Loading...
HomeMy WebLinkAboutSW8120302_COMPLIANCE_20130606STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 i.io2,c?- DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE © COMPLIANCE EVALUATION INSPECTION DOC DATE oio ota _ YYYYMMDD Nelson, Christine From: Zak Shipman [Zak.Shipman@timmons.coml Sent: Thursday, June 06, 2013 4:04 PM To: Nelson, Christine Cc: Miller, Carol Subject: RE: French Creek Exchange SW8 120302 Thanks! I will pass this info along. Zak Shipman, PE Project Manager TIMMONS GROUP I www.timmons.com 5410 Trinity Road, Suite 112' Raleigh, NC 27607 Office: 919.866.49371 Fax: 919.859.5663 Mobile: 919.210.8608 1 zak.shipman@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Nelson, Christine fmailto:christine.nelson@ncdenr.gov] Sent: Thursday, June 06, 2013 3:52 PM To: Zak Shipman - Cc: Miller, Carol Subject: RE: French Creek Exchange SW8 120302 Zak, There is no final inspection from the stormwater group. The submitted designer's certification is the indicator that the stormwater group relies on to ensure that it was built according to the approved plans. If there are any noted deviations from the approved plans, then a revision or modification may be necessary. If you happen to do an as built survey, we'd love to get a copy of those too though it is not required. Erosion control may have a final inspection to close out their permit once everything is stabilized, but Carol with the Land Quality group will know that better than I do. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Zak Shipman[mailto:Zak.Shipman@timmons.com] Sent: Thursday, June 06, 2013 3:33 PM To: Nelson, Christine Subject: FW: French Creek Exchange SW8 120302 . Ms. Nelson, We have a contractor wrapping up construction on a wet -pond that you permitted for us about a year ago (permit attached). The pond is stabilized and has had the final clean up done to it. Does someone from DENR need to come out and do a final inspection on the pond? If so would you mind sending me their contact info so we can get them scheduled? . Thanks, Zak Shipman, PE Project Manager TIMMONS GROUP j www.timmons.com 5410 Trinity Road, Suite 112 1 Raleigh, NC 27607 Office: 919.866.4937 j Fax: 919.859,5663 Mobile:919.210.8608 zak.shipman(@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Casmer, ]o fmailto:io.casmer(&ncdenr.goy] Sent: Friday, April 13, 2012 2:53 PM To: Zak Shipman Subject: French Creek Exchange SW8 120302 Hi Zak: Normally we fax the permit to the owner and consultant when it is issued, however 1 couldn't get the fax to go thru to you so I am attaching via email. Camp Lejeune has received their copy. Jo Gamer Administrative Assistant IV NC Dept. of Environment & Natural Resources Division of Water Quality -Surface Water Protection Section 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Please note emall address has changed. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.