Loading...
HomeMy WebLinkAboutSW8990126_COMPLIANCE_19990601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ke�(1Gi%,.G DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW8990126 Effective: 06/01/99 Expiration: County: Brunswick Region: Wilmington Contact Person: Peter Brennan Title: President Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 02/2112011 Entry Time: 02:15 PM Primary Inspector: Angela K Hammers Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: State Stormwater (See attachment summary) . Owner: Alltek Inc Project: Alltek Exit Time: 02A0 PM Phone: Phone: 919-796-7215 Ext.7317 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8990126 Owner - Project: Alltek Inc Inspection Date: 02/21/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On July 22, 2010 a Notice of Violation was issued and sent to the Permittee for Failure to Certify the Stormwater System and Failure to Maintain the system. On November 8, 2010 a Notice of Inspection was written and sent to the Permittee stating that woody vegetation along the pond slopes had been removed and erosive areas of the system had been repaired, however, a certification of the stormwater system had not yet been received. As of February 21, 2011, a copy of an engineer's certification has not been received by DWQ. Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the rile? Copy of the recorded deed restrictions is in the file? Comment: A copy of the PE was not found in the file. Page: 2 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor November 8, 2010 Mr. Peter M. Brennan, President Alltek, Inc. 2110 Moon Station Dr. Kennesaw, GA 30144 Division of Water Quality Coleen H. Sullins Director Subject: NOTICE OF INSPECTION Alltek Permit No. SW8 990126 Brunswick County Dear Mr. Brennan and Mr. Rosas: Mr. Vladimir Rosas Alltek, Inc. 2155 Enterprise Blvd. NE Leland, NC 28451 Dee Freeman Secretary On October 26, 2010, Angela Hammers of the Wilmington Regional Office of the Division of Water Quality (DWQ) inspected Alltek in Leland, Brunswick County to determine compliance with Stormwater Management Permit Number SW8 990126 issued on June 1, 1999. DWQ file review and site inspection revealed that.the site is not compliant with the terms and conditions of this permit and remains under a Notice of Violation (NOV-2009-PC-0690) issued on July 22, 2010. Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter, which summarizes thefindings of the recent inspection. As indicated in.the attached inspection report, the following deficiencies must be resolved: 1. Submit an engineer's certification of the stormwater system to this office. It is noted that vegetation has been removed from the pond slopes and forebay berms as requested. In addition to the above certification, please submit the following: A request for acceptance of the permit extension (SL2009-406) or a complete renewal application package. A request to transfer ownership of the permit as needed. Please inform this Office in writing before December 9 2010, of the specific actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action including the assessment of civil penalties of up to $25,000 per day. If a written plan of action is not submitted to this office by December 9, 2010 then DWQ staff will re- inspect the site and issue a Notice of Violation with a recommendation for enforcement if the listed deficiencies have not been addressed. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One I, 1 Phone: 910-796.72151 FAX: 910-350-20041 Customer Service: 1-877-M-6748 Nort l Carol l na Internet: www.ncwaterquality.org Amin //, , An Equal Opportunity 1 Affirmative Action Employer I [[ "J Mr. Peter Brennan & Mr. Vladimir Rosas Alltek Stormwater Permit No. SW8 990126 Please be reminded that if any ownership or name change has occurred it is the permittees' responsibility to notify this office in writing. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 796-7215. Sincerely, Angela Hammers Environmental Specialist Enclosure: Compliance Inspection Report Copy of Notice of Violation (NOV-2009-PC-0690) GDSlakh: S:IWQSISTORMWATERIINSPECT1990126.nov10 cc: John Hennessy-NPS-ACOU Georgette Scott Phil Norris, PE (Andrew & Kuske) WiRO Files Page 2 of Compliance Inspection Report Permit: SW8990126 Effective: 06/01/99 Expiration: County: Brunswick Region: Wilmington Contact Person: Peter Brennan Title: President Directions to Project. Type of Project: State Stormwater - HO - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 1012612010 Entry Time: 02:15 PM Primary inspector: Angela K Hammers Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: I] Compliant ■ Not Compliant Question Areas: ■ State Stormwater (See attachment summary) Owner: Alltek Inc Project: Alltek Exit Time: 02:45 PM Phone: Phone: 919-796-7215 Ext.7317 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8990126 Owner - Project: Alltek Inc Inspection Date: 10126/2010 Inspection Type: Compliance Evaluation Reason for Visit: follow-up Inspection Summary: The following deficiencies were noted during the inspection: 1. A PE Certification has not been received by this Office. 2. Documentation of the verification of the depth of the ponds has not been received by this office. To bring this system into compliance, the following must be completed; 1. Submit a PE Certification of the stormwater system to this office. 2. Submit documentation of the depths of the ponds to this office. Please note this permit is under Notice of Violation, NOV-2009-PC-0690. Please complete the above listed deficiencies to bring this permit into compliance. Also,note that this permit was stated as expiring on June 1, 2009. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: A PE certification has not been received by this Office. Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Yes No NA NE ■ ❑ ❑ ❑ ❑ 0 ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ Y ❑ Yes No NA NC ❑ ■ Q ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to OWQ ❑ ❑ ❑ i upon request? Comment: It was observed that woody vegetation along. the pond banks has been removed; eroded areas have been revegetated. The depth of the ponds has not been verified. Page: 2 Compliance Inspection Report Permit: SW8990126 Effective: 06/01/99 Expiration County: Brunswick Region: Wilmington Contact Person: Peter Brennan Title: President Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 07113/2010 Entry Time: 12:15 PM Primary Inspector: Angela K Hammers Secondary Inspoctor(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: State Stormwater (See attachment summary) Owner: Alltek Inc Project: Alltek Exit Time: 12:45 PM Phone: Phone: 919-796-7215 Ext.7317 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8990126 Owner - Project: Alltek Inc Inspection pate: 07/13/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The following deficiencies were noted during the inspection: 1. This permit has expired as of .June 1, 2009. 2. No PE certification was found in the file. 3. There was a lack of maintenance of the stormwater system. To bring this system into compliance, the following must be completed: 1. Submit either a renewal application package (application, processing fee) or a written request to SL2009-406 Permit Extension with an extended expiration date of June 1, 2012, 2. Submit a PE Certification for the stormwater system to this office. 3. Maintain the stormwater system to include: Removal of woody vegetation from the forebay berms Verify the depth of the ponds Repair and/or re -vegetate all eroded areas 4. It is the responsibility of the Permittee to request a change of ownership as needed. This permit is under continued Notice of Violation. The above deficiencies must be corrected. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Permit expired on June 1, 2009. No PE certification was found in the file. Operation and -Maintenance Are the SW measures being maintained and operated as per the permit requirements? accept the Yes No NA NE ■ ❑ ❑ ❑ ❑■00 i ❑ ❑ ❑ ❑ ❑ ■ ❑ V— kfn AIA NF 0■❑❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ 0 ❑ v upon request? ' Comment: Woody vegetation observed on the forebay berm of Pond #2 (North side of property). Woody vegetation observed on the forebay berm and in front of outlet of Pond #1 (East side of property - front pond). Some vegetation observed within basin of Pond #1. Page: 2 A&K1198236 Permit No. 5 w8 9 9 0/ a c� (to he provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Contact Person: Alltek Peter Brennan Phone Number: ( 1-800 ) 334-9259 For projects with multiple basins, specify which basin this worksheet applies to #1 Basin Bottom Elevation 51.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 55.0 ft. (elevation of the orifice) Temporary Pool Elevation 56.0 ft. (Elevation of the discharge structure overflow) Permanent Pool Surface Area 8,020 sq. ft. (water surface area at the orifice elevation) Drainage Area 3.6 ac. (on -site and oil site drainage to the basin) Impervious Area 1.8 ac. (on -site and off -site drainage to the basin) Permanent Pool Volume 13,778 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 8,530 cu. ft. (volume detained above the permanent pool) Forebay Volume 3,400 _ cu, ft. SA/DA1 used 0.043 (surface area to drainage area ratio) Diameter of Orifice 1.5 in. Design TSS Removal 90 % (85% TSS removal required, see item k below) H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev 1/August 1998 Page 1 of 3 a. The temoorary pool controls runoff from the 1 inch storm event b. The basin lenuth to width ratio is t-=reater than 3: 1. c. The basin side slopes above the permanent pool are no steeper than 3:1. d. A submersed and vegetated perimeter shelf at less than & 1 is provided (show detail i. e. Veaetation above the nermanent pool elevation is specified. f. An emerLencv drain is provided to empty the basin. t7. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). h. The temoorary pool draws down in 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. i. The forebav volume is anoroximately equal to 20% of the total basin volume. k. Sediment storaee is provided in the permanent pool. 1 A 10-fnnt vPaPtntivP GltPr is nrnviriivi at the nntlPt2 (inAiriP Prn6vP flnru ralrnlatinncl m. Recorded drainage easement for each basin includin z access to nearest riLht-of-wav n. A site snecific operation and maintenance (OM plan is provided. o. A vep-etation manasement/mowinL schedule is provided in the O&M plan. D. Semi-annual inspections are snecified in the O&M plan. a. A debris check to be performed after every storm event is specified in the O&Nl elan. r. Snecific clean -out benchmarks are snecified in the O&M plan (elevation or depth). c A lPaally rPcnnn6h1P narty is rlacianntPrl in the C)kMt nlan3 (inrhiriP name and titlpl t. if the basin is used for sediment and erosion control durint? construction. clean out of the. basin is specified to be performed prior to use as a wet detention basin. Footnotes: lWhen using the Division SAIDA table, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Lincar interpolation should be employed to determine the correct N aluc for non- standard table entries. 2The requirement for a vegetative filter may be waivcd if the %%et detention basin is designed to meet 90% TSS removal, 3The legally responsible party should not be a homeo%�-ners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 111. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, forebav, non-integrated pretreatment Systems (pretreatment other than forebays), and the vegetated filter if one is provided. This system (check one) [Idoes ® does not incorporate a vegetated filter. This system (clreck one) ❑ does ® does not incorporate non-integrated pretreatment. .Nlaintenance activities shall be perform as follows: 1. :after every significant runoff' producing rainfall event and at least monthly: Form SWU-102 Rev 1/August 1998 Page 2 of 3 ,R 4 a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 4 feet The sediment removal benchmark depth is: 3 feet 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: Address: Phone. - Title: Signature: Date: Peter M. Brennan 2110 Moon Station Drive, Kennesaw, GA 30144 1-800-334-9259 1, , QY; a `�'Y� , �i D ��yn a r , a Notary Public for the State of 'V\ D r k CoL wo ; v, a.. County of `new a V% v r , do hereby certify that pe+-{ r YV\ (� r-e m H a ri personally appeared before me this 15 day of jc n �a r•{ , 19 qcj , and acknowledge the due execution of the forgoing infiltration system maintenance requirements. _)X4&vdt&y hand and official seal, My c4inmission expires 7.2 te- -100-2- Form SWU-102 Rev 1/August 1998 Page 3 of 3 ,P W C4 SEAL IF r VOjA RY. s PtJBLI G 4� a CO'��' State Storinwater Management Systems Permit No. SW8 990126 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Alltek Permit Number. SW8 990126 Location: Brunswick County Applicant: Mr, Peter M. Brennan, President Mailing Address: Alltek, [tic. 2110 Moon Station Drive Kennesaw, GA 30144 Application Date: January 19, 1999 Water Body Receiving Stormwater Rtmoff: Banton Branch (CFR 18-77-1-1-2) Classification of Water Body: "C Sw" POND 1 POND 2 Pond Depth, feet: 4 5 Permanent Pool Elevation. FMSL: 55 56 Total Impervious Surfaces, ft-: 78,500 114,781 Future, ft': 0 114,781 Offsite Area entering Pond, ft': None, per Engineer Required Surface Area, ft': 6,751 8,237 Provided Surface Area, ft': 8,020 10,890 Required Storage Volume, ft': 6,542 9,171 Provided Storage Volume, W: 8,530 11,485 Temporary Storage Elevation, FMSL: 56 57 Controlling Orifice: 1.5" (� pipe 9 State Stormwater Management Systems Permit No. SWS 990126 I1. SCHEDULE OF COMPLIANCE The stormwater management system sliall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not fimited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. C. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogginb of outlet structure, orifice device and catch basins and piping. 9. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative. spray fountains will not be allowed in the stormwater treatment system. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 9. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stortwater facilities will be restricted by the sale of any portion of the property. 10. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Prior to the sale of any portion of this project, the permittee must notify DWQ, and provide the name, mailing address and phone number of the buyer. Additional requirements may apply to both parties. 11. The runoff from all built -upon area on the project must be directed into the permitted stormwater control system. 12. if the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4 Compliance Inspection Report Permit: SW8990126 Effective: 06/01/99 Expiration: County: Brunswick Region: Wilmington Contact Person: Peter Brennan Title: President Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 0810612009 Entry Time: 09:50 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: ® State Stormwater (See attachment summary) Owner: Alltek Inc Project: Alltek Exit Time: 10:00 AM Phone: Phone: 910-796-7215 Inspection Type: Stormwater Page: 1 Permit: SW8990126 Owner - Project: Alltek Inc Inspection hate: 08/06/2009 Inspection Type: Stormwater Inspection Summary: In order to bring this state stormwater permit into compliance you must provide the following: 1. A renewal application and the $505.00 renewal fee. 2. Provide the required Engineers Certification. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: 1. Permit expired on June 1, 2009. 2. This office has not received the Engineer's Certification Reason for Visit: Routine Page: 2 A&K#98236 Permit No. SC-08 9 90 a Lp (to be provided by DWo State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT 'Phis form may he photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: AlItek Contact Person: Peter Brennan Phone Number: ( 1-800) 334-9259 For projects with multiple basins, specify which basin this worksheet applies to: #2 Basin Bottom Elevation 51.0 ft. Permanent Pool Elevation 56.0 ft. Temporary Pool Elevation 57.0 ft. Permanent Pool Surface Area 10,890 sq. ft. Drainage Area 3.1 ac. Impervious Area 2.63 ac. Permanent Pool Volume 26,725 cu. ft. Temporary Pool Volume 11,485 cu. ft. Forebay Volume 5,770 cu. ft. SA/DA1 used 0.061 Diameter of Orifice 1.5 in. Design TSS Removal 90 % II. REQUIRED ITEMS CHECKLIST (average elevation of the floor of the basin) (elevation of the orifice) (Elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) (combined volume of main basin and forebay) (volume detained above the permanent pool) (surface area to drainage area ratio) (85% TSS removal required, see item k below) The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached, If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev UAugust 1998 Page 1 of 3 a. The temgorary pool controls runofffrom the 1 inch storm event. b. The basin lenuth to width ratio is ureater than 3.1. c. The basin side slopes above the nermanent nool are no steeper than 3 1 d, A submerued and vetetated perimeter shelf at less than 6 1 is provided (show detail), e. VeBetatlon above the permanent pool elevation is snecified. f' An emerp-encv drain is provided to ernoty the basin. e. The nermanent pool denth is between 3 and 6 feet freouired minimum of feet). h. The temporary pool draws down in 2 to 5 days. i, A trash rack is provided for both the overflow and orifice. i, The forebav volume is aoproximateiv eaual to 20% of the total basin volume. k. Sediment storage is provided in the nermanent pool. 1 A 10-fnnt vPaPtntiva filtar is nrnvirlPri nt the rritlPt2 (Inr.hirlP PrncivP flrnv rnlriilntinnO m. Recorded drainaee easement for each basin includine access to nearest right-of-way. n. A site specific operation and maintenance (O&NI) plan is provided. o. A veeetation manaeement/mowing schedule is nrovided in the 0&%1 elan p. Semi-annual insnections are snecified in the O&M plan. o. A debris check to be performed after every storm event is specified in the O&.%1 plan r. Soeciftc clean -out benchmarks are specified in the O&M elan (elevation or denth). c A iPanliv rPcnnn¢ihlP narty is r1p6onntPri in the (,)k 1 ninn3 (inrhiriP name nnri titlPl t. If the basin is used for sediment and erosion control durine construction_ clean out of the basin is snecified to be nerformed prior to use as a wet detention basin. Footnotes: l when using the Division SA/DA table. the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2The requirement for a vegetative filter may be waived if the lvct detention basin is designed to meet 90% TSS removal. 3The legally responsible park- should not be a homcoivners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin forebav, non-integrated pretreatment systems (pretreatment other than forebays), and the vegetated filter if one is provided. This system (check one) ❑ does ® does not incorporate a vegetated fiiter. This system (check one) ❑ does ® does not incorporate non-integrated pretreatment. Maintenance activities shall be perform as follows: l , After every significant runoff producing rainfall event and at least monthly, Form SWU-102 Rev IlAugust 1998 Page 2 of 3 a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b, Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an apppropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 5 feet The sediment removal benchmark depth is: 3.75 feet 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. 6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: Address: Phone: Title: Signature: Date: Peter M. Brennan 2110 Moon Station Drive, Kennesaw, GA 30144 1-800-334-9259 1, �. -Qri 0. `N . CO JRrhA,n , a NotaryPublic for the State of `11ar' -k arD I; �► Countyof " o_w go„noq-C,r , do hereby certify that pe+trr `M Y) n c► In personally appeared before me this _15 day of ,�AN �a r�1 , 19 J6_ , and acknowledge the due execution of the forgoing infiltration system maintenance requirements. Witness my hand and official seal, My commission &pires Form SWU-lot Rev 1/August 1998 Page 3 of 3 IA. COV SEAL. , V01ARy. ftBOr- R C Date DesignAndrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS. INC, Wilmington, N.C. 28401 / CF 2 Check Job G)j�����/� Q_ For 19LL TEL_ Job No. 50 o ,ev 7) u� 7C . c (13 61-1 IV g - 0 FT � v Z4�D t g OO - F�L 6el 2Dg"_ 0630 FTC !7Z e�vU 6C--L r'TORMWATER bV���aaa�i�lrra�rr D E C E I V E "o BAN 191999 . WE M�UI Z& QLIP ',a IN!la N NSW' Date Design and Kuske CONSULTING ENGINEERS, INC. 902 Market St. Wilmington. N.C. 284d1Check 4�heetAndrew Job /'". �/ For fit--L-Ted- �1vZ 0 � Z D 2r-r •-d i IJ cr Tp Tv 1 m P, Giv 2r-� = '5 5 4�7' 3�j 03Co F7 Z- o r2. 11417e� 1 S F o 14 r e-- 7 'Fe v% 7-s 5 perm w ✓,9 t_. wl a r-1 L rS2 4 Yam. = , / L/, 7 0 l i-- , 2 �-Zo' 2s s7 ► z qo 3 FT FT -'- Fr Z = f1y45 er3 5fl •j, FTC 17z, &oG < Z D A"f �• Cv Z��z . Z� . � = eq-,115 FT L V"6 l I1Z, " 0e! G!c-c­ ':�- p ► I Z`5 F-) L