Loading...
HomeMy WebLinkAboutSW8990421_COMPLIANCE_19991229STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT N0. SW��v�O� I DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD City of Wilmington Park Avenue Right of Way Improvents Project Wallace Avenue to 52nd Street December 15, 1999 08240055.OW (40) On -Site Imprevious Area Tabulation On -Site Built Upon Area (sf) Bioretentention Area ----------------------------; ------------- i------------- 1 2 3 4 Street 7,084: 6,270: 9,8121 12,760 Bike Path -------------"+------------' 3,213: 2,904, 3,982: 3,278 Side Walk 11-408: 1,364� 1,232� 1,914 Drives 308; 959; 713; 1,584 Totals 12,013: 11,497: 15,739: 19,536 ql � f � I 1 1 I �- •II E C E I V E DEC 2 91999 FROJ # O42 Bioretention Impervious Areas.xis 1 Park Avenue Right of Way Roadway Improvements 08240055.OW (40) City of Wilmington Bioretention #3 j0 f 1 0 Bioretention Sizing Calculation n v 0% . with out sand bed (7% sum of c x area) a, iL b p 0?"c 87 w Total Basin Area Ta = 2.97 acres Impervious Area C -47 +'J�rA''�stiit►>• sf 4 (.07-C•Ta)•43560 = 4256.38 minimum bioretention surface area surface area provided = 4860 sf Bioretention Stage/Storage data ._ , 31.251 4860,001 (4860 - 6207) Qe✓ 31.70 fi207.00 Volume 2 �(31.7 - 31.25) Volume = 2490.07 . <:'.�-1 �l�lsg Storage Draw Down Use 1/2 of the min. Infiltration rate provised Infiltration Rate inch/hour Ir := 1.8 by Soil Tech Engineering for this site. Bioretention Bottom Aria Ap = 4860 Q .- Ap• [r Q = 0.2 12,3600 Time := Volume lume Time = 0.14 days Note : less that 4 days 0,86400 Peak Runoff Reduction P .= 4.5 2 year storm 1000 CN :- 75 S :- CN - t0 (P-02-S)'` Runoff z P r b 8 S). Runoff = 2.05 Infiltration Volume to Runoff Volume Ir = 0.88 Enter in Figure 6-1 of the TR-55 Manual Ruff as ratio of storage to runoff volume (VsNr) The ratio of peak outflow discharge 1 to peak inflow discharge (Qo/Qi) 90 % reduction in the 2 year storm bra.mcd R Park Avenue Right of Way Roadway Improvements 08240055.OW (40) City of Wilmington Bioretention #4 Bioretention Sizing Calculation with out sand bed (7% sum of c x area) Total Basin Area Ta = 2.21 acres Impervious Area C .47 �r i sf (.07 C'Ta)'43560 = 3167.2 minimum bioretention surface area n d surface area provided = 3100 sf Bioretention StagelStorage data = 30.351 3100.00 (3100 _ 3972) 30.80 3972.00 Volume = 2 (30.8-30.35) Volume= 1591? Storage. Draw Down Use 112 of the min. Infiltration rate provised Infiltration Rate inch/hour Ir 1.8 by Soil Tech Engineering for this site. Bioretention Bottom Area Ap 3100 Ir Q Ap' 1273-60-0 Q = 0.13 Time,- Q_.- Volume 86400 Time = 0.14 days Note :less that 4 days Peak Runoff Reduction P := 4.5 2 year storm 1000 CN := 75 S .- CN - 10 Runoff:= Runoff= 2.05 P + 0.8-5 Infiltration Volume to Runoff Volume Ir Runoff = 0.88 Enter in Figure 6-1 of the TR-55 Manual as ratio of storage to runoff volume (VsNr) 1 The ratio of peak outflow discharge to peak inflow discharge (Qo/Qi) 90 % reduction in the 2 year storm bra.mcd