Loading...
HomeMy WebLinkAboutSW8990236_COMPLIANCE_19990811STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE- YYWMMDD Compliance Inspection Report Permit: SW8990236 Effective: 08/11/99 Expiration: 08/11/13 Owner: J&S Miller Inc Project: Superior Center County: New Hanover Carolina Beach Rd Region: Wilmington Contact Person: James D Miller Title: Pres Directions to Project: 170' north of Christa Drive on east side of US 421. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Mott Creek (Todds Creek)) (03-06-17 } ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 06/1012013 Entry Time: 09:00 AM Primary Inspector: Christine Nelson Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: State Stormwater (See attachment summary) Wilmington NC 28412 Phone: 910-799-4857 Exit Time: 09:30 AM Phone:910-796-7215 Inspection Type: Transfer. Renewal Page: 1 Permit: SW8990236 Owner - Project: J&S Miller Inc Inspection Date: 06/10/2013 Inspection Type: Transfer Renewal Reason for Visit: Routine Inspection Summary: The permit expires on August 11, 2013 and a renewal application must be submitted 180 days prior to the expiration. Section 11.7 of the permit requires the certification to be submitted prior to the operation of the facility. The certificiation does not appear to have been submitted. Section 11.9 of the permit requires a modification when there is a transfer of ownership. The permittee dissolved on 12/5/2006 without transfering the permit to the current property owners. Please submit the completed certification, renew the permit, and transfer the permit to the current owners. Page: 2 Permit: SW8990236 Owner - Project: AS Miller Inc Inspection Date: 06/10/2013 Inspection Type: Transfer Renewal c:i., o.. 1^... Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Reason for Visit. Routine Comment: The permit expires on August 11, 2013 and a renewal application must be submitted 180 days prior to the expiration. Section 11.7 of the permit requires the certification to be submitted prior to the operation of the facility. The certificiation does not appear to have been submitted. Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: CIRI RM---...-- Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Yes No NA NE Yes No NA NE Yes No NA NE ❑❑❑■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ ■ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? Comment: Section 11.9 of the permit requires a modification when there is a transfer of ownership. The permittee dissolved on 12/5/2006 without transfering the permit to the current property owners. Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE ■ ❑ ❑ ❑ Page: 3 Compliance inspection Report Permit: SW8990236 Effective: 08/11/99 Expiration County: New Hanover Region: Wilmington Contact Person: James D Miller Title: Pres Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Mott Creek (Todds Creek)) (03-06-17) ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 05/09/2009 Entry Time: 08:30 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: ® State Stormwater (See attachment summary) Owner: J&S Miller Inc Project: Superior Center Exit Time: 09:00 AM Phone: 910-799-4857 Phone: 910-796-7215 Inspection Type: Stormwater Page: 1 Permit: SW8990236 Inspection Date: 05/09/2009 Owner - Project: J&S Miller Inc Inspection Type: Stormwater Reason for Visit: Routine Inspection Summary: In order to correct the following deficiencies you must perform the following: 1. Submit the required Engineers Certificate that was required uupon completion of the stormwater system. 2. Control cattail growth to a minimum of 50%. Is the permit active? Q Cl ❑ Signed copy of the Engineer's certification is in the file? ❑ ® ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? SO n n Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ ■ Comment: This office has not received a copy of the engineers certification SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ❑ ❑ ❑ Are the outlet structures located per the approved plans? ®❑ ❑ 0 Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? n ®❑ n Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ n 00 upon request? Comment: Cattails have exceeded the 50% allowance required by the operation and maintenance agreement. Page: 2 SUPERIOR CENTER NEW HANOVER COUNTY STORMWATER MANAGEMENT CALCULATIONS STORMWATER E C E C V E JUN301999 D E M PROJ # February 1999 Revised June 1999 i •. cItcp�...,..••• tit ��,; Prepared By: JOSEPH S. HILL, JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 Harbour Drive Wilmington, North Carolina 28401 (910)799-1544 SUPERIOR CTR.STWR CUR SUPERIOR CENTER Detention Pond Calculations 2. Forebay Calculations Outlet Protection Design - 18" 0 Pipe SUPERIOR CfR.SWR CVR.doc SUPERIOR CENTER Stormwater Detention Pond Calculations Stormwater runoff from the project will be retained in a wet detention pond. This pond will store the runoff generated by 1 inch of rainfall. The stored runoff will be discharged over a period of 3.7 days. The pond area required to remove 90% of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina coastal regions. Runoff Calculations Impervious Surfaces - Building Rooftop - 23,200 SF Asphalt Street & Parking = 26,739 SF Total Impervious Surfaces = 49,939 SF Total Area = 1.7977 Ac. = 78,308 SF Total Pervious Area = 28,369 SF 1" Runoff from Impervious Surfaces = 0.083' x 49,939 SF = 4,145 CF 1" Runoff from Pervious Surfaces = 0.2 x 0.083' x 28,369 SF = 471 CF Total runoff to be stored in pond = 41616 CF = 34,620 Gals Detention Pond Calculations Pond Surface area @ Temporary Pool Elev. of 38.7' = 7,038 SF Pond Surface area @ Permanent Pool Elev. of 38.0' = 6,192 SF Average Pond Surface Area = 6,615 SF Pond Storage Volume = 6,615 SF x 0.7' Depth ="-4,630 CF Total Watershed Area = 1.7977 AC. = 78,308 SF SUPERIOR CTR.SfWR CALC.doc Page I of 4 Impervious % = 49,939 SF = 78,308 SF = 63.8% Pond Depth = 5.0' SA/DA % required for 90% solids removal @ 5.0' Depth (see chart) = 4.6% 4.6% x 1.7977 AC. = 0.10 AC. = 4,356 SF Pond surface area @ Permanent Pool Elev. of 27.3' = 6,192 SF Pond is therefore adequate for 90% TSS removal. -Orifice Disc`aege Cate Calculations Use V diameter orifice for outlet Calculate average discharge rate and time to lower orifice head from 0.7' to 0.6% 0.1' pond height x 6,615 SF average pond area x 7.5 gal/Ft3 = 4,961 Gallons Storage Average head on orifice from 0.7' to 0.6' = 0.65' Average discharge rate @ 0.65' head: Q(GPM) = (449)c A-/2gh Q(GPM) = Volume discharged in gallons per minute c= discharge coefficient = 0.6 A = orifice area in square feet g = gravity = 32.2 h = head above center of gravity Q(GPM) _ (449)(.6)(.0055)-/(2)(32.2)(0.65) Q = 9.6 GPM Time required to lower pond 0.1' @ 0.65' average head: T = 4,961 Gal. = 9.6 GPM = 517 minutes 9.6 GPM vs 517 minutes plotted on curve (see discharge curve). SUPERIOR CTR.STWR CALC.doc Page 2 of 4 Discharge rate and time to lower head from 0.6' to 0.5': Q = 8.8 GPM T = 4,961 Gal. 8.8 GPM = 564 minutes 8.8 GPM vs 1,081 minutes plotted on curve. Discharge rate and time to lower head from 0.5' to 0.4': Q = 8.0 GPM T = 4,961 Gal. = 8.0 GPM = 620 minutes 8.0 GPM vs 1,701 minutes plotted on curve. Discharge rate and time to lower head from 0.4' to 0.3': Q = 7.0 GPM T = 4,961 Gal. = 7.0 GPM = 709 minutes 7.0 GPM vs 2,410 minutes plotted or, curve. Discharge rate and time to lower head from 0.3' to 0.2': Q = 5.9 GPM T = 4,961 Gal. = 5.9 GPM = 841 minutes 5.9 GPM vs 3,251 minutes plotted on curve. Discharge rate and time to lower head from 0.2' to 0.1': Q = 4.6 GPM T = 4,961 Gai. = 4.6 GPM = 1,078 minutes 4.6 GPM vs 4,329 minutes plotted on curve. Discharge rate and time to lower head from 0.1' to 0.0': Q = 2.7 GPM T = 4,961 Gal. = 2.7 GPM = 1,837 minutes 2.7 GPM vs 6,166 minutes plotted on curve. The outlet structure will discharge the total calculated runoff volume of 34,620 gallons in approximately 3.7 days (see Orifice Discharge Curve). SUPERIOR CTR.STWR CALCAOC Page 3 of 4 d � � -/-- d ..� , m � 7 . / . . 0 n. =--- Q k 2 ¥ « o m � Q � i 2 } w XL ¥ » a 0 \ � . tb Q > w O C � g CJC) • S o � � ---- __. N4/ o � � ■ m SA/DA - 85%.TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4-OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7-OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SA/DA - > 90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 200 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50% 5.6 5.0 4.3 3.9 3:5. 3.1 2.7 2.3* 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5' .0 4.5 3.9 3.4 2.9 2.3 80% .9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3..9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 -5.8 5.1 4'.3 3.6 6 `t �, SUPERIOR CENTER Forebay Calculations Provide 20% of Total Permanent Pool volume including area of forebay construction: Permanent Pool Volume: Pool Area @ Elev. 38.0' = 6,192 SF Pond Area @ Elev. 33.0' = 700 5r Pond Average Area = 3,446 SF 3,471 SF x 5.0' Depth = 17,230 CF Permanent Pond Volume 171230 CF x 0.2 = 3,446 CF Forebay Volume Required Forebay Volume: Forebay Area @ Elev. 37.8' = 11728 SF Forebay Area @ Elev. 34.0' = 306 SF Forebay Average Area = 11017 SF 1,017 SF x 3.8' Depth = 3,865 CF Forebay Volume 31865 CF = 17,230 CF = 22% Forebay = 22% of Permanent Pond Volume SUPERIOR CTR.STWR CALC.doc Page 4 of 4 Appendices Cu 15 10 8 6 0 L_ N 4 m L U C 2 T :y C m 1 0.8 0.6 0.4 Q I i■w�iwiw■w■�ww��w■iw �■w■ww ' • wwwww■ww wwwwww ■�wwww��►;SM ON -Mill 5 10 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Figure 8.03b Rainfall intensity duraiian curves —Wilmington. 20 15 10' 8 a 1 4 L U C 2 Qy 1 c 0.8 m 0.6 `c Ta 0.4 t3: 0. Qf Duration ww■1ww Hatter #rra mm NO tititi1�1• ��>•>•����� MUNI w10101 i ,1 S 10 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Duration Figure 8.03c Rainfall intensity duration curves —Hatteras. 0 8.035 FIGURE5 I8I FIGURE 4 FLOW FOR CIRCULAR PIPE FLOWING FULL BASED ON MANNING'S EQUATION n=0.012 5000 4000 3000 2000 1000 800 600 500 400 300 200 p 10C w 8C ,r 6C a 5C t- 4C w w 3C U- U_ m 2C U Z_ 1C 0 ti 6 5 4 R� MIS 0 WRAP zi 0 K", PAP A 01 •02 .03'.04.05 .1 .2 .3 .4.5.6 .8 1. 2 3 4 5 6 810 SLOPE OF PIPE IN FEET PER 100 FEET 2 I SUPERIOR CENTER Erosion Control Plan Outlet Protection Design 18" 0 Pipe Outlets Use attached Nomographs to determine Rip Rap size and Rip Rap apron configuration for 18" 0 RCP discharging to detention pond and from detention pond to U.S. 421 R/W ditch. (9.2 CFS) Design Criteria: 1. Flow = 9 CFS; 18" 0 outlet pipe 2. Assume minimum tailwater conditions; no defined channel. Pipe Diameter = Do = 1.5' Apron Length = La = 10' (from Nomograph) Upstream Apron Width = W„ = 3 x Do = 3 x 1.5' = 4.5' Downstream Apron Width = Do + .4La = 1.5' + 10' = 11.5' Min. Median Stone Size = d5o = 0.4' Min. (from Nomograph) (See attached Rip Rap Blanket Configuration - Plan View) Select "Class B" Stone (minimum) 5" - 15" Apron Thickness = 1.5 x dmax = 1.9' SUPERIOR CTR.18 PIPE OUTI.Er.doc Page 1 of 1 Water Conveyance and Energy Dissipation 7.57 ment. However, to simplify our calculations, we will assume that both i and A remain constant. Therefore, the pestdevelopment runoff is 0.6 ( 0.6 ) 0.3 (20 ft'Isec) v 40 ft'/sec 0.3 (0.57 ma/sec) s 1.14 m3/sec This flow will exceed the natural capacity of the stream. It may erode the streambank and cause flooding problems. STD 3. Determine how to accommodate the postdevelopment flow in a nonerosive man- ner. There are several ways we could handle the increased flow. We could further divide the subdivision so that approximately one-half drains into the stream and one-half e, :rl.s 1. Z 3 r � 1 f 1 , r !r �115 � � 1 r � � l � � 1 i W (max. TWI W -(min. TW) Fig. 7.47 Riprap blanket configuration for outlet protec- tion; see the reference for design details. (2) 1 0 r/ 69 R-GP 0 L. 'i = 10 , 7.54 Erosion and Sediment Control Handbook .3 0, 2 Wd - 09' L.. 30 Outlet 1 I tO 90 pipe toy diameter0, croEaP 25 r4•K 80 'CL' of apto 70 20 a 60 15 - — • 1.4 o Q' can 1.3 Nmm u v 4 1.2 1.0 E 3 0.9 E ors u a 5 10.8 0� 0 d i I' "—�—i yti'a" a 2,N 106 70.5 a M1 10.4 j2 d Qc to l u7�� 1 0.3 N m � � � I �0.2 1 .I 0 3 5 10 20 s0 100 200 500 1000 �.2 C♦L5 Oischarge, ft3/sec 0.1 0.2 0.3 0.4 0.6 0.8 1 2 3 4 5 5 7 8 10 15 2025 Discharge, m3lsec Fig. 7.45 Design of riprap outlet protection from a round pipe flowing full; minimum tailwater conditions. (6, 14) to find the riprap size and apron length. The apron width at the pipe end should be 3 times the pipe diameter. Where there is a well-defined channel immediately downstream from the apron, the width of the downstream end of the apron should be equal to the width of the channel. Where there is no well-defined chan- nel immediately downstream from the apron, minimum tailwater conditions apply and the width of the downstream end of the apron should be equal to the pipe diameter plus the length of the apron. EitiMPLE 7.4 Biprap Outlet Protection Design Calculation for Minimum Tailwater Condition Given: A flow of 6 ft3/sec (0.17 m'/sec) discharges from a 12-in (30-cm) pipe onto a 2 percent grassy slope with no defined channel. _ Find The required length, width, and median stone size d,a for a riprap apron. d ,�, = & q-=`