HomeMy WebLinkAboutSW8081016_HISTORICAL FILE_20110216STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
= o t I 02 1 So
YYYYMMDD
AIMIA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
February 16, 2011
Commanding officer, Marine Corps Base
Mr. Carl Baker, Deputy Public Worms Office
MCB Camp Lejeune
1005 Michael Road
Camp Lejeune, NC 28547
Subject: Approved Plan Revision
P-1222 MP Company Operations Complex
Stormwater Project No. SW8 081016
Onslow County
Dear Mr. Baker -
On February 9, 2011, the Wilmington Regional Office received a plan revision for Stormwater
Management Permit Number SW8 081016. The revisions include strengthening the forebay
berm and creating a weir in the berm. The new berm will include a concrete cap on top,
extending 12" below the outfall elevation, to discourage scouring as the water exits the forebay.
It has been determined that a formal permit modification is not required for the proposed
changes. We are forwarding you an approved copy of the revised plans for your files. Please
replace the old approved plan sheets with the new ones.
Please be aware that all terms and conditions of the permit, issued on December 3, 2008,
remain in full force and effect. Please also understand that the approval of this revision to
the approved plans for the subject State Stormwater Permit is done on a case -by -case
basis. Any other changes to this project must be approved through this Office prior to
construction. The issuance of this plan revision does not preclude the permittee from
complying with all other applicable statutes, rules, regulations or ordinances which may
have jurisdiction over the proposed activity, and obtaining a permit or approval prior to
construction.
If you have. any questions concerning this matter, please do not hesitate to call Georgette Scott
or me at (910) 796-7215.
Sincerely,
Steve G. Pusey
Environmental Engineer
GDSlsgp: S:IWQSIST0RMWATER1Permits & Projects120081081016 HDQ011 02 permit—pr 081016
cc: Jim Farrell, PE — Hoggard-Sure Associates, P.C.
Onslow County Building Inspections
Steve Pusey
Wilmington Regional Office
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One 1 }
Phone: 910-796-72151 FAX: 910,350-20041 Customer Service: 1-877-623.6748 NOrt� 1 Caro1 i na
Internet: www.ncwalerqualit .org
An Equal Oppostunily 1 AffirimVve Action Ernployer
/A
HE
aggard-Sure
kssociatesP.o.
EMS SURVEYORS PLANNERS
757-484-9670 • Fax: 757-484-7498 - 901 Port(enue Parkway. Suite 5 • Portsmouth. Yiroinio 23704
1
Mr. Steve Pusey
NC Division of Water Quality
127 Cardinal Drive Extention
Wilmington, NC 28405
Re: P-1222 MP Company Operations Complex
Stormwater Project No. SW8 081016
Marine Corps Base
Camp Lejeune, North Carolina
Our File No. 2988.00.08
Dear Mr. Pusey:
February 8, 2011
As per our discussion please find two (2) copies of the revised plans as part of this package. The
forebay outfall has been partially revised form an earthen berm to a concrete weir. The weir elevations
have been revised as discussed to 21.00 and 21,50. The concrete weir apron extends 12" below the
outfall elevation to discourage scouring as the water exists the forebay. The weir and associated detail
are on the attached sheets C-105 and C-506 respectively.
If you need any further clarification please contact me at (757) 484 9670 or at jim@hoggard-eure.com
S
Ji
Project Manager
RE (i j V % E
92011
Project Name:'?-r: Date:'74,k2b D
Project Receive Date: p Acce to Re ted circle one
Proiect Location: t,,fY4 Ad4-kTf6reauire Eves o). Date received:�A r 2-,�I
i Symbols for completing form: `✓ "'Ye OK; ' x No/Deficient; 'nla' or
Rule(s) Subject (check all that apply): R
❑ 1995 Coastal ❑ 2008 Coastal ❑ Phase II ❑ Universal
Paperwork:
❑ Check for $505 (must be no older than 6 months)
❑ Application form with correct/original signatures (original plus 1 copy). If Corporation or LLC also:
o Print the info from the NCSOS
o Either, 1.) The applicant is listed on the NCSO h hislher correct title or, 2.) A notarized letter of
authorization has been provided: ur_,�\
❑ Supplements (1 original per BMP). BMP type(s):
❑ O&M with correct/original signatures (1 original per BMP, except level spreaders/filter strips and swales)
❑ Deed restrictions (if outparcel or subdividing) (original plus 1 copy)
o Deed restriction template (signed and notarized) or
o Proposed Declaration of Covenants and Restrictions (signed,and notarized)
❑ Soils report identifying the SHWT
❑ Supporting calculations, signed & sealed (if necessary)
❑ Receiving stream classification: , If SA or ORW also:
o SA: USGS topo map with the site, the receiving waters and the A2 mile radius shown to scale.
o ORW: 575 ft of MHWL for Area of Environmental Concern and max BUA per rule.
❑ Modifications: 1.) If built: Designer's Cert., 2.) If partially built: Partial Cert., 3.) If not built: No Cert. needed.
Development Type (check all that apply):
❑ Residential or ❑ Commercial ❑ Deed restrictions match?
❑ Subdivision or ❑ Single Lot ❑ Deed restrictions match?
❑ High Density or ❑ Low Density ❑ Deed restrictions match?
❑ Offsite project ❑ Redevelopment ❑ Modification - ❑ mpt
❑ NCG02 (bulkhead) ❑ NCG03 (clear/grade) ❑ NCG04 (linear] Q� gpgtot (a
Density:
❑ BUA calculations include common areas, clubhouse, sidewalks, etc.
❑ BUA W. , Matches high/low density requirement for rule and receiving stream class.
❑ No obvious math errors
❑ If High Density: Design storm correct for rule and receiving stream class.
Plans, signed and sealed (2 sets):
❑ Two sets received ❑ Layout (with proposed BUA dimensions)
❑ Grading ❑ Drainage area map (all HD systems & curb outlet swales)
❑ Vicinity map ❑ Project Boundaries ❑ Legend
❑ Wetlands:
o Delineated on plans o "No wetlands onsite" on plans
❑ Details:
o Roads o Cul-de-sacs o Curbing o Sidewalk
o BMPs/ Level spreaders/ Filter stripsi Curb outlet swales o Buildings (Apts or Condos)
Offsite Projects:
❑ Designer's Certification has been submitted for the Offsite BMP receiving the runoff from the project.
❑ Deed restrictions have been recorded and a copy submitted for the Offsite BMP permit.
❑ Lot size has not changed from what was approved under the Master Plan.
❑ Correct lot number is referenced on the supplement form.
❑ Offsite system is in compliance with its permit, if known.
Infiltration Projects:
❑ Soils report: SHWT, soil type, and expected infiltration rate are provided.
❑ DWQ has conducted a site visit? Date:
Wet Ponds: Permanent Pool Meets One of the Following:
❑ Is located no lower than 6" below the estimated SHWT.
❑ Incoming groundwater is quantified and evaluated, AND Storage volume verified, AND Outlet evaluated for free
drainage to the receiving waters under SHWT conditions.
Decision (check one):
❑ Complete: Return file to admin (Jo Casmer) to log in. (Stamped in received date = BIMS date)
❑ Slightly incomplete: E-mail consultant, request information to be returned within one business day (24 hours after
request. Info requests on Friday, allow a return on the following business day). If info not returned, issue an
application return letter and give everything to admin. (Add info received date= BIMS date)
Cl Substantially incomplete: Issue an application return letter and give everything to admin.
Johnson, Kelly
From: Johnson, Kelly
Sent: Tuesday, December 14, 2010 9:16 AM
To: 'jim@hoggard-eure.com'
Subject: FW: P-1222 MP Company Operations Comples, Stormwater, SW8 081016
Jim,
I haven't heard back from you on this. If you are applying for a revision, please make sure that I receive it this week. I go
through each package when it comes in to make sure that we have all of the documentation that we need. I generally
ask for missing items to be submitted by COB the next day or I have to return the application. I didn't set a deadline
originally because you aren't local. But, I really need the complete package by Friday or I will have to return it.
Thanks,
KJ
From: Johnson, Kelly
Sent: Wednesday, December 08, 2010 12:20 PM
To: 'jim@hoggard-eure.com'
Subject: P-1222 MP Company Operations Comples, Stormwater, SW8 081016
Jim,
I got your package in the mail. Are you applying for a plan revision? If so, I will need the Plan Revision application which
is available on our website,
http://portal.ncdenr.orglweblwq/ws/su/statesw/forms does.
Thanks,
KJ
***My email has changed to k II .iohnson ncdenr. ov
oh vuso Vu
Kelly Johnson
Environmental Engineer
Division of Water Quality
Stormwater Permitting
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Office: 910.796.7331
Fax: 910.350.2004
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
A
a.
)ggard-Eure
associates,...
IEERS SURVEYORS PLANNERS
757-484-9670 • Fax: 757.484.7498 - 901 Port(eatre Parkway, Suite 5 • Portsmouth. Virainia 23704
November 30, 2010
Ms. Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Extention
Wilmington, NC 28405
Re: P-1222 MP Company Operations Complex
Stormwater Project No. SW8 081016
Marine Corps Base
Camp Lejeune, North Carolina
Our File No. 2988.00.08
Dear Ms. Lewis:
Please find two (2) copies of the revised plans as part of this package. The forebay outfall has
been partially revised form an earthen berm to a concrete weir. The weir elevations have been
maintained from the original plans. The concrete weir apron extends 12" below the outfali elevation to
discourage scouring as the water exists the forebay. The weir and associated detail are on the attached
sheets C-105 and C-506 respectively.
If you need any further clarification please contact me at (757) 484 9670 or at jim@hoggard-eure.com
Jim Farrell, P,E.
Project Manager
DEC 03 2010