ,,•\ ,. r_ .1'"' T(il{17[,-C!C1:01114- �� � � � '1G��\ 'e _ / 1 i J, � `�� j r��= i • �r.,��•>;C. J�.-'�Jf$ �q�J �r/�•b�'S 1S �.�1 �` t �r -'f •�• +1, 4� \ 1 j � r,4.� i'/ %Y �� ,-�-�..r:. '�i:.i' <r�s,�t , tit���.,, t O ` / a1 , , : `i l /, f / •'`1.r t +y0 - vc _;� t i`4\ '+t� �` 1•-P�'.:, "� \' �� rn � Q �_q � - �:��` 1�����' / „�� ,;� 4t �J/ „'F%� O •'� l 1 r �� \ �` � _ fr "iP',-.E ! % 1 ! : (� }• `S' , \ 1 4 '�• `Uril�cr t f . Z p 1 -� t•7 r,r - -.J r � w .. • -• 1 ' � �J ��, / J ����V� 1\ori}\ � � r Flr��l�-['1'/L'`•x � ,\�'^E+'i rr//' /'!fir' ( - 1 f r`-�•�:�rr a. �- r. }r��, \�J� .k �'�Y 1 ti , ; 1 \rq ma iS �. "/ r.S ' 7' ``Y. it /+ L •ray t �' 1�� '0�:1t .l�r At 4' ilrn[n on I r• / _ � �\ti("%' ��"� � r. ?• 1 .5 F'� !+,• {4�. r'J,oI r�• ''� � � t'1f b /l ems. \ '-��; 5'Y � HTJ�t }F k i. �� ,rJ i'- /fit < --I ��~r'''`"-C f.�'+�' �i _ Y - � tL-�• �.�_ / r 'A7 r �F }S Ii, Y tf+. .Yl/ c�r SJ-,., i` !\ �• / �r . ! - �4 "� yj, 40. ' I v �J 1c • >a i �/ {r'-r f� rl,� z r�4f t� / Ste` r J v L• li' tt%r O J, +� �\ �-1�fr !/ h , tl _ ty r r �fr f \� �� r �/ JISS -.. {. / r . \ .+. e�• r > vt,,,,•. � l 1.,4'•,•'p�_, •J �-�',;� ���t �J CI y �.�,r ;. _ / 1. �% .r _,. -�. .. Fh_'t 4� * � ��r' �; � � •i'�:x� /'1�° 1�tc`- � i ?nf r, (U) UPSTREAM SAMPLE POINT r a,,, r �: •.'.i, 7j ��- t� 'i";,l'.`l ;' • ilti:,• � ,� r ��}; OY•\ �rii \ .IY+I Jo- � L r: r� / 1 Wvi�i2pi • riJ�7r. ti�4 �� j�cJrj{:�%il4r%, t f J?ci,f r ^r � -2 'F ^r°, :r► r _ r f5ir �a1v'yfi��f:ry �i t"i F�:E'r l4j �,/i -5 lSv3yr\ •I� '�v + v ��inE7�G'T,vZ''�>;C'3'r' .i,�, y;'` Y,"y 'i � y,.. • �:." fr .?:'_ .'�y'^.. �/f i5.,•-/ '9� i" . cPc r Sf '�� t�'+ %`v]%'�(•' J;' i}Eul sfr � S' ^a^�r'� r�r,�i''p��.�� .l�f�:l irC.'1J •. :C� /f r %�'J � �;� � .mow -tat \S� `�'ts-`�� F y � i'Jr�'��1' .�-.��5 r�i�i`'�, f���2�- -i� �•-4 ,�� L '�4.:• j• s��r red/; , �,.rft F% aU ��. �� c '0 � f -•r , f r � Q*} �u. r r 4;rr -tl � ,,yti�'• 1.•=. r .� ' �' �• i r �,1 _ �� � � "' `� + 11•r 0't;�i ;z f�, +� i:,, �' �l�.i��`t' n .��i.� c_i;��.°�"•.� a: rT' - � - � r �' - _ �� J,.a ;h'r :��' ,t� k +,(,; y"�.7ily:: •��-' y J .ti -1 /, �f r , -J�'. SAMPLE �P) E PO AT DISHCARGE PIP lr ,Gai E ��• �..: UI `. ! J ' iYl N � �n � •ti 1.� +,i. r 1,y y� �t-a J.S � - _ -Z. i ' 4 .4 � iUJz f�l .�. •�:�irl ��, ��. ( + 1.^? r� .�iFsl:l}r"�S�•1S 3''.?iI' Pr;RKj;< V1i.v°{ � ,\_ n2�r1?�� �, �ja~ s:.�ti ,1 . `vsU ',-- r"''n��+Z ti7 tt'f:7�`"��� c1'-r � -±.�:• I. t'� S"'.'.,: ': f_wi ; .i�1 x .�%1�' s-',q � Tti ��: • _ ' R f'• 4..-'��4 [l'' �' i':i 1. �� ',n'va r• •G�4f" arrk� r�!� - .r�- �55.._ o - :3;�' 3 +����F+r•��r'�/..� s� >� DDOWNSTREAM� t,�;;� SAMPLE I'OL� f =�`f";;1;::.... .•r ��Pail;-� rQ � ";tir l e `*•+-,-' .. T •'< t; � 7ti` ,1'::". O' lu� .���� ,r �,fc�''�r 711 r ti",'y"}'•'r: �- BJ��'I ,�_.�:,�: •qr •,,/ � [• J',~,;.�r ''��-l. �\ � '. SSt �' � 1 rGOCF r.i 'f e � 1' 4Y "F- w.:... 1,, .};" '• �T�'a• }r > v, �-;�ir' '� £tir. 1',� Gr[ac ^ 111.. • ��J� CO2JRS'�?, .�' �:1ltiJ� ".ii : � j� ��_ 1?T � rr �,i • �� ^•�i%[�,7ii r: •,', '.: '�1'�\•!' .'� � r =J �r�+� .: • 5:�: -- � + t::.:, Sch /7n} '>' �1/ram %5 S. rt :.1 �{ �Y �j� .,ter s:f� R;r a ,, v •Y x [, �/ " i ) S__ ` fr t it.: f�' CJ �(.F (; �'~ 9 r'tr .I^ �:�` , 31.1i ' [�',•�� -tr, � ,• c� T�_S` �•.'10'? 3„•".'• T�r.�- �7•"3��' .'ter �•_ti?.� �rt'r �=.��'I' .+' 1 �:`�F � Ia � r�.If• � JZ;•• ('It ,".ri "' �r �` ' -< 'p.,. - O. l•- 4 c..r��..c�,t _ '1 S • r r,,, "l �.rit' �:':..;`;_:.?":-: ;yCi �:'+ ra�l �• _ .Jr' i . ' (.i' s�'',�';' r P . Ct:_ _ .L ti lir�:� ~`';f'• ".k !,-• ; . , e . 'I r.' i .�' � � CiDii �' ,Y.' � '�,Y� jF.^�i ;'1yJ : 0 i ,lS I 'N ,': "'.'� :r N..,,ii•- ;._r,l,... w T, _ :%l� '��� �� 1%7 p. V .� � �'�Oui ' .,,/ �, - n�i; . �� :S_ .`�" �'c� A :-.0 �.•,•�` � r S �1 � i ,_�r-L' er �. -�% � ;it, •i �' � � _� � "�"'i Imo'•• ',� • S' r%4t, 'i', .Ta:fi>'•'.a.., `�- ��ti� .�- r _' i t 7 ' � �' s% �� d t', 1 �/• %1� `�;;%r7 alal .l _L '� f /`+/y_ _T�: r •'1v S'` ',t=' _'l.�i_ �' _ i - P'•H i4 i- '��' �j-:.�, "� 1y/� _,r%\?� _' ��._ � �%�-t•'ffL• •'l' ,/ `'.j r'� °- F;. �k�ry. r[ "d ./.; '' 'rT �,�-�;'• �. _�; IJ � Z' l t'�f\, 0:^' � - 1 /�� ✓� 20\: G'\L r �'; 1 �• } n.C; <<� r,. .�:�'7 rj y r y t �L` 1 " T`�� U-. ::� _ _ri./•��; ...�.._ .i::�v*y_� 1 �C- yt�ti;1 tr'•y :L3� - �`'_i r? -` •�,. .r,1 .U7,.:.�'�'`r •, !dam `'`-S /_ -t' 3 '' =•�•1 y y r _ ��• I'.'-i + f- r, tirYi 1..;_ �- t. / /�-r _- !;\r _ L_--` .i-\;.�' RCN \ JI, C�-r \f` • �_/, z• 17 tr�'`r \ ,..<<, ';..` lu � �� '.� N _J f m �•." .1/, �\1,.; -�;Si,iT.- Tl i v• •' 'i��:� a� 4 �t..q,S y' LZO ` � "� ����- ' O , /" '' ' � ��• . �!4 ' i ` �/'�-: �~s�� � � `�' ` Z s£/' �s � �.� � eS S� �s;�-sue � �•:y ° + C `( _ - i'" '��J'Ijff p��-•t-'�. \ •t�',✓. 'Y' �� r+. `"'r�,r�� T �1 F t-��i,•J!��. '- l� SY � .�, Y• ! -%_ n•. "7,2 � �T��.l.�;.�",' . \�•; i" f��'� r J 7�'� :-"�Q'. ;•.1�'�j:��\�'tJ ji, r _�� }•' �t, �+✓�/ �� � ,2 .r•tr �% �,/11tf (- ��•�il �rl ,1�� ,�;t �f T.. S t �•y f .� ` •,f J� ry)!• \ �; � � ! /�.•r='- _ `' .Y.>�� �/ r. ll• �f.•-�� ,.' ,-+j: �.f� `�, '•�_ ,.'1 F � � I,f, �-'�::it " �' 1^ \ `•\, r5/ .�. �s�;>. / f !? .-r` +�:� • ` ��� �'�_,+•.-: ��ltli r.i... ."%+''.�Y� '�l_� Y: y � +. =-•t IQ•' �!. ;`+e^C \� // r `� '°Y. 7r� r ? F��� � .-,ems r' � .t '.." ,,:., rJ � j_ : ,• Y: r I 1 `\ '-��� , - >,. � �.t i,t ��Ka.-\\;. '��' w7,` •1. �.,i. �'rr� .St [ �t�t=. r.3(,! f j'j51 �'. �.i\` •S'r� u';+�% .,rj' iJ Sr. 4" _` r -.�...j•-✓�r��1 �5��{1;y k•4i�� r f•'',SI:J q. _\ 'Y,ti i.T,{- .4}' i •'fr•• 'S:;�. '�: 1 _ T.AYht ��`..;+ "F'i/ .f� 1%r.7':,, T:%`-f.•{, rJ\ /. r7 J:•, ?� J y�l YYItirr ~r•'r _ _ is r i i K� j '^:t •. \�•S-�en, _;� .Y3'' ^+1 �. c 4 r \. _ ��,`.\I�• o iY • J ';f� �- it' ( � � •ur O � t9. is;/,'�-� �.� ^=� _ _��r . -`` a,.- tip- " '• , � l� , �5y. �• � "I ,,� ,��,. . ��:-'' "'.L ��7rr rt' �, - �-yJ /^^a3'r's.�) It%r _ l•. \ �-�z� r ,•fi, y�• 'r, •,k.{� t�,`�f/, J - �.. '••5,•, `_+•wtit''I r/`�fy�� . '���.r�C '1'\ ,� �-fM'''*�L:^ f �t4 � n�;J � . -• - -•t, fr�:;'.��-{1�y;� c,� ai'i • s'•.- .., r � � ! .}`ice' ., _ "A: i ,+��� fK k},"[r r L.-J('... �t _tom. �.:4?�rlh-ti ��/.. r..:ti�r.,•, 'dI y�•,' {_ ��-.� �- ' �. t• ,i'C rt-. pig, t�/ 1/tp1:���4'% � Y• i:it'-•.r�:.d i`vt` Y:.vlL j `�'''.�..t 1 1'' _ - ;y, L tr•+.-� µ/J �"�. 'ff !�. •'7 � , �1'.' �' �"�'i�•:i: -:�� �`•� � �r i �,+. �A � i f .�r _'4•. 74. V / - r\ � �� �>,F� `� �. r.rk'::.tr,♦1` '�, t" •i �, •'1 j,-��•-:!'ram..;. , �. Fa'�,� s ' r U (( 0 r 1 -t;" ••:r ^yl`;'-i; * Y: 1 /�'" r x,�•,}Y r "'' ".ii J' F•'• ,'�:•.:' v , / ?� AdJT� '���;.� f }��'r� '� i �T\>.� �/`::rf `:;lY•-?x � � �'f' \i 1'•'':' .F 1 vp�`- . 1 / `Vr `+ 7 r a: g '�ii' 1�1 �\>�liU-r'tiZ*�7i{. �_. .�, � ;''� �,k J`� ����� +•a �J: `�-`:.��, S'- r'. _ f -l� Y r},s+ .y ( ��w,5i'r-' �E�i'rI� t` _•_ :�F1S1.01f�,... r��.. .i - r ! �•`-.:.;;� _ ..:�,a �'+, J t- t- 7 •`:'. '�,'� sr •/if r •.F.h;'\`•'=:si.titYd7.�t:,�i,,.�_,+-'t��12':Y '��f`r}rL�:�4f,`�� Yi � r,+ ,./�/•, •t ( � .,` ' �. ;,'�-. 7i ,F ', :: ; r,J y` ' S K ;r +��t -4 y •:'. ,� : •-.. =•�`t, �f !�'11 _ : e4 •, :;::'' n�/r i•,• s r,- ,r 'i�� t�.'�11'1�. ` .r,'32 .:tU�::r_:: �ai -J�. .' - r% j�!.�:�j, //+ ���Z _t.. .%/�'' , '.5i.` :'r. n. •��'� •4r,, ,r yM„(�� ��7' '.++'i�.; %�:,+:5ti4-�.::+, "� \lr «!„.jy,,��' 'r'. � � - '•r _1:,� �I � nl!y:';'.\ � ,.Yexyt� 'Ct •Tr,:s�7. t- ��.. ,na � � r ,� - �-T. i�J+O, . 1 ~:ice: fal/ /•�'.r •.;:;H'•!'Atr �1S' jsf�.�.�:� ``.v,:. F'•;.;,: ^l. L, �'ir.. �' -i:�C •�:��'•!�:•r: ' r'i �r'i•f (r' }., 1''' s��: ZF1'-► -i �� •r•.t � •�''t�• +._�1-'r'...� r .rti'-,',livti- •�C� +w :'>�.• ,:;. ;. 4, •tee r.3?: ., :'r,•:v.` n•.• :=��. i t r- .•'n t:'fb •;Y••: .ti '!r• f'S:•af. r ,'�•• -'.7:' ,;y'.i;: .y , . V+,�j� -'F }�.�r.1.. n-�a .. f �:` �k r -, r .y ''J ..f�"'i: t : 'p`Tf'•_ . i. � !•Si`�_ '.'�:rr.,: .� J `••.tt 'n+4p :'{Z .�:: :%'-'r�' .l •/ � � ,3'L• J. r; t•' L „\�' r`�':fi'Y-` �tr •et i ,!y'!.�f'+E.it��+ `(' � ,,J :'i'- ox •'Jl �'~ 1\' %ram,. -ti.t. i' Y .LT r'rY_\' Ji+ // Vq c%� '+:�.. _•'�� �.��... :•n'�. - .. a. - .lJGH7 .y. i 5 yAir q — , ; I — )Zr' I"'t IV.7 Nl� 43" I,ONAK 5W 4�` (;U�, .4 .14 As Fit CONSULTING CHEMISTS Customer: NCDENR-IDWQ 127 N. Cardinal Drive Exi. Wilmington, NC 28405 Attn: Jim Bushardt Date Sampled: Sampled By: Envirochem 07/26/00 Jim Busbardt 910 392 4424 W Environmental Chemists, Inc. 6602 Windinill Wjy • Wilmmrinn. NUrsh Carohno 2840.5 i9E0) 392-0223 (L-ah) • f910) 192-4424 (F:») EChem1V C -.10i.Cnin NCDF-NR: DWQ CERTIFICATE 4tQ4, DLS CERTIFICATE #37729 Date of Report: July 28, 2000 Purchase Order #: Report Number: 0-2558 REPORT OF ANALYSIS Report To: Jim Bushardt Parameter Sample m #p Ai #U Ub ID # 6218 # 6219 # 6220 Turbidity, NTU 385 97.3 6.2 Reviewed by [t- I! /..� and approved for release to the client. w y � �1 •V w WOLLO 1 ,.A a d CISIIH C w -on fl amom t�t I� $Y'I (a -jo Cal) Q�IVI� �I(/IZ it..iLinylle l�w.y J y Q1.i�lV d 4u'9jo i j � _ Q poctmo � a �o a c7 E V u U -fta a. lotGrl h, 4 ai ai � � a . EO"d wayaoaLnu3 ySti:60 00 'State of North Carolina Department of Environment and Natural Resources. Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality January 11, 2000 Ms. Mary Gornto, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 Subject: Revised Stormwater Permit Park Avenue Right -of -Way Improvements Stormwater Project No. SW8 990421 New Hanover County Dear Ms. Gornto. - As requested, please find attached the revised Stormwater Management Permit. The revision consists of deleting the requirement to construct the treatment system prior to construction of the project. The construction of the bio-retention areas prior to the road will only result in the continual injury, repair and replacement of expensive vegatation. Item 41 in Section II has been revised to read as follows: The stormwater management system -shall be constructed in it's entirety, vegetated and operational for its intended use as soon as possible after the road has been paved. Temporary approved Erosion Control measures must be constructed and maintained prior to the bio-retention areas being constructed. If you have any questions, please do not hesitate to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSSlarl: S:1WQSISTORMWATILETTERS1990421.JAN cc: Greg Hetzler, P.E., McKim and Creed David Mayes, P.E., City of Wilmington Wilmington Regional Office Linda Lewis Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer - 50% recycled/10%, post -consumer paper 'State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality January 11, 2000 Ms. Mary Gornto, City Manager City of Wilmington PO Box 18I0 Wilmington, NC 28402 Subject: Permit No. SW8 990421 Park Avenue Right -of -Way Improvements High Density Stormwater Project New Hanover County Dear Ms. Gornto: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Park Avenue Right -of -Way Improvements on December 29, 1999. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 990421 dated January 11, 2000, for the construction of Park Avenue Right -of - Way Improvements. This permit supercedes the -one issued to you on January 4, 2000. This permit shall be effective from the date of issuance until January 11, 2010, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter I 50B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:IWQSISTORMWATIPERMln990421.JAN cc: Greg Hetzler, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering David Mayes, P.E., City of Wilmington Linda Lewis Wilmington Regional Office Central Files . 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State Stormwater Management Systems Permit No. SW8 990421 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ciry of Wilmington Park Avenue Right -of -Way Improvements New Hanover County FOR THE construction, operation and maintenance of 4 bio-retention areas in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as atiach'ed and.on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 11, 2010 and shall be subject to the following specified conditions and limitations: L DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. Each of the Bio-Retention basins has been designed to handle the runoff from a limited amount of built -upon area, as follows: Basin 1 @19,722 ft'; Basin 2 @19,206 ft-1; Basin 3 @23,448 ftz; and Basin 4 @27,245 ftz. These built -upon areas include offsite residential development. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The drainage -area will be limited to the amount of built -upon area indicated on page 4 of this permit, and per approved plans. The drainage areas shown on the approved plans include offshe areas. 5. The drainage area for each bio-retention basin must be less than 5 acres. 2 State Stormwater Management Systems Permit No. SW8 990421 6. The minimum width for each bio-retention area must be 15'. The minimum length for each bio-retention area must be 40'. For widths greater than 20', the length must be at least twice the width. 7. The minimum required surface area for each bio-retention basin must be 7% of the combined Rational runoff coefficient multiplied by the drainage area. 8. The minimum required volume for each bio-retention basin must be based on the 1.5" storm. 9. The drawdown time for each bio-retention basin must be less than 4 days. 10. ' For an average tree spacing of 12', and an average shrub spacing of 8', the minimum stem count for each bio-retention area is 1,000 trees and shrubs per acre of drainage area. 1 l . There must be at least 2 or 3 shrubs provided for each tree. 12. A minimum of three (3) species of trees and three (3) species of shrubs must be provided in each bio- retention basin to ensure diversity. 13. At installation, trees must be a minimum of 2.5" caliper. Shrubs must be at least 3 or 4 feet in height or have an 18"-24" spread. 3 State Stormwater Management Systems Permit No. SW8 990421 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Streamlindek #: Classification of Water Bode: Bio-Retention Basin Number: Pond Depth, feet: Drainage Area, ft': Dimensions, L x W, ft.: Total Impervious Surfaces, ft2: Offsite Area entering Pond, ft': Required Surface Area, ft'. Provided Surface Area, ft: Required Storage Volume, ft': Provided Storage Volume, ft': Draw Down Time, hours: Minimum Stem Count: Number of Trees provided: Number of Shrubs provided: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Park Avenue Right -of -Way Improvements SW8 990421 New Hanover County' Ms. Mary Gornto, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 December 29, 1999 Hewletts Creek 1 (CFR 18-87-26) "SA" 1 2 3 4 11 6" 6 6" 611 87,120 91,476 129,373. 96,268 18x195 21x185 15x310 15x220 19,722 19,206 23,448 27,245 7,709 7,709 7,709 7,709 1,951 2,241 2,989 2,695 3,840 4,160 3,840 2,840 2,759 2,733 3,428 3,666 2,004 4,160 3,840 3,840 3.5 3.6 3.5 3.4 35 38 35 35 12 11 24 15 243 274 373 185 4 State Stormwater Management Systems Permit No. SW$ 990421 I1. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use as soon as possible after the road has been paved. Temporary approved Erosion Control measures must be constructed and maintained prior to the,bio-retention areas being constructed. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Monthly scheduled inspections. b. Remulch any void areas by hand when needed. C. Every two to three years replace the previous mulch layer. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal within the collection system, swales, and basin areas. g. Access to each basin must be available at all times. h. At least twice a year, preferably in the spring and fall, remove and replace all dead or diseased vegetation. i. As needed, treat diseased trees and shrubs. j. Provide sufficient irrigation to ensure that the plant life will live. k. Annually, preferably in the spring, replace support stakes as needed. 4. Records of maintenance activities must.be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification: 7. If the stormwater system was used as an Erosion Control device, it must be restored to'design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. State Stormwater Management Systems Permit No. SW8 990421 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 10. Prior to the, sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 11. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 12. The runoff from all built -upon area on the project must be directed into the permitted stormwater control system. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within thetime frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS l . This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance withNorth Carolina. General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the I Ith day of January, 2000. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 11 Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 990421 2 State Stormwater Management Systems Permit No. SW8 990421 Park Avenue Right -of -Way Improvements Stormwater Permit No. SW8 990421 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best ofmy abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 990421 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outletlbypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outletibypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. ] 1. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspector E. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality January 4, 2000 Ms. Mary Gornto, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 Subject: Permit No. SW8 990421 Paris Avenue Right -of -Way Improvements High Density Stormwater Project New Hanover County Dear Ms. Gornto: The Wilmington Regional Office received a complete Stormwater Management Permit Application forPark Avenue Right -of -Way Improvements on December 29, 1999. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 990421 dated January 4, 2000, for the construction of Park Avenue Right -of - Way Improvements. This permit shall be effective from the date of issuance until January 4, 2010, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish art adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:1WQSISTORMWATIPERMIT1990421.JAN cc: Greg Hetzler, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering David Mayes, P.E., City of Wilmington Linda Lewis �Wilmington-Regional--Gffice-"� Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State Stormwater Management Systems , Permit No. SW8 990421 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws;. Rules, and Regulations PERMISSION IS HEREBY GRANTED TO City of Wilmington Park Avenue Right -of -Way Improvements New Hanover County FOR THE construction, operation and maintenance of 4 bio-retention areas in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved 'stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 4, 2010 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. Each of the Bio-Retention basins has been designed to handle the runoff from a limited amount of built -upon area, as follows: Basin 1 @19,722 ft2; Basin 2 @19,206 ft2; Basin 3 @23,448 ft2; and Basin 4 @27,245 ftZ. These built -upon areas include offsite residential development. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The drainage area will be limited to the amount of built -upon area indicated on page-4 of this permit, and per approved plans. The drainage areas shown on the approved plans include offsite areas. 5. The drainage area for each bio-retention basin must be less than 5 acres. 2 State Stormwater Management Systems Permit No. S W 8 990421 6. The minimum width for each bio-retention area must be 15'. The'minimum length for each bio-retention area must be 40'. For widths greater than 20', the length must be at least twice the width. 7. The minimum required surface area for each bio-retention basin must be 7% ofthe combined Rational runoff coefficient multiplied by the drainage area. 8. The minimum required volume for each bio-retention basin must be based on the 1.5" storm. 9. The drawdown time for each bio-retention basin must be less than 4 days. 10. For an average tree spacing of 12', and an average shrub spacing of 8', the minimum stern count for each bio-retention area is 1,000 trees and shrubs per acre of drainage -area. 11. There must be at least 2 or 3 shrubs provided for each tree. 12. A minimum of -three (3) species of trees and three (3) species of shrubs must be provided in each bui- reiention basin to ensure diversity. 13. At installation, trees must be a minimum of 2.5" caliper. Shrubs must be at least 3 or 4 feet in height or have an 18"-24" spread. i State Stormwater Management Systgms Permit No. S W8 990421 ' Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream/Index 4: Classification of Water Body: Bio-Retention Basin Number: Pond Depth, feet: Drainage Area', ftz: Dimensions'-, L x W, ft.: Total Impervious Surfaces, ftz: Offsite Area entering Pond, ft'-: Required Surface Area', ft': Provided Surface Area, W: Required Storage Volume', ft':. Provided Storage Volumes, ft': Draw Down Time', hours: Minimum Stem Count': Number of Trees provided': Number of Shrubs provided': DIVISION OF WATER QUALITY PROJECT•DESIGN DATA SHEET Park Avenue Right -of -Way Improvements S W8 990421 New Hanover County Ms. Mary Gornto, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 December 29, 1999 Hewletts Creek / (CFR 18-87-26) "SA" 1 2- 3 4 6" 6" 6" 6" 87J20 91,476 129,373 96,268 18x195 21x185 15x310 15x220 19,722 .19,206 23,448 27,245 7,709 7,709 7,709 7,709 1,951 2,241 2,989 2,695 3,840 4,160 3,840 2,840 2,759 2,733 3,428 3,666 2,004 4,160 3,840 3,840 3.5 3.6 3.5 3.4 35 38 35 35 12 11 24 15 243 274 373 185 State Stormwater-Management Systems Permit No. SWS 990421 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Monthly scheduled inspections. b. Remulch any void areas by hand when needed. c: Every two to three years replace the previous mulch layer. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal within the collection system, swales, and basin areas. g. Access to each basin must be available at all times. h. At least twice a year, preferably in the spring and fall, remove and replace all dead or diseased vegetation. i. As needed, treat diseased trees and shrubs. j. Provide sufficient irrigation to ensure that the plant life will live. k. Annually, preferably in the spring, replace support stakes as needed. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior -to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The Director may determine that other revisions to the project should require a modification to the permit. M State Stormwater Management Systems Permit No. SW8 990421 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The runoff from all built -upon area on the project must be directed into.the permitted stormwater control system. 15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submita written time schedule to the Director for modifying the site to meet minimum requirements. The. permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 111. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials_ as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may. subject the Pennittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform'satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 4th day of January, 2000. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 990421 on State Stormwater Management Systems Permit No. SW8 990421 Park Avenue Right -of -Way Improvements Stormwater Permit No. SW8 990421 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to'observe (periodically/weekly/full time) the construction of the project, for - (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL VA State Stormwater Management Systems Permit No. SW8 990421 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the proj ect is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc:, NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspector .;-. FFICE'USEONLY ,. Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION: 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): City of Wilmington 2. Print Owners/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): Mary Gornto, City Manager 3. Mailing Address for person listed in item 2 above: PO Box l 810, 138 North Front Street City: Wilmington Telephone Number: ( 910 )341-7810 State: NC Zip: 28402 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Park Avenue, R.O.W. improvements, Wallace Avenue to 52nd Street 5. Location of Facility (street address): Park Avenue - Wallace Avenue to 52nd Street City: Wilmington County: New Hanover 6. Directions to facility (from nearest major intersection): From College and Oleander Drive, go .75 miles East on Oleander, left (North) onto Wallace Avenue, 0.2 miles North to Park Avenue 7. Latitude: 34.2 Longitude: 77.9 of facility 8. Contact person who can answer questions about the facility: Name: Gregory J. Hetzler, P.E., McKim & Creed Telephone Number: { 910 ) 343-1048 il. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number NIA and its issue date (if known) Form: SWU-101 April 1998 Pagel of4 3. Specify the type of project (check one): Low Density High Density Redevelop 4. Additional Project Requirements (check appropriate blanks): CAMA Major X Sedimentation/Erosion Control III. PROJECT INFORMATION WQC 401 Project ff980672 General Permit X Other (Tuv�c poao 404 Permit In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Runoff from the reconstructed road, and new sidewalks and bike path will flow to grassed lined swales. The flow length along grassed lined swales is maximized prior to entrance to collection system. 4- 61,1211 bib refe,)Aoi 2re2 5 are Oro v+�!ed a�I4__-Ae rvoc(w?,q, v 2. Stornwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 6.46 acres 4. Project Built Upon Area: 31.9 % 5. How many drainage basins does the project have? I 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. over -a �� .Basin Information ion ,-:: , .: — „ - . Drainagd Basin 2 ' Receiving Stream Name I-lewletts Creek Receiving Stream Class SA Drainage Basin Area 6.46 acres Existing Impervious* Area 1.23 acres Proposed Impervious* Area 2-0614ed—ul-lelep x zere5 % Impervious* Area (total) 31.9% Impervious* Surface Area :: ' - • - Drainage Basin 1` 'Drainage Basin 2` On -site Buildings 0 On -site Streets 56,145 sf ( 1.29 acres) On -site Parking 0 On -site Sidewalks 10,575 sf(0.24 acres) Other on -site 22,900 sf (0.53 acres) Off site 0 "Total: 1= 89,620 sf (2.06 acres) * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sicleivalks, gravel areas, etc. 7. How was the off -site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Dorm: SWU-101 April 1998 Page 2 of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop Ceneral Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major +Sedimentation/Erosion Control �404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. Stormwater runoff from this project drains to the L- t` ear River basin. 3. ' Total Project Area: 6.4 & -acres 4. Project Built Upon Area: �Jf , I % 5. How many drainage areas does the project have? `T 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin lnformation Drai��agc Arca I ' - g . _-Draina e Area 2 > Receiving Stream Name etute; W 5 rZeL<'_ {-eek Receiving Stream Class _5A S . Drainage Area . �?'T/ ZQ 914 4 7(p Existing Impervious* Area Proposed Impervious *Area 19 2 Z 2C7Co , % Impervious* Area (total) '22 , (p Ip 2 Impervious*_Surface Area' A +�Diainage Areal rry Drainage Area 2 On -site Buildings On -site Streets F 4- On-site Parking On -site Sidewalks f L�(' a 3& Other on -site 52 / $(03 Off -site '4 fC'rr12i i 7,307 27CQ 604 Total: ` q, 7'Z Z Total: lq 2d& { Impervious area is defined as the built upon area including, but not llinited to. buildingsroads, parkin, areas, sideivalks. gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . 2. Stormwater runoff from this project drains to the Qn. rezK River basin. 3. Total Project Area: & Ae acres 4. Project Built Upon Area: 31• f % /J 5. How many drainage areas does the project have? mot"' 6. Complete the following information for each drainage area. If there are more than two drainage areas'in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information "a t ;Drainage Areag�3 r, Drainage.Area'?f Receiving Stream Name New ,e4f Ze et j e- 'S Cr Receiving Stream Class SA S Drainage Area , 2q 3 (p g Existing Impervious. Area Proposed Impervious *Area 2 44 '27 245 % Impervious` Area (total) F v% Z 9, 3 o ImpcMous*.Sitrface Area ' - Drainage Area 1 Drainage Area 2 Ors -site Buildings On -site Streets g it 2 12 7690 On -site Parking On -site Sidewaiks !r 2 3 2 ' R t 4- Other on-siteStke h Vr iV & Q 5 A, 8%2 Off -site tf4 of remzigiq 9UA 17 o , 7 ocf Total: 2 5.441 Total: 27 245 ` Impervious area is defined as the built upon area including, but not hinired to, buildings. roads, panting areas, sidewalks, gravel areas, etc. Fonts SWU-101 Version 3.99 Pace 2 of 4 By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): Gregory J. Hetzler, P.E., McKim & Creed Engineers, P.A. Mailing Address: 243 North Front Street City: Wilmington State: NC Zip: 28401 Phone: ( 910 ) 343-1048 Fax: ( 910 ) 251-8282 VII. SUBMITTAL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP (see Attachment A) • Permit application processing fee (see Attachment A) • Detailed narrative description of stormwater treatment/management: • Two copies of plans and specifications including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage casements, pipe sizes, runoff calculations - Drainage basins delineated - Vegetated buffers (where required) Vill. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Mary M. Gornto, City Manager certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions in accordance with Attachment A of this form will be recorded with all required permit conditions, and that to the best of my knowledge the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature:N[�Nd k Date: T Sr —q 9 Title: rr1. , % n.r► .:1- b _ 7 Form: SWU-101 April 1998 N Page 3 of ATTACHMENT A 1. Deed Restriction Requirements The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of lots or outparcels: 1. No more than square feet of any lot, including that portion of the right-of-way between the edge of pavement and the front lot line, shall be covered by impervious structures, including asphalt, gravel, concrete, brick, stone, slate or similar material but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. 2. No one may fill in, pipe, or alter any roadside swale except as necessary to provide a minimum driveway crossing. NOTE: If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size, and the allowable built -upon area for each lot. For commercial projects that have outparcels or future development the following statements must also be recorded. 3. The connection from the outparcel or future area into the stormwater system must be made into the forebay such that short -circulating of the system does not occur. 4. All built -upon area from the outparcel or future development must be directed into the permitted stormwater control system. S. Built -upon area in excess of the permitted amount will require a permit modification prior to construction. For curb outlet systems, the following statement in addition to items 1 and 2 above must be recorded: 6. No one may pipe, fill on or alter any designated 100 font long grassed swale used to meet the requirements of NCAC 21-1.1008(g). 2. Supplement Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project: Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Oft -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River basin Nutrient Management Strategy Supplement 3. Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit Low Density High Density Other Director's Certification General Permit Form: SWU-101 April 1998 New, Modification, or Late Renewal $225 $385 $225 $350 $50 Page 4 of 4 Timely Renewal Without Modification n/a $225 n/a n/a n/a OPERATIONS AND MAINTENANCE PLAN BIORETENTION AREA Name: PARK AVENUE R.Q.W. IMPROVEMENTS Project No.: SW8 990421 WALLACE AVENUE TO 52ND STREET Responsible Party: CITY OF WILMINGTON Address: P.O. BOX 1810. WILMINGTON. NC 28402 Phone No: 341-5880 1. Maintenance Requirements: Maintenance of the system components is necessary to the continued operability of the stormwater management facilities. The following are minimum requirements which the maintenance staff of the owner's group will be required to follow to maintain the detention area management system. 1. Immediately after project is finished and planting has occurred: a. Mulch bioretention areas; any ground cover designated as plugs may be put in place once the areas have been mulched. (Ground cover via seeding and/or comprised of grass should not be overlaid with mulch). b. Water plant material at each day's end for 14 successive days. STORMWATER D E C E I 2. Whenever needed: V E a. Remulch devoid areas by hand. JUL 2 2 1999 b. Replace any inadequate stakes or wires. p;3oi # �'w� T-ICA21 C. Treat all diseased trees and shrubs by mechanical means or by hand. � 4 5 3. Monthly or after every runoff producing rainfall event, whichever comes first: a. Visually examine and repair erosion. 4. Semi -Annually: a. Remove and replace dead and diseased vegetation determined to be past treatment during the following periods: 3115 to 4130 and 1011 to 11130. b. Test pH of the organic layer and soil, and use results to establish amount of any required alkaline substance (e.g. limestone) to be applied and follow by such an application. & 0824=55 PARK AVE OESIGNIO&M PLAN - SIORETENTION AREA HOC OPERATIONS AND MAINTENANCE PLAN BIORETENTION AREA 5. Annually: a. Provide any additional necessary mulch by hand in the spring. b. Replace support stakes in the spring. C. Soil testing should be performed in order to determine the accumulation of toxins and heavy metals. Pending testing results, removal of the contaminated soil, and in worst case scenarios, removal and disposal of the complete soil base and the plant material may be needed. 6. Every two to three years: a. Optional: Remove past mulch layer followed by application of new layer by hand in spring. 7. General: a. All components of the bioretention system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. b. Deficiencies or inoperable conditions must be reported to the Project Engineer. If resolution to the deficiency can not be implemented within 15 days, notification shall be given to the Division of Environmental Management, Wilmington Regional Office, phone 395-3900. I acknowledge and agree by my signature below that 1 am responsible for the performance of the above operation and maintenance procedures. Signature:&�JA22Date: Mary Gornto, City Manager &TB24 0055 PARK AVE DESIGM08M PLAN-HIORETENTION AREA.DOC 44.�4 `�MCKIN4&CREED December 23, 1999 Linda Lewis, Environmental Technician NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Project No. SW8 990421 Response No. 8 City of Wilmington's Park Avenue Right -Of -Way Improvements Project Dear Linda: M&C 0824-0055.OW (40) STORMWATER RECEIVED DEC 2:91999 DWQ Please find enclosed, for your review and approval, this submittal in response to your letter dated December 3, 1999, for the referenced project. We have attempted to respond quickly. Please note your letter was postmarked December 16th, and received December 17'''. 1) Please find attached the requested break down of on -site built -upon areas (BUA) that drain to the individual basins. The built -upon areas have been calculated for on -site impervious areas. As previously presented, the design accounts for the overall quantities of BUA, both for the on -site, and off -site, BUA. Your calculations need to reflect that the topographic survey does not depict the off -site BUA for the neighborhood watersheds (see #3). 2) Enclosed are two copies of Detail Sheet 3. Your August 30"' letter commented on the cross section details on this sheet, which we have previously addressed the clarification of. 3) As you indicated, the BMP recommends sizing the basins through the established criteria, "A= (5 to 7%)*C*A". This relationship accounts for volumetric sizing in accordance with the State BMP Guidelines dated November 1995. Our understanding of the sizing guidelines is that separate computation for the 1-inch event volume is not applicable based upon the BMP guideline. With regard to the example problem provided, the determination of Built -upon area, in the example, was for determination of the run-off Coefficient. We have previously provided documentation of our methodology for determining the runoff coefficient. Please call should you like me to review with you the coefficient determination. The performance values, referenced in the compliance calculations, for the two individual data sheets for Basin 3 (3,840 so and 4 (3840 so, are incorrectly stated. Please find enclosed 2 copies of the revised calculation sheets that reference the correct performance value. The areas performance values are correctly listed in all other locations in the documentation, i.e. the Data Summary, on the Plans, Detail Sheets and the Supplemental Narrative. The calculations state; Basin 3 min. area req'd 4,256 sf w14,860 sf provided, - Basin 4, min. area req'd 3,167 sf. wI 3,100 sf provided. No further revisions of the calculations are required. The comprehensive site plan also includes the additional routing of the run-off from the roadways through grassed lined water quality swales either, prior to or after Bioretention treatment. This adds to the treatment provided by the retention areas. 243 N. FRONT ST., WILMiNOTON, NORTH CAROLINA 28401 s M2410055 park avo design110-comm1122399 stormwater response doc TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com AA0002667 Linda Lewis Stormwater Project No. SW8 990421 December 23, 1999 Page 2 of 2 'If you desire, we are always available to discuss this project at your convenience either in person or by telephone. Please call should you have any questions. Sincerely, McKI CREVDA. yeti iir,f � Gregory J. e.E= Q 5 Project M nager _ • 0228SEA87 9Jhltab ��►iii�m�t��`� �� Attachments — 2 copies Summary of On -site Built -Upon Areas Detail Sheet 3 Bioretention #3 and Bioretention #3, dated 1015199, rev. 12/23/99 cc: David Mayes, P.E., wlencl Mary Gornto, City Manager w/o encl Design Book File 5 T524=55 park ave desi9nM-ccmm1122399 stormwater response.doc v v MCKM&CREED v 4,04MCIQM&CREED November 24, 1999 Linda Lewis, Environmental Engineer Division of Water Quality NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Stormwater Project No. SW8 990421 Submittal No. 7 City of Wilmington's Park Avenue Right -Of -Way Improvements Project Dear Linda- M&C 0824-0055.OW (40) ' E C E r v E n NOV 2 4 ?999 D E PAFi�O,i # Please find enclosed for your review and approval this letter submittal that is in response to your latest letter dated November 15, 1999 for the referenced project. This seventh submittal is provided based upon our original Application dated April 20, 1999. Your comment letter of November 15, 1999 was not anticipated, as it was my understanding that all information required had been submitted. Your comment letter of October 15- 1999, was based on material presented at the first opportunity to meet with you on September 20, 1999. The November 15" comment letter is concerned with the basic project understandings, which were presented in our April 201h application, and the March 111h Preliminary submittal. Restatement of Project CriterialObiectives- You had classified this project as an "Other Project". Being that public roads are involved, built - upon surfaces have been minimized, stormwater has been diverted away from surface waters, and Best Management Practices (BMP) have been employed to minimize water quality impacts. As presented, this project enhances the water quality from approximately 35 percent removal of Total Suspended Solids (TSS), to greater than 85 percent removal of TSS. In addition, as originally presented to you in March, under "Other Projects", the definition of "Redevelopment" criteria requires that the stormwater management practices must provide at least the same level of treatment prior to the development. Conformance with environmental concerns has further been accepted through receipt of a 404 Wetlands Fill Permit, 401 Water Quality Permit and Land Disturbance Permit. This project minimizes water quality impacts. First, the existing water quality treatment provided in the area can be notably improved with establishment of grassed treatment swales. The stormwater will be treated via four Bio Retention areas. These Bio Retention areas are not only designed to collect the first 0.5 to 0.7 inches of runoff as specified by the BMP. The areas are also designed to treat the first 1 '/2 inch of runoff. Substantial areas are provided for overland - grassed flow, and substantial native landscaping is included. These improvements far exceed the requirements for the project. sA0824k0055 park ave des ign114-colY,%N2%9Wo4AMPCP ffl,AFRTH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com AA0002667 Linda Lewis November 24, 1999 Page 2 of 3 Response to Comments — For your review, I have summarized our responses to your letter in the order of your comments. Your responses (in bold and underlined) and our corresponding responses (in plain text) are as follows: Please provide the road and the bike path widths on the plans. I see a dimension 21' in the road but it scales closer to 28', and I want to be sure what is being permitted. There is a small road and a bio-retention area on the first sheet of the plans, but it is not dimensioned or labeled. Perhaps this detail could be beefed up a bit to convey the necessary information. Please refer to the submitted details for dimensional data. The bike path width is shown as 8 feet on sheet 4 and on the cross section details on sheet 3. The road width (typical) is 24 ft as shown on detail sheet 3. The 21' width is referencing inside gutter dimension. The contractor will construct to the dimensioned details, as is standard on road projects. The small road (shared driveway) on sheet 3 is dimensioned at a width of 12 ft on the first sheet of the plans. The dimensions of the bio-retention areas are shown on your 50- scale Roadway Improvement Plan. The lengths for the areas are 200 ft, 187 ft, 314 ft, and 226 ft for areas 1 through 4, respectively. No additional data need be submitted. 2 Please provide a breakdown of the impervious area that drains to each bio- retention system, i.e., the street, sidewalk, bike path, and existing impervious areas that drain to it. You have shown the required Rational C Value, there is no justification how it was derived which would require knowledge of the impervious surfaces for each system. You are not clearly founded in requesting individual calculation of the impervious areas within the bio-retention areas. A necessary breakdown of the project's impervious surfaces has been provided on the Application dated April 20, 1999. These areas are based upon the quantity take -off presented on the Application and on the 50-scale Roadway Improvement Plan. The impervious surfaces on the project total 2.06 acres. Please note that the specific determination of impervious areas (at least offsite) is not required in the design practice of Bio-Retention areas. It is not contrary to providing the standard level of care to not perform a definitive take -off of impervious areas off the site. However, please note that an attempt to do this take -off was made, utilizing the City's database for stormwater inventories. In addition, the definitive count you requested could not be ascertained using their system. The design of the bio-retention areas is based upon computations utilizing the empirical run-off coefficient and the Rational Method. Therefore, the counting, or knowledge, of individual impervious areas off the site, or on the site, is not deemed appropriate, or needed for sizing calculations or permitting. sM824=55 park ave designl10-comm1112399 stormwater response.doc v v McIQM&CREED v Linda Lewis November 24, 1999 Page 3 of 3 The determination of the runoff coefficient for the sizing of the Bio-Retention areas was determined utilizing standard practice and care, as included in the calculations. As you will find, referring to your reference tables, the standard accepted runoff coefficient for residential areas ranges for a C value from 0.3 to 0.5 (0.5 resulting in the higher notice of runoff). It is my opinion that the surrounding areas, zoning, soils, and present land uses are representative of these values. In addition, adjustment of the C value downward, for the very low storm event we are designing for, has not been made. Thus, use of this value provides for a conservative design approach. The documentation includes the design calculations (page 6 and including a NCDQT Reference), and the Bio-Retention sizing calculations summarized in the Table of Bio- Retention Data on the plans. No additional data need be submitted. 3 Based on my attempt to determine the built -upon area draining to each system, it appears that #4 is deficient in the volume needed to store the first inch. Please verify and revise as needed. As it is not possible for me to review your Engineering Calculations, it is not possible to direct you with regard to your design process. Please consider in your design calculations that the 1 inch event you are designing for exceeds the standard set in the Bio-Retention BMP. As previously stated and provided, we have demonstrated that the project has water quality enhancing improvements greatly exceeding those required. The utilization of the Bio-Retention areas is one of the additional components provided. The Bio-Retention areas do meet the BMP guidelines. With regards to the collection of the first flush storm event, these areas are designed to collect the required first 0.5 to 0.7 inches in accordance with the BMP, and also exceed this, by collecting the 1 '/z event. No additional data need be submitted. We are available to discuss this project at your convenience. Please let us know if you would like to meet with us to further review the process that we developed to improve the water quality at Park Avenue. Sincerely, t e+ Gregory J. Project M nager a !liill�11�F' CART �Q40F�SS/p99 SEAL' r • a _ 022887 p ti mow,; Kam`. cc: David Mayes, P. E., City of Wilmington Mary Gornto, City Manager File Design Book s:1082410055 park ave designll o-comm1112399 stormwater response.doc v v Mcmm&cREED Application Submittal Log for NC DENR Stormwater Management Permit Application City of Wilmington Park Avenue Right -of -Way Improvement Project from Wallace to 52nd Street (2,500 If.) McKim & Creed, P.A. Project Number 08240055.OW (40) Date I Calendar Days I Days to: Submittal: Contact Initiation .Comment Reply Number September 1, 1998 I (191) 0 ,Office visit requesting meeting on Meeting time not available. Handed high- : Engineering Phase of Park Avenue ;lighted copy of regulation stating, Public :Road - Treatment to Maximum Extent Practicable February 1, 1999 (38) (38) ?Telephone Contacts requesting ;DENR responded after 30 days requesting ;pre -submittal meeting !submittal of Preliminary Application in lieu :Of pre -meeting March 11, 1999 0 0 1 'Submitted for review the :Response after 30 days - Have not ;Conceptual Site Plan and Narrative reviewed draft submittal, submit formal ;at request as meeting time not ;Application ;available April 20, 1999 0 0 2 !Submitted Stormwater Application ;Draft Submittal not reviewed prior to this :Permit Application July 8, 1999 79 79 :DENR Response Letter :6 comments. Requested Engineering ;Design Calculations for various items July 14, 1999 85 6 3 'Submitted Requested Clahfications�Reference made to location of Design ;Calculation in Application Submittal. No ;design revisions July 22. 1999 93 8 ;Submitted! Created Standard BMP ;DENR does not have a standard form for ;Form for Bid Retention Areas :Bio Retention areas. Standard form was ;prepared and signed by Mary Gornto. No ;plan revisions. August 8, 1999 _ 108 23 — --;DENR Response Letter 0 comment. Reference to Design Manual :is not beneficial as DENR does not have :Application reference manual transmitted ;application submittal August 11, 1999 113 5 4 ;Resubmitted Design Manual ;Resubmitted original application file copy :No plan revisions August 11, 1999 113 0 'DENR Telephone contact ;DENR stated Application would be ;complete upon receipt of calculations August 30, 1999 132 19 ;DENR Response Letter :11 comments, including request for full ;justification for 42 pages of BMP _ :Guidelines. September 20, 1999 ; 153 21 5 ;Resubmitted Design narrative per ;Submittal included extensive response to :BMP Format :BMP criteria and detailed Landscape ;plantings for each of the 4 individual Bid ;Retention Areas. No physical design :revisions. September 20, 1999 ; 153 0 ;DENR Meeting. DENR Allowed to ;DENR Requested clarification on plant ;meet for first time to review ;application and plans. !species. October 15, 1999 178 25 6 ;DENR Response Letter :4 comments. Requesting redesign of Plantings Plan. November 3, 1999 197 19 ;Resubmitted Plantings Plan ;Landscape Plantings added November 15, 1999 ; 209 12 ;DENR Response Letter !3 comments. Requesting clarification of ;road width and justification of run-off design ;values. November 24, 1999 218 9 7 :Resubmitted letter response. :No changes to Application or plan. DENR Storm Water Application Log.xls 1 11124/9/ 44 v M IQMCIZEED State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality December 3, 1999 Ms. Mary Gornto, City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 ANNE NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AMC) NATURAL RESOURCES Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Improvements New Hanover County Dear Ms. Gornto: The Wilmington Regional Office received some of the previously requested information for the Stormwater Management Permit Application for Park Avenue Improvements on November 24, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the-stormwater review: My previous letter had requested a breakdown of the amount of built -upon area that drained to each of the 4 proposed bio-retention areas. Mr. Hetzler's response was that I was not "clearly founded" in that request. The bio-retention design requirements clearly show that the amount of pavement for each bio-retention area is needed to assure that ' the design requirements are met. Please have the engineer provide this. 2. The road detail is located on Sheet 3, however, the plan sets submitted to me did not include a sheet 3. Please submit 2 copies of sheet 3. My comment concerning the under -sized volume in Bio-retention area 4 was based on the design requirements as outlined in the BMP document, for which I had to estimate the amount of built -upon area that drained into it. Each of these bio-retention areas is individually treating the runoff from a specific drainage area. If Mr. Hetzler can provide the individual built -upon area that drains to each bio-retention area, this comment may be moot. I have enclosed a copy of an example design calculation where the amount of pavement draining to that bio-retention area is specifically called out. Closer examination also shows that the required minimum area for Bio-retention area 3 has not been provided. A copy of Mr. Hetzler's calculations is enclosed. 127 Cardinal Dr. Ext, Wilmington, North Carolina 28405 Telephone 9.10-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Ms. Gornto December 3; 1999 Stormwater Project No. SWS 990421 Ms. Gornto, this bio-retention project is the first one I have permitted. The design requirements are not as familiar to me as those for a detention pond are, therefore, the review time has been somewhat extended. I have tried my very best to request pertinent information and review it as quickly as possible, however, since it is my first, the process is going to take longer, and minor details such as the comments above, are unavoidable. As a matter of fact, I was in the process of writing the permit when these questions presented themselves. Mr. Hetzler has expended a fair amount of time in reminding me that this project meets all the requirements, without providing sufficient information to verify this claim. He appears to be trying to make it seem that my requests for information are without basis and intended to purposely delay this project. Let me assure you that my intent is to get this project permitted, and off my desk, but it must be permitted correctly and in accordance with all the applicable rules. Please bear with me as I make every effort to get what I need from your engineer to write this permit. Please note that the requested information should be received by. this Office prior to January 4, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. - The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation ofNCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Please revise and return all original documents enclosed with this letter, or provide new originals. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, rol,IR A I � Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATIADD1NF01990421.DEC CC' Linda Lewis Greg Hetzler, P.E. Department of Environment and Natural Resources 811ilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality November 15, 1999 Mr. Greg Hetzler, P.E. McKim and Creed 243 N. Front Street Wilmington, NC 28401 Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Road Improvements New Hanover County Dear Mr. Hetzler: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Park Avenue Road Improvements on November 4, 1999. I attempted to write the permit, however, a few items were still missing, making the application incomplete. The following information is needed to continue the stormwater review, and write the permit: Please provide the road and bikepath widths on the plans. I see a 21' dimension in the road, but it scales closer to28', and I want to be sure what is being permitted. There is a small road and bio-retention section on the first sheet of the plans, but it is not dimensioned or labelled. Perhaps this detail could be beefed up a bit to convey the necessary information. 2. Please provide a breakdown of the impervious area that drains to each bioretention system, ie, the street, sidewalk, bike path, and existing impervious areas that will drain to it. You have shown the required Rational C value, however, there is no indication how it was derived, which would require knowledge of the impervious surfaces for each system. 3. Based on my attempt to determine the built -upon area draining to each system, it appears that 94 is deficient in the volume needed to store the first inch. Please verify and revise as needed. Post -it• Fax Note 7671 Date 1 I-IS_gq paoges� To Gr He fs `er- From Lin-4 2 Lt4,. is Co./Dept. 11G L,M t Gee J`I i� co. DVQ �C Phone # Phone # Fax # 2r) { _ C�Z Fax # 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/101/a post -consumer paper Mr. Hetzler November 15, 1999. Stormwater Project No, SWS 990421 --------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 15, 1999, 'or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance -under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 1-43-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. RSS/arl cc Sincerely, Linda Lewis Environmental Engineer S:\WQS\STORMWAT\ADDTNFO\990421.NOV Linda Lewis Dave Mayes, P.E. 127 Cardinal Dr. Eat., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10'% post -consumer paper P. 1 * * * COMMUNICATION RESULT REPORT ( NOV.15.1999 FILE MODE OPTION ---------------------- 765 MEMORY TX ------ REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER Department ent of Environment it QFiL ent and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman! Secretary Division of Water Quality Mr. Greg Helder, P.E. McKim and Creed 243 N. Front Street Wilmington, NC 28401 Dear Mr. Hetzler: ADDRESS (GROUP) 9-25188282 ---- November 15, 1999 6:26PM ) TTI NCDENR WIRO RESULT PAGE E-3)3)3)3)3) P. 0/1 E-2) BUSY E-4) NO FACSIMILE CONNECTION i NORTH CARoW"A Dr►A*rmW OF ENVIRaNMENT ANP NATURA6 AEGOUR= Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Road Improvements New Hanover County The Wilmington Regional Office received previously requested information for the Stozmwater Management Permit Application for Park Avenue road Improvements oa November 4, 1999. I attempted to write the permit, however, a few items were still missing, making the application incomplete. The following information is needed to continue the stormwater review, and write the permit: . 1. Please provide the road and bikepath widths on the plans. I see a 21' dimension in the road, but —'fQl ,ra 7 .~milt to ho.. g11r(;L, what is belne nermitted. There is a small road and cp ago e � Des 1GN B! 0 3 B!v 4 2E6_Au 12C HGk 1 5 lJr2rn - - Tmprviou5 �e�c��i�. _�Gr� ,/ea _ P,-c,AM °k I 19 S 3 3 4� L IZ-3 rq'�,cf C� 'ea�- Vol d DWI - hr� 7 ! 34 lac+ 5. 5 � 1224 218Z 3.� �. 1R54- Z4 ro. s Above c r: i er 2 b2.se(_4 cn m;0 . w4J J -Wi - I ' • r,-r;., ��� �ti = 4C�' ' Pol&_C__ e� "h --�v `f m- S� dravi24-e2 ��rST Ir1CJ1 SlU'i2U ` -� G2°� ----.------ - M-PC(zvJC)oS Af?EA - -- - lvLF0 ,rp '3 1-----Bio 4--- - l5vo - - 3�vo Zoo -- -- ynri�.`orfi- #7re@5 Pf-ov, * Shrob5 ?rvv, re�.,rabb _ f7'"Gv. r2 Ko__ J_ 3?,40 - 35 _.- _-- /Z -- -.. 24.3 2:1 3:1 . , 20 �- (3lU Z - - ---- - 41�0 -- 38 - -- ><1 - --Z?4- - - - --- ---- - Z:! cr 3� -- -- �ZS '. - - - giu 3 3S4-o 3S Z4- 3-73 2:1.cr 3.1 /& I 13104 3�ao 35 l S 1�5 2:1c,-s; 112: I - - _ - ---- -F: ___--- ---- - - - - _. - - -- --- -- . - --_ - -_ _ _ _ -- __ -- -- - - - : , � � . ,� } . • � � - _ � r � �-..�. _.�__.. ��-- w..�-.._�_�. .._..--�-� _ _...__. -__ ___ ___ �__ _. _ _-_ _ .__�____ _ �_� .---r- _-_.� � � ; 'L • 1 - I _ - • 1 � •y. .. 1 __ "_" - __ _--.� ___��__�� -� _. _. _.r �_t- - �. T_ �� � ...tom..-...�-._ -_�.-- - ���..�_-�_ �_ ��. �� _ _ / . � �1 _ 7r � '� � �- -- � ' � . 2c sF s� (utFhe2 /e� l�o , Vvi,r�. 2 l2Q 13 '7-70 1 q 5 Iasl 3940 ? 2C-04 3. 5 .2� 1 �v`� ?�f7 21 2Z41 . 41 V? 40- 3, Z�I 2 l - _110 - 5 _i85 / e-- -z98q 3940 -4- 3240 :5, 5 . Z1 -15-739 1gs3c� '1']v�(_ �A- _ 15 _3 Z� 2Ca95 3�40 �` 3840 _ ♦ RECEIVED 44 MCKINA&CREED NOV 041999 BY: November 3, 1999 Linda Lewis, Environmental Engineer NC DENR - Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Project No. SW8 990421 Park Avenue Right -Of -Way Improvements Project City of Wilmington - New Hanover County Dear Linda: M&C 08240055.OW (40) The enclosed information is provided in response to your acknowledgement letter and request for additional information dated October 15, 1999 for the above referenced project. Each of the items of your letter has been carefully reviewed and are addressed as follows: Item #1 In accordance with the, BMP guidelines, two more varieties of shrubs have been added to the plant list. These include Ilex Glabra (inkberry) and flex Verticillata (common winterberry). The required number and size of species are specified in the plant list, as shown on the revised landscape plans enclosed. Item #2 No response required, since the use of a wax myrtle tree species has been approved. Item #3 The minimum required caliper diameter for single stem trees is 2.5 inches. However, the multi - stemmed trees have stems equal to or greater than the minimum caliper diameter required, for the given height specified. Item #4 A site vicinity map is provided on the site 1 layout plans. Sincerely, Mc Cree . A. GregJ ory . etzler, P.E. Project Manager Enclosures cc: David Mayes, P.E., City of Wilmington Mary Gornto, City Manager 11MCE WILMATMCLERICAL1082410055111-03-99 Slormwater Response.doc 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com AA0002667 �IvxIQM&CREED TO: NCDENR-DWQ 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: Linda Lewis NOV 4 41999 3Y ETTER OF TRANSMITTAL DATE: November 3, 1999 PROJECT NO: Q824-0055.OW RE: Stormwater Project SW8 990421 Park Ave. RAW Improvements, New Hanover Co. TRANSMITTAL NO: 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Specifications ❑ Calculations ❑ Shop Drawings ❑ Samples ® Other - Quantity Drawing No. Rev, Description Status 1 NA NA Cover Letter dated 11/03/99 G3 2 L-01 3 Planting Plan dated 7A1199, revised 10/29/99 G3 2 L-02 3 Planting Plan dated 711199, revised 10/29/99 G3 2 L-03 3 Planting Plan dated 711A99, revised 10/29/99 G3 2 L-04 2 Planting Plan dated 711A99, revised 10/29/99 G3 2 L-05 2 Planting Plan dated 7/1/99, revised 10/29/99 G3 2 L-06 2 Planting Plan dated 711199, revised 10/29/99 G3 2 L-07 2 Planting Plan dated 7A1A99, revised 10/27/99 G3 2 C101 D Roadway Improvement Plan dated 3/10/99, revised 11/2/99 G3 2 2 2 Details dated 1016A99, revised 11/3/99 G3 2 4 --- Stormwater Plan along Wallace Ave. to 52nd Ave. from Sta. 10+00 to 14+00 G3 2 5 --- Stormwater Plan along Wallace Ave. to 52' Ave. from Sta. 15+00 to 20+00 G3 2 6 --- Stormwater Plan along Wallace Ave. to 52nd Ave. from Sta. 21+00 to 27+00 G3 2 7 --- Stormwater Plan along Wallace Ave. to 52nd Ave. from Sta. 28+00 to 31+00 G3 Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected -See Remarks REMARKS Please do not hesitate to call us with any questions. 243 N. FRONT ST., WILMINGT N,,NC 28401 91C1 3-1048 F 101251-8282 cc: David Mayes &Mary Gornto KIM &- E D, PA Greg Hetzler, design book, &file Signed Z _Z Gregory P. Hetzler, P.E. Project Manager F:1CAM082410055 PaIK Ave Oesign100-ADMUStormwater Response TRANS doc I - I Haden-Stanrlale FAX MEMO Date: 1SC._�s � ._..,_� Project No.: • Time: _—.__. ProjectName: _ Please deliver the following pages to: Name: Firm: low Fax No: From: As Requested >'e For Distribution ❑ With Attached Drawings >< For Review / Comment / Approval ❑ Original to Follow Transmitting Pages, including this cover page. Remarks: WiN OF ZS1 M*214Z Nader.Stanrlale, Inc. Planners and Landscape Archteeats 311 North Second Street, Suite 1 Wdminaton, North Carolina 28401 Phone 910.251.5010 Fens 910.251.7704 LANDSCAPE PLANTS OF THE SOUTHEAST Liriope (li-ri'o-pe) lily -turf muscarii (mus-cay'ree) grape hyacinth; from Latin for musky, in allusion to musky scent LILYT URF Family Liliaceae Size Height 12-18 inches; spread 12-18 inches. Zones B, 7, 8, 6. Form Grasslike with leaves recurving toward ground. Forms clumps. Foliage —1-2 feet long and 1/ 3-1 inch wide. Flower — July to Aligust; small clusters on center spike above leaves. Fruit — fall; berrylike In clusters. Texture Medium. Color Foliage — dark green. Flower — lavender -pink. Fruit — shiny black. Culture Shade but tolerates full sun. Soil -- tolerant. Moisture —medium. Pruning — each March cut tops to within 1 inch of ground with lawn mower or by hand shearing. Pest Problems — scale. Growth Rate — moderate to ra id. Notes Thrives in practically any situation and is often used to border walks and drives. Frequently used in beds around trunks of trees. Effective UNWO In mass. Requires little care. Withstands salt spray. Varieties Big Blue — improved strain with large leaves: large flower spikes. Majestic — strong grower, foliage dark green: large deep lavender (lower in July and August. Monroe White -- white flowers: shade only. Silvery 5unproof — white variegated form, leaves more yellow in dense shade. lavender flowers held well above foliage. vastegata — leaves yellow -striped. Small Trees — Deciduous 323 Lagerstroemia j lay-ger-stree'mi-a j named for Magnus von Lagerstroem Indica (in'di-ka) from lndi CRAPE-MYRI Family Lythra Size Height 15-25 feet: spread 5-15 feet. Zones 6, 7, 6, 9. Form Upright and open or rounded; multiple trunk with dense branching. Foliage — emerging in late spring; opposite, 1-2 inches long. Flower — July and August; dense clusters 4-9 inches long on new wood. Texture Medium. Color Foliage — medium green; fall, yellow, red, or rusk -red. Flower — white, pink, red, or lavender. Bark — pale gray -brown, shredding to reveal lighter underbark. Culture Sun. Soil — medium to good drainage; medium to high fertility. Moisture -- medium to high. Pruning — lightly for shape. Pest Problems — mildew when grown in shade. Growth Hate — moderate. Notes Decorative and effective throughout year as specimen or multi-trunked small tree. Not screening material; use with evergreen background. May be pruned annually to ground to maintain shrub size. Difficult to transplant large sizes. Varieties Acoma — height 4.6 feet: pendulous branches with white flowers_ Mildew resistant foliage. Cherokee — height 10.12 feet; mildew resistant dark green foliage and bright red flowers. Hopi -- height 7-9 feet: pink flowers and mildew resistant foliage; very cold hardy. Muskogee — n and lavender flowers atc ez — heightee : glossy green mildew is to owers. Distinctive bar ulruuglluul yea] Year EMNI — ent{ll]Slle paltf TRIM llt/Wel,. rtrlglll lU-Lt] ICG1. MEN --Walum pink flowers July to September. Semi -dwarf growth habit. Maroon fall foliage, Mildew resistant. Potomac — height 18-20 feet, upright growth. Dark green mildew resistant foliage and clear pink flowers. Powhaten — height 14.16 feet; medium purple flowers; moderate mildew resistance- Tuskegee — horizontal growth habit; dark pink flowers. Mildew resistant. William Toovey— watermelon pink flowers: shiny green foliage. Height 12-15 feet: moderate mildew resistance. Zuni -- semi -dwarf growth habit: lavender flowers. Mildew resistant. COMMUNICATION RESULT REPORT ( OCT.15.1999 3:08PM ) P. 1 --- FILE MODE TTI NCDENR WIRO — OPTION ADDRESS (GROUP) RESULT PAGE MEMORY TX __--------------�-------------�--------- ------------------------------- —------ 9-3417801 — — — ——---------------3 -- OK P. -------- ---- ------ -- REASON FOR ERROR ----------- ------------------------------------------------------- - _ E-1) HANG UP OR LINE FAIL E-2) BUSY — E-3) .NO ANSWER E-4) NO FACSIMILE CONNECTION - State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Bunt, Governor Wayne McDevitt, Secretary FAX COVER SHEET Date: j— - I No. Of Pages: 3 To: i7�2vtd- es From: Lrl)z- ' CO - FAX #: 1. C) i . FAX#: 0- -2Q REALARKS 127 Cardinal Drive Extensiun, Wilmingtou, N.C.294054845 Telephone (910) 395-3900 Fuz (910) 3: An Equal Opportunity Affirmative Action Employer ��� * * * COMMUNICATION RESULT REPORT ( OCT.15.1999 12:15PM ) FILE MODE OPTION 70U- MEMORY TX REASON FOR ERROR E-1) HANG UP OR LINE FAIL E--3 ) NO ANSWER ADDRESS (GROUP) ------------- 9-2517704 P. 1 NCDENR WIRO T PAGE ---------- --- E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Governor Wayne McDevitt, Secretary F4X. cove. SKEET Date: .6-I5 l `� �' 9' ' Pages : To: 2n ►n,Q rom: L O :: L �rS CO: Sf2nZiZle FAX # .- 215I - 4 FA.X#: RENT M: Ae25e 0,zzfd�-eSS i �em-S 127 CardipAl Drive E=tension, WilirilngTon, N.C.28405-3845 Telephone (9I0) 395-3900 Fix (910) 350 2004 An Equal Opportunity Alrrmadve Action Employer P. 1 C-T! C thV )r7 -------------- 703 MEMORY TX COMMUNICATION RESULT REPORT ( OCT.15.1999 12:44PM ) TTI NCOENR WIRO - ADDRESS (GROUP) - RESULT PACE OPTION _ - - - -- ------ - - - 1 •----------------------- ------------------- --- --- -- --OK- - P. 3/3 9-25182$2 REASON FOR ERROR E-2) BUSY E-1) HANG UP OR LINE FAIL E-4) NO FACSIMILE CONNECTION E-3) NO ANSWER I State of North Carolina ' Department of Environment and Natural Resources Wilmington R40TW Office James B. Hunt,jGovemor Wayne McDevitt, Secretary FAX COVER SKEET to -42i Date: �ff�Maqge TaZ er ' F m: CO: I 0 F CO: FAX;{#: Z5t SZ92- FAQ#: 910--H-2QU4 127 C2rdin2l Drive Extension, WjlTingfon, N.C. 28405-3845 Telephone (910) 395-3000 fti (910) 3SU-2004 AnEque lOpportunity AffrmativeActionEmployer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James 13. Hunt, .Ir., Governor Bill Holman, Secretary Division of Water Quality October 15, 1999 Mr. Greg Hetzler, P.L. McKim and Creed 243 N. Front Srrect Wilmington, NC 28401 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Improvements New Hanover County Dear Mr. I-{etzler: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Park Avenue improvements on October 8, 1999. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: I'lease specify at least 3 species of shrub, as required by the BMP guidance. The use of switch grass has been approved to be used as a shrub, but you still need to specify 2 other species. Variety is needed because each species will provide differing evapotranspiration and nutrient uptake levels. Provide 2 copies of revised landscape plans. 2. The use of a wax myrtle as one of the tree species has been approved. 3. As previously requested, please specify the minimum 2.5" caliper for all trees, and the minimum 31-T height or 18"-24" spread for all shrubs on the plant table. Provide 2 copies of the revised landscape plan. 4. As previously requested, please provide a vicinity map on the site / layout plans. 127 Cardinal ❑r. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled1100/. post -consumer paper Mr. Hetzler October 15, 1999 Stormwater Project No. SW8 990421 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 15, 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the. permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:IWQSISTOIZMWA'r1ADDINFO\99042LOCT cc: Linda Lewis Mary Gornto David Mayes, P.E., via FAX Ryan 1301.1ma, via FAX 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An F(lual Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper lil i - „ ii sc,-A'OC e Pe- s �-e 7` IFf"vl�cl�v� . ii 2 sod ` 4' f l� � ¢ S �� f sec✓ �1 � c�� 'I - u!�' Hill. Lam, fh = 45 � 0 L W wZ 2O° 4h - �' ��" ve�l� Iz c�efzls. ii f���le.cfra-- blvc.k 1z� c���er--i- rv,�o F�' � ,�vss�vps "�v-r�vcl�• 13v4-� o-P F31U /{-rem 1ri ox Co" {aelvw s(,,z% ;� v II! DA 5 - -2G-e5 DA - TZ, ¢ 2creS IUeQ eros; v� ) `7"Z I, �✓Z� �- bl2 6-tarn ? No� {Y S W f0 ro !-e.mcsve,_, ? 4'g S7�li S .2 i; SIv�e5`�- vK� Clvse- �rnx;•,, (� v�sf2b(e sr��l sfr���,,�,. n�5 � �y �1°. c-F etch 131U �n =�lu q .6f DA. 576 }S used' to C C22h��,zr� Curb Cif` wid -f k _ 3' " _✓ � I bass �Xcess S }aim 2 _ r� Gry551_v¢r �, S%p6 bb nd� 2w J r 2 Curb C_ -� .o n�nc� Co ii.ryher —�_ ( 0 � s h-ee5 e��h5 lv�4S5.� O I 1 cxb �Ye�s 5hruh5 1 2cre_ - -zg - 5�� 4rb6s frees. Q Nt' i' S`n jJl In r �e5 7, Sh �ib5 ��. _. Y . �� .. ,, - � — ,--- -- ,� . — � � y � -, �" �. —�-- _� _ _� f '� �a 'i � .i � -� -- + � - - � - � , i., � i �. { � '✓ S e.ecr i'vu/Id . C � er � `�S(.U(�c�l r255 r2 Mgr- �u 5 C7nl � ��,�� �cc91 Z � � �/v�d� �j� '�v� V►`�?�-ems z [—V1c�� � ��^ I �I �-2`r5 , _ �.��� ✓� �rz,e`� GIn p �^ w12��,�' PlZnn,j f rG?�i C5 �P . 3 S As 2 G7'2 i IL e [�05 � hcr��s P� o ��U /hs �UJ ZSS/ lam+ �5 /b5/ 2GI'2 n4Lh 2 T� � ��s� Cie I— ' G�25S GI�PP,� hef/b OVA SG. Kahle. LL i DA 4d ? OJ ffoce Are- f � ,hrez/c. 2 Ii � Ls b e/ � a -I SQC. 64 4; � L�hQI Cv'' �2� Trv� c'v�b cuf h� l�/o h���,.�j�- fi7aS•� Curb cuf 5 -A of r-#f_J4, lid z 8/0 � io--sjp-4�+os`,! vvlcJ�I� Crvss�y�5 he slc�oed �c� _ R-v, ry de s g why 4 rprnGur�Gu�f� r F CC r 2 �r _ r �a) runo�ro(UrIJ 4� o� �o �5 zChi-P.vQv� . .YosScv�S calf b2 SEo,, tslO /b c 4 F 3 eat �o: IV ees( DA � e2c.�, Ja'o /f�-e2 � Q,� sfd•e 5 7�.� j�l�2se r -fie. c�lcs e�c�i Faro �h�f ''! QGPm�v�Sl�2r2 2 /l 2+�GS�V� tie (UC1 mj d . P(e25 e ZL G 2% VC i.,7� Yr] . lut^�be761 e2iyj�d1 elf . i } L i ' i P ` � ` _ � _ I '� ro� �� t i.� � _ _ _ S � I' �. fit ill il. 1E ���25e rJ�eGI �� 2T ieZS� 3 cI 44,E l le-e rjn�iPi Cif I�H H P--Zck sib a It Ii IN �P� Tr" ; h'.f S oecA�''e���j�� YK�Q_ 2Ye S�C)Wii On_ �1225e �}1`CNIClP Spec f'G I��'�.7�` fi5+ $ I2 1i e2c� R f J i � u /ire2 i5„� Ij�1►-Uhs, ('lerse 5hcy.v 2G�7 Cj bL fw ee17 ee5 h e (w e in 5 1f �� flJe85 $ `7' _� r?,i'i {�-ee �2-�- C2i; a� Z. S"- � r ryl Ir• plerse JJ5o'c' W�h%1 _ Lr1—qur`n�2�ireJ chi � sc2yz¢ Zh �EI i TT_�1 I u1 I F III I� tl �,.. � � � j � _...+ _. NZ De srwao w McCi Hand Ot_SANW-R �G pOIf3TE: t0 MaTk°1= q� �CdL' .tee DR .9 OAS D! r�1 uS my ��e1�f� i�i''!Ose / a: �}•� S E 4V Ltt11�' 5i Th�'�SA�I�CFSSORa ff �� r=.7tTti' tt i`ir = Gear R0 �1 C-��•m Jjfj p 5� q - V ` '4Cres Z 0r_ - ;"ve � �Cf„�on pr % c> 132 � raAstia-ja`o" v,/r iit,�y'�=�SiTv s= l� � rR � t:�ilLt.Itf�.S i rat: (JI S L f _y l-5 \afl�ard o ' �. � � '�•� l - K�mgeriy tip, a5� tt, � P� ~� ��.:,; �i: @ 'TG Ord r� .fir 'r'! , -�, �+/ --`.a7 ti`0� C1 ., _ ..� • ttrf ��¢Q,✓er �}-/{ •[J V - ` �',;: i�` -�'_51 t r/� `�Lel � Pifl� q{i�S ........ ----- ..._.— -.,�1 � Re" �; .... -. c t -._.. ". d%.Y Lad fiel 1 t s f � iiiwide #�s I�'o fioresf c 6 �� t m ; 9 hilly d I �e Qm ? 1 St � `as� Pine Need? Dry 4 reereaf r Old tt3ear o �e aP, o ❑ie m StbOry [ a, Ivt= lDn �+l G rP 5re f l�' x WailaCR Cit o: o = co m e NDSPt; U1WRlGHT5V1 EE Q AVE c"9 Ave { �iPa� � QVl1t1iEF�a 3os�x � t�rO 2 ��fi'e� ve 1 Gir � � PARK C5 �eaC�ifree t Pined 5t t�ulbnr � o Ave sJ Ave a D� N ¢� L�. ftt !e ra OLEANDER,76 t sw, s N� x Q r Q Ra to s ;rg e-n Drto at S WjtJTER PARK u$ KUG -ire '-�lCi�e�C- i i 'Y�j u- Ailtu :C e Rd P�ttrAARY m� Dr o Lake SGf'Ofa r St COGtri # r �c�s� Arboryya m f��Sl1a Dr �p� 6i ' 3 � r �a S"i()LAi4D GRtSS Ms r r t. 1 r Haden •Stanziale FAX MEMO Date: f� _ -- Project No.: Time: '-�r� -_-_ Project Name: Please deliver the following pages to. Name: Firm: �Y -- -- — Fax No: From: 'eL As Requested >< For Review / Comment / Approval ❑ For Distribution ❑ Original to Follow ❑ With Attached Drawings ❑ Transmitting Am? Pages, including this cover page. RR izx 4 ast - '1— fladerr-swnzlale, Inc. Planners and Landscape Architects. 311 North Seoond Street, Suite 1 Wilmington, North Carolina 28401 Phone 910.251.5010 Fax 910.251.7704 210 LANDSCAPE PLANTS OF THE SOUTHEAST Myrice (nur-I'ka) ancient Greek, possibly name for tamarisk cerifera (se-rirfer-ra) wax -bearing WAX -MYRTLE Family Myrlcaceae &wou -n ow .0 -es Gt rmye liAecas riu ZoN� 7, IT JADouc.o►;r JC�E Fi voe RV swt�4ue'r� Size Height 10-12 feet; spread 8-10 feet. Zones Z 8. B. Form Irregular. Foliage — alternate. 3 inches long, leathery, Ian oblong -lanceolate, aromatic. Flower -- early spring; inconspicuous. Fruit — late summer through winter; clusters of Ye inch globular berries covered with whitish resin; only on female plants. Texture Fine to medium. Color Folia e — eilow e Cultur Sun or part shade. Soil — tolerant; medium drainage; medium fertility. Moisture — high. Pruning — none. Pest Problems —none. Growth Rate ���fo�rmfor or e in practically any situation, od background malarial; sed in borders or trimmed to tree- lauter boxes. Provides good foliage texture and color contrast in borders. Plentiful in Carolina coastal area. Useful on coast but will not tolerate direct exposure to salt spray. Not for mountain areas. Fruit attracts birds. --A — T MCKAIIII&CREED September 20, 1999 Linda Lewis, Environmental Engineer Division of Water Quality NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 M&C 08240055.OW (40) STORIVONATER RE: Stormwater Project No. SW8 990421 Park Avenue Right -Of -Way Improvements Project City of Wilmington Dear Linda: E C E I V E OCT 0 E 1999 Q D E M PROJ # Please find enclosed for your review and approval this submittal in response to your letter dated August 30, 1999 for the referenced project. For your information, I have briefly summarized our responses in this letter in the order of your comments. Attached are any necessary supporting data. Our responses are summarized as follows: Bio-Retention Basin drawdown calculations - We have attached design calculations for the Determination of the Period of Drawdown for the Bio-Retention areas. As shown in the calculation summary, the 6 inch ponded areas of the four separate areas are dewatered below the surface in as required, in less than four days. The rates of final drawdown is less than one day for all four areas. See pages 3 and the attachment calculations for the Supplement. 2 Bio-Retention Basin Offline Operation - The enclosed Narrative Supplement Pages (3 through 13) have been provided to clearly illustrate for you the required "offline" operation that is provided for the Bio-Retention areas. The offline operation is summarized in the attached supplement for the Hydraulic Flow Pattern of the Bio-Retention Areas. See pages 7, 8, and 9. 3 Ponding Depth of Bio-Retention Areas - The depth of the ponding areas in the Bio-Retention infiltrative areas is limited to a Ponding depth of six (6) inches as required by the BMP. The method of maintaining this depth is accomplished as directed by the BMP design guidelines. The basal area of the infiltration area is set at an elevation 6 inches lower than the adjacent swale flow line. In addition, the area inlet is the only route of conveyance in, or out of the pond. As the 6- inch depth is attained, runoff then naturally flows away in the Swale, down gradient, in accordance with methods recommended in the BMP. The supplemental narrative has 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com AA0002667 AW expanded the description of this function. See page 9, 12, and the elevations listed in the Table on page 11. 4 Provision of Inverts for Cross Overs and Curb Cuts - The invert elevations for the crossovers and the curb cuts do provide for a maximum ponding depth design criteria of 6 inches. As discussed above in number 3, a table has been added to the detail plan sheet 2 summarizing the elevation critical to the Bio- Retention areas. The detail plan and table illustrates the elevations from the fall of the road, across the swale, into the Bio-Retention Areas. In addition, the ponding depth of 6 inches is noted. 5 The Plan Scale has been added to the plans. The scale is 1 inch = 20 ft. 6 Drainage Areas Less than 5 Acres - The attached Plan and Table summary list the areas and sizes. The watershed drainage area for the Bio-Retention areas is less than 5 acres each. A summary of the drainage areas are as follows: SUMMARY OF 81O-RETENTION DRAINAGE AREAS Bio-Retention Area Area Ac. 2.0 2 2.1 3 2.97 4 2.21 7 Water Table Depth Design Criteria= The Groundwater table elevation for the project area was discussed in the Catlin Geotech Boring Report (dated 03/30/99) as being approximately 5 feet below ground elevation. Upon review of the boring reports, apparent water table elevation observed at the site based upon same day recording were approximately 8 '/z feet below ground elevation. The free water surface was also noted as being greater than 6 feet below the surface by Soil Tech during the September site review. It is our opinion that the depth to water criteria is met. Please refer to the supplemental Narrative for additional discussion. See page 13. 8 . Landscape Basis of Design - We have closely reviewed your comments in regards to the Landscape criteria associated with the Bio-Retention Areas. Your Specific concern was that the criteria were strictly adhered to in order that proper planting and layout be achieved to support the high water quality treatment functions of a Bio-Retention area. Enclosed are more recent plans of the areas which illustrates all four areas. These are similar to the previous typical Bio-Retention area plan. Upon review of the Landscape comments by the Project Landscape Architect, the attached memorandum from Haden Stanziale is provided. This Memorandum makes recommendations to the City of Wilmington to maintain the current Planting Design for REED 44�4�'O�MCM4&0 - the benefit of the Bio-Retention Areas, and of the project. The premise of the memorandum is to maintain the current proposed plan. Through the recommended use Switch Grass, treatment will occur as required. The Switch Grass, though not a shrub, provides similar or better treatment qualities, in their opinion. Revised plant counts are listed in the Table on page 11. Please note the overall number of plant counts provided. Even if the shrub like Switch Grass is taken on a 25% to 50% equivalent to shrubs to shrubs, the numerical counts are met. This is provided for your review. 9 The Drainage area of DA-1 is better defined as not being an "open-ended". The divide is Wallace Avenue. Please see attached 50 scale plan. 10 Determination of Entrance Velocities to Bio-Retention Areas - The entrance velocities into the Bio-Retention areas are summarized in the attached supplemental calculations. The velocity of the stone protection apron is not exceeded. The flows are adequately dissipated with the stone apron. Flows in the more restrictive adjacent swales have a velocity of 2.5 fps (permissible). See page 17. 11 Linda, our statement of the projects adequacy of our plan to the BMP manual, by stating general conformance and compliance with the BMP Guidelines, was not meant as an over simplification of fact. To respond to your comment request, the attached Supplemental Narrative summarizes your highlights of the manual and provides adequate response to your concerns. See pages 14-18. Please let us know if you would like to meet with us to review the process that we developed to improve the water quality at Park Avenue. Sincerely, McKim reed, P. Gregory J. tz er, P.=���- Project Manager g SEAL, /-� 022337 _ o o Enclosures ��lfllll �N\\ cc: David Mayes, P. E., City UtWilmington Mary Gornto, City Manager File � IvxIQM&CREED Pa n i c e rn v i rg a t v m ' H a e ri s e H e r rn s BOI'AMCALNAME Panicum viigaturrr PRoNU\cumoN PAN-ih-kum veer-GAH-turn COMMON NAME Switch grass USDA HARMNEss ZONE 5 to 9 ORiGiN Widespread over North America: Canada to Florida, Atlantic Ocean west to the Rocky Mountains PREFERRED SITES Prairies, open woods DESCRIPTION: This wide-ranging native North American grass was one of the original components of the tallgrass prairie that once covered the vast interior of the United States. An extremely versatile grass, it tolerates a wide range of soil and climatic conditions. It is valued as an ornamental for its erect upright form, showy flowers, bril- liant fall color, and interesting winter silhouette. Truly a grass for all seasons, switch grass is easy to grow and sure to please. Switch grass is a clumping, warm -season grass. Leaf color ranges from deep green to gray -green. The leaves, '/4 to '/2 inch wide and 18 to 24 inches long, clothe stiff, sturdy sterns 4 to 7 feet tall. Its upright clumps begin to flower in July ',in airy panicles I to 2 feet above the foliage. The branched panicle is tightly ascending at first but becomes more airy as the branches spread open. The flowers emerge pinkish, reddish, or silvery, mature to grayish white or brown, and persist well into winter. In the fall, the plants turn various shades of yellow. The fall color is usually Panicum virgatum, switch grass, in yellow fall color. strong and fades to beige with the onset of winter. Plants remain upright throughout the winter until cut back or overtaken by new foliage in the spring. LAND5CAP£ Usrs: Switch grass is effective planted alone or massed in groups. Tall cultivars make excellent back- ground plants. Switch grass tolerates moist, vvet soil and so makes a fine choice for water gardens, streamsides, and pond edges. It is also a good choice for naturalising and attracting wildlife. Switch grass can be used along highways and roadsides, as a groundcover for erosion control, and for transition areas between garden and woods. The grass has one of the most beautiful fell color displays, usually yellow, but some cultivars turn red and orange. Because it holds its dormant form, switch grass is good for winter effects. The flowers and foliage of switch grass are stunning in fresh and dried arrangements. CULTURE AND PROPAGATION: Switch grass prefers moist, fer- tile soil in full sun, although it tolerates extremes in soil conditions, from sand to heavy clay and from dry slopes to boggy areas. It thrives in seacoast conditions and tolerates wind and salt spray. It also tolerates light shade, but will Flop if the shade is too heavy. Propagate by seed, or by division in the spring. Propagate named cultivars by division only, since they do not come true from seed. PESTS AND PRORLEMS: Switch grass can easily overtake a prairie seeding; It should make up no more than 10 to 15 percent of the seeding mix so that the other grasses can become established. BcF ANICAL NAME Panicum virgatum `Haense Herms' PRONUNCIATION PAN-ih-kum veer-GAH-turn HEN-suh HAIRNIZ COMMON NAME Red switch grass DESCRIPTION: Red switch grass is similar to switch grass (Panician virgattirn) in most aspects, differing mostly in its compact habit and bright red -orange fall color, its foliage grows 3 to 3r/z feet tall in a tight vertical column. Purplish red highlights on the leaf tips become redder as the season progresses. The foliage becomes reddish orange in October and matures to a gray -brown. With the foliage becoming redder and the seed heads maturing to a whitish gray, the plant resembles a fire Mth smoke rising above the flanks. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality August 30, 1999 Ms. Mary Gornto,'City Manager City of Wilmington PO Box 1810 Wilmington, NC 28402 Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No.'SW8 990421 Park Avenue Improvements New Hanover County Dear Ms. Gornto: The Wilmington Regional Office received a Stormwater Management Permit Application for Park Avenue Improvements on August 11, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please provide calculations that show the drawdown of each bio-retention area is less than 4 days. 2. The narrative does not go into any details as to how this system will work. The bio-retention system is supposed to be an offline system, like infiltration. The BMP document demonstrates the use of deflector blocks to "deflect" the design storm into the bio-retention areas, and allow the excess design to overflow into the piped bypass. While means other than a deflector block for bypassing the excess rainfall can be used, the "crossovers" designed with this project do not appear to provide the required bypass, unless it 'is your intention that each curb-cut/crossover will be able to direct the runoff into a bio-retention area because the bypass ditch will not have any water flowing in it until after the design storm level is reached? If this is the correct design premise, please include in the narrative. 3. The depth of the bio-retention area cannot be more than 6". Please convey this information on the plan details for the Section 2 typical road and bio-retention area section, curbcut detail, and crossover detail. 4. Please provide inverts for each crossover and-curbeut on the plans. The lowest invert of the crossover should be 6" higher than the bottom of the bio-retention area, in order to provide the required 6" depth. 5. Please add the scale to the.plans. 6. Please demonstrate that the drainage area for each bio-retention area is less than 5 acres. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 'Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity AfiirnuativeAction Employer 50% recycled/](1'%o post -consumer paper Ms. Gornto August 30, 1999 Stormwater Project No. SW8 990421 7. For bio-retention to work, the water table must be a minimum of 6' below the surface. According to the soils report, the water table'is only 5' below the surface. How do you justify using the bio-retention system? The landscape plan/calculations are lacking in the following areas: a. A minimum of 3 species of trees and 3 species of shrubs must be specified. According to the proposed planting plan, the recommended plant list only shows 1 tree and 2 shrubs. The plan has a wax myrtle, a river birch and a golden rain -tree shown, however, neither the wax myrtle nor the golden rain -tree are included on the plant list. Additionally, the wax myrtle is not listed on the recommended plant listing in the BMP document. Please include at least 3 allowable trees in the plant list b. -Provide a separate plan and plant list for each bio-retention area. Due to the variation in size -of each area, a typical plan will not suffice. Please include the total number of each type of tree and shrub for each area. C. Only two shrubs are shown on the plant list, but of those two, only one is shown on the plan. Please provide a minimum of 3, as required, and include all three in the plan for each area. d. Please provide a calculation of the minimum number of trees and shrubs required according to the BMP requirements. One thousand per acre of bio-retention area are required. Once you know the total required, a ratio of 2:1 or 3:1 of trees to shrubs is required. For example, if.500 trees and shrubs are required, at least 333 to 375 should be trees. Please show the minimum spacing between trees and between shrubs. The closest they can be'is I F for trees, and T for shrubs. The farthest apart they can be is 19' for trees and 12' for shrubs. r f. Please indicate the minimum caliper size for each tree as 2.5", and the minimum shrub height as 3'-4', or shrub spread as--18"-24". g. . Please -specify the planting soil guidelines on the landscape plan. 9. The drainage area map indicates that DA-1 is Open-ended. Is Wallace Avenue supposed to be the other side of that drainage area? Please indicate the entire DA-1 area. 10. Please provide velocity calculations for each bio-retention area that demonstrate a non -erosive velocity draining into it. Thecalculations submitted are based on.the overall drainage area. 11. You cannot simply copy the BMP design manual and indicate that the proposed project is in compliance. Each requirement should be listed and a calculation or narrative statement and a detail provided to indicate compliance. Ms. Gornto August 30, 1999 Stormwater Application No. SW8 990421 I have enclosed a highlighted copy of Chapter 4 of the Best Management Practices document, Bio- retention Areas. The highlighted portions are the minimum requirements for this type of system. Please review the highlighted areas and provide the requested information. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 29, 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215. l and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATIADDINFO1990421.AUG cc: Linda Lewis s Greg Hetzler, P.E. fr u'rri7 Cat C� Q Mccl .Ifand O � 1O F. C'�, ��- '- �`' 0e4` 'q�P to �e DR tea• � � yJ` Marki�� air -9 cdh r PLACE �G YUt }1C•iDla _ CC�I 1 UT�11'-r'S1TY ~^CT',T1JT.S - � q` CENT SR ' e� f c� flr is TThT�t:4Ct TESSrJr�ro `�rp fl' Clear RuLIJ Pc a a, i.aSLL c mr'�o0a11J'KN-y / - Pkti'`�Ve Cie R)so;7 rNl BOO ! f C- vl Vill =-r-a-., i _ ' Y j•^yf 4J� ��� .r.:�'.a! o . �&V6 5'hriber s' C{1 Fount 10 pr �f �.c_ ti ,��li��_�TJI i '�,Qy `r Pil1c f�l�',$--•^"�_._.�'� Rid ewoof s For, �i,-ieidl3 Dr d' Forest ¢ rn /y �Q1 t11 ° r eaf r .f bite Qf y c� J St 4� `� Pine {fee 7i flry eerrt ar C q l Old Mp , a aco'AL c%a c !/ -re _ E F AP. a 7 W le 11 W n03v G Avg, 4ve _ m1 t rx Wallac Cir o n — n o HDS� L srP � E cr WRiC,1-{TS1f LLE AVE a i� Ave�! �W ltAT Ek ti S ), _Park �s»i TER PAFY% t Peachtree t $e( rav Cir v r G� Pine 51 Mulb a Ave Aver pRcv OLEANDER 76 �.. Qco d - }� g een DrSQirea Dr � , �� ER F P RK '1rt11G :g at 1� cr i ------ WIN, --- Si-. .,'5-�.-iL�C]'tt� _� ""°r a� s `�:%'e�,.. 7� � 9.. �i'_ r �Q°�fw Atuil n a e Rd QR6MARY� SS+,COU ` RAR1Ct�.� �4r*lt,,. �f ��Da a Lake SC�TC30T m r .�.......... ,,•i,-a`r ,l 'ash _ rol nl r fly ` + GMSE t..5 Ab s -"Ca s i Mc K 1 N4 & C R E E D To: NCDENR Y 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 ATTENTION: Linda Lewis Fcw_�;� 'EIVED AUG 1 11099 LETTER OF TRANSMITTAL DATE: April 20, 1999 , PROJECT NO: TASK NO: 08240055 • RE: Park Ave. Roadway Improvements TRANSMITTAL NO: 1 PAGE 1 OF WE ARE SENDING: ❑ Originals E Prints ❑ Shop Drawings ❑ Samples ❑ Specifications E Calculations E Other - Application Quantity Drawing No. Rev. Description Status 3 Stormwater Management Permit Application Form G 1 $420,00 Application Fee G 3 Stormwater Design Narrative and Supporting Calculations G 3 Site Plan, Bioretention Area Plan, and Construction Plans G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: 1381 Old Mill Circle, Suite 120, Wnvon-Salem, NC 27103 (3W) 765-7503 FAX (338) 765-7217 cc: Dave Mayo McKIM & CFWED FfiGINEERS, PA Sign n ner DocumenQ _ 4 4 ca DeWitt 3 f,drr'I 14anf1 S �� � � lniattid y r p©INTE` '� rj �tzi8xi f ron ve 7 DRDr fib. PEACE Q t` Pc COLLEGE ny y die U �riDlq ; pC,RK ES � ropvE OR S rj scR54TY. U r _ Uta1VEr�-.SIiY� 'isC:Tlt'OS.S •ya c�q` (UP! - - CENTER ® Dr ro .a m sc;HoOL Gr C{ear Fvt ��-_�: Dr I. �u11511"c'SS' d DI _ _ � ty; eve � a �1ea11 Aky; y o o' Beres - DT -- •- .�w_ - _.-.._ rns P�',tiGk Dn D, 1 J� r.,nStiD� -� �y{4iTH CARQ'rlr,A c{ z f i;Q u'J W1L1A4SJOTQtJ U �0re0i `n,�`n{sityr--'�" vice � ova Cry ;Ord $lvci a o 5� S.r 5txiber's' I J11`� Cr Fousll Dr rr� isVT 'T pO �7. Q , _" ;' b ! c� Se _._ ¢ ~ �%r Rid Ewooti Nei his _..__._._.- Pd6 i8aretool'D; ¢ C� <sHeid Dr �� �OrEBt ¢ m S ejr, bll ¢ vo a 5t O Pine Neel Or,,, leenleaf _ �s r 010 M 7' ` c Ci a o ABC IL! Qar�'S Fld en Ch E F r SE m Rbdfy ti ', n w u m �' the QR A♦_ t 49 R{ m► 1F .x Wallace C;r o a m o HO L m 'rp a WRIGFf7SV LLi fr o c 0 rr rn AVE � c� q STAl1WISaTEH r + �,� a o ark �r�t - 0N�c Q �'d '¢ f/fY�� ve ! c, �w Si Peachtree ' t Be) rav Cir < D:e r s (( �arl� St F4,RCJ PARK Si Mulb r v Ave ' u, P1T4e } a -q y �� �, 1 0 � � E• � {ty Aver pR ts'' OLEANDER 76 � �a' :•p r; Cc eert Rr S Irea r br �� 3 RM,rh '"INTER PARK + 3M e Rd PRISV4AFtYr° 1 5 x E y ASv AutitTllrl Dr Lake SCHOQ St CQ �' " fi r Ts«y s� arbOrLva j ,�>MLM1fiiG Ez r n �a i� ip } �,�':� a 8 � e ro4 ri � S R OLAt'Ji7 4t n v A v eta d x 5k r >E� y x •� � v�xn z v� A r, q , � C) - a RISE fAS +1�.YCxai.�` CiCil3Pl4 . F At?�irj �.w C e S '�'', �MCKIM&CREED August 11, 1999 Ms. Linda Lewis M&C 08240055.OW (40) lt!�UVIIIIVE AUG 1 1 ;L999 Division of Water Quality - Water Quality Section NCDENR - Wilmington Regional Office LBY. 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Park Avenue Right of Way Improvement Project From Wallace Avenue to 52"d Street Wilmington, NC Stormwater Project No. SW8 990421 Dear Ms. Lewis: Per your August 6, 1999 letter, you did receive previously requested information on July 22, 1999 but still have not received calculations for review of the above -mentioned project. To ensure that you have received all text (non -form and non -drawing) materials for this submittal, enclosed are two copies of the entire original submittal minus the plans and application forms. As we discussed earlier today, upon receipt of this supplemental information, you will have received all components of the application. If you should have any questions, please feel free to contact Gregory Hetzler or myself at our office. Thank you for ongoing time and effort with this project. Sincerely, MCKIM AND CREED, P.A. C%r,t) L`6�f, Elizabeth Kountis Environmental Scientist cc: David Mayes, City of Wilmington Mary Gornto, City Manager, City of Wilmington David Cochran, P.E., McKim & Creed Enclosure: April 20, 1999 Stormwater Management Permit Application Submittal (excluding the application form and drawings) (2 copies) 5:1082410055-Park Ave Desigr�dd-A6AA"� i49 L�I�IY�hrR34�fte4!6 TH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mcklmcreed.com AA000266T State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office ,lames B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality August 6, 1999 Ms. Mary Gornto, City Manager City of Wilmington Post Office Box 1810 'Wilmington, NC 28401 Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Roadway Improvements New Hanover County Dear Ms. Gornto: The Wilmington Regional Office received previously requested information for' the Stormwater Management Permit Application for Park Avenue Roadway Improvements on July 22, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Thank you for the "crib sheet" to guide me to where I can find the necessary information. Unfortunately, I am as yet unable to use it, since the original April submittal did not include a calculation booklet. Please submit a set of the calculations for review. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 6, 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATIADDINfO1990421.AUG ec: Linda Lewis Greg Hetzler, P.E. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50%. recycled110%, post -consumer paper 44�,,MCKIM&CREED TO: NCDENR - Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: Linda Lewis WE ARE SENDING: ® Originals ❑ Specifications LETTER OF TRANSMITTAL DATE: .July 22, 1999 PROJECT NO: 08240055 TASK No: PERMT RE: Park Ave. Right of Way Improvements SW8 990421 TRANSMITTAL NO: PAGE 1 OF 1 ❑ Prints ❑ Calculations ❑ Shop Drawings ❑ Samples ❑ Other - Quantity Drawing No. Rev. Description Status 1 --- --- Cover Letter dated 7/22/99 G 1 --- --- Operations and Maintenance Plan - Bioretention Area Dated 7/19/99 G }} ~ r J Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: cc: David Mayes - City of Wilmington Mary Gornto - City Manager, City of Wilmington David Cochran - McKim and Creed file 243 NORTH FRONT STREET, WILMINGTON, NC 28401 (S10) 343-1048 FAX (910) 251-8282 McKIM & CREED ENGINEERS, PA Signed EIU beth Kountis Environmental Scientist 11MCE_WUDATAICAD1082410055 Park Ave Design100-ADMININCDENR SW O&M transmittal.doc v�MCKIM&CREED July 22, 1999 Ms. Linda Lewis Division of Water Quality - Water Quality Section NCDENR - Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Park Avenue Right of Way Improvement Project From Wallace Avenue to 52nd Street Wilmington, NC Stormwater Project No. SW8 990421 Dear Ms. Lewis: M&C 08240055.OW (40) Per your July 8, 1999 request, we are submitting a response to supplement our July 14, 1999 reply for your approval regarding the Stormwater Management Application for the above -mentioned project. Upon review of your request, it is anticipated that with our July 14, 1999 response and this supplementary response, you will deem the application complete and approve the City's application in the near future. If this conclusion is incorrect, please advise us so that adequate scheduling can be allowed for this Capital Improvements project. According to Item #3, Page 2 of our July 14, 1999 response, you had requested the provision of an Operations and Maintenance (O&M) Plan. This O&M Plan had been drafted based upon your latest April 1999 Best Management Practices but had not been presented to Ms. Mary Gornto, City Manager for her signature at that time. Since July 14, 1999, the O&M Plan has been presented to and signed by Ms. Gornto. The O&M Plan with her original signature is enclosed. Upon review of this supplemental information, if you should have any questions, please feel free to contact Gregory Hetzler or myself at our office. Thank you for your continuing assistance with this project. SA082410055-Park Ave Des ign100-Admin1072299 LL O&M letter.doc 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL 910.343,1048 FAX 910.251.8282 www.mckimcreed.com Ms. Linda Lewis July 22, 1999 Page 2 of 2 Sincerely, McKIM AND CREED, P.A. Eliz ieh 4Ko u n�t i Environmental Scientist cc: David Mayes, City of Wilmington Mary Gornto, City Manager, City of Wilmington David Cochran, P.E. McKim & Creed Enclosure: Operations and Maintenance Plan Bioretention Area Dated July 19, 1999 S:1082410055-Park Ave Design100-Admin1072299 LL O&M letter.doc V MCMM&CREED v A"Ale, ? A i iF� T,4Ql.E STORMULl.ATER DESIGN NARRATIVE AND SUPPORTING CALCULATIONS PARK AVENUE ROADWAY IMPROVEMENT WALLACE AVENUE to 52ND. STREET Wilmington, NC Prepared for: City of Wilmington 138 North Front Street Wilmington, NC 28401 Project No. 08240�5.OW Prepared By: McKim & Creed Engineers 243 North Front Street Wilmington, NC 28401 (910)343-1048 April, 1999 Q E C E t V E JUL $4-1999 D D E M FRQ,i # WMA D E M # �MCIQM&CREED July 14, 1999 Ms. Linda Lewis Division of Water Quality, Water Quality Section NCDENR - Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Park Avenue Right of Way Improvement Project From Wallace Avenue to 52"d Street Wilmington, NC Stormwater Project No. SW8 990421 Dear Linda: M&C 08240055.OW (40) E C E I V E JUL 1 41999 D E M PROJ # In accordance with your request dated July 8, 1999, we are submitting responses for your approval regarding the Stormwater Management Application for the above -mentioned project, classified as "Other". Upon review of your letter, it is my understanding that you have primarily requested clarification on existing submitted information and, that with the explanations below, you are finding the application complete and approval of the City's application will be forth coming. Please advise us otherwise in order to allow adequate scheduling of their Capital Improvements project. Responses to your letter are detailed below and presented in the order of your letter. 1. Please provide sealed calculations indicating compliance with the Bioretention design requirements. Included are the 6 major components of the system, minimum length, width and depth requirements, maximum ponded depth, location restrictions, size requirements based on Rational C, and tree and shrub spacing recommendations. This information is located in the original application. The application submittal of April 20', 1999 listed on the Transmittal Letter three copies of the document "Stormwater Design Narrative and Supporting Calculations" Park Avenue Roadway Improvement Wallace Avenue to 52"d Street, dated April, 1999, by McKim & Creed. The sealed document includes the statement "Since Bioretention areas have 85 % TSS removal from Station 10+Q0 to Station 24+00 we are in full compliance of DENR's requirements". I have attached a "crib sheet" of the Table of Contents which directs you to the appropriate design items. The crib sheet includes references to the 6 major components. 2. Delineate the drainage area to each bioretention area. The watershed boundary information contained in the sealed calculations is referenced in the sealed calculations on page A6 which describes the linear watershed as 250 feet North bounded by Wrightsville Avenue and 100 feet South toward Pine Street. This information was not shown on the construction plans as they extend past the mapped project limits. This information has been transferred to the attached plan as detailed in the sealed calculations. 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com AA0002667 Ms. Linda Lewis July 14, 1999 Page 2 3. Provide a signed Operation and Maintenance Plan. Required maintenance can be found on Page 57 of the July 1998 reprinted BMP manual. This new request will be provided. At your direction, we have drafted a new Operations and Maintenance Plan form for Bioretention Areas for your use. This will be presented to Mary Gornto, City Manager for signature. This new document was drafted based upon your latest April 1999 Best Management Practices dated April 1999. This document will be provided under separate cover. 4. Delineate all wetlands on -site, or note on the plans that none exist. Wetlands were not shown on the sealed Final Plans as, the project narrative describes, under Wetlands, the project received ACE and DWQ permits to place fill in the bottom of the existing ditch in the R.O.W. The application included a copy of your 401 Water Quality Certification, (WQC 401 project # 980672 dated September 23, 1998). The Nation Wide 26 Application was issued April 26, 1999. The Nationwide 26 application includes the sketch map of the ACE approved wetlands. The documented wetland limits has been transferred to the attached plan. 5. Provide a location map on the plans. A copy of a location plan for the Park Avenue Right of Way Improvements from Wallace Avenue to 52Id Street Project has been placed on the attached plan. 6. Please reference the project number above on all correspondence. Thank you for assigning a project number to our application of April 22, 1999. The project Number SW8 990421 will be referenced on all correspondence. If you have any questions regarding this supplemental information, please feel free to contact me at my ce. Thank you for your assistance with this project. Sin ly, sy_ Gregory J. tzl , P. E. Project Manager PC : David Mayes, P.E., City of Wilmington Mary Gornto, City Manager, City of Wilmington David Cochran, P.E., McKim & Creed Enclosures: 3 copies -Annotated Table of Contents Roadway Improvement Plan, C101, Dated 10 Mar 99, Revised 14 APR 99 4:F/MCMM&CREED State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality Ms. Mary Gornto, City of Wilmington PO Box 1810 Wilmington, NC Dear Ms. Gornto: City Manager 28402 July 8, 1999 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990421 Park Avenue Improvements New Hanover County The Wilmington Regional Office received a Stormwater Management Permit. Application for Park Avenue Improvements on April 21, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide sealed calculations indicating compliance with the Bioretention design requirements. Included are the 6 major components of the system, minimum length, width and depth requirements, maximum ponded depth, location restrictions, size requirements based on Rational C, and tree and shrub spacing recommendations. 2. Delineate the drainage area to each bioretention area. 3. Provide a signed Operation and Maintenance Plan. Required maintenance can be found on Page 57 of the July 1998 reprinted BMP manual. 4. Delineate all wetlands on site, or note on the plans that none exist. 5. Provide a location map on the plans. 6. Please reference the project number above on all correspondance. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 'telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50%. recycled/10% post -consumer paper Ms. Gornto July 8, 1999 Stormwater Project No. SW8 990421 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 8, 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces associated with this project prior to receipt of the stormwater permit is considered a violation of NCGS 143-215.1, and is subject to enforcement action. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, 40 Ms. Linda Lewis Environmental Engineer RSS/arl:`S:1WQSISTORMWATIADDINF01990421.JUL cc: Linda Lewis Herb Fox, P.E., City of Wilmington Greg Hetzler, P.E. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper i v v MCIQM& QUEEZDP, APR 2 1 1999 TO NCDENR 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 ATTENTION: Linda Lewis WE ARE SENDING: ❑ Originals ❑ Specifications LETTER OF TRANSMITTAL DATE: April 20, 1999 PROJECT NO: 05240055 TASK NO: RE: Park Ave. Roadway Improvements TRANSMITTAL NO: PAGE 1 OF 1 ® Prints ❑ Shop Drawings ❑ Samples ® Calculations ® Other - Application Quantity Drawing No. Rev. Description Status 3 Stormwater Management Permit Application Form G 1 $420.00 Application Fee G 3 Stormwater Design Narrative and Supporting Calculations G 3 Site Plan, Bioretention Area Plan, and Construction Plans G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: 1381 Old Mill Circle, Suite 120, Winston-Salem, NC 27103 (335) 765-7503 FAX (336) 765-7217 DocumenQ t � � 'i 5 � �.1• - r .,: 4 ��w f� . v� i � `, y�r � w�c•St y _ .�- .r - ,s� ,�iti-., - 'ti '��. .r t tY � M ��� I { `yXyF'�� � . f . ^�i � � � � _ � � r . } 1 i i �' •s f 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Project Narrative Supplement Stormwater Permit Application North Carolina Department of Natural Resources Stormwater Project Number SW8 990421 for Park Avenue Right of Way Improvement Project from Wallace Avenue to 52" " street STORMWATER Prepared for the City of Wilmington September 28, 1999 McKim & Creed, P.A. 0824-0055.OW (40) Q E C E! V E OCT 0 8 1999 DEpA PROJ # MCIUM&CREED ' City of Wilmington 10/07/99 Park Avenue Right of Way 1 Table of Contents Project Narrative Supplement Stormwater Permit Application North Carolina Department of Natural Resources ' Stormwater Project Number SW8 990421 Park Avenue Right of Way Improvement Project ' from Wallace Avenue to 52"d street Item Pages ' I BIO-RETENTION AREA DRAWDOWN CALCULATIONS - Summary overview - 3 Procedure - 3 Infiltration Test Report - 3 Determination of Rate of Drawdown - 3 II HYDRAULIC FLOW PATTERN OF THE BIO-RETENTION AREAS - ' A. Overview of system operation - 4 B. Existing Stormwater Flow Patterns - 4 ' C. Proposed Infrastructure Improvements - 5 D. Proposed Stormwater Flow Patterns - E. Treatment amenities flow patterns - ' 1. Grassed lined swales - 7 2. Use of secondary swale design - 8 3. Bio-Retention Area Flow Patterns - 9 ' 4. Overland Grassed Sheet Flow - 10 Table of Critical Related Elevations for Drainage and Treatment Amenities 11 III Ponding Depth of Bio-Retention Areas - IV Water Table Depth Design Criteria - 12 13 V RESPONSE TO DENR SELECTED HIGHLIGHTSFROM THE BMP MANUAL - Pages 14 -19 VI Attachments Infiltration Field Test Report Drawdown Rate Determinations Memorandum Haden Stanziale 1 Mco wiRO:%CLERICAL5DATAY082410050110079951ormwater Response.doc Attachment -2 v�MCIQM&CREED Ll Ll City of Wilmington 10/07/99 Park Avenue Right of Way Summary of BIO-RETENTION AREA DRAWDOWN CALCULATIONS - A. Summary overview - As shown in the calculation summary, the 6 inch ponded areas of the four separate areas are dewatered below the surface in as required, in less than four days. The rates of final drawdown are as follows: Area 1, 0.14 days, Area 2, 0.15 days, Area 3, 0.14 days, Area 4, 0.13 days. B. Procedure - The infiltrative rates of the soils were determined based upon a set of three (3) infiltrative tests performed by Soil Tech. The test locations were selected based upon layout of the four areas, the uniformity of observed soil data. The soils within the tested areas was noted to be consistent with the previous subsurface soil borings. The general characteristics of the soils are a very fine sand. The three (3) tests results were reviewed and a value was selected for the analysis of the four basin areas. ' Observation of the apparent water Table were previously noted in the soil boring logs. The apparent water table was observed at a depth of 8.5 ft. The depth of the water table at the time of the infiltrative tests was deeper 3 ft than 6 ft . ' C. Infiltration Test Report - See Attached report dated September 30, 1999, by Soil Tech. Infiltration soil values were determined to be as follows Location/ Test No. Bio-Retention Area k Rate Inch/ hr 1 1/East End 0.06 2 31West End 0.07 3 4/East End 0.10 ' D. Determination of Rate of Drawdown - * Use'/2 min. 0.06"/hr to calculate all drawdowns. See attached calculations. Bio-Retention Area Attachment to Supplement Calculated Drawdown (Days) Required Rate (Days) 1 0.14 Less than 4 days 2 0.15 Less than 4 days 3 0.14 Less than 4 days ' 4 0.13 Less than 4 days End of attachment for Drawdown Determination Supplement. 1 Mce wiRO:SCLERICAL50ATA10824=50510079951ormwater Response doc Attachment -3 t v�IVICIQM&CREED ' City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement eII HYDRAULIC FLOW PATTERN OF THE 1310-RETENTION AREAS AND SITE tA. Overview of system operation - The Bio-Retention Areas of the system operate as an off-line system. The curb and gutter discharges direct the first flush through to the infiltrative areas. This flow is conveyed via the swale cross over, into the off-line areas, which are situated to create an off-line, 6 inch deep, ponded area as required for the Bio-Retention areas. The system utilizes this design concept, in - lieu of the deflector block as detailed in the BMP document. The BMP concept is actually similar in use to the crossovers except the proposed crossovers utilize the adjacent grassed swale, instead of the concrete gutter along the pavement. See detail sheet 2 and elevations noted on the 50 scale plan. B. Existing Stormwater Flow Patterns - ' To better narrate the flow patterns, the following is a review of the water conveyance patterns on p g Y the site: Please refer to the 50 scale site plan. Off -site stormwater run-off into the project area enters via: 1 1) West - An existing stormwater surface swale from the West, under Wallace Avenue, through an existing 42 inch RCP culvert. These flows continue through the drainage ditch to the drainage ditch up gradient of Belgrave Circle; 2) North - Overland surface flow from the near Right -of -Way (+- 250 ft. Northward) on Wrightsville Avenue. These untreated flows flow over the unimproved roadway and enter the existing drainage channel; 3) South - Overland surface flow +- 100 ft. southward from the direction of Pine Street. These untreated flows flow over the unimproved roadway and enter -the existing drainage channel; 4) East - Existing drainage channels from 52"d Street traverse naturalized drainage channels. These untreated flows flow into the drainage channel swales up gradient of Belgrave Circle. This existing watershed is bounded by the R.O.W on Wrightsville Avenue, the center of Wallace Avenue, and the topography divide toward Pine street. The proposed improvements do not alter the existing general flow patterns, though they do greatly enhance the treatment of the flows prior to the flows being received into the redefined drainage channel, routing the runoff the length of Park Avenue. The previous non descript drainage channel is replaced with the stabilized subsurface conduit. The water will be through overland flow through designed grassed treatment ' swales, through flow utilizing off-line Bio-Retention areas, and through improvement of existing eroded downstream collection channels. The Hydrology of the existing watershed was studied to Mce_wiRll:VCLERICALSDATA10824400504100799Slormwaler Rwponse.doc Attachment -4 4MCIQW&CREED City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE BIO-RETENTION AREAS AND SITE - CON'T 1 C. Proposed Infrastructure Improvements - 1 Conveyance patterns of Stormwater run-off into the site, and exiting the site, are not significantly altered by the proposed improvements. Where upon, the treatment is greatly increased form 35% TSS to 85% TSS. The Study of the Upper Watershed at Riley's Branch has allowed the proper understanding to adequately plan for the infrastructure improvements within the site. These improvements include the developments of: 1. Provision of Stormwater Treatment Best Management Practices where none currently exist. The BMPS's include: a) provision of properly designed Landscape plantings to benefit water quality via treatment, stabilization, infiltration, and shading b) grassed treatment swales, ' c) Bio-Retention areas, and d) stabilization of off -site drainage ways. 2. These practices occur along the adjacent the existing roads, residential and commercial lots, and non-descript drainage channels which are subject to erosion during common rainfall events. 3. Provision of hard surfaced curb and gutter roadway of a 24 ft. width, in lieu two one way A graveled roads with a total width of 28 ft. 4. Provision of properly designed inlets, pipes, swales and stabilized outlets. 5. Provision of properly designed Landscape amenities to benefit the treatment of run-off, and shading of roadway asphalt. Mce_wiRQ:%CLERICALIDATA10824=501100799StonTiwaler Response,doc 11 Attachment -5 MCM4&CREED City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE 81O-RETENTION AREAS AND SITE - ' C{ ON,T) ' D. Proposed Stormwater Flow Patterns - The patterns of the proposed onsite flow conveyances are summarized as follows: 1 1. From the West - Existing flows from west of Wallace Avenue enter the site through an improved roadway culvert crossing. This Culvert is at the start of the conveyance piping which transports this runoff through the site, to the side of the existing non descript drainage channel, and the waters will exit at the head of an improved outlet channel leading to Belgrave Circle, then to Oleander. The new conveyance piping consists of both 66 inch RCP ' for a length, then as cover depth diminishes, reduces to twin 48 inch RCP pipe. Cast -in -place drainage structures provide intermittent access, and provide inlet for treated stormawater treated via Bio-Retention Areas, grassed swales, and overland grassed sheet flow. 2. From the East - Existing flows from west of 52nd Street will enter the site and will be ' conveyed along now existing swales. The flow in these existing swales will be received into two 36 inch RCP road culverts which transport the collected runoff to the stabilized outlet structure. 3. Flows from the South - Existing flows from the south, along the divide toward residential Pine street, are continued to be conveyed toward the area of the existing drainage channel via existing overland grassed sheet flow. Now, in lieu of falling over the steep bank into the channel, the flows will cross the new pedestrian sidewalk, curb, flow across the cross -sloped 24 ft. wide roadway, and will be collected into the curb and gutter on the north side of the roadway. There are nine new proposed curb and gutter outlets on the north side of the roadway improvements. These outlets convey runoff to the stormwater collection and treatment system located to the north of the roadway. ' 4. Flows from the North - Existingflows from the residential and commercial Wrightsville 9 Avenue will flow toward the project area as currently occurs. These flows differ from the southern flows, as these flows do not inherently drain across, onto, the new roadway. The flows do drain across the area of the proposed Bike Path and a very limited number of ' residential driveways. The development on the north side of the property consists of a mix of residential and office uses. These northerly flows are intercepted, along with the southern flows, into the grassed swales, the Bio-Retention Areas, and the overland Grassed/ 1 vegetative developed areas. Mce_wihWGIE RICAUDAT*0824=50Y100799Stcrmwater R©sponse_doc Attachment -6 � MCKA4&CREED h City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE BIO-RETENTION AREAS AND SITE - C[ ON,T) E. Treatment Amenities Flow Patterns - The new treatment amenities, the BMP's, include grassed swales, Bio-Retention Areas, the overland grassed/ vegetative areas. These treatment devices collect and convey stormwater run-off from off -site, and on -site in the following categorical characteristics. Grassed lined swales - a) Primary Treatment grassed swale (Wallace Ave. to 300 ft. east of the intersection) - The swale located from Wallace Avenue, along the north side of Park Avenue, collects a limited amount of run-off form this area. This 300 linear ft swale collects both overland run-off from a limited drainage area to the north between Wallace Avenue and Wrightsville, and from a limited drainage area to the south, which includes 150 ft. of the new roadway. The roadway run-off is directed to the swale via the first curb cut outlet on the roadway. The treated flows then enter the new 66 inch RCP collection piping. b) Primary grassed swale (52n° Street to the east, to the up gradient discharge to) - Belgrave Circle) - The existing and new grassed Swale will treat and convey run-off over the approximately 600 ft. length to the north and the 300 ft length to the south of Park Avenue R.O.W. The primary flow conveyed is from surrounding existing residential and public roadway improvements. Three new curb cut outlets on the east end of the roadway discharge collected runoff and direct the flows to approximately 600 ft of newly defined grassed swale being developed alongside the north edge of the curb and gutter roadway. These treated flows are then discharged into the new twin 48 inch RCP collection piping. c) Secondary Treatment Grassed Swales ( along remaining entire length of Park Avenue Curb And Gutter New Roadway, RLeater than 1,200 linear feet of secondary grassed treatment swale) - The improvement project has the benefit of having the enhanced quality of over 1,200 If. of secondary grassed treatment swales. These swales will be relied upon for treatment for stormwater run-off which exceed the first flush intensity. Mce wiRQ:SCLBRICALSOATA%0824=5MI00799Stormwator Rasponsa.dac Attachment -7 1 v �McIQMF�CREED City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE BIO-RETENTION AREAS AND SITE - C( ON'T) E. Treatment Amenities Flow Patterns - (con't) 1. Grassed lined swales - ' These secondary swales are located to transport runoff away from the Bio-Retention Areas for designed events which would otherwise flood the Bio-Retention areas. 1 Flooding is considered any flow which would otherwise direct waters to the areas resulting in a depth greater than the maximum desired 6 inch ponding depth in the infiltrative areas. Secondary grassed treatment swales convey runoff away from the ' ponded Bio-Retention areas and direct these flows to stabilized drain inlets where the water enter the subsurface piping. These secondary swales are designed with "False Sumps" down gradient of the inlet catch basins. These false sumps ensure that the down gradient Bio-Retention areas only receive the initial flows from their individual respective watershed areas. Flows in excess of the first flush are released over these false sumps, to a down gradient drain inlet. ' Ponded waters remain in the off-line Bio-Retention areas as the areas 1) Receive only direct waters from the curb outlets via the swale cross over, the waters flow directly across the swale into the infiltrative areas, 2) the Infiltrative areas are off-line from the swale, 3) the infiltrative areas are deepened 6 inches below the swale, this allows the subsequent flows to flow the path of least head, down the secondary grassed swale. 2. Use of secondary swale design - The use of the secondary swale inlets are not located on the roadway's curb line due to the geometry of the site. The project required the location of the drain pipes to be away from the typical roadside location due to the use of Bio-Retention areas and the utility relocations. The secondary swales adequately convey flows exceeding first flush rainfall along the project roadway via grassed swale and ultimately direct the discharge to the drain inlets which are designed for the larger events. 1 Mce—wiNO:4CLERICALSDATA5o824kGO504100799Stormwater Response doc Attachment -8 �MCTJM&CREED J 1 I IL� G I 1 I City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE 1131O-RETENTION AREAS AND SITE - C( ON,T) E. Treatment Amenities Flow Patterns - 3. Bio-Retention Area Flow Patterns - Bio-Retention areas are incorporated into the roadway stormwater treatment plan with the strict guidance of the Best Management Plans, BMP's. Specific concern is related to the ability of the Bio-Retention areas to receive the first flush of stormwater runoff. The Bio-Retention areas are thus situated in elevation, and in proximity to the discharging curb and gutter outlets. a) To efficiently receive the first flush of runoff. This is accomplished by two inherent design procedures. i) The areas are located at the direct discharge outlet of the curb and gutter outlets. The discharges flow through the curb outlet, across stabilized stoned aprons which cross down and over the grassed swale, whereupon the flows pass across the swales and lead directly down into the infiltrative area. The infiltrative area is located 6 inches lower in elevation than the grassed swale. ii) The Bio-Retention area is located offline from the grassed swale. Thereby, flow through the area is not evidenced. b) The Bio-Retention areas subsequently are flooded during the initial event. Water rises to the elevation of the adjacent swale. Water from the roadway curb cut then are directed, via lower head resistance, to a flow line that conveys the waters down the secondary grassed swale, to the receiving drain inlet. These by-passing flows are directed into the inlets through the utilization of a blockage in the swale referred to as a "False Sump". The system utilizes this design concept, in -lieu of the deflector block as detailed in the BMP document. The BMP concept is actually similar in use to the crossovers except the proposed crossovers utilize the adjacent grassed swale, instead of the concrete gutter along the pavement. The periodic placement of this false sump directs runoff conveyance, in the secondary swale, to enter the subsurface piping. The secondary swale is designed to adequately convey runoff from the 10 year reoccurring storm event. The top of the false sump is one (1) ft. higher than the swale at these locations. This top elevation of the False Sump is set at an elevation lower than the up gradient Bio-Retention cross over apron. This avoids further back water into the infiltration area. Mce_wi110ACLERICAUDATA50824=504100799S10rmwater Response.doc Attachment -9 . Q#, MC 412�_ � - KM&CREED City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement II HYDRAULIC FLOW PATTERN OF THE BIO-RETENTION AREAS AND SITE - CI ON,T) E. Treatment Amenities Flow Patterns 1. Overland Grassed Sheet Flow - Overland Grassed sheet flow occurs onsite to supplement the grassed treatment swales, and the use of the Bio-Retention areas. Overland grassed flow is evident at the following locations: a) Along the new Bicycle path - areas providing a reach of 25 ft to 10 ft. of grassed sheet flow are provided along the new Bicycle path. These flows then are collected and treated additionally in both the Bio-Retention areas and the grassed swales. Mce_wiNQ:%CLERICALIDATALD82410050410D7995iormwa[er Response.doc Attachment -10 MCM4 & CREED I O N a` ao C N C � � d A m o E > O � a n c m � � y U W O � 7 C 7 a y @ a_ 0 I N v 0 4) 04 4) N O O) Oo co C Z C O D N N . E u n a cL D CL ar ¢ U. U a) E Z @ @ {6 3 U 3 u E r E O O p O Q. N Z U) Nn y y 0� O M O V i[I W O M N a) n n fa '� 0 O '- M ^ O a0 N ^ N m .�- 7 w Q= p C, O M .- N r ^ co W M ^ p) Of N O M M M N r M M i ^ p C N Z O ,- N ^ N N O ❑ rn a3 M rr O y N _ N V o u7 to r, Lo ym m v� N c m W a=^ m^ r N M r T "' rr n a N O M .� M M )` V V^ N^ ^ a) Z O^ N co V M Mn Q O U)21 a, romp h m N %' to 7 V p N 0 0 a) EO ^ 1) DD Q w O. D O N (V to N ID r rn O M M co �rj M^ }^ O Q C z O^ r N N N .y U O a` rL N n y in to u3 cc s ap N W C R m lu =O N N in M iCi O O/ O Coil M N M n N M N } a O N Z G J O O C a x x E Y o 3 o m 5 M o mm co y Q LPL m N E > O •� L m cn N y= n. L .�. O U Q N d mO a cD cn Q kn Q N )m w o N yb_ S-~ 10 7 N C O W 0 emu. 2 n o z v E a) O rn,_ .0 6 a) al m w m L LL C t c aAm m E � cotL rn Sim L m'c 2 'E p @ c2Q > o r uci m n yQ a 4 o m a m r �o y @ co y J N t N M a p 0 m VJ •- Y 'C L ._� (a u) 3 V cL L y LE U J c ❑ U D Z❑ Q Q 'C U° m r a= o N N m Y m r L) o o cau ci O y ) m V) A U1 - a C m a a 2 m m p w F¢- @ r U) � m .n 9 > c ° ❑ r_ Z = .4 y a) ar u) v m n = a 2 -c r cn >+ N .� « f- U m Q y C N m N U) a) HF- �G m w co �mCm� O a) Sd�m3E a) (n Nmr y H7 v _m >C _ O o ozQ = ❑'C U >OO�Unl D C n N ' 00 07U T (�� r= 7 L)Q O UFaornm F:aJQ'.± ca Qm o c O OCC U �Z U O .oNO a O° m m o m m cro °;W °m mo E wL)0w m �m0 QN —E a UcccaM❑LLm ma a a> a ATTACHMENT PAGE 11 fl [l 1 1 1 '�l 1 City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement III PONDING DEPTH OF BIO-RETENTION AREAS - Ponding Depth of Bio-Retention Areas - The depth of the ponding areas in the Bio-Retention infiltrative areas is limited to an inflow depth of six (6) inches as required by the BMP. The method of maintaining this depth is accomplished as directed by the BMP design guidelines. The basal area of the infiltration area is set at an elevation 6 inches lower than the adjacent runoff flow line. In addition, the area inlet is the only route of conveyance in, or out of the pond. As the 6 inch depth is attained, runoff then naturally flows away, down gradient, in accordance with methods recommended in the BMP. The supplemental narrative has expanded the description of this function. Runoff accumulation in excess of six (6) inches is deterred from entering the areas as the flow then reaches an elevation equal to that of the adjacent flow line in the swale. The runoff then is directed, not into the closed cell infiltration area but, into the flow line of the adjacent swale where it flows down gradient. The flows are then collected via the drain inlet. Run-off in excess of the 6 inch ponding depth, then flows into the inlet, or in larger events, to the False Sump, into a subsequent receiving drain inlet. The runoff, in either of the later two cases, enters the subsurface piping. This deflector provision is in accordance with the BMP "deflector" operational characteristics. The specific elevations, which set the control for the limitation of the six-inch ponding depth, are summarized for your review on Detail Sheet 2 and Page 11. The table entitled "Summary of Bio-Retention Elevations" has been added to the plan. This data was derived from the roadway vertical alignment data and the plan elevation data for the Bio- Retention Basin inverts. The Curb cut Detail, the Crossover Detail has been revised to show these relationships. The typical Road Detail has not been revised with the elevations, as the elevations are specific to the four Bio-Retention areas. Mce_wi11O:(CLERICALSDATA50824=50%l OD79951ormwater Response.doc Attachment -12 � MC MM&CREED I r L L r] 1� n City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement III PONDING DEPTH OF BIO-RETENTION AREAS - Ponding Depth of Bio-Retention Areas - The depth of the ponding areas in the Bio-Retention infiltrative areas is limited to an inflow depth of six (6) inches as required by the BMP. The method of maintaining this depth is accomplished as directed by the BMP design guidelines. The basal area of the infiltration area is set at an elevation 6 inches lower than the adjacent runoff flow line. In addition, the area inlet is the only route of conveyance in, or out of the pond. As the 6 inch depth is attained, runoff then naturally flows away, down gradient, in accordance with methods recommended in the BMP. The supplemental narrative has expanded the description of this function. Runoff accumulation in excess of six (6) inches is deterred from entering the areas as the flow then reaches an elevation equal to that of the adjacent flow line in the swale. The runoff then is directed, not into the closed cell infiltration area but, into the flow line of the adjacent swale where it flows down gradient. The flows are then collected via the drain inlet. Run-off in excess of the 6 inch ponding depth, then flows into the inlet, or in larger events, to the False Sump, into a subsequent receiving drain inlet. The runoff, in either of the later two cases, enters the subsurface piping. This deflector provision is in accordance with the BMP "deflector" operational characteristics. The specific elevations, which set the control for the limitation of the six-inch ponding depth, are summarized for your review on Detail Sheet 2 and Page 11. The table entitled "Summary of Bio-Retention Elevations" has been added to the plan. This data was derived from the roadway vertical alignment data and the plan elevation data for the Bio- Retention Basin inverts. The Curb cut Detail, the Crossover Detail has been revised to show these relationships. The typical Road Detail has not been revised with the elevations, as the elevations are specific to the four Bio-Retention areas. I Mce_wilYll:4CLERlCAL1DATA1082410050110079951ormwalar Response,doc Attachment -13 v v MCKM&CREED City of Wilmington 10/07/99 Park Avenue Right of Way Project Narrative Supplement aIV WATER TABLE DEPTH DESIGN CRITERIA - Water Table Depth Design Criteria - The initial project narrative did not discuss the water table depths at the site. The inference during design was made though that the site provided adequate drainage based upon uniformity of the fine grained sand soils, evidenced infiltration of the on -site soils during events, and the topography, The Groundwater table elevation for the project area was discussed in the Catlin Geotech (dated 03130199)as being approximately 5 feet below ground elevation. Upon review of the boring reports, apparent water table elevation observed at the site based upon same day recording were approximately 8 Y2 feet below ground elevation as soil logs. In addition, Ground water was not noted above a depth of 6 ft during our recent site investigation by Soil Tech, Attached. The classification of the soil samples at higher elevations above the 8 '/z ft depth were classified p g p as being moist. Upon review of these logs it is apparent that the ground water elevation was approximated at the time of the soil report to be at depth of five feet below grade. The approximation is based upon moist conditions in the soils. This moist classification is not definitive of a Seasonal High Water Table (SHWT), or evident of an apparent water table elevation. Your comment concerning the depth to groundwater as being five feet below the surface is noted. The BMP states that it is not desirable to site the infiltration area at a location where ground water is less than a depth of six feet, the BMP does not state that a minimum of six feet is ' required to ground water. With all considered at the site, it is my opinion that the general intent for ground water separation is maintained in accordance with the regulations. The design of the Bio-Retention areas considered the soil boring findings, and the intent of this application that improvement upon the stormwater treatment form existing treatment conditions be advanced at the site. Considering the redevelopment of this project to improve upon the existing treatment, and the physical constraints of the Public R.O. W. Project, it is considered that the separation ' recommendations mentioned in the BMP are complied with. u Mce_wiR0',1CLERICAL. DA'CA%08241005MlQO7998tormwater Response,dcc Attachment -14 4 v MCMM&CREED n J Il 1 City of Wilmington 10/07/99 Park Avenue Right of Way .Project Narrative Supplement V RESPONSE TO DENR SELECTED HIGHLIGHTS FROM THE BMP MANUAL - Page 33 A. Functions of the Bio-Retention Area Components - Six Components Grass Buffer Strips - The standard depicts either: • a length of grass strip to receive sheet flow off the roadway or • a short length of grass strip directly below the curb and gutter outlet. I I I 11 u r The sheet that flows off the roadway is not acceptable on this curbed roadway as pedestrian and bicycle traffic are associated in the area. The short stretch of grass swale is also not acceptable due to City Requirements for outlet aprons, and the concern for erosiveness of the grassed outlet. The BMP on page 36 also states the gutter and diversion block should meet guidelines by the local permitting authority. => To mitigate this concern it is submitted that • all areas off the Bicycle path due have grass filter strips, • that the high side of the roadway does have a filter strip located between the sidewalk and curb. This area receives runoff from the residential area which prior did not have any filter strips. • That the project has substantially an excess of grassed swales to provide treatment for higher events that did not previously exist. • The new road surface will be paved, not dirt. Pondinq Area - A ponding area is provided as required. See page 9, 11 and 12. Planting Soil - The native soils comply with the BMP criteria of Loamy Sand Soils. The soils are classified as a Very Fine Grained Sand which is a similar way to say Loamy Sand soils. The BMP states this is advantages as the importation cost for imported soils can be avoided. See page 42 of the BMP, last paragraph A. Mce_wihQ:1CLERICALIDATA108241005011007995tormwater Response.doc Attachment -15 41-4�4-#�'�MCIJM&CREED 1 i i I I 1 t 11 City of Wilmington 10/07/99 Park Avenue Right of Way V RESPONSE TO DENR SELECTED HIGHLIGHTS FROM THE BMP MANUAL- (con't) Page 33 A. Functions of the Bio-Retention Area Components - Six Components (con't) Sand Bed - An imported sand bed is not provided in the project. The in -situ soils provide similar characteristics. Per page 42, a sizing rate of 7% has been used anyway. Organic Layer - The planting bed proposed will provide the necessary layer of organics to filter the pollutants. A proliferation of specified Switch Grass provides extensive annual growth of organic material. The root systems also promote filtering required. See Landscape Plans and attached memo. Plant Material - The Plant material currently specified is recommended by the Landscape Architect for the applications being made. The BMP was consulted during selection of Planting Material. The Project Documents include Technical Specifications for installation, preparation and care. See Landscape Plans and memorandum attached. Page 36 Minimum Design Requirements - Minimum width of 15 ft with 25 ft width preferred A minimum width of 15 to 28 feet is provided, See dimensions on Site Plan. Minimum length of 40 ft preferred, or 2 to 1 length to width ratio The minimum length is provided and the ratio is exceeded in all cases, typically 16 to 1 is provided Ponded depth is 6 inched maximum Maximum ponded depth is complied with. See supplemental Narrative, Pages 8-12 Planting soil should be 4 feet minimum depth The native soils comply with requirement. Please see Supplemental Narrative, 13 and 14. Ponding Depth should not be present for a period longer than four days The infiltration occurs in less than one days. Refer to supplemental calculations, Page 3. Mce_wihp,1CLERICALAUATA%0B24100545100799Stormwater Response.doc Attachment -16 I v �MCHIM&cREEv iCity of Wilmington 10/07/99 Park Avenue Right of Way I V RESPONSE TO DENR SELECTED HIGHLIGHTS FROM THE BMP MANUAL - {con' Page 36 and 37 Bio-Retention Types Recommendation for off-line types of Bio-Retention areas which provide diversion into the areas. This configuration is provided in the design through the cross over and lowered sump area. See Supplemental Narrative, Page 8 and 9. I Recommendation for a 6 inch sump in the Bio-Retention area All Bio-Retention areas have a specified sump depth of 6 inches. See page 11. Page 42 III. Grading Plan A. Locating the Bio-Retention Area 1. Stormwater Management Concept Plan In NC all areas must be less than 5 acres in size �i All drainage areas are less than 5 acres. Please refer to summary table on plans and supplemental Narrative. Page 11. 2. Location guidelines The following locations would be undesirable for Bio-Retention Areas with ground water within 6 feet of surface The groundwater is approximately 8.5 feet, see supplemental Narrative. Page 13. Areas where mature trees need to be removed Mature trees are not located in the Bio-Retention areas Areas with existing Slopes Greater than 20 The site is flat Areas in close proximity to poor soil substratum The soil reports indicate consistent very fine sand soils B. Sizing Guidelines The guidelines recommend a sizing factor ranging from 5 to 7 percent of the drainage area, multiplied by the Rational runoff coefficient. The 5 percent value is conservative, the 7 percent is liberal. A value of 7 percent was utilized. See design Calculations p. A-13 and supplemental Narrative, Page 11. I Mce wiAQACLERICALIDATA10824%00501100799Stormwaler Response.doc I Attachment -17 � �MCIQM£aCREED 11 11 1 City of Wilmington 10/07/99 Park Avenue Right of Way V RESPONSE TO DENR SELECTED HIGHLIGHTS FROM THE BMP MANUAL - (con't) Page 45 C. Drainage Calculations Discussion of diversion of First Flush into Bio-Retention area with subsequent ponding depth of 6 inches maximum Refer to provision in Supplemental Narrative for Ponding, Page 12. Curb cut widths 3 ft minimum 4 ft curb cut width provided, see detail sheet. Maintain offline area Refer to Supplemental Narrative and Plans. See page 9. Maximum entry velocities of 3 fps for planted, and 9 fps for mulched beds The drainage apron into the Bio-retention areas is a stone energy dissipater in accordance with City Standards, this is acceptable. The swale velocities are calculated at 2.5 fps with an acceptable velocity of 4.5 fps Page 45 D. Grading Plan Guidelines Goal to capture first flush and bypass larger events This is complied with, see supplemental Narrative, pages 9, 11, and 12. Goal is to set the Bio-Retention area 6 inches below curb flow and have offline ponding This is complied with, see plans and Narrative, pages 9, 11, and 12. Mce_wil4fl 1CLERICAL tDATAW824100505700799Ssormwater Respansadac Attachment -18 v MCI�IMCIZEED v City of Wilmington 10/07/99 Park Avenue Right of Way RESPONSE TO DENR SELECTED HIGHLIGHTS FROM THE BMP MANUAL - con't) Pages 47 through 53 IV Planting Plan Briefly, this BMP states several goals as follows • Plants to tolerate moisture and ponding • Species selected per table IV • Do not use invasive plants • Use diversity • • Promote constant evapotransporation Stem count (trees and shrubs) • Minimum 400 per acre • Average 1000 per acre • Maximum 1250 per acre • Use 2.5 inch caliper trees • use 3-4 ft high shrubs • use ground cover of seeds or plugs • plant trees away from inlet • use perimeter layout • use random layout • use shading • Measure acidity • test the soils • Mulch is optional if ground cover provided In response please refer to the attached Memorandum dated September 191h from Haden Stanziale, Landscape Architect. The present local recommendation is to maintain the current specified planting plan for utilization of Best Management Practices on this project. A copy of the detailed construction plan for the Landscape Improvements is attached for review. This plan set also has individual Bio-Retention area layouts. See response to question 8 on the comment reply letter. I i Mce—wiROikCLERICALSDATA10824=501100799Stonnwater Respcnse.doc Attachment -19 V v MCIUM&CREED v 1 1 1 0 0 t 0 City of Wilmington 10/07/99 Park Avenue Right of Way ATTACHMENTS Table of Contents Project Narrative Supplement Stormwater Permit Application North Carolina Department of Natural Resources Stormwater Project Number SW8 990421 Park Avenue Right of Way Improvement Project from Wallace Avenue to 52nd street Item Infiltrative Field Tests Report Drawdown Rate Determinations Memorandum - Haden Stanziale Prepared for the City of Wilmington September 28, 1999 McKim & Creed, P.A. 0824-0055.OW (40) Mcv wiRQ:SCLERICAL%DATAkOR244005011007995tormwaler Response,dcc Pages 1 2 3 Attachment -20 v�M�KIIvi&cREED BIORETENTION DRAW DOWN CALCULATIONS Park Avenue Right of Way Improvements City of Wilmington, North Carolina Prepared for : City of Wilmington Post Office Box 1810 Wilmington, North Carolina 28402 October 7, 1999 Project No. 08240055.OW tttEu�a�rtr� CJCR� i�rr Ii 0 w _ i?Gepdtbj�� McKim and Creed, P.A. 243 North Front Street Wilmington, North Carolina 28401 (910) 343-1048 $:%024=55 Pork Ave Design500-ADMIMOrawdawn NARRATIVE.doc BIORETENTION DRAW DOWN CALCULATIONS Park Avenue Right of Way Improvements I- Design Narrative 1 1 1 1 1 1 1 1 1 1 1 1 '1 A critical part of the design of a bioretention areas is to insure that the ponded water, collected from the drainage area; draws down within a four day time period. Ponded water in excess of four days, limits the plant species, that can be planted within the bioretention area and increases the potential to breed mosquitoes and other undesirable insects. To calculate the ponded water draw down, on site soil infiltration rate were determined by Soil Tech Engineering Inc. from information. gather, during on site infiltration test. The soil tests were conducted in three locations of proposed bioretention area, at 36 inches below the existing ground elevations, which will be approx. the same elevations of the finished bioretention area bottom. The results of their soil tests indicates that infiltration rates range from 0.06 toLL0.10 inches per minute. The attached draw down calculations used M2 of the minimum 0.06 inches per minute infiltration rate recorded by Soil Tech Engineering Inc. , which is 1.8 inches per hour, when converted to feet per seconded and multiplied by the available infiltration area of the bioretention area bottom the result is an infiltration rate in cubic feet per second. The water volume, in cubic feet, can then be divided by the resultant cubic feet per second infiltration rate to determine a draw down time. The results of the draw down calculations indicates that the ponded water of bioretention area #1 infiltrates in 0.14 day, bioretention area #2 infiltrates in 0.15 day, bioretention area #3 infiltrates in 0.14 day, and bioretention area #4 infiltrates in 0.13 day, all well within the BMPs four day requirement. Si082410055 Park Ave Design100-ADMIN4Drawdown NARRATIV@,doe Park Avenue Right of Way Roadway Improvements 08240055.OW (40) 10f5199 City of Wilmington - Bioretention #1 Bioretention Sizing Calculation with out sand bed (7% sum of c x area) Total Basin Area Ta .= 2.0 acres Impervious Area C := .47 sf (.07•C•Ta)•43560 = 2866.25 minimum bioretention surface area surface area provided = 3840 sf Bioretention Stage/Storage data • = 36.001 3940.00 (3 840 � 4177 ) 36.50 4177.00 Volume 2 (36.5 - 36) Volume = 2004.25 Storage Draw Down Infiltration Rate inch/hour IT l.8 Use 112 of the min. Infiltration rate provised by Soil Tech Engineering for this site. Bioretention Bottom Area Ap = 3840 IT Q Ap 12.3600 Q = 0.16 Volume Time Q- 8640 Time = 0.14 days Note : less that 4 days Peak Runoff Reduction P := 4.5 2 year storm CN : = 75 S - = 1000CN - 10 Runoff := p + 02- S Runoff = 2.05 Infiltration Volume to Runoff Volume IT = 0.88 Enter in Figure 6-1 of the TR-55 Manual Rif as ratio of storage to runoff volume (VsNr) I The ratio of peak outflow discharge 80 %reduction in the 2 year StOrtY1 to peak inflow discharge (Qo1Qi) Y bra"mcd Paris Avenue Right of Way Roadway Improvements .- 1015199 08240055.OW (40) City of Wilmington v 0 B 1 1 '1 1 1 1 1 1 1 1 1 Bioretention #2 Bioretention Sizing Calculation - - with out sand bed (7% sum of c x area) Total Basin Area Ta = 2.1 acres Impervious Area C .= .47 sf (.07•C•Ta)•43560 = 3009.56 minimum bioretention surface area surface area provided = 4160 sf Bioretention Stage/Storage data .= 30 4160.00 Volume :_ 2 (4160 4570).(34.1 34.14.10 - 33.6) Volume = 2182.5 - 4570.00 Storage Draw Down Infiltration Rate inch/hour It - 1 8 Use 112 of the min. Infiltration rate provised - by Soil Tech Engineering for this site. Bioretention Bottom Area Ap .= 4160 Q = Ap 1360 Q = 0.17 Time := Volume Time = 0.15 days Note : less that 4 days "It 8 Peak Runoff Reduction P := 4.5 2 year storm 1000 - CN = 75 S CN - 10 Runoff := P 0 8 Runoff = 2.05 Infiltration Volume to Runoff Volume Ir Runoff 088 Enter in Figure 6-1 of the TR-55 Manual as ratio of storage to runoff volume (VsNr) 1 The ratio of peak outflow discharge to peak inflow discharge (Qo/Oi) bra.mcd 90 % reduction in the 2 year storm Park Avenue Right of Way Roadway improvements 1015199 08240055.OW (40) City of Wilmington Bioretention #3 Bioretention Sizing Calculation with out sand bed (7% sum of c x area) Total Basin Area Ta := 2.97 acres Impervious Area C .47 sf (.07,C•Ta) 43560 = 4256.38 minimum bioretention surface area surface area provided = 3840 sf Bioretention Stage/Storage data := 31-251 4860.001 (4860 +-6207) 31,70 ii207.00 Volume (31.7 - 31.25) Volume = 2490.07 2 Storage Draw Down Infiltration Rate inch/hour it l.8 use 112 of the min. Infiltration rate provised by Soil Tech Engineering for this site. Bioretention Bottom Area Ap = 4860 Ir Q Ap•T23-00 Q=0.2 Volume Time .= Time = 0.14 days Note : less that 4 days 86400 Peak Runoff Reduction P := 4.5 2 year storm 1000 - CN = 75 S.= CN - 10 Runoff = P r 0.8$ Runoff = 2.05 Infiltration Volume to Runoff Volume Ir Rif = 0.88 Enter in Figure 6-1 of the TR-55 Manual as ratio of storage to runoff volume (VsNr) 1 The ratio of peak outflow discharge to peak inflow discharge (QolQi) 90 % reduction in the 2 year storm bra.mcd 1 1 l 1 1 1 1 1 1 it 1 1 1 1 1 1 1 1 Park Avenue Right of Way Roadway Improvements 10f5199 08240055.OW (40) City of Wilmington Bioretention #4 _ Bioretention Sizing Calculation with out sand bed (7% sum of c x area) Total Basin Area Ta = 2.21 acres Impervious Area C A7 sf (.07•C•Ta)-43560 = 3167.2 minimum Bioretention surface area surface area provided = 3840 sf Bioretention Stage/Storage data •_ 30.35 3100.00 (3100 w 3972 ) 30.80 3972.00 Volume (30.$ - 30.35) Volume = 1591.2 Storage Draw Down Infiltration Rate inch/hour 1r , 18 Use 112 of the min. infiltration rate provised by Soil Tech Engineering for this site. Bioretention Bottom Area Ap = 3100 Ir Q AP'"12.3b00 Q = 0.13 Time _ - Volume •86400 Time = 0.14 days Note :less that 4 days Peak Runoff Reduction P .= 4.5 2 year storm 1000 CN=75 S=TN -l0 Runoff Runoff = 2.05 P r 0.8 S Infiltration Volume to Runoff Volume Ir = 0.88 Enter in Figure 6-1 of the TR-55 Manual Runoff as ratio of storage to runoff volume (VsNr) bra.mcd 1 The ratio of peak outflow discharge to peak inflow discharge (QolQi) 90 % reduction in the 2 year storm Chapter S: Storage volume for detention basins I 1 P a I 1 I 1 1 1 As rural areas become urbanized, the resulting increases in peak discharges can adversely affect downstream flood plains. Increasingly, planners, developers, and the public want these downstream areas to be protected. Many local governments are adopting ordinances to control the type of _ development and its allowable impacts on the watershed. One of the most common controls requires that -postdevelopment discharges do not exceed present -condition discharges for one or more storm frequencies at specified points along a channel. This chapter discusses ways to manage peak discharges by delaying runoff. It also presents a procedure for estimating the storage capacity required to maintain the peaks within a specified level. Efforts to reduce the effects of increased runoff from urban areas have been minnovative and diverse. Many methods have been used effectively, such as infiltration trenches, porous pavement, rooftop storage, and cisterns. But these solutions can be -,expensive or require site' conditions that cannot be ,�rovided. The detention basin is the most vridely used measure for controlling peak discharge- It is generally the least expensive and most reliable of the measures that have been considered. It can be designed to fit a wide variety of sites and can accommodate multiple - outlet spillways to meet requirements for multifrequency control of outflow. Measures other than a detention basin may be preferred in some locations; their omission here is not intended to discourage their use. Any device selected, however, should be assessed as to its function, maintenance needs, and impact. Estimating the effect of storage When a detention basin is installed, hydraulic routing procedures can be used to estimate the effect on hydrographs. Both the TR-20 (SCS 1983) and DAMS2 (SCS 1982) computer programs provide accurate methods of analysis. Programmable calculator and computer programs are available for routing hydrographs through dams. 11-9 This chapter contains a manual method for quick estimates of the effects of temporary detention on peak discharges. The method is based on average storage and routing effects for many structures. Figure 6-1 relates two ratios: peak outflow to peak inflow discharge (goigi) and storage volume to runoff volume (VslVr) for all four rainfall distributions. The relationships in figure 6-1 were determined on the basis of single stage outflow devices. Some were controlled by pipe flow, others by weir flow. Verification runs were made using multiple stage outflow devices, and the variance was similar to that in the base data. The method can therefore be used for both single- and multiple -stage outflow devices. The only constraints are that (1) each stage requires a design storm and a computation of the storage required for it and (2) the discharge of the upper stage(s) includes the discharge of the lower stage(s). The brevity of the procedure allows the planner to examine many combinations of detention basins. When combined with the Tabular Hydrograph method, the procedure's usefulness is increased. Its principal use is to develop preliminary indications of storage adequacy and to allocate control to a group of 'detention basins. It is also adequate, however, for final design of small detention basins. M (210-VI-TR-55, Second Ed., June 1986) 6-1 1 Input requirements and procedures Use figure 6-1 to estimate storage volume (Vs) required or peak outflow discharge (qo). The most frequent application is to estimate VS, for which the required inputs are runoff volume (Vr), qo, and peak inflow discharge (qi). To estimate qo, the required 6inpTV V5, and qi. 1 a r .6 I! II } I ! II I fill ? II I! !III IIII '� � I II Ili Ilil I- t { ! I ! ' '4 00 1f I III! II!. ' ru 3 I II I!I I I I I o� I I� II, II IIII ! II II ill III 2 IIII III! I I! III ' I I I =1 I I ILL ! III 1 illl I Estimating Vs Use worksheet 6a to estimate Vs, storage volume required, by the follougng procedure. 1. Determine qo. Many factors may dictate the selection of peak outflow discharge. The most common is to limit downstream discharges to a desired level, such -as predevelopment discharge. Another factor may be that the outflow device has already been selected. 2. Estimate qi by procedures in chapters 4 or 5. Do not use peak discharges developed by any other procedure. When using the Tabular Hydrograph method to estimate qi for a subarea, only use Tvoes II & III ' .2 .3 .4 .5 .6 Peak outflow discharge (L) Peak inflow discharge Figure 6-1.--Approximate detention basin routing for rainfall types 1. 1A, 11, and III. 6-2 (210-VT-TR-55, Second Ed., June 1986) .7 .8 peak discharge associated with Tt = 0. Compute golgi and determine Vs/Vr from figure Q (in inches) was determined when computing qi in step 2, but now it must be converted to the units in which V; is to be expressed —most likely, acre-feet or cubic feet. The most common conversion of Q to V, is expressed in acre-feet: V,. = 53.33Q(A1z,) [Eq. 6-11 where 5. From steps 3 and 4, compute q,,: qo = qi la°� [Eq. 6-31 qi 6. Proportion the outflow device so that the stage at q,, is equal to the stage corresponding to V5. If qo cannot be calibrated except in discrete steps (i.e., pipe sizes), repeat the procedure until the stages for qo and V, are approximately equal. Limitations Vr = runoff volume (acre-ft), Q = runoff (in), AR, = drainage area (mi,,), and • 53.33 = conversion factor from in-mi'- to acre-ft. 5. Use the results of steps 3 and 4 to compute V;: V5 = V, V` [Eq. 6-2] Vr� where VS = storage volume required (acre-ft). 6. The stage in the detention basin corresponding to VS must be equal to the stage used to generate q, In most situations a minor modification of the �! outflow device can be made. If the outflow device has been preselected, repeat the calculations with a modified qo value. Estimating qQ Use worksheet 6b to estimate qo, required peak outflow discharge, by the following procedure. I. Determine V,. If the maximum stage in the detention basin is constrained, set VS by the maximum permissible stage. 2. Compute Q (in inches) by the procedures in chapter.2, and convert it to the same units as VS (see step 4 in "Estimating VS"). 3. Compute V,/V, and determine golgi from figure 6-1. 4. Estimate qi by the procedures in chapters 4 or 5. Do not use peak discharges developed by any other method. When using the Tabular method to estimate qi for a subarea, use only the peak discharge associated with Tt = 0. This routing method is less accurate as the q,/qi ratio approaches the limits shown in figure 6.1. The curves in figure 6-1 depend on the relationship between available storage, outflow device, inflow volume, and shape of the inflow hydrograph. When storage volume (VS) required is small, the shape of the outflow hydrograph is sensitive to the rate of rise of the inflow hydrograph. Conversely, when VS is large, the inflow hydrograph shape has little effect on the outflow hydrograph. In such instances, the outflow hydrograph is controlled by the hydraulics of the outflow device and the procedure therefore yields consistent results. When the peak outflow discharge (qa) approaches the peak inflow discharge (Q, parameters that affect the rate of rise of a hydrograph, such as rainfall volume, curve number, and time of concentration, become especially significant - The procedure should not be used to perform final design if an error in storage of 25 .percent cannot be tolerated. Figure 6-1 is biased to prevent undersizing of outflow devices, but it may significantly overestimate the'required storage capacity. More detailed hydrograph development and routing will often pay for itself through reduced construction costs. (210-VI-TR-55, Second Ed., June 1986) 6-3 I ENGINEERING, INC 2592 Hope Mills Road Fayetteville, NC NC 28306 910426-2323 City of Wilmington - September_ 30, 1999 Post Office Box 1810 Wilmington, North Carolina 28402 Attention : Mr. David Mayes Reference: Infiltration Evaluation Park Avenue Project Wilmington, North Carolina Job No.: 3353-99 1 _ Dear Mr. Mayes rSoil Tech Engineering, Inc. has recently conducted an evaluation of the existing site conditions for the roadway development along the proposed Park Avenue ' project located north of Wallace Street in Wilmington, North Carolina. We conducted an investigation of the subsurface soils at the three designated ' locations indicated on the site sketch on September 29, 1999. The purpose of our evaluation was to determine the suitability of the in -place soils for the discharge of stormwater runoff. We investigated the subsurface soils to a depth of six feet below the existing ground surface. We also classified each subsurface strata encountered by depth and obtained representative soil samples at the three designated locations. Selected samples were tested in our laboratory for grain size structure in accordance with the American Society for Testing and Materials (ASTM) procedures entitled ASTM D-422; "Particle Size Analysis of Soils". Our sampling indicated the subsurface soils at the test locations to be stratas of 1 moderately drainable silty sands which are underlain by tan clayey sands at location #1, and relatively free draining sands at location #3. '' L 1 f] 1 1 Infiltration Evaluation Park Avenue Project Wilmington, North Carolina Page Two - We also conducted an evaluation of the subsurface infiltration at the three designated locations. The infiltration rate of the in -place soils were determined at a depth of approximately 36 inches below the existing ground surface at each location. The infiltration -rate was found to be 0.06 inches per minute at location #1 and 0.07 inches per minute at location #2, and 0.10 inches per minute at location #3, based on our analysis. We did not encounter groundwater at the locations investigated to a depth of 6 feet below the existing ground surface and in our opinion the seasonal high groundwater condition should be below the depths explored. Please find the results of -our field and laboratory tests and a sketch indicating the locations checked. Please contact us if you have questions. Yours truly, SOIL TECH ENGINEERING, INC. 7c1"i �D�O'V 7 Parks A. Downing, Jr. Manager AL J James Pate, P,E. PADjr:JPltm Enclosure cc: McKim & Creed Infiltration Evaluation Park Avenue Project Wilmington, North Carolina Job No,: 3353-99 Location #1 Location Depth Soil Description #1 0" - 6" Topsoil 6" - 18" Gray Silty Fine to Medium SAND 18" - 36" Tan Silty Fine to Medium SAND 36" - 72" Tan Clayey Fine to Medium SAND Groundwater, was not encountered at the depths investigated. Infiltration Rate : 0.06 inches per minute Test was conducted 36 inches below the existing ground surface. Location #2 Location Depth Soil Description #2 0" - 6" Topsoil 6" - 30" Gray Silty Fine to Medium SAND 30" - 72" Brown Silty Fine to Medium SAND Groundwater was not encountered at the depths investigated. Infiltration Rate : 0.07 inches per minute Test was conducted 36 inches below the existing ground surface. - Infiltration Evaluation Park Avenue Project Wilmington, North Carolina Page Two Location #3 - Location Depth Soil Description #3 0" - 6" Topsoil 6" - 36" Gray Silty Fine to Medium SAND 36" - 42" Tan Silty Fine to Medium SAND 42" - 72" Gray Fine to Medium SAND Groundwater was not encountered at the depths investigated. - Infiltration Rate : 0.10 inches per minute Test was conducted 36 inches below the existing ground surface. m lrli Grain Size Analysis Park Avenge Project Wilmington, North Carolina Job No.: 3353-99 Location #1 #2 #3 Depth 36" - 72" 30" - 72" 36" - 42" Sieve Size Percent Passing, By Weight #10 99.5 99.9 99.9 #40 78.2 70.3 78.5 #80 28.3 18.7 14.7 #200 19.5 11.8 8.7 Percent Moisture 13.9 % 16.4 % 10.2 % Soil Description Tan Brown Tan Clayey Silty Silty Fine to Fine to Fine to Medium Medium Medium SAND SAND ,SAND IHaden•Stanziale - _ MEMORANDUM 1 TO: Greg Hetzler FROM: Ryan Bouma Dan Weeks DATE: September 19, 1999 RE: Park Avenue Bio-Retention (Sent via fax) After reviewing Linda Lewis' comments, highlighted in the Bio-retention guidelines, with regard to plant I type plant count and plant spacing, we have a few concerns with applying the guidelines in the Park Avenue Bio-Retention areas. 1. The plant choices listed in the guidelines function well in Bio—Retention areas in Prince George's County Maryland. This portion of Maryland is in USDA Plant Hardiness zone 7 while Wilmington is in zone 9. Consequently there are plants, such as Wax Myrtle, that will work well in Wilmington that wouldn't be on an appropriate plant list for Maryland. 2. The narrow, linear nature of these Bio-Retention areas make it difficult to simultaneously focus plantings around the perimeter of the retention area and to create a random, natural feel to the ' planting design. We feel the random, naturalistic distribution is more important than perimeter planting for aesthetic reasons. Also the resulting tree canopy will better protect and shade the retention areas than would perimeter planting. 3. The utility lines, which run under the Bio-Retention areas, restrict the planting of trees. This makes it difficult to achieve the minimum plant counts without crowding plants into other portions of the bio retention areas. It would be possible to achieve the minimum plant counts in each bio retention area. However, to do this without impacting the utility connections we would not be able to meet the minimum plant spacing requirements. This would not result in the optimum conditions for plant growth and Bio-Retention function. At this point, we have used switch grass extensively as opposed to more shrubs. We believe grasses will function better than the a smaller herbaceous groundcover and shrubs because of their root systems. Switch grass spreads by rhizomes, underground roots that become new plants. The resulting network of roots is very appropriate for Bio Retention areas because of its ability to absorb water and its resistance to erosion. At maturity, each plant will be 4-7 feet in height and have a 30-inch spread. Rather than try to ' achieve a number of plants we aimed for an appropriate, Bio-Retention oriented spacing, 3 feet O.C. Please feel free to contact us with any comments or questions regarding these issues. CC: Dan Weeks , File. I Haden-Stanziale, P.A. Planners and Landscape Architects ' 31 1 North Second Street, Suite I Wilmington, NC 28401 Phone 910.25 1.3010 Fax 910.251 .770.4 1 1 1 1 E 1 1 G- . RS � 1 C V1 C cd Ln LA Figure 550-1. USDA Plant hardiness zones. Placement of Plantings: P}ant. saplings that will become large trees under electric utility right-of-ways necessi- tates major trimming of limbs that often results in misshapen trees with weakened defenses. Close study of cultural require- ments and mature size will eliminate many similar problems. Fitting the right plant to the right place includes using plant materi- als whose requirements for water, light and soil match the site conditions; placing plants that will be large when mature away from electric lines and other structures; and using hardy plant materials as discussed in Subsection 2.3, Hardiness, of this section. Diversity of Plant Communities: As chemical measures for fighting attacks of insects and disease become less effec- tive, designing to resist these attacks becomes crucial. Monocultures can provide a fertile breeding ground for these prob- lems. Designs that group large numbers of trees of the same cultivar or even from the same genera are highly -vulnerable to - attack. As Dutch Elm Disease has demon- strated, reliance on a single plant is also risky when that plant provides the back- bone of a design. It the plant is wiped out by disease, the landscape will take many years to repair. For these reasons, no single genus should be represented in an area by more than ten percent of the overall piant- ing scheme.. Variety within these genera is further encouraged to promote a diverse plant community that has a healthy resiliency to attack by insects or disease, especially in urban street tree applications. Disease and Insect Resistance: In conjunction with the recommendations above, it is important to study the condi- tions of the site and to select a cuitivar resistant to potential disease or insect prob- lems. For trees, use of reference materials such as those found at the end of this sec- tion or consultation with a reliable arborist will aid in selection. ZONE 6VG. MI - BELOW -5C 2 "a To -4Q 3 -4O7 TO •30- 4 -W TO .20- 9 20'To-ic- e -IO' TO P 7 0-TO to, e 147 TO 20' 9 _ 20-TO W- Io 30'TO 4p Proximity of Plants: The root systems of large trees can extend out horizontally several times the height of the tree. Many trees suffer disease due to proximity to heavily irrigated lawns. Plants should be grouped according to. their requirements for sun, water, and soil chem- istry. Some insects and diseases have devel- oped a life cycle that relies on several piants. The Cedar -apple Rust_ that -.attacks crabapples from junipers is one example. These plants should be kept,.separate to avoid outbreaks. Long -Term Maintenance Costs: Determining how much a client is willing to spend on long-term maintenance is very important for ensuring a good fit between site and design. No design is maintenance - free, but the plants used can be taiiored to fit the budget that will provide for their 1 Time -Saver Standards for Landscape Architecture STORMWATER DESIGN NARRATIVE AND SUPPORTING CALCULATIONS PARK AVENUE ROADWAY IMPROVEMENT WALLACE AVENUE to 5211D. STREET Wilmington, NC Prepared for: City o5Wilmington 138 North Front Street Wilmington, NC 28401 Project No. 08240�5.OW Prepared By: McKim & Creed Engineers 243 North Front Street Wilmington, NC 28401 (910)343-1048 April, 1999 STORMWATER E C E l V E AUG 111999 © E M PRo.i # PARK AVENUE ROADWAY IMPROVEMENT WALLACE AVENUE TO 52"D STREET Index 1. Narrative 2. BMP chapter 4 - Bioretention Areas 3. -Drainage Calculations Al thru A3 Curb Inlet Spacing A4 and A5 Curb Cut Design A6 Surface Area Runoff A7 and A8 = Swale Inlet Capacity/Grate Inlet Spacing A9 thru Al 1 Outlet Protection (New York DOT Dissipater Method) Al2 Water Quality Permit Runoff Determination A13 Bioretention Area Sizing A14 thru A17 HGL (SWIM Model Output) 4. Soil Test Reports 5. Site Plan 6. Typical Bioretention Plan View and Section Plan 7. Construction Plans PARK AVENUE ROADWAY IMPROVEMENT WALLACE AVENUE TO 52ND STREET NARRATIVE Project Location: The project is located in the existing Park Avenue right of way from Wallace Avenue to 52nd Street. Location is situated between Oleander Drive and Wrightsville Avenue being approximately .75 miles east of College Road. Project Description: Existing conditions of Park Avenue include .58 acres of unpaved pervious roadway north and .53 acres of unpaved impervious roadway to the south and .12 acres of impervious bike path. A ditch currently bisects the roadway down the length of Park Avenue zoning in a North and South are narrow and hazardous. The improvements associated with this project includes the paving, curbing, driveway connections, bike path improvements, utility relocations and stormwater improvements. The proposed improvements will have a total impervious area of approximately 2.06 acres an increase of .83 acres over the existing conditions. The total impervious area will be 32% for the project. Wetlands The Project has had a wetland delineation performed. The state has issued approval of a 401 Water Quality Certification for the improvements as proposed, WQC 401 project #980672. The wetlands on the site were located in narrow, 4 or 7 ft., width, along the ditch bottoms. A Nation Permit Application has been submitted to the US ACE office on January 28, 1999, by Steve Morrison, Land Management Group, Inc. Mean High Water Not applicable DENR Criteria: Our understanding and interpretation of DENR administration Code Section 15A NCAC 2H.1000 (December 1, 1995) is that the Park Avenue improvements falls under the other projects as classification in Section .1003 (3) B and C, which states; "Other projects: Development may also be permitted on a case -by -case basis is the project: C:NWNN'RProfiles%Administrator%DesktopTrojeds4PARKAVENUE ROADWAY IMPROVEMENT Narrative.doe (A) otherwise meets the provisions of this section and has water dependent structures, public roads, and public roads, and public bridges which minimize built -upon surfaces, divert stormwater from surface waters, divert stormwater from surface waters as much as possible and employ other Best Management practices to mini ize water quality impacts. The proposed Park Avenue improvements meets this the indicator stated in the other projects classifications. The groje� — e dent structure , it is a public road, the built -upon surfaces have been minimize and several (grassed swales and bio-retention) Best Management practices will be used to minimize water quality impacts. Even then the project built -upon has increased from 1,23 to 2.06 acres the project still qualifies o� as a redevelopmen# based on the equal or greater stormwater control statement_of the The project employs both grassed swales and bio-retention areas for 85% TSS stormwater treatment for runoff from station 10+00 (Wallace Avenue) to station 24+00. The remainder of the project from station 24+00 to the end of the project grassed swales are used. The existing condition of Park Avenue at very best only provides very marginal vegetated buffers and possibly some treatment in the existing ditch, but neither are of high quality or meet DENR standards and at best provide only 35% TSS removal. The improvements we propose will provide at the least this amount of TSS removal and the project as a whole provides much greater stormwater control. Section .1002 (14) defines "Redevelopment" means any rebuilding activity which has no net increase in built -upon area or which provides equal or greater stormwater control than the previous development (stormwater controls shall not be allowed where otherwise prohibited). V Our understanding of these section indicates that to be classified as a redevelopment project under the others section of the ruling, our project must meet one of the requirements as stated in the definition: 1. Equal or greater stormwater control than previous development or; restated, the stormwater management practices designed for our project must provide at the very least must provide the same amount of stormwater control as was provided before our project was developed. Proposed Stormwater Management Plan In order to comply with the DENR ruling we are proposing the following measures: From the beginning of our project (Sta. 10+00) to station 24+00 runoff is treated by bioretention areas that meet the design requirements listed in "Stormwater Best Management Practices" (November 1995) i.e. 15' wide, >40' long, and meeting the required area. All Swale lengths exceed 100' per acre D.A. (drainage areas into curb cuts are an acre or less - usually less). Soils and vegetation requirements have been met and information is provided on the attached planting plan and the soil test. Since bioretention areas have an 85% TSS removal, from station 10+00 to station 24+00 we are in full compliance DENR's requirements. This is irregardless of whether or not we use swales for TSS removal in this area. C:SWINNT4ProCJeslAdministretoed)asktopWrojeashPARK AVENUE ROADWAY IMPROVEMENT Nartative.d= Chapter 4 Bioretention Areas 1.. Introduction It is understood that many development projects present a challenge to the designer of conventional stormwater BMPs, such as wet detention ponds, because of physical constraints, such as layout of the site and topographical relief of the site. Many of these siting problems of wet detention ponds can be overcome if the issue of stormwater quality treatment is addressed at the very first stages of development planning. For those sites where these significant spatial limitations cannot be overcome, one or a combination of the following BMPs can provide the water quality benefit that is required. Sand filters and bioretention areas, are intended to address the spatial constraints that can be found in intensely developed urban areas where the drainage area are highly impervious. Both can be used on Small, urban sites that would not normally support the hydrology of a wet detention pond and where the soils would not support an infiltration device. They are filtration systems vdth.the bioremntion areas providing some nutrient uptake and groundwater recharge. The following are guidelines for the siting, construction, and maintenance of these stormwater BMPs. The design procedum described here is based on a manual published by the Prince George's County, Maryland (Design Manual for Use of Bioretent = in St water hjuagm= for Prince George's County, Maryland) Text and graphics are used from this manual with their permission. If further guidance is needed for this BMP, these are limited supplies of this manual available from the Division of Environmental Management., Water Quality Section. Bioretention is a water duality practice developed by the Prince Gorge's County, Maryland, Department of Environmental Resources using plants and soils for removal of pollutants from suxrnwater runoff. Bioretention employs various physical and biolod al processes in the water quality treatment of runoff. These processes include adsorption, filtration, volatilization, ion exchange, and decomposition. Biological systems have been widely used in retention and transformation of nutrients found in agricultural and sewage treatment waste. Bioretention was developed to have a wide range of applications for various considerations which include: • Site conditions, • land uses, • soil types, • stormwater pollutants, and • wet or dry conditions. Numerous Studies have documented. the pollutant loadinglwater quality impacts of development These SWdies have shown that the amount of pollutant runoff, in the form of sediment, nutrients (primarily nitrogen and phosphorus), oil and grease, and trace metals, increases substantially following the development of a site. Pollutant loadings are concentrated in the "first flush" of runoff from impervious areas. Bioretention areas are an off-line system used in the treatment of the "first flush." Pollutant removal is performed through physical and biological treatment processes occurring in the plant and soil complex including transpiration, evaporation, storage, and nutrient uptake.. 32 There are many potential side benefits to the use of plant based BMPs other than water quality treatment Planting system , if sited properly, can improve the landscape value of the site, provide shade and wind - breaks, and absorb noise. I The purpose of this chapter is to provide guidelines for the creation of biare=tion areas within the design of stcnmwater management practices for development sites. Presented in the next section are the overall bior=nhoa area layout and explanation of the functions of the components of bioretention systems. Schematic illustrations are given for several types of biomtention practices for use in green space areas of sites. Guidelines for site grading and planting plans are presented in Sections M and IV, respectively. Soil and organic layer considerations are discussed in Section V. Main�-e requirezaents for bioretention areas are discussed in Section VI. Section VII presents the methodology for computing the level of pollutant reduction which may be achieved as a result of implementation of bioretention practices at a site. II. The Bioretention Concept A conceptual illustration for the bioretention water quality control practice is presented in Figure 7. The bioretention area design provides infiltration and water storage for uptake by vegetation. Figure 7. shows the sheet flow runoff from an impervious surface (such as a parking lot) discharge into the bioretention area through a grass buffer strip. The nmoff is then infiltrated into a planting media_ Once the infiltration capacity of the planting soil is exceeded, stormwater is discharged at the surface of the planting soil. The surface of the planting soil is depressed to allow for some ponding of the runofE The runoff is infiltrated through a surface organic layer of mulch and/or a ground cover to the planting soil. The runoff is scared in the planting -sail where it is discharged over a period of days to the in -situ material underlying the bioretendon area or through an underdrain. It is important to emphasize that whenever possible, bioretention areas should be designed as an off-line treatment system. As shown in the figure, runoff from precipitation provides the major source of the waxer to be used for bioretention. Water exits the bioretention area by infiltration or evapotranspiration_ Excess runoff that Cannot be infiltrated or ponded or lost through evapotranspiration is diverted away from the bioretention area. The diversion of excess runoff is accomplished by grading the bioretention area such that the ponded surface elevation is equivalent to the elevation at which runoff is discharging into the bioretention area A. Functions of the Bioretention Area Components The bioreteation area components have been combined to have complementary roles or functions to improve water quality. The six major components of the bioretention area are: • Grass buffer strip, • Ponding area, • Planting soil, • Sand bed, • Organic layer, and • Plant material. 33 amass buffer strip is located between the impervious surface and the bioretention area. It functions to reduces the runoff velocity and filter particulates from the runoff, Prior to di&Chargng to the bioretention area The sand bed is located at the bottom of the bioretention area It provides for drainage and aeration of the planting soil, and augments the ah ity of the bioretention area to drain the runoff it receives. The sand bed that is shown on the following drawings to be located at the side of the bioretention area where runoff is received is meant to slow the velocity and spread out the runoff over the bioretention area This vertical sand layer is no longer being required by Prince George's County, and is not required nor encouraged for use in North Carolina Originally this vertical sand bed was thought to provide aeration for the roots, but with the introduction of an underdrain it also allowed for shorting circuiting of the EN2. '. T. The ponding area over the root zone provides for some surface storage of the storm water runoff, and provides for the evaporation of a portion of the runoff. Settling of the particulates that have not been filtered by the grass buffer or the sand bed occurs in the ponding area The organic layer provides a medium for biological growth and decomposition of organic material. The organic or mulch layer on the surface of the soil has several physical and biological functions. The surface layer acts as a filter for pollutants in the nmoff and protects the soil, from drying and eroding and simul ates the leaf litter in a forest community. The organic or mulch layer provides an environment for microorganisms to degrade petroleum -based solvents and other pollutants. The planting soil is the region which provides tie source of water and nutrients for file plants to sustain growth. The voids in the soil also provide for stormwater storage. Clay particles that compose a portion of the soil adsorb heavy metals, nutrients, hydrocarbons, and other pollutants. Plant Material The role of plant species in the bioretention concept is to use nutrients and other pollutants and to remove water through evapotranspiration. A forest community structure is replicated to avoid monoculture susceptibility to insect and disease infestation and to create a microclimate which is resistant to the stresses to which landscaped areas in urban areas are subjected, including heat and drying winds. KV Flgure 7, Bioreteation Area Conceptual Layout, From Prince George's Co. Design Njanlual for Us, of Bloretention In Stormwater Management, 1993 VLPO-ir.ANSPiRAlCN 111 I 2lCRE7N10N s4 T`7 j! FNLF; ' _ • '� � ..war �c rw ••� _ .. _ _ _3cr�M�7�� a+aeil -A `URr 0RASS i PONOINC AREA INFILTRATION PA ?ENT J G'•. TURF GRASS -=--- PLANTING SOIL I GROUNC COVE T T T S.ANO HD IN-STU MATERIAL `T T T INFlLMAiION I i 35 g. Minimum Design Size Requirements The following dimensions are recommended for bioretention areas regardless of the drainage area size: Minimum width of a functional bioretention area should be 15 feet. A width of 25 feet is preferable. • Minimum lenath should be 40 feet_ For widths equal or pester than ?A feet, the length of the + The 22nded area should have a maximum dqpt4 of 5 inches. • The planting soil should have a minimum depth of 4 feet. The minimum width criterion of 15 feet is especially important in replicating tree and shrub distribution patterns which exist in a forest community. This minimum width will permit the spacing of trees and shrubs in a random fashion that replicates the density and distribution of plants in a natural forest. It also assists in creating a micxoclimate which can offset the effects of urban messes, resulting from pollutants in stormwater runoff, insect and disease infestation. solar radiation, and wind. The criterion of designing the length of bioretention area to be twice the width was established for the following reasons: to allow sbeet flow to be dispersed over a greater distance, reducing the likelihood of concentrated flow, and to maximize the edge-to-intemor area ratio. The ponding depth of 5 inches was established to provide for adequate surface storage of water so that water would not pond for a period in excess of four days. A ponding time in excess of four days would Severely limit the potential plant species for bioretention areas. In addition, a drawdown of water in four days limits the potential of ponded water to bred mosquitoes and other undesirable insects. The minimum planting soil depth guideline was established based on horticultural and construction considerations. The minimum planting sail depth of four feet was'set to provide appropriate moisture capacity, and to create space for the root system of the plants to provide for resistance from windthrow. The construction of the bioretention area requires the excavation of a trench or pit For most soils, trench depths greater than four feet would require shoring measures. C. Bioretention Area Types Conceptual illustrations of various types of biorttenfion areas are presented in Figures 8 through 11. It should be noted that the layout of the bioretention area will vary according to individual sites, and to specific site constraints such as underlying soils, existing vegetation, drainage, location of utilities, sight distances for traffic, and aesthetics. ' The bioretention area featured in Figure 8, to be located adjacent to a parking area without a curb, has the lowest construction cost, since there is no curbing, and the drainage is sheet flow. In a paved area with no curb, pre -cast car stops can be installed along the pavement perimeter to protect the bioretention area A bioretention area suitable for traffic areas is shown in Figure 9. Mr- water is diverted into the bioretention area through the use of an inlet deflector block, which has ridges that help channel the runoff into the bioretention area The gutter, and diversion block should meet the guidelines set forth in the relevant local permitting authority. A concept for a bioreiention traffic island is presented in Figure 10. As shown in the illustration, the minimum recommended width of the traffic island is 20 feet fivm top of curb to top of curb. When grading' a bioretention area in traffic island, a two -foot buffer should be maintained between the curb and the bioretention area_ Ttae two foot buffer will min;mize the possibility of drainage seeping under the pavement section, and c rtating " rosst heave" during winter months. A bioretention area suitable for imctallation along a Swale is shown in Figure 11. A berm 1 foot in height separates the swale from the biormnuon area. To maintain an off-line system, the biorexenuon area should be such that the overflow from the bioretention area discharges into the swale, It is_reco_mmended that the bioretention area invert be a maximum of one-half foot below the swale invert to.pmvide for the 2IMpriate depth of ponded waxer. — - 37 S. Parking Edge and Perimeter Without Curb, From Prince George's Co.1993. A LIMIT 70r"' Or 0I5 VEGEiA :-D BERM 1 GRADING LIMIi ! _ 1 1JIN, - t 40' ?SIN. � .x� � aIOREi=NTION •AREA LIMI i - - -GRASS EXISi1NG EDGE _ — * OF PAVEMEN i Ss�EE i FL W GROUND COVER OR MULCH LAYER A 1 P AN VE - ( T TO SCA1c 1 M.Ax. NOED Y �• GROUND.. COVER OP. `.1 WA r - QEPTr? 'tl MULCH LAYr- SHrr.._ 1 FLOW LAYER M i !Mi i _ p>-I' /-PLANSING SOIL J PA�MtI\ ___ _111 - - 1 �i �: 1 M X. TYPICAL) _-_ l' MIN. SAND BED (TYPICAL) J `-- IN—SiiU MATERIAL �--- SIORETtNIION AREA ure 9. Parking Edge and Perimeter With Curb, From Prince George's Co. 1993 0 SIOREi N70N AREA LIMIT Gress Swele — LIMIT F / DIStiR :.rvCE �- \ MIN. - _ 'Sand Bed. - A' Curb Inlet Deileclors Pavemer %: - wi,I) Curb C'pening FLOW iSee A��endix .) FL c (NOT T SCAB) \PON i CUPS OPENING PROPOSED � - �� PROPOSE E GRADE i MAX. PLA LNG —� 4' MIN. GRADE INLET DEFLECTOR .s: 5 L � 1 AND BED �-- BIOPE EEN7i DN AREA —�-j SECTION A -A' (NOT TO SCALE) 39 all IFigure 11. Bloretemdon Swale, From prince Gtorge's Co. 1993 -FLAN VIEW -.dlr:z '(NOT TO SCALE) 3: 1 MAX. (Ty-p-) —MAX- PONDER WA —1--R DEPTH (5 INCHES) XT - -pc- Grade BIORETE-N 110N AREA SECTION A -A' (NOT TO SCALE) 41 III. Grading Plan A. Locating the Bioretention Area Stormwater Management Concept Plan The first step in locating a bioretention area for a site is creating a stor nwater management concept plan. The purpose of the stormwater concept plan is to ensure the implementation of proper site management quality control practices during the early planning stages of the site development process. The information needed to develop the concept plan includes: existing and proposed drainage areas, soils, vegetation, and hydrographic features such as streams, floodplains, and wetlands. In North Carolina, bioretention areas will be limited to drainage areas less than 5 acres in size: However; in many cases the application of bioretenion areas will be limited because of erosive velocities to 0.25 to 1 acre. The limiting factor in the drainage area size is the amount of sheet flow runoff for the 10-year storm. Generally, commercial, industrial, or residential drainage areas exceeding 1 acre in size will have sheet flow greater than the 5 cfs. When sheet flow exceeds this level, the designer should investigate the potential erosion to vegetated areas. 2. Location Guidelines = Preferable locations for bioretention areas include: • areas upland from inlets or outfalls that receive sheet flow from graded areas, and • areas of the site that will be excavated or cut. The following locations would be undesirable for bioretention: • areas that have a water table within 6 feet of the land surface, areas that have mature trees which would be removed for construction of the bioretention area, areas that have existing slopes of 20% or greater, and areas in close proximity to an unstable soil stratum. When available, areas of loamy sand soils should be used for siting the bioretention areas. - These soft types comprise the planting soils for bioretention areas, and locating bioretention areas in these soils would eliminate the cost of importation of planting soil. (See soil and organic specifications in Section V_) B. Sizing Guidelines The first step in developing the grading plan is determining the size of the bioretention area The drainage area contributing to each bioretention area should be delineated for the site. The Rational Method "c" coefficient should then be determined for the drainage area using the methodology described in the North Carolina Erosion and Sediment Control Manual, Appendix 8.03. The size of the bioretention area should be 5% to 7% of the drainage area multiplied by the Rational "c" coefficient If the bioretention area is constructed according to the concept, that is, including a sand bed, then the size of the bioretention area should be 5976 of the drainage area multiplied by the Rational "c" coefficient. If the use of a sand is not considered appropriate at a particular site, then the size of the bioretention area should be 7% of the drainage area multiplied by the Rational "c" coefficient- The sizing rule is based on the bioretention area infila-sting precipitation events of 0.5 to 0.7 inches occurring over a six -hour time period. The precipitation amount and duration ca m:sponds to the median storm event for most of North Carolina (USEPA, 1985)_ A description of the methodology used to determine the amount of runoff infiltrated into the bioretention area is contained in Section VIM, Water Balance Computations. A sample computation of the size of a bioretention area is presented in Figure 12. The figure includes a map of the drainage area that would drain to the sample bioretention area 43 Figure 12. Sung of a Bioretention Area, From Prince George's Co, 1993 �S / f'.. INL::I N _ _1,. BIOME I =JAI n .r L O�. TIO�v' � PQve'-.en; DRAl�At,- .:1 Arec 2 \ 0 SO 50 +20 _ 4 L SCALE: 1" — 60' � — PLAN VfEW ID?E_T'NT1pN APEA SING �D�PU � A�0� AREA 'C'. 10?M'N7 (SO - ACTO? C x AF_A AVEMEN7 23.500 0.F0 21.400 GRASS 10,10D . 0.25 2.500 707A1 S -3,000 23,20O ?SORT-1-N 71ON fir= A Sf=r 1- W 7H SAND BED (57. SUM OF C x AREA) .05 x 2-.900 _ 1.195 OR 'SAY 1 200 SD FT. 2_ WiTHOUT SAND BED (77..SUM OF C x AREA) _ .07 x 23,900 + 1,673 OR SAY 1,700 SO Ti. -SEE CH.AP iE-R Iv, PRINC4 GEORGES COUNTY STORMWA-17R MANAGEMENT MANUAL r 44 C- Drainage Considerations The runoff entering the bioretention areas will be in the form of sheer flow. 'There are two major drainage considerations in the design of bioreteation areas: • the diversion of the' firs[ Busk" of runoff into the bioretention area, and • the potential erosion of the surface of the bioretention area by the sheet flow. The diversion of the "first flush" can be accomplished by having sheet flow drain directly into the bioretention area as shown in Figure 8, or through curb openings as shown in Figure 9. The curb openings should have a width of 3 feet, which allows for the first one inch of runoff to be insercepted, but diverts . larger flows around the bioretenfion area, maintaining an oIT-line system--lbe hyFraulic ysis was developed using HEC-12, Drainage of Highway Pavements (U.S. D.O.T., 1994) using a drainage area of one acre and having a commercial land use (runoff coefficient of 0.8). 7be.h drau3ic H2aciry is also based on a diversion block in front of the curb openi2g. Multiple curb o sin should be considered for longitudinal slopes great$ than 7%. . The potential erosion created by the sheet flow is a major concern in the design of the bioretention areas. _ Planted ground cover can wid=and a higher sheet flow velocity than mulch It is recommended that the maximum inflow sheet flow velocity for Planted around cover be 3 feet seco and the maYimunl inflow velocity for mulched areas be less than l ft/sec. Hydraulic analysis indicates that the outflow velocity from a 3-foot curb cut draining a 1-acre commercial tract is'0.5 ft/sec, and would be non -erosive to either type of cover. Where bioretention areas drain sheet flow from asphalt pavement, velocities can exceed 3 ft/sec for: 100-foot lengths of asphalt pavement of slope exceeding 20%. 200-foot lengths of asphalt pavement of slope exceeding 5 %. The sheet flow computations reflect laminar flow conditions. Flow in a paved or graded area varies with the incongruities found in the surface, and will have a tendency to concentrate in the depressions. The velocity of the concentrated flow would be higher than the laminar sheet flow velocity, and may have the potential to erode the vegetation. D.. Grading Plan Guidelines The goal of the grading scheme is for the first flush of runoff to be diverted into the bioretemdon areas, and for larger flows to drain to the existing storm sewer system. The bypass of the larger storm volumes allows for the retention of the first flush of runoff which has the highest concentration of pollutants. A sample grading plan and elevation detail for a bioretention area is shown in Figure 13. The grading plan was created for a double -cell bioretention area There is a seven -foot buffer between cells which allow for the planting of upland trees. As indicated in the grading plan, sl a and gutter flow is diverted into the bioretention areas through openings in the curb. Inlet defle= blocks are located in front of tize curb openings to channel the flow into the bioretention area. The elevation of the invert of the bioretention area is set by the curb opening elev ation. The curb opening elevation is 05 ft. higher than the invert of the bioretention area, so water is allowed to pond to a maximum depth of one-half foot before runoff bypasses the bioretention area and flows into the storm drain system. 45 Figure 13. Sample Grading PU , From Prince George's Co. 1993 _ inicC Dc6cc:orx ,_ with C.Ixn �enclg� Ws• Deficctor with C�rC �jenits hr;L/y67 1•�,;;:;;` l Owl �j %L i TN �' \ J' •y�•� NO. i�HCE . SCAL:: i- R -PLAN VIEW • .. r I ' i aoa� H;ArI ax1. c7cstiNcarHa ��--4c • w.x ra+awc DE PT. ,AYy04T � ---------- _ 2' n c - f a/•DE I GLEE ut=. aFiL'^Gt.' 1 )AA.X pLyx7Y+C A• Sok .. SE- i- N A -A' (H07 TC "- ") Where space constraints allow, runoff to the bioretention areas should be filtered by a grass buffer strip and sand bed, as shown in Figure 7, The buffer snip and the sand bed will reduce the amount of fine material entering the bi=.Mrition area, and minimize the potential fcc clogging of the planting soil. The sand bed also increases the infiltration capacity and acts as a level spreader to evenly distribute flow within the bioretention area. It is necessary to sequence the installation of sediment and erosion controls to minimize the contamination of tine planting soil with silts and floes. Sediment controls are installed around the area to be disturbed before grading, and around the biormention area before the excavation of the trench or pit for the planting soil. Sands and fines will have a tendency to clog the planting soil, and impair the functions of the bioretention area_ IV. Planting Ptah �---- �T r pt. mY.►-r �,s.�" . The planting plan considerations include site planning and aesthetic considerations for designing the bioretention plant community. Tables listing suitable species of trees, shrubs, and ground cover are provided -at the end of this section. A. Planting Plan Concept The use of plant material in bioretention areas is modeled from the properties of a terrestrial forest community -ecosystem. The terrestrial forest community ecosystem is an upland community dominated by trees, typically with a mat= canopy, having a distinct sub -canopy of understory trees, a shrub layer, and herbaceous layer. In addition, the terrestrial fc= ecosystem typically has a well -developed soil horizon with an organic layer and a mesic moisture regime. A terrestrial forest community model for sto mwater management was selected based upon a forest's documented ability to cycii4nd assimilate: nutrients, pollutants, and metals through the interactions among plants, soil, and the organic layer. Key elements of the terrestrial forest ecosystem that have been incorporated into bioretention design include species diversity, density, and morpbology, and use of native plant species. Species diversity protects the system against collapse from insect and disease infestations and other urban stresses such as temperature and exposure. Typically, native plants demonstrate a greater ability of adapting and tolerating physical, climatic, and biological strL—_ S ( Metropolitan Washington Council of Governments, 1992). B. Plant Species Selection ww' $s►TT4,c Aec> Plant species appropriate for use in bioretention areas are presented in Table IV.1, provided at the end of this section. These species have been selected based on their ability to tolerate urban stresses such as pollutants, variable soil moisture and ponding fluctuations. .Important design considerations such as form, size, and type of root system are also included A key factor in determining the suitability of a species is its ability to tolerate the soil moisture regime and ponding fluctuations associated with bioretention. The plant indicator status (Reed, 1988) of listed species are predominantly facultative (:Le., they are adapted to stresses associated with both wet and dry conditions); however, facultative upland and wetland species have also been included. This is important because plants in bioretention MrM will be exposed to varying levels of soil moisture and ponding throughout the year, ranging from high levels in the spring to potential drought conditions in the summer. All of the species listed in Table W. 1 are commonly found growing in the Piedmont or Coastal Plain regions of North Carolina as either native or ornamental species. 47 Designers considering species other than ones listed in Table 1V-2 should consult the following reference material on plant habitat requirements, and consider site conditions to ensure that alternative plant material will survive: Hightshoe, G.L., 1988. Native Trees, Shrubs and Vines for Urban and Rural America, Van Nostrand Reinhold, New York, New York. • Reed, P.BJr., 1988. National List of Species That Occur in Wetlands: Northeast. United States Fish and Wildlife Service, St. Petersburg, Florida. Reasons for exclusion of certain plants from biommtion areas include inability to meet the criteria outlined in Table IV.2 (pollutant and metals tolerance, soil moisture and ponding fluctuations, morphology, etc.) In addition, species that are considered invasive, or otherwise not recommended, should not be specified. C. Site and Ecological Considerations Each site is unique and may contain factors that should be considered before selecting plant species. An example plant material checklist is provided in Section X. The checklist has been developed to assist the designer in identifying critical factors about a site that may affect both the plant material layout and the species selection. Selection of plant species should be based on site conditions and ecological factors. Site considerations include microclimate (light, temperature, wind), the importance of aesthetics, overall site development layout, and the extent of maintenance requirements. Exposure to wind and light will affect the candidate species. These factors combined with the potential sitings of any structures will also need to be considered. Of particular concem is the increase in reflection of solar radiation from buildings upon bioremn6=2reas. Aesthetics can be important in development projects that have high visibility. Species that require replar maintenance (shed fruit or are prone to storm damage) should be restricted to limited visibility and — pedestrian and vehicular traffic. ' Species selection should consider interactions with adjacent plant communities. Nearby existing vegetated areas dominated by non-native invasive species pose a threat to adjacent bioretention areas. Adjacent plant communities should be evaluated for compatibility with any proposed bioretention area species. Invasive species typically develop into monocultures by out competing other species. Mechanisms to avoid encroachment of undesirable species include providing a soil breach between the invasive community for those species that spread through rhizomes and providing annual removal of seedlings from wind borne seed dispersal. It is equally important to -determine if there are existing disease or insect infestation associated with existing species on site or in the general area that may effect the bioretention plantings. D. Number of Species OR----E �.TTHr�p ?_p+hT'gq 'RL_�A A minimum of three species of trees and three species of shrubs should be selected to insure diversity. Ir addition to reducing the potential for monoculture mortality concerns, a diversity of trees and shrubs with differing rates of transpiration may ensure a more constant rate of evapotranspiration and nutrient and pollutant uptake throughout the growing season. Herbaceous ground covers are im ortant to prevent erosion of the mulch and the soil layers Suitable herbaceous ground covers are identified in Table IV.3 C. 48 u u u C G u z gr= a o a 0 0 0 0 0 0 0 0 0 a _ {yam a o D � vl � �' Yt O •rt F'1 ri'j �p � O � 10 sa to L c A Y 'fl z va > v, > rn a a cr tn cn c h t-3 z � x �. T=i ❑ U ° a ❑ rig — — "' � � �.. ..� .a � .� pW 'E3 N N N N N N N N N N N N N N v L5 V V U •Y p r •r�• CU r 'L1 •r V �C .� 'c '�' � �C ti Y •U .� may" F . U U U U U U U U U U Y • b yg .� C r n 4 Z •L ° ; L iL`i� V LO v O pp � Y :3QZ •q3 16 � w Y.54 :z a� � / ƒ / ƒ COO \ \ \ 5 ¥ C. a ©00 Go 7 1 k§k§ — % t § /2/] § m � 4 2 � 3 § ƒ \. k ƒ § t t » ± Y u u c u O,J a o a 0 a 0 3C4a 0 Y a o it q- o o o a o 0 0 En coo Lr En 'n wl O O O Cl? CIP aua 0 u u a4n V� Orr K C v� C cn L ci C v� L v� ri tip C [n L a Ci] _ V1 L ex W C.: U Y�I o Cc�. —. � r UU+ � G° U U Y a M �i U U + u 'r 'm �" ! .".. r C .: is �. emu+ �G �U+ 6. '� %� r'Ti ��+ �• .�.'�' ,'�` H � � � h I.�. Gam'., � iaz,. � ❑Q.. Lis. � w uE. � LE � a � v � a ~ yq V �G � pypypy O U .0 L' b yy 4 t7 S C •� '� U C a C u i U�v� tn I mat :a ��� �u+4 ra - � �����f f72 t : G \ -c_ £ G A r 2 / / 2 g n • = Q N\ N tN "r eja k kk k ii2 §fi= I{i _7 � § } ) s 2 « L u u z z z z v 0 $ P ° E ° e °2 ° ° 2 ° E ° ° e ° e ° o"' G: rn L rn i= En En t, cn cn en v) L �n LE rn � r � D Q7 cz G- L7 O D u`�D r o� 0 �. u0 E p- z 0 u •v G C 7 en Vj In to O 9 in F] r O .s � � u as � Pn O y •� •� L�1]. ."V' C � � •��+ •ram CC� �Yr+ rrN�� CC u ts o .0 .00."IC.4. E. Number and Size of Plants --- - SSE 'Pttr�-N-r rl4 The number of tree and shrub plantings may vary, especially in areas where aesthetics and visibility are' vital to site development, and should be determined on an individual site basis. On average, 1000 trees and shrubs should be planted per acre. For example, a bioretention area measuring 15' x 40' would contain a combination of trees and shrubs totaling 14 individuals. The recommended minimum and maximum number of individuals and spacing are given in Table TVA Two to three shrubs should be specified for each tree (2:1 to 3:1 ratio of shrubs to trees). Table IVA Recommended Tree and Shrub Spacing Tree Spacing (feet) Shrub Spacing (feet Total Density (stems/acre Maximum 19 12 400 Average 12 8 1000 Miiiimum 11 7 1250 At installation, trees should be 2.5 inches in caliper, and shrubs 3 to 4 feet in height or 18 to 24 inches in spread. Ground cover may be as seed or, preferably, plugs. The relatively mature size requirements for trees and shrubs are important to ensure that the installation of plants are readily contributing to the bioretention process (i.e., evapotranspiration, pollutant uptake). F. Plant Material Layout .w�— Sg;E. �:' : �t�t t a �t At►�T l..1 C %�+�¢,�1 The layout of plant material can be a flexible process; however, the designer should follow some basic guidelines. As discussed above, the designer should first review the Plant Checklist, Section X. The checklist table can help expose any constraints that may limit the use of a particular species and/or where a species can be installed. There are two guidelines that should apply to all bioretention areas. First, woody plant material should not be placed within the immediate areas of where flow will be entering the bioretention area. Besides possibly concentrating flows, trees and shrubs can be damaged as a result of the flow. Secondly, it is recommended that trees be planted primarily on the perimeter of bioretention areas, to maximize the shading and sheltering of bioretention areas and to create a microclimate which will limit the extreme exposure from summer solar radiation and winter freerss and winds. An example planting plan is shown in Figure 14. Often designers will find that the environmental factors such as wind and temperature vary not only on site but also between bioretention areas. As a result, the designer may need to consider the placement of each plant. An example would be to consider placing evergreen treys or other wind tolerant species on the northern end of a bioretention area, against cold winter winds. The final plant material layout should resemble a random and natural placement of plants rather than a standard landscaped approach with trees and shrubs in rows or other orderly fashion. The most important goal dictating each consideration is to provide optimal conditions for plant establishment and growth. The idea of presenting bioretention areas as landscaped areas should not be the main focus of a bioretention design; however, the goals of the bioretention system can be achieved without sacrificing aesthetics. k - 49 Figure 14. Sample Planting Plan, From Prince George's Ca, 1993 1 ME- � T C^ r'.,._ - Carp Coenines (;ri,j 11. nat- y / ' x . V. I 'r L.&A-1 C\ 3 I.V. L !� II .3, C.k. 1FA _ 1 FA-, 0 15 �a I PLANTING PLAN LEGEND HERBACEOUS COVER- SAND BED TREE SHRUB TREE SHRUB 5"M 8nT „Zi�,CNTirtC NAME COMMON NAMSte_ OI sciEwnr-ig 1J41.{c COMMON NAW F.A. Frezinus emericnnc white asn C.a {Icthre clnitalic sweet pepperousn N.S. Nyssc syiwcticc black corn !-!.V. ^crnCmelis Arpinir-c witC.'1 hCZ7! O.P. Cuercus palustris pin oak I.V. Ile% verticllatC winter]erry ? O.R. Ouercus rubre red ock L.R. Lsnderc benzoin .�ieebus; V.D. Viburnum den;eturn crrawwood V.L Viburnum len:ego ncnm perry V. Soil, Mulch, and Plant Material Guidelines A. Planting Soil Guidelines The characteristics of the soil play an important role in the improvement of water quality through the use of bioretention systems. The soil is a three-phase system composed of gas, liquid, and solid, each of which in the proper balance is essential to the pollutant removal achieved through bioretention. The soil anchors the plants and provides nutrients and moil= for plant growth Microorganisms inhabit and proliferate within the soil solution, and the unsaturated pore space provides plant roots with the oxygen necessary for metabolism and growth. A desirable planting soil for bioretcntion must be permeable to allow infiltration of runoff and provide adsorption of organic nitrogen and phosphorus. The recommended planting soil for bioretention would have the following properties:: Soft Texture and Structure �.t�a� Y��r�t�t'c� pw.a S��br►Y►STS� It is recommended that the planting soils for biorewntion have a sandy loam, loamy sand, or loam texture. Suitable planting soils for bioretention areas are indicated on the soil triangle in Figure 15. These soils have a clay content ranging from 10 to 25 %. Water balance computations in Section V M indicate that soils with infiltration rates greater than 05 in/hr are suitable for bioretention. Sandy loam, loamy sand, and loam soils have minimum infiltration rates ranging from 0.52 to 2AI in/hr. Otber types of loamy soils such as silt loams, and sandy clay 1 oams have infiltration rates of 0.27 in/hr or lower and are not suitable for bioretention_ 2. Soil Acidity �in a bioretention scbeme, the desired soil pH would lie between 55 and 6.5 (Tisdale and Nelson, 1975). -The soil acidity affects the ability of the soil to adsorb and deorb -nutrients, and also affects the microbiological activity in the soil. 3. Sail Testing The planting sail for bioretention areas must be tested prior to Installation for pH, organic m .er, and other chemical constituents. The soil should meet the following criteria (Landscape Contractors Association, 1986): pH age: 5.5 - 6.5 ; Organic matte 15 - 3.0% Magnesium (Mg): 35 lbsJacre Phosphorus (P20s): 100 lbsJacm Potassium (K20): 85 IbsJacre Soluble salts: not to exceed 500 ppm It is recommended that one test for magnesium, phosphorus, potassium, and soluble salts be performed per borrow source or for every 500 cubic yards of soft material. It is recommended that a sieve analysis, pH, and organic matter test be performed per bioretention area 51 Figure 15. Soll Triangle of the Basic Textural Gasses, From Prince George's Co, 1993 USDA. TEXTURAL t r IANGLE 100% cloy 90 ;0 d0 -0 70 Ciay �0 Silt -50 cicv Y �c G 40 Scnd,v 60 cloy Silty. Ciay clay -0 Scnd\/cicy lacm loam 70 J loanV /\ 20 r^aflr�~ V 80 10 \/Sty 90 rncai loam Silt Sand 90 —so — 70 60 50 40 30 20 10 100% sand 100% silt Percent sand SL117ABL.E PL *MNG SOIL FOR BIOREI =NMON 52 4. Soil Placement Placement of the planting soil in the bioretention area should be in lifts of 18 inches or less and lightly compacted Minimal compaction effort can be applied to the soil by tamping with a bucket from a dozer or a backhoe. Sample specifications relating to the planting soil are contained in Section )X. . B. Mulch Layer Guidelines w - - +F �cr rAC-+Asti+ 'P-r-"T)'-�" Rai The mulch layer plays an important role in the overall bioretention design. This layer serves to prevent erosion and to prourt the soil from excessive drying. Soil biota existing within the organic and soil layer are important in the filtering of nutrients and pollutants and assisting in maintaining soil fertility. Bioretention areas can be designed either with or without a mulch layer. If a dense herbaceous layer or oundcover (70 to 80% covqaga is proyia mule layer is not necessary Areas should be mulched once trees and drubs have been planted. Any ground cover specked as plugs may be installed once mulch has been applied. The mulch layer recommended for bioretention may consist of either a standard landscape fine shredded hardwood mulch or shredded hardwood chips. Boot types of mulch are commercially available and provide some protection from evasion. The mulch should be aged(stockpiled) for a minimum of six months before being applied to bioretention areas. However, an optimal age for mulch is twelve months. Mulch should be free of weed seeds, soil, roots, or any other substance not cousisting ofeither bole or branch wood and bark. Tire mulch should be uniformly applied approximately 2 to 3 inches in depth. Mulch applied any deeper than three inches reduces proper oxygen and carbon dioxide cycling between the soil and the atmosphere. Grass clippings are unsuitable for mulch, primarily due to the excessive quantities of nitrogen stared in the material. Adding large sources of nitrogen would limit the capability of bioretention areas to filter the nitrogen associated with runoff. C. Plant Material Guidelines 1. Plant Material Source The plant material should conform to the current issue of the American Standard far NurseryStock published by the American Association of Nurserymm Plant material should be selected from certified nurseries that have been insl by state or federal agencies. The botanical (scientific) name of time plant species should be in accordance with a standard nomenclature spume such as Qray's Manual of Botany (Fernald, 1950). Some of the plant species listed in Table IV. 1, (Recommended Plant Spedes For Use in Bioretention) may be unavailable from standard nursery sources. Designers may need to contact nurseries specializing in native plants propagation. All plant material specified must be propagated, germinated or otherwise developed from nurseries located in approximately the same Hardiness Zone. - r 2. Installation 53 The success of bioretention areas is very dependent on the proper installation specifications that are developed by the designer and subsequently followed by the contractor. The specifications include the —� procures for installing the plants and the necessary steps taken before and after installation. 1 Specifications designed for bioretention should include the following considerations: • Sequence of Construction • Contra='s Responsibilities • Planting: Schedule and Specifications • Maintenance • warranty The sequence of construction describes site preparation activities such as grading, soil amendments, and any pre -planting structire installation. It also should address erosion and sediment control procedures. Erosion and sediment control practices should be in place until the entire bioretentiou area is completed The contractor's responsibilities should include all the specifications that directly affect the contractor in the performance of his or her work. The responsibilities include any penalties for unnecessarily delayed work, requests for changes to the design or contract, and exclusions from the contract specifications such as vandalism to the site, etc. The planting schedule and specifications include type of material to be installed (e.g., ball and burlap, bare root, or containerized material), timing of installation. and post installation procedures. Balled and burlapped and containerized trees and shrubs should be planted during the following periods: March 15 through June 30 and.septenmber 15 through November 15. Ground cover excluding grasses and legumes can follow tee and4hrub planting dates. Grasses and legumes typically should be planted in the spring of _ the year. The planting schedule and plan should address the following Items: • transport of plant material • preparation of the planting pit • fertilization • installation of plant material • stabilization: seeding (if applicable) • watering and general care An example of general planting specification for trees and daubs and ground cover is given in Section X Typically, a warranty is established as a part of any plant installation project The warranty covers all components of the installation for which the contractor is responsible. The plant and mulch installation for bioretention sbould be performed by a professional landscape contractor. An example of standard guidelines for landscape contract work is provided below: The contractor shall maintain a one (1) year 90% care and replacement warranty for all planting The period of care and replacement shall begin after inspection and approval of the complete installation of all plants and continue for one year Plant replacements shall- be in accordance with the maintenance schedule D. Plant Growth and Soil Fertility An understand.ing of plant growth and soil fertility development over time is important for estimating the success and life span of bioretention areas. The physical, chemical, and biological factors influencing plant growth and development will vary over time as well as for each biorelention area However, there are certain plant and soil processes that will be the same for all bioretenbon areas. Plant Growth T>7e role of plants in bioretention includes uptake of nutrients and pollutants and evapotranspiration of stormwater runoff. The plant material, esperaally ground covers, are expected to contribute to the evapotranspiration process within the Sort year of planting. However, trees and shrubs that have been recently planted demonstrate slower rates of growth for the second year due to the initial shock of transplanting. The relative rate of growth is expected to increase to normal rarer after the second growth season The growth rate for plants in bioreteation areas will follow a similar pattern to that of other tree and shrub plantings (reforestation projects, landscaping). For the first two years, the majority of tree and shrub growth occurs with the expanmon of the plant root system By the third or fourth year tie growth of the stem and branch system doznimates increw»g the height and width of the plant. 7bie comparative rate of growth between the root and stem and branch system remains relatively the same throughout the life span of the plant The reproductive system (flowers, fruit) of the plants is initiated last The growth rates and time for ground covers to become acclimated to bioretention conditions is much faster than for trees and shrubs. The raze of growth -of a typical ground cover can often exceed 100 percent in the _ first year. Ground covers are considered fly ma= after the first year of growth. The longevity of ground covers will be influenced by soil fertility and cbemistry as well as physical factors, such is shading and overcrowding from trees and shrubs and other ecological and -physical factors. Plants are expected to increase their contribution to the biorutention concept over time, assuming that growing conditions are suitable. The rate of plant growth is directly proportional to the environment in which the plant is established. Plants grown in optimal environments experience greater rates of growth. One of the primary factors determining this is soil fertility. 2. Soil Fertility Initially soil in bioretention areas will lack a mature soil profile. It is expected that'over time discrete soil zones referred to as horizons will develop. The development of a soil profile and the individual horizons is determined by the influence of the surrounding envio it mcluding physical, chemical, and biological. processes. Two primary processes important to horizon development is microbial action and the percolation of water in the soil, Horizons expected to develop in bioretention areas include an organic layer, followed by two bodwris where active leaching (eluviation) and armtmulation (aIluviation) of minerals and other substances occur. The time frame for the development of soil horizons will vary greatly. As an average, soil horizons may develop within three to ten years. The exception to this is the formation of the organic layer often within the fast or second year (Brady, 19&4). 55 The evaluation of soil fertility in bioretention may be more dependent on the soil interactions relative to plant growth than horizon developa=IL The soil specified for bioretention is important in filtering - pollutants and nutrients as well as for supplying plants with water, nutrients, and support Unlike plants that will become in=asingly beneficial over time, the soil will begin to filter the stormwater runoff immediately. It is expected that the ability to filter pollutants and nutrients may decrease over time, reducing the soil fertility accordingly. Substances from runoff such as salt and heavy metals eventually disrupt normal soil functions by lowering the cation exchange capacity (CEC}. The CEC, the ability to allow for binding of particles by ion attrwtion, decreases to the point that the transfer of nutrients for plant uptake can not occur. However, the environmental factors influencing each bioretention area wilt vary enough that it is difficult to predict for the life span of soils. Findings from other stormwater management systems suggest an accumulation of substances eliminating soil fertility within five years. The monitoring of soil development in biore ation areas will belp develop better predictions on sort fertility and development and measures to restore sail fertility. VI. Maintenance Guidelines A schedule of recommended maintenance for bioretention areas is given in Table VI. I. The table gives general guidance regarding methods, frequency, and time of year for biomtemon area maintenance. A- Planting Solt - Urban plant communities tend to become very acidic due to precipitation as well as the influences of stormwater runoff. For this reason, it is recommended that the application of an alkaline substance, such as limestone, be considered once or twice a year. Testing of the pH of the organic layer and soil should precede the limestone application to determine the amount of limestone required_ Soil testing should be cones annually so that the accumulation of toxins and heavy metals can be detected or prevented. Over a period of time, heavy metals and other toxic substances will tend to accumulate in the sail and the plants. Data from other environs such as forest buffers and grass swales suggest accumulation of toxins and heavy metals within five years of installation. However, there is no methodology to estimate ifie level of toxic materials in the bioretention areas since runoff, soil, and plant characteristics will vary from site to site. As the toxic substances accumulate, the plant biological functions may become impaired, and the plant may experience dwarfed growth followed by mortality. The biota within the soil can also perish and the natural soil chemistry may be altered. The preventative measures would include the removal of the contaminated soil In some cases, removal and disposal of the en&e�soil base as well as the plant material may be rewired B. Mulch Bioretention areas should be mulched once the planting of trees and sbrubs has occurred. Any ground cover specified as plugs may be installed once the area has been mulched Ground cover established by seeding and/or consisting of grass should not be covered with mulch C. Plant Materials An important aspect of landscape architectural is to design areas that require little maintenance. Certain Plant species involve mainenan= problems due to dropping of fruit or other portions of the plant Antoci M. problem includes plane, primarily trees, that are susceptible to windthrow, which creates a potential hazard to people and property (parked cars). As a result, some plant species will be limited to use in low traffic areas. ongoing monitoring and maintenance is vital to the ove:-Z success of bioretention areas. Annual maintenance will be required for plant material, mulch layer, and soil layer. A maintenance schedule should include all of the main considerations discussed below., 'lie maintenance schedule usually includes maintenance as part of the construction phase of the project and for life of the design. Maintenance requirements will vary depending on the importance of aesthetics. Soil and mulch layer maintpnanrp will most Utly be limited to correcting area of erosion_ Replacement of mulch layers may be necessary every two to three years. Mulch should be replaced in the spring. When the mulch layer is replaced, the previous layer should be removed first. Plant material upkeep will include addressing problems associated with disease or insect infestations, replacing dead plant material, and any necessary pruning, 57 Table VLI. Example Maintenance Schedule for Biore[endon Areas Description --- Method FiTuen y Time of ear Soil inspect and Repair Visual Monthly Monthly Erosion O anlc Laver Remulch any void area By hand Whenever nerd Whenever needed Remove previous mulch By hand Once every two or Spring layer before applying three years new layer o tional Any additional mulch added By hand O= a year Spring Piants R=Ove and replacement See planting Twice a year 3115 to 4140 and of all dead and diseased specifications 1011 to 11130 vegetation considered beyond treatment Treat all diseased trecs Mechanical or NIA Varies, but will and shrubs by hand depend on insect or disease infestation Water of plant material By hand Immediately after NIA shall take place at the completion of end of each day for profit fourteen consecutive days _ and after planting has b=n cam lemd Replacement of support By hand Once a year Only remove stakes stake in the Replace any deficient I By hand Whenever needed Whenever stakes or wires I I I needed Vil. Peak Runoff Control and Pollutant Reduction This section will examine the peak runoff control and the pollutant reduction benefits of bioretention areas. At some sites local or state agencies may require peak flow attenuation in addition to the water quality protection that bioretention areas provide. This chapter will outline methodology that can be -used to determine the reduction in peak runoff from bioretentioa methods. This chapter will also discuss the pollutant removal from bioretention practices. Bioremution areas remove pollutants through a variety of pbysical, biological, and chemical treatrnent processes such as adsorption. flocculation/coagulation, ion ex".?nge, decomposition and filtration. The amount of pollutant loading reduction required by the North Carolina's state stormwater management requirements is 85% reduction in TSS. The state assume that when designed, constructed, ted., and maintained properly a bioretention area will provide a minimum of this level of trea±mm Bioretention areas can potentially provide peak runoff control in two ways: increasing the time of concentration for a site using sheet flow, and, Providing storage for runoff. - The amount of pear reduction provided by mcmasi g the time of concentration and runoff storage can be readily determined using the methodology in the Soil Conservation Service Report TR-55 (U.S.DA, 1996). According to the timeof-travel computation in TR-55, 25 feet of grass would add 0.1 hour to the time of concentration, compared to that of pavement. For a one -acre commercial Site that has a runoff - curve number of 90, the time of concentration increase would reduce the 2 year nmoff from �0 3 cfs. Biaretention areas also have the capacity to infiltrate the first one inch of nmoff. The followiyng method can be. used to daerrnme the peak flow reduction from the infiltration of the first one inch of runoff. Ile - first. step is to dex mine the amount of runoff from the existing site from the design storm. For example, the runoff for the 2-year storm , 3.1 inches of rainfall, for a site having a curve number (CN) of 90 would be computed as follows: Runoff — M - o-2*512 (P + 0.8*S) Where: P (Predpitation) = 3.1 inches S = (I DOWN - 10) = 1.11 inches Runoff = * 2 (3.1 + 0.8 * 1.11) Runoff = 2.39 inches . The ratio of the infiltration volume to the runoff volume is 0512.39 or .21. Entering .21 into Figure 6-1 of the TR-55 Manual as the ratio of storage to runoff volume (V,(V,), the ratio of peak outflow discharge to r peak inflow discharge is 0.68, or a 32 % reduction in the 2- year storm_ t. 59 VUL Water Balance for Bioretention Areas - A. Water Balance Methodology An example water balance was developed for a proposed bioretention area based on the precipitation. evapotranspiration and the infiltration for a commercial tract over a four -day time period The four -day period was selected for hydrologic, horticultural, and maintenance constraints. Four days is the median time period between storms in the Washington area (EPA), and it would be undesirable for the soil in a bioretention area to remain satiumieft for more than four days. A ponding time in excess of four days would severely limit the potential plant species for the bioreteation areas. The overall objective of the water balance was to determine the amount of water to be infiltrated and diverted from the bioretE on area as a result of varying amounts of precipitation. The bioretention area is composed of four components: • ponding area (6" minimum) • root zone for plants (4' minimum) • sand bed surrounding the root zone • in -situ material below the bed These four components are shown for the bioremntion areas in Figures 6 through 9. The bicret,ention area used in the analysis was 15 feet wide by 40 feet long, which is the minimum size. In the first part of the water balance simulation the Site runoff enters both the sand bed surrounding the root zone and the toot zone itself at the center of the bioretention area. The volume of ponded water is governed by the following relationship Ponded Volume = Runoff Volume - Sand Bed Infiltration- Root Zone Infiltration. Runoff is diverted from the biorment ion area once the ponded volume is at its limit. The water balance computations were tun at one -hour intervals for the four -day (96-hour) time period using a spreadsheet computer program. The spreadsh�t analysis was set up such that site, precipitation, and soil parameters can be varied The development of the p =pitation, evapotranspiration, and infiltration variables of the water balance are described below. B. Parameters �Mr� .�s� �•i The water balance was determined for rainfall events of 0S and 0.7 inches. 'The rainfall distribution in the Metropolitan Washington Couwll of Governments manual, Co n1linag 13d2an Runoff, indicates that a rainfall of 0.7 inches would rot be exceeded 80 percent of the time. The precipitation was assumed to occur over six hours, which is the median storm length for most of North Carolina (EPA, 1986). .E In determining the runoff to the bioczt.ention area, it was assumed that the commercial tract was over 80 percent impervious. 'Ibis assumes a greater imperviousness than will be allowed in any Water Supply watershed, but this level.is often reached in developments in the twenty coastal counties. 2. Evapotranspiration Evapotranspiration (ET) is the aggregate term for the water use by the biological functions of plants, and the water loss from evaporation from the surface of the plant and the adjacent soil. There has been extensive research regarding the ET rate for various crops. It is general procedure to develop ET rates for „reference" crop species such as alfalfa, and adjust the ET rates for the species of interest. The monthly ET rates for alfalfa were computed using the Blaney-C riddle Potential Consumptive Use equation- The crop coefficient (K value) for alfalfa ranges from 0.80 to 0.85. The K Valve for bioretention areas is comparable to the K valve for deciduous orchards (0.6 to 0.7). Consequently, the ET rate for alfalfa was lowered by 15 % to develop the bioretention area rate. The ET rate for alfalfa is s mmadze below in Table IV.2 for various months of the year. The ET rates were computed using mean monthly temperatures, wind speed, and other weather data compiled by the University of Maryland Agricultural Experiment Station for Prince George's County. It should be noted that there is no appreciable ET for the months of November through March. Even though ET rags are shown for Maryland, the computation of rates can be calculated for NC and are similar to rates in Maryland. c Table IV.2. Evapotranspiration Rates for Reference Crop Species (Alfalfa) and for Bioretention Areas Eva otrans iration inches MoWth - Reference Crop Alfalfa Bioretention Areas — April 2.88 2.45 May 5.56 4.73 June 7.74 6.58 . JUIX 8.66 7.36 August 666 5.58 September 4.50 3.83 October 2.64 2.24 The ET rate for the month of July, 7.36 intmonth, was used in the water balance example. 3. Infiltration Throughout the water balance, water infiltrates from the ponded area to the root zone, from the root zone onto the sand layer and finally from the sand layer into the in -situ material or to the undmt3rain. The infiltration rates for the sand, soil, and in -situ material were taken from the State of Maryland Manual on Infiltration Practices. The infiltration rates used in the water balance are given m Table 1V.3 for the components of the bioretention area These will not apply if an underdrain is used. 3N Table TV.3, Infiltration Rates for Bioretention Components Bioretention Component Soil Type Infiltration Rate. inlhr Sand Bed Sand 8.27 Root Zone Loamy Sand 2.41 SandX Loam 1.02 Loam 0.52 In -Situ Material Silt Loam 0.27 SandX g1 Loam 0.17 Clay Loam 0.09 In the water balance, the rate of sand and soil infiltration was initially set at the maximum rate until 80 percent of the layer was saturated- d After 80 percent sanitation was achierred, the infiltration rate was set to: Infiltration Rate = Max Rate * G - Saturation Fraction) -C. Results - The results of the water balance indicate that the minimum sized bioreteation area of 15 by 40 feet will infiltrate runoff for a site area of 0.2 acres for a rainfall of 0.7 ir<cbes. The runoff from a slightly larger site area of 0.3 acres can be infiltrated for a 0.5 inch rainfall. Under the most conservative scenario for the 0.7 inch rainfall, the bioretention area would comprise 7% of the site area. Since bioretention would be located in parking islands which are rewired by many local governments, bioretention practices might not significantly increase the existing landscape requirements. lice water balance is based on the root zone soil being comprised of a loam having an infiltration rate of 0.52 inches per hour, and an in -situ soil infltration rate of 0.2 inches per hour. In -situ or root zone soils with lower infiltration rates would lower the capacity of the bioretenbon area below design limits. The water balance was also used to determine the ponding volume, and percentage of saturation for the sand and root zone soil, for the 0.5 and 0.7 inch rainfall events. The plots indicate that the total ponding time in the bioretention area is 16 hours, which is well below the four -day maximum time period allowed. The plots also indicate that the sand and soil are pardially saturated for 70 hours of the 9-6-hour (4-day) time period, and aerobic conditions would exist in the soil for the 0.7 inch rainfall. PM IX. Bioretention Area: Soil Specifications A. Planting Soil 'The bior=ntion areas shall consist of a planting soil having a composition of at least 10 to 25 percent clay and shall be of a sandy loam or loamy sand texture. Loamy soils may be utilized for the planting soil but must consist of 35% sand. In addition, the furnished planting soil shall be of uniform composition, free of stones, stumps, roots or similar objects larger than one inch, brush, or any other matexlal or substance which may be harmful to plant growth, or a hindrance to planting or maintenance operations. The planting soil shall be fry of plants or plant parts of Bermuda grass, Quack grass, Johnson grass, Mugwort, Nutsedge, Poison Ivy, Canadian 'Thistle or others as specified. It shall not contain toxic substances harmful to plant growth. The placating soil shall be tested and meet the following criteria: pH range Organic matter Magnesium - Mg Phosphorus P2O5 Potassium - K2O Soluble salts 5.5 - 6.5 1.5 - 3.0% 35 lbsJacre 100 lbsJacre 85 lbsJacre not to exceed 500 ppm The following testing frequencies shall apply to the above soil constituents: • pH, Organic Matter. 1 test per 90 cubic yards, but no mare than 1 test per Bioretention Area • Magnesium, Phosphorus, Potassium, Soluble Salts: I test per 500 cubic yards, but no less than 1 test per borrow source One grain size analysis shall per performed per 90 cubic yards of planting soil, -but no less than 1 test per Bioretention Area B. Mulch Layer Specifications A mulch layer shall be provided on top of the planting soil. An acceptable mulch layer shall include shredded hardwood or shredded wood chips or other similar maieaal. Of the approved mulch products, all must be well aged, uniform in color, and free of foreign material including plant material. We11-aged mulch is defined as mulch that has been stockpiled or stared for at least twelve (12) months. C. Sand Specifications The sand shall be free of deleterious matr:rial and rocks greater than 1 inch in diameter. t D. Compaction 63 Soil shall be planed in layers less than 18 inches and lightly compacted (minimal cornpactive effort) by tamping with a bucket from a dozer or a backhoe. X. Bioretention Area: Plant Specifications • Root stock of the plant material shall be hell moist during transport from the source to the job site and until planted. • Walh of planting pit shall be dug so that they are vertical. • The diameter of the planting pit must be a minimum -of six inches (6") larger than the diameter of the ball of the tree. • The planting pit shall be deep enough to allow 1/4" of the ball to be above the existing grade. Loose soil at the bottom of the pit shall be tamped by hand • The appropriate amount of fertilizer is to be placed at the bottom of the pit (see below for fertilization rates). • The plaint shall be removed from ti� container and placed in the planting pit by lifting and carrying the plant by its' ball (never lift by branches or think). • Set the plant upright and in the center of the pit so that the top of the bail is approximately 1/4" above the final grade. • Back5n planting pit with existing soil. • Make sure plant remains straight daring bar-kfilli.ng procedure. • Never cover the top of the ball with soil_ Mound soil -around the exposed bail (1/4"). • Trees sball be braced by using 27J�y 2" white oak stakes. Stakes shall be placed parallel to walkways and buildings. Stakes are to be ej ally spaced on the outside of the tree ball. Utilizing hose and wire, the tree is braced to the stakes. • Tree and shrub fertilizer shall be a 21-gm, tighty compressed, long lasting, slow release (2 year) fertilizer tablet with a minimum guaranteed analysis of 20-10-5: Total Nitrogen: (N) - 20% Water Soluble Organic Nitrogen - 7 % Water Insoluble Organic Nitrogen -13% Available Pbospbodc Add (Pj0j)- 1 D% Soluble Potash (K2O) - 5 % For containerized trees and shrubs, place the specified fertilizer tablet(s) in the bottom of the planting pit according to the fouowing rates: 1 gal. Container 1 m 21 gm_ Tablets 3 gaL Container 2 m 21 gm. Tablets 5 gal. Container 3 ea. 21 gm. Tablets 7 gaL Container 5 ea. 21 gm. Tablets M • The ground cover planting boles shall be dug through the mulch with ow of the following: hand trowel, shovel, bulb planter, or boe (this does not apply to grasses or legumes). • Beforc planting, biodegradable pots shall be split, and non -biodegradable pots shall be removed. Root systems of all potted plants shall be split or crumbled • The ground cover shall be planted so that the mots are surrounded by the goal below the mulcb_ Potted Plants shall be set so that the top of the pot is even with the existing grade. The roots of bare root plants shall be covemd to the crown. • Before planting, apply a pre -emergent herbicide to the mulched and planted ground cover bed. • The entire ground cover bed shall be thoroughly watered Grasses and legume seed shall be tilled into the soil to a depth of at least 2 inches by either harrowing or discing. Fertilizer shall be applied at the same rate and utilizing the same process for non -grass ground cover. Grass and legume plugs shall be planted following the non-grass'gzound cover planting tw2miques. All ground covers -shall be fertilized with a 10-6-4 analysis fertilizer as a wet application at the rate of 3 lbs. per 100 square feet of the bioretention area prior to planting non -grass ground cover or as part of the grass seed groimd cover. 29 XI. Referenem Brady, N.C. 1994. The Nature and Properties of Soils. MacMillan Publishing Co., New York, New York-, Correll, D. March 20, 1992, Personal communication by PGCDER staff. Smithsonian Environmental Research Center. Edgewood, Maryland - Correll, D. and Peterjohn, W.T. 1984. Nutrient Dynamics in an agricultural watershed: observations on the role of a riparian forest, Ecology, 65(5). 1994. pp. 14,66 - 1475. Criddle, W.D. 1958. Methods of computing consumptive use of water. Proceedings ASCE, Div. Irrigation and Drainage 84:1-27. - Fernald, M.L., 1950. Grays Manual of Botany, eighth edition. Dioscorides Press, Portland, Oregon Lindsley, R.IC, Kohler, MA and Paulhus, J.L.H.,1958. Hydrology for Engineers, Second Edition, McGraw-Hill, Inc., 328 pp. Gounin, F., 1992- Personal Communication by PGCDER staff, University of Maryland, College Park, Maryland, March 17. Hightsboe, G_L., 1988. Native Trees, Shrubs, and Vines for Urban and Rural America, Van Nostrand Reinhold, New York, New York - Maryland Maryland Department of Natural Resources (MDNR), Water Resources Administration (WRA), 1984. "Maryland Standards and Specifications for Stormwater Management Infiltration Practices", Stormwater Management Division, Tawes State Office Building, Annapolis, Md. 21401. p. 2-23. Metropolitan Washington Council of Governments, 1992. Watershed Restoration Sourcebook: Collected Papas presented at the 199I Conference; "Restoring our Home River". Moyer, W.J. and R.C. Moyer. 1997. Climate of Upper Marlboro, Maryland, Contribution No. 7571, and Experiment Station Bulletin No. 13 of the Maryland Agricultural Experimental Station, The University of Maryland., 69 pp. North Carolina Department of Environment, Health, and Natural Resources, Division of Land Quality, Raleigh, NC. September 1988. Erosion and Sedimeht Control Planning and Design Manual. Prince Georges County, Department of Environmemal Resources (DER), 1991, Stormwater Management Design Manual., Appendix 4-5.2 pp. Prince George's Cmmty. October 1989. Prince George's County Landscape Manual. Prince George's County, Maryland. Reed, P.B. Jr., 1988. National List of Species That Occur in Wetlands: Northeast. United States Fish and Wildlife Service, St- Petersburg Florida. Schlesinger, W. H. and Wadag, R.H.1985. Forest Ecosystems: Concepts and Mana.gemenL Academic Press. Orlando, Florida_, pp. 416-418. Schueler, T. 1987. Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs. Metropolitan Washington Council of Governments. pp.416 - 418. 'Tisdale, S.L. and Nelson, W.L., 1975,. Soil Fertility and Fertilizers, 'Third Edition, Macmillan Publishing Co., Inc., New York, 694 pp.. U.S. Department of Agriculture, Sail Conservation Service, 1986. Urban Hydrology for Small Watersheds EngiDwzing Division, Technical Release 55, June, 1986. p 3.3 . U.S. Environmental Protection Agency (USEPA), 1986. Methodology for Analysis of Detention Basins for the Control of Urban Runoff Quality, Office of Water Nonpo_ int Source Branch Washington, D.C. 20460, EPA440/5 -87-00 1. pp. A-5 - A-10. r% DRAINAGE CALCULATIONS INDEX Curb Inlet Spacing Curb Cut Design Surface Area Runoff Swale Inlet Capacity/Grate Inlet Spacing Outlet Protection (New York DOT Dissipater Method) Wafer Quality Permit Runoff Determination Bioretention Area Sizing HGL (SWIM Model Output) Al thru A3 A4 and A5 A6 A7 and A8 A9 thru Al 1 Al2 A13 Al thru All O4/20/99 10:04 V9192338031 McKI3d & GREED/RL »-. �%ILXENGTDN GIVIL ro002 o mNio a Tas*rm ❑ ran FdPW ❑ CONFEREWX PLANNM � a 1�r �1� T AUTHM MEW: s f ,Rr�► �Gcn 5� _ _ PRM No. NOR r ■r■■�n■E■■■rn■SMEE■EE■■MOB■ SEES■■■®r■■■rruErSEErr■Mr■■■ NONE ■■MMMO■■■MM■SS■ MEN ■■■SE■■ _OC ■■■S■ NONSENSE ■EMMS■■■■ e■■■rrEr■ ■■r■■■r■■■■ ,r■■ !nESMM�iMOM�.S■■ MM■ERNE■■ ■rrlm9■■-MENM ► . .._ rn., r■■Er ■ , .. r■ ■ OMENS r■r■■E .. = M■ 0ME■M■■■■■■rrS■ ■■r■r■■ ■Md■moramZzw m"o rmo■■■Orr■■■■■ ■■■■EEMOMSEr■ ■■SEES■ . 0 � �� ■ ■ M■■ronM■ Emmons ■■■■SSr���� rrrr■E _...� r■EE 0EMEMO ONE 0 NO mmummom"RY, SOME on - M� i■■l EASE MSSS■ ■ ■■MEFAMr■ ■■ruE■M ESQ■■■■■■r■■Err ■■� ■■ IMMEM rMr■O■■■Er Orr 04/20/99 10:05 V9102338031 CREED/RL WILMINGTON CIVIL ;h003 A3 CKAlcr4r--l.:. T Ez&'AaM Grim. s Vwcwts; $&QO4 ; T-6 Fr CLB - FYI O.S: -40 C cL4 rF3tS - 0.4- 20 TIM Qz-. -40 CLI- :mom --ruing 4- X4 2 -M4 0.3 Flow In tuam.91slu purr 34cliam, 5-22 Aldo,& bb lu:Un p aib:JJOUJI 4�,4-2,otAN140M&CR-EED B GNEE S i llChlld Ei {1(ltL%KL —•+ „1LXi1.�UlU� cltilt WjUU5 age � TWE { rr■ ■®nrrrrrrrr®�r�rrr ram'_.- r r �!r rrrrrrrrri� /���rrr C�i��iC_ ri 1 rrr r Br •.. ■r �%11 0 19Sol 0arrr ■■ rr■ rr®rrrr�r No MEN rc�� ear ,��: . r!�■ ■ rr■ r No ' : ��• I / .r �� ern ./-.r .: � r�rr ■rrrrNrr� � ACTKM com. U4/20199 IU:U1s CREEL%RL '-- %llJli.GTU\ ClViL kOU01 A--7 AMA ❑ hocop Cl igsEi ENGWEERS ❑ Fl,D RSQR T PLANNERS 511RVEYOiiS Dq7E 715I-`�_ 7w AUTHOR 1 �-r 6�&rrt PR03. NO._ Nt,r=7S �L1Ow f AX. 4I,PTil (ii J.vCE T l • �� � ' 3 ��.s Qo= 0.67�(Zg as G 0.67 3(►��s _ qo= .G7(4fz-31.16s�.s Qwl 6A wxe 7-[jr'llr 7dlTZV*, OM' 4 B y f�i�!/llffl, S 6? : --- A Os !o yes LZ V= 3 pff r, ox GF%!.K VE.L-aclTY 0 4XI'Mowuv � ((�< �p9�s . � �tl4rzsrGVI—CS� FN,6 Af, >s z AMON comer: S !/ — V r V V V v J M J i [� r J J V v .. a .+a � 1• ..�. M �.. w u v i • •.. -- u+• .• µ. v. �. . u � V V v V ,,00,Nl'W&CREED 0 MEMO PUVVQM SLRVErCIRS DAM / 99 TM nUMM � �/1iL- CUM: DF uyiiI67ZX� sm=. l9kul�a Paa. rjo. rr�� vrrr�r��r�■�r,��arrr■ r� �� ��� ■ram , ..�rrrr r-�rEr� ■� ■� sissssrii SEMEN MOMMNNMMMMsEirI r % / li �SiiiO IR1i� Ir/ .- Lti •, . ;- rrir�r .... �iti�����i■is■ ■ r��6�� SINS® SEMEN ■r��nr� ■i��■ MEN �iMN rM nowso r� N Ion, NMI Er Irarrs�rINN OMENS ■o ■r■�r�� rn 04/20/99 10:09 %29192338031 McKIM & CREED/RL ... 9iILMINGTON CIVIL It I IQ 009 A � CHART F-I6 NEW Y+DRK bOT RATER METHOD FOR USE IN DEF'DMD EELS (Saurm- "Beak and Q=ad i imng Pro=hnve ", New York Depa =ca of Tracasportadeq Division ofDesiga and ConstrucdoiL 1971) Nete: To use the following cha n you must know: 1) Q Fta��iJ�., td[.G r7��7�11C7 Quo 2) 77-F5 Qt. 3) V fuii where Q - &sckargc is cfs and V Velocity is FPS. F.STfMAn0?4 OF STONE SIZE AND DUvEENSIONS FOR CULVERT App DNS Step 1) Compute Sow velocity Y. at MNat or paved :del QUdeL-- Step 2) For pips ativats D. is &ametm For pipe arch, ath and box wlvdrts, and p�chnnel outias� whem A= acss4ccdoaal a = ofgaw ar au%s. For mU41C culverts, use Da lMxD. of sic MwM Step 3) Fcr aptott Bra of 10% or stage use tecotrmaldatioes for next . ! bow zD= (Zones I ftmzgh 6) • R er • w Y 31C ZvAz Sours Erosoa amd Secmcd Ccabml Pim=iag and Desigm Mz=4 NC DeVarmwr Qom. Land Quality sc4)n, Seirte:IIbcx 1gm Pc". Um. 5-37 U4/2u, )A' lu: ulj )jcjti cuiu 0. 410 t,6 C MART F-17 T.RNMIT OF APrRnv ZONE APRON MATERIAL PIOTEcr CULV= Ll To rREVEur SCOUR HOM UM L2 ALWAYS 1 STONE FILLING QMM) CLASS A 3xDo 4xDo 2 STONE FULNG(UGEED 3 xDo (25M5> 3 STONE MING (MMIUMF JCLASS j-'N 4xDo —:37XDom. 4 STONE FMLING CLASS 1 4xDo 8xDo 5 STONE MUM Qff:A� CLASS 2 SxDo 10xDo 6 STONE FHJINCr (ElEAV)0 CLASS 2 6xDo lOxDo 7 SPECIAL STMY REQUMM (F.rERGY DISSIPATERS, SMUNG BASIN OR LARGER SIZE MM�- Wulth = 3 tunes pipe diameter (min) fq I I L Z! Tj W) 9 S-o' DETEMMI(AUON OF STONE SIZE FOR DUMPED SMNE'CELANNIEL UNINGS AND RM-MUMSTS Step 1) Use figw;�4- 18a to ddcmiae mmd== stone size (m& for 12 Fps = 20"L or 550 or'.. Stcp2) Use figure F-18b to determine acceptable size range for stoat (for 12 FPS it is 125-5W Hm for 759r of srone, and the mw6m= and mirlimyrn ranp in Wright sbm& be 25-5500 Ib&) WOM- In dam cba=cl vdocd= for swm rmiap and rcv=cat, user the foIfowiug�:cxffra'cats of rung Diameter Meanings' bfid== diamess On" of ffiag CTStes FM'c 3 0.031 9 12 Light 6 0.035 12 is meffi= 13 0.040 18 24 Heavy 23 0-044 30 36 S=lm—. Em iatt and Sc&merlCo=oIPk=io and Design Manual, NC De nrmt= OfMCD, Laced Quality Secdca, SqY=bcr 1989, Rty. l2f93- 5-38 A �9192J38U31 MCKI]i c;ilt�U:ic► ++1L�11.�u1U� 411L CE kwr F-la Po ' $mog Suc for Rig Rsg wd;ht raw of 3tncre3 C 7s% of =aes 40 0�? - 150 50 - ISO 200 50 - 2W ?SO 50 - 250 400 100 - 400. sm ISO - gQO- wo 200 » a00 tA00 250 - 1.000 I= 400 - 1r6t30 - 29M a00 - 27C0 Gads of Rep RW Pi n=g =d Dam MMML NCDvzmp= oft=D UM. 5-39 . U1%2V/99 lu:10 C rreyylrt of snsra tzgGbRd mwm= and In of ts0 ZS 2Q0 25 250 ?5 .900 25 6g0 25 800 25 tA00 _ 50 t,900 ff0 t.600 SO Z,000 75 Z.700 100 F—Isd S..rs Ymk ad dwa[ 9i.9 waio�m ;4.. Yo& Soasw-- E=sm and 5ed=rai Comad i.md �7 Secaoq Sepcvabar y saa. 04/2U/99 1U: ILI 18�33bU3i �`k�. • F�rc�k�s X� Conduit Maxssm"'m Read Fricti.oti Name Flex Loss Loss p=drive2 23.321 0.203 0.108 prdrivel 37.782 0.532 0.241 mcmi11An 50.346 0.510 0.435 belgraveA 53.792 0.32Z 0.145 belgraveu 53.792 0.322 0.145 pineA 51.081 0.290 0.061 pi.neB 51.081 0.290 0.061 oleauderA 45.426 0.228 0.245 oleanders 46.322 0.254 0.239 oleaaderC 45.050 0.22-9 0.246 52odA 103.128 4.760 1.439 IargoA - 52.637 0.299 0.124 Lurs a 52.637 0_299. 0.124 stab 60.044 0.425 0.100 P668 139.917 0.220 0.003 MA 139.370 0.189 0.366 P48D 69.267 0.147. 1.017 P48C 76.535 0.202 1.098 P488 73.921 0.217 0.882 P36B 2.916 0.001 0.003 P36A 3.195 0.009 0.004 P46A 77.604 0.269 1.090 Comduit Max3mzmz fiatal Name Flow Flora opasl4 .117.3675 863459.4 prdrive2 23.33713 672966.1 prdr2strt 0.000000 0.000000 opea33 23.72454 674690.8 prdrival 37.79064 1683464. prdzlstxt 3.829086 077.644 apen22 40.46080 1089296. m-ni l li^ 50-36233 12.98799. 0=4 Is= 0.000000 0.000000 belgraveA 54.38311 1148116. belgrav" 54.38311 1.148146, belgstrt 0.000000 0_000000 yardflow 0.000000 0.000900 opens 99.40551 2294801. pSnrA 51.16267 1152835. pineB 51.16261 1152835. pineatrt 7-3_54510 133963.3 opeu4 100.1293 2434280. oleanderA 45.71277 958236.5 oleaader8 46.45801 842362.8 oleandezC 45,08377 1066630. oloanstat 0.000000 0.000000 51'dA 103.1287 32b2537. 52ndstxt 0.000000 0.000000 open2 103-1286 3201376. laxgoA 52.65314 1640749. 1AaVdB 52. M14 1610749. urgstxt 0,000000 0.000000 opeal 106.0340 3269863. oyeatmil 117.7731 2846554. open3 92.21906 2925398. overflow2 105.2-919 290553.1 stub 62.55503 2210465. sidechan -39.98829 -312507.2 natural -86.99264 -825612.5 opens 113.2609 2278682. openll 50.17522 1291386. ovarflow 86.43309 834123_7 Pomeltng -2.232706 -730.6701 ME 143.1442 2186501_ 866SOVR 0.000000 0.000000 ilcYilb & l;iitt;ll�tcL »»» n1L311:�41u:r 1:1111, Joy . (��l �asickd �raf� �J �t► Critical Normal - HW TW Depth Depth Elevat £levat 1.555 3.000 39.617 39.507 Max Flow 1.999 3,000 40.007 39.234 K= Flow 2.217 3.500 39:285 38.339 Max -Flow 2.203 4.000 28_025 27.574 Max'£low 2.203 4.000 28.025 27.574 Flax Flaw 2.144 2.733 27.266 26.911 Max Flow 2.144 2.733 27.266 26.911 Max t'low 1.945 2.170 27..519 27.059 Max Flow 1.965 1.972 27.381 26.919 Max Flow 1.936 2.076 27.381 26.919 Max i1.ox 7.664 3.000 27.254 21.151 Mar Flow 2.178 2.049 16.108 15.685 max -Flow 2.1.78 2.049 16.108 15.685 Max r1ow 2.333 2.751 29,600 29,085 Max Flow 3.295 2.991 35.308 35.050 Max Flow 3.288 3.507 35.061 34.526 Max Flax 2.515 2.802 34.526 33.393 Max Flow 2.647 2.956 33.393 32.064 Mew Flow 21600 3.052 32.064 30.962 Max Flow 0.529 0.493 26.776 26_772 Flax Flow 0.S54 0.714 26.572 26.558 Max Flow 2.666 1.161 30.9.62 29.600 Max Flow Naximum # # Junction Invert FSaum� Velocity ## Ksme Elevation El.Rvution 0.4674653 ## ufslimit 34.70000 40.37794 3.301542 ## Drive#2-B 34.53000 40.30509 0.000000 #1 Drivv-42 FL 34.52000 40.17621 0.6732376 ## Drive#1-B. U .50000 40.17561 5.346247 ## Drive#1 A: -R.40000 39.45799 0.4616368 t# Ftclii LU= B 3.42000 39.29202 0.8846199 ## mcmLuan-A 33.19000 38-4339D 5.235558 ## belgrav--8 22.91000 28.89917 0.000000 ## belgrave-A 22.61000 28.51255 4.241178 ## pines 22-81000 29,4062.3 4.244I78 ## pine -A 22.71000 28.24398 0.000000 ## oleaader*B 22.71000 29.12845 0-000000 ## cleaWar-A 21.37DOO 27.88404- 1.855668 ## 52nd-H 19.59000 27.25418 3.948067 '#1 52ad-A 19.68000 Z1.15114' 3.948067 ## 1ar901-8 11.50000 16.10864 0.6438706 ## laxgo-A 11.00000 15.68616 2.920058 ## outiall 10.00000 12.08108 2.997073 t# n detail 21.12000 27.88273 3.070875 ## outfali2 20.00000 20.09329 3.279048 k# ovrf1ow2 39.00000 39.26478 C.000000 9# 1 29.37600 35.38811 15.41684 #1 4 Z6.71000 33.75753 0.000000 #t 8 24-.32000 30.98809 3.096752, ## 13 23.15000 29.62993 4.004349 ## 14 23.00000 29.13050 4.004345 ## 18 24.30000 29.26659 0.000000 ## Aode5 24,31000 20.92446 1.957497 tt mode6 26.50000 27.39199 0.7305794 ## pond 22.00000 27.88495 1/698996 ## 2 29.00000 35.20291 7.17193.1 ## 3 28.16000 34,76702 4.970011 ## 7 25.34000 32.12684 0.7713524 1# 17 23-45000 29.44454 4.838919 ## 2,253755 ## 1.471901 ## 2.559669 '## -0.1604711 ## 6.585513 t# 0.000000 ## �? ec �J6 r u4i"Uibv IU:l� aala2Juaujl ?lelilA a u(LLV;xL --- 11I.A.AiM31u., l,01L yj ulu A it5r P66A 142.9618 2186306. 7.468083 It P66ACVR 0.000000 0.000000 0.000000 If P48D 72.04028 2184641. 5.732354 it P4800VR 0.000000 0.000000 0.000000 ## P48C 82.02991 2427299. 6.527726 ## P48C10VR 0.5656140 11.33761 0.4071221 ## P485 75.02874 241668S. 5.970609 ## P48BM 5-036286 6300.077 2.632615 ## P36B -18.03983 --293176.6 --2.552150 If P361XNR -5.031681 -20809,44 -1.030118 It P36A -15.46900 -274913-6 -2.188453 ## P36AOM -10.10782 -44723.90 1.272058 ## P48A 78.14580 2537016. 6.218618 ## P48A01TR 2.840721 4295.718 3.902907 ## 108.4764 3270663. 0.000000 ## FARE # 2 89.20680 834531.3 0.000000 ## rREE # 3 105.300S 2"660.5 0.000000 ## U-J/LU, bb IU:1J Pidw Y RMIT x` Condait max xmm Name r1ow prdrive2 24.944 prdrival 37.730 ==Mi,llaa 53.069 belgraveh 54.123 belgrave8 54_123 pineA 50.421 pineB 50.421 oioanderA 56.199 OleandezB 56.599 vleanderC 55.598 52ndA 113.474 l.argvA 58.326 largos 58.326 stub 79.941 P66B 186.088 P66A 189.036 P43D 94.377 F48C $6.494 P40D 73.905 P36B 3.367 P3QL 3 _649 P48A 87.967 '(]'aia«JJbUJ1 Conduit maximum Frame Flow opeal4 180.4194 prdrive2 24.94472 prdr2atrt 0.4590742E-0 opeal� 23.73331 pxdZiN el 37.77364 prdrLstrt 13.49514 Openiz 46.17295 mrm333.an 53.09019 mcmilstrt 0.000000 brigravrA 54.48028 belsmaveB, 54,48029 belgstrt 31.17867 .. y'aidflow 35.7117-2 opens 127.4604Pimapi 50.60782 pines 50.60782 pinestrt 95.35623 %:,=4 - 104.0772 oleander]► 56.Z6532 o2eand+era 56.61593 aleanderc 55.63441 oleanstrt 0.000000 52ndA 113.5537 52adstrt 0.000000 vpen2 113_5720 largos► 59.32608 largos $8.32608 largstxt 0.000000 Weal 3.18.4304 opentail i27.4Z86 open3 101.0314r Ovrilow2 177.5616 stub 79.96127 sidechan -65.05808 natural -156.7409 Opwn6 145.2720 op�1 54.38291 ovsvrflow 153.1699 7.375753 I'm196.4404 Read Friction Less Loss 0.232 0 0.531 0 0.567 0. 0.346 0. 0.34,6 0 0.300 0. 0.300 0 0.351 0 0.357 0 0.349 0 5.358 1 0.381 0 0.361 0 0.754 0 0.424 0 0.382 0 0_296 I O.ZZ9 I 0.238 0 0_002 0 0.007 0 0.342 1 Total .Flay 11.24570. 713997.2 1 9.283615 716078.5 1271356. 39559.58 1310653. 1598689. 0.000000 11.31532. 7131532. 263237.3 338904.6 2881196. 915740.9 915740.9 1302014. 3129647. 1272559. 1158524. 1352883. 0.000000 4411919. 0.000000 44i0075. 2266514. 2266514. 0.000000 4518948_ 3804035. 377,6443. 62U33.8 2854803. -825082.7 -1698008. 2860282. 1590028. 1768806. -1033.748 3035404. .124 _240 484 152 _152 064 .064 .377 .384 .375 _G70 _158 .158 .178 .158 .736 .887 .403 .882 _004 .006 .400 MCAJA a �ntcli nL --- n11 ll1.�VlU.� k..11LL Critical Depth 1.610 1.990 2.278 2.210 2.210 2.129 2.129 2.174 2.182 2.162 8.685 2.293 2.298 2.708 3.816 3.046 2.943 2.017 2.600 0.570 0.596 2.842 •" ON •f Normal 3.000 3.000 3.500 4.000 4.000 2.707 2.707 2.464 2.Z12 2.349 3.900 2.180 2.180 4.000 3.604 4.499 4.000 3.326 3.052 0.527 0.762 4.000 f# &N Elevzt 40.384 40'005 39.576 29_121 29.121 28.159 28.159 28.171 28.171 28.171 20.275 16.394 16:394 30.238 38 A 69 38.16L 36.649 34.730 33.099 26.587 26.:562 31.981 Qel=ity ## frame 0.4728734 ## U/31imit 3.529001 it Drive#2-ft: 0.6171617E-01#1 Drive#2 A 0.6632028 ## Driae#1-B. 5.344215 ## Drive#1--A- 0.7461007 ## mcm 3Sau-8 0.8940095 ## MCKLUaa-A 5.518024 ## beigrave-8 0.000000 ## belg=ve-A 4.335432 ## pits-H 4.335432 ## pine -A 0.6928127 ## oleander B 1.103928 ## oleander -A 1.775764 ## 52u4-8 4.027292 ## 52ad-A 4.027292 ## largo-s ` M112523 ## largo -A 2_674297 ## rmtftll 3.453347 #f nodetail 3.489362 ## oatfallt 3.472447 ## ovrflow2 0.000000 to 1 16.61079 ## 4 0.000000 f# 8 3.185594 ## 13 4.528200 ## 14 4.529200 ## 18 0.000000 ## nodes i.988489 ## nade6 0.6935226 ## pond 1,689130 ## 2 8.778828 ## 3 6.363093 ## 7 -0.7419864 U 17 -2.038061 ## 2.095880 ## 1.490256 ## 3.173311 ## -0.88671908-011# 9.268730 If TW F.leva:t 40.028 39.232 38.526 28.620 28.620 27.792 27.792 27.426 27.426 27.426 21.303 1.5 - 957 15.857 29.307 38.161 36.649 34.730 33.099 31.901 26.582 26.570 30.238 Invert Elevation 34.70000 34,33000 34.52000 34.50000 34.40000 33.42000 33.2.9000 22.91000 72.81000 22.81000 22.71000' 2-2.71000 21.37000 19.59000 19.60000 11.50000 11.00000 10.00000 21.12000 20.00000 39.00000 29.37000 26.71000 24_32000 23.l5000 23.00000 24_30000 24.31000 26.50000 22.00000 29.00000 28.16000 25.34000 23.45000 Flax Flow Max Flow Max Plow Max' Flow Sax • Flow Max F1ov Flax Flew Max Flow Max Flaw M" -Flaw M= flow Fiat Plow M= Flair Flax Flew Max Flow Max Epos+ Fiat Flow VAX MOW Max Flow Fiax Flow Flax plow ►sax P20W Fiaidmtm zlevation 40.53130 40.40686 40.25036 40.26484 39.64827 39.61460 39.02647 29.37997 29.35500 29.33512 29.33219. 29.24435 26.97681. 28.27483 21.30443 16.39464 15.85910 12.24589 28.97656 20.12610 39.40640 38.58124 34.73917 31.99810 30.26040 29.41317 29.71243 29.58596 27.43350 28.97750 39.93531 37.50378 33.10523 29.95604 U4/2u/ba 1u:13 'LYi+lbGfabU:ll hchiA & wv=DihL - MILR1:\V1U.N i.1*1L WJuiJ A 17 P668QVR 0.000000 0`.000000 0.000000 It P66A 199.4121 3032696. 9-39451.2 ## P66AOVR 0.000000 0400000 0.000000 it P40D 98.52608 3028059. 7.039747 ## P48DUVR 0.000000 0:000000 0.000000 ## P48C 66.65584 3331734. 6.896127 ## P48COVR 39.51232 90297.22 2.637695 1# P480 73_92618 3207562. 5.882828 ## P46BOVR 64.00372 213895.1 2_954804 #t P36B -22.12708 -697803.7 -3.130453 ## 236BCVR -20.71695 -134187.2 -1.660126 ## PM -17. L5739 -611281.4 -2.427262 ## P36PJM -30.66052 -217721.8 -1.796507 ## Ptak 87.99072 3452010. 7.002025 ## P48AMR 44.32383 151716.5 2.943514 #1 FSEE # 1 120.1407 4520253. 0.000000 of FLtEE 1 2 157.3407 1709243. 0.000000 #1 iitF.E # 3 170-9912 872155.3 0.000000 ## Cyr.. E L in ENGINEERS and SCIENTISTS March 30, 1999 Mr. David Mayes, P.E. City of Wilmington P.O. Box 1810 Wilmington, North Carolina 28401 r 220 Old Dairy Road • P.O. Box 10279 Wilmington, North Carolina 28405 Telephone: (910) 452-5861 Fax: (910) 452-7563 Re: GeotechnicalInvestigation Park Avenue Improvements - Wallace Avenue Fast Wilmington, North Carolina CATLINProject No. 99042 Dear Mr. Mayes: CATLIN Engineers and Scientists is pleased to present you with the results of our subsurface geoteehnical investigation at the above -referenced site. Drilling and soil testing performed on / March 24, 1999-included three Standard Penetration Test (SPT) borings, one to 20 feet below land surface (BLS) and two to 15 feet BLS. The following discussion outlines our method of testing and geologicallgeotechnical findings. 1.0 INTRODUCTION The purpose of this study was to determine the shallow subsurface soil conditions relative to determining allowable soil bearing capacities and to identify existing soil conditions which would affect site preparation for the proposed structure(s). The exploration of the subsurface soils and analysis of their condition and engineering characteristics are cons idered_sufficient to provide reasonable basis for general foundation design and site preparation. 2.0 SITE DESCRIPTION The subject site is part of Park Avenue located in the City of Wilmington beginning approximately 720 linear feet east from its intersection with Wallace Avenue and extending approximately 1,130 linear feet east. The three borehole locations were generally located on maps provided to CATKIN. An on -site meeting with Mr. David Shook, Designer of McKim and Creed, and a CATLIN representative field -located actual borehole locations. 3.0 FIELD ACTIVITIES Drilling of the SPT borings was performed in general accordance with the American Society for Testing and Materials (A.STM) Method D1586. The three'SPT soil borings, March 30, 1999 Page 2 B-1, B-2, and B-3, were advanced utilizing hollow stem auger and mud rotary drilling techniques to a depth of 20 feet, 15 feet, and 15 feet BLS, respectively. Approximate locations of the borings are illustrated on sketches contained in Attachment A. A 140-pound hammer was used to drive split -spoons into the soil in 1.5-foot segments. The number of blows required to drive the spoon for each 6.0-inch increment was noted and recorded. The number of blows required to drive the sampler the first 6.0 inches is considered to be a seating drive. The number of -blows required to drive the final 12.0 inches is.designated the "penetration resistance" or N-value. Soil samples were retrieved from the split -spoon and classified by color, texture, and water content in general accordance with A.S') M D2488 (Standard Practice For Description and Identification of Soils). Soil descriptions and blow counts were then transferred to boring logs which are included as Attachment B. 4.0 FINDINGS For the purpose of geotechnical engineering, SPT N-values (blow counts) allow a description of miative density or consistency for in -place soils. The descriptive terms for relative density (granular soils) or relative consistency (fine-grained soils) are somewhat universal through the industry and allow continuity in reporting. Please note, however, that there are minor differences Z¢escriptive terminology and respective N-values among various geotechnical references. The descriptive terms used by CATLIN are listed below for "sands" (granular) and "silts and clays" (fine-grained). SANDS (GRANULAR) SILTS AND CLAYS (FINE-GRAINED) Penetration Resistance (Blows/Foot) Relative Density Penetration Resistance (Blows/Foot) Relative Consistency 0 - 4 Very Loose 0 - 1 Very Soft 4 - 10 Loose 2 .4 Soft 10 - 30 Medium 4 - 8 Medium 30- 50 Dense 8 - 15 Stiff' Over 50 Very Dense 15 -30 Very Stiff L_.Over 30 Hard ,r. -- i rnu.i:�_- _LIB I-:�` F.k March 30, 1999 Page 3 The following provides (ummary of notable findings the Park Avenue, Wallace Avenue vicinity site: 1. Soil type encountered across the site consisted generally of very fine grained sand. 2. Ground water was generally encountered at a depth of approximately five feet BLS. / 3. Soils encountered in the upper 3.5 feet at the site are generally of loose density. Between depths of approximately 3.5 feet to 20 feet, sails were typically found to be medium density. 5.0 CLOSING CATLIN warrants that the findings contained herein have been provided after exploration and evaluation -in accordance with generally accepted professional engineering practice in the field of geotcchnical engineering. No other warranties are expressed or implied. CATLIN understands that additional surveying is to be accomplished by the City at this site. Efforts were trade by field personnel to leave identification flags and survey tape to located boreholes for the surveyor. Also, notes were taken by Mr. Shook as to the final locations of the boreholes on his set of plans. CATLIN appreciates this geotechnical/drilling services at your convenience. Sincerely, Keith P. Bulla, P.E. Project Manager KPBfhs Enclosures vo+ZWk l.0 opportunity to provide the City' of Wilmington with our If you have any questions concerning our findings, please call us B - - - - -. � , 1 -z=w-) r. U-+ ATTACHMENT A r.- RiQ Ntr R 31 ' 55 0: 3_4178 - . �QLL I .. wad XLJ � U x to I �a xr �� W� 11 t ! `� L Aft FX�i F— x jr g�wfi x i LLI ra X I�t FROM- CP. I L l N c I i k N i 1 � l w L 1 1 !! :5o P. 0 7 I I I } 1� I irr .il �7 iu:::'J iU=a-. 1cui tNJ, 1; 4„h;i Lih T-a5D F. 03 ATTACHMENT B �t 0 Qsss Jul• s�o-¢s2-aoa� Scot McLendon US Army Corps of Engineers,; Regulatory Branch IttcKir-n ;L P.O. Box 1890 Wilmington, N.C. 28402-1890 Re: City of Wilmington; Paris Avenue right of way improvement project Dear Scott, I have enclosed the completed application for the utilization of Nationwide Permit 25 for the above project which will impact .307 acres of ditch bottom wetland as we reviewed on site. I have also r= enclosed a copy of the 401 certification received from DWQ and an Environmental Summary �' ` prepared for the project. Please issue your approval for this activity as soon as possible and feel free to contact me with any questions you may have at your convenience. Thank you for your assistance. Sincerely, Steve Morrison Environmental Consultant encl: application materials, 401 certification, environmental summary cc: Greg Hetzler ✓ OEM 10- CORPS ACTION ID: NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): PRE -CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 3. NOTIFICATION TO THE CORPS OF ENGINEERS 2. APPLICATION FOR SECTION 401 CERTIFICATION 3. COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN M- COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT. I. OWNERS NAME: Cr T Y o f G(%14_-l1l-1G7_Z)N 2. MAILING ADDRESS: d +"1 R • D,40D MAYS__ PROJECT LOCATION ADDRESS,"INC UDING SUBDIVISION N�ME OF DIFFERENT -FROM MAILING ADDRESS ABOVE): ,57) U7' I4 r&r-1T'o F LJ4l1 Fa R / 5440k',4VryL r-77-�C-1J 5 ;Z tiD S —2 7' TELEPHONE NUMBER (HOME): ��A (WORK): 3y%- 7S:'0r7 4. IF APPLICABLE: AGENTS NAME OR RESPONSIBLE CORPORATE OFFFGIAL, ADDRESS, PHONE NUMBER: ,46�F,v7-- MOR,21TOAJ. Gss,vn z�, 7 c J 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY.A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY _OEt-i 14ksvoy„cg_ NEAREST TOWN OR CITY: i1%r[/*�r,✓�r7yry SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): vr-. G✓A 2s:ru r_c� L✓. r.+c� /��� �-, S2ti� S�-, 6. . IMPACTED OR NEAREST STREAM/RIVER: fw�TTS C�C�,UL4�S7'� RIVER BASIN: CAE f�_r�P 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER (SA); HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (OR", WATER SUPPLY (WS-I OR WS-II)? YES ( ] NO (�F YES, EXPLAIN: 75. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF CO STAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)? YES ( ] NO [ 7c. IF THE PROJECT 1S LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? /�F✓��i�xvr�ac. 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ I NO [1F YES, PROVIDE ACTION ID NUMBER OF PREVIOUS PERMIT AND ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ j NO [q-'IF YES, DESCRIBE ANTICIPATED WORK: 9a. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND 41, 2-A•P-r-S 9b, ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: .30- s1c12rl 10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: . 30 7 EXCAVATION: FLOODING: OTHER: - DRAINAGE: TOTAL ACRES TO BE IMPACTED: .3 07 IOb. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: FT. AFTER: FT. WIDTH BEFORE (based on normal high water contours): FT. AVERAGE DEPTH BEFORE: FT. AFTER. FT. (2) STREAM CHANNEL IMPACT WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: CHANNEL EXCAVATION: CONSTRUCTION OF A DAM FLOODING: OTHER: 11. 1F CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? ZA- WHAT IS THE EXPECTED POND SURFACE AREA? 12_ DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MEC}4ANICAL EQUIPMENT TO BE USED (ATTACHED PLANS: 8 1/2" X 11" DRAWINGS ONLY): 164 r a 1= "JA y 1 r4 PP--vyM OP£S D2 r Nct ub Pr p��J6 a Fbl-FcNzS _��.fu�Filc,✓� AIL (SPA-9 c..t�LE Co►�ST2ucrroN v 771 uT 7`n 16ZCc.vD5'- 13AInt:140E, oZz:R-. 6RAb 11 , 7-P-UCKS. 13. PURPOSE OF PROPOSED WORK: 90hD ��67- of L�q�' IM�oy�rfNTS _ 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS): ,,j R.777vMr e2Ald y I�/TCr'�C /N(JS: iTs elPsA An/TS F=/LLrA Ire ,L// nc j ,2o.Ah irYlf'�oV�r✓lr�. 1✓+�PAc; Mi,�i�J�2�eFriow -IPl CLUZ)Ef llrG�r7`,+-7)yf— F'/LTtP-i,y6 CO-- Pglc,G 7-0 c2u.rc7-7vtiJ TV er- /+PP t/rj) Pu,oe 7� aJG / 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: '% (ATTACH RESPONSES FROM THESE AGENCIES.) 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES [� NO I] OF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [ I NO [✓jam b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? _ YES [ I NO [� IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS SAGGETT DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROUNA 27603-8003, TELEPHONE (910) 733-6369. 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: x WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29 AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET .OR THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. c. IF•DELINEAT10N WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e. WHAT IS LAND USE OF SURROUNDING PROPERTY? s�lJFui� f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? GrY F—xlS77Nfr— g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OF THE US MAY NOT BE IMPACTED PRIOR TO: 1. ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2. EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, AND, 4%/ . roily c 3. (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM. (AGENTS SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED (183•)) = USGS QUAD MAP u .. F_ - .•.;4;F1• t 'r �r rti., •E '�,� -- zzf `s►ry .D .."' ,.J + UFSP 2+; + +;n.�.; �. '� r--••�r:.0 Y ]3� h ,: r r ' ' �' S � Y/• r "• '�'� ~Vii�..O\"` l Ct �� µ:! T.\ ' ~�• � '•�L 1 .w•o, ,.� 3' ^� - •, w ter' � '�� � • • i•, � J, - `" �"• ..t ajtil . `w . � r�1r. t,1,�: y--�---. ,l�t� • '� r. � . �t� �._ _. � �1 t .� 4�'E�.ti Y(,lsj' W' �,`��`, 'h��"�r•'1��' I '��'C �i�i� .,��. 9 � �1�4 ,�rP.��ti ��� •� r ••j{- ' _ • • ram..�!�� � �ry,y �i�A 5... G�.r 7 � !•,. '�'r'• V �'1L" '%C 4\ �. r� r' ii•�� : f ,r ' �,. ` diW I7i �1vi [U+a M v•. -;"Q /. r - . \ I•• !.•'' �ry F �•� slew 91 vow 4N r%:.i .+ t�'4 p. Y�•: � . r��•..� 1 ' �,.;' �'-fir;?, ' �2.: - 4. _ - •`+I � _ / � FY•s;`�',�y / / �Y r ��-�•..��_, y ` *'�' •` 'L� "ate -4' . ' - - �' //ram k � t �.r i' ,� ti.,y 5 �, �l •�'•R • � „j �,�}.• •� ,'.�.,� - y : t ; ✓ ti, k.`�,/ i , � � • Try � � � =- :.� �;�. _ 3700 i • - . yo ' • "'' i oe- =_b�Q`• - %`.''•rc�' 2- t �:;' _.;;- �'�?ir •. ti,: E "�•a � — / •�'� 4 0 -• j"B'h�-" ' � • "•E �\ - '`, e.•. ,.0 :pV. ' ' li / i' E1 1 r •: —1•'- t T3• .`Fi .,•r `�iq �' :';�••jy \Y \' ram+.. ri• � _ - ..'�'._ � ].lL��.. '�- :� •/ �C". +. �'�2fJ„ .: „i `��- may` �� r, - _•l - ^. - J,• .' r. sky i . / • '•.'•',�,'�,i. 3 `. '•�':�1� a [[ 'c! I ".-�. 1 -• n� ..y �^ •�� _ •�.'.1 � _-�• •� •.. "� � 1'c' 1. i'� ,` '� ` GNTS'yiL i r•i�r J �`•� :`y `1,_�•l - •, . yC:'• 1 �►1/ Aika�71 41. �tl -�nY" 5.' �Y ,fiE�kT�'^rf .•yk�.lh:• -a+� ;V, "�' .. "4.TtI{�( .t.1: IAL _ ��yy• r ?! _ �'�•\�.r, _. � �~. �e•z�i' �• 'r � � 1. yF �R�• �' �EIi GOL'P ..�;�,`,y r •`{' •Jp , f ../ ' N �•y1 �+� .f ': `,_?r3� :i ��' 'i C.1. ��.' I cCSrlRS$! _ _ .} l '�'� �'✓ .•r +. j K - L - - 5J'- a � _( `_'i•t,- i• i� 7788 i •::� }���� `�. .{'� � Fr' �- % ��' y � 7 u �i � �i•x`ti .�?• �� �• " �' :r�_"_:, ' •�' / O.2� L' �' a - f J � �.P - Y. �,q`� � „d �~r :'A �. ..r s� �'�' � ;-'ay ,.- •, �'�-..`�`� 1 � �t'r.� F� �.. h«�"a,?. ����' �\��';/R�' I � III h�' 4�' 1L •�`�.n�.�.. �. -� 1� �•--,rw •��`,: �! an '��••`� I .�` _�_:'22�-�•.�\ I -r /� � /�•: �V� �� ?:•7G�y'+�.� . ,r _7• '� � f�...l .I• �ii"�7 FF••' ��,� v _ -� •:::�r/r _�� _ram_//M, T- j'?:Jt :. 12 tk r'r , �,o,� -( -nl i �..,�^ f ,/ •rri,, t r 'ii:, �7 :,�:. _ r _ ,Iy'�.�; �•� -� ..ryh, `.. •,�a / =S�a: .Sl•'a/.rk 1-w NI �}y ` ? G'. SCALE 1 "=2000' w..atJ 7••l•. f'yC�• �j,'I `' Z ZS �.r'`.J� T%� .r• `i/ � ••r'�j- �'_c• ��� � 4` i�I y.Y�;:i+��/_ ..-f.7.•� !/fQ. �'t.� /� �': ff -...- ? O I, 1 .��.f � �""J'6 \J c� ;:./ r' ���:r � •��,. � .J�' ,n+,��"vCinF•f i�.��"i� / i.��rj+i�L1 ��O 2 C7 C/�-.�^�r\}/...,t p Flu..'_'°. a .lt� .+} �!� � � ��� '`•rC�1�,�'•� + � f • _ �1 \. C {�^.? 4 t7• 44444���� yC�/�. ? / rl. �Y ajrr�rw� tJ jjjv. %Y 3�. 1^��j`~ .f` -��` '� :�F�.-,-:. _fir• ., `T• �I �r' �. `�'��; �-. �' = r1.7:�'�J� . ^'-"'=� '•� � /'.:�., ���i/��'�r - �...^�•` '�'. ? w 's' � ,tom GROLY Goll" r w IL L p n rA cz n p ss+ r> n ! n _ # $p k Q r � Y a ■ , i %em �ati x It u] ' 07/li, 98 FRI '16:30 FAI 910 452 0060 L�`+D ]f.ANAGE]f_NT GROUP Q1003 � b i N �o rt J a- ai ri I N N _ xn, � ro 11 o�U31 q w �. Ad j uj ._. Ln ti u 3 Zr- La i ua J � _�=in State of North Carolina Department of Environment and Natural Resources Division of Water Quality 11kTW"!;WA James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary NORTH CAROLINA DEPARTMENT OF A. Preston Howard, Jr., P.E., Director ENVIRONMENT AND NATURAL REscuRCES September 23, 1998 New Hanover County WQC 401 Project # 980672 APPROVAL of 401 Water Quality Certification Mr. David Mays City of Wilmington Engineering Department 138 N. Fourth Street :.'ilmington, NC 28.10I Dear Mr. Mays: You have our approval, in accordance with the attached conditions, to place fill material in 0.31 acres of wetlands or waters for the purpose of constructing the Park Avenue Improvement project in Wilmington, as you described in your application dated September 3, 1998. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3108, This Certification allows you to use Nationwide Permit Number 26 when the Corps of Engineers issues it. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non -Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA pezzriit expires unlcssbtherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acte, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If.you do not accept any of the conditions of this certification -you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 15OB of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DWQ Regional Office Mr: John Dorney Central Files Steve Morrison; Land Management Group Montell Irvin; Ramey, Kemp and Associates 980672.1tr �'•'.`` Division of Water Quality Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycied/10% post consumer paper ENVIRONMENTAL SUMMARY FOR PARK AVENUE RIGHT OF WAY IMPROVEMENT PROJECT CITY OF WILMINGTON August, 1998 Land Management Group, Inc. ENVLRONNIENTAL SUAMARY FOR PARK AVENUE RIGHT OF WAY IMTROVENIENT PROJECT CM OF W 2YMgGTON ' The project site is contained within the right of way of Park Avenue between Wallace Avenue and 52nd Street in the Winter Park area of Wilmington. This corridor is approximately 2625' -- long and currently features a substantial man-made drainageway throughout its length. This ditch system varies in depth from approximately 12' at Wallace Avenue to 3' toward 52nd Street. Elevations within the right of way generally range between 30 and 40 feet. The right- f way at its western end has two unpaved roadbeds separated by the vegetated drainage ditch These roads serve as accessways to a number of homes and small businesses at this end of the corridor. The eastern end of the right of way contains a paved bike path from 52nd Street to the north terminus of Pine Street. No through motor vehicle traffic takes place here. Along the north side of the main drainage ditch, the embankment and roadside appears to be periodically mowed as a maintenance activity. Here, typical held succession growth dominates as a generally low ground cover. Vegetation on the south side of the ditch and along the unpaved roads consists of longer term growth featuring tree, shrub and ground cover strata. Trees and saplings included: Loblolly pine Pinus taeda Longleaf pine Pinus palustris Sweetgum Liquidambar styraciflua Dogwood Cornus florida Black willow Salix nigra Live oak Quercus virginiana Water oak Quercus nigra Red maple Acer rubrum Black cherry Prunus serotina ^r Mimosa Albizia juh%rissin Carolina laurel -cherry Prunus caroliniana Magnolia Magnolia grandiflora Sumac Rhus copalhum Shrubs included: Privet Ligustrum sinense Yaupon Ilex vomitoria Wax myrtle - Myrica cerifera Ground cover included: Poison ivy Crrapevine Dog fennel Greenbriar Bracken fern Common smartweed Penny wort Rhus radicans Vitus rotundifolia Eupatorium capillifolium Smilax glauca - Pteridium aquilinum Polygonum hydropiper Hydrocotyle sp. There are four different soil types shown within the right of way project area as described in the New Hanover County Soil Survey as prepared by the USDA Natural Resource Conservation Service (formerly Soil Conservation Service). In general the soil types from west to east along the corridor are Baymeade-urban land complex (1-6% slopes well -drained, moderately permeable), Seagate fine sand (somewhat poorly drained, moderately permeable), Lynn Haven fine sand (poorly drained, moderately permeable) and Leon sand (poorly drained, rapidly permeable). Of these soil types, Lynn Haven and Leon are listed on the national hydric sons list meaning that in an unaltered state, these soils are saturated., flooded or ponded long enough during the growing season to develop anaerobic conditions in the upper part. Hydric soils are one of the three criteria for wetland jurisdiction. However, the substantial drainage features on this urbanized site have altered the hydrological regime within the soil to the point that certain hydric soil indicators are absent beyond the confines of some ditch bottoms only. Since even the Lynn Haven and Leon soils have moderate to rapid permeability, lateral, subsurface drainage from the presence of extensive ditching is effective. Soil mapping as detailed within the soil survey is a general guide with a minimum 5 acre resolution. Mapped soil units can and do often have inclusions of other soil types within the shown classification. 2 Water flows within the right of way are directed by the existing ditch system. Storrnwater runoff from the surrounding developed neighborhoods is the major contributor to water levels in the ditches with a supplemental lesser amount provided by groundwater seepage in lower areas. The drainage direction is to the interior from, either end of the corridor to a point 800' west of 52nd Street where a cross ditch directs the water flow southward to beyond Oleander Drive and eventually to a tributary of Hewletts Creek. Portions of the ditch system contain surface water only after rainfall events especially in the higher areas. Deeper ditches in lower areas hold water year-round. No natural stream beds or waterbodies are Iocated within the subject right of way area. WETLANDS The project area has been inspected by Corps of Engineers Regulatory Branch staff to verify the presence and extent of jurisdictional 404 wetlands. It has been determined that the only jurisdictional areas He within the bottoms of the drainageway comprised of the centrally located ditch extending from Wallace Avenue to and including the. cross ditch which directs water off the corridor. The cross ditch also extends to 52nd.Street near the northern side of the right of way and is jurisdictional along its length within the ditch bottom. The total wetland area within the project corridor is 13,380 square feet (.307 acres). Vegetation within the wetland area is dominated by Common smartweed (Polygonum hydropiper) and Penny wort (Hydrocotyie sp.) which are obligate hydrophytes. Soils are saturated or submerged for sufficient periods during the growing season to produce anaerobic conditions in the upper part as evidenced by a sulfitic odor and a glayed coloration- Wetland hydrology is present due to the influx of area stormwater runoff and the proxinuty of groundwater to the ditch bottoms. The U.S. Fish and Wildlife Service and the National Marine Fisheries Service have provided the following list of plants and animals which'are Federally -Listed, Candidate Species and Federal Species of Concern which could be present in the area of the proposed project: NEW HANOVER COUNTY Mammals Eastern cougar Felis concolor Endangered Finbacic whale Balaenoptera physalus Endangered Humpback whaie Right whale Sei_whale Sperm whale West Indian manatee Megaptera novaeangliae Endangered Eubaleana glacialis Endangered Balaenoptera borealis Endangered Physeter catodon Endangered Trichechus manarus Endangered Birds Arctic peregFin falcon Falco peregrinus tundrirrs Threatened Bald eagle Haliaeetus leucocephalus Endangered Piping plover Charadrius melodus Threatened Red -cockaded woodpecker Picoides borealis Endangered Roseate tern = Sterna dougallii Endangered Wood stork - Mycteria americana Endangered Reptiles American alligator Green sea turtle Hawksbill sea turtle Kemp's ridley sea turtle Leatherback sea turtle Loggerhead sea turtle Alligator mississippiensis Threatened/SA* Celonia mydas Threatened Eretmochelys imbricata Endangered Lepidochelys coriacea Endangered Dermochelys coriacea Endangered Caretta caretta Endangered 4 Fishes Shortnose sturgeon Plants Cooley's meadowrue Rough -leaved loosestrife Seabeach amaranth Acipenser brevirostrum Endangered Thalictrum cooleyi Endangered Lysimachia asperulaefolia -Endangered Amaranthus pumilis Threatened * The American alligator is listed as threatened only under similarity of appearance. Section 7 consultation is not required. As with any plant or animal species, their presence is determined by the availability of suitable habitat for existence. The existing site and future project offer no suitable habitat for the listing of endangered and threatened species. rMAUS-162m,1� 1 Prior to the beginning of construction, certain permitting is required by regulatory agencies. Stormwater Management Permit A Stormwater Management Permit is required whenever a Sedimentation and Erosion Control Plan permit is necessary for a project. A permit application must be submitted to the NCDENR Division of Water Quality for approval. Sedimentation and Erosion Control Plan Permit A Sedimentation and Erosion Control plan must be submitted to NCDENR Division of Land Resources for approval and permitting since the project will disturb a surface area greater than one acre. Nationwide 26 Permit, For impacts to small areas of non -adjacent jurisdictional 404 wetlands, the use of Nationwide Permit 26 is authorized by the Corps of Engineers. The total corridor wetland area measures .307 acres and therefor qualifies for this usage. An application must be submitted to the Corps for approval and should demonstrate avoidance and minimization of impacts where possible as well as measures to preserve water quality. No mitigation for wetland impacts is required. A 401 Water Quality Certification is not required by DWQ since the wetland impacts will be less than 1/3 of an acre. 5 Y-17 IS, Oz or z .1 :61!p Ad re - per.. � ; .-. f �+.' . _�; r. �� ` •. ,, - � . •=,.'�i¢,,, was -�,� iy . .. .rr..•�ctiif .••, - , 1t _' ��i� r..•f� .r. rr.r ii �e . !i•+?`�!':S may.: ~y :� ,�� �' i� .f� \�� _'1' - � ,�� +'yam �/ ., ;r ,��� • ��+ •'�l .r � � w, /�� '�.. .� .ram •�