Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8090517_HISTORICAL FILE_20090831
PERMIT NO DOC TYPE �DOC DATE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS SW8 09051-I ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION •ram 1L i Ml I� AA NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Governor August 31, 2009 Commanding Officer c/o Carl MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Director Baker, Deputy Public Works Officer Subject: State Stormwater Management Permit No. SW8 090517 Piney Green Gate Security Upgrades High Density Commercial Wet Detention Pond Project Onslow County Construction Contract No. N40085-06-D-4008 Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for Piney Green Gate Security Upgrades on August 25, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 090517 dated August 31, 2009-, for the construction of the subject project. This permit shall be effective from the date of issuance until August 31, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. Please be aware of the condition listed in Section 11.1 of the permit. Due to the proximity.of the construction to surface waters, the wetlands unit of the Division of Water Quality must be notified at least one week prior to construction. Regular inspections will be conducted to ensure the surface water is not being impacted. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, or me at (910) 796-7215. Sincerely, &eote Sdott Stormwater Supervisor Division of Water Quality GDSI can: S:IWQSISTORMWATERIPFRMIT1090517.aug09 cc: Robert Pryor, DTC Christine Nelson Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 OpC Phone; 910-796-72151 FAX: 910-350-2004 1 Customer Service 1-877-623-6749 North Carolina Internet: www.ncwaterqualo.org Awmallry An Equal Opportunity (Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 090517 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General & MCB Camp Lejeune Piney Green Gate Security Upgrade Piney Green Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 31, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. A total of 150,994 square feet of new built -upon area is proposed. Of this amount, 13,909 square feet could not be collected and treated. The Division agreed to a minimum trade-off ratio of 3.0 square feet of existing built -upon area to be collected and treated for each 1 square foot of new built -upon area that could not be collected and treated. This trade-off ratio resulted in treating a minimum of 41,727 square feet of existing built -upon area. A total of 82,593 square feet of existing built -upon area is being treated in the wet detention pond. The runoff from the 13,909 square feet of additional, untreated built -upon area must sheet flow through at least 50' of vegetation at a non -erosive velocity to the maximum extent practicable. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.10 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 219,678 square feet of built - upon area. This built -upon area consists of 137,085 square feet of proposed built -upon area and 82,593 square feet of existing built -upon area. 4. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. Pace 2 of 8 State Stormwater Management Systems R Permit No. SW8 090517 5. A minor variance for the 50' buffer has been granted by the Division for necessary roadway improvements within zone 2 of the buffer. The existing road is located within both Zone 1 and Zone 2 of the buffer. The proposed improvements will be located as far from the surface water as physically possible and impacts to the surface water have been minimized. This additional built - upon area, which will be limited to 2,750 square feet of built -upon area within Zone 2 of the buffer, is necessary in order to construct a right turn lane onto Old Sawmill Road. The road improvements and additional built -upon area may not be constructed any closer to the stream than the existing limits of the roadway. 6. A vegetated filter strip is not required for the wet detention pond as the pond has been designed for a 90% TSS removal efficiency. 7. The tract will be limited to the amount of built -upon area indicated in Section 1.10 on page 3 of this permit, and per approved plans. This permit does not provide any allocation of built -upon area for future development. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 10. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, 9cres: 10.60 Onsite, ft : 461,786 Offsite, ft2: none b. Total Impervious Surfaces, ft2: 219,678 Onsite Existing, ft2: 82,593 (3:1 tradeoff for new) Onsite Proposed, ft2: 137,085 Offsite, ft2: none C. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 4.39 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 32.50 9. Permanent Pool Surface Are, ft2: 18,750 h. Permitted Storage Volume, ft : 45,104 i. Temporary Storage Elevation, FMSL: 34.50 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 4.49 k. Controlling Orifice: 2.0"0 pipe I. Orifice flowrate, cfs: 0.08 M. Permitted Forebay Volume, ft3: 17,371 n. Fountain Horsepower 113 o. Receiving Stream/River Basin: Wallace Creek 1 White Oak P. Stream Index Number: 19-20 q. Classification of Water Body: "SB; NSW" II. SCHEDULE OF COMPLIANCE Due to the proximity of the construction to surface waters, the wetlands unit of the Division of Water Quality must be notified at least one week prior to construction. Regular inspections will be conducted to ensure the surface water is not being impacted. Paae 3 of 8 State Stormwater Management Systems Permit No. SW8 090517 2. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 4. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Decorative spray fountains will be allowed in the stormwater. treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 113 horsepower. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. Paae 4 of 8 State Stormwater Management Systems Permit No. SW8 090517 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. Prior to the construction of any permitted future areas shown on,the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person, or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change Form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Paae 5 of 8 State. Stormwater Management Systems Permit No. SW8 090517 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 315t day of August 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION %r oleen . Sullins, Director Division ofWater Quality By Authority of the Environmental Management Commission Pace 6 of 8 State Stormwater Management Systems Permit No. SW8 090517 Piney Green Gate Security Upgrades Stormwater Permit No. SW8 090517 Onslow Count Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Paae 7 of 8 I '. . State Stormwater Management Systems Permit No. SW8 090517 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized and located per the approved plans. .13. All required design depths are provided. .14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or -recorded easements. CC' NCDENR-DWQ Regional Office PROP 8 of 8 ad 1-1 DWQ USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form rrray be photocopied for use as an original7�Y�,-- C-,�� ; I. GENERAL INFORMATION 1 7 1. Applicants name (specify the name of the corporation, individual, etc. who oprcect Commanding Officer, Marine Corps Base, Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl Baker Deputy Works Officer 3. Mailing Address for person listed in item 2 above: Bid& 1005 Michael Rd. City:MCB Camp Lejeune State:NC Zip:28547 Phone: (910 451-2213 Fax: (910 ) 451-2927 Email:carl.h.baker ROusmc, mil 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): -•--■sarv� � 5. Location of Project (street address): Pine.Green Road City:Marine Corps Base - Camp Lejeune, Tacksonville County:Onslow Zip:285 6. Directions to project (from nearest major intersection): Route 24 to Piney Green Road - Requires security permissions to enter MCB - Camp Lejeune 7. Latitude:34' 42' 46.8" N Longitude:770 19' 15.6" W of project 8. Contact person who can answer questions about the project: Name:Robert P. Pryor, PE Telephone Number: (203 ) 239-4200 Email: robert_pryor ca teamd tc.com H. PERMIT INFORMATION: 10 1. Specify whether project is (check one): ®New []Renewal ❑Modification Forth SWU-101 Version 0925.08 Page I of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®I-Iigh Density ❑Redevelop ❑General Permit ❑Universal SMP []Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ME Gt1 ❑CAMA Major ®Sedimentation/Erosion Control Z404/401 Permit ❑NI'DES It dust i t rmw, t � �`� 9 _Uen III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater is collected via sheet runoff and conveyed via grassed swales culverts to a wet detention basin and 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 12.71 acres 4. Total Coastal Wetlands Area: 0 acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**:12.71 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA):47 7. How many drainage areas does the project have?2 8. Complete the following information for each drainage area. if there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For hiizh density proiects. complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 . �reo}$d Drainage Area 2_ U,,trOA,\ Receiving Stream Name Wallace Creek Wallace Creek Stream Class & Index No. 5>�j; NSW 19-20 5$', NSW 19-20 Total Drainage Area (so 461,786 sf io4p, 91,880 sf On -site Drainage Area (so 461,786 sf 91,880 sf Off -site Drainage Area (so 0 sf 0 sf Existing Impervious* Area (so 82,593 sf 22,742 sf Proposed Impervious*Area (so 219,678 sf 36,651 sf Impervious* Area (total) 48% 40% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 9,286 sf - On -site Streets (so 208,432 sf 32,891 sf On -site Parking (so - - On -site Sidewalks (so 1,960 sf 3,760 sf Other on -site (so - - Off -site (so - - Total (so: 219,678 sf 36,651 sf * hirperviorts area is defined as the built upon area including, but not Bruited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated to exclude Coastal Wetlands front. use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BL1A). Form SWU-101 Version 09.25.08 Page 2 of 1. 9'. How was the off -site impervious area listed above derived o 1 7 L y Projects in Union County: Contact the DWQ Central Office staff to check to see tf you project is located within a Threatened & Endangered Species watershed that may he subject to snore ,st'Lingent--s•tortn.ivator --- requiremenls. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://l12o.enr.state.nc.us/su/bmi2 forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. 0 V. SUPPLEMENT FORMS 0 The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http://li2o.ezr_state.nc.us/su/bn)p forms.ltm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-1ermeable Pavement Form SW401-Cistern Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of VI. SUBMITTAL REQUIREMENTS RECF�VFD fl n t. 7 MO4 Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found byllocating=project onthe—� interactive online map at http://h2o.enr.state.nc.us/su/msi maps. ttm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Ini is • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) y �� • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management _y • Copy of any applicable soils report • Two copies of plans and specifications (sealed, signed & dated), including: RP - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Robert Pryor, PE Mailing Address:556 Washington Avenue_ City:North Haven State:CT Zip:06473 Phone: 203 239-4200 Fax:.(203 �234-7376 Email:robert.pryor®teamdtc.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Carl Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will onstructed in conformance with the approved plans, that the required deed restrictions and protective co n is will be r ded, and that the proposed project complies with the requirements of 15A NCAC 2H .100 . Signature: Date: Form SWU-101 Version 09.25.08 Page 4 of Permit No. SW8OC105il ? (to be provided by DINO) RECEIVED AUG 2 .,?! 2009 BY: 0 G NCDENR Q Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. !. PROJECT INFORMATION Project name Piney Green Gate Contact person Robert P. Pryor Phone number 203-239.2400 Date 81512009 Drainage area number 1 Il1, DESIGN INFORMATION Site Characteristics Drainage area 481,786 fe Impervious area, post -development 219,678 fe %impervtous 47.57 % Design rainfall depth 1.5 in Storage Volume: Nan -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flaw required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity; 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak Bow Post -development 1-yr, 24-hr peak Bow PrelPost 1-yr, 24-hr peak Bow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 OR vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stared above the state -required temp. pool? Elevation of the top of the additional volume 27,820 to OK 45,104 to OK, OK, volume provided is equal to or In excess of volume required. _ft3 ft' _ft3 0 ft3 ft3 Y (Y or N) 3.8 in 0.40 (unidess) 0.59 (unidess) 0.16 inlhr OK 4.49 ft01sec 8.08 h3lsec 3.59 f131sec 34.50 fmsi 32.50 fmsl 30.50 fmsi 33.00 fmsi 32.00 fmsi Data not needed for calculation option 41, but OK if provided, '24.50 fmsi 23.50 fmsi Data not needed for calculation option #1, but OK if provided. 1.00 ft (Y or N) 34.5 imsl OK Farm SW401 -Wet Detention Basin-Rev.5 Parts I. & If. Design Summary, Page 1 of 2 Permit No. t`V Oyl 05 1 (to be provided by D WO) II, DESIGN INFORMATION Surface Areas Area, temporary pool 25,000 fP Area REQUIRED, permanent pool 17.271 it? SAIDA ratio 3.74 (unittess) Area PROVIDED, permanent pool, Ap._pw 18,750 f? OK Area, bottom of 10h vegetated shelf, A,d ,,,a Area, sediment cleanout, top elevation (bottom of pond), 16,250 2,800 (tz RECEIVED Volumes Volume, temporary pool 45,104 fln OK AUG 2 7 Z009 Volume, permanent pool, Vp,.,,, 82,234 ft3 Volume, forebay (sum of forebays if more than one forebay) 17,371 fe Forebay %of permanent pool volume 21.1 % % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 3.74 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10.2b) Y (Y or N) Volume, permanent pool. Vv,,,,,,w 82,234 fe OK Area provided, permanent pool, Av, 18,750 ftZ OK Average depth calculated 4.39 It OK Average depth used in SAIDA, dw, (Round to nearest 0.5ft) 4.5 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A., _,,d ft' Area, bottom of 1 Oft vegetated shelf, A.b,_,�ff fig Area, sediment cleanout, top elevation (bottom of pond), Anal v ft' "Depth' (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated ft Average depth used in SAIDA, d_ (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unidess) Driving head (Ho) 0.67 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.) (unittess) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 4.49 Osec OK Post -development 1-yr, 24-hr peak flow 0.46 t0isec OK Storage volume discharge rate (through discharge orifice or weir) 0.08 felsec OK, draws down in 2-5 days. Storage volume drawdown time 4.02 days Drawdown time varying from expected value by more than a half day. Check calculation. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of Ilowpath to width ratio 3 :1 OK Length to width ratio 2.3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filler provided? N (Y or N) OK Recorded drainage easement provided7 Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK DgAi aaq� 14S �+��� � a.$.Tergencies Pump the pond Permit No. o os I -) (to be provided by DWO) • Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project, Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. RPP CS210 1. Plans (1" - 50' or larger) of the entire site showing: C S 220 - Design at ultimate build -out, C 5 Z.b 0 - Off -site drainage (it applicable), CS ?'k, I - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. RPP CS224 2. Partial plan (1" = 30' or larger) and details forthe wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. RPP CS224 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. RPP CS241,CS242 4, if the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. RPP Appendix B 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. RPP CS242 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. RPP Appendix B, C 7. The supporting calculations. RPP NIA 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. RPP NIA 9. A copy of the deed restrictions (if required). RPP Appendix A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 0 Form SW401-Wet Detention Basin-Rev.5 Part III. Required Items Checklist, Page 1 of 1 0 • -' Permit Number: ii 14 7 009 (to be provided by DWQ) Drainage Area Number: Wet Detentiorn.,�8asin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. 'These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem - The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long- approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 • E • C�+���(% +-.+ Perm it Number: _SW (to he provided by DWQ) Drainage Area Number: t,t r BMP element: -:'ofentifil= roblem::1 How I will remediate the roblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying., The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying, The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-RevA Page 2 of 4 Permit Number: 6\_ d t�� l? (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment, remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 8 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blranlrs) 7 Permanent Pool Elevation 32.5 Sediment Removal 26.0 Pe manen Pool - - - - - - - - - - - - - Volume Sediment Removal Elevation 24.5 Volum-e Bottom Elevation 25.0 -ft Min. -------------------------------------------- ----- Sediment Bottom Elevation 23.5 1-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin 0&M-Rev.4 Page 3 of 4 Z,%—,A+_.Jt V J�," Permit Number: 'J-S: II 11 1 7 ZQQg 1 (to be provided byDWQ) I acknowledge and agreelbymy signature below that I am responsible for the performance of the maintenance procedures lief-ch above. I agree to notify DWQ of any i } problems with the system or prior to any changes to the system or responsible parry. Project name:Piney Green Gate BMP drainage area number:1 Print name:Carl Baker Title:Deputy Public Works Officer Address:Bldg 1005 - MichaelRoad, MCB Camp Lejeune, NC 28547 Phone:(910) 4 -2213 Signature: Date: 5 — Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, 1 �oYl n .� > a Notary Public for the State of } County of t)hsl0 L') do hereby certify that personally appeared before me this -?JV day of and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, /kyr��� MICE A dONIi IM !!Dory fwbw omlvw County $tair of Norm Caroling 0 SEAL My commission expirest/G/D _ Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 oue�t+l791tw �r:��s47 p�1 5i SCIO �tCt� at �ou� Csxalisxf pirdlo+�► Co�su+X "NaLk bootie ,f 111- 0 BY: Pennit Name: a,(JY (to be proOded by Dlf'Q) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will bekept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed Swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer witi not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizera2plication. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximate y six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Farm SW40 I -Grassed Swale O&M-Rev.3 Page 1 of 2 �d�9 Permit Number: II I I (to he provided by D Q) `BY: I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:MCB Camp Leieune - Piney Green Gate Physical Security Upgrades BMP dreincige area number:I Print namc:Carl Baker Title:Deputy Public Works Officer Addri Phone Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, a Notary Public for the State of L/Ad "i , County of Vu% , do hereby certify that �&/ t(za ^^� personally appeared before me this day of and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, AUCI A •OfI#IM "ON" Folft Onstow County IWO of Noft Cdood" L tofnmtwton Mhos pat 23. 2010 SEAL My commission expires �r� o74/d Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 AJ . 1"IMOO A 33tu a1e4uv r�i�toN ytnuoo wet$n0 onUOIO:) MGM to otmt8 Qtt}S •tS too amligxg noictiMM03 VM Nelson, Christine. From: Soumelidis, Andy [andy.soumelidis@teamdtc.com] Sent: Thursday, August 27, 2009 10:20 AM To: Nelson, Christine Subject: RE: Piney Green Gate - Permit Status Attachments: SW401-Wet Detention Basin.pdf Christine, Let me know if you need anything else. Thanks for your help. Can you please e-mail me a copy of the permit when complete? Thanks. Thanks, Andy Soumelidis Civil Engineer, Land Development Diversified Technology Consultants 2321 Whitney Avenue Suite 301 Hamden CT 06518 Ph 203 239 4200 Fax .203 234 7376 www,teamdtc.com From: Nelson, Christine[maiito:christine.nelson@ncdenr.gov] Sent: Thursday, August 27, 2009 10:10 AM To: Soumelidis, Andy Subject: RE: Piney Green Gate - Permit Status Andy, did not receive an updated supplement. The version I have still lists the impervious area for the pond as 220,000 sq ft instead of 219,678 sq ft as identified on the latest version of the application received on Aug 25. Can you e-mail the updated version to me? Christine From: Soumelidis, Andy [mailto:andy.soumelidis@teamdtc.com] Sent: Wednesday, August 26, 2009 4:34 PM To: Nelson, Christine; Pryor, Robert Cc: 'Towler, David; Russell, Janet Subject: RE: Piney Green Gate - Permit Status Christine, Please find my responses below for Items 1 & 2 per our phone conversation. Please call me if you have any additional questions. Thanks. I Tlianks, Andy Soumelidis Civil Engineer, Land Development Diversified Technology Consultants 2321 Whitney Avenue Suite 301 Hamden CT 06518 Ph 203 239 4200 Fax 203 234 7376 www.teamdtc.com From: Nelson, Christine[mailto:christine.nelson@ncdenr.gov} Sent: Wednesday, August 26, 2009 2:30 PM To: Soumelidis, Andy; Pryor, Robert Cc: Towler, David; Russell, Janet Subject: RE: Piney Green Gate - Permit Status Andy/Robert, I can not find that you have provided the justification I asked for in Items 1 & 2 of my request for additional information sent on August 21, 2009 in the package received on August 25, 2009. Am I missing it? Item 1: Why is this additional impervious area necessary? How much impervious area are you proposing in zone 2 of the buffer? Added to stormwater narrative (attached): The road improvements have been modified to only have new impervious within "Lone 2 which requires a minor variance. The additional impervious surface proposed within "Lone 2 (f2,750 so does not impact the stream as it drains to the east of Piney Green Road. The road widening includes the addition of a right turn lane, requested by the Navy, due to the proposed. improvements to Old Sawmill Road. Also, plan CS222 calls out the square footage of impervious area within zone 2 of the buffer. Item 2: (a) The BUA from the generator pad is located so close to the drainage area, why could the runoff not be collected? It appears that this area could have very easily been graded to drain to the pond. The runoff was originally collected and treated because we had a swale to the west of the truck inspection area. Since the swale had to be removed from the buffer and the proposed emergency generator pad includes screen walls (CMU walls), shown on sheet CS210 (architectural plans yet to be completed for this design), we decided to sheet flow the approximately 300 sf of impervious area. 'rhe ratio of treated existing impervious to untreated new impervious is 5.94. (b) The currently proposed grading plan, which removed the BUA for the generator pad area from the pond drainage area, means that the supplements and probably the corresponding calculations and other documents are now not consistent. All calculations/supplements/applications included in the request for information response 2 reflect the generator pad not draining to the 13MP. Please provide justification for these items. Depending on the justification for Item 2, 1 may have to confer with a few people here to verify its ok. Also, were two of the four sets of plans supposed to go to Rhonda for Erosion Control? Yes • Christine From: Soumelidis, Andy [mailto:andy.soumelidis@teamdtc.com] Sent: Wednesday, August 26, 2009 1:27 PM To: Nelson, Christine Subject: RE: Piney Green Gate/Main Gate - Permit Status Thanks. Thanks, Andy Soumelidis Civil Engineer, Land Development Diversified Technology Consultants 2321 Whitney Avenue Suite 301 Hamden CT 06518 Ph 203 239 4200 Fax 203 234 7376 www.teamdtc.com_ From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, August 26, 2009 1:24 PM To: Soumelidis, Andy Subject: RE: Piney Green Gate/Main Gate - Permit Status Andy, Piney Green Gate is on my desk now to review the submitted information. I will hopefully have completed the review (and permit) sometime tomorrow morning. The Main Gate review will probably happen late Thurs or Fri. Christine From: Soumelidis, Andy [mailto:andy.soumelidis@teamdtc.com] Sent: Wednesday, August 26, 2009 12:01 PM To: Nelson, Christine Subject: Piney Green Gate/Main Gate - Permit Status Christine, I was just wondering what the status is with these two projects. Thanks. 9 Thanks, Andy Soumelidis Civil Engineer, Land Development Diversified Technology Consultants 2321 Whitney Avenue Suite 301 Hamden, CT 06518 Ph 203 239 4200 Fax 203 234 7376 www.teamdte.com 4 r D A U G 2 5 2009 BY Request for Additional Information Response 2 8/24/09 1. It appears that the proposed improvements to Old Sawmill Road will be adding impervious surfaces within both Zone 1 (0 to 30 ft from the top of the stream bank) and Zone 2 (30 to 50 ft from the top of the stream bank) of the buffer. Proposing to impact Zone I or both Zone 1 and 2 of the buffer is considered a major variance and must be approved by the Commission. However, if only Zone 2 is impacted, the division can approve a minor variance. Only Zone 2 is impacted with improvements to Piney Green Road within the 50' buffer If possible, please move the road improvements to the existing edge of pavement in the vicinity of the buffer. This would prevent Zone 1 from being further impacted, allowing the division to consider the minor variance within Zone 2. [Session Law 2008-21 1 Section 2(b)(3)b.5 references the minor variance procedures in 15A NCAC 02B.0233(9)(b)] If the variance can be considered as a minor variance, please provide a written request and documentation justifying the additional impervious surfaces proposed within the stream buffer and demonstrate that impacts to the stream have been minimized. The road improvements have been modified to only have new impervious within Zone 2 requiring a minor variance. The additional impervious surface proposed within this buffer does not impact the stream as it drains to the east of Piney Green Road. 2. According to plan sheet CS 260, it appears that the concrete generator pad has been removed from the drainage area. Please include this built -upon area within the drainage area of the wet detention pond. If this concrete pad cannot drain to the pond, please provide justification and update the application and other documents to reflect the reduction in drainage area and built -upon area. The drainage area and built -upon area calculations have been updated to exclude the concrete generator pad from Drainage Area 1. 3. The storage volume calculations submitted on August 5, 2009 indicate that the provided storage volume is 43,901 0, while the volume computations and the supplement indicate that the storage volume provided is 45,104 0. Please ensure the documents are consistent. The storage volume calculations have been updated. 4. Please provide updated drawdown calculations based on the new minimum required storage volume, 27,820 cubic feet. The calculations have been updated. Ir JZEV ET AUG 3 5 2009 5. Please submit an updated plan sheet CS222 to reflect t and and site in order to ensure consistency with the other plans. Plan CS222 has been included. 6. Due to the minor nature of these comments, the express Addlnfo fee has been waived for this request for additional information. Concur. 7. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Concur. LAND ENGINEERED SCRUG OGRE, LVR SOLUTIONS TRANSMITTAL w N.ER 1 attr_tt'+�T'[ r�T AUG ') 5 2009 Via UPS To: North Carolina Department of Environment & DATE: August 2 - Natural Resources Express Permit Coordination PROJECT No. 08-278-106 127 Cardinal Drive Extension RE: Piney Green Gate Wilmington, North Carolina 28405 WE ARE SENDING YOW a Attached UNDER SEPARATE COVER SPECIFICATIONS COPY OF LETTER CHANGE ORDER SHOP DRAWINGS X DRAWINGS OTHER REPORTS ORIGINALS/COPIES DATE DESCRIPTION 410 Request for Additional Information Response 2 THESE ARE TRANSMITTED AS CHECKED BELOW: FOR APPROVAL APPROVED AS SUBMITTED RESUBMIT COPIES FOR APPROVAL x FOR YOUR USE APPROVED AS NOTED SUBMIT COPIES FOR DISTRIBUTION AS REQUESTED RETURNED FOR CORRECTIONS RETURN CORRECTED PRINTS FOR REVIEW AND COMMENT OTHER REMARKS: COPY To- FILE SIGNED: ANDY SOUMELIDIS IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE. PA12008108278-CAMP LEJEUNEIDOCUMENTSITRANSMITTAL512009-06-30 NC DEPT OF ENV & NATURAL RESOURCES LOT.DOC DIVERSIFIED TECHNOLOGY CONSULTANTS 2321 WHITNEY AVENuE HAMDEN, CT 06518 203 239 4200 203 234 7376 FAX NORWICH. CT ANDOVER. MA r. NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly -'raves Perdue Coleen H. Sullins Governor Director August 21, 2009 Commanding Officer c/o Carl Balser, Deputy Public Works Officer MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 090517 Piney Green Gate Security Upgrades Onslow County Construction Contract No. N40085-06-D-4008 Dear Mr. Baker: Resources Dee Freeman Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for Piney Green Gate Security Upgrades on July 17, 2009 with additional information received on August 10, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: It appears that the proposed improvements to Old Sawmill Road will be adding impervious surfaces within both Zone 1 (0 to 30 ft from the top of the stream bank) and Zone 2 (30 to 50 ft from the top of the stream bank) of the buffer. Proposing to impact Zone 1 or both Zone 1 and 2 of the buffer is considered a major variance and must be approved by the Commission. However, if only Zone 2 is impacted, the division can approve a minor variance. If possible, please move the road improvements to the existing edge of pavement in the vicinity of the buffer. This would prevent Zone 1 from being further impacted, allowing the division to consider the minor variance within Zone 2. [Session Law 2008-211 Section 2(b)(3)b.5 references the minor variance procedures in 15A NCAC 02B.0233(9)(b)] If the variance can be considered as a minor variance, please provide a written request and documentation justifying the additional impervious surfaces proposed within the stream buffer and demonstrate that impacts to the stream have been minimized. 2. According to plan sheet CS 260, it appears that the concrete generator pad has been removed from the drainage area. Please include this built -upon area within the drainage area of the wet detention pond. If this concrete pad cannot drain to the pond, please provide justification and update the application and other documents to reflect the reduction in drainage area and built -upon area. 3. The storage volume calculations submitted on August 5, 2009 indicate that the provided storage volume is 43,901 ft3, while the volume computations and the supplement indicate that the storage volume provided is 45,104 W. Please ensure the documents are consistent. Wilmington Regional Office 127 Cardinal 06ve Extension, Wilmington, North Carolina 28405 One Rhone: 910-796-72151 FAX: 910-350.20041 Customer Service.1-877-623-6748 NorthCarolina Internet: www.ncwaterquaiity.org Naturally ly An Equal OpportunitylAffirmative Action Employer �L 1` r Mr, Carl Baker =T- --- August 21, 2009 Stormwater Application No. SW8 090517 4. Please provide updated drawdown calculations based on the new minimum required storage volume, 27,820 cubic feet. 5. Please submit an updated plan sheet CS222 to reflect the latest changes to the pond and site in order to ensure consistency with the other plans. 6. Due to the minor nature of these comments, the express Addlnfo fee has been waived for this request for additional information. 7. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August 27, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If that occurs, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, CLIuC Christine Nelson Environmental Engineer GDSlcan: S:1WQSISTORMWATERIADDIN1=O120091090517.aug09 CC" Robert P. Pryor, DTC Christine Nelson Wilmington Regional Office Page 2 of 2 Nelson, Christine From, Nelson, Christine Sent: Friday, August 21, 2009 11:35 AM To: 'Pryor, Robert'; 'Towler, David'; 'Soumelidis, Andy' Cc: Russell, Janet; Weaver, Cameron Subject: r2ncf request:for-additionai-info:-SIN-ProjecfN6:-090517=Piney Green Gate Attachments: 090517'aug09 pdf Gentlemen, I have attached a pdf version of my 2" d request for additional information For Stormwater Project S W8 090517 — Piney Green Gate Security Upgrades. I will also send_copics via maihPlease let me know if you have any questions! Thanks, Christine Christine Nelson State Stormwater Program - Express Permitting NC Division of Water Quality Wilmington Regional Office 910-796-7323 E-mail correspondence to and froni this address may he subject to the North Carolina Public Records Latin and may be disclosed to third parries. Nelson, Christine From: Soumelidis, Andy fandy.soumelidis@teamdtc.com) Sent: Wednesday, August 19, 2009 11.21 AM To: Nelson, Christine . Subject: RE: Piney Green question Christine, Yes, we are proposing a right turn lane onto Old Sawmill Road. There is approximately 1,000 sf of new BUA within the buffer. Thanks, Andy Soumelidis Civil Engineer, Land Development Diversified Technology Consultants 2321 Whitney Avenue Suite 301 Hamden CT 06518 Ph 203 239 4200 Fax 203 234 7376 www, From: Nelson, Christine[mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, August 19, 2009 11:00 AM To: Soumelidis, Andy; Pryor, Robert Subject: Piney Green question Robert and Andy, I'm a bit confused by your response to Item 3.a, paragraph 3. Aren't you proposing a right turn lane onto Old Saw Mill Road that will add BUA within the buffer? I'm also confused by the last sentence; I think a word is missing: "Minimal road widening occurs in this area to have any impact on the stream" I have other comments, but i want to make sure I understand this before I get them approved to send out. Thanks, Christine Christine Nelson State Stormwater Program Division of Water Quality Wilmington Regional Office 910-796-7323 Before printing this email, please consider your budget and the environment. (♦ If you must print, please print only what you need. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. RECE3 S r Request for Additional Information Request 8/5/09 1. Please explain what is happening with what appears to be a drainageway associated with flared end section 3 (FES 3) on sheet CS222. From the plans, it appears that a swale and/or pipe, potentially carrying offsite runoff, will utilize the conveyance swale to the pond. Where is the water from this drainage way going? Please either divert all offsite runoff around the BMP and show how this is accomplished on the plans or expand the project area and drainage area to include all areas draining to the BMP. The project area and drainage area has been expanded to include this area (DA-B) draining to the BMP. All applicable calculations have been revised. 2. Plan sheet CS210, which delineates the project boundary, includes an area adjacent to NC HWY 24 that is not included in the drainage area map on plan sheet CS260. If additional BUA is proposed in this area, please include a third drainage area in the application documents for this additional area. If no additional BUA is proposed, either remove this area from the project boundary or identify a third drainage area. Please ensure to update all application documents accordingly. This area was removed from the permit boundary. 3. Please provide additional information on the wetland delineation documentation provided in Appendix F. According to the map provided in Appendix F of the calculations, there appears to be an identified stream within the wetlands to the west of the road. Please verify the wetland documentation to determine if this line does in fact represent a stream. If the documentation or ACOE do not identify this feature as a stream, please contact Joanne Steenhuis with DWQ to verify the existence of the stream. A perennial stream has been identified from the additional wetlands maps attached. If this feature is identified as a stream, a 50 foot buffer is required from the top of bank for all streams or rivers. This buffer cannot contain new impervious surfaces, wet detention ponds, swales, or energy dissipation devices. A 50' buffer has been provided and shown on sheet CS220 & CS240. If this feature is found to be a stream, please identify the stream, including the top of banks, and delineate the buffer on the plans. Please remove new impervious surfaces, any portions of the wet detention pond, proposed swales, and energy dissipation devices from the required buffer. The wet detention pond, proposed swales, energy dissipation devices, and all new impervious coverage, except the road, have been removed from this buffer. �21 �C'`.���'�TJ�� A 2p0� w �T. It appears that new impervious surfaces are proposed=for--ti road -that could possibly be located within the buffer. If additional impervious surfaces are proposed within the buffer for the road widening portion of the project, provide documentation demonstrating that the additional impervious surfaces are necessary to be located in the buffer and that stream impacts have been minimized. No new impervious areas other than the road and active control barrier (which acts as a component of the road and needs to be in this location) lie within the buffer. Minimal road widening occurs in this area to have any impact on the stream. Provide calculations examining the flow from the pond outlets as well as all swales to ensure that runoff from the 10 year storm will enter the buffer in a diffuse and non - erosive manner. It is often necessary to provide an energy dissipation device, such as a level spreader, to promote diffuse flow. Rip rap calculations have been provided for the pond outlet depicting flow less than 2 fps. b. If a stream is not identified within the wetlands, please provide additional calculations to demonstrate that the discharge from the pond and runoff from the swales for the 10-year storm will enter the wetlands at a diffuse, non -erosive velocity (2 ft/s or less). Outlets and swales with velocities in excess of 2 ftls that discharge to wetlands must provide a velocity reduction device such as a level spreader, which provides non -erosive flow into and through the wetland. Rip rap calculations have been provided for the pond outlet depicting flow less than 2 fps. Please ensure to look at the velocity of the re -graded swale entering the wetlands from the south east side of the road. Calculations for the swale (Swale 9) entering the southeast side of the road have been provided (DA—J). If level spreaders are proposed, please provide calculations and supplements for each as well as a signed and notarized operation and maintenance agreement. No level spreader is being proposed. 4. If possible, please provide existing or proposed contours in the area proposed for the pond discharge. We do not have additional topography for this area. P r4. 4,'rl_f 5. Plan sheets CS220 and CS224 identify the forebay berm elevation as being 33.5 ft, however the permanent pool elevation has been identified as 32.5 ft. Generally the berm is set at or below the permanent pool elevation. Please either: a. Set the elevation of the berm at or just below the permanent pool = (32.5 ft.) b. Include a weir in the berm set at or just below the permanent pool c. Demonstrate how the forebay will draw down to the permanent pool elevation d. Provide updated calculations and other application documents setting the forebay permanent pool elevation at 33.5 ft. In this scenario the forebay must be excluded when evaluating if the pond meets the minimum requirements (such as surface area and average depth). 6. Please provide calculations for the required surface area for the permanent pool, including the determination of the SAMA ratio. Calculations have been provided. 7. Please verify that the surface area provided in the supplement for the bottom of the 10 ft vegetated shelf is identified correctly. The value listed in the supplements does not appear to be consistent with the calculations. Surface area has been changed to match the calculations. 8. Please provide more spot elevations or finished floor elevations for the impervious areas near the start of swale 1 in order to demonstrate that the runoff will be directed to the conveyance swales. Swale 1 has been removed from the buffer, but additional spot elevations have been provided. All calculations for Swale can be removed from the package. 9. The rip rap aprons associated with the pond outlets appear to be different on plan sheet CS222 than the other sheets. Please ensure the plan sheets are consistent. All rip rap aprons are consistent. 10. Plan sheet CS252 indicates that shallow land plants are proposed between the permanent pool and the temporary pool elevations. Please note that it is not required for shallow land plants to be planted above the top of the vegetated shelf. In fact, the signed and notarized operation and maintenance agreement requires vegetation along the perimeter of the pond to be maintained at approximately 6 inches. Instead of proposing shallow land shrubs above the top of the vegetated shelf and on the 3:1 side slopes, it is best to propose grass. Shallow land plantings were changed to E1.=32.5-33.0. E1.=33.0 to upland areas will be turf ground cover (centipede grass). AUG x 0 2009 -7. 11. Please include details for the proposed road and typical swales on the plans. A cross section has been provided on sheet CS220. 12. Due to the significant additional review time that will be needed, please submit a reapplication fee of $500. Check is included. LAND S E), �i ENGINEERED �•11 LETTER OF TRANSMITTAL ■T RII DTIf R SOLUTIONS WATER �r 1 „ To: North Carolina Department of Environment & Natural Resources Express Permit Coordination 127 Cardinal Drive Extension Wilmington, North Carolina 28405 WE ARE SENDING YOU SPECIFICATIONS CHANGE ORDER X DRAWINGS X REPORTS DATE: August 7, 2009 PROJECT No. 08-278-106 RE: Camp LeJeune Pinev Green Gate Qx Attached UNDER SEPARATE COVER COPY OF LETTER SHOP DRAWINGS X OTHER ORIGINALSICOPIES DATE DESCRIPTION 210 1 Revised Plans & Calcs (Request for Additional Information) THESE ARE TRANSMITTED As CHECKED BELOW: FOR APPROVAL. APPROVED AS SUBMITTED X FOR YOUR USE APPROVED As NOTED AS REQUESTED RETURNED FOR CORRECTIONS FOR REVIEW AND COMMENT OTHER REMARKS: Via UPS RESUBMIT COPIES FOR APPROVAL SUBMIT COPIES FOR DISTRIBUTION RETURN CORRECTED PRINTS COPY T0: FILE SIGNED: ANDY SOUMELIDIS IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE. P:12008108278-CAMP LEJEUNEIDOCUMENTSITRANSMITTALs12009-06-30 NC DEPT OF ENV & NATURAL RESOURCES LOT.DOC DIVERSIFIED TECHNOLOGY CONSULTANTS 2321 WHITNEY AVENUE HAMDEN, CT 06S18 203 239 420D 203 234 7376 Fax NORWICH, CT ANDOVER, MA r _ 4 � • NCDENR North Carolina Department of Environment,and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen K Sullins Dee Freeman Governor Director Secretary July 31, 2009 Commanding Officer c/o Carl Baker, Deputy Public Works Officer MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 090517 Piney Green Gate Security Upgrades Onslow County Construction Contract No. N40085-06-D-4008 Dear Mr. Baker: The Wilmington Regional Office received an Express Stormwater Management Permit Application for Piney Green Gate Security Upgrades on July 17, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please explain what is -happening with what appears to be a drainageway associated with flared end section 3 (FES 3) on sheet CS222. From the plans, it appears that a swale and/or pipe, potentially carrying offsite runoff, will utilize the conveyance swale to the pond. Where is the water from this drainage way going? Please either divert all offsite runoff around the BMP and show how this is accomplished on the plans or expand the project area and drainage area to include all areas draining to the BMP. 2. Plan sheet CS210, which delineates the project boundary, includes an area adjacent to NC HWY 24 that is not included in the drainage area map on plan sheet CS260. If additional BUA is proposed in this area, please include a third drainage area in the application documents for this additional area. If no additional BUA is proposed, either remove this area from the project boundary or identify a third drainage area. Please ensure to update all application documents accordingly. Please provide additional information on the wetland delineation documentation provided in Appendix F. According to the map provided in Appendix F of the calculations, there appears to be an identified stream within the wetlands to the west of the road. Please verify the wetland documentation to determine if this line does in fact represent a stream. If the documentation or ACOE do not identify this feature as a stream, please contact Joanne Steenhuis with DWQ to verify the existence of the stream. a. If this feature is identified as a stream, a 50 foot buffer is required from the top of bank for all streams or rivers. This buffer cannot contain new impervious surfaces, wet detention ponds, swales, or energy dissipation devices. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910.796.72151 FAX: 910-350.20041 Customer service: 1-877.623-6748 North Carolina Internet: www.ncwaterquality.org Aat�tmrally An Equal Opponunity 1 Affirmative Action Employer Mr. Carl Baker July 31, 2009 Stormwater Application No. SW8 090517 If this feature is found to be a stream, please identify the stream, including the top of banks, and delineate the buffer on the plans. Please remove new impervious surfaces, any portions of the wet detention pond, proposed swales, and energy dissipation devices from the required buffer. It appears that new impervious surfaces are proposed for the road that could possibly be located within the buffer. If additional impervious surfaces are proposed within the buffer for the road widening portion of the project, provide documentation demonstrating that the additional impervious surfaces are necessary to be located in the buffer and that stream impacts have been minimized. Provide calculations examining the flow from the pond outlets as well as all swales to ensure that runoff from the 10 year storm will enter the buffer in a diffuse and non -erosive manner. It is often necessary to provide an energy dissipation device, such as a level spreader, to promote diffuse flow. b. If a stream is not identified within the wetlands, please provide additional calculations to demonstrate that the discharge from the pond and runoff from the swales for the 10-year storm will enter the wetlands at a diffuse, non -erosive velocity (2 ft/s or less). Outlets and swales with velocities in excess of 2 ft/s that discharge to wetlands must provide a velocity reduction device such as a level spreader, which provides non -erosive flow into and through the wetland. Please ensure to look at the velocity of the re -graded swale entering the wetlands from the south east side of the road. c. If level spreaders are proposed, please provide calculations and supplements for each as well as a signed and notarized operation and maintenance agreement. 4. If possible, please provide existing or proposed contours in the area proposed for the pond discharge. 5. Plan sheets CS220 and CS224 identify the forebay berm elevation as being 33.5 ft, however the permanent pool elevation has been identified as 32.5 ft. Generally the berm is set at or below the permanent pool elevation. Please either: a. Set the elevation of the berm at or just below the permanent pool b. Include a weir in the berm set at or just below the permanent pool c. Demonstrate how the forebay will draw down to the permanent pool elevation d. Provide updated calculations and other application documents setting the forebay permanent pool elevation at 33.5 ft. In this scenario the forebay must be excluded when evaluating if. the pond meets the minimum requirements (such as surface area and average depth). 6. Please provide calculations for the required surface area for the permanent pool, including the determination of the SA/DA ratio. 7. Please verify that the surface area provided in the supplement for the bottom of the 10 ft vegetated shelf is identified correctly. The value fisted in the supplements does not appear to be consistent with the calculations. S. Please provide more spot elevations or finished floor elevations for the impervious areas near the start of swale 1 in order to demonstrate that the runoff will be directed to the conveyance swales. Page 2 of 3 Mr. Cari Baker July 31, 2009 Stormwater Application No_SW8 090517 9. The rip rap aprons associated with the pond outlets appear to be different on plan sheet CS222 than the other sheets. Please ensure the plan sheets are consistent. 10, Plan sheet CS252 indicates that shallow land plants are proposed between the permanent pool and the temporary pool elevations. Please note that it is not required for shallow land plants to be planted above the top of the vegetated shelf. In fact, the signed and notarized operation and maintenance agreement requires vegetation along the perimeter of the pond to be maintained at approximately 6 inches. Instead of proposing shallow land shrubs above the top of the vegetated shelf and on the 3:1 side slopes, it is best to propose grass. 11. Please include details for the proposed road and typical swales on the plans. 12. Due to the significant additional review time that will be needed, please submit a reapplication fee of $500. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August 10, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If that occurs, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, , n_ UV672-" Christine Nelson Environmental Engineer GDS/can: S:IWQSISTORMWATERIADDINFO120091090517.ju109 cc: Robert P. Pryor, DTC Christine Nelson Wilmington Regional Office Page 3 of 3 ;l iE G 4rl Nelson, Christine i �I From: Nelson, Christine Sent: Friday, July 31, 2009 3:15 PM i To: 'Pryor, Robert'; 'Towler, David' E Cc: 'Soumelidis, Andy'; Russell, Janet ` Subject: request for additional info: SW Project No. 090517 - Piney Green Gate �I I Attachments: 090517.ju109.pdf � II f , All, '} I have attached a pdf version of my request for additional information for Stormwater Project SW8 090517 — Piney Green Gate Security Upgrades. I will also send copies via mail. Let me know if you have any questions! "I hanks! Christine Christine Nelson State slormwater pro -rain - Empress Permitting SIC Division of Water Quality Wihnington R",ional Office 910-796-7323 Before printing this email. please consider your budget and the environment. If you must print, please print only what you need. E--meoil cru•r•espoiidence 10 awl.fimn lhis udilress may he suhjecl 10 1he Alooh # C'nrnlincr 1'xhlic kecrrr•ds 1_rrn• curt! ufrtr hc: disclrrsed 1n dTird pirr'1ic,r. i I i! iE LAND ENGINEERED 4TRUDTugEB SOLUTIONS LETTER OF TRANSMITTAL '- 'WATER Via UPS To: North Caroline Department of Environment & DATE: July 16, 2009 Natural Resources Express Permit Coordination PROJECT No. 08.278-106 127 Cardinal Drive Extension RE: .. ... ._................. ..—......... ........ ..,._._ Wilmington, North Carolina 28405 Attn: P44@Rda44a4 C-41 WE ARE SENDING YOU: F-x� Attached ^n UNDER SEPARATE COVER 11 1; 7 ry 2009 SPECIFICATIONS COPY OF LETTER L I CHANGE ORDER SHOP DRAWINGS l X DRAWINGS X OTHER X REPORTS ORIGINALS/COPIES DATE DESCRIPTION a 110 Express Permit Package- Stormwater 110 Express Permit Package — Erosion and Sedimentation Control THESE ARE TRANSMITTED As CHECKED BELOW: FOR APPROVAL APPROVED AS SUBMITTED RESUBMIT COPIES FOR APPROVAL X FOR YOUR USE APPROVED AS NOTED SUBMIT COPIES FOR DISTRIBUTION AS REQUESTED RETURNED FOR CORRECTIONS RETURN CORRECTED PRINTS FOR REVIEW AND COMMENT OTHER REMARKS: COPY TO: FILE SIGNED: ANDY SOUMELIDIS IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE. P:12008\0827$-CAMP LEJEUNEII70CUMENTSITRANSMITTALS12009-06-30 NC DEPT OF ENV & NATURAL RESOURCES LOT.DOC DIVERSIFIED TECHNOLOGY CONSULTANTS 556 WASHINGTON AVENUE NORTH HAVEN CT 06473 203 239 4200 203 234 7376 FAX NORWICH, CT ANDOVER, MA [\ CO n � a N U O o p LO � U of T rd rd * LO N �i * F= V W O ,o z _ N 0� Z o td N zF WU � 0% �1 d YZ O z a In r14 * of o W S * a N a is -k �r * N U * � J * � * O F- * * H Cl) o* U o� N LG �zco k WQLu t * Z�Q Z U ru* §L 0 LA Gam >+ rd rll N Lr) a Ln W o z(L)co w jN Q .H rdgU z � ro 0 V. rl rd H �4 r- -i °H� z ,j C r TRANSMISSION VERIFICATION REPORT TIME : 08/31/2009 09:53 NAME : NCDENR FAX : 9103502018 TEL : 9107967215 DATE DIME 08/31 09:50 FAX NO./NAME 919104512927 DURATION 00:02:49 PAGE(S) 09 RESULT OK MODE STANDARD ECM State of North Carolina Department of Environment and Natural Resources, Wilmington Regional Office Beiyerlr Eaves Perdue, Governor FAX COVER SHEET Dale: - } C 1_I111,0.(.}'1?V..io fnllnw Dee Preemain, Secretar-i No. ('ages (excl. cnvcl•): Fxiwess 11emiitting T'mm: Sandra f;xtwi - - % 3 Fax: (�},1,(� 35a-� f►()al 1:'.7 Cardintil Drive I`\1ai irnl_ wifmington. W 28405 • (910) 796.7215 . An I-L]L1,11 ( ppor1L1111tV A('Jirl v1ivc Action FinplmlttT TRANSMISSION VERIFICATION REPORT TIME 08/31/2009 09:58 NAME NCDENR FAX 9103502018 TEL 9107967215 DATE,TIME 08/31 09:54 FAX NO./NAME 912032347376 DURATION 00 : 04 : 43 PAGE(S) 09 RESULT OK MODE STANDARD State of North Caroling .Department of Environment and Natural Resources Wilmington Regional Office Beverly lirrt:es perdue. Governor FAX COVER SHEET Dee Freem ao, Secretar4 Date: No. Pages (c Xci, (;ovc1$ .,xpress Permitting Frkitn: San!iro Ei Ll:li l Phone J9 4,0) 796_7265 Fax: ��111.�.�# 0- .004 �o fellow .. 117 Car[limfl Orivc Exicnsion. Wilmington, NC: 2840i • (910) 796-721 i .Mtn 14tial Opj ominity Ml-u- intive Aoio�n k nhlin-ur l � 4 �o Ov1_ �1 nvy"Wav c A vIY\ r rho PP'/ For ❑ENR Use ON LYk 6 North Carolina Department of Environment and Re _ Reviewer; ARNatural Resources Submit: _(p=Z�T 5 C-O f L-**'� N[DENR Request for Express Permit Review Time: I D: �1O GO-r%rr% Confirm: ^[ FILL-IN all the Information below and CHECK the Permit(s) you are requesting for express review. FAX or Emau the completed Corm to express Coordinator along with a completed DETAILED narrative. site plan (PDF fllel and vicinity map !same items expected In the_ application package of the project location. Please Include this form in the application package. • Asheville Reglon-Allson Davidson 828-296.4698;alison.davidson-Pncmall not - • Fayetteville or Raleigh Region -David Lee 919.791-4203; dav1d.1e9@Rcma11.net ncmall.net • Mooresvillo & -Patrick Grogan 704.663.3772 or patrick.grosratQncmall.net • Washington Rogion-Lyn Hardison 252.946.9215orlyn.hardisorlltncmaAnet `(D — 2 • Wilmington Region -Janet Russell 910-350-2004 or janot.russalK&ncmall.not Cam^ NOTE: Project appkcation received after 12 noon will be stamped in the following work day. Project Name: PINEY GREEN GATE IMPROVEMENTS - MCB CAMP LEJEUNE County_ ONSLOW _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ Deleted: _ Applicant: COMMANDING OFFICER, MARINE CORPS BASE CAMP LEJEUNE Company: NIA Address: BLDG. 1005 MICHAEL ROAOCity: MCB CAMP LEJEUNE, State: NC Zip: 28547- Phone: 910-451-2213 Fax::910451-2927 Email: cad.h,baker@usmc.mll Physical LocatiomOLD SAWMILL ROAD - MCB CAMP LEJEUNE, JACKSONVILLE Project Drains into N5W (WALLACE CREEKI waters - Water classification SSBB (for classification see- http:iih2o.enr.sta(&.nc.uslbimslreportsirebortsWB.hlml) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , wilhin'G mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: ROBERT P. PRYOR P.E. Company: DIVERSIFIED TECHNOLOGY CONSULTANT_ - - - - Deleted: — ----------------------- Address: 556 WASHINGTON AVENUE City: NORTH HAVEN, State: CT Zip 6473-_ Phone: 203-239-4200 Fax::203-234.7376 Email: robert.oryor@teamdlc.car� - - - - - - - - - - - - - - - - - - - - - - - - - - - - Deleted:. SECTION ONE: REQUESTING A SCOPING MEETING 0_NLY ❑ScopingMeeting ONLY ❑DWO,❑DCM,j]DLR, ❑OTHER________________,___________________________- Deleted: SECTION TWO: CHECK ONLY THE PROGRAMS YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach 70P0 map marking the areas in questions ❑ IntermittenUPerennial Determination. # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Slormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter — If Curb Outlet Swales E]Off-site[SW _ (Provide permd It)] ® High Density -Detention Pond _# Treafinent Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density-Bio-Retention _# Treatment Systems ❑ High Oensity-Slormwater Wetlands _ # Treatment Systems❑ y High Density. Other # Treatment Systems / ❑ MODIFICATION: El Major El Minor ❑ Revision SW ____(Provide permit#) ® Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ^� ® upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 1212^18 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Received from US ACOE ® Yes ❑ No For DCNR use onl y Fee Split for multiple nermits:fCheck# I Total FaaAmabntt SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAVA $ Variance (0 Mai; 0 Mfn) $ SW (0 HU, El Lb, 0 Gen) LQS $ Stream Deter, $ NCDENR EXPRESS September2008 Q E C E P V E JUN .12 2009 DWG? PROD 0 -_i NYT: How the U.S. surplus became a deficit - The New York Times Page 3 of 3 URI,: http://www.msnbc.msn.com/id/31199889/ MSN Privacy, Legal © 2009 MSNBC.com http://www.msnbc.msn.com/id/31199889/print/l/displaymode/I 098/ 6/10/2009 For DENR Use ONL North Carolina Department of Environment and Reviewer: � AZANatural Resources Submit: S Z sec®EivR p Request for Express Permit Review Time: conrirm: -L-y - Le FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Eman me complerea corm to Express Coordinator along with a completed DETAILED_ narrative, site plan (PDF file) and vicinity map flame items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;afison.davidson(&,ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.fee(@,ncmail.net s • Mooresville & -Patrick Grogan 704-663-3772 orpatrick.groganAnc►nail.net • Washington Region -Lyn Hardison 252-946-92f5orlyn.hardison(@-ncmail.net rr�� • Wilmington Region -Janet Russell 910-350-2004 orjanet.rpsself(a)ncmail.not NOTE: Project application received after 12 noon will be stamped in the following work day Project Name: PINEY GREEN GATE IMPROVEMENTS - MCB CAMP LEJEUNE County: ONSLOW Applicant: COMMANDING OFFICER, MARINE CORPS BASE CAMP LEJEUNE Company: NIA Address: BLDG, 1005 MICHAEL ROADCity: MCB CAMP LEJEUNE, State: NC Zip: 28547- Phone: 910451-2213 Fax::910-451-2927 Email: carl.h.baker@usmc.mil Physical Location:PINEY GREEN ROAD - MCB CAMP LEJEUNE, JACKSONVILLE Project Drains into NSW (WALLACE CREEK) waters — Water classification SB (for classification see- hUp:llh 2o. en r.state. n c.0 slbim streporislreportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N EngineerlConsultant: ROBERT P. PRYOR, P.E. Company: DIVERSIFIED TECHNOLOGY CONSULTANTS Address: 556 WASHINGTON AVENUE City: NORTH HAVEN, State: CT Zip 6473-_ ❑ C° E d Phone: 203-239-4200 Fax::203-234-7376 Email: robert.pryor@teamdtc.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY MAY t 8 2009 ® Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE _PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS_PERMITTINRGROJ # DWQ ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please affach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls -- Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ® General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond _ # Treatment Systems El High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density—Stormwater Wetlands _ # Treatment Systems❑ High Density - Other — # Treatment Systems /❑ MODIFICATION: ❑ Major ❑ Minor ❑ Revision SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 12.18 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both Scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No Fee Split for multiple permits: {Check # Buffer Impacts: ® No ❑ YES: acres) Isolated wetland on Property ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit For DENR use only Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (® HD, ❑ LID, ❑ Gen) ' $ 401: $ LOS $ Stream Deter,_ $ 'EG CC_ - C-A-fresS 2,'000 6wrK:� 13 x (a S = E3 4:" NCDENR EXPRESS September 2008 r- S t„� w 4, 0 0 0 Pork's Dirty Secret: The nation's top hog producer is also one of America's worst polluters... Page 2 of 7 .................. RATE / COMMENT PRINT SHARE; .................................... .........._,.. 2345 Smithfield is no longe able to disfigur watersheds quite so obviously a in the past; it c n no longer expand and flatten mall pig farms uite so easily. Several state legis tures have pas ed laws prohibiting or limi ng the ownersh p of smail farms by pork processors. n some places, ew slaughterhouses re required to eet expensive waste -disposal re uirements; ma y are forbidden from using the wa te-lagoon syst m. North Carolina, where pigs now ou umber peopl , has passed a moratorium on new og operation and ordered Smithfield to fund res rch into al ernative waste - disposal technologies. S h Caroli a, having taken a good look at its neighbor's c stal ain, has pronounced the company unw om in the state. The federal government and several tate have challenged some of Smithfield's r cent cquisition deals and, in a few instances, ha a force he company to agree to modify its aste-tagoo systems. These initiatives, of tour e, come comically I te. Industrial hog operati s control at least se enty-five percent of the mark . Smithfield's market ominance is hardly at risk: T enty-six percent of t pork processed in this c untry is Smithfield rk. The company's expansi n does not seem t be slowing down: Over the pas two years, 5mit field's annual sales grew by $1.5 bi ion. 1n Septe ber, the company announced t at it is mergi g with Premium Standard Farms, the na on's second largest hog farmer and sixth -largest ark proces r. If the deal goes through, Smithfield w I own mor pigs than the next eight largest pork prod cers in the nation combined. The company's m rket levera a and political clout will allow it to produce ever reater quantities of hog waste. Smithfield points to the improvements it has made to its waste -disposal systems in recent years. In 2003, Smithfield announced that it was investing $20 million in a program to turn its pig shit in Utah into alternative fuel. It now produces approximately 2,500 gallons a day of biomethanol and has begun building a facility in Texas to produce clean -burning biodiesel fuel. "We're paying a lot of attention to energy right now," says Treaty, the Smithfield vice president. "We've come such a long way in the last five years." The company, he adds, has undergone a "complete cultural shift on environmental matters." ADVE R'11SEPMEN T hup://www.rollingstone.con-Ypolitics/story/I 2840743/porks_dlrty_secret—the—nations—top_h... 5/8/2009 Piney Green Road — Express Permit Narrative: 1. General Information a. Name of Project — Piney Green Gate Improvements — MCB Camp Lejeune b. Street Address, City, County— Piney Green Road, MCB Camp Lejeune, Onslow c. Acres in Tract — 12.18 acres d. Acres Being Disturbed — 12.18 acres e. Acres in Wetlands — NIA 1. Wetlands Must Be Delineated — Appendix F 2. Proposed Wetland Impacts Require Permits From Corps & DWQ — Appendix F f. Ownership Information From NC Secretary of State Web Site — NIA g. Description of Development Proposal —The proposed project involves improvements to the existing security checkpoint into Marine Corps Base Camp Lejeune located on Piney Green Road, south of NC Route 24. The improvements include additional inbound and outbound travel lanes on Piney Green Road and the construction of a commercial vehicle queuing and inspection facility to the west of Piney Green Road. 1. Previous or Existing Permits — NIA 2. Tax parcel ID Number — NIA h. Pre-1988 Built Upon Area, If Applicable — NIA i. Discuss Phasing of the Project & Stormwater Facilities -- See Drainage Narrative j. Discuss Proposed Waste Water Treatment & Water Supply — Proposed water service will connect to proposed Onwasa water line. Proposed 6" sanitary sewer service will connect to a new lift station, and through a force main to the Onwasa force main and wastewater Pump station. k. Identify Historic Sites & Projects Being Funded With Public Monies — The project is being funded with government monies. 1. Disclose Any/All Non -Compliance Issues with DENR Agencies — NIA z. Stormwater Information a. Provide River Basin, Stream Classification & Index Number for All water Bodies On or Adjacent To The Project or Closest to The Project Area — White Oak River Basin, Wallace Creek Waters, SB, NSW 19-24 b. Identify Whether the Stormwater Design is High Density or Low Density - I -ID, Commercial or Residential — Military Facility, State Stormwater or NPDES Phase II — State Stormwater, Address Vested Rights --- NIA; Identify Pockets of High Density — NIA c. Proposed Total % Impervious Surface — 47% d. Number of Proposed Treatment Measures, Type(s) of Collection System — Wet detention i pond (1), grass lined swales, culverts, and sheet now e. Will All Built Upon Area Be Collected — All new impervious coverage and portions of existing impervious surface will be conveyed to the wet detention pond. f. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer— NIA g. Discuss Coastal Management Areas of Environmental Concern — NIA h. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP — NIA i. Discuss Whether Road Construction Across Other Property Is Nee r T(eccess Thl E Project — NIA U MAY 18 2009 DW Q PROD # Lawn -Boy Insight 10685 self-propelled gas mower Review: Powered by ConsumerGuide ... Page I of 3 a 9 �� rg,�I. $t'€�* € ;:=r �... `:7 za. t?;` ".a <, i.- ••r ':t -x�.ya tr# z01 r j,�l,':� Y ° CONSUMERGUIDEN PROIDUCi5 Bubble � 3 b b l e HI SCORE: 29762M LEv 01 Boomers I Search Consumer Guide Products and tte Web: to GARMNCE sc�ch http://products.howstufl-works.com/lawn-boy-insight-10685-mower-review.htm 5/11/2009 Piney Green'Road — Drainage Narrative: The proposed project involves improvements to the existing security checkpoint into Marine Corps Base Camp LeJeune located on Piney Green Road, south of NC Route 24. The improvements include additional inbound and outbound travel lanes on Piney Green Road and the constniction of a commercial vehicle queuing and inspection facility to the west of Piney Green Road. The overall project site contains 12.18 acres. Currently, there is 2.48 acres of impervious coverage within the project site. Stormwater collection and treatment presently consists of sheet runoff into grass -lined swales and discharge to low areas and existing roadway culverts. The proposed plan calls for an increase in impervious coverage to 5.77 acres, or approximately 47% of the project site. Runoff from the eastern side of Piney Green Road will continue to be collected by a relocated grass -lined swale. Runoff from the western side of Piney Green Road and the proposed vehicle inspection area will be collected via grass -lined swales and conveyed to a new wet detention basin. The proposed wet detention basin has been sized to meet the requirements and recommendations contained in the NCDENR BMP manual. The basin will serve as a water quality treatment facility and will also act to maintain flows to pre-constniction rates for the I -year, 24-hour storm event. The basin is equipped with an emergency spillway sized pass flows up to and including the 100-year storm event. E C E . 0 V ED MAY 18 20p9 DWO PROD #� Pork's Dirty Secret: The nation's top hog producer is also one of America's worst polluters... Page 3 of 7 But cultural shifts, no matter how genuine, cannot counter the unalterable physical reality of Smithfield Foods itself. "All of a sudden we have this 800-pound gorilla in the pork industry," Successful Farming magazine warned -- six years ago. There simply is no regulatory solution to the millions of tons of searingly fetid, toxic effluvium that industrial hog farms discharge and aerosolize on a daily basis. Smithfield alone has sixteen operations in twelve states. Fixing the problem completely would bankrupt the company. According to Dr. Michael Mallin, a marine scientist at the University of North Carolina at Wilmington who has researched the effects of corporate farming on water quality, the volumes of concentrated pig waste produced by industrial hog farms are plainly not containable in small areas. The land, he says, "just can't absorb everything that comes out of the barns." From the moment that Smithfield attained its current size, its waste -disposal problem became conventionally insoluble. Joe Luter, like his pig shit, has an innate aversion to being contained in any way. Ever since American regulators and lawmakers st ed forcing Smithfield to spend more money on wa -e treatment and attempting to limit the co any's expansion, Luter has been looking to do busin s elsewhere. In recent years, his gaze has fallen on t e lucrative and unregulated markets of Polan . In 1999, Luter bought a st e-owned company called Animex, one of Poland's ggest hog processors. Then he began doing business hrough a Polish subsidiary called Prima Farms, acqui ing huge moribund Communist -era hog farms nd converting them into concentrated feeding opera ions. Pork prices in Poland were low, so Smithfield's sw ping expansion didn't make strict economic sense, a cept that it had the virtue of pushing small hog far ers toward bankruptcy. By 2003, Animex w s operating six subsidiary companies and seve processing plants, selling nine brands of meat and taking in $338 million annually. The usual violations occurre . Near one of Smithfield's largest plants, in Byszkow0, n enormous pool of frozen pig spit, pumped into lagoon in winter, melted and ran into two near y lakes. The lake water turned brown; residents in loc villages got skin rashes and eye infections; the st ch made it impossible to eat.•A recent report t the Helsinki Comma sslon found that Smithfield's Ilution throughout Poland was damaging the ountry's ecosystems. Overapplication was ende ic. Farmers without permits were piping liquid pig hit directly into watersheds that fed into the Baltic Se . When Joseph Luter entered Poland, rate announced Obama's Chess Masters The Class Clowns Obama's Sheriff The Dirty Dozen The Big Takeover The Making of a Narco State Obama's Bailout ADVERTISEMENT MORE POLITICS http://www.roll ingstone.com/politics/story/ 12840743/porks_dirty_secret_the_nations_top_h... 5/8/2009 1;5 i d fi�►� ;' .fir 8th•ln Ic �71h�1-n' ' � •�' � n � a B1� Sri ti i °tufl2)suew�fe; �r Certification Requirements: 1. The drainag area to the system contains approximately the permitted acreage. 2. The drainage rea to the system contains no more than the permitted amount of built- pon area. 3. All the built -upon ar associated with the project is graded such that the runoff drains to the sy m. 4. The outlet/bypass structure a vations are per the approved plan. 5. The outlet structure is located p the approved plans. t 6. Trash rack is provided on the ou et/bypass structure. 7. All slopes are grassed with ermanent vegetation. 8. Vegetated slopes are nos eper than 3:1. 9. The inlets are located per the a roved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface a ea and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ inspector, county County Building Inspector y 0 lip M flflip. i� El �o g 4�I va %/ 6TOtl IIINATS J O10 I i �° �i tN 11 �Pi I 1� Y � I E �� i IR�1 I 1 �� 61�1II I N Hill S z 24 1 w UV FAwrt ES ENGINEERNG COMMAND oarA..o mw..e I e 8 2e�� - MmLANf 1 M'o � 3' 6 MARINE CORPS BASE GwP LEJENNE, NC d ] h�T�F��►a+� I PINEY GREEN GATE— i PHYSICAL SECURITY UPGRADES I, ERNE GREEN WE - SNE yti0ut a\/J1 b n r� project name county County Stormwater Project No. SW8 project # Designer's Certification I, 1 , as a duly registered in the State of North Caro ina, having been authorized to observe (periodically 1 weekly / full time) the constructio of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and dilig nce was used in the observation of the project construction such that the construction as observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date cc: NCDENR DWQ Regional Office inspector, county County Building Inspector FW: Piney Green Gate & Old Sawmill Road - Express Permit Subject: FW: Piney Green Gate & Old Sawmill Road - Express Permit From: "Pryor, Robert" <robert.pryorateamdtc.com> Date: Mon, 18 May 2009 10:23:21 -0400 '1'o: <janet.russell rr ncmail.net>, <janet.russell a ncdenr.gov> CC: "Marra, Tom" <tom.marra a teamdtc.com>, "Soumelidis, Andy" <andy,soumelidis rr teamdte.com>, "Towler CIV David W" <david.towler a usmc,mil> Janet, Please find express permit application material for the Piney Green gate and Old Sawmill Road improvements at Camp LeJeune. Per my earlier emails, we would like to Sit down with you on May 27, 2B, or 29th to review these permit applications as well as the permit application for the Main Gate improvements at Marine Corps Air Station New River that was sent to you last week, Thanks, Robert P. Pryor, PF, LS, LEEDVAP Manager, Land Development Diversified Technotogy Consultants 556 Washington Avenue North Eiaven, Cr 06473 T: (203) 239 4200 x 109 M: (203) 889-8068 F: (203) 234 7376 robert.pryor@tcamdtc.com teamdte.com www, teamcitc. coin P Save paper and the environment, Print this out only ifyou really need to! From: Soumelidis, Andy Sent: Friday, May 15, 2009 4:47 PM To: Pryor, Robert Subject: Piney Green Gate & Old Sawmill Road - Express Permit FYU. Both Old Sawmill and Piney Green. Thanks, Andy Soumelidis Civil Engineer, Lund Development Diversit►ed Technology Consultants 556 Washington Avenue North Haven, CT 06473 T' (203) 239 4200 x258 F: (203) 234 7376 andy.soumelidis@teamdtc.com www.teamdtc.com ECEgIIED MAY 181009 PHOJ # DWq rntent-Description: Express Permit Review (OSM).pdf: Express Permit Review (OS,�1).pdfntent 'Type: applicationloctet-streamntent-Encoding: base64 Content -Description: Express Permit Review (PG).pdf' Express Permit Review (PG).pdf Content -Type: applicationloctet-stream Content -Encoding: base64 of I 5/18/2009 3:06 PM 4. Required Actions: (Each deficiency is explained below and what needs to be done to bring the system back into compliance) X Inspector: Linda Lewis Water Quality/Wilmington Regional Qfficel(910) 796-7215 ENBlarl: SAWQSISTQRMWATIINSPECTIfilename ,J111. 1 7 2009 51'-7 Express Permit Application Package IN SUPPORT OF Proposed Improvements to Piney Green Gate MCB Camp Lejeune, NC for the Commanding Officer, Marine Corps Base, Camp Lejeune •LESS/p • �� 9� •a SEA r: r 34 BRT P.1 1P���`� �1ut DTC No. 08-278-106 July 14, 2009 ENGINEERED SOLUTIONS LAND STRUCTURES WATER DIVERSIFIED TECHNOLOGY CONSULTANTS SS6 WASHINGTON AVENUE NORTH HAVEN CT 06473 203 239 4200 203 234 7376 FAX NORWICH, CT ANDOVER, MA U • TABLE OF CONTENTS Piney Green Road — Express Permit Narrative Piney Green Road - Drainage Narrative SK-1 Location Map APPLICATION DOCUMENTS Request for Express Permit Review Stormwater Management Permit Application Form ON 1111 1 7 2009 SUPPORTING DOCUMENTATION & CALCULATIONS Appendix A Wet Detention Basin — Cc������►�S rt reHno'e� CN Appendix C Stormwater Basin Study Appendix D Stormwater Management System Calculations Appendix E Express Collection System Calculations for Culverts and Swales Appendix F ACOE Wetland Delineation Documentation REFERENCED DRAWINGS GOO Cover Sheet CV001 Existing Conditions Legend CS210 Site Layout Plan CS220 Grading & Drainage Plan CS222 Roadway Grading, Drainage, Plan & Profile CS224 Pond Plan & Section CS240 Sedimentation & Erosion Control Plan CS241 Sedimentation & Erosion Control Notes & Details CS252 Pond Planting Plan CS260 Drainage Area Plan CS261 Drainage Area Plan AUG 2 B Z009 Piney Green Road — Drainage Narrative: The proposed project involves improvements to the existing security checkpoint into Marine Corps Base Camp LeJeune located on Piney Green Road, south of NC Route 24. The improvements include additional inbound and outbound travel lanes on Piney Green Road and the construction of a commercial vehicle queuing and inspection facility to the west of Piney Green Road. The overall project site contains 12.71 acres. Currently, there is 2.42 acres of impervious coverage within the project site. Stormwater collection and treatment presently consists of sheet runoff into grass -lined swales and discharge to low areas and existing roadway culverts. The proposed plan calls for an increase in impervious coverage to 5.88 acres, or approximately 4717c of the project site. Runoff from the eastern side of Piney Green Road will continue to be collected by a relocated grass -lined swale. Runoff from the western side of Piney Green Road and the proposed vehicle inspection area will be collected via grass -lined swales and conveyed to a new wet detention basin. The proposed wet detention basin has been sized to meet the requirements and recommendations contained in the NCDENR BMP manual. The basin will serve as a water quality treatment facility and will also act to maintain flows to pre -construction rates for the 1-year, 24-hour storm event. The basin is equipped with an emergency spillway sized pass flows up to and including the 100-year storm event. Based on Plan # CS260, there is new impervious area within watershed #2, which does not receive treatment through the BMP. Conversely, there are existing impervious areas in watershed # 1 that are not presently treated and will receive treatment as a result of the proposed project. Existing impervious Areas within Watershed #1 to receive treatment: 1.90 acres New Impervious Areas within Watershed #2 that do not receive treatment: 0.32 acres Ratio of Treated Existing Impervious/Untreated New Impervious = 1.90/0.32 = 5.94 The road improvements have been modified to only have new impervious within Zone 2 which requires a minor variance. The additional impervious surface proposed within Zone 2 (±2,750 st) does not impact the stream as it drains to the east of Piney Green Road. The road widening includes the addition of a right turn lane, requested by the Navy, due to the proposed improvements to Old Sawmill Road. L.7 L'G a2009 . Piney Green Road — Express Permit Narrative: 1. General Information a. Name of Project — Piney Green Gate Improvements — MCB Camp Lejeune b. Street Address, City, County — Piney Green Road, MCB Camp Lejeune, Onslow c. Acres in Tract — 12.71 acres d. Acres Being Disturbed — 12.71 acres e. Acres in Wetlands — NIA 1. Wetlands Must Be Delineated — Appendix F 2. Proposed Wetland Impacts Require Permits From Corps & DWQ Appendix F f. Ownership Information From NC Secretary of State Web Site -- NIA g. Description of Development Proposal — The proposed project involves improvements to the existing security checkpoint into Marine Corps Base Camp Lejeune located on Piney Green Road, south of NC Route 24. The improvements include additional inbound and outbound travel lanes on Piney Green Road and the construction of a commercial vehicle queuing and inspection facility to the west of Piney Green Road. 1. Previous or Existing Permits — NIA 2. Tax parcel ID Number -- NIA h. Pre-1988 Built Upon Area, If Applicable — N/A i. Discuss Phasing of the Project & Stormwater Facilities — See Drainage Narrative j. Discuss Proposed Waste Water Treatment & Water Supply — Proposed water service will connect to proposed Onwasa water line. Proposed 6" sanitary sewer service will connect to a new lift station, and through a force main to the Onwasa force main and wastewater pump station. Identify Historic Sites & Projects Being Funded With Public Monies -- The project is being funded with government monies. Disclose Any/All Non -Compliance Issues with DENR Agencies — NIA 2. Stormwater Information a. Provide River Basin, Stream Classification & Index Number for All water Bodies On or Adjacent To The Project or Closest to The Project Area — White Oak River Basin, Wallace Creek Waters, SB, NSW 19-20 b. Identify Whether the Stormwater Design is High Density or Low Density - HD, Commercial or Residential — Military Facility, State Stormwater or NPDES Phase 11— State Stormwater, Address Vested Rights — NIA; Identify Pockets of High Density — NIA e. Proposed Total % Impervious Surface — 47% d. Number of Proposed Treatment Measures, Type(s) of Collection System — Wet detention pond (1), grass -lined swales, culverts, and sheet flow e. Will All Built Upon Area Be Collected All new impervious coverage and portions of existing impervious surface will be conveyed to the wet detention pond. f. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer — NIA g. Discuss Coastal Management Areas of Environmental Concern — NIA h. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BM P — NIA i. Discuss Whether Road Construction Across Other Property Is Necessary To Access This Project — NIA ry Ir l`.-• Y � � � i y '�r•1'fC�r�ij,�, , f - �G... � ,, 'S + T s �+���;,;,� y. r t��iln�L-n ,ry S s� 4►_ xod Al p� 6th-U-n j;11 QLLJ��p��VCY f j Y�S��.'.,.�� � t"4 =���r E ' � .A r• i � r L l...?"1� !f••* � •' r�(,,,�{" p-�(- [("ft�i ,�"..J� r r. �� T{ ..,.. - a4 :. jA � i 1s r' �* is A, Q4.y ��•!R Or C i S . �_ l' � � _ � •tea' r C!Lk 21 OV I n—I U. Ry ti 33 y t F '7 I I 111 h Piney Green Gate Security Improvements - MCB Camp Lejeune Stormwater Computations 5-Aug-09 RIECO-7 .Required Storage Volume i AUG S 5 24 09 (Simple Method) BY: Runoff Coefficient R„=0.05+0.9*1, 1a=0.48 R„=0.05+0.9*0.48 R, = 0.482 Volume of Runoff VREQ = 3630 * Ra * Rv * A R„ = 0.482 RQ = 1.5" A = 10.60 ac VREQ = 3630 * 1.5 * 0.482 * 10.60 VREQ = 27,820 ft3 VPRov = 45,104 W Average Depth of Permanent Pool _ Option 1 : day = V perm pool/ A perm pool day = 82,234 118,750 day = 4.39 use Table 10-4 (48% Impervious, Coastal 90%, and dav= 4.5 ), SAIDA = 3.74 'Surface Area Required - Permanent Pool SAIDA * Drainage Area = SAfeq 0.0374 * 461786 = 17,270.8 1 0 2009 Piney Green Gate Security Improvements - MCB Camp Lejeune Stormwater Computations 5-Aug-09 Wet Detention Basin Volume Computations lPermanent Pool Volume_ Elevation _z Area (ft } Incremental 3 Cumulative 3 Volume (ft) Volume(ft ) 24.5 2800 0 0 25 3265 1516 1516 26 6600 4933 6449 27 8000 7300 13749 28 9480 8740 22489 29 11040 10260 32749 30 12685 11863 44611 31 14405 13545 58156 32 16250 15328 73484 32.5 18750 8750 82234 Temporary Pool Volume � Incremental Cumulative Elevation Area {ft2) 3 Volume (ft) 3 Volume(ft ) 32.5 18750 0 0 33 21530 10070 10070 34 24025 22778 32848 34.5 25000 12256 45104 Forebay Volume Incremental Cumulative Elevation Area (ft) Volume (ft) Volume(ft) 26 1420 0 0 27 1760 1590 1590 28 2125 1943 3533 29 2515 2320 5853 30 3000 2758 8610 31 3370 3185 11795 32 3830 3600 15395 32.5 4075 1976 17371 RECE v E'> BUG 5 2M BY: Piney Green Gate Security Improvements - MCB Camp Lejeune Stormwater Computations 1 4-Jul-09 'Drawdown Computations Q = CDA(2gHo)12 Cp = 0.60 A=.02 g = 32.2 ft/sec2 Ho = 0.67' (34.5'-32.5')13 Q = 0.60 * 0.02 (2*32.2*0.67)12 Q = 0.08 cfs Drawdown Time T=Vreq/Q T = 27,82010.08 T = 347,750 seconds T = 4.02 days Xt (_' P-11 v Pond Report - -,. J Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Thursday, Aug 6, 2009 Pond No. 1 - Piney Green Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 24.50 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) 0.00 24.50 2,800 0 0,50 25,00 3,265 1,516 1.50 26.00 6,600 4,933 2.50 27.00 8,000 7,300 3.50 28.00 9.480 8,740 4.50 29.00 11,040 10,260 5.50 30.00 12,685 11.863 6.50 31.00 14,405 13,545 7.50 32.00 16,250 15,328 8.00 32.50 18,750 8,750 8.50 33.00 21,530 10,070 9.50 34.00 24,025 22,778 10.00 34,50 25,000 12,256 11.00 35,50 27,020 26,010 Total storage (cult) 0 1,516 6,449 13,749 22,489 32,749 44,611 58,156 73,484 82,234 92,304 115,081 127,338 153,348 2 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 0.00 0.00 Crest Len (ft) = 14.00 40.00 0.00 0.00 Span (in) = 24.00 2.00 0.00 0.00 Crest El. (ft) = 34.50 35.00 MO 0.00 No. Barrels = 1 1 0 0 Weir Coeff, = 3,33 3.33 3.33 3.33 Invert El. (ft) = 28,65 32.50 0.00 0.00 Weir Type = Riser Broad --- --- Length (ft) = 65,00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0,60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla Yes No No TW EIev. (ft) = 0.00 Nate: Culvertfonfice outflows are analyzed under inlet {ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (5). Stage I Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cis cfs cfs cfs cfs cfs cfs 0.00 0 24.50 0.00 0,00 --- --- 0.00 0.00 - - --- --- 0,000 0.50 1,516 25.00 0.00 0.00 --- - 0.00 0.00 --- -- 0.000 1.50 6,449 26.00 0,00 0,00 --- 0.00 0.00 --- --- --- - 0,000 2.50 13,749 27.00 0,00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 3.50 22,489 28.00 0,00 0.00 -- --- 0.00 0.00 --- --- --- --- 0.000 4.50 32,749 29.00 0.00 0,00 - --- 0.00 0,00 --- --- --- -- 0.000 5.50 44,611 30,00 0.00 0.00 -- --- 0.00 0.00 --- --- --- - 0.000 6.50 58,156 31.00 0.00 0.00 - --- 0.00 0.00 - --- --- --- 0.000 7.50 73,484 32,00 0.00 0.00 -- -- 0.00 0.00 - --- --- --- 0.000 8.00 82.234 32.50 0.00 0.00 --- --- 0.00 0.00 - -- - 0,000 8.50 92,304 33.00 0.07 is 0,07 is --- --- 0.00 OM - - 0.068 9.50 115,081 34.00 0.13 is 0.13 is --- - 0.00 0,00 - - 0.125 10.00 127,338 34.50 0.15 is 0.15 is --- - 0.00 0.04 -- - 0.145 11.00 153,348 35.50 35.44 is 0.06 is - 35.37 s 47.09 --- --- --- --- 82.53 • LMG D I LAND MANAGEMENT GROUP INC. JAN 0 5 2099 Environmental Consultants aC; December 23, 2008 Robert Pryor, P.E. ll It I i 2009 Diversified Technology Consultants 556 Washington Ave. [BY: North Haven, CT 06473 Reference: Stormwater basin study for the proposed basin areas for the MCB Camp Lejeune Main Gates, Located off of Holcomb Blvd. and Piney Green Rd in Jacksonville, NC. Dear Mr. Pryor: On December 22, 2008, Land Management Group, Inc. had the pleasure of evaluating the proposed MCB Camp Lejeune Main Gates proposed stormwater basin areas for the Piney Green Rd, gate as well as the Holcomb Blvd. gate. The purpose of the evaluation was to describe the soil profile, quantify the depth to the seasonal high water table, and to inform the project engineer of any potential limitations of this project. The soils at this site are mapped as Baymeade soils in the Soil Survey of Onslow County (USDA, 1992). Actual soil pit 1 confirm the soil to be a Stallings soil series and soil pit 2 confirms the soil to be a Baymeade soil series, Appendix B. The Baymeade soil series can best be described as soils that formed from sandy marine sediments on flats and low ridges, the Stalling soil series can best be described as soils that formed from poorly drained sediment in the coastal plain. The seasonal high water table is normally evident by observation of redoximorphic features suggesting past conditions of saturation and reduction. There is evidence of redoximorphic features at l I" in pit l which was located at the Piney Green Rd. proposed area and 44" in pit 2 which was located at the Holcomb Blvd. proposed area (see soil profile descriptions in Appendix B and Test Area Map Appendix A). No physical water levels were recorded on December, 2008 within test depth of either soil pit, as documented in the soil profile descriptions, Appendix B. All recorded depths are from the existing surface as noted in the soil profile descriptions, Appendix B. The: official published description and physical and chemical data for a Baymeade and Stallings soil series are shown in Appendix C for comparison. www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 9 P.C. Box 2522, Wilmington, NC 28402 In summary, this site has an area that is proposed for stormwater basin placement. This area has soils that have a seasonal high water tables at l l" in pit 1, and 44" in pit 2. If infiltration rates are required, then they can be provided at the client's request. Please do not hesitate to contact me if you have any questions with this report- I may be reached at 910452-0001, 910-471-0505 or at nhowellglmg.roup.net . Sincerely, Nicholas Howell NC Licensed Soil Scientist #1294 .7 U RECFIV ED .1111 1 7 2009 BY: Appendix A Test Area Maps 0 • ,It !I, 17 2009 BY: • 0 • MCB Camp Lejeune Piney Green Rd Main Gate Stormwater Basin Evaluation Test Area Map December 23, 2008 C777 W j � •I•• �r .. ���� /f•f •// rr r ap a• �: tell g P1 Is S ,:• �::• to i• f • � 9 i•� :1 1 - • U V W4iCHLIHL SCE SHLEI CS202B t 1 � � � �- warKartwy�sv.4mrrvu.� S $'� � `t-.•- - � s � f!D ML �pEpU1MT7 � V r Fo-sou P1t Job # 30+08401 Robert Pryor Drawing By NAH. Land Management Group, Inc. i Environmental Consultants Drawing Not to Scale' P.O. Box 2522 "DrawingProvided B Others'"* Wilmington, NC rovi womy"Gmugigg� Phone: 910-452-0001 Fax: 910-452-0060 0 0 0 L Soil Pit Jab # 3U-08-01 Robert Pryor Drawing By N.P.H. MCB Camp Lejeune Holcomb Blvd. Main Gate Stormwater Basin Evaluation Test Area Map December 23, 2008 n ri I 7 2009 BY.- Land Management Group, Inc. *Drawing Not to Scale* Environmental Consultants vP.O. iBoi n= **Drawing Provided By others** WffW..MGrinuartet Phone: 910-452-DOD1 Fax: 910-452-CM a f r N t-y + ti v Y•jtS �` 1. a4�1 i, t7 1 + . 4" a ti .. ~Midway�� w� r.yf i' � i. y .,Y Qr + �' .i••� iT a. ,. t ' t' •�yy(��� A.r �� .�T �'t,� �p?i{i t �� r• - ,t, r�tiv� ! _ t •. fit-, h'r�. {f�{ff''�l�rtf • r 4 s M a.. � �t `'�4�}`.�. e jl, SrF^ �i�e� +v, a�^�sd� �n � • .` �, p L 7,+, � a 'J � � ' : ; �r1s. t i + ; , r 1% T F _yr!S'i� - $ A ate ne5 r _ it +� flit "�i '� {�AL .,� ; "A"•'' �'�i'• � +' �ji �� + '!Sfi ` ..ice L *s t ►. }�} � ..�'d � F 3L"i: �"C.:E ���t t � l ,,l s f�- ty��, A- � w A .. �� '� � � � y� {_t r �` S�f+7DQ,TvIo P!IesA' �� f��*:#°.•r`•. Wyl 41 A,3 '� :'ice• ..•K,1t rIr:'r a tt K�'1-�;*#�+.�tLc i`:.lrimapotMODD UI'pij�%I:.r Sri _w�..)It 3+'az •.; ol•u- �rlo'se.�e-w� ''tittF: ir. '..,��••.. _ ' r t •eio. •iorr � 'tti \ - . J C tea.•. �• 1A lr A J'�i A..L y Yc�h•iF } �� A �tti Appendix B Soil Profile Descriptions • T V'] - )D 171 7 2009 BY: MCB Camp Lejeune Stormwater Basin Evaluation ,!I IL 1 7 2009 December 23, 2008 Piney Green Gate Pit 1 Side Slope 2-4% Stallings Series Fill — 0-11" Mixed Sandy Fill, structureless. Ab—11-17" Loamy Sand, granular very friable non sticky non plastic, 1 OYR 2/1. Bg—17-25" Loamy Sand weak medium subangular blocky 2.5Y 4/1. Btgl -- 25-42" Sandy Loam with Sandy Clay Loam bodies, weak medium subangular blocky friable slightly sticky slightly plastic, 2.5Y 6/1. Btg2 — 42-47"+ Sandy Clay Loam, weak coarse subangular blocky friable slightly sticky slightly plastic, 2.5Y 3/ 1. Physical Water: NA SHWT: 11" from existing grade. Holcomb Blvd. Gate Pit 2 Micro Ridge 0-1 % Baymeade Series A — 0-4" Loamy Fine Sand, granular very friable non sticky non plastic, 1 OYR 3/1. E — 4-9" Fine Sand granular very friable non sticky non plastic, 1 OYR 6/1. Bw — 9-17" Loamy Fine Sand weak medium subangular blocky very friable non sticky non plastic, 1 OYR 5/4. E'—17-26" Fine Sand, granular very friable non sticky non plastic, 1 OYR 7/4. Btl — 26-44" Fine Sandy Loam, weak medium subangular blocky friable slightly sticky non plastic, 1 OYR 6/6. Bt2 — 44-65" Fine Sandy Loam, weak medium subangular blocky friable slightly sticky non plastic, 1 OYR 6/6 with 7.5YR 5/8 and 1 OYR 6/2 mottles. C — 65-70"+ Fine Sand, single grained, loose non sticky non plastic, 2.5Y 5/4 with 1 OYR 5/6 and 2.5Y 6/2 mottles. Physical Water: NA SHWT: 44" Project PINEY GREEN GATE Location CAMP LEGEUNE, NC Circle one: Present Developed X 1_ Runoff Curve Number (CN) By AS Date Checked RPP Date DA-1 8/5/2009 8/5/2009 Soil Name Cover description Area Product and (cover type, treatment, and CN 1 of hydrologic hydrologic condition; CN x area N acres group percent impervious; a) `y miz unconnected/connected impervious F w % (Appendix A) area ratio) B Open Space, Good Cond. 61 7.83 477.63 Imperv. Area (drive) 98 1.90 186.20 B Woods 55 0.87 47.85 1 Use only one CN source per line Totals = 10.60 711.68 total product CN (weighted) = total area 2. Runoff Frequency yr Rainfall, P (24-hour) in S Runoff, Q in 711.68 68 = 67.14 use CN = 10.60 Storm 1 Storm 2 Storm 3 1 1 i (Use P and CN with Table 2-1, Fig. 2-1, EX WS CN.As Project PINEY GREEN GATE Location CAMP LEJEUNE, NC Circle one: Present Developed x 1. Runoff Curve Number (CN) By AS Checked RPP FBY: CIEDII n Z 7 2009 Da to 1/2612009 Date 1/26/2009 DA-2 Soil Name Cover description Area Product and (cover type, treatment, and CN 1 of hydrologic hydrologic condition; CN x area N h , a , group percent impervious; N v "' ` NaCreS mi' ~ m t' unconnected/connected impervious F . ', w •a w (Appendix A) area ratio) B Open Space, Good Cond. fit 1.59 96.99 lmperv. Area (drive) 98 0.52 50.96 1 Use only one CN source per line Totals = 2.11 147.95 total product 147.95 CN (weighted) = total area - 2.11 - 2. Runoff Frequency yr Rainfall, P (24-hour) in S Runoff, Q in (Use P and CN with Table 2-1, Fig. 2-1, 70.12 Use CN = 71 EX WS CN (7-7-09).xls Project PINEY GREEN GATE By AS Date 3/1712009 Location CAMP LEJEUNE, NC Check, RPP Date 311712009 Circle One: Present eveloped Circle One: T. T, through subarea DA-1 NOTES: Space for as many as two segments per flow type can be used for each worksheet. include a map, schematic, or description of flow segments. Sheet flow (Applicable to T, Only) Segment ID 1. Surface description (table 3-1) GRASS GRASS 2. Manning's roughness coeff., n (table 3-1) 0.150 0.150 3. Flow Length, L (total L < 300 ft) ft 78 222 4. Two-yr 24-hr rainfall, P. in 4 4 5. Land slope, s ft/ft 0.013 0.005 "' Compute Tt 0.142 + 0.481 0.624 6. Tt = 0 . 007 (nL) hr Pz 0.500,4 Shallow concentrated flow Segment ID 7. Surface description (paved or unpaved) UNPAVED 8. Flow length, L ft 585 9. Watercourse slope, s ft/ft 0A11 10.Average velocity, V (figure 3-1) ft/s 1.7 I, Compute Tt hr 0.096 + D.D96 11.Tt = 3600 V Channel flow Segment ID 12.Cross sectional flow area, a fta 13.Wetted perimeter, pw ft 14.Hydraulic radius, r r a pw Compute r ft 15.Channel slope, s ft/ft 16.Manning's roughness coeff., n V = 1.49 r2/3 s'/z 17. n Compute V ft/s 18.Flow length, L ft L _ 19. T` 3600 V Compute T, hr 0.000 20.Watershed or subarea T, or T. (add Tt in steps 6, 11, 19) hr 0.7i9 Use Tc = 43 min. .fill. 1 7 2009 Proj ect PINEY GREEN GATE By AS Date 3/17/2009 Location CAMP LEJEUNE, NC Check( RPP Date 3/1712009 Circle One: G ent eveloped Circle One: T, TL through subarea DA-2 NOTES: Space for as many as two segments per flow type can be used for each worksheet . Include a map, schematic, or description of flow segments. Sheet flow (Applicable to T, Only) Segment ID 1. Surface description (table 3-1) 2. Manning's roughness coeff., n (table 3-1) 3. Flow Length, L (total L < 300 ft) ft 4. Two-yr 24-hr rainfall, P. in 5. Land slope, s ft/ft 6. Tt = 0.007 (nL) °'e Compute Tt hr P 0,5 �QA a Shallow concentrated flow 7. Surface description (paved or unpaved) 8. Flow length, L 9. Watercourse slope, s 10.Average velocity, V (figure 3-1) Segment ID 11 . T, = L Compute Tt 3600 V ft ft/ft ft/s hr GRASS 0.150 300 4 0.009 0.484 + UNPAVED 135 0.020 2.2 0.017 + .If 1( 1 7 2009 '3Y: ___ = 0.017 Channel flow Segment ID 12,Cross sectional flow area, a ft, 13,Wetted perimeter, pW ft a 14.Hydraulic radius, r r p Compute r ft 15.Channel slope, s ft/ft 16.Manning's roughness coeff., n V = 1 .4 9 r2,3 91/2 17. n Compute V £t/s 5.00 18.Flow length, L ft 45 _ L _ 19.T` w 3600 V Compute T� hr 0.003 0.003 20.Watershed or subarea T. or T. (add T. in steps 6, 11, 19) hr 0.504 Use Tc = 30 min. 0 2009 Watershed Model SchemaV� y raflow•tslydrographs Extension for AutoCADcai Civil 3D0 2009 by Autodesk, Inc. v6.066 Project: PineyGreenExisting. gpw � Thursday, Aug 6, 2009 AUG .; 0 2000 Hydrograph Return_P_er_iodyRocgrapfs Extension for AutoCADO Civil 3D® 2009 by Autodesk. Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff - - 4.491 8.894 ----- 14.87 20.44 29.14 37.00 45.81 DA-1 2 SCS Runoff ------ 1.338 2.479 ------- 3.985 5.365 7.492 9.398 11.52 DA-2 3 Combine 1.2 5.686 11.15 ------- 18.50 25.32 35.95 45.53 56.25 Total Discharge from Site Proj. file: PineyGreenExisting.gpw Thursday, Aug 6, 2009 3l:.el Hydrograph Summary,Rep�d IA y ow Hydrographs Extension for AutoCADO Civil 3D0 2009 by Autodesk, Inc. v6.066 Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time intervali (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 4,491 1 755 31,878 ----- ------ ------ DA-1 2 SCS Runoff 1.338 1 744 7,569 ----- ------ ------ DA-2 3 Combine 5,686 1 752 39,448 1,2 ----- ------ Total Discharge from Site PineyGreenExisting.gpw Return Period: I Year Thursday, Aug 6, 2009 Hydrograph Summary N N. 2000 Repl�ad,Aow Nydrographs E=xtension for AutoCAD® Civil 300 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 20.44 1 750 128,420 ------ ------ ------ DA-1 2 SCS Runoff 5,365 1 741 28,068 --- ------ ----- DA-2 3 Combine 25.32 1 748 156,489 1,2 ------ ------ Total Discharge from Site PineyGreenExisting.gpw Return Period: 10 Year Thursday, Aug 6, 2009 Project PINEY GREEN GATE Location CAMP LEGEUNE, NC Circle one: Present Developed X 1. Runoff Curve Number (CN) IRECET'. AUG 2 5 20" BY: By AS Date Checked RPP Date DA-1 8/5/2009 8/512009 Soil Name Cover description Area Product and (cover type, treatment, and CN 1 of hydrologic hydrologic condition; CN x area N N group percent impervious; N m N N lacres mi2 unconnected/connected impervious F U. w (Appendix A) area ratio) B Open Space, Good Cond. 61 4.69 286.09 Imperv. Area (drive) 98 5.04 493.92 B Woods 55 0.87 47.85 1 Use only one CN source per line Totals = 10.60 827.86 total product CN (weighted) = total area = 2. Runoff Frequency yr Rainfall, P (24-hour) in S Runoff, Q in 827.86 = 78.10 Use CN = 79 10.60 Storm 1 Storm 2 Storm 3 (Use P and CN with Table 2-1, Fig. 2-1, PR WS CN.As Project PINEY GREEN GATE Location CAMP LEJEUNE, NC Circle one: Present Developed x 1. Runoff Curve, Number_ (CN) RE By AS Date Checked RPP Date DA-2 1 /26/2009 1/26/2009 Soil Name Cover description Area Product and (cover type, treatment, and CN 1 of hydrologic hydrologic condition; CN x area N N X acres group percent impervious; v ` mi, unconnected/connected impervious w (Appendix A) area ratio) B Open Space, Good Cond. 61 1.27 77.47 Imperv. Area (drive) 98 0.84 82.32 1 Use only one CN source per line Totals = 2.11 159.79 total product CN (weighted) = total area = 2. Runoff Frequency yr Rainfall, P (24-hour) in S Runoff, Q in 159.79 2.11 76 75.73 Use CN = Storm 1 Storm 2 Storm 3 (Use P and CN with Table 2-1, Fig. 2-1, PR WS CN.xls Project PINEY GREEN GATE By AS Date 311712009 Location CAMP LEJEUNE, NC Check RPP Date 3117/2009 Circle One: Present Developed Circle One: T� Tt through subarea DA-1 ROTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to T. Only) Segment ID 1. surface description (table 3-11 2. Manning's roughness coeff., n (table 3-1) 3- Flow Length, L (total L c 300 ft) ft 4. Two-yr 24-hr rainfall, P. in S. Land slope, s ft/ft 6 TL = 0. 007 (nL) °'a Compute Tt hr P2 °.5g°.4 Shallow concentrated flow 7. Surface description (paved or unpaved) 8. Flow length, L 9. Watercourse slope, s 10.Average velocity, V (figure 3-1) Segment ID 11.TL = L Compute Tt 3600 V ft ft/ft ft/s hr = 0.583 = 0.290 ASPHALT GRASS 0.011 0.150 60 240 4 4 0.004 0.004 0.023 + 0.560 UNPAVED 1160 0.004 1.1 0.290 + Channel flow Segment ID 12.Cross sectional flow area, a fta 13.Wetted perimeter, pw ft a 14.Hydraulic radius, r r W pw Compute r ft 15.Channel slope, s ft/ft 16.Manning's roughness coeff., n V = 1.49 rZ/3 01/2 17. n Compute V ft/s 1B.Flow length, L ft _ L _ 19. TL 3600 V Compute Tt hr 0.DD0 20.Watershed or subarea T, or T. (add TL in steps 6, 11, 19) hr 0.873 Use Tc = 52 min. 7L I ?' 2009 BY: Project PINEY GREEN GATE By AS Date 3/1712009 Location CAMP LEJEUNE, NC Check( RPP Date 3/17/2009 Circle One: Presen Developed Circle One: T� Tt through subarea DA-2 NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to T. Only) Segment ID 1. Surface description (table 3-1) 2. Manning's roughness coeff., n (table 3-1) 3. Flow Length, L (total L < 300 ft) ft 4. Two-yr 24-hr rainfall, P2 in 5. Land slope, s ft/ft 6. Tt = 0. 007 (nL) 0.8 Compute T, hr P 0-5�0.1 1 Shallow concentrated flow 7. Surface description (paved or unpaved) S. Flow length, L 9. watercourse slope, s 10.Average velocity, V (figure 3-1) 11.Tt = L 3600 V Segment ID ft ft/ft ft/s Compute Tt hr GRASS 0.150 300 4 0.009 o.a$a + UNPAVED 135 0.020 2.2 0.017 Channel flow Segment I❑ 12.Cross sectional flow area, a ft2 13.Wetted perimeter, pW ft a 14.Hydraulic radius, r r pw Compute r ft 15.Channel slope, s ft/ft 15.Manning's roughness coeff., n V = 1.49 r2/3 01/2 17. n Compute V ft/s 5.00 18.Flow length, L ft 45 _ L 19.T` 3600 V Compute Tt hr 0.003 0.003 20.Watershed or subarea T, or Tt (add T, in steps 6, 11, 19) hr 0.504 Use Tc = 30 min. CP1TVF,D JUL 17 2009 BY: GG 1 0 2009 1 Watershed Model Schema T. --- y raflovv Hydragraphs Extension for AutoCADD Civil 3D(D 2009 by Autodesk, Inc. v6.066 Project: PineyGreenProposed.gpw Thursday, Aug 6, 2009 �.I,; Hydrograph Return Period Hyd�affiiwC'I�yarographs Extension fog AutoCADCD Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------ 8.078 13.18 - -- - 19.53 25,14 33.59 41.00 49.15 DA-1 2 5CS Runoff ------ 1,817 3.088 ------- 4.702 6,145 8,334 10.27 12.40 DA-2 3 Reservoir 1 0.461 3.873 ------- 13.55 22.22 32.90 40.58 48.75 Wet Detention Basin 4 Combine 2,3 1.875 4.371 ------ 14.71 24.67 38.46 47.96 57,85 Total Discharge from Site Proj. file: PineyGreenProposed.gpw Thursday, Aug 6, 2009 � eN —:\ i r w.' u ? 009 3 Hydrograph Summary Reppgl - - ydra ow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin] Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 8,078 1 757 56,920 ---- ------ ------ DA-1 2 SCS Runoff 1.817 1 742 9,796 ------ ------ ------ DA-2 3 Reservoir 0.461 1 1106 23,102 1 34.52 127,893 Wet Detention Basin 4 Combine 1.875 1 742 32,898 2,3 ------ ------ Total Discharge from Site PineyGreenProposed.gpw Return Period: 1 Year Thursday, Aug 6, 2009 t 4.,` to C,'.; G i 0 20 6 Hydrograph Summary Re PPydr13a ,w Hydrographs Extension=for-AutoCADd Civil 3D®2009 by Autodesk, Inc. v6.066 � Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 25.14 1 754 174,636 ------ ------ ------ DA-1 2 SCS Runoff 6,145 1 740 32,131 ----- ------ ---- DA-2 3 Reservoir 22.22 1 769 140,614 1 35.06 141,885 Wet Detention Basin 4 Combine 24.67 1 767 172.745 2,3 ----- ------ Total Discharge from Site PineyGreenProposed.gpw Return Period: 10 Year Thursday, Aug 6, 2009 --� •--� rya "—'• -r`� Piney Green Gate - MCB Camp-Lejel: Rip Rap Sizing Computations 5-Aug-09 Outlet Pipe from Pond Maximum Peak Flow = 22.22 cfs allowable velocity 1.7 fps Apron Width = 8 ft Apron Slope = 0.5% Mannings "n" = 0.07 Flow Depth = 1.63 ft Area of Flow = 13.071 ft^2 Q = 21.6609 Wetted Perimeter = 11.268 ft Hydraulic Radius = 1.160 Velocity = 1.7 fps Project. Piney Green Gate 2/2/2009 Location: Camp Lejeune, NC Drainage Area A (DA-A) Q10 = CIA C = ((0.3 " 0.84) + (0.9 0.50))11.34 = 0.52 I = 7 1 A = 1.34 ac Q,Q = 0.52 } 7 ' 1.34 = 4.88 cfs Note: 1. Rainfall intensity duration curves, NOAA web site. JUL 1 7 20og DY: j r`t a n ?OOS Project: Piney Green Gate Location: Camp Lejeune, NC Drainage Area B (DA-B) Q10 = CIA C = 0.15 1 = 7 1 A = 0.87 ac Q,o=0.15*7*0.87=0.92cfs Note: 1. Rainfall intensity duration curves, NOAA web site. 815I2009 .. �. UG i02000 Project: Piney Green Gate Location: Camp Lejeune, NC Drainage Area C (DA-C) Q10 = CIA C = ((0.3 i 1.00) + (0.9 " 1.97))12.97 = 0.70 I = 7 ' A = 2.97 ac Q10=0.70'7*2.97= 14.55cfs Note: 1. Rainfall intensity duration curves, NOAA web site. 8/5/2009 Project: Piney Green Gate Location: Camp Lejeune, NC Drainage Area D (DA-D) Q1a = CIA C=((0.3*1.08)+(0.9*1.22))12.30=0.62 I = 7 1 A = 2.30 ac Qio = 0.62 * 7 * 2.30 = 9.98 cfs Note: 1, Rainfall intensity duration curves, NOAA web site. 2/2/2009 �. ; 4 ,f �I. 1 7 2009 SY: Project: Piney Green Gate 2/2/2009 Location: Camp Lejeune, NC Drainage Area E (DA-E) Q10 = CIA C = ((0.3 * 0.34) + (0.9 * 0.37))10.71 = 0.61 I = 7 1 A = 0.71 ac Q10=0.61 *7*0.71=3.03cfs Note: 1. Rainfall intensity duration curves, NOAA web site. JUL 17 2009 BY: Project: Piney Green Gate 2/2/2009 Location: Camp Lejeune, NC Drainage Area F (DA-F) Q,o = CIA C=((0.3*0.14)+(0.9`0.38))I0.52=0.74 I = 7' A = 0.52 ac Q,o=0.74"7"0.52=2,69cfs Note: 1. Rainfall intensity duration curves, NOAA web site. JUL 1 7 2009 BY: Project: Piney Green Gate 2/2/2009 Location: Camp Lejeune, NC Drainage Area G (DA-G) Q,o = CIA C = ((0.3 " 0.08) + (0.9 " 0.13))10.21 = 0.67 Tc = 5 min. I = 7 1 A = 0.21 ac Q10=0.67"7"0.21=0.98cfs Note: 1. Rainfall intensity duration curves, NQAA web site. 1�V�Jb jl ii_ 1 7 2009 Project: Piney Green Gate Location: Camp Lejeune, NC Drainage Area H (DA-H) Q10 = CIA C=((0.3*1.01)+(0.9*0.44))/1.45=0.48 Tc = 5 min. I = 7 1 A = 1.45 ac Q,o=0.48*7* 1.45=4.87cfs 18" pipe flow at full capacity = 13.0 cfs QTOTAL = 4.87 + 13.0 = 17.87 cfs Note: 1. Rainfall intensity duration curves, NOAA web site. 2/2/2009 FJUL 1 7 2009 �3Y: Project: Piney Green Gate 2/2/2009 Location: Camp Lejeune, NC Drainage Area I (DA-1) Q10 = CIA C = ((0. 3 * 0. 19) + (0. 9 * 0, 04))10.23 = 0.40 Tc = 5 min. I = 7 1 A = 0.23 ac Q10 = 0.40 * 7 * 0.23 = 0.64 cfs Note: 1. Rainfall intensity duration curves, NOAA web site. �._ JUL 1 7 2009 BY: 0 2000 Project: Piney Green Gate Location: Camp Lejeune, NC Drainage Area J (DA-J) Q10 = CIA C=((0.3*0.24)+(0.9*0.14))10.38=0.52 Tc=5min. I=7' A = 0.38 ac Q10=0.52*7*0.38=1.38cfs Note: 1. Rainfall intensity duration curves, NOAA web site. 8/5/2009 Culvert Report Hydraflow Express Extension for AutoCAD@ Civil 3D0 2009 by Autodesk,-In Culvert A from Drainage Areas C, D, E Invert Elev Dn (ft) = 31.05 Pipe Length (ft) = 70.00 Slope (%) = 3.50 Invert Elev Up (ft) = 33.50 Rise (in) = 18.0 Shape = Cir Span (in) = 18.0 No. Barrels = 2 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0,0098, 2, 0.0398, 0,67, 0.5 Embankment Top Elevation (ft) = 37.50 Top Width (ft) = 50.00 Crest Width (ft) = 5.00 Eley [nl 2800 37.00 36.00 35.00 3400 3300 32.00 31,00 30.00 0 5 10 15 2C 25 30 35 40 45 50 55 60 65 70 75 80 95 90 Cir Culvert HGL Embank Reach [III 0 2009 Thursday, Aug 6 2009 Calculations Qmin (cfs) = 27.00 Qmax (cfs) = 28.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime = 27.60 = 27.60 = 0.00 = 7.92 = 8.12 = 32.49 = 34.88 = 36.91 = 2.27 = Inlet Control Culvert A from Drainage Areas C, D, E Hw Depth [it) INN MEMO MEMEMMEME a 50 350 2.50 1.50 0.50 050 -1.50 -2.50 .3,50 Culvert Report Hydraflow Express Extension for AutDCADD Civil 3DO 2009 by Autodesk, Inc. Culvert B from Drainage Areas D & E Invert Elev Dn (ft) = 34.95 Pipe Length (ft) = 58.00 Slope (%) = 0.34 Invert Elev Up (ft) = 35.15 Rise (in) = 15.0 Shape = Cir Span (in) = 15.0 No. Barrels = 2 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 38.00 Top Width (ft) = 50.00 Crest Width (ft) = 18.00 ELY 00 39.00 MOD 37.D0 36.00 350D 34,00 33.00 Culvert B from Drainage Areas D & E i 7 Z009 Wednesday, Jul 8 2009 Calculations Qmin (cfs) = 10.00 Qmax (cfs) = 12.50 Tailwater Elev (ft) = 36.55 Highlighted Qtotal (cfs) = 11.60 Qpipe (cfs) = 11.60 Qovertop (cfs) = 0.00 Veloc Dn (ftls) = 4.73 Veloc Up (ft/s) = 4:73 HGL Dn (ft) = 36.55 HGL Up (ft) = 37.02 Hw Elev (ft) = 37.19 Hw/D (ft) = 1.63 Flow Regime = Outlet Control KW Draa, Uil 395 205 1.85 O 95 ` x MINES`-, yY��.1��L�ST#��L �Cla+d�Jf3. ' i�k.L��[W .�. •�i 4r 'L'.S,SK��'"•�3 �1i: �, __ �.'Iy aft- � ��i�1 �. - ° _ ,{�. ,�4 ��e,"'Y �' -7a: -�.L� ,�sS `. .��+:1•M.,.�s � - w ��j T � -- -'--'- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 G caw HGL Embank 4115 Culvert Report Hydraflow Express Extension for AutoCADV Civil 3M) 2009 by Autodesk, Inc. Culvert C from Drainage Area E Invert Elev Dn (ft) = 38.14 Pipe Length (ft) = 40.00 Slope (%) = 0.30 Invert Elev Up (ft) = 38.26 Rise (in) = 15.0 Shape = Cir Span (in) = 15.0 No. Barrels = 1 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 40.50 Top Width (ft) = 30.00 Crest Width (ft) = 18.00 E L-Y VQ 41.00 4050 4000 39 50 3400 X50 Sam 37M Culvert C from Drainage Area E Jul 8 2009 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 3.03 Tailwater Elev (ft) = 37.19 Highlighted Qtotal (cfs) = 3.00 Qpipe (cfs) = 3.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.25 Veloc Up (ftls) = 3.28 HGL Dn (ft) = 38.84 HGL Up (ft) = 39.13 Hw Elev (ft) = 39.30 Hw/D (ft) = 0.83 Flow Regime = Inlet Control Hw Depth Ili) 274 224 T 1.74 __ 124 ..., _..._ _. W' .. 'SR y r ' � r•by �r .k �Y 1,b �. �,.. _� _ _ r � xsata F � �. /i]l}i ..... k`d��� �s ■ n � :R#«. �'diTS .�Fa. 074 D.24 -0.26 -0.76 0 5 10 15 20 25 30 35 40 45 5D 55 60 Cm CJverl HGL Embank Rmhlll) .77-.+,�.7 Culvert Report Hydraflow Express Extension for AutoCADO Civil 3D0 2009 by Culvert D from Drainage Areas B, F, G, H, Invert Elev Dn (ft) = 29.52 Pipe Length (ft) = 116.00 Slope (%) = 3.00 Invert Elev Up (ft) = 33.00 Rise (in) = 24.0 Shape = Cir Span (in) = 24.0 No. Barrels = 1 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 38.00 Top Width (ft) = 45.00 Crest Width (ft) = 30.00 Elev lit] 39.00 37.00 3500 33.00 31.00 2900 27.00 0 Culvert D from Drainage Areas B- F- G. H, I 10 20 30 40 50 60 70 60 90 100 Cir Giveu HGL Embank Thursday, Aug 6 2009 Calculations Qmin (cfs) = 10.00 Qmax (cfs) = 11.00 Tailwater Elev (ft) = Normal Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (fUs) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime = 10.10 = 10.10 = 0.00 = 10.33 = 5.44 = 30.22 = 34.14 = 34.70 = 0.85 = Inlet Control Hw Depth (IQ 6. DO 4.00 Ii Ile conklol.-. 2-DO 0.00 -2.00 -- 4.00 -6.00 140 150 160 Reach 09 Culvert Report Hydraflow Express Extension for AutoCADV Civil 3130 2009 by Autodesk, to Culvert E from Drainage Areas B, F, G, H Invert Elev Dn (ft) = 34.40 Pipe Length (ft) = 32.00 Slope (%) = 0.31 Invert Elev Up (ft) = 34.50 Rise (in) = 24.0 Shape = Cir Span (in) = 24.0 No. Barrels = 1 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 39.50 Top Width (ft) = 20.00 Crest Width (ft) = 10.00 Elev pry 4000 - 3900 - 3800 - Culvert E irom Drainage Areas B, F. G. H Erbank Wednesday, Aug 5 2009 Calculations Qmin (cfs) = 9.00 Qmax (cfs) = 10.00 Tailwater Elev (ft) = 34.82 Highlighted Qtotal (cfs) = 9.50 Qpipe (cfs) = 9.50 Qovertop (cfs) = 0.00 Veloc Dn (ftls) = 5.31 Veloc Up (ft/s) = 4.57 HGL Dn (ft) = 35.51 HGL Up (ft) = 35.76 Hw Elev (ft) = 36.14 Hw/D (ft) = 0.82 Flow Regime = Inlet Control 40 45 50 H. Devrh (it) 550 4.50 3 s0 2.50 1.50 0 50 .050 —i— -1.50 55 R each (ftj Culvert Report Hydraflow Express Extension for AutoCADO Civil 3D& 2009 by Autodesk, Inc. Culvert F from Drainage Areas F & G Invert Elev Dn (ft) = 36.80 Pipe Length (ft) = 30.00 Slope (%) = 0.33 Invert Elev Up (ft) = 36.90 Rise (in) = 15.0 Shape = Cir Span (in) = 15.0 No. Barrels = 1 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 40.00 Top Width (ft) = 16.00 Crest Width (ft) = 10.00 Ekv (h) 41.00 40,00 3300 38.00 37.00 3G 00 35,00 Culvert F Irem Drainage Areas F 9 G Wednesday, Jul B 2009 Calculations Qmin (cfs) = 3.00 Qmax (cfs) = 4.00 Tailwater Elev (ft) = 37.7 Highlighted Qtotal (cfs) = 3.70 Qpipe (cfs) = 3.70 Qovertop (cfs) = 0.00 Veloc Dn (ftls) = 3.91 Veloc Up (ftls) = 3.70 HGL Dn (ft) = 37.70 HGL Up (ft) = 37.85 Hw Elev (ft) = 38.10 Hw/D (ft) = 0.96 Flow Regime = Inlet Control H. Depth M 4.10 ��LI�'1tI. ������Y�s,r�'�`t}-:•APf.Y{t��'.^ITL.'q�i r';;w�-Y3�+�� �..�. 7 I .._ ._.- _..-. [`xt' ::�;, .�'e r� i�� _�•� ..�i,+x �'f�a�..i1 , F hf't i. °!4.'�Iu- � ��Ta[i-:i�...v, �'?�� L�;, : s'�' ° X C. ' fkf�. ...... . ...... 1c on •ic en A en rd 01reft HGL Embark Reach (n) 3.10 210 1.10 0.10 -0.90 •1.90 Culvert Report Hydraflow Express Extension for AutoCADe Civil 3DQ 2009 by Autodesk, Inc. Culvert G from Drainage Area F Invert Elev Dn (ft) = 37.10 Pipe Length (ft) = 58.00 Slope (%) = 0.34 Invert Elev Up (ft) = 37.30 Rise (in) = 15.0 Shape = Cir Span (in) = 15.0 No. Barrels = 1 n-Value = 0.013 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 40.00 Top Width (ft) = 50.00 Crest Width (ft) = 10.00 Q 00 MOD 31100 37.00 3600 0 Culvert G from Drainage Area F Wednesday, Jul 8 2009 Calculations Qmin (cfs) = 2.00 Qmax (cfs) = 3.00 Tailwater Elev (ft) = 38.10 Highlighted Qtotal (cfs) = 2.70 Qpipe (cfs) = 2.70 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 2.57 Veloc Up (ft/s) = 2.87 HGL Dn (ft) = 38.10 HGL Up (ft) = 38.20 Hw Elev (ft) = 38.27 Hw/D (ft) = 0.78 Flow Regime = Inlet Control Hm Depth(R) 370 .. Y 2l �YFh f3 �;f tali j�. -��b _ 1 �_,�ltl�l�i �` l�Lp� �.•!1'ns Li' r'xi ,SS~ ii�.�[3S �� � !�'�.ji _ _ _.._._ _... __._ -._. i � � f�� Y fit' � � r .�'� f - ♦rt, *-`w�. ,,, ; m�� � - - _•_._ ill:t..:, ciC' 270 1.70 0.70 430 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 go -1.30 - Cr R►ved HGL Embank Reads (II) Channel Report Hydraflow Express Extension for AutoCAD® Civil 31)0 2009 by Autodesk, Inc. Piney Green Gate - Swale 1 (Bermudagrass) Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 34.50 Slope (%) = 0.40 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 1.94 Elev (ft) Section 37.00 36.50 36.00 35.50 35.00 r19.-1il 34.00 7 2009 J Wednesday, Jul 8 2009 Highlighted Depth (ft) = 0.29 Q (Cfs) = 1.940 Area (sqft) = 1.41 Velocity (ftls) = 1.37 Wetted Perim (ft) = 5.83 Crit Depth, Yc (ft) = 0.19 Top Width (ft) = 5.74 EGL (ft) = 0.32 Depth (ft) 2.50 2.00 1.50 1.00 0.50 [OX6I11] _n rn 0 2 4 6 8 10 12 14 16 18 20 v vv Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD5 Civil 3D0 2009 by AutohesK Inc. Thursday, Aug 6 2009 Piney Green Gate - Swale 2 (Bare Soil) Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 1.34 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 27.56 Total Depth (ft) = 3.00 Area (sqft) = 8.07 Invert Elev (ft) = 34.50 Velocity (ft/s) = 3.42 Slope (%) = 0.30 Wetted Perim (ft) = 10.47 N-Value = 0.020 Crit Depth, Yc (ft) = 1.11 Top Width (ft) = 10.04 Calculations EGL (ft) = 1.52 Compute by: Known Q Known Q (cfs) = 27.56 Elev (ft) Section 38.00 37.00 36.00 35.00 34,00 33.00 Depth (ft) 3.50 2.50 1.50 0.50 -0.50 _i rin 0 2 4 6 8 10 12 14 16 18 20 22 24 vV Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD@ Civil 3D® 2009 by Autodesk'[nc��+ Piney Green Gate - Swale 2 (Curled Wood Mat) Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 34.50 Slope (%) = 0.30 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 27.56 Elev (ft) 38.00 - 37.00 36.00 35.00 34.00 33.00 Section I 5 10 15 20 Reach (ft) Thursday, Aug 6 2009 Highlighted Depth (ft) = 1.59 Q (cfs) = 27.56 Area (sqft) = 12.35 Velocity (fUs) = 2.23 Wetted Perim (ft) = 13.06 Crit Depth, Yc (ft) = 1.00 Top Width (ft) = 12.54 EGL (ft) = 1.67 25 30 Depth (ft) 3.50 2.50 1.50 0.50 -0.50 1 -1.50 35 Channel ReportI�r���� Hydraflow Express Extension for AutoCADO Civil 3D@ 2009 by Autodesk, lric"• � Thursday, Aug 6 2009 Piney Green Gate - Swale 2 (Bermudagrass) Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 1.48 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 27.56 Total Depth (ft) = 3.00 Area (sqft) = 9.53 Invert Elev (ft) = 34.50 Velocity (ftls) = 2.89 Slope (%) = 0.30 Wetted Perim (ft) = 11.36 N-Value = 0.025 Crit Depth, Yc (ft) = 1.11 Top Width (ft) = 10.88 Calculations EGL (ft) = 1.61 Compute by: Known Q Known Q (cfs) = 27.56 Elev (ft) Section 38.00 37.00 35.00 34.00 33.00 Depth (ft) 3.50 2.50 1.50 0.50 -0.50 A r1n } 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. Piney Green Gate - Swale 3 (Bermudagrass) Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 35.00 Slope (%) = 0.30 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 11.59 S F "'u`' Wednesday, Jul 8 2009 BY Highlighted Depth (ft) = 1.01 Q (cfs) = 11.59 Area (sqft) = 5.08 Velocity (ft/s) = 2.28 Wetted Perim (ft) = 8.39 Crit Depth, Yc (ft) = 0.72 Top Width (ft) = 8.06 EGL (ft) = 1.09 Elev (ft) Section Depth 38.00 3.00 37.50 2.50 37.00 2.00 36.50 1.50 36.00 0 1.00 35.50 0.50 35.00 0.00 'Ad Fn 0 50 2 4 6 8 10 12 14 Reach (ft) 16 18 Channel Report HydraFlow Express Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. Piney Green Gate - Swale 4 (Bermudagrass) Trapezoidal Bottom Width (ft) = 5.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Eiev (ft) = 38.00 Slope (%) = 0.40 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 3.03 Elev (ft) 4o.ao 39.50 39.00 38.50 38.00 37.50 2 4 6 Section 4 8 Reach (ft) 1 7 9nnn Wednesday, Jul 8 2009 Highlighted Depth (ft) = 0.33 Q (cfs) = 3.030 Area (sgft) = 1.98 Velocity (ftls) = 1.53 Wetted Perim (ft) = 7.09 Crit Depth, Yc (ft) = 0.22 Top Width (ft) = 6.98 EGL (ft) = 0.37 10 12 14 16 Depth (ft) 2.00 1.50 1.00 0.50 _n rn Channel Report 1 o •�aa Hydraflow Express Extension for AutoCADO Civil 3D® 2009 by Autodesk" Inc. Piney Green Gate - Swale 5 (Bare Soil) Wednesday, Aug 5 2009 Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.61 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 10.10 Total Depth (ft) = 4.00 Area (sqft) = 4.17 Invert Elev (ft) = 35.00 Velocity (ftls) = 2.42 Slope (%) = 0.30 Wetted Perim (ft) = 8.86 N-Value = 0.020 Crit Depth, Yc (ft) = 0.46 Top Width (ft) = 8.66 Calculations EGL (ft) = 0.70 Compute by: Known Q Known Q (cfs) = 10.10 Elev (ft) Section 40.00 39.00 38.00 37.00 36.00 35.00 �tmffIIl7 Depth (ft) 5.00 Elul C 3.00 2.00 1.00 ! !1 i &Til 0 5 10 15 20 25 30 35 40 vv Reach (ft) Channel Report i.�U ° 2009 Hydraflow Express Extension for AutoCADS Civil 3DCR 2009 by Autodesk; inc. —' Wednesday, Aug 5 2009 Piney Green Gate - Swale 5 (Curled Wood Mat) Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.82 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 10.10 Total Depth (ft) = 4.00 Area (sgft) = 6.12 Invert Elev (ft) = 35.00 Velocity (fUs) = 1.65 Slope (%) = 0.30 Wetted Perim (ft) = 10.19 N-Value = 0.035 Crit Depth, Yc (ft) = 0.46 Top Width (ft) = 9.92 Calculations EGL (ft) = 0.86 Compute by: Known Q Known Q (cfs) = 10.10 Elev (ft) Section 40.00 • 1 17 38.00 37.00 36.00 35.00 34.00 Depth (ft) 5.00 [KIII] 3.00 2,00 1.00 1 11 i Affil 0 5 10 15 20 25 30 35 40 vv Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. Piney Green Gate - Swale 5 (Bermudagrass) Trapezoidal Bottom Width (ft) = 5.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 4.00 Invert Elev (ft) = 35.00 Slope (%) = 0.30 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 10,10 Elev (ft) Section 40.00 39.00 38.00 37,00 36.00 35,00 34.00 Wednesday, Aug 5 2009 Highlighted Depth (ft) = 0.69 Q (cfs) = 10.10 Area (sqft) = 4.88 Velocity (ftls) = 2.07 Wetted Perim (ft) = 9.36 Crit Depth, Yc (ft) = 0.46 Top Width (ft) = 9.14 EGL (ft) = 0.76 Depth (ft) 5.00 4.00 3.00 2.00 1,00 M ■ KON 0 5 10 15 20 25 30 35 40 vv Reach (ft) Channel Report Hydraflow Express Extension for AutoCADO Civil 3D0 2009 by Autodes'k Inc. Wednesday, Aug 5 2009 '—•r Piney Green Gate - Swale 6 (Bane Soil) Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.59 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 9.460 Total Depth (ft) = 4.00 Area (sgft) = 3.99 Invert Elev (ft) = 35.00 Velocity (ft/s) = 2.37 Slope (%) = 0.30 Wetted Perim (ft) = 8.73 N-Value = 0.020 Crit Depth, Yc (ft) = 0.44 Top Width (ft) = 8.54 Calculations EGL (ft) = 0.68 Compute by: Known Q Known Q (cfs) = 9.46 Elev (ft) Section 40.00 39.00 38.00 37.00 35.00 34.00 5 10 15 20 25 Reach (ft) Depth (ft) 5.00 4.00 3.00 2.00 1,00 Ili _a nn 30 35 40 �_ �S Channel Report Hydraflow Express Extension for AutoCADG) Civil 3DO 2009 by Autodesk, Inc. Wednesday, Aug 5 2009 Piney Green Gate - Swale 6 (Curled Wood Mat) Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.80 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 9.460 Total Depth (ft) = 4.00 Area (sqft) = 5.92 Invert Elev (ft) = 35.00 Velocity (ft/s) = 1.60 Slope (%) = 0.30 Wetted Perim (ft) = 10.06 N-Value = 0.035 Crit Depth, Yc (ft) = 0.44 Top Width (ft) = 9,80 Calculations EGL (ft) = 0.84 Compute by: Known Q Known Q (cfs) = 9.46 Elev (ft) Section 40.00 39.00 3&00 K1I17 35.00 34.00 Depth (ft) 5.00 4.00 3.00 2.00 1.00 sun .9 nn •VV 0 5 10 15 20 25 30 35 40 Reach (ft) ti� r vr.•r�- r� � -. Channel Report 4,,G ,43 Hydraflow Express Extension for AutoCADa civil 3D® 2009 by Autodesk. Inc. Wednesday, Aug 5 2009 Piney Green Gate - Swale 6 (Bermudagrass) Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.66 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 9.460 Total Depth (ft) = 4.00 Area (sgft) = 4.61 Invert Elev (ft) = 35.00 Velocity (ftls) = 2.05 Slope (%) = 0.30 Wetted Perim (ft) = 9.17 N-Value = 0.025 Crit Depth, Yc (ft) = 0.44 Top Width (ft) = 8.96 Calculations EGL (ft) = 0.73 Compute by: Known Q Known Q (cfs) = 9.46 Elev (ft) Section 40.00 37.00 35.00 34.00 Depth (ft) 5,00 MR1111 3.00 2.00 1.00 M _a nn 0 5 10 15 20 25 30 35 40 vv Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD) Civil 3DO 2009 by Autodesk, Inc. Piney Green Gate - Swale 7 (Bermudagrass) Trapezoidal Bottom Width (ft) = 2.50 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 38.00 Slope (%) = 0.30 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 3.67 Elev (ft) 42.00 --7 41.00 40.00 39,00 38.00 37.00 5 10 Section 15 20 Reach (ft) Y 7 Z009Wednesday, Jul 8 2009 BY. Highlighted Depth (ft) = 0.54 Q (cfs) = 3,670 Area (sgft) = 2.22 Velocity (ftls) = 1.65 Wetted Perim (ft) = 5.92 Crit Depth, Yc (ft) = 0.36 Top Width (ft) = 5.74 EGL (ft) = 0.58 25 30 Depth (ft) 4.00 3.00 2.00 1.00 M 1 -1.00 35 Channel Report Hydraflow Express Extension for AutoCAM) Civil 3DO 2009 by Autodesk, Inc. Piney Green Gate - Swale 8 (Bermudagrass) Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2,00 Invert Elev (ft) = 38.00 Slope (%) = 0.40 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 2.69 rrrr 1 7 ZQD9 'V:_ Wednesday,1Jul82009 Highlighted Depth (ft) = 0.39 Q (cfs) = 2.690 Area (sqft) = 1.63 Velocity (ftls) = 1.65 Wetted Perim (ft) = 5.47 Crit Depth, Yc (ft) = 0.27 Top Width (ft) = 5.34 EGL (ft) = 0.43 Elev (ft) 41.00 40.50 40.00 39.50 39.00 38.50 38.00 17 J,!] Section Depth (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0.00 -n rn 2 4 6 8 10 12 14 16 18 20 Reach (ft) Channel Repoli RUG i 0 2009 wY "_ Hydraflow Express Extension for AutoCADCD Civil 3D® 2009 byAutodesk—Inc. Piney Green Gate - Swale 9 (Bare) Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 29.00 Slope (%) = 1.00 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 1.38 Elev (ft) Section 31.00 30.50 29.50 29.00 28,50 I 1 2 3 4 5 6 7 Reach (ft) Thursday, Aug 6 2009 Highlighted Depth (ft) = 0.16 Q (cfs) = 1,380 Area (sqft) = 0.72 Velocity (ft/s) = 1.93 Wetted Perim (ft) = 5.01 Crit Depth, Yc (ft) = 0.15 Top Width (ft) = 4.96 EGL (ft) = 0.22 8 9 10 11 12 Depth (ft) 2.00 1.50 1.00 0.50 rim _n r1n r Ijl(A r cw � G n o jA V '•t r}s, f{ - •ice '• � 17.' 'w. � +:r'M YY • i ♦ �yT� .A ��.!'3r ,.'�i I •? r s ►� - `� • < as r c ,.silo* .' Ac •.I..- fit ` t A i� AN fA- ♦ •,'�+, ti •�/ - w_L`;. i }I i ��,yij M-M YtT .'L�•r�f�� Y�`r �za�r� � �� � * �'+�A��, , � •,.i"s�:. �' aEa� f'rCr� 11r�Jr' J•1� } ! *M� .. �i�'+ rC �fi�,K:� i h' 4 17F+. •,•1 ' ► } -•`� .lei ` � � a' - *�_ < it IL �. . :• `{`.I ••� Mr• •,. Y` �• . - V ATM•... ���`•�. '� R �` � � '�'•�iYlt rytyrir�F 4.. w ��.� .w.•.� .r F Mr �' 1 _. � �Y•���Jr w.�� ^'""�+. .++�►�rMlrw.+e 1.. * • �'��a it . "'a••+► ti- `�+�� . �W �� ,sa., w1rYr�r .. • �f ! I rIf +�+t�.. � �J