Loading...
HomeMy WebLinkAboutSW8081202_HISTORICAL FILE_20120531STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. 1 SW8 I zpZ DOC TYPE I ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 201z OS 3 i YYYYMM DD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary May 31, 2012 Carl Baker, Deputy Public Works Officer MCB Camp Lejeune 1005 Michael Road Camp Lejeune, NC 28542 Subject: Stormwater Permit No. SW8 081202 P1223 Truck Company Maintenance Operations Complex High Density Project Onslow County Dear Mr. Baker: The Wilmington Regional Office received a modified Stormwater Management Permit Application for P1223 Truck Company Maintenance Operations Complex on May 25, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000, We are forwarding Permit No, SW8 081202 dated May 31, 2012, for the construction of the subject project. We are also forwarding the modified plan set to be added to the existing plan set previously approved for this permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. This permit shall be effective from the date of issuance until March 6, 2019 which includes all extensions, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431- 3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, �C(a'r'lers ;�'a Ytif ki d, P. E., Director Division of Water Quality GDSlcsb: S:IWQSIStormwaterlPermits & Projectsk2009\081202 H012012 05 permit 081202 cc: Vincent J Chirichella II, P.E., Clark Nexen Wilmington Regional Office Wilmington Regional Office 127 Cardinal prive Extension, Wilmington, North Carolina 28405 One Phone: 910.796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 N orth C aro l i na Internet: www.ncwaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 081202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl Baker and MCB Camp Lejeune P1223 Truck Company Maintenance Operations Complex Michael Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of a two (2) wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 6, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The wet detention ponds, pond #1 and pond #2, have been designed to handle the runoff from 131,424 square feet and 272,833 square feet, of impervious area, respectively. 3. The tract and each BMP will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. A 50 feet wide vegetated buffer shall be provided adjacent tidal waters, streams, rivers, and impoundments. No built -upon area is allowed within this buffer. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 081202 7. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Wet Pond #1 Wet Pond #2 a. Drainage Area, acres: 4.07 7.02 Onsite, ft : 163,006 305,841 Offsite, ft2: 14,259 NIA b. Total Impervious Surfaces, ft2: Design inches: 131,424 272,833 C. Storm, 1.5 1.5 d. Pond Depth, feet: 4.5 4.0 e. TSS removal efficiencyy: 90% 85% f. Bottom Elevation, FMSL: 7.5 11 g. Seasonal High Water Table, FMSL: 14.5 16 In. Permanent Pool Elevation, FMSI : 15 17.5 i. Permanent Pool Surface Arai, ft : 11,943 19,881 j. Permitted Storage Volume, ft : 16,204 35,868 k. Temporary Storage Elevation, FMSL: 16.15 19 I. Controlling Orifice: 2"0 pipe 3"0 pipe M. Permitted Forebay Volume, ft3: 8,556 13,986 n. Fountain Horsepower, HP: 116 114 o. Time to Draw Down, days: 2.9 2.76 P. Receiving Stream/River Basin: New River 1 White Oak q. Stream Index Number: 19-(15.5) r. Classification of Water Body: "SC;NSW" fil. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 081202 6. Decorative spray fountains will be allowed in the wet detention pond stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond #1 116 horsepower and pond #2 is 114 horsepower. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 081202 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as -listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 31st day of May, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION tortihar1e aKlld, F'. E., UlreCtor Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 081202 P1223 Truck Company Maintenance Operations Complex Stormwater Permit No. SW8 081202 Onslow County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6of7 State Stormwater Management Systems Permit No. SW8 081202 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized per the approved plans. .13. All required design depths are provided. .14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. _15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 7 of 7 CN Comm. No.: NC2861 Camp ] Ljeune. North Carolina P1223 "Truck Company Maintenance Operations Complex Stormwater Narrative Stormwater Management Permit Modification Submittal 24t1' May 2012 I UJ 144 T ji z • '�GINEEQ:•' ��'� CHIR�G �* �a•����a+NS.Z�.12 Clark Nexsen License #C-1028 Engincer (s): Vince Chirichella, P.E. Wyatt Bone, E.I. TABLE OF CONTENTS 1.0 PROJECT INFORMATION...........................................................................................I 1.1 PROJE-CT LOCATION AND hl'ISTiNG CONDITIONS..................................................................1 1.2 PROJFwCI' DhSCRIPTION.........................................................................................................1 1.3 GE30'ITCI- LAICAL INVESTIGATION..........................................................................................2 2.0 DESIGN APPROACH.......................................................................................................2 2.1 STORM DRAINAGE PIPING....................................................................................2 3.0 WATER QUALITY ANALYSIS.......................................................................................2 4.0 WATER QUANTITY ANALYSIS...................................................................................3 4.1 PR13DI.\'EiLOPMENT CONDITIONS ..........................................................................................3 4.2 POSI' DFV131,01' \]] N"I' CONDITIONS.......................................................................................3 P1223 Truck Company Maintenance Operations Complex CN Comm. No.:NC2681 Stormwater Narrative Clark*Ncxsen 1.0 PROJECT INFORMATION 1.1 PROJECT LOCATION AND EXISTING CONDITIONS The project site for the P1223 Truck Company Maintenance Operations Complex is located at Camp Lejeunc. The site is bounded by Michael Road to the north, Gum Road to the west, and Louis Road to the south. The east side of the construction limits is bounded by an adjacent project that will construct a B-NIP at the site limit. The site consists of 11.70 acres of partially wooded, undeveloped land that has been used for pedestrian troop operations and storage. Existing grade elevations generally range from about 27 feet N4SL in tine northwest corner of the site to a low of 11 feet MSL on the south side of the site. The existing site is forty seven percent (47%) impervious. 1.2 PROJECT DESCRIPTION The purpose of the originally permitted project can be found in tine paragraph below. The purpose of this current project is to replace the existing permitted infiltration basin with a ever pond. The owner has opted for the replacement in light of maintenance issues. A wet pond will better suit their needs for this site. The wet pone] will be located in tine same area as tine infiltration basin, and the current piping system will be modified so that only two outlets enter the wet pond. The previously permitted drainage area is only changing in size, as the footprint of the wet pond is larger than the infiltration basin. The same amount of 13UA will be draining to the wet pond, and the downstream outlet will remain the same. T'Ihe purpose of this project is to provide a single story 'l-ruck Company Maintenance Operations Complex at the Marine Corps Base at Camp Lejeune. This project will be similar to a motorpool that will service large vehicles and provide on site parking for these operations. The site work will include two entrances to a 165 space POV parking lot from Michael Road. Service access for the large vehicles based at this facility will be provided through a separate entrance from Michael Road southwest of the POV parking lot entrance. 'I"lne service entrance will provide space for the vehicles to stage and not interfere with traffic on Michael Road. Sidewalks will be provided for pedestrian access onsite. Approximately 11.7 acres will be disturbed during this construction period. This project will meet minimum anti -terrorism force protection standards. P1223 Truck Company Maintenance Operations Complex CN Comm. No.:NC2681 Stonnwauer Narrative Clark*Nexsen The total drainage area for the site is 11.09 acres. The Pre -development conditions are 47% impervious whereas the post -development conditions are 80% impervious. The project site has one outfall as indicated on the drainage area maps. 'fine site drains to an existing 24" IRCP located along the southern side of the site betvveeti the two storm water BNIPs. fhe modified post -development drainage area map is shown on CG101. 1.3 GEOTECHNICAL INVESTIGATION Geotechnical investigation was performed by GeoEnvlronnnental Resources, Inc. (GLR). A copy of the Geotechnical report can be found in the original permit documents. 2.0 DESIGN APPROACH 2.1 STORM DRAINAGE PIPING Permanent storm drainage piping systems were previously designed for a 10-year storm event using the Rational Method for rainfall analysis. Rainfall intensity values were taken from the NOAA website. Runoff coefficients are based on the following values: Description Runoff Coefficient, C Paved and Roof Areas 0.95 Unimproved A real 0.35 The new wet detention basin is designed to drawdown the temporary storage volume of the 1.5- inch rainfall event in 2-5 days. An emergency spillway and riser structure are designed for this basin. 3.0 WATER QUALITY ANALYSIS According; to the NCDINR Design Guide, the vet detention basin stormwater treatnnent system is designed to remove 90 percent of the average annual post development total suspended solids (I'SS), 25 percent of the average annual post development total nitrogen (IN), and 40 percent of the average annual post development total phosphorus (I'P), by implementing Best Management Practices 2 P1223 Truck Company Maintenance Operations Complex CN Comm. No.:NC2681 Stormwater Narrative Clark*Nexsen 4.0 WATER QUANTITY ANALYSTS The wet detention basin was designed according to NCDENR Design guide to hold the 1.5" storm event and slowly draw down between 2-5 days. 4.1 PREDEVELOPMENT CONDITIONS The total development area is 11.70 acres. The site drains to the east and ultimately into the New River of the White Oak basin. The table below summarizes the predevelopment conditions peak runoff: PredeveloPment Condition Peak Runoff Summary 1-year Peak 10-year Peak Runoff Runoff (cfs) (cfs) Drainage Area #1 10.01 15.65 4.2 POST DEVELOPMENT CONDITIONS The post development site continues to drain from North to South to the proposed wet detention basin/permitted wet detention basin. All built upon area (BUA) is captured and treated by the 2 BNfPs. The method of conveyance is a piped system that includes drop and curb inlets. Plans, storm system sizing and basin routing .calculation (for the permitted wet detention basin) are provided in the original permit package. The table below summarizes the post devclopment conditions peak runoff. 3 P1223 Truck Company Maintenance Operations Complex CN Comm. No..NC2681 Stormwater Narrative Clark+Nexsen Post development Condition Peak Runoff Summa 1-year 10-year Peak Peak Runoff Runoff (cfs) (cfs) Drainage Area #1 15.43 24.12 The routing analysis shows a decrease in post development runoff. The table below summarizes drainage area 1 predevelopment and post development runoff after routing the peak event from above through the wet detention basin. Routed 1- Routed 10- year Peak year Peak Runoff Runoff (cfs) (cfs) Pre Drainage Area #1 10.01 15.65 Post Drainage Area #1 0.081 0.102 Net Difference in Runoff -9.929 -15.55 4 Flex Viewer Powered by ArcGIS Server `ARNELL-- v' (c) Copyright 2008 ESRI, Al rights reserved, Printed on Mon May 21 2012 01',29:44 PM. Project Information WET DETENTION POND 7 Project Name: Truck Company Maintenance ! Operations Complex Project #: 2861 Designed by: WL6 Date: 5/21/2012 Checked by: Vic Date: 512112012 Site Information Sub Area Location: Wet Pond 1 Drainage Area (DA) = 177,265 sf Impervious Area (IA) = 131,424 sf Percent Impervious (1) = 74A % Elevations Top of Bank Elevation = 18.00 ft Emergency Elevation = 16.50 ft Temporary Pool Elevation = 16.15 Permanent Pool Elevation = 15.00 ft Bottom of Pond Elevation = 7.50 ft Sediment Cleanout, Bottom Elevation = 6.60 ft Basin AreasNolumes Area of Permanent Pool = 11,943 sf Area of Bottom of Shelf = 9,730 sf Area of Bottom of Pond = 1,612 sf Area of Temporary Pool = 15,322 sf Volume, main pool = 32,481 cf Volume, forebay (sum of forebays) = 8,556 cf Volume, permanent pool = 41.037 cf Forebay % of permanent pool volume = 20.8 % Average Depth A P,_-P.01 (includes main pond & forebays) (Elev = 15.00 ) Ab„ ,Wf (includes main pond & forebays) Awi- ,,,d (excluding sediment storage & forebays) A,,,„P_,d (includes main pond and forebays) (Elev = 16.15) V m.h P., (from Hydraflow) Vf,,s,y(from Hydraflow) V,-P.Pi (Vf..t.y+V,,,,, _P-i) OK Depth of Pond = 7 ft Depth (list, btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 4.53 ft Use Average Depth of = 4.50 ft Round down to nearest 0.5 Required Surface Area - Wetland SA/DA = 5.87 (90% TSS Removal via Pond) Min Req'd Surface Area = 10,405 sf (at Permanent Pool) Required Storage Volume- Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0.009 (I) = 0,72 in/in Storage Volume Required = 15,893 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yeslno)? Yes ( 11943 n 10405 ) sf WET DETENTION POND 1 1.0" Volume Elevation Required Temporary Pool Volume = 15,893 cu ft Temporary Pool Lower Elevation Bound = 15.50 Temporary Pool Upper Elevation Bound = 16,00 Temporary Pool Lower Volume Bound = 6,562 cu ft Temporary Pool Upper Volume Bound = 13,922 cu ft Temporary Pool Elevation = 16.15 Orifice Sizing - Wet Detention 02uAy6= 0.0938 cfs Q5p,,= 0.0375 cfs Orifice Size = 2.00 in Driving Head (ti,) = 0.36 ft O o d" = 0,063 cfs Drawdown Time = 2.9 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 4-ft x 4-ft Riser Box Top of Riser: 16.15 sf Invert of Riser: 14.24 cf Area: 16.0 sf Volume: 31 cf Weight: 1,907 Ibs Factor of Safety 1.10 WT Req'd of Anti -Flotation Device: 2.098 Ibs Volume of Concrete Req'd: 23.9 cf Depth Provided: 1.50 ft Volume Provided: 24.0 cf WT of Anti -Flotation Device Provided: 2.102 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 15.00 11,943 0 0 0.00 15,50 14,345 6,562 6,562 0.50 16.00 15.101 7.360 13.922 1,00 16.15 15,332 2,282 16.204 1.15 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Top of Riser [Elev. 16.15) - Bottom of Riser [Elev. 14.241? (Outside Dim. = 4-ft x 4-ft, Inside Dim. = 3-ft x 3-ft) (Water Displaced - Top of Riser to Invert of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf (4-ft x 4-ft Box filled 1.50-ft deep with concrete) OK Hydraflow Table of Contents Truck.gpw Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2011 by Autodesk, Inc. v8 Monday, May 21, 2012 1 - Year SummaryReport ......................................................................................................................... 1 HydrographReports................................................................................................................... 2 Hydrograph No. 1, Rational, Pre Development DA1................................................................ 2 Hydrograph No. 2, Rational, Post Development DA 1............................................................. 3 Hydrograph No. 3, Reservoir, Post Dev. Basin 1................... Pond Report - Temporary Pond........................................................................................... 5 10 - Year Summary Report ......................................................................................... ......... 6 ....................... HydrographReports................................................................................................................... 7 Hydrograph No. 1, Rational, Pre Development DA1................................................................ 7 Hydrograph No. 2, Rational, Post Development DA 1............................................................. 8 Hydrograph No. 3, Reservoir, Post Dev. Basin 1..................................................................... 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138) 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 10.01 1 10 6,005 ---- Pre Development DAt 2 Rational 15.43 1 10 9,258 -- --- --- Post Development DA 1 3 Reservoir 0.081 1 20 8,044 2 15.68 9,203 Post Dev. Basin 1 Truck.gpw Return Period: 1 Year Monday, May 21, 2012 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD3 Civil 3D& 2011 by Autodesk, Inc. v8 Hyd. No. 1 Pre Development DA1 Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.300 ac Intensity = 4.739 inlhr OF Curve = Jacksonville. IDF Q (cfs) 12.00 10.00 6I Lffifflo 1G 2.00 0.00 --X 0 2 Monday, May 21, 2012 Peak discharge = 10.01 cfs Time to peak = 10 min Hyd. volume = 6,005 cult Runoff coeff. = 0.64 Tc by User = 10.00 min Asc/Rec limb fact = 111 Pre Development DA1 Hyd. No. 1 -- 1 Year 2 4 6 8 Hyd No. 1 Q (cfs) 12.00 10.00 M 4.00 2.00 I- - 1_ I I I _.v 0.00 10 12 14 16 18 20 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2011 by Autodesk, Inc. v8 Monday, May 21, 2012 Hyd. No. 2 Post Development DA 1 Hydrograph type = Rational Peak discharge = 15.43 cfs Storm frequency = 1 yrs Time.to peak = 10 min Time interval = 1 min Hyd. volume = 9,258 tuft Drainage area = 4.070 ac Runoff coeff. = 0.8* Intensity = 4.739 inlhr Tc by User = 10.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 111 * Composite (Area1C) = [(3.020 x 0,95) + (1.050 x 0,35)] 14.070 Q (cfs) 18.00 15.00 12.00 • 11 Am KIM 0.00 0 2 4 Hyd No. 2 Post Development DA 1 Hyd. No. 2 -- 1 Year 6 8 Q (cfs) 18.00 15.00 12,00 • 11 . 11 3.00 10 12 14 16 18 20 Time (min) 4 Hydrograph Report Hydrattow Hydrographs Extension for AutoCAD® Civil 3DO 2011 by Autodesk, Inc. v8 Monday, May 21, 2012 Hyd. No. 3 Post Dev. Basin 1 Hydrograph type = Reservoir Peak discharge = 0.081 cfs Storm frequency = 1 yrs Time to peak = 20 min Time interval = 1 min Hyd. volume = 8,044 cuft Inflow hyd. No. = 2 - Post Development DA 1 Max. Elevation = 15.68 ft Reservoir name = Temporary Pond Max. Storage = 9,203 cuft Storage Indication method used. a (cfs) 18.00 15.00 12.00 • +} o MR 0.00 0 300 Hyd No. 3 Post Dev. Basin 1 Hyd. No. 3 -- 1 Year Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 2 [IT]=]] Total storage used = 9,203 cuff Pond Report 5 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2011 by Aulodesk, Inc. v6 Monday, May 21, 2012 Pond No. 3 - Temporary Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 15.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 15.00 11,943 0 0 0.50 15.50 14,345 6,562 6,562 1.00 16.00 15.101 7,360 13,922 1.15 16.15 15,332 2,282 16,204 2.00 17.00 16,664 13,593 29,797 3.00 18.00 18,293 17,470 47,268 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 15.00 2.00 0.00 0.00 Crest Len (ft) = 12.00 25.00 0,00 0.00 Span (in) = 15.00 2,00 0.00 0.00 Crest El. (ft) = 16.15 16.50 0.00 0,00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 14.24 15.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 34.47 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.01 0.00 0.00 n1a N-Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0,60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla Yes No No TW Elev. (ft) = 0,00 Stage (ft) 3.00 2.00 IR1I17 0.00 -1- 0.0 10.0 Total Q Ncte: Gulvertl0ritice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a) Stage I Discharge 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 Elev (ft) 18.00 17.00 16.00 --1- 15.00 130.0 Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 15.65 1 10 9,389 ------ - -- ----- Pre Development DA1 2 Rational 24.12 1 10 14,475 -- -- ------ Post Development DA 1 3 Reservoir 0.102 1 20 11,969 2 16.03 14.403 Post Dev, Basin 1 I Truck.gpw Return Period: 10 Year Monday, May 21, 2012 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8 Monday, May 21, 2012 Hyd. No. 1 Pre Development DA1 Hydrograph type = Rational Peak discharge = 15.65 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 9,389 cuft Drainage area = 3.300 ac Runoff coeff. = 0.64 Intensity = 7.409 inlhr Tc by User = 10.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 111 Q (cfs) 18.00 15.00 12.00 . M 3.00 0.00 -" I 0 2 Hyd No. 1 Pre Development DA1 Hyd. No. 1 --10 Year 4 6 8 Q (cfs) 18.00 15.00 12.00 MH . ms 3.00 N 0.00 10 12 14 16 18 20 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADS Civil 3DO 2011 by Autodesk, Inc. v8 Monday, May 21, 2012 Hyd. No. 2 Post Development DA 1 Hydrograph type = Rational Peak discharge = 24.12 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 14,475 cuft Drainage area = 4.070 ac Runoff coeff. = 0.8* Intensity = 7.409 inlhr Tc by User = 10.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 111 Composite (Area1C) = [(3.020 x 0.95) + (1.050 x 0.35)] 14.070 a (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 --X 0 2 4 Hyd No. 2 Post Development DA 1 Hyd. No. 2 -- 10 Year 6 8 a (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 1 0.00 10 12 14 16 18 20 Time (min) Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 T Monday, May 21, 2012 Hyd. No. 3 Post Dev. Basin 1 Hydrograph type = Reservoir Peak discharge = 0.102 cfs Storm frequency = 10 yrs Time to peak = 20 min Time interval = 1 min Hyd. volume = 11,969 cult Inflow hyd. No. = 2 - Post Development DA 1 Max. Elevation = 16.03 ft Reservoir name = Temporary Pond Max. Storage = 14,403 cult Storage Indication method used. Q (cfs) 28.00 24.00 20.00 16.00 12.00 1511110 0.00 0 300 Hyd No. 3 Post Dev. Basin 1 Hyd. No. 3 --10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 1 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) - Hyd No. 2 II1 Jjl.. Total storage used = 14,403 cuft DESIGN OF RIPRAP OUTLET PROTECTION WORKS"EET Project Truck Company Maintenance / Ops. Complex Date May-21-2012 Location Carnp Lejeune, NC Designed W. Bone Project No. 2861 Checked V. Chirichella Outlet ID EX-1 Pipe diameter 24 inches Pipe slope 4.05 percent Roughness Coef, 0.013 Full Flow Capacity 45.53 cfs Full flow velocity 14.49 ft/sec i Zone from graph above = 2 Is grade of apron 10% or more Y YIN Zone used = 3 Outlet pipe diameter 24 in. Outlet flowrate 45.5 cfs Outlet velocity 14.49 ft/sec Material = Class I Length = 16.0 ft. Width at Outlet = 6.0 ft, Width at end of Pad 24.5 ft. Stone diameter = 10 in. Thickness = 26 in. Zone I Material I Diameter Thickness Length l Class A 4 9 4 x D(o) 2 Class B 8 18 6 x D(o) 3 Class I 10 25.5 8 x D(o) 4 Class I 10 25.5 8 x D(o) 5 Class II 14 34.5 10 x D(o) 6 Class II 14 34.5 10 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual Rip Rap Apron Design 5/21/2012 DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project Truck Company Maintenance / O s. Complex Date May-21-2012 Location Camp Lejeune, NC _ Designed W. Bone Project No. 2861 _ Checked V. Chirichelia Outlet ID EX-2 Pipe diameter 24 inches Pipe slope 2.61 percent Roughness Coef, 0.013 Full Flow Capacity 36.55 cfs Full flow velocity 11.63 fl/sec 1 �� � �� 1�11, ����>• � 1 -terry MEN C CC�CCMCERMEMIM � „ Zone from graph above = 1 Is grade of apron 10% or more Y Y/N Zone used = 2 Outlet pipe diameter 24 in. Outlet flowrate 36.5 cfs Outlet velocity 11.63 ft/sec Material = Class B Length = 12.0 ft. Width at Outlet = 6.0 ft. Width at end of Pad 19.9 ft. Stone diameter = 8 in. Thickness = 18 in. Zone Material Diameter Thickness Length I Class A 4 9 4 x D(o) 2 Class B 8 18 6 x D(o) 3 Class 1 10 25.5 8 x D(o) 4 Class 1 10 25.5 8 x D(o) 5 Class II 14 34.5 10 x D(o) 6 Class II 14 34.5 10 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual Rip Rap Apron Design 5/21/2012 DESIGN OIL RIPRAP OUTLET PROTECTION WORKSHEET Project Truck Company Maintenance / Ops. Complex Date May-21-2012 Location Camp Lejeune, NC Designed W. Bone Project No. 2861 Checked V. Chirichella Outlet ID 0-1 Pipe diameter 15 inches Pipe slope 0.7 percent Roughness Coef. 0.013 Full Flow Capacity 5.40 cfs Full flow velocity 4.40 R/sec ACC �� CC�CCC�CC 1r� v�l■■1�1�1 .■■i�l�rrrrt■ri■■il■nl tr■■t�■■� Zone from graph above = 1 Is grade of apron 10% or more N YIN Zone used = 1 Outlet pipe diameter 15 in. Outlet flowrate 5.4 cfs Outlet velocity 4.40 ft/sec Material = Class A Length = 5.0 ft. Width at Outlet = 3.8 ft. Width at end of Pad 9.5 ft. Stone diameter = 4 in. Thickness = 9 in. Zone Material I Diameter Thickness I Length 1 Class A 4 9 4 x D(o) 2 Class B 8 18 6 x D(o) 3 Class I 10 25.5 8 x D(o) 4 Class I 10 25.5 8 x D(o) 5 Class II 14 34.5 10 x D(o) 6 Class II 14 34.5 10 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 9.06.05 through 8.06.06 in NC Erosion Control Manual Rip Rap Apron Design 5/21/2012