Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8080945_HISTORICAL FILE_20081106
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 09)Oc)L4.S DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ?LM I 1 0 YYYYMMDD I0� WArFR O� QG >_ p � November 6, 2008 Commanding General USMC Base Camp Lejeune Attention: Carl Baker 1005 Michael Rd. Camp Lejeune, NC 28547 Michael F. l-asley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: State Stormwater Management Permit No. SW8 080945 MCAS Marine Corps. CALA New River High Density Commercial Sand Filter Project Construction Control Number: NIA Onslow County Dear Mr. Baker: Coleen Ed. Sullins Director Division of Water Quality The Wilmington Regional Office received a complete State Stormwater Management Permit Application for MCAS Marine Corps. CALA New River on October 29, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 080945 dated November 6, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until November 6, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have an contact Malco questions, or need additional information concerning this matter, please 1 Boney, or me at (910) 796-7215, Regional Supervisor Surface Water Protection Section ENBImb: S:IWQSISTORMWATERIPERMIT1080945 cc: C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd Onslow County Planning Department Malcolm Boney, NCDENR Cwilmington Regional Office Central Files N `hCarolina VaNra!(y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquahLY ore Fax (910) 350-2004 1-877.623-6748 An Equal Opportune y/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 080945 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General USMC Base Camp Lejeune- Attention: Carl Baker MCAS Marine Corps. CALA New River Perimeter St. Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 1 Sand filter(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 6, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 159,895 square feet of impervious area. 3. This sand filter with a basin must be operated with a 50' vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. The built -upon area for the future development is limited to 0 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2of8 State Stormwater Management Systems Permit No. SW8 080945 " 7. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. 8. The following design criteria have been permitted for the sand filter and must be provided and maintained at design condition: a. Drainage Area, Acres: 160,895 Onsite, ft : 160,895 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 159,895 Onsite, ft : 159,895 Offsite, ft2: 0 C. Design Storm, inches: 1.5 d. Design volume (ft }: 18,886 e. Max. head (ft) 2- f. Avg. head (ft) 1 g. Runoff coefficient (ft2: 0.94 h. Width of forebay ft): 55 i. Surface area of sediment basin (ft2): 5,544 j. Surface Area of sand filter (ft) 2,552 k. Depth of the sand media (ft) 1.5 I. Storage Volume top of sand filter (ft'): 16,192 M. Predevelopment 1 yr 24 hr peak flow, cfs: 1.26 n. Drainage basin area (Acres) max. 5 3.67 o. Post -development 1 yr 24 hr peak flow, cfs: 9.48 P. Type of Sand filter (open?): Y q. Does excess vol. Bypass sand filter? Y r. Off line splitting device used? Y S. 2 ft seperation Y t. Vegetate filter length (ft) 90ft U. Expected sand permeability, ft/day'. 3.50 V. Time to Draw Down, (hours): 40 W. Receiving Stream/River Basin: White Oak/New River X. Stream Index Number: 19-(1) Y. Classification of Water Body: "SC" 11. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3of8 State Stormwater Management Systems Permit No. SW8 080945 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. -The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080945 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event -that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080945 Permit issued this the 6t" day of November 2008. NORTH CA LINA ENVIRONMENTAL MANAGEMENT COMMISSION for Cole en 4uIns, irec or Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 080945 MCAS Marine Corps CALA New River Stormwater Permit No. SW8 080945 Onslow County Designer's Certification l , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 Stake Stormwater Management Systems Permit No. SW8 080945 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Planning Department Page 8 of 8 7 � 8, K: DW E'O1�ftiY Date Received Fee Paid PermitNumber State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This farm may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer Marine Corps Base Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl H. Baker,_P.E., Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: Building 1005 Michael Road City:MCB Camp Lejeune . _ State:NC Zip:28547 Phone: (910 __ ) 451-2213 Email:carl.h.baker©usmc.mil Fax: (91Q ) 451-2927 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): CALA: Interim Facilities 5. Location of Project (street address): Perimeter Street City:Camn LeLejeune - County:Onslow Zip:28542 6. Directions to project (from nearest major intersection): East on Douglas Rd. from Rt. 17. Turn right on Canal Street. Turn left on Perimeter Street. 7. Latitude:34' 42' 296" N Longitude:77° 27065" W of project 8. Contact person who can answer questions about the project: Name:Randy Scott Telephone Number: (910 ) 449-5401 Email:randy.scott@usmc.mil 11. PERMIT INFORMATION: 110 1 1. Specify whether project is (check one): NNew ❑Renewal ❑Modification Form SWU-101 Version 03.27.08 Page 1 of 4 r 2. If this application is being submitted as the result of a renewal or modification to an existing permit,. list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project, CALA (Drainage Area 1): The expansiorLof the runwav area to the southwest will require a vallev Butter at the edge of the pavement. The valley gutter with catch basins will collect runoff from both new and existing pavement and discharge to a sand filter and dry detention pond. This, project is High Density. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 3.69 acres 4. Total Wetlands Area: N/A acres 5. 100' Wide Strip of Wetland Area: N/A___ acres (not applicable if no wetlands exist on site) 6. Total Project Area**:3.69 acres 7. Project Built Upon Area:100 "/o 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device. Brian Information' i*." s .. ', Y Drainage Area 1 e 1% ti.. Drainage Area 2 Receiving Stream Name New River Stream Class & Index No. Sc Total Drainage Area (sf) 160,895 On -site Drainage Area (sf) 160,895 Off -site Drainage Area (sf) 0 Existing Impervious* Area (sf) 110,118 Proposed Impervious*Area (sf) 49,777 % Impervious* Area (total) 99 Impervious* Surface''Area Dtairiage Aiea,la ' R Drauiage Area'2,` On -site Buildings (sf) On -site Streets (sf) On -site Parking (so On -site Sidewalks (sf) Other on -site (sf) 159,895 Off -site (sf} Total (sf): 159,895 i impervious area is aepnea as the ouut upon area rnctuaing, nut not amttea to, outtaings, roaas, parxtng areas, sidewalks, gravel areas, etc., Form SWU-101 Version 03.27.08 Page 2 of 4 **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BU& 10. How was the off -site impervious area listed above derived?N/A- _- IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from littp://h2o.enr.state.nc.us/Su/bmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-b Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from htti2://ii2o.enr.state.nc.us/sLiLap- forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement OCT C IV, 2nill� Form SWU-101 Version 03.27.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form C Cc'3 • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP cezrs • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR cars _ • Calculations & detailed narrative description of stormwater treatment/management CQ A'S • Copy of any applicable soils report Cad • Two copies of plans and specifications (sealed, signed & dated), including: cCrr� - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):C. Allan Bamforth, fr., Engineer -Surveyor, Ltd. Mailing Address:2207 Hampton Boulevard City:Norfolk State:VA Zip:23517 Phone: (757 627-7079 _ Fax: (757 925-7434 _ Email:alb©bamforth.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Carl Baker, Deputy Public Works O,&er certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1/ Signatu Form SWU-101 Version 03.27.08 Ul i .0 4 Page 7 -a. ., r. Date: r LVUr� Permit Number; ® (to be provided by D W01 E+ O G � r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on tine, printed and submitted with all of the required information. Make sure to also till out and submit the Required !terns Checklist (Section 111) and the l&M Agreement (Section IV) Project name Contact name Phone number Date Drainage area number GALA AND FIRE TRAINER: INTERIM FACILITIES Randy Scott 91 GA49-5401 1 - GALA SITE . Site Characteristics Drainage area (AD) 160,895.00 f? OK Impervious area 159,895.00 ftZ % Impervious (IA) 99.4% % Design rainfall depth (Ro) 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.50 in 1-yr, 24-hr intensity 0.15 inlhr Pre -development 1-yr, 24-hr runoff 1.26 ft3lsec Post -development 1-yr, 24-hr runoff 9.48 ft3lsec Pre/Post 1-yr, 24-hr peak control 8.22 ft3lsec Storage Volume Design volume (WQV) 18,886.00 ft' Adjusted water quality volume (WQVAdi) 14,164.50 ft' OK Volume contained in the sedimentation basin and on top of the sand filter 16,192.00 Maximum head on the sedimentation basin and sand filter (hMa.Rfter) 2.00 ft OK Average head on the sedimentation basin and sand filter (hA) 1.00 ft OK Runoff Coefficient (Rv) 0.94 (unitless) Type of Sand Filter Open sand filter? Y Y or N If this is an open sand filter: The clearance between the bottom of the sand >4.5 ft filter and the SHWT (dsHwT) Closedlpre-cast sand filter? N Y or N If this is a closed sand filter: The clearance between the bottom of the sand ft filter and the SHWT (dsr+wT) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground ft structure (d$pace) Form SW401-Sand Filter-Rev.3 Paris I and 11. Project Design Summary, Page 1 of 3 Sedimentation Basin Permit Number -Z L— OU04—' f ky.- (to be provided by Dw• ' Surface area of sedimentation basin (As) 5,544.001ft 2 Sand Filter Surface area of sand filter (AF) 2,56iod ft, Depth of the sand media filter bed (dp) 1.50 ft Coefficient of permeability for the sand filter (k) 3.50 (fUday) --' Time to drain the sand filter (t) 40.00 hours Time to drain the sand filter (t) 1.67 days Additional Information Does volume in excess of the design volume bypass the sand filter? Y or N Is an off-line flow -splitting device used? V Y of N Does volume in excess of the design volume flow evenly distributed through a v , Y Y or N vegetated filter? -Z What is the length of the vegetated filter? KOO ft Does the design use a level spreader to evenly distribute flow? Y or N 'LLY Is the BIVIP located at least 30ftfrom surface waters (50ft if SA waters)? or N Is the BMP located at least 1 00ft from water supply wells? YorN Are the vegetated side slopes equal to or less than 3:1 V.. ;..: Y or N Is the BUIP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? W, YorN What is the width of the sedimentation chamber/forebay (VVS,d)? --5-5."00ft What is the depth of sand over the outlet pipe? . :. . . .- A1-.00ft Figure 1: Open Sand Filter I ILI Sittl Sail; stm�:oilably: kigli- . .................... : ............. e b"L(IrtPike. OK. Meets minimum, but may need to be increased to contain the required volume if error under Storage Volume section. OK. Meets minimum, but may need to be increased to contain the required volume if error under Storage Volume section. OK. Submit drainage calculations. OK OK OK OK OK OK OK Insufficient ROW location OK OK Form SVV401-Sand Filter-Rev.3 Parts I and H. Project Deskgn Summary, Page 2 of 3 Figure 2: Closed Sand Filter Permit NLim ber.%-2-°-�" w o w av (fo be provided by DWQ) �Velr y Flow r , e� , C:on>=i'etc {or olleze' ,ctn,chsral watcr"ia1), ". dn-Sitil,`ioil. Se'asa,iably ieeli'' \Ymer Table tl at C1' ' Cellacled.'' " ®ram i:^°"�^''• apa:�y�;pp y' JL. a RIN E �,SHWT ... .,. -'.................. kfall i,tatin❑ Smid kilicr Cliau,bci �tT'icmry scd'vnrlus; : (Trapped SaGifs) . 'j`resa' Form SW401-Sand Filter-Rev.3 Parts I and II. Project Design Summary, Page 3 of 3 Permit No. GtA.* Wel�Wa (to be provided by D Wu) Please indicate the page or plan sheet numbers where the supporting documentation can be found, An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. CG001 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CC? m CG502 2. Plan details (1" = 50' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. C-V CG502 3. Section view of the sand filter 0" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media - Connection between the sedimentation chamber and the sand filter chamber, - SHWT level(s) Outlet pipe, and Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) rates ATTACHED 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in'the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CQ3 ATTACHED 5. Supporting calculations (including drainage calculations) Cg,3 ATTACHED 6. Signed and notarized operation and maintenance (0&M) agreement NIA 7. A copy of the deed restrictions (if required). Form SW401-Sant! Filter-Rev.3 Part III, Page 1 of 1 Permit (to be provided by DWQ) ;� III' REQUIRI=Q ITEMSCHECKLIST ..r.rw Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. CGO01 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber Maintenance access, Flow splitting device, Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. C CG502 2. Plan details (1" = 50' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and Boundaries of drainage easement. C21 CG502 3. Section view of the sand filter (V = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, Depth of sand filter media Connection between the sedimentation chamber and the sand filter chamber, SHWT level(s) Outlet pipe, and Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) cab ATTACHED 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CQ3 ATTACHED 5. Supporting calculations (including drainage calculations) r,z�i ATTACHED 6. Signed and notarized operation and maintenance (0&M) agreement NIA 7. A copy of the deed restrictions (if required). Form SW401-Sand Filter-Rev,3 Part Ipl, Page 1 of 1 Permit Number: .5, W Y0 �U 9 q �, (to be provided by DWQ) Drainage Area Number: Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - Once a year, sand media will be skimmed. The sand filter media will be replaced whenever it fails to function properly after vacuuming. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set Iocation and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is resent. Remove the trash/debris. The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as (if applicable) pavementsurface. soon as possible. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to sand filter erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximatel six inches. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is 'too large for repair - The pretreatment area Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by - -- - - hand. If a pesticide is used, wipe it ' on the 21ants rather than spraying. i-lj,. ( C '1 )i!I!„ Form SW401-Sand Filter 0c".M-Rev.3 I Page I of 3 6MP element: Potentialproblem: How I will remediate theproblem: The filter bed and Water is ponding on the Check to see if the collector system underdrain collection surface for more than 24 is clogged and flush if necessary. If system hours after a storm. water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. The outflow spillway Shrubs or trees have started Remove shrubs and trees and pipe to grow on the embankment. immediately. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is dania ed. Repair or re lace the pipe. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 91.9- outlet. 733-1786. Form SW'101-Sand Filter O&M-Rev.3 Page 2 of 3 i Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CALA and Fire Trainer: Interim Facilities BMP drainage area number:I (CALA Site) Print name:Carl H. Baker, P.E. Title. -Deputy Public Works Officer _ Address: Building 1005 Michael Road, MCB Camp Leieune, NC, 28547 _ Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president: a Notary Public for the State of County of /�k)�,� j , do hereby certify that ? personally appeared before me this day ofrn,a=,> and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, `,'���IIetI Iili..i COUP ti�`� ......ItO" SEAL My commission expires Form SW40I-Sand Filter O&M-Rev.3 Page 3 Of NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEETjI Project name Contact name Phone number Date Drainage area number CALA and Fire Trainer. interim Facilities Randy Scot 910-449-5401 September 16, 2008 1 - CALA Site For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter and Dry Detention Drawdown flow from the BMP 4.27 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area ft 2 Impervious surface area ftz Percent impervious % Rational C coefficient Peak flow from the 1 inihr storm cfs Time of concentration min Rainfall intensity, 10-yr storm Whir Peak flow from the 10-yr storm cfs Where Does the Level Spreader Discharge? To a grassed bioretentlon cell? N (Y or N) To a mulched biorelention cell? N (Y or N) To a wetland? N - (Y or N) To a filter strip or riparian buffer? N (Y or N) Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 0.00 ft Width of dense ground cover 0.00 ft Width of wooded vegetation 0.00 ft Total width 0,00 ft Elevation at downslope base of level lip 0,00 fmsl Elevation at top of bank of the receiving water 0,00 fmsl Stope (from tevel lip to to top of bank) #DIViO! % Are any draws present? N (Y or NJ Level Spreader Design Forebay surface area soft Feet of level lip needed per cfs #DIV10! ft/cfs Answer "Y" to one of the following: Length based on the 1 inthr storm? N (Y or N) Length based on the 10-yr storm? Y (Y or N) Length based on the Bi discharge rate? N (Y or N) Design flow 1.94 cfs Is a bypass device provided? N (Y or N) Do no! complete this section of the worksheet. Do nol complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the wcrksheet. Do nol complete this section of the wcrksheet. Do not complete this secton of the worksheet. Do not complete this section of the worksheet, Do not complete this seclion of the worksheet. OK _ Noforebayis needed. A bypass device is not needed. #Divio! Form Sw401-Level Spreader, Filter Strip, Restored Riparian Buffer•Rev,5 Parts I. and If. Design Summary, page 1 of 2 Length of the 4evel lip 22.00 ft #VALUE.' Are level spreaders in series? IN (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W Y Peak velocity in the channel during the 10-yr storm Channel lining material t •-- M (Y or N) Do not complete this sectior of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet ft Do not completo this section of the worksheet ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. cfs Co not complete this section of the worksheet. i B i Do not complete this section of the worksheet Form SW401-Level Spreader, Filter Strip, Restored Riparian Huffer-Rev.5 Parts I, and it. Design Summary, page 2 of 2 Please indicate the page or plan sheet numbers where the supporting documentation can be found. -An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. Ca 'S CG001 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. C a-13_ CG504 2. Plan details (V = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. CCr 3 CG504 3 Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present. Ste_ CG504 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. Cat 3 Attached 6. The supporting calculations. Attached 7. A copy of the signed and notarized operation and maintenance (OEM) agreement. N/A 8. A copy of the deed restrictions (if required). 1 Y. - ;; � a Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Permit Number: (to be provided by DJYQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Inunediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How 1 will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow sputter device i The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page I of 3 BMP element: The Swale and the IeveI Iip The bypass channel The filter strip The receiving water Potential problem: The swale is clogged with sediment. The level lip is cracked, settled, undercut, eroded or otherwise damaged. There is erosion around the end of the level spreader that shows stormwater has bypassed it. Trees or shrubs have begun to grow on the swale or just downslo e of the level lip. Areas of bare soil and/or erosive gullies have formed. Turf reinforcement is damaged or ripap is rolling downhill. Grass is too short or too long if applicable). Areas of bare soil and/or erosive gullies have formed. Sediment is building up on the filter strip. Plants are desiccated. Plants are dead, diseased or dying. Nuisance vegetation is choking out desirable species Erosion or other signs of damage have occurred at the outlet. How L will remediate the problem: Remove the sediment and dispose of it off -site. Repair or replace lip. Regrade the soil to create a berm that is higher than the level Lip, and then plant a ground -cover and water until it is established. Provide lime and a one-time fertilizer application. Remove them. Regrade the soil if necessary to remove the gully, and then reestablish proper erosion control. Study the site to see if a larger bypass channel is needed (enlarge if necessary). After this, reestablish the erosion control material. Maintain grass at a height of yproximately three to six inches. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Remove the sediment and restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. _ Provide additional irrigation and fertilizer as needed. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Remove vegetation by hand if possible. If pesticide is used, do not allow it to get into the receiving water. Contact the NC Division of Water Quality local Regional Office, or the 401 Oversight Unit at 919-733-1786. i Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer Q&M:Rev-3— - = Page 2 of 3 6� Y� � �`) ' , Permit Number: �� (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CALA and Fire Trainer: Interim Facilities BMP drainage area number: I (CALA Situ_ Print name:Carl H. Baker P.E. Titic:.Deputy Public Works Officer Address: Building 1005 Michael Road, MCB Catmp Lejeune, NC, 28547 Pho Sigr Date: V 7�2�—O Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold acid a resident of the subdivision has been named the president. a Notary Public for the State of &k&j 1�q,-Z1 L AJr4 , County of do hereby certify that (?'glez- iX2 personally appeared before me this }� day of — , 2�,' and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires - --- == - - Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 State Stormwater Management Systems Permit No. SW8 080945 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General USMC Base Camp Lejeune- Attention. Carl Baker MCAS Marine Corps. CALA New River Perimeter St. Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 1 Sand filter(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules'} and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 6, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 159,895 square feet of impervious area. 3. This sand filter with a basin must be operated with a 50' vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. The built -upon area for the future development is limited to 0 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 080945 7 8 The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. The following design criteria have been permitted for the sand filter and must be provided and maintained at design condition: a. Drainage Area, 9cres: 160,895 Onsite, ft : 160,895 Offsite, ft': 0 b. Total Impervious Surfaces, ft2: 159,895 Onsite, ft : 159,895 Offsite, ft2: 0 C. Design Storm, inches: 1.5 d. Design volume (ft3): 18,886 e. Max. head (ft) 2 f. Avg. head (ft) 1 g. Runoff coefficient (ft2: 0.94 h. Width of forebay (ft.)- 55 i. Surface area of sediment basin (ft): 5,544 j. Surface Area of sand filter (ft) 2,552 k. Depth of the sand media (ft) 1.5 1. Storage Volume top of sand filter (ft3 ): 16,192 M. Predevelopment 1 yr 24 hr peak flow, cfs: 1.26 n. Drainage basin area (Acres) max. 5 3.67 o. Post -development 1 yr 24 hr peak flow, cfs: 9.48 P. Type of Sand filter (open?): Y q. Does excess vol. Bypass sand filter? Y r. Off line splitting device used? Y S. 2 ft seperation Y t. Vegetate filter length (ft) 90ft U. Expected sand permeability, ft/day: 3.50 V. Time to Draw Down, (hours): 40 W. Receiving Stream/River Basin: White Oak/New River X. Stream Index Number: 19-(1) Y. Classification of Water Body: "SC" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 080945 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved, plan. 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080945 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event -that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the. North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080945 Permit issued this the 6th day of November 2008. NORTH CARWNA ENVIRONMENTAL MANAGEMENT COMMISSION for yoieen m7 zpmins, uirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 080945 MCAS Marine Corps CALA New River Stormwater Permit No. SW8 080945 Onslow County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7of8 State Stormwater Management Systems Permit No. SW8 080945 Certification Requirements: 1. The drainage area to the system contains approximately -the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Planning Department Page 8 of 8 DWQ USE ONLY Date Received Fee Paid Permit Number 1D4),Vc) % 0 SktjF0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer, Marine Corps Base, Camp Lejeune _ 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl H. Baker, P.E., Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: Building 1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Email:carl.h.bake 0usmc.mil 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): CALA: Interim Facilities 5. Location of Project (street address): Perimeter Street City:Camp Lejeune _ I_ County:Onslow Zip:28542 6. Directions to project (from nearest major intersection): East on Douglas Rd. from Rt. 17. Turn right on Canal Street. Turn left on Perimeter Street. 7. Latitude:34° 42' 296" N Longitude:77° 27' 065" W of project 8. Contact person who can answer questions about the project: Name:Randy Scott _ Telephone Number: (910 ) 449-5401 Email:randy.scott@usmc.mil IL PERMIT INFORMATION: OCT 0 9 7n.n,8 1-. - Specify whether project is (check one): ®New ❑Renewal []Modification LBY: Form SWU-101 Version 03.27.08 Page I of 4 2; If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP []Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. CALA (Drainage Area 1): The expansion of the runway area to the southwest will require a_valley gutter at the edge of the pavement. The valley gutter with catch basins will collect runoff from both new and existing pavement and discharge to a sand filter and dry detention pond. This project is High Density._. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 3.69 acres 4. Total Wetlands Area: N/A acres 5. 100' Wide Strip of Wetland Area: N/A _acres (not applicable if no wetlands exist on site) 6. Total Project Area**:3.69 acres 7. Project Built Upon Area:100 % 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For hieh density proiects, complete the table with one drainage area for each enizineered stormwater device. .Basiri Infoimation' Drainage Areal `:. Drainage Area 2 Receiving Stream Name New River Stream Class & Index No. SC Total Drainage Area (so 160,895 On -site Drainage Area (sf) 160,895 Off -site Drainage Area (so 0 Existing Impervious* Area (sf) 110,118 Proposed Impervious*Area (so 49,777 % Impervious* Area (total) 99 Im ei ions* Surface Area p Drainage Area 1. Drainage Area 2 r On -site Buildings (so On -site Streets (sf) On -site Parking (so On -site Sidewalks (so Other on -site (sf) 159,895 Off -site (sf) Total (sf): 159,895 f ()r^Y 11 IY nnnn I * Impervious area is defined as the built upon area including, but not limited to, buildings,'roads, pinking areas, sidewalks, gravel areas, etc. BY: Form SWU-101 Version 03.27.08 Page 2 of 4 **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). 10. How was the off -site impervious area listed above derived?N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http:/Zh2o.enr.state.nc.us/sufbmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from http://l12o.enr.state.nc.uslsu/bmp_ forins.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Fitter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement RE71VOC BY: Form SWU-101 Version 03.27.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http:/fh2o.enr.state.nc.tis/stl/msi mans.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form C 2 ^3 • Original and one copy of the Deed Restrictions & Protective Covenants Form (if _ Ca -cS required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP _ CA-0:5 • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR C4/3 • Calculations & detailed narrative description of stormwater treatment/management Ca �s • Copy of any applicable soils report Caeg • Two copies of plans and specifications (sealed, signed & dated), including: rr3 - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Mailing Address:2207 Hampton Boulevard City:Norfolk State:VA Zip:23517 Phone: 7 7 27-7 79 Fax: (757 ) 925-7434 Email:alb@bamforth.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Carl Baker, Deputit Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the requi.red deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NC AC 2H _104n A - Form SWU-101 Version 03.27.08 RF -NTED Date: V k, I v v LUUV Page 44 o t& 9 as State of North Carolina Departmnt of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review: Sand Filter Reviewer must fill out Tab "I & II - Design Info" to get this sheet to work properly. Project Information Project name MCAS Marine Corps CALA New River Contact name C. Allan Bamforth, P.E. Phone number 757 627-7079 Drainage area number t Reviewer Malcolm Boney Desi n Variable Variable Equation T Value Units Volume to Treat Volume to Treat, Reported WQVReported I - t8,886 ft Volume to Treat, Required IWQVSchueler I =3,630'RD'Rv'AT0e1 18,872 ft -Adequate design volume used? yes Volume to Treat, Adjusted WQVAdi 14,154 ft Drainage area ATaral 160,895 ft Drainage area ATora, 3.67 acres Impervious area A,mp 159,895 ft Percent Impervious IA =AimplAratai 0,99 (unitless) Design Storm R❑ 1,5 in Runoff Coefficient Rv =.05+•9(tA) 0.94 (unitless) Head on the Sedimentation Basin and Sand Filter, See Table 1 Below Surface area total (sedimentation basin+sand filter), Reported AS+AF 8096 tt2 Maximum head on the sedimentation basin and sand filter hMaxF6ler =WQVSchueler/(AS+AF) 1.75 ft Average head on the sedimentation basin and sand filter hA =hMaxFiner12 0.87 ft Sand Filter Design Coefficient of permeability of sand filter bed. Reported ikReporled 3.5 fUday Coefficient of permeability of sand filter bed, Typical IkTyp;�, 3.5 fUday Was a typical permeability of the sand filter used? (It doesn't have to be exactly this number, but must make sense. yes Table 1: Max Filter Depths and Minimum Surface Area Combinations hMa Ftser (ft) As+AF (ft) WQVAdj (it') 2.0 7,077 14,154 2.2 6,434 14,154 2.4 5,898 14,154 2.6 5,444 14,154 2,8 5,055 14,154 3.0 4,718 14,154 3.2 4,423 14,154 3.4 4,163 14,154 3.6 3,932 14,154 3.8 3.725 14,154 4.0 3.539 14,154 4.2 3,370 14,154 4.4 3.217 14,154 4.6 3,077 14,154 4.8 2,949 14,154 5.0 2,831 14,154 5.2 2,722 14,154 5.4 2,621 14 154 5.6 2,528 14,154 5.8 2,440 14,154 6.0 2,359 14,154 It Permit Number: (to be provided by DWQ) of w"TER Ah v NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section lll) and the l8M Agreement (Section IV) I: PlIWAINFORMATION ; Project name SW8 080945 WAS CALA Facilities Contact name Phone number Date Drainage area number Cad Baker 910-451-2213 November 6, 2008 III:, DESIGNjIN.FORMATION Site Characteristics Drainage area (AD) 160,895 ftZ OK Impervious area 159,895It2 % Impervious (IA) 99.4%% Design rainfall depth 1.5 in Peak Flow Calculations Does this project require prelpost control of the 1-yr 24-hr peak flow? 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff PrelPost 1-yr, 24-hr peak control Storage Volume Design volume Adjusted water quality volume (WQVAdi) Volume contained in the sedimentation basin and on top of the sand filter Maximum head on the sedimentation basin and sand filter (hMaxril,) Average head on the sedimentation basin and sand filter (hA) Runoff Coefficient (Rv) Type of Sand Filter Open sand filter? If this is an open sand filter: The clearance between the bottom of the sand filter and the SHWT (dSHwT) Closedipre-cast sand filter? If this is a closed sand filter: The clearance between the bottom of the sand filter and the SHWT (dsH vr) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dsa,) YorN in inlhr ft3lsec ft3lsec ft3lsec 18,886 ft3 14,165 ft3 OK 16,192 2ft OK 1-ft 0.94 (unitless) Y YorN 4.5 ft N YorN Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 1 of 3 Permit Number: (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sand Filter Surface area of sand filter (AF) Depth of the sand media filter bed (dr) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? Does volume in excess of the design volume now evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the 8MP located at least 30ft from surface waters (50ft if SA waters)? Is the 8MP localed at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chambedforebay (Ws,,d)? What is the depth of sand over the outlet pipe? Figure 1: Open Sand Filter Sedintentatioa C'blud�et• �OI' F01'eba�"� Flow III -Situ Soil; SeasonnblkHiatt WaterT-nble 5,544 ft2 OK 2,552 ff2 OK 1.5 ft 3.5 (f /day) 40 hours OK 1.67 days Y YorN Y YorN OK Y YorN 90 It Y YorN Y YorN Y YorN Y Y or N OK n!a Y or N Insufficient ROW location. 551t OK 1ft OK Srutd Filler Cha�her 0titlet tripe (ts wr Form SW401-Sand Filler-Rev.1 Parts I and II. Project Design Summary, Page 2 or 3 Figure 2: Closed Sand Filter Permit Number: (to be provided by DWQ) Flow fh•er land Flow Conclete (Or Other shuehUal matuill) ltt•Sih] Soil' Seacoaabh- High Water Tablc Water C'olkcted Se+linractatiou Clranrber (Ft�ebay) (Hravy sedimaus. Orguucs. Debns) .......... Covcr Ch atc.v Sand ! Outict Yipc .............., [1 . • • 5pnce (IPipe :CIF t r., ............................ . t+ tt (6wr i "VJ . Saud Filter Chmubcr (Trapped Solids) Form SW401-Sand Fllter•Rev,I Parts I and II. Project Design Summary, Page 3 of 3 s w g n T01Y5 AGA` North Carolina Department of Environment and Natural Resources NCDENR Request for Express Permit Review For DENR Use ONLY Reviewer: 01ci ne`{ Submit: iQiaL08 Time: _10 Confirm: �-"Ca FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinitV map (same -items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a.ncmaii.net� • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(e?_ncmail.net • Mooresville 8 -Patrick Grogan 704-663-3772 or patrick.grogan(ftcmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison aowmail.net • Wilmington Region -Janet Russell 910-350-2004 o►ianetrussell(fncmail.net NOTE. Project application received after 12 noon will be stamped in the following work day. R E C E I V E Project Name: GALA AND FIRE TRAINER: INTERIM FACILITIES J County: ONSLOW Applicant: CARL H. BAKER, P.E. Company: MCB CAMP LEJEUNE SER 15 ,'_00$ Address: 1005 MICHAEL RDCity: CAMP LEJEUNE, State: NC Zip: 28547 Phone:910-451-2213 Fax:910-451-2927 Email: cad.h.baker(c-usmc.mil DWQ Project Drains into NEW RIVER waters - Water classification SC, NSW (for classification see- PROJ # hftp:/Ih2o.enr.state.nc.us/bimstreports/reportsWB.htm1,) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: C. ALLAN BAMFORTH, P.E., L.S Company: C. ALLAN BAMFORTH, JR. Address: 2207 HAMPTON BOULEVARD City: NORFOLK, State: VA Zip: 23517 Phone: 757-627-7079 Fax::757-625-7434 Email: dwc@bamforth.com (Check all that apply) �0 ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls - Please attach TOPO map marking the areas in questions ® State Stormwater ® General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond — # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems El High Dens ity-Sto rmwater Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION ❑ REVISIONS SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information r ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront F4 Land Quality ® Erosion and Sedimentation Control Plan with 4,81 acres to be disturbed.(CK # k (for DENR use)) WETLANDS QUESTIONS MUST BE ADDRESSED BELOW ❑ Wetlands (401): Check all that apply Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: (Check # Isolated wetland on Property ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: acre(s) Minor Variance : ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ SUBMITTAL DATES DATES Fee CAMA Variance ❑ Ma ; Min $ SIN ❑ HD, ElLD, ElGen AFee.SUBMITTAL 401. $ LQS Stream Deter,_ $ NCDENR EXPRESS January 2008 - ip t C6 i-v K_ `o' " tl 0 ^ `^ 3C) CALA and t W6 Trainer Interim Facilities Subject: CALA and Fire Trainer Interim Facilities From: "Gregory L. Herron" <g1h a bamforth.com> Date: Mon, 15 Sep 2008 16:41:00 -0400 To: <janet.russell@ncmai1.net> CC: "Anna Ice Bamforth" <alb a bamforth.com> Janet, Please find attached our request for an express review for E & S and Stormwater for the CALA and Fire Trainer: Interim Facilities, New River, Camp Lejeune. will forward a pdf of the plans when they are available. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com E G E I V ED SE. 15 �01A _� P r' . J 4, Content -Description: VICINITY MAP.doc � E VICINITY MAP.doc I Content -Type: application/in sword Content -Encoding: base64 I Content -Description: RI -QUEST FOR EXPRESS_082608.doc REQUEST FOR EXPRESS_082608.doc Content -Type: application/msword Content -Encoding: base64 Content -Description: Form_SWMApplication_Rev2_rev082708.doc i Form_SWMApplication_Rev2_rev082708.doe Content -Type: application/msword Content -Encoding: base64 1 of 1 9/15/2008 5:29 PM DWQ USE ONLY Date Received I-ee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopier) for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer, Marine Corps Base, Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl H. Baker, I'.E., Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: Building "1005 Michael Road City:MCB Camp Lejeune _ State:NC Zip:28547 Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Lmail:carl.h.baker@usmc.mil 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): CALA and Fire'I'rainer: Interim Facilities 5. Location of Project (street address): Perimeter Street City:Camp Lejeune County:Onslow Zip:28542 6. Directions to project (from nearest major intersection): East on Douglas Rd. from Rt. 17. `turn right on Canal Street. Turn left on Perimeter Street. 7. Latitude:34° 42' 54" N Longitude:77° 26' 94" W of project 8. Contact person who can answer questions about the project: Name:Randy Scott _ _ _ Telephone Number: (910 �) 449-5401 _ I'-mail:randy.scott@usmc.mi[ ^ 1101F:19t ►]7�/:`1I 630; "I. Specify whether project is (check one): ®New ❑Renewal ❑Mod,E1V0 ra�tionC E n � SEP 15 2008 Fonn SWU-101 Version 03.27.08 Pagel ol`4 DWO PROD # 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ®Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP []Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/ l,rosion Control 0404/401 Permit ❑NPDES Stormwater IIl. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. CALA (Drainage Area']): The expansion of the runway area to the southwest will require a valley nutter at the edge of the pavement. The valley gutter with catch basins will collect runoff from both new and existing pavement and discharge to an sand filter and dry detention pond. 'I'he runoff area collected exceeds the area of new pavement. This project is High Density. Fire Trainer (Drainage Area 2). This project includes a gravel drive. Grass swates will collect the runoff from the entire gravel drive and discharge into a vegetated filter strip. This site is considered Low Density, 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 8.37 acres 4. Total Wetlands Area: N/A _ _ _ _ acres 5. 100' Wide Strip of Wetland Area: N/A acres (not applicable if no wetlands exist on site) 6. 'Total Project Area**:8.37 acres 7. Project Built Upon Area:100 CALA/23 Fire 8. I -[ow many drainage areas does the project have?2 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For hieh density oroiects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name New River New River Stream Class & Index No. SC Sc Total Drainage Area (sf) 160,895 204,009 On -site Drainage Area (so 160,895 204,009 Off -site Drainage Area (so 0 0 Ixisting Impervious* Area (so 110,118 0 Proposed Impervious*Area (so 49,777 47,053 Impervious* Area (total) 99 23 Impervious` Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so On -site Streets (so On -site Parking (so On -site Sidewalks (so Other on -site (so 159,895 47,053 Off -site (so Total (so: 159,895 47,053 Form SWU-101 Version 03.27.08 Page 2 of Impervious area is defined as fire built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of zvetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BLIA). 10. How was the off -site impervious area listed above derived IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm -deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from http://h2o.enr.state.ne.us/sutbmp forms.htm. Form SW401-1-ow Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration'rrench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at littp://h2o.enr.state,nc.us/su/msi ma s.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) . • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for 1.13) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soils report • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):C. Allan Bamforth,_Ir., Engineer -Surveyor, Ltd. Mailing Address:2207 I-fampton Boulevard City:Norfolk State:VA Zip:23517 Phone: (757 ) 627-7079 EmaiLaWbamforth.com VIII. APPLICANT'S CERTIFICATION Fax: (757_ _) 925-7434 1, (print or type rtante of person listed in General Information, item 2) Carl Baker, DeputJ Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2I-1 .1000. Signature: Date: Form SWU-101 Version 03,27.08 Page 4 of CALA & 11ire'rrainer Site Subject: CALA & Fire Trainer Site From: Janet Russell <Janet.RusseII a ncmaii.net> Date: Mon, 15 Sep 2008 17:46:11 -0400 To: "Gregory L. Herron" <glh a bamforth.com> BCC: Towler GS05 David W <david.towler a usmc.mil> Greg, we are in receipt of the Express Request for the above -referenced project. However, we didn't receive a stormwater narrative or vicinity map that could physically get us to the site. Please send us a little more information and the site plan pdf as soon as it's available. A guidance for the stormwater narrative is attached for your information. Thanks, Janet Content -Tyne: application/msword' 1SW Narrative.doc � Content -Encoding: base64 of 1 9/15/2008 5:49 PM r.� CALA and Fire Trainer: Interim Facilities Marine Corps Air Station Camp Lejeune, New River, North Carolina Stormwater Management General Permit E C E 1 11 E D SEP 16 2008 DVV Q PROD # "Phis project is composed of two individual sites (CALA and Fire Trainer) located within the vicinity of the existing runway at the Marine Corps Air Station, New River, NC. The proposed construction sites are independent of each other and are separated by portions of the existing runway as well as buildings and roadways. The work includes relocation of a fire Fighting mock-up airplane from the end of Runway 05 to the end of Runway 01; removal of existing propane tanks; expansion of the concrete parking apron; removal and relocation of taxiway lights; and incidental related work. Included in the site work are grading, stormwater management and lighting. The total drainage area is 8.37 acres. The receiving stream for this project is Southwest Creek in the White Oak Basin, Stream Class C. existing Conditions Trainer Site: The fire fighting training facility is located along the west side of the runway perimeter road at the south end of the runway that is oriented from the north to the south. This site is a generally level open grass covered site. The project is 4.68 acres and the disturbed area is 1.12 acres! The site includes 1.08 acres of a gravel drive. The drainage area has 23% impervious area and is low density. The entire drive drains to a vegetated filter strip designed according to the Morth Carolina Division of Winter Quality, Stormwater Best Management Practices 11anual, .hdy 2007. This will reduce the time of concentration from the flow leaving the gravel drive and also reduce pollutants. Grassed swales will be constructed along the new gravel pavement to direct the stormwater to the filter strip. A level spreader is also provided to diffuse the flow. The fire water will be directed to a stone area located within the center of the drive. --�j CALA Site: The CALA site is 3.69 acres and is located along the north side of the runway perimeter road at the south end of the runway that is oriented from the northeast to the southwest. The drainage area has 99% impervious cover. The west portion of the proposed pavement expansion area has elevations approximately 4 feet to I foot below the adjacent finish grade elevations of the ple, OR HV'L Ili .= �"a r LWX9 � p�q �. 3 �'' vRl � �... ��� � 1 ..--- �` existing drainage concrete pavements. Additionally, the western portion of the site contains an existing ditch, which is within the limits of the proposed retaining wall. The width of the ditch ranges from 2 to 4 feet and 4 to 5 feet. 1A LN' The project includes an addition to the existing runway. A portion of the new pavement along with some of the existing pavement drains to the BMP. The proposed BMP is a sand filter that drains into a dry detention basin designed according to the North Carolina Division of Water Quality, Stormivaler Best Management Practices Manual, July 2007, that will handle both the: quality and quantity volumes. A storm piping system will be constructed along the new pavement to direct the stormwater to the new BMP and also provide a bypass system for the filter into the pond. Energy dissipaters will be installed in the outlet structure and a level spreader will be provided for the discharged water. The basin is located to the southwest of the site. The amount ol'existing impervious area draining to the new BMP is greater than the amount of new impervious area bypassing the BMP. The bypassed area drains to an existing ditch. ssn . Cr r«, , 11 Tj, q 3: 0S2 t Y3e9V CALA AND FIRE TRAINER, INTERIM FACILITIES MCAS NEW RIVER, NORTH CAROLINA VICINITY MAP DECEIVED SEP 15 20-08 DWa PROD # about:blank September 18, 2008 Mr. Bamforth: Since speaking with you on the telephone, I have had another discussion with Linda Lewis about your project(s). Linda believes that this is 2 projects, not one - as far as stormwater permitting goes. Please send me the pdf site plans for each area. Please confer with Linda (linda.lewis@ncmail.net) and let me know how you want me to proceed. As stated, I will be glad to schedule a "scoping" meeting here at the office where a discussion, question/answer time can occur. Thanks, Janet Russell Express Coordinator 1 of] 9/18/2008 5:29 PM LU Q KA �,: ••,...'yY 1 H3NNN1 — SdVW ,k3H ;sq S3111110VJ MOM k x fVQ :H3NNkil3813 aNV VIVO 9 k 3 'ON 'eH3,VH M3N Halms an SdW3 3Hib" k ! € r ,UNvuv-GIM OVdAV" n o� oo Lf U U to 0 00 . 6. UA � Z s w U U v � C g a Y Z O F 7 O C) [) m U � U o 0 0 } } +ps sot ei •rV4'.rM� 91uoL Naal 9sn uWt� �.rIDun[stNoty�-t'•ra 's"'u\Fwi�➢n\..:�nw u r. f _ r ..••.ar ,, tl �� VIVO — dYh loalNDO NOGOd3 I 1 6311nioyJ WI83-LNI m e r :H3NIVHk 3HI3 (INV VIVO ,N 'N3Na W3H "lY15 W SdMM 3NClYn _ � _ • „iG��r' € ! { E � � : 8 9 E Y f I � 6 wwm �, s�m�l�l=Y'O�W'JYjAYN wy s � 3 1 1 L � � { U J Ic �m n Re: CALA-and Trainer review meeting Subject: Re: GALA and Trainer review meeting From: Janet Russell <Janet.Russet l a ncmai1.net> Date: Mon, 29 Sep 2008 17:40:13 -0400 To: "Gregory L. Herron" <glh a bamforth.com>, 'fowler GS05 David W <david.towler@usmc.mil> Greg, you are confirmed to meet with Malcolm Boney to submit your stormwater application package for 2 projects (CALA & Fire Trainer) on October 9th at 10:00 AM. The meeting will be here in the regional office. David Towler with the Base is being copied on this email. Do you also want to meet with Erosion Control that same day? If so, I will proceed with arranging that. Let me know. Some items on the submittal requirements maybe of help. It is attached. Janet Gregory L. Herron wrote: We would like 10:00am on the 9th, please confirm. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Monday, September 29, 2008 4:30 PM To: Gregory L. Herron Subject: Re: CALA and Trainer review meeting Greg: We have 9:00, 10:00 or 11:00 available on the 9th of October. Which do you want? Janet Gregory L. Herron wrote: Janet, We would like to schedule the review meeting on Thursday, 10/9/08 if that can be done. Zf this date does not work, please forward possible alternative dates. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax qlh@bamforth.com ]Submittal Requirements 2.doc Content -Type: application/msword i of 9/29/2008 5:40 PM RE: 'CALA and Trainer review meeting Subject: RE: CALA and Traincr review meeting From: "'Fowler CIV David W" <david.towler a usmc.mi> Date: 'I'ue, 30 Sep 2008 07,38,50 -0400 To: "Janet Russell" <Janet.Russel l a ncmail.net>, "Gregory L. Herron" <glh@bamforth.com> All, October 9, at 10:00 AM is good for me, I'll be there. V/r, David W. Towler, ET Marine Corps Base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-3236 ext. 3284 -----Original Message ----- From: Janet Russell (mailto:Janet.Russell@ncmail.net] Sent: Monday, September 29, 2008 17:40 To: Gregory L. Herron; Towler CIV David W Subject: Re: CALA and Trainer review meeting Greg, you are confirmed to meet with Malcolm Boney to submit your stormwater application package for 2 projects (CALA & Fire Trainer) on October 9th at 10:00 AM. The meeting will be here in the regional office. David Towler with the 13ase is being copied on this email. Do you also want to meet with Erosion Control that same day? If so, I will proceed with arranging that. Let me know. Some items on the submittal requirements may be of help. It is attached. Janet Gregory L. Herron wrote: We would like 10:00am on the 9th, please confirm. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax qlh@bamforth.com -----Original Message ----- From: Janet Russell [mailto:Janet.Russeil@ncmail.net) Sent: Monday, September 29, 2008 4:30 PM To: Gregory L. Herron Subject: Re: CALA and Trainer review meeting Greg: We have 9:CO3 10:00 or 11:00 available on the 9th of October. which do you want? Janet Gregory L. Herron wrote: I of 2 9/30/2008 3:05 PM Rr: CALA and 'l`rainer review meeting Subject: RE: CALA and Trainer review meeting From: "Gregory L. Herron" <glh@bamforth.com> Date: `Cue, 30 Sep 2008 07:33:50 -0400 To: "Janet Russell" <Janet.Russel I@ncmai1,net> Thanks Janet. Yes we would like to meet with Erosion Control also. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7019 757-625-7434 fax qlh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Monday, September 29, 2008 5:40 PM To: Gregory L. Herron; Towler GS05 David W Subject: Re: CALA and Trainer review meeting Greg, you are confirmed to meet with Malcolm Boney to submit your stormwater application package for 2 projects (CALA & Fire Trainer) on October 9th at 10:C0 AM. The meeting will be here in the regional office. David Towler with the Base is being copied on this email. Do you also want to meet with Erosion Control that same day? If so, I will proceed with arranging that. Let me know. Some items on the submittal requirements may be of help. It is attached. Janet Gregory L. Herron wrote: I We would lake 10:00am on the 9th, please confirm. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax qlh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net Sent: Monday, September 29, 2008 4:30 PM To: Gregory L. Herron Subject: Re: CALA and Trainer review meeting Greg: We have 9:00, 10:00 or 11:00 available on the 9th of October do you want? Janet Gregory L. Herron wrote: I Janet, Which 1 of 2 9/30/2008 l :25 PM about:blank Greg, if you'll send me the Express Request and mark scoping only DWQ (I'm guessing), we will try and accommodate you on the 9th of October (note - not the 1 Oth) for another meeting. Also, I check with Rhonda Hall, Express Erosion Control. Rhonda can meet with you on the 9th, but will not be able to accept your package that day because she has too many coming in that week. She will give you a submittal date to mail in your erosion control submittal package when you come on the 9th. Is that O.K.? Janet Gregory L. Herron wrote: Janet, We would also like to schedule a scoping meeting for another project at Camp Lejeune for the same day, October 10th. Is this possible? Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Monday, September 29, 2008 5:40 PM To: Gregory I,. Herron; Towler GS05 David W Subject: Re: CALA and Trainer review meeting Greg, you are confirmed to meet with Malcolm Boney to submit your stormwater application package for 2 projects (CALA & Fire Trainer) on October 9th at 10:00 AM. The meeting will be here in the regional office. David Towler with the Base is being copied on this email. Do you also want to meet with Erosion Control that same day? If so, I will proceed with arranging that. Let me know. Some items on the submittal requirements may be of help. It is attached. Janet Gregory L. Herron wrote: We would like 10:00am on the 9th, please confirm. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From; Janet Russell [mailto:Janet.Russell@ncmail.net] I of 2 9/30/2008 5:59 PM RE: CA1,A iind Trainer review meeting Subject: RE: CALA and "Trainer review meeting From: "Gregory L. Herron" <glh a bamforth.com> Date: Wed, I Oct 2008 07:38:02 -0400 To: "Janet Russell" <Janet.Russell@ncmail.net> Yes, That will be OK. I will forward the Express Request for the scoping meeting today. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627--7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net Sent: Tuesday, September 30, 2008 6:00 PM To: Gregory L. Herron _ Subject: Re: CALA and Trainer review meeting Greg, if you'll send me the Express Request and mark *scoping only DWQ* (I'm guessing), we will try and accommodate you on the 9th of October (note - _not the 10th) _for another meeting. Also, I checked with Rhonda Hall, Express Erosion Control. Rhonda can meet with you on the 9th, but will -not be able to accept your package that day because she has too many coming in that week. She will give you a submittal date to mail in your erosion control submittal package when you come on the 9th. Is that O.K.? Janet Gregory L. Herron wrote: Janet, We would also like to schedule a scoping meeting for another project at Camp Lejeune for the same day, October 10th. Is this possible? Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Monday, September 29, 2008 5:40 PM To: Gregory L. Herron; Towler GS05 David W Subject: Re: CALA and Trainer review meeting Greg, you are confirmed to meet with Malcolm Boney to submit your stormwater application package for 2 projects (CALA & Fire Trainer) on 1 of 3 10/1/2008 8:55 AM CALA and Fire Trainer: Interim Facilities Marine Corps Air Station Camp Lejeune, New River, North Carolina Stormwater Management Stormwater Narrative This project is located within the vicinity of existing runway at the Marine Corps Air Station, New River, NC. The work includes expansion of the concrete parking apron; removal and relocation of taxiway lights; and incidental related work. Included in the site work are grading, storinwater management and lighting. The total drainage area is 3.69 acres. The receiving stream for this project is Southwest Creek in the White Oak Basin, Stream Class C. Site Conditions The CA LA site is 3.69 acres and is located along the north side of the runway perimeter road at the south end of the runway that is oriented from the northeast to the southwest. The drainage area has 99% impervious cover for a total of 3.67 acres. The project includes an addition to the existing runway with 2.24 acres of new and proposed impervious area. The west portion of the proposed pavement expansion area has elevations approximately 4 feet to 1 foot below the adjacent finish grade elevations of the existing drainage concrete pavements. Additionally, the western portion of the site contains an existing ditch, which is within the limits of the proposed retaining wall. The width of the ditch ranges from 2 to 4 feet and 4 to 5 feet. The proposed BMP is a sand filter that drains into a dry detention basin designed according to the North Carolina Division of Water Quality, Stormwater Best Management Practices Manual, July 2007. The entire CALA site, including both new pavement and existing pavement, drains to the BMP. The new BMP will handle both the quality and quantity volumes. A storm piping system will be constructed along the new pavement to direct the stormwater to the new BMP and also provide a bypass system for the filter into the pond. Energy dissipaters will be installed in the outlet structure and a level spreader will be provided for the discharged water. The basin is located to the southwest of the site. Area that bypasses the BMP drains to an existing ditch. 7RECF BTVED OCT 0 9 2008 Y: our Naval Facilities Engineering Command NAVFAC MID -ATLANTIC NAVFAC work Order Number: 791876 Appropriation: MCON CALA & Fire Trainer: Interim Facilities At: the Marine Corps Air Station, New River Jacksonville, North Carolina (P703) PREPARED BY: OCT 0 2008 BY:�5a_ C. Allan Bamforth, Jr.. Engineer -Surveyor, Ltd. 2207 Hampton Blvd. Norfolk, Virginia WE Contract N40085-06-D-8007) SPECIFICATION PREPARED BY: Civil: Anna Lee Bamforth, P.E., L.S. Electrical: Steve Robey Structural: Nick Sours Date: August 25, 2008 SPECIFICATION APPROVED BY: For Commander, NAVFAC MID -ATLANTIC: Date: CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 SECTION 01 57 13.00 22 EROSION AND SEDIMENT CONTROL 07/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D 3787 (2001) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D 4533 (2004) Trapezoid Tearing Strength of Geotextiles ASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of Geotextiles NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (1993; revised 2006) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Construction Sequence Schedule; G SD-03 Product Data Sediment/Silt Fence Dust Suppressors Filter Fabric 1.4 CONSTRUCTION SEQUENCE SCHEDULE Submit a Contractor furnished construction work sequence schedule, a minimum of 10 days prior to start of construction. The work schedule shall SECTION 01 57 13.00 22 Page 1 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. 1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. PART 2 PRODUCTS 2.1 SEDIMENT/SILT FENCE 2.1.1 State Standard Sediment/Silt Fence NCSCC ESCM Standard 6.62, sediment/silt fence (maximum height of 18 inches). 2.2 INLET PROTECTION 2.2.1 State Standard Inlet Protection NCSCC ESCM Standard 6.51, using hardware cloth and gravel. 2.2.2 state Standard Culvert Inlet Protection NCSCC ESCM Standard 6.55. 2.3 CONSTRUCTION ENTRANCE 2.3.1 State Standard Construction Entrance 2.3.1.1 Aggregate NCSCC ESCM, Standard 6.06. 2.3.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: a. Minimum grab tensile strength (TF 25 41/ASTM D 4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D 3787) 75 psi in the weakest direction C. Apparent Opening Size 40-80 (U.S. Sieve Size) SECTION 01 57 13.OD 22 Page 2 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533) 50 pounds 2.4 DUST SUPPRESSORS Calcium chloride, or other standard manufacturer's spray on adhesives designed for dust suppression. 2.5 TEMPORARY SEEDING 2.5.1 State Standard Temporary Seeding Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch. PART 3 EXECUTION 3.1 CONSTRUCTION SEQUENCE SCHEDULE Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major site grading takes place. Provide additional sediment/silt fences as grading progresses. Provide inlet and outlet protection around existing drainage structures, and inlet and outlet protection at the ends of new drainage systems.. Stabilize graded and disturbed areas immediately after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding." Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. 3.2 SEDIMENT/SILT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees and 20 degrees towards the potential silt load area. Sediment/silt fence height shall be approximately 16 inches. Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. Splice filter fabric at support pole using a 6 inch overlap and securely seal. 3.3 INLET PROTECTION Provide stakes evenly spaced around the perimeter of the inlet, a maximum of 3 feet apart. Stakes shall be driven immediately adjacent to the drainage structure, a minimum of 18 inches into the ground. The fabric shall be securely fastened to the outside of the stakes, with the bottom of the fabric placed into a trench and backfilled. 3.4 CONSTRUCTION ENTRANCE Provide as indicated a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum SECTION O1 57 13.00 22 Page 3 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC of 12 inches. 3.5 DUST SUPPRESSORS 791876 Immediately dampen the surface before 'calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square yard of surface for pellets for the initial application. For subsequent applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required to control dust emissions. 3.6 TEMPORARY SEEDING 3.6.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. When it is impossible or impractical to bring an area to finish grade so that permanent seeding operations can be performed without serious disturbance from additional grading. c. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding is more than 30 days away. d. When an immediate cover is required to minimize erosion, or when erosion has occurred. e. Provide on erosion control devices constructed using soil materials. 3.6.2 Seeding Requirements 3.6.2.1 State Standard Seeding Requirements Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch in an air dried condition, and secure mulch in place. 3.6.2.2 Permanent Seeding Temporary seeding shall be removed, and permanent seeding shall be provided during the specified planting season. Provide seed, lime, fertilizer and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. 3.7 MAINTENANCE AND INSPECTION Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits after each rainfall or when SECTION 01 57 13.00 22 Page 4 GALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 sediment reaches approximately one-half the barrier height. Immediately repair damaged erosion control devices and damaged areas around and underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each inspection. Modifications shall be approved by the Contracting officer. 3.8 CLEAN UP At the completion of the job, or when directed or approved by the Contracting officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting Officer. -- End of Section -- SECTION 01 57 13.00 22 Page 5 CALA E FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 SECTION 31 23 00.00 20 EXCAVATION AND FILL 04/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION(AWWA) AWWA C600 (2005) Installation of Ductile -Iron Water Mains and Their Appurtenances ASTM INTERNATIONAL (ASTM) ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates ASTM D 1140 (2000) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve ASTM D 1556 (2000) Density and Unit Weight of Soil in Place by the Sand -Cone Method ASTM D 1557 (2002e1) standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D 2321 (2005) Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D 2487 (2000) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D 2922 (2005) Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017 (2005) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) ASTM D 3786 (2001) Hydraulic Bursting Strength of Textile Fabrics -Diaphragm Bursting Strength Tester Method ASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 4355 (2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon -Arc Type Apparatus SECTION 31 23 00.00 20. Page 1 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 ASTM D 4491 (1999a; R 2004e1) Water Permeability of Geotextiles by Permittivity ASTM D 4533 (2004) Trapezoid Tearing Strength of Geotextiles ASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of Geotextiles ASTM D 4751 (2004) Determining Apparent Opening Size of a Geotextile ASTM D 4759 (2002) Determining the Specification Conformance of Geosynthetics ASTM D 4833 (2000el) Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products ASTM D 698 (1978; R2003) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)) U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2003) Safety -- Safety and Health Requirements U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) EPA 530/F-93/004 (1993; Rev O; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, I$, IC, and II) (SW-846) EPA 600/4-79/020 (1983) Methods for Chemical Analysis of water and wastes NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) NCDOT RS (2006) Standard Specifications for Roads and Structures 1.2 DEFINITIONS 1.2.1 Degree of Compaction Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 698, for general soil types, abbreviated as percent laboratory maximum density. 1.2.2 Hard Materials Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. SECTION 31 23 00.00 20 Page 2 GALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 1.2.3 Rock 791876 Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. 1.3 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G".designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Dewatering work plan Submit 15 days prior to starting work. SD-06 Test Reports Borrow Site Testing; G Fill and backfill test Density tests Copies, of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. d. Material character is indicated by the boring logs. e. Hard materials will not be encountered . f. Borrow material in the quantities required is not available on SECTION 31 23 OO.OD 20 Page 3 CALA & FIRE 'TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC Government property. g. Blasting will not be permitted manner. 1.6 REQUIREMENTS FOR OFF SITE SOIL 791876 Remove material in an approved Soils brought in from off site for use as backfill shall be tested for TPH, BTEX and full TCLP including ignitability, corrosivity and reactivity. Backfill shall contain less than 50 parts per million (ppm) of total petroleum hydrocarbons (TPH) and less than 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall not fail the TCPL test. TPH concentrations shall be determined by using EPA 600/4-79/020 Method 418.1. BTEX concentrations shall be determined by using EPA 530/F-93/004 Method 5030/8020. TCLP shall be performed in accordance with EPA 530/F-93/004 Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Material shall not be brought on site until tests have been approved by the Contracting Officer. 1.7 QUALITY ASSURANCE 1.7.1 Dewatering Work Plan Submit procedures for accomplishing dewatering work. 1.7.2 Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Excavation made with power -driven equipment is not permitted within two feet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill.is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer. 1.8 Regulatory Requirements Provide work and materials in accordance with applicable requirements of NCDOT RS. Divisions and Sections mentioned herein refer to those specifications. Paragraphs in NCDOT RS entitled "Method of Measurement" shall not apply. 1.9 Modification of References Where term "Engineer" is used in NCDOT RS it shall be construed to mean Contracting Officer. Where term "state" is used, it shall mean "Federal Government". SECTION 31 23 00.00 20 Page 4 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791676 PART 2 PRODUCTS 2.1 SOIL MATERIALS 2.1.1 Satisfactory Materials Any materials classified by ASTM D 2487 as GW, GP, GM, GP -GM, GW-GM, GC, GP -GC, GM -GC, SW, SP, SM, SP-SM, free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location. 2.1.2 Unsatisfactory Materials Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 3inches. The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Common Fill Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. 2.1.4 Backfill and Fill Material ASTM D 2487, classification GW, GP, SW, SP, SM, with a maximum ASTM D 4318 liquid limit less than 20; maximum ASTM D 4318 plastic limit less than 6; a maximum of 15 percent by weight passing ASTM D 1140, No. 200 sieve; and free of rubble, organics, clay, debris and other unsuitable material. 2.1.5 Topsoil Natural, friable soil representative of productive, well -drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7. 2.2 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 1557 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D 2321 materials as follows: a. Class I: Angular, 0.25 to 1.5-inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487. SECTION 31 23 00.00 20 Page 5 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 2.3 GRAVEL PAVEMENT 791876 NCDOT RS, materials for construction of gravel shall be in accordance with Sections 1005 and 1010 for aggregate base course, standard size No. ABC. 2.4 SORROW Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property. 2.5 GEOTEXTILE FABRIC Provide a pervious sheet of polyester, nylon, glass or polypropylene , ultraviolet resistant filaments woven, spun bonded, fused, or otherwise manufactured into a nonraveling fabric with uniform thickness and strength. Fabric shall have the following manufacturer certified minimum average roll properties as determined by ASTM D 4759: Class A a. Grab tensile strength (ASTM D 4632) min. 180 lbs• machine and transversed direction b. Grab elongation (ASTM D 4632) min. 15 percent machine and transverse direction C. Puncture resistance (ASTM D 4833) min. 80 lbs. d. Mullen burst strength (ASTM D 3786) min. 290 psi. e. Trapezoidal Tear (ASTM D 4533) min. 50 lbs. f. Apparent Opening Size (ASTM D 4751) U. S. Sieve 40 g. Permittivity (ASTM D 4491) 0.05 sec-1 h. Ultraviolet Degradation (ASTM D 4355) 70 percent Strength retained at 500 hours 2.6 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. color and printing shall be permanent, unaffected by moisture or soil. Warning Tape Color Codes Yellow: Electric Yellow; Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems White: Steam Systems SECTION 31 23 00.00 20 Page 6 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 2.6.1 Warning Tape 791876 Acid and alkali -resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation. 2.7 DETECTION WIRE FOR NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG. PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Shoring and Sheeting Provide shoring and sheeting where necessary. In addition to Section 25 A and B of EM 385-1-1, include provisions in the shoring and sheeting plan that will accomplish the following: a. Prevent undermining of pavements, foundations and slabs. b. Prevent slippage or movement in banks or slopes adjacent to the excavation. 3.1.2. Drainage and Dewatering Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.2.1 Drainage So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained. 3.1.2.2 Dewatering Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with SECTION 31 23 00.00 20 Page 7 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 79IB76 specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 1 foot below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. 3.1.3 Underground Utilities Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where existing underground utilities are discovered. 3.1.4 Machinery and Equipment Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged. 3.2 SURFACE PREPARATION 3.2.1 Clearing and Grubbing Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 3.2.2 Stripping Strip suitable soil for topsoil to a minimum depth of 3 inches without contamination by subsoil material from the site where excavation or grading is indicated and stockpile separately from other excavated material. Satisfactory material unsuitable for use as topsoil shall be stockpiled and used for backfilling. Locate topsoil so that the material can be used readily for the finished grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed. 3.2.3 Unsuitable Material Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils SECTION 31 23 00.00 20 Page 8 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with backfill and fill material and compact to 95 percent of ASTM D 698 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with backfill and fill material and compact to95 percent of ASTM D 698 'maximum density. Satisfactory material removed below the depths indicated, withcut.specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved cverdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer. - 3.3.1 Pipe Trenches Excavate to the dimension indicated uniform support for each section of Tamp if necessary to provide a firm to accommodate bells and joints so for the entire length. 3.3.2 Excavated Materials Grade bottom of trenches to provide pipe after pipe bedding placement. pipe bed. Recesses shall be excavated that pipe will be uniformly supported Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph "DISPOSITION OF SURPLUS MATERIAL." 3.3.3 Final Grade of Surfaces to Support Concrete Excavation to final grade shall not be made until just before concrete is to be placed. 3.4 SUBGRADE PREPARATION Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to plus or minus 2 percent of optimum moisture. Minimum subgrade density shall be as specified herein. SECTION 31 23 00.00 20 Page 9 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 3.4.1 Proof Rolling 791876 Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade, After stripping, proof roll the existing subgrade of the paved areas with six passes of a 7 to 10 ton, pneumatic -tired roller or a dump truck loaded with 6 cubic yards of soil. Operate the roller or truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer, Rutting or pumping of material shall be undercut as directed by the Contracting Officer and replaced with fill and backfill material. 3.5 SUBGRADE GEOTEXTILE FABRIC Place geotextile fabric as indicated directly on prepared subgrade free of vegetation, stumps, rocks larger than 2 inches diameter and other debris which may puncture or otherwise damage the fabric. Repair damaged fabric by placing an additional layer of fabric to cover the damaged area a minimum of 3 feet overlap in all directions. Overlap fabric at joints a minimum of 3 feet. Obtain approval of geotextile fabric installation before placing fill or backfill. Place fill or backfill on fabric in the direction of overlaps and compact as specified herein. Follow manufacturer's recommended installation procedures. 3.6 FILLING AND BACKFILLING Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. 3.6.1 Common Fill Placement Provide for general site. Use satisfactory materials. Place in 10 inch lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content. Finish to a smooth surface by blading, rolling with a smooth roller, or both. 3.6.2 Backfill and Fill Material Placement Provide for paved areas, utility trenches and under concrete slabs. Place in 10 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against the structure. 3.6.3 Backfill and Fill Material Placement Over Pipes and at Walls Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, SECTION 31 23 00.00 20 Page 10 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC wrappings, or tanks. 3.6.4 Trench Backfilling 791876 Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 10 inch lifts to top of trench and in 10 inch lifts to one foot over pipe outside structures and paved areas. Place backfill in 4 to 6 inch lifts when hand compaction is used. 3.7 Aggregate Base Course and Gravel Placement Begin spreading material at the point nearest the source of supply. Permit traffic and hauling over the aggregate. Fill ruts formed by traffic and reroll. After aggregate placement, continue machining and rolling until surface is smooth, compacted, well bonded, and true to the designed cross section. Compact' to 100 percent ASTM D 1557 maximum dry density. Maintain the aggregate smooth and true to grade and cross section until concrete or utility structure placement. 3.8 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. 3.9 BURIED WARNING AND IDENTIFICATION TAPE Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade. 3.10 BURIED DETECTION WIRE Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe. 3.11 COMPACTION Determine in -place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. 3.11.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 foot line of the paved area or structure to 85 percent of ASTM D 1557. 3.11.2 Structures and Concrete Slabs Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill material to 95 percent of ASTM D 1557. SECTION 31 23 00.00 20 Page 11 GALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 3.11.3 Adjacent Area 791876 Compact areas within 5 feet of structures to 90 percent of ASTM D 1557. 3.11.4 Paved Areas Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill materials to 95 percent of ASTM D 1557. 3.11.5 Airfield Pavements Compact top 24 inches below finished pavement or top 12 inches of subgrades, whichever is greater, to 100 percent of ASTM D 1557; compact fill and backfill material to 100 percent of ASTM D 1557, 3.12 FINISH OPERATIONS 3.12.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.12.2 Topsoil and Seed Provide as specified in Section 01 57 13.00 22 EROSION AND SEDIMENT CONTROL. 3.12.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes. 3.13 DISPOSITION OF SURPLUS MATERIAL Remove from Government property surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber. 3.14 FIELD QUALITY CONTROL 3.14.1 Sampling Take the number and size of samples required to perform the following tests. 3.14.2 Testing Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3,14.2.1 Fill and Backfill Material Testing Test fill and backfill material in accordance with ASTM C 126 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 4318 for liquid limit and for plastic limit; ASTM D 698 or ASTM D 1557 for moisture density relations, as applicable. SECTION 31 23 00.00 20 Page 12 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 3.14.2.2 Density Tests 791876 Test density in accordance with ASTM D 1556, or ASTM D 2922 and ASTM D 3017. When ASTM D 2922 and ASTM D 3017 density tests are used, verify density test results by performing an ASTM D I556 density test at a location already ASTM D 2922 and ASTM D 3017 tested as specified herein. Perform an ASTM D 1556 density test at the start of the job, and for every 10 ASTM D 2922 and ASTM D 3017 density tests thereafter. Test each lift at randomly selected locations every 2000 square feet of existing grade in fills for structures and concrete slabs, and every 2500square feet for other fill areas and every 2000 Square feet of subgrade in cut. Include density test results in daily report. a. Bedding and backfill in trenches: One test per 5D linear feet in each lift. -- End of Section -- SECTION 31 23 00.00 20 Page 13 GALA L FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 SECTION 33 40 00 STORM DRAINAGE UTILITIES 01/08 PART I GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN WELDING SOCIETY (AWS) AWS D1.1/D1.1M (2006; Errata 2006) Structural welding Code - Steel ASTM INTERNATIONAL (ASTM) ASTM A 48/A 4BM (2003) Standard Specification for Gray Iron Castings ASTM C 231 (2004) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method ASTM C 443 (2005a) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets ASTM C 76 (2007) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C 923 (2007) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals ASTM D 1751 (2004) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) ASTM D 1752 (2004a) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion U.S. GENERAL SERVICES ADMINISTRATION (GSA) FS A-A-60005 (Basic) Frames.Covers, Gratings, Steps, Sump and Catch Basin, Manhole SECTION 33 40 00 Page 1 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 1.2 SUBMITTALS 791876 Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Placing Pipe Printed copies of the manufacturer's recommendations for installation procedures of the material being placed, prior to installation. SD-07 Certificates Hydrostatic Test on Watertight Joints Frames and Covers for Airfield Drainage Structures Certification on the ability of frame and cover or gratings to carry the imposed live load. 1.3 DELIVERY, STORAGE, AND HANDLING 1.3.1 Delivery and Storage Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material, The Contractor shall have a copy of the manufacturer's instructions available at the construction site at all times and shall follow these instructions unless directed otherwise by the Contracting officer. 1.3.2 Handling Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged. PART 2 PRODUCTS 2.1 PIPE FOR STORM DRAINS Pipe for culverts and storm drains shall be of the sizes indicated and shall conform to the requirements specified. 2.1.1 Concrete Pipe Concrete pipe shall conform to ASTM C 76, Class V. 2.2 MISCELLANEOUS MATERIALS 2.2.1 Concrete Unless otherwise specified, concrete and reinforced concrete shall conform SECTION 33 40 00 Page 2 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 to the requirements for 4000 psi concrete under Section 03 30 00 CAST -IN -PLACE CONCRETE. The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 5 to 7 percent when maximum size of coarse aggregate exceeds 1-1/2 inches. Air content shall be determined in accordance with ASTM C 231. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion -joint filler material shall conform to ASTM D 1751, or ASTM D 1752, or shall be resin -impregnated fiberboard conforming to the physical requirements of ASTM D 1752. 2.2.2 Frames and Covers for Airfield Drainage Structures Fabricate frames and covers of standard commercial grade steel welded by qualified welders in accordance with AWS D1.1/D1.1M. Covers shall be of rolled steel floor plate having an approved anti -slip surface. Steel frames and covers shall be hot dipped galvanized after fabrication. At the contractor's option, ductile iron covers and frames may be used for airfield drainage structures if designed for a minimum proof load of 100,000 pounds in lieu of the steel frames and covers. Covers shall be of the same material as the frames (i.e. ductile iron frame with ductile iron cover, galvanized steel frame with galvanized steel cover). Proof loading shall be performed in accordance with FS A-A-60005 and ASTM A 48/A 48M. Proof loads shall be physically stamped into the cover. Provide the Contracting Officer copies of previous proof load test results performed on the same frames and covers as proposed for this contract. The top of the structure shall be modified to accept the ductile iron structure in lieu of the steel structure indicated. The finished structure shall be level and non -rocking, with the top flush with the surrounding pavement. 2.2.3 Joints 2.2.3.1 Flexible Watertight Joints a. Materials: Flexible watertight joints shall be made with plastic or rubber -type gaskets for concrete pipe. The design of joints and the physical requirements for rubber -type gaskets shall conform to b. Test Requirements: Watertight joints shall be tested and shall meet test requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C 443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. Alternate types of watertight joint may be furnished, if specifically approved. 2.3 RESILIENT CONNECTORS Flexible, watertight connectors used for connecting pipe to manholes and inlets shall conform to ASTM C 923. 2.4 HYDROSTATIC TEST ON WATERTIGHT JOINTS 2.4.1 Concrete Pipe A hydrostatic test shall be made on the watertight joint types as proposed. Only one sample joint of each type needs testing; however, if the sample joint fails because of faulty design or workmanship, an additional sample SECTION 33 40 00 Page 3 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 joint may be tested. During the test period, gaskets or other jointing material shall be protected from extreme temperatures which might adversely affect the performance of such materials. Performance requirements for joints in reinforced concrete pipe shall conform to ASTIR! C 443. PART 3 EXECUTION 3.1 EXCAVATION FOR STORM DRAINS AND DRAINAGE STRUCTURES Excavation of trenches, and for appurtenances and backfilling for storm drains, shall be in accordance with the applicable portions of Section 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below. 3.1.1 Trenching The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus the indicated dimensions inches to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be Placed within the trench width as specified. Contractor shall not overexcavate. adhere trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government. 3.1.2 Removal of Unstable Material Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government. 3.2 BEDDING The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. 3.2.1 Concrete Pipe Requirements When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in a soil foundation accurately shaped and rounded to conform to the lowest one-fourth of the outside portion of circular pipe or to the lower curved portion of pipe arch for the entire length of the pipe or pipe arch. When necessary, the bedding shall be tamped. Bell holes and depressions for joints shall be not more than the length, depth, and width required for properly making the particular type of joint. 3.3 PLACING PIPE Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Pipe shall not be laid in water, and SECTION 33 40 00 Page 4 CALA & FIRE TRAINER: INTERIM FACILITIES MCAS NEW RIVER, NC 791876 pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. 3.3.1 Concrete Pipe Laying shall proceed upgrade with tongue ends of tongue -and -groove pipe pointing in the direction of the flow. 3.4 JOINTING 3.4.1 Concrete Pipe 3.4.1.1 Flexible Watertight Joints Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry: Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade. 3.5 DRAINAGE STRUCTURES 3.5.1 Manholes and Inlets Construction shall be of reinforced concrete, complete with frames and covers or gratings . Pipe connections to concrete manholes and inlets shall be made with flexible, watertight connectors. 3.5.2 Walls and Headwalls Construction shall be as indicated. -- End of section -- SECTION 33 40 00 Page 5 4 ANNA LEE BAMFORTH, P. E., L.S. C. ALLAN BAMFORTH, JR., P.E., L.S. LINDA Z. SAMFORTH RICHAHD E. GARRIOTT, P. E. RICHARD W. CLARK, L.S. DAVID W. CAMPBELL C. ALLAN BAMFORTH, JR. ENGINEER - SURVEYOR, LTD. EST. 1977 October 27, 2008 Mr. Malcolm Boney North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28540 Re: Stormwater Permit Application CALA and Fire Trainer Interim Facilities (07.092) Dear Mr. Boney: Please find attached two (2) copies of revised plans, and one (1) copy of the revised Level Spreader Supplement for the Fire Trainer. Our responses to the comments dated October 22, 2008 follow: 1. For low density projects with runoff transported primarily by vegetated conveyances shall not include a discrete stormwater collection system. A stormwater collection system, as defined in section .1002 of our administrative code, is any conduit, pipe, channel, curb, or gutter for the primary purpose of transporting (not treating) runoff. A stormwater collection system does not include vegetated swales, swales stabilized with armoring or alternative methods where natural topography or other physical constraints prevent the use of vegetated swales, curb outlet systems, or pipes used to carry drainage underneath, built upon surfaces that are associated with development controlled by the provision of rule .1003(d)(1). Please include a level spreader at the discharge of the under drain with a 50 ft. vegetative filter to diffuse flow or remove the perforated pipe embedded within the drain. Perforated pipes Have been revised to terminate in swale flowing to existing level spreader and 50 ft. vegetative filler. Revised plans and Level Spreader Supplement attached. LOCT 2 8 7008 BY; 2207 HAMPTON BOULEVARD, NORFOLK, VIRGINIA 23517 1 P.O. Box 6377, NORFOLK, VIRGINIA 2350E TEL: 17571 627-7079 1 FAX: (757) 625-7434 1 E-MAIL: ALB@BAMFORTH.COM October 27, 2008 Mr. Malcolm Boney, NCDWQ RE: CALA and Fire Trainer Interim Facilities (07.092) Page 2 2. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Noted. If you require any additional information or have any questions, please do not hesitate to contact us. cc: Eric Carpenter, MCAS Cherry Point Sincerely, Anna Lee Bamforth, P.E., L.S. ' TN7 O C T 2 8 408 BY-.— 5 W A TF�O �O G i_ t] � October 22, 2008 Commanding General USMC Base Camp Lejeune Attention: Carl Baker Camp Lejeune 1005 Michael Rd. Camp Lejeune, NC 28547 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: Request for Additional Information Stormwater Project No. SW8 080945 MCAS Marine Corps Fire Trainer New River Onslow County Dear Mr. Baker: Coleen 14. Sullins Director Division of Water Quality The Wilmington Regional Office received a State Stormwater Management Permit Application for MCAS Marine Corps Fire Trainer New River on October 9, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: For low density projects with stormwater runoff transported primarily by vegetated conveyances shall not include a discrete stormwater collection system. A stormwater collection system, as defined in section .1002 of our administrative code, is any conduit, pipe, channel, curb, or gutter for the primary purpose of transporting (not treating) runoff. A stormwater collection system does not include vegetated swales, swales stabilized with armoring or alternative methods where natural topography or other physical constraints prevent the use of vegetated swales, curb outlets systems, or pipes used to carry drainage underneath built upon surfaces that are associated with development controlled by the provision of rule .1003(d)(1). Please include a level spreader at the discharge of the under drain with a 50 ft vegetative filter to diffuse flow or remove the perforated pipe embedded within the under drain. 2. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 29, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 30 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under -an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. NonchCarolina Naiura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service WiLnington Regional Office Internet: www.nctyaterquatity.ore Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at malcolm.boney@ncmail.net. Sincerely, Malcolm Boney . Environmental Engineer ENBImb: S:1WQSISTORMWATERIADDINFO120081081003 CC: C. Allan Bamforth, P.E., L.S. Malcolm Boney, NCDENR Wilmington=Regional Office j ot0F wArA,9QG October 23, 2008 Commanding General USMC Base Camp Lejeune Attention: Carl Baker Camp Lejeune 1005 Michael Rd. Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 080945 MCAS Marine Corps CALA New River Onslow County Dear Mr. Baker: Michael P. Lasley, Governor William G. Ross Jr., Secretary North Carol ina Department of Environment and Natural RCSOarces Coleco H. Sullins Director Division or Water Quality The Wilmington Regional Office received a State Stormwater Management Permit Application for MCAS Marine Corps CALA New River on October 9, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. High Density developments with a control system must be designed to store, control, and treat the stormwater runoff from all surfaces generated by one and one half inch of rainfall. Please calculate the required storage, control and treatment for a one and one half inch rainstorm event. Please correct the 1-inch rain event on the supplement to a 1.5-inch rain event. 3. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 29, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 30 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. NQ`" hCarolina Arrfura!!Y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 29405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.newaterqualit ,orb Fax (910) 350-2004 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer — M% Recycled110% Post Consumer Paper Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at malcolm.boney@ncmail.net. Sincerely, 4 JJ0111 A ookar Malcolm Boney Environmental Engineer ENBImb: S:IWQSISTORMWATERIADDINFO120081080945.oct08 CC: C. Allan Bamforth, P.E. Malcolm Boney, NCDENR Wilmington -Regional Office ' - r STORAMATER CALCULATIONS P-703 GROW THE FORCE INTERIM FACILITIES MARINE CORPS AIR STATION, NEW RIVER, NORTH CAROLINA A/E Contract No. N40085-06-D-8007 Work Order No. 791876 C. ALLAN BAMPORTH, JR., ENGINEER —SURVEYOR, LTD. NORFOLK, vwiv to April 2008 R�F��� O C T 0 9 2008 BY: Interim Facilities, CALA Site, Camp Lejeune 07108 Trench Calculations ATM C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Basis of Desi;yn: The CALA project includes an addition to the existing runway. On this site, a portion of the new pavement along with existing pavement drains to the new BMP. The amount of existing impervious area draining to the BMP is greater than the amount of new impervious area bypassing the BMP. The bypassed area drains to an existing ditch. The BMP is designed for both quantity and quality volumes. Quality volume was determined using the runoff volume from the first inch and a half of rain, to drain in less than 40 hours. The quantity design is based on the rational method using a ten year stone and Wilmington 1-D-F curve. Calculations have also been performed using the 1-year, 24- hour storm, Soil Group B. Time of concentration was found using Seelye's Chart for overland flow, Kirpich Chart for overland flow and Mannings Equation for pipe flow with n = 0.013. The BMP design is a sand filter with sediment basin that drains into a dry detention area and was sized with the Haestad Methods "PondPack" software. It is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007". Predevelopnxent: Total Area — 3.10 acres For purposes of calculations, treat entire area as grass. Time of Concentration Seelye's Chart for Overland Flow: L = 200 ft Slope = (20.0 — 18.0)/200 = 2% Kirpich Chart for Overland Flow: L = 220 ft Height = (18.0 — 15.0) = 3' Total T,, = 20 minutes T, = 15 minutes T,�=2.5x2=5minutes Rainfall Intensity - Wilmington I-D-F Curve, 10-Year Stone, 20 minutes Allowable Discharge — Use all Grass Q (I0-Year)= CAI = (0.30 x 3.10) x 4.6 = 4.28 efs Runoff Volume f1-vr. 24-hr storm q = 1.26 cfs Page 1 I = 4.6 in/hr Interim Facilities, CALA Site, Camp Lejeune 'french Calculations C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Postdevelo ment: Area — 3.69 acres Impervious — 3.67 acres C = 0.95 Grass — 0.02 acres C = 0.30 Time of Concentration Seelye's Chart for Overland Flow: L = 200 ft Slope = (20.6 — 19.5)/200 = 0.55% C = 0.95 Kirpich Chart for Overland Flow: L = 480 ft Height = (19.5 — 14) = 5.5' T, = 6 minutes Mannings Equation for Pipe Flow: L = 190 Velocity = 2.5 ft/see T, = 1 minutes Total T, = 15 minutes Temporary Water Quality Volume Required T, = 8 minutes 07108 ATM Use "Simple Method" by Schueler to Determine Runoff Volume for One and a Half -Inch Storm Over Site: Site Area = 160,895 sf Impervious = 159,895 sf Runoff Coefficient = Rv = 0.05 + 0.009(1) I = Percent Impervious = 159895/160895 = 99% Rv = 0.05 + 0.009(99) = 0.94 in/in Volume = (Design Rainfall) x (Rv) x (Drainage Area) Volume = (1.5 in rainfall)/(12 in) x (0.94 in/in) x (3.69 acres) = 0.43 ac-ft Page 2 Interim Facilities, CALA Site, Camp Lejeune Trench Calculations C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Minimum Sand Filter Bed Surface Area A= [WQV x df]/[k x t x (ha + dO] WQV = water quality volume, df = filter depth, k = sand permeability, t = draining time, ha = average head A = [18886 x 1.5]/[3.5 x 1.66 x (1 + 1.5)] A = 1950 sq. ft. Runoff Volume (1-yr, 24-hr storm) q = 9.48 cfs Page 3 07/08 ATM Interim Facilities, CALA Site, Camp Lejeune 07/0S Trench Calculations ATM C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Summary of Results: Required Area for Sand Filter = 1950 sq. ft. Area Provided for Sand Filter = 2552 sq. ft. Allowable Outflow (I0-YearStorm) = 4.28 cfs Outlet Structure — 10" Circular Orifice at Elevation 7.00 Peak Outflow for 10-Year Storm = 4.27 cfs at Elevation 10.07 feet Page 4 Type.... Mod. Rational Craph Page 12-01 flame.... SUBAREA 10 Tag: c110 Event: 10 yr File.... K:\.7ob-Files\2007\07092\ealra�CAI,A REV 072908.PPW Storm... e, b, d Tag; c110 MODIFIED RATIONAL METHOn ---- Graahical Summary for Maximum Required Storage ---- Method I Q � CiA * Units Conversion; where Conversion = 43560 / (12 k 3600) it tyr**t#*##k.l****w**t*#*k*vFt***1rN*t#####t+R ttt**•k**taY-1 k* A4r*t*t*iii*Ir atw*k * RETURN FREQUENCY: 10 yr I Allowable Outflow: 4.28 cfs * 'C' Adjustment: 1.000 I Required Storage: 22385 au.ft: `------------------'--------------------------------------------------* * Peak Inflow: 8.37 cfs * .HYG File: C110 Q I Td = 65.00 min Return Freq: 10 yr /------- Approx. Duration for Max. Storage I ------/ C adj.factor:1.0o0 1 I I Tc= 15.00 min 1 I I I = 5.2703 in/hr Area = 3.900 acres I Q = .19.69 cfs Weighted C = .950 Adjusted C = .950 Required Storage I -- 22385 cu.ft E Td= 65.00 min I I I = 2.2414 in/hr x x x x x x xlx x x x x x x x x x x Q= 8.37 cfs I x x I o Q = 4.28 cfs I x o Ix (A1low.Outflow) I x 0 I x o NOT TO SCALE I x Ir. o--__�_------ I l0 1 x -_--_..---------------------------- ---- 72.33 min T S/N: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 9.12 AM Date: 7/3Q/2008 Type.... Vol: Elev-Area page 9.01 Name.... POND 10 rile.... K:\Job-Files\2007\07092 \calcs\CALA REV 072908.PPW Elevation Pl.animeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) ------------------------------------------------------------------------ 7.00 ----- 5400 0 0 0 11.65 ----- 9256 21726 33675 33675 11.70 ----- 17480 39456 658 34333 13.00 ----- 19475 55406 24009 58342 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq-rt-(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the .increment Areal,Area2 = Areas computed for EL1, EL2, respectively volume = Incremental volume between ELl and EL2 SIN: 321201907096 C. Allan 3amforth, Inc. PondPaCk Vcr. 9.0046 Time: 9:11 AM Date: 7/30/2008 Type .... Qutlet Input Data Page 10.01 Name.... Outlet 1 File..... K:\Job-b'ile,s\2007\0'1092\talcs\CALA'REV 072908.PPW 0 REQUESTED POND WS ELEVATIONS: Min. Elev.= 7.00 ft Increment = .10 ft Max. Elev.= 13.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only-(UpStream to DnStrcatn) <--- Reverse Flow Only (DnStream to UpStream) < ---> Forward and Reverse Both Allowed Structure No. Outfall ' El, ft E2, ft ----------------- ----------- ------------------ orifice-Circulat ---> TW 7.OD0 13.000 TW SETUP, bS Channel S/N; 321201907096 C. A1lan Bamforth, Inc. PondPack Ver. 9.0046 Time: 9:11 Am Date: 7/30/2008 Type.... Outlet Input Data Name.... Outlet 1. File.... K:\Job-Files\2007\07092\calcs\CALA REV 07290a.PPW Page 10.02 OUTLET STRUCTURE INPUT DATA Structure ID = St.xucture Type Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 7.00 ft Diameter = .8330 ft Orifice Coeff. - .600 Structure ID = TW Structure Type - TW SETUP, DS Channel ------------------------------------- FREE OUTFALL CONDITIONS SPECIFIED CONVLRGtHCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance .01 ft Min. HW tolerance = .01 ft Max. EW tolerance = .01 ft Min. Q tolerance .10 Cfs Max. Q tolerance - .10 cfs SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 9:11 AM Date: 7/30/2008 Type.... Pond £-V-Q Table Page 11.01 Name,.., POND 10 File.... K:\Job-Fi.les\2007\07092\talcs\CALA REV 072908.PPW LEVEL POOL ROUTING DATA HYG Aix = K:\Job--Files\2007\07092\ta1c5\ Inflow HYG file = NONE STORED - POND 10 IN C110 Outflow ICYG file = NONE STORED - POND 10 OUT c110 Pond Node Data = POND 1.0 Pond Volume Data = POND 10 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS Starting WS Elev 7.00 Et starting volume - 0 cu.ft Starting Outflow _ .00 Cts Starting Infiltr. _ .00 cfs Starting 'fatal Qout= .00 cfs Time Increment 1.00 min Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs cu.ft sq.ft cfs cfs cis ------------------------------------------------------------------------------ 7.00 .00 0 5400 .00 .00 .00 7.10 .03 544 5472 .00 .03 18.15 7.20 12 1094 5545 .00 .12 36.60 7.30 .26 1653 5618 .00 .26 55.35 7.40 .45 2218 5691 .00 .45 74.38 7.50 .68 2791 5765 .00 .68 93.70 7.60 .94 3371 5840 .00 .94 113.31 7.70 1-22 3959 5914 .00 1.22 i. 3.18 7.80 1.53 4554 5990 .00 1.53 153.33 7.90 1.52 5157 6066 .00 1.82 173.71 8.00 2.00 5767 6142 .00 2.00 194.24 8.10 2.17 6385 6219 .00 2.17 215.01 8.20 2.32 7011 6296 .00 2.32 236.02 8.30 2.47 7644 6374 p0 2.47 257.28 8.40 2.60 8286 6452 .00 2.60 278.79 8.50 2.73 8935 6531 .00 2.73 300.56 8.60 2.85 9592 6610 .00 2.85 322,58 8.70 2.97 10257 6690 .00 2'.97 344.87 8.80 3.09 16930 6770 .00 3.09 367.42 8.90 3.19 11611 6851 .00 3.19 390.23 SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 9:11 AM Date; 7/30/2008 Type.... Pond E-V-Q Table Page 11:02 Name.... POND 10 File-. K:\Job-Fi.l.es\2007\07092\f-dlcS\GALA REV 072908.PPw LEVEL POOL ROOTING DATA HYG Dir = K:\Job-Files\2007\07092\calcs\ InflOW HYG file = NONE STORED - POND 10 IN C110 Outflow HYG file = NONE STORED - POND 10 OUT C110 Pond Node Data - POND 10 Pond Volume Data = POND 10 Pond Outlet Data = Outlet 1 No infiltration t INITIAL CONDITIONS Starting wS Elev 7.00 ft starting Volume 0 cu.ft Starting outflow = .00 cfs Starting Infiltr. µ .00 cfs Starting Total Qout= .00 cts Time Increment a 1.00 min Elevation Outflow Storage Area Infilt. Q Total 2S/t + O . ft cfs cu.ft sq•ft cfs •cfs cfs ------------------------------------------------------------------------------ 9.00 3.30 1230C 6932 .00 3.30 413.30 9.10 3.4D 12597 7014 .00 3.40 436.65 9.20 3.50 13703 7096 .00 3.50 460.26 9.30 3.60 14417 7178 .00 3.60 484.15 9.40 3.69 15138 7261 .00 3.69 508.31 9.50 3.79 15869 7345 .00 3.79 532.74 9.60 3.88 16607 7429 .00 3.88 55'7.46 9.70 3.96 17355 751.3 .00 3.96 582.45 9.80 4.05 18110 7598 .00 4.05 607.72 9.90 4.13 10874 7684 .00 4.13 633.27 10.00 4.22 19647 7770 .00 4.22 659.11 10.10 4.30 20428 7856 .00 4.30 685.23 10.20 4.3B 21218 7943 .00 4.36 711.64 10.30 4.45 22617 8030 .00 4.45 738.34 10.40 4.53 22824 8118 .00 4.53 765.33 10.50 4.61 23640 8206 .00 4.61 792.61 10.60 4.68 24465 8295 .00 4.68 820.19 10.70 4.75 25299 8384 .00 4.75 848.06 10.80 4.82 26142 8474 .00 4.82 876.23 10.90 4.90 26994 8564 .00 4.90 904.70 S/N: 321.201907096 C. Allan Bamforth, Inc. POndPaCY Ver. 9.0046 Time: 9:11 AM Date: 7/30/200B Type.... Pond E-V-Q Table Name.... POND 10 File.... Kc\Job-Files\2007\07092\talcs\GALA REV 072908.PPW Page 11.03 LEVEL POOL ROUTING DATA HYG Dir = K:\Job-Files\2007\07092\talcs\ Inflow HYG file = NONE STORED - POND 10 IN C110 Outflow HYG file = NONE STORED - POND 10 OUT c110 .Pond Node Data POND 10 Pond Volume Data = POND 10 Pond Outlet Data = Outlet 1 .No Infiltration INITIAL CONDITIONS Starting WS Elev - 7.00 ft Starting Volume - 0 tuft Starting Outflow = .00 cfs Starting Infiltr. - .00 cfs Starting Total Rout= .00 cfs Time Increment = 1.00 min Elevation Outflow Storage Area I11filt. Q Total ft cfs cu.ft sq.ft cfs cfs --------------------------------------------------------------- 11- 00 4.97 27855 8655 .00 4.97 11.10 3.03 28725 8746 .00 5.03 11.20 5.10 29604 8838 .00 5.10 11.30 5.17 30493 8930 .00 5.17 11.40 5.24 31390 9022 .00 5.24 11.50 5.30 32297 9115 .00 5.30 11.60 5.36 33213 9209 .00 5.36 11.70 5.43 34333 17480 .00 5.43 11.80 5.49 36088 17630 .00 5.49 11.90 5.55 37859 17780 .00 5.55 12.00 5.62 39644 17931 .00 5.62 12.10 5.60 41445 18082 .00 5.68 12.20 5.74 43261 18235 .00 5.74 12.30 5.80 45092 18367 .00 5.8o 12.40 5.86 46938 18541 .00 5.86 12.50 5.91 48800 18695 .00 5.91 12.60 5.97 50677 18850 .00 5.97 12.70 6.03 52570 19005 .00 6.03 12.80 6.09 .54478 19161 .00 6.09 12.90 6.14 56402 19318 .00 6.14 2S/t + O cfs 933.47 962.54 991.91 1021.59 1051.58 1081.87 1112.48 1149.85 1208.43 1267.50 1327.08 1387.17 1447.75 1508.85 1570.46 1632.57 1695.21 175B.35 1B22.02 1886.21 SIN; 321201907096 C. Allan aamforth, Inc. PondPacY. Ver. 9.0046 Time: 9:11 AM Date: 7/30/2008 Type.... Pond E-V-Q Table Page 11.04 Name.... POND 10 File.... K:\Job-Files\2007\07092\calcs\GALA REV,072908.PPW LEVEL POOL ROUTING DATA HYG Dir = R:\Job-Files\2007\0'7092\Calcs\ Inflow- HYG file = NONE STORED - POND 10 IN C110 Outflow HYG file = NONE STORED - POND 10 OUT C110 Pond Node Data = POND 10 Pand Volume Data = POND 10 Pond Outlet Data = Outlet 1 No Infiltration INITIAL, CONDITIONS Starting WS Elev = 7.00 'f:t Starting Volume = 0 cu.ft Starting Outflow - .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = 1.00 min Elevation Outflow Storage Area Infilt, Q Total 2S/t + O ft cfs , cu.ft sq.ft cfs cfs cfs 13.00 6.20 58342 19475 .00 6.20 1950.92 SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046. Time: 9:11 AM Date: 7/30/2008 Type.... Pond Pouting Summary Nane.... POND 10 OUT Tag: c110 .File.... R:\Job-FileS\2007\07092\talcs\CALA REV 072908.PPW Storm... e, b, d Tag_ c110 LEVEL POOL ROUTING SUMMARY HYG Dir = K:\Job-Fi1es\2007\0'1092\talcs\ Inflow 11YG file = NONE STORFD - POND 10 IN c110 Outflow HYG file = NONE STORED - POND 10 ouT c110 Pond Node Data = POND 10 Pond Volume Data = P01M 10 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting uS Elev = .7.00 ft Starting Volume = 0 cu.ft Starting Outflow - .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = 1.00 min INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow 8.37 cfs at 15.00 min Peak Outflow = 4.27 cfs at 71.00 min ------------------------------------------------------ Peak Elevation = 10-07 ft Peak Storage = 20179 cu.ft MASS BALANCE (cu-Et) + Initial Vol = o + HYG Vol IN = 32657 - Infiltration = 0 - HYG Vol OUT = 32604 - Retained Vol = 53 UnrouLed Vol 1 cu.ft (.001t of Inflow Volume) Page 11.07 Event: 10 yr SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 T.ime: 9:12 AM Date: 7/10/2008 E IL LO O Lo O (ch O m b (r7 O (n (D a) V" D1 M 0� M 07 cl7 C7 ch 0) ch ao 00 00 00 (D0 00 u u u u u u u a u u u u m U U U U U U U U U U U V LL EU Z Oo p C C O (a C O O U') Z) c6 V N M h N h C J II II 11 It II II II It it II II II 12 _ Q Q Q¢ Q Q Q Q Q Q Q Q f- E @ d o y If1 O T �ti c0 �r c7 co h c0 cO N U r r r (V '- N C '= U3 co o E_ (n rn Ch co chr, 0 a Q' W Cl) UC70 rM- T r O N EL V M h tt7 (t) M D W Y r N r r N M! UI o f c M co N O E 0 O O 4 G b O Z V O }' M cif N M {'7 l[7 V) � 2, Q U M M Y r 0 N CD N ❑ O O (D c0 c4 cD T z j a �- N N M M o n V (n Lo V V O b LL,f/S N Cl) cr) W o LO (n LO n a _ a CNI No CDNo No 0 w oa o 0 0 0 o a U) n o o a a o 0 r 0 y a: J D N to N co b T OM 3 c W o � 0 - ro ] N Jw o 0 Y 0 0 0 (� of O m �' e O Obi, V m r F- c 5 W r O b O Di LO!� W O Q Y co E co h h [o OD b N ci U7 d ¢ N N m C m e 3 z� U C �E _ �n (n �6 pry E O N lf1 N (p T Cl) cD O1 (D O1 �7 LOIn V M M � U d c (D Q) r0 0 0 41 Ui L _ E o 0 E � � U U, W (n C7 u� C1 In b ` to m U1 ? Z. i m y � b O CDO = O c UWZ o` ¢ 0 O '- r c 'o v P. o o N M V tC5 cD M. C��trclr�ricn! • ErrAironrrreriial• 7irsfing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNCIAL ENGINEERING SERVICES Combat Aircraft Loading Area Expansion (Task 1) Project P-703; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina G E T PROJECT NO: EC08-172G May 16, 2008 Prepared for C. Allan Bamforth, Jr., Engineer- Surveyor, Ltd. 2207 Hampton Blvd. Norfolk, Virginia 23517 ATTN: Mr. Allan Bamforth, P.E. Prepared by GET Solutions, Inc. V s 504 East Elizabeth Street Suite 2, Elizabeth City, NC 27909 Phone 252-335-9765 ♦ Fax 252-335-9766 ♦ www.getsolutionsinc.com TABLE OF CONTENTS 1.0 PROJECT INFORMATION...................................................................... 1 1.1 Project Authorization..........................................................1...... 1 1.2 Project Description................................................................... 1 1.3 Purpose and Scope of Services .................................................. 2 2.0 FIELD AND LABORATORY PROCEDURES ............................................... 3 2.1 Field Exploration...................................................................... 3 2.2 Laboratory Testing ...................................................... ....... 4 3.0 SITE AND SUBSURFACE CONDITIONS.......................................:............ 6 3.1 Site Location and Description.................................................... 6 3.2 Subsurface Soil Conditions........................................:..I........... 7 3.3 Groundwater Information.......................................................... 8 4.0 EVALUATION AND RECOMMENDATIONS .............................................. 9 4.1 Clearing and Grading................................................................. 9 4.2 Subgrade Preparation............................................................. 11 4.3 Structural Fill and Placement ................................................... 11 4.4 Building Foundation Design Recommendations ........................... 12 4.5 Gabion Retaining Wall Foundation Design Recommendations ........ 13 4.6 Foundation Excavations...........................................................13 4.7 Retaining Wall Foundation Settlements......................................14 4.8 Below Grade Stuctures.......................:.................................14 4.9 Pavements.............................................................................15 4.10 Storm Water Ponds................................................................16 5.0 CONSTRUCTION CONSIDERATIONS.................................................... 19 5.1 Drainage and Groundwater Concerns ........................................ 19 5.2 Excavations.......................................................................... 19 6.0 REPORT LIMITATIONS....................................................................... 20 APPENDIX I - BORING LOCATION SKETCH APPENDIX II - LOG OF BORINGS APPENDIX 111 - SOIL BORING PROFILE APPENDIX IV — SUMMARY OF CBR TEST DATA APPENDIX V — SATURATED HYRDAULIC CONDUCTIVITY WORKSHEET APPENDIX V —CLASSIFICATION SYSTEM FOR SOIL EXPLORAITON GE:... :. I 'u5 wmac ft=n IM-1 A. � 0, ft, & A- GroWl.'a ea! L rrirrn:nrnlR: • Testing TO: C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2207 Hampton Blvd. Norfolk, VA 23517 Attn: Mr, Allan Bamforth, P.E. RE: Report of Subsurface Investigation and Geotechnical Engineering (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-703 Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Dear Mr. Bamforth: May 16, 2008 In compliance with your instructions, we have completed our Preliminary Geotechnical Engineering Services for the referenced project (RFP Report). The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, G E T Solutions, Inc. CAR "5s/' Gerald W. Stalls Jr., E.I.T. Senior Project Manager = . sl"At:. ` 014103' Camille A. Kattan, P.E. Principal Engineer t,, r t,,, t• NC Reg. # 14103 504 Fist U7abeth Street; Suite 2 • Elizabeth City, NC 27909 . Phone: (252)335-9765 • Fax: (252)335-9766 info@getsolutionsinc. com Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No; EC08-172G 1.0 PROJECT INFORMATION 1.1 Project Authorization: G E T Solutions, Inc. has completed our Preliminary Geotechnical Engineering study for the proposed Combat Aircraft Loading Area Expansion (Task 1) portion of the P-703 Grow The Force Interim Facilities project located within the New River portion of Camp LeJeune military facility in North Carolina. This report is to be included in the design/build RFP for this project. Authorization to proceed with the services was received from Mr. Allan Bamforth, P.F. 1.2 Project Description: The proposed development at this site is planned to consist of relocating the propane fueled fire fighting mock-up and its associated propane tanks and piping, as well as constructing other site infrastructure components including storm water management features. The new site will include a new entrance roadway and cul-de-sac area that. will encompass the new fire fighting mock-up unit. Additionally, a storm water management (BMP) pond will be constructed within the northeast portion of the site. The finish grade elevations throughout the construction area are anticipated to be located slightly above the existing site grade elevations. The original fire fighting mock-up site will be modified including an expansion of the exiting concrete pavements to the south and west as well as construction of a new BMP pond. The west concrete pavement expansion will require up to approximately 7 feet of select fill to establish the design grades and a near level sloped embankment along the north and west perimeters. The sloped embankment will be supported by a retaining wall (Gabion of Segmental), If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. Sofiitions •Inc""- , x Report or Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G 1.3 Purpose and Scope of Services: The purpose of this study was to obtain preliminary information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: 1. General assessment of the soils revealed by the borings performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills, surficial/subsurface organics, or expansive soils. 3. Soil subgrade preparation, including stripping, grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 5. Feasibility of utilizing a shallow. foundation system for support of the proposed retaining wall. Design parameters required for the foundation systems, including foundation sizes, allowable bearing pressures, foundation levels, and expected total and differential settlements. . 0. Soil design parameters including active, passive, and at rest earth pressure coefficients have been provided for retaining walls. 7. Permeability (infiltration) values are provided based on the results of three (3) Saturated Hydraulic Conductivity Tests, three (3) Double Ring Infiltration Tests, three (3) 15-foot deep SPT borings, and five (5) 10 to 15-foot deep Hand Auger borings, as well as our experience with similar soil conditions. B. Typical pavement sections recommendations based on the results of three (3) SPT borings performed to a depth of 10-feet and three (3) CBR tests, as well as our experience with similar soil Conditions. Soli loon iric`'%\n7 Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: ECOB-172G The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. 2.0 FiELD AND LABORATORY PROCEDURES 2.1 Field Exploration: In order to explore the general subsurface soil types and to aid in developing associated pavement and storm water design parameters, ten (10) 10- to 40-foot deep Standard Penetration Test (SPT) borings (designated as B-T1 through B-T4, BMP-T1 BMP-Cl, BMP-C2, and CBR-1 through CBR-3) and two (2) 10-foot deep Hand Auger borings (designated as BMP-C3 and BMP-C4) were drilled by G E T Solutions, Inc. within the proposed construction areas. The SPT borings were performed utilizing mud -rotary drilling techniques with a CME 55 ATV -mounted drill rig. Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to a depth of 12 feet and at 5-foot intervals thereafter to the boring termination depth of 35-feet. The soil samples were obtained with a standard 1.4" i.D., 2" O.D., 30-inch long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. The results of the borings are presented in Appendices II and III of this report. Additionally, a CBR bulk soil sample was collected from the approximate subgrade level at each of the three (3) CBR boring locations (CBR-1 through CBR-3). These samples were returned to our Virginia Beach laboratory for natural moisture, full sieve, Atterberg Limits, Standard Proctor, and CBR testing. The boring schedule noting the SPT boring depths and locations is presented in Table I on the following page. Report of Subsurface Investigation and Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Table I — Boring Schedule 5/16/08 O�gfli.„, Number .+4i .5 •.ln+.n#".Li'uSYAian'1rS1:66JiTu�ix�Zid4iCu'�x:�kaMY:.LP:i1�+(tAr.:'I�d�...1:...5'.d�F1'.�+. .s;BCo�r-m.hg s a ,Vs1D_1 L k.�/ ,},.y ! 4r.:—+ .yK�. Li pp Tc'r rv-iqg';F7sErr2 l,ryyf}:!�- + vx�v:S ,{•xi"'p�5.,� ah ,S S1.' y1 �, W 1 '�y �.�J;�R!� A'/i�,�ip�`'�3.z7 ,��,,}{.,r 'i.F.i. {t.8 "�i,f 4'� �e`�11', B-T1 SPT 15 Approximate Center of New Mock-up Location B-T2 SPT 15 Original Site; Southwest of Existing Pavement; South End B-T3 SPT 30 Original Site; Southwest of Existing Pavement; Center B-T4 SPT 40 Original Site; Southwest of Existing Pavement; North End BMP-T1 SPT 15 East of New Mock-up Location BMP-Cl SPT . 15 Original Site; South of Existing Pavement BMP-C2 SPT 15 Original Site; Southeast of Existing Pavement BMP-C3 Hand Auger 10 Original Site; Southwest of Existing Pavement BMP-C4 Hand Auger 10 Original Site; Southwest of Existing Pavement CBR-1 SPT 10 Original Site; Southwest of Pavement Section CBR-2 SPT 10 Original Site; South of Pavement Section CBR-3 SPT 10 Original Site; Southeast of Pavement Section The boring locations were established and were identified in the field by G E T Solutions Inc. personnel by measuring from existing landmarks. The approximate boring locations are shown on the "Boring Location Plan" attached to this report (Appendix I, Figure 1). -This plan was developed based on the site plan provided to G E T Solutions, Inc. by C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2.2 Laboratory Testing. Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled, and transferred to our Elizabeth City laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of fourteen (14) representative soil samples were selected and subjected to natural moisture, 4200 sieve wash, and Atterberg Limits testing and analysis in order to corroborate the visual classification of the recovered soils. These test results, as well as the classification test results for the CBR bulk soil samples are presented in Table II on the following page and are also presented on the "Log of Boring" sheets (Appendix I1). SgltitforSs;'Iric:�,��; Report of Subsurface Investigation and Geonechnice|Engineering Services (Final RFPReport) Combat Aircraft Loading Area Expansion (Task 1) P'171; Grow The Force Interim Facilities New River, Comp LoJeune, North Carolina GET Project No: ECO8'172G Table 11 - Laboratory Test Results iNatural S.H.C. — Saturated Hydraulic Conductivity Test Sample D.R. = Double Ring Test 8omp|o 0 Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description: This project is composed of two individual sites (Trainer and CALA) located within the vicinity of the existing runway in the New River portion of the Camp LeJeune Military facility in North Carolina. The proposed construction sites for this project are independent from each other and are separated by portions of the existing runway as well as existing buildings and roadways. Additional information regarding each individual site is provided below. Proposed Trainer Site: The proposed fire fighting training facility is located along the west side of the runway perimeter road at the south end of the runway that is oriented from the north to the south. This site is generally an open grass covered site and appeared to be relatively level with less than 1-foot change in elevation in 50 feet. The northernmost site boundary generally consists of an open area. The westernmost boundary generally consists of wooded areas. The southernmost boundary generally consists of an open area with an existing utility building and a lightly wooded area beyond. The easternmost boundaries generally consist of the existing perimeter roadway with the existing aircraft runway beyond. Original Trainer (CALA) Site: The original training (CALA) site is located along the north side of the runway perimeter road at the south end of the runway that is oriented from the northeast to the southwest. This site is generally an open grass covered site and appeared to be relatively level with less than 1-foot change in elevation in 50 feet. As an exception, the west portion of the proposed pavement expansion has existing site grade elevations ranging from about 7 to 13 feet MSL within a 50-foot distance, which is approximately 4 feet to 1 foot below the adjacent finish.grade elevations of the existing drainage concrete pavements. Additionally, the western portion of the site contains an existing ditch, which is within the approximate limits of the proposed retaining wall. Within the proposed construction limits the existing drainage ditch ranges in width and depth from approximately 2 to 4 feet and 4 to 5 feet, respectively. i S6lUt1ian M ' " % Report of Subsurface Investigation and Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G 5/16/08 The northernmost site boundary generally consists of a combination of the existing concrete pavements, a single story utility trailer, and/orbpen grass covered areas. The westernmost boundary generally consists of a lightly wooded area with brush followed by the runway perimeter road. The southernmost boundary generally consists of lightly wooded area with brush followed by the runway perimeter road. The easternmost . boundary generally consists of an existing ditch followed by an open area and a portion of the existing runway beyond. 3.2 Subsurface Soil Conditions: The surficial materials encountered at the boring locations were noted to consist of Topsoil ranging in thickness from about 3 to 18 inches. Beneath the surficial Topsoil, the subsurface soils were consistent at the boring locations and to their explored depths. More specifically, the subsurface soils consisted primarily of very loose .to medium dense SAND (SP, SP-SM, SM, SC-SM, SC) with varying amounts of silt and clay. Additionally, deposits of very soft to stiff CLAY (CL, CH) with varying amounts of sand were encountered at the location of borings 13-T1, BMP-T1, BT-4, and BMP-C1 at varying depths. A brief description of the natural subsurface soil conditions encountered at the boring locations for each site are presented in Table III and Table IV, included below and on the following page of this report. Table III —. Subsurface Soil Summary: Proposed Trainer Site AVERAGE RANGES OF DEPTH STRATUM DESCRIPTION SPT(') N- I (Feet) ALUES Bo R s"�- BtT1lan 8M0,.1.Tz1 0 to 0.5 Topsoil 0.5 to 15 ! SAND (SP, SP-SM, SM, SC) with varying amounts 5 to 21 of silt and clay 2 to 9 IA CLAY (CL,CH) with trace sand; 5 to 9 Boring BMP-T1 only IL $ to 13 IB CLAY (CH) with trace sand; Boring B-T1 only - Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot Report of Subsurface Investigation and Geotechnicai Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Table IV — Subsurface Soil Summary: CALA Site 5116/08 AVERAGE RANGES OF DEPTH STRATUM DESCRIPTION SPT(') N- (Feet) ALUES '�+'K `n ttir•1W'FLIe�� ""'v7 Wlsi+" �,13or.in s:B-Tf2-throw as- �': TT �rF -f,rh )f�jhj,'`I _ 1 �' 'YM?G`n r(-. F�..bs.'a h,B T�4;„BMP?,.Cz1.thcou hBMPn„C4;ancIECBR.T�throu eg �¢'.__ -. ,. �, 7"1 '� h CBR-3 0 to 0.69 " Topsoil 0.69 to 40 1 SAND (SP, SP-SM, SM, SC-SM, SC) with varying 2 to 37 amounts of silt and clay 5.5 to 13 IA CLAY (CH) with trace sand; Boring BMP-T4 only 2 to 5 13 to 15 IB CLAY (CH) with trace sand; Boring BMP-C1 on( 3 Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration included in Appendix II (Boring Log sheets) and in Appendix III (Generalized Soil Profile) should be reviewed for specific information as to individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition- may be gradual. 3.3 Groundwater Information: At the time of our field drilling activities, the groundwater table level was found to occur at a depths ranging from about 4 to 13 feet below the existing site grade elevations at the boring locations. Based on the existing site grade information provided on the project site plans, the encountered groundwater depth correlates to elevations ranging from approximate 4 to 12.5 feet MSL. In order to more accurately determine the groundwater level, a groundwater monitoring well should be installed and 48 hour groundwater readings obtained. Perched and shallow water levels are anticipated to occur within the vicinity of borings B-T1, BMP-T1, BT-4, and BMP-C1, during periods of heavy precipitation and/or during the "Wet" season throughout the project site: This is anticipated to occur as a result of the surficial and/or shallow subsurface CLAY (CL, CH) soils acting as a restrictive soil layer and allowing excessive moisture to accumulate within the overlying granular soils. Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171, Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man- made influences, such as existing swales, drainage ponds, underdrains, and areas of covered soil (paved parking lots, side walks, etc.). It is estimated normal seasonal hi h groundwater level will fluctuate within 2 feet above t e current levels. We recommend tha t e contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on this project, if needed. 4.0 EVALUATION AND RECOMMENDATIONS Generally, the proposed expansion of the concrete pavements and construction of the "Gabion" retaining wall within the west portion of the original training site (CALA) is anticipated to require surcharge fill to pre -consolidate very soft CLAY (CH) soils that were encountered at an approximate elevation of 3.5 feet MSL. The height and duration of the surcharge fill process should be more accurately determined following the completion of additional analysis.. Additionally, given the anticipated location of the retaining wall and the existing site grade elevations within this area, foundation improvements in the form of undercut and backfill with suitable structural fill is anticipated to be required in order to develop the required bearing capacity (preliminarily noted herein) along with global stability. 4.1 Clearing and Grading: The proposed construction areas should be cleared by means of removing the surface vegetation, associated root mat, and topsoil, where encountered. It is expected that a cut ranging from approximately 3 to 18 inches below existing grades will be required to remove the majority of the surface organic materials, where encountered. This cut is expected to be deeper in isolated areas to remove deeper deposits of organic soils, which may become evident during the clearing. The granular subsurface soils encountered at the location of CBR-1 to a depth of about 2 feet below existing site grade elevations was noted to contain trace amounts of organics. Accordingly, these soils should be further evaluated in the field during the subgrade preparation procedures to further determine their suitability to remain in -place for pavement support. Additional information regarding the subgrade evaluation procedures is provided in Section 4.2 of this report. Report of Subsurface Investigation and 5/1610B Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G The subsurface soils (CLAY; CL or SAND; SC, SC-SM) recovered at the location of borings B-T1, BMP-T1, CBR-2, and CBR-3 typically contained appreciable amounts of fines. Also, the current (natural) moisture contents of the surface soils at the explored locations were tested to be near or in excess of their optimum moisture. Accordingly, combinations of excess surface moisture from precipitation ponding on the site and the construction traffic, including heavy compaction equipment, may create pumping and general deterioration of the bearing capabilities of the surface soils. Therefore, undercutting to remove very soft soils may be required. The extent of the undercut will be determined in the field during construction, based on the outcome of the field testing procedures (subgrade proofroll). Furthermore, inherently wet subgrade soils combined with potential poor site drainage make this site particularly susceptible to subgrade deterioration. Thus, grading should be performed during a dry season if at all possible. This should minimize these potential problems, although they may not be eliminated. The project's budget should include an allowance for subgrade improvements (undercut and backfill with select fill or Aggregate Base Course material). 0 Control of surface water is very important to the successful completion of the proposed construction. The contractor should plan his grading activities to control surface water and minimize erosion of exposed cut or fill material. This may include constructing temporary berms, ditches, flumes and/or slope drains to intercept runoff and discharge it in a controlled fashion, while complying with state and local regulations. The project's budget should include an allowance for subgrade improvements (undercut and backfill with select fill). It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed construction area. 11 Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G 4.2 Subgrade Preparation: Following the clearing operation and prior to site grading or any fill placement, the subgrade soils should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of soft material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas (where possible), with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. During the subgrade evaluation process a series of test pit excavations and/or hand auger borings should be performed within the- vicinity of boring CBR-1 (at the discretion of the engineer) to further evaluate the subgrade soils and to determine their suitability to remain in -place for pavement support. The depth and location of this additional exploration should be determined and observed in* the field by the Geotechnical Engineer. Fallowing the proofroll and approval by the engineer, it is recommended that, within the construction areas, the natural granular soils where encountered below stripped grades should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557), as tested to a depth of 12-inches, where possible. This densification will require the use of a large vibratory roller. 4.3 Structural Fill and Placement: Following the proper compaction and approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SM, SW, GP, GW), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. 5olutioris In" c;`�, Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Faciiities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G All structural fill should be compacted to -a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. Care should be used when operating the compactors near existing structures to avoid transmission of the vibrations that could cause settlement damage or disturb occupants. In this regard, it is recommended that the vibratory roller remain at least 25 feet away from existing structures. These areas should be compacted with the use of a roller under static operations to a distance no closer than 10-feet from any existing structure. Areas of 10 feet or closer to existing structures should be compacted with the use of small, hand -operated compaction equipment. 4.4 . Use of On -Site Excavated Soils as Structural Fill Material: The surficial and/or subsurface soils encountered at the boring locations, which were generally noted to consist of SAND with varying amounts of silt (SP, SP-SM, SM) may potentially be used as structural and/or pavement select fill material, provided they are properly dried, placed, and compacted. Based on the visual and laboratory classification test results, these soils appear to meet industry standard characteristics of typical structural fill material. Additional information regarding suitable structural fill material is provided in Section 4.3 of this report. For optimum grading and compaction, these soils should be stockpiled separately from the soils previously identified (SC-SM, SC, CL, CH), and/or Topsoil, when encountered. The Geotechnical Engineer should perform additional classification tests (natural moisture and 4200 sieve analysis) on any soils proposed to be used as structural fill for verification purposes. S61ad inMc Rm Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp Le.leune, North Carolina GET Project No; EC08-172G 4.5 Gabion Retaining Wall Foundation Design Recommendations: Provided that the previously recommended earthwork construction procedures are properly performed, the proposed retaining wall can be supported by shallow spread footings bearing over firm natural soil or well -compacted structural fill material. The footings can be designed using a net allowable soil pressure of up to 1500 pounds per square foot (psf). Foundation improvements in the form of undercut and backfill are anticipated to be required in order to remove the very soft CLAY (CH) soils as encountered at the location of boring B-T4 (northwest portion of CALA pavement expansion). The undercut is anticipated to require an excavation extending to an elevation below the groundwater level and will likely require de -watering. The depth and location of the foundation undercut, if necessary, should be determined in the field by the Geotechnical Engineer. The resulting excavations should be backfilled with suitable select fill material as indicated in Section 4.3 of this report. These cohesive soils, where allowed to remain in -place within the sloped embankment and pavement areas, will likely result in perched water levels during the "wet" season and/or periods of heavy precipitation. Accordingly, a foundation under -drain system within the vicinity of the retaining wall may be required. Should a foundation under - drain system be incorporated in to the retaining wall design, hydrostatic pressures may be reduced. 4.6 Foundation Excavations: Following the undercut and backfill procedures, where required, and immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers, to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately re -compacted. In addition to compaction testing, hand auger borings with Dynamic Cone Penetrometer (DCP) testing should be performed within the base of the foundation excavations to ensure that the footing bearing soils are suitable for foundation support. Soiutians,��'� Report of Subsurface Investigation and 5/16/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171, Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Soils exposed in the bases of all satisfactory and remedied foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 4.7 Retaining Wall Foundation Settlements:, It is estimated that, with proper site preparation (as previously presented), the maximum resulting total settlement of the proposed building foundations should be up to 1 to 2 inches, pending the outcome of the surcharge program. The settlements were estimated on the basis of the results of the field penetration tests and laboratory analysis. Careful field control will contribute substantially towards minimizing the settlements. 4.8 Below Grade Structures: In order to reduce the magnitude of lateral loads being applied to below grade walls and to promote positive water drainage, it is recommended that a granular backfill be placed directly behind the retaining wall and extend laterally back from the wall a. minimum distance of five feet. These granular soils should be a relatively clean, free draining granular material (sand) classified as SP-SM or better, containing less than 12 percent passing the No. 200 sieve (0.074 mm). The compaction of the select backfill soils behind the wails should be 95 percent of the Modified Proctor maximum dry density (ASTM D1557). The soils in this zone should not be over -compacted. In order to minimize the potential for wall damage due to excessive compaction, hand operated mechanical tampers should be used to compact the granular materials. Heavy compaction equipment should not be allowed within five feet of the retaining wall. With regard to the design of the structure's walls to resist lateral earth pressures, the following estimated soil parameters can be used: Report of Subsurface Investigation and Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171, Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G 5/16/08 2 31 r Y 7i^d r �' �, s:r , � � j' ` {� r:,Y '� ' i.• w^ � �-n'Site, EarthPressu erer @oefflcrent�a l,'i1� —Y".17R^9i ....,w Seleet B,ackflfl a d' � JF' 47L' vJ��.�i llfatural�- (SPSPp'{�ti SNf' i �ygc'a'iB. � Natural Sy u�bsurfa l ... u AY (CH) p `` Total Moist Unit Weight (Ww; lbs/ft3) 115 120 Coeff. of At -Rest Soil Pressure (Ko) 0.53 0.86 Coeff. of Passive Soil Pressure (K) 2.77 1.32 Coeff. Of Active Soil Pressure (Ka) 0.36 0.76 Angle of Internal Friction (} 28" 8° Cohesion (c; psf) 0 300 Retaining walls should be sized with considerations given to the hydrostatic pressures. These pressures should assume the water table to occur near the ground surface. Also, the wall's foundation (base) should include a heel to be sized by the Structural Engineer, in order to enhance wall stability by increasing the resisting overturning forces. Should a foundation under -drain system be incorporated in to the retaining wail design, hydrostatic pressures may be reduced. 4.9 Pavements: The California Bearing Ratio (CBR) test results indicated soaked CBR values ranging from 9.1 to 15.1, having an average of 12.5. The average soaked CBR value was multiplied by a factor of two-thirds to determine a pavement design CBR value. The two-thirds factor provides the necessary safety margins to compensate for some non - uniformity of the soil. Therefore, a CBR value of 8,4 should be used in designing the pavement sections. A summary of the CBR test results and the moisture density relationship curves (Proctors) is provided in Appendix IV. In preparation for a stable subgrade support for the pavement section, the following construction steps are recommended: MENNEN l: S61adons inc7';�`�9 Report of Subsurface Investigation and Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp Le.Jeune, North Carolina GET Project No: EC08-172G 1. Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. 2. , If excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer to 10 to 12 inches and/or the use of a Geotextile fabric (such as Mirafi 500x or equivalent). These alternates are to be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at the time. 5/16/08 Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The previous sections represent minimum thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. 4.10 Storm Wat r_P_ond In order to aid in the storm water pond design three (3) Saturated Hydraulic Conductivity Tests (infiltration test) and three (3) Double Ring Infiltration Tests were performed on the subsurface soils encountered at the location of borings BMP-T1, BMP-C2, and BMP-C4. E Report of Subsurface Investigation and Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Saturated Hydraulic Conductivity Tests: 6/16/08 The infiltration testing was completed by performing a hand auger boring to a depth of approximately 7 to 10 feet at the hydraulic conductivity test locations. Following obtaining a relatively static groundwater level reading, a second hand auger boring was performed adjacent to the initial boring, at a distance of at least 10-feet. The second hand auger boring was extended to a depth ranging from approximately 3.5 to 5 feet below the existing site grade elevations, which maintained a minimum depth of 1-foot above the groundwater level previously encountered at each test location. Representative samples of the soils to be tested for Hydraulic Conductivity were then obtained and sealed in glass jars for laboratory analysis, including natural moisture and #200 sieve wash testing. Once equipment setup and subsequent saturation of the subsurface soils to be tested was complete, the infiltration rate of the soils was recorded at increments of either 10 ml or 100 mi. The records of the infiltration test results are included on attached "Saturated Hydraulic Conductivity Worksheet" in Appendix V. Additionally, the field Infiltration test results and the encountered groundwater levels encountered at the test location is provided in Table V below. The attached "Boring Location Plan provides the approximate test location. Based on the results of our field saturated hydraulic conductivity testing procedures and our experience with similar soil conditions encountered at the boring locations, as indicated in Section 3.2 of this report, the permeability rates noted in Table V below are provided to aid in the storm water design process. Table V -- Saturated Hydraulic Conductivity Test Results 4` VWL77. Nest De Mtn atic� I� =. z Percent Silt "Average lnfil r`a ionsTest ' `F r Tes#�No ti p . i -1 ' i(ft,) N oundvva er r r � * �. .` �andl0rq, aY, Re`s ltsa Ksat Values : cm/sec.fir,� inliho —ei .{t� i��nA �;3 r��n`Y' BMP-T1 4.5 10 85.0 4.51 E-06 0.006 BMP-C2 5.5 6.5 34.9 3.55E-04 0.504 BMP-C4 4.5 5.5 29.4 1.41 E-03 1.996 * = The depths noted above are referenced from the existing site grade elevations at the boring locations at the time of our subsurface exploration procedures. Solirtions� lra'c j Report of Subsurface Investigation and Geotechnicai Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G Double Ring Infiltration Tests: 6/16/08 The double ring infiltration testing was completed by excavating the test area to a depth of approximately 1 to 2.5 feet below the varying existing site grade elevations at an approximate distance of 10 feet to each of the previously completed boring locations to determine the groundwater levels and/or to perform the previously noted Saturated Hydraulic Conductivity Testing. Representative samples of the soils to be tested for infiltration were then obtained and sealed in glass jars for laboratory analysis, including natural moisture and #200 sieve wash testing. Once equipment setup and subsequent stabilized water level was obtained between the inner ring and the annular space between the inner and outer rings was obtained, the volume of water infiltrated into the soils was recorded at increments of very 15 minutes for the first hour, every 30 minutes for the'second hour, and once for the final hour. The volume of water used during each time interval was recorded and used to determine the infiltration rate of the shallow subsurface soils at each test location. Based on the results of our field double'' ring infiltration testing procedures and our experience with similar soil conditions encountered at the boring locations, as indicated in Section 3.2 of this report, the permeability rates noted in Table V below are provided to aid in the storm water design process. Table V — Double Ring Infiltration Test Results - F'1 USL Test�DePth ! 7' "5. h }��€t ��-Groundwater;r� t�• 112�u Static �a �� �•5Y L..�JL-ti L .A l'� z ` ;'Ee�el � ) M"Wr P ercentS,EIti0� t� 7 u7J t�.'� ,'� and/orrCla fiiE. Average lnfltration Test+ �v°�y� �'���� 5' p� ""Yf '�In i#' I t Results KsaC Uafues ' - '—- .— �i ) inlhour' /sec ts M .) BMP-T1 1.5 10 24.5 5.29E-04 0.750 BMP-C2 2.5 6.5 19.9 9.10E-04 1.290 BMP-C4 1.5 5.5 5. 1.05E-02 14.882 * = The depths noted above are referenced from the existing site grade elevations at the boring locations at the time of our subsurface exploration procedures. 5alititians;lr►c-�c'�° s, Report of Subsurface Investigation and 5116/08 Geotechnical Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: ECOS-172G Based on the results of the completed BMP borings and the infiltration testing procedures, as well as our experience with similar soil conditions, the surficial and shallow subsurface soils (CLAY) are anticipated to have significantly lower infiltration rates than the deeper granular soils. The soil conditions noted herein and in Section 3.2 of this report, as well as their associated infiltration rates should be considered when determining the required depth and/or size of the BMP areas. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: Perched groundwater levels are expected to interfere with excavations that extend below a depth ranging from approximately 4 to 13 feet below existing grades, which corresponds to an elevation ranging from 4 to 12.5 feet MSL. Dewatering to a depth ranging from about 4 to 13 feet can most likely be accomplished by pumping from sumps. However, dewatering below the groundwater levels may require well pointing. Perched water levels are anticipated to occur within the vicinity of borings 13-T1 BMP- T1, BT-4, and BMP-Cl as'a result of subsurface CL CH) deposits and may affect construction procedures during periods of precipitation and/or the %wet" season. Accordingly, it is recommended that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. 5.2 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration {OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. MENNEN "Soiwoo_�Mczwl! Report of Subsurface Investigation and 5/16/08 Geotechnicai Engineering Services (Final RFP Report) Combat Aircraft Loading Area Expansion (Task 1) P-171; Grow The Force Interim Facilities New River, Camp LeJeune, North Carolina GET Project No: EC08-172G The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible, person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by.G E T Solutions, Inc, and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can . not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. as well as their consultants for the specific application to the Proposed Combat Aircraft Loading Area Expansion (Task 1) - P-171; Grow The Force Interim Facilities. project located within the New River portion of the Camp LeJeune military facility in North Carolina. APPENDICES 1. BORING LOCATION PLAN 11. LOG OF BORINGS 111. GENERALIZED SOIL PROFILE IV. SUMMARY OF CBR TEST DATA V. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET VI. CLASSIFICATION SYSTEM FOR SOIL EXPLORATION APPENDIX I - BORING LOCATION PLAN W Z H I I I I ------------------ --- a 0 fx - W N W W d LO Z F-� A Vl z X W W l7 W J ¢ 3 ca o J Ln W Q > C] ¢ to ti to z O J W z - IL cu ¢ 4z A 2 Lin 4u l+l h 21 k 7 J L¢ L m U ¢� a H z r i0 o z , Z \w\ r r o Q \ \ L \ W -J W CL C UJ a \� Z�id 2 T Z En Q 13 a� aco a z U , Z La pq z I I y� I I d� I II CLw I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I ! I I I I I I I I I Q J J I I I I II II I w I I I I I I I I I I I I I I I I I I I I `i f I I I w I I I I E Z La I I I I m IL E I I I m A IIW N Q z o \ I I I I z IL u 4 cu I I I I z A g o w z �n I J X az CA ¢¢ APPENDIX H - LOG OF BORINGS m GET srs_ •+;� ,�.;.r�•�F. BORING LOG B-T1 PROJECT: Combat Aircraft L 6adinp Area Ex ansion Task 1 CLIENT: C. Allan Bamforth Jr. PROJECT LOCATION: New River, North Carolina PROJECT.NO.: ,. ECO8-172G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 20.5' MSL DRILLER: Fishburne DrillingInc. _ LOGGED BY: P. Lankford, EIT DRILLING METHOD:, Mud Rota(Wash).DATE: 4-8-08 DEPTH TO WATER- INITIAL": 13' AFTER 24 HOURS: 4.' CAVING> fl. j m N � a v ra " Description m E m y E 1d.F- 40� o m a a j C) V TEST RESULTS Plastic Limit H Liquid limit Moisture Content- o N-Value - 10 20 ' 30 40 50 60 70 zo 0 0 6 B 12 g 955.1 is 8-inches of TOPSOIL 1 24 ss 2 3 q c _ .: . Tan'. moist, Silty Fine SAND (SM), loose .fipiz� 2 Tan -Gray, moist; Clayey SAND (SC), loose to medium dense2 Mottled Gray -Reddish Tan from 4-feet Tan -Gray ffonl.fi-feet ' "•" ' 24 ss a 2 3 24 ss s s 8 4 24 .ss' q 4 .q .. .. 8 Mottled Gray. Reddish Tan, moist. Fat CLAY.(CN) medium stiff .. :"'• rr.�r 5 24 ss q 4 4 4 10 10 s 16 ss 7 17, Tan; wet„poorly graded fine to, medium SAND (SP-SM) with silt to oil raded fine to.medium.SANd SP medium dense s Boring terminated alas ft:. 0 20 •10 35 15 Notes: SS = split Spoon Sample ST = Shelby Tube Sarnpie HA = Hand Auger Sample BS = Bulk Sample ainuarlWetpr n mpy rf f he i i in r r pvp -wo- a PAGE 1 of 1. . Standard Penetration_ Tests were performed in the field in general accordance with ASTM D 1586. GET - c a:•a�M� � •r h� BORING...LOG B-T2 PROJECT. Combat Aircraft Loading Area Ex ansion Task I CLIENT: C. Man Bamforth Jr. PROJECT LOCATION:. New River, North Garbling PROJECT NO.: .: ... EC08-172G . BORING LOCATION: See Attached Bodriq Location Plan SURFACE ELEVATION: 14.5' MSL DRILLER: Fishburne Drillin Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary(Wash) DATE: 5-7-08 DEPTH TO WATER - INITIAL`: -V ' 5.5' AFTER 24 HOURS: � ._ CAVING .L 9' N ADO m ;, Eaw Description 2 t9 n z cn a > m rn�cn Q 41 3 m a? z o v a TEST RESULTS Piastic 1-knit H, Liquid Limit Moisture Content - o N-Value - 10 20 30 40 50 60 70 e e 12 8 8 3 12 18-inches ofTOPS 01L: 1.5 ..... 1 24 ss 6. s :.. .::. = ' ....... _- .-. ' - Lighl.Tan, moist, poorly:graded fine to medium SAND (SP); mediti dense 2 24 ss s a 4, 7 z Tan, moist to''wet, Silty fine SAND (SM), very loose to medium dense Wet.frorn 5;5-feet 5 3 24 ss 4 a- a2. r ..2 A2 Tan Reddish Tan, wet, Silty fine SAND (SM) to poorly graded fine to medium SA-SM)'with silt, very loose, 1B 5s a 2 2. 5 Dark Gray, wet Silty flee SAND (SM) with Cemented Sand, Marine Shell Fragments and.trace clay, medium dense i 8 6 '24 ss: 0 o: Boring terminated at 15.ft.. 5 .. a. 25 to is so 35 Notes: SS = Split Spoon Sample .ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample 7�,q initial cy(oundwater rpadihoa 1. P = W�jnhl of P PAGE i of 1 Standard Penetration Tests were performed in the 61d in general accordance with ASTM D 1586• GEC PROJECT: Combat Aircraft Loading Area Expansion Task 1 fR. CLIENT: C. Allan Bamforth Jr, PROJECT LOCATION: New River, North Carolina PROJECT NO.:.,. ECOB-172G xd �t� •ERrf�arnn •,re r BORING LOCATION: See Attached Boring yLocation Plan _ SURFACE ELEVATION: 11,0' MSL BORING LOG DRILLER: Fishburne Drilling Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary((Wash) DATE: 5-7-08. B-T3 DEPTH TO WATER -'INITIAL*: 6' AFTER 24 HOURS: v CAVING f. 22' c q q 4 a d a> n m 3 fF o TEST RESULTS Plastic Limit !-1, Liquid limit .J a'r u7 o JE_ � w Description m m m F in c? V Moisture Con ten(- e Lu C7 N . cn � LO Z o N-Value - / l 10 20 30 40 5D 60 70 0 0 9 ,o 14-inches of TOPSOIL : 1: 24 ss 2 5 Tan, moist, poorly graded'fine to,medlbm:SAND (SP); loose: 6 6 Tan -Gray, rtr6isl to wet; Silty fine SAND (SM), medium dense 2 24 ss 5 t0 3 -- s' 3 24 ss a a z Wettfrom 6-feet, - 3 4 24 ss: 4 8 Tan-Gray,,wet,: Silty fine SAND (SM) wllh !race clay and trace: organics; very loose' ? i 5 14 ss z 3 = so ::::: 2 M. -ray=Tan, wel,,Silty fine SAND'(SM) to poorly graded fine to modiu SAND (SP-SM) with silt, with -Marine Shell Fragments,:Veryloose to 6 18 ss 2 t 2 medium dense 3 5 6 :c 18 a t2', 6 0 ii 7 11 23 Gray -Tan; wet; Silty;fin6SAND (SM), medium dense 8 18 ss 5 5 25 - is - _15 9 , 7 9 18 s5 s 20 13.7 3D 13 Boring terminated at,30 FL D io 35 25 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample 65 = Bulk Sample _ PI PAGE 1 of f Standard Penetration Tests,were performed in the Geld in, general accordance with ASTM D 1586, GET PROJECT: Combat Aircraft Loadinq Area Expansion Task 1 CLIENT: C' Allan Bamforth Jr. h PROJECT LOCATION: New River, North Carolina PROJECT NO... ECOt3-172G " BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 9.0' h75L BORING LOG DRILLER: Fishburne DrillingInc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rota Wash DATE: 5-7-08 B-T4 DEPTH TO WATER- INITIAL`: 5' AFTER 24 HOURS: 1� CAVING> -L 25' oo TEST RESULTS c w c a Q a c4 Plastic Limit H Liquid Limit W o o W Description Z M t in a z ` Moisture Content - a in N-Value - 10 20 30 AQ 50 60 70 a o 8-inches of TOPSOIL j.. 2 s .6 Tan; moist, poorly graded fine to medium SAND (SP-SM) with siIt to :at?. ••: •-• 1 24 `ss 5•_ 8 `"poorly graded fine to medium SAND (SP),-very ]ease to loose. i r 3 Mottled Tan -Reddish Tan from 2-feat 7xrt 2 24 ss 2: 4 s Reddish -Tap; ri,oistto iyef;Clayey SAND (SC), very loose 2 $ Wei from 5-feet1 3 20 S.S. a 2- �. 'IDark Gray, wet, Fat CLAY (CH), very soft to. rrieditim stiff o 4 24 ss 2 2 2. 2 , 5 24 . ss 3 5 10 3. ; ,s Light Tan, wet, Silty fine SAND (SM) with Cemented Sand and Marine Shell Fragments, dense cli 6 24- ss 15 31 18 i 5. ,o Gray -Tan, wei,'Siityline SAND (SM),.loose'fo dense 7 20 ss 5" 10 si 20 4 5 1 8 18 ss s 14 - 25 e. "•20 9 24 ss 9 20 30: 13 ,0 9 -75 10 20 ss tD 19 35 13 Notes' SS Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample •7' P fnifiat r -racarYinn m2y r?r)f he inrfirfthepr level, PAGE 1 of,2 Standard Penetration Tests were performed in the field in general accordance with ASTM 0 1586. a GET " r �A>K+9 .1•rri ro�.=„eI. rw=nr. LOG OF BORING ppt� Itl No. B-T4 PROJECT:. Combat Aircraft Loading Area Expansion (Task i) PROJECT NO.: EC08-172G CLIENT:' C. Allan Bamforth Jr.' PROJECT LOCATION: New River, North Carolina LOCATION: See Attached Boring Location Plan ELEVATION: 9.0' MSL DRILLER: Fishburne Drilling inc. _ LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rota Wash DATE: 5-7-08 DEPTH TO - WATER> INITIAL; $ 5' AFTER 24 HOURS: CAVING> S. 25' j r m uj ¢ ?' �w a m �w ,� Description Q' �: a'o m Z a ¢ m F a TEST RESULTS Plastic Limit H Liquid Limii Moisture Content - o N-Value - 11) 20 30 40 50 60 70 30 12 With Cemented Sand and Marine Shell Fragments from 38-feet 37 r 9 ' 11 20 ss 14 20 18 �0 Boring terminated at 40.ft "35 45 •40 50 �5 55 16 so 60 r-5 2P 72 65' ' 70 -65 Not S: SS = Spill Spoon Sample AG 2 of 2 Standard Penetration Tests were performed in the held in general accordance with ASTM D 15W =Shelby Tube Sample HA = Hand Auger Sample 85 = Bulk Sample GET. ' cn d,.F.zr�.m�r.r as BORINGLOG N BMP-T 1 PROJECT:. Combat Aircraft Loading Area Expansion Task 1 CLIENT: C. Allan Bamforth Jr. PROJECT LOCATION:. New River, North Carolina PROJECT NO::... .. -ECDS-172G BORING LOCATION: See Attached Boring Location Ffan SURFACE ELEVATION: 22.5' MSL DRILLER: Fishburne Drilling Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rota Wash DATE: DEPTH TO WATER- INITIAL'": -V- 10' AFTER 24 HOURS:' � � CAVING>' L ° r w Lj S o Description C z°co a> a m � in m a m ov TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- o N-Value - 10 20 30 413 50 60 70 Q o B g 8 9 zi 24.tQ 5 4-inches of TOPSOIL 3 1 24 5s z- 3 4 _ ) ,t. ' b •;._ .: r ' -_ - ' Gray -Tan; moist, Silty Time SAND (SM), loose 26 Monied Gray -Reddish Tan,irioist,.Faf CLAY (CH)„"medium. stiff: 2 24 ss 3' a 5 3 24 ss 4 4. 4 Mottled Gray -_Reddish Tani, moist, Sandy,Lean CLAY (CL),;inediiim - . .stiff to stiff. .. 4 24 ss 4 4 4. 15 $ 24 ss 3 4� $ 1a Reddish Tan Gfay, moist to wet, Clayey SAND (SC), foo_se' 4 13 Tarr Wet,,poorly graded tine to medium�SAND (SP-SM) With. silt to poorly graded {ine to, medium SAND (SP), medium dense _, f ' i i r 1 " 6. 1a ss 10 ,1' 17 Boring ,terrriinated at 15.ft. 6 a. 8 25 30 a' 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *Tho fi f r ra i ;—A i Yi _ f 1h? I n P 1 = ' 1 r PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GEC" PROJECT: Combat Aircraft Loading Area Expansion STask 1) (--,�hxt. T,.7 BGRING LOG pq BMP-Cl CLIENT: C. Allan BamfD6 Jr. PROJECT LOCATION: New River, North Carolina PROJECT NO.:.. ECOB-172G BORING LOCATION:. See Attached Baring Location Plan SURFACE ELEVATION:, 18.0' MSL DRILLER: Fishburne_Drilling Inc. _ y LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rota Wash DATE: 4-8-08 DEPTH TO WATER- INITIAL`: -V, 13' AFTEk 24 HOURS: -3� CAVING> L- o v} w w o a a w Description' o .2 a. ro [7 2 o m z cn a1 a m Lo d. N E> cn N c'O ; —�° a? �, : m z o N v o TEST RESULTS Plastic Limit l-t Liquid Limit Moisture Coritent- o N-Value - 10 20 30 40 50 6D 70 n D 11 8 8 13 3 — 3-inches of TOPSOIL. ? E 1 18 ss 4 6 7 .2 Tan -Gray, moist, Silty fine SAND (SM), loose to medium dense' Gray -Light Gray from.2-feet 2 8 ss 4= a G. 15 y $ 4 Very light Gra moist, poorly ry 'g. y, P y graded fine to.medium.SAND (SP-SM) With silt to poorly graded fine to medium SAND (SP), loose •�•"� t � r ]:t1: 4:r f i 3 24 4, a 4- 10 Ligh_.. .. t Gray moist, Silty fine SAND (SM) to poorly graded fine to medium'SAND (SP-SMy with silt, loose to medium dense. _ 4 18 ss 4 3 5. S. iD 5 16 Ss 7. 6 7 a 6 24 1 ss z 2 5' 1a Dark Gray, tivet. Fat CLAY (CH), softi 15Iq Boring lerminali:d at.15 ft:.. s a 20 5, .10 s 25 10 30 -15 35 Notes-. SS = Sptlt Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample 'rhP.ingial pprTmdwater .�! a of thn vatircroundwafor levmf.- Pr PAGE 1 of 1, Standard Penetration rests were performed in the field in general accordance with ASTM D 1586. 0 GET ®RIptG LAG Bf�n�+ �i P-C2 PROJECT_: Combat Aircraft Loading Area Expansion Task I CLIENT: C, Allan Barrforth Jr.. PROJECT LOCATION: New River, North Carolina PROJECT NO: ECO&172G BORING LOCATION:- See Attached Boring Location Plan SURFACE ELEVATION: 20.5' MSL DRILLER: Fishbume Driilin Inc. LOGGED By, P. Lankford, EIT DRILLING METHOD: Mud Rota Wash BATE: 4 DEPTH TO WATER - INITIAL*: U: 13' AFTER 24 HOURS: _ CAVING> J w Q a y o m DBSCfIpti0i1 a a a o z m R 7q n m z o .` TEST RESULTS . Plastic Limit H. Liquid Limit Moisture Content - o N Value o 11 s 11 18 4 2 10' 20 30 40 50 60 70 8-inches of TOPSOIL 6 ': T 1a ss 3 fi t ': " b r.• .. ., - . Gray -Tan, moist, Silty fine SAND (SM) with trace small roots, loose io medium dense Tan from 2-feet; Wtiled-Tan-Light Gray from 6-feet 2 2a SS 3 4.}: s z' 5 3 24 , ss 6 7' 4 24 ss 14 5 t 8 ss 7 10 4 is Gray, wet; poodygratled fine to.meditati SAND (SP-SM) with silt to poorly graded fine to medium SAND (M,,,very• loose !*.i rr.n: 6 24 ss 3, 5 Boring ter rinated aL75 ft. 0 g 25 5 30 -1D to 35 15 Notes: SS = Split Spoon Sample ST = Shethy Tube Sample HA = Hand Auger Sample BS = Bulk Sample •The in;IW nrnnnrlwatPr r?ndinn may not he indirml va of ihA,statir umurldwaterlHVE%' . PAG1= 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. O GETPROJECT: Combat Aircraft Loading Area Expansion (Task 1) CLIENT: C. Allan Bamforth Jr: �k,* K.1•t��;or..,3r•r. BORING LOG pA BMP-C3 PROJECT LOCATION: New River, North Carolina PROJECT NO.: EG08-172G BORING LOCATION: See Attached Boring Location Pian SURFACE ELEVATION:. 9.5' MSL DRILLER: B. Gallop T LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger _ DATE, . 4-29-08� DEPTH TO WATER - INITIAL": 4' AFTER 24 HOURS: CAVING> L 5' c s > m a J-E a-� w ❑ Description C � a o E 7E a i � m a 6 E W ; Q to m n ,—�� o ` TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- o N-Value - 10 20 30 40 50 60 70 o' 0 8-inches of TOPSOIL . s - - Gray -Tan, moist to wet, Silty fine SAND (SM) to poorly graded fine t medibm SAND (SP-SM) with silt, loose to medium dense: Reddish Tan from 4-feet Wet.from 4-feet 5 5 Boring terminated at 7 ft: .0 10 4 15 5 B -' 16 20 25 _20 30 to -25 35 ST = Shelby Tube S Notes: SS = Splil Spoon SaLo., HA= Hand Auger S BS =Bulk Sample . ' i i r i nt o f it i r r. st Fr- r r r! o - PAGE 1 of 1 Standard Penetration Tests were performed in the held in general accordance with AS TM D 1586, GEC r�.:•u=+mw.r�:� BORING LOG p�pp BM P-C4 PROJECT: Cornbat Aircraft Loadin Area Ex arision (Task]): CLIENT: C. Allan Bamforth Jr, PROJECT LOCATION: New River, North Carolina PROJECT NO.: EC0$-172G BORING LOCATION: See Attached Borin Location Plan SURFACE ELEVATION: 15.5' MSL DRILLER:. B. Callo LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger DATE: _ 4-29-08 DEPTH TO WATER - INITIAL": 4� 8' AFTER 24 HOURS: CAVING> -L. 10' > �' w� n E ra o Descriptipri r C7 a z rn E. o N�cn W F- 10 m o U aZ > a 0 v o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content = a N-Value - ®. 10 20 30 40 5o 60 70 15 0 0 4,0 5-inches of TOPSOIL a. :f.�c( i } . b - Tan -Gray, moist; poorly graded fine to'rrledium SAND (SP-SM) with silt to poorly graded fine.to medium SAND SP ; loose to medium p Y 9 (. ) dense Light Tan -Tan from '2-feet 5 Tan, moist to wet, Silty fine SAND (5M),t6 poorly graded fine_ to medium SAND (SP-Stvl) With silt,'medium dense Reddish Tan.from 7-feet Wet from.8-feet 10 z $ 4 10 s B&hg.f&minated'aI.10 ft. .0 zo 25 30 15 35 20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 7 Standard Penetration Tests were performed in Cho- field in generar accordance with ASTM D 1588. GETPROJECT: ` 13®RING LOG CF3R-1 Combat Aircraft Loading Area Expansion Task t CLIENT: C. Allan Bamforth Jr: PROJECT LOCATION: New River, North Carolina PROJECT NO.: ECOB-172G BORING LOCATION: See Attached Boring Location Plan _ SURFACE ELEVATION- 13.5' MSL DRILLER: Fishburne Drilling Inc. LOGGED BY: P. Lankford,.EIT DRILLING METHOD: Mud Rotary (Wash) _ DATE: 4-8-08 DEPTH TO WATER - INITIAL": -'F, 8.5' AFTER 24 HOURS: -Z� CAVING -C. c c > N LU m y o E r a ;, 0.2 ou Description L m m' E z a E m a to E N N, p `v m o % @ � o o " v a TEST RESULTS Plastic Limit H Uquid Limit Moisture Conferit- o N-Value - 10 20 30 40 50 60 70 0 0 13 15 14: 6 g4 5, 4-inches of TOPSOIL: 0.3 Dark Gray, moist to wet,, Silty 6ne'5AND (SMi ),.loose to medium dense Mh`traoe Organics from 0.33 to.2-feet Tan from 2-feet Dark Gray from 4-fe'e[ Tan with clay lenses €f6m 6 to 84661: Gra`y-Tan from 6 feet Wet from B:5-feet ' ; 1 24 ss 49 7 :., , . -. 7p . 2 1$ 'ss s 6' s, 2 a 3 1$ ss 6. 9 9 5 . " T? .4 24 ss t0 7 5 1B ss 7' ' 3. z ,° Boring terminated at 101L' 0 1$ -5 -S0 20 25' 15 3° -20 35 Notes: SS = Splil Spoon Sample ST= Shelby Tube Sample HA = viand Auger Sampie BS = Bulk Sample. —Theinit"t o f _ as A = I PAGE 1 of 7 Standard Penetration Tests were performed in the field in general accordance with ASTM D.1586.. GET �� ry c o- ;• + n •� BORING LAG CBR-2 PROJECT: Combat Aircraft Loading Area Expansion Task I CLIENT: C. Allan Bamforlh Jr. PROJECT LOCATION:. New River, North Carolina. PROJECT NO ECOB-172G BORING LOCATION: See Attached Bodnq Location Plan SURFACE ELEVATION: 16.5' MSL DRILLER: Fishburne Drilling Inc: LOGGED BY: P. Lankford, EIT DRILONG METHOD: Mud Rota Wash DATE: 4-8-08 DEPTH TO WATER- INITIAL*: 9' AFTER 24 HOURS: CAVING> _G ° a] a a Description m a o 0z a.i N a ° N = 3 to —m°. Q m ru Z o *4 ov TEST RESULTS Plastic Limit H. Liquid Limit Moisture Content - o N-Value 10 20 30 40 50 60 70 0. 0 10 5 9 14 7 42.7 8-inches of TOPSOIL 1 24. ss 3 5. a . - - - . Tan -Gray, moist to wet, Silty, Clayey SAND.(SC-SM) to Silty fine SAND (SM), loose to medium dense- Light Tan -Tan from 2-feet Tan -Gray from 8-feet, Wet.froni 9-,feet 5 2 24 Ss 3: 33: 3' 2 3 24 ss 3? g 10 4 18 ss 5' j a 5 24 ss' a s 2. t0 4 Boring terminated aL.10.fC 5 15 0 25 3 10 35 -15 Notes:. SS = Split Spoors Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample r Pi I argoindiggigrWDH — ==f e PAGE f of 1 Standard Penetration. Tests were performed in the ffeld in general accordance with ASTM D 1566. GETPROJECT:. 2 Combat Aircraft Loading Area Expansion Task 1 CLIENT: C. Allan Bamforth Jr. ~s^ c.o�c:=iw•r. �, .rtyl•r� n BORING LOGDRILLER: C B R-3 PROJECT LOCATION: New River, North Carolina PROJECT NO.: EC08-172G BORING LOCATION: See Attached Soring Location Plan SURFACE ELEVATION: 18.5' MSL Fishburne Drillinq Inc. LOGGED BY: P. Lankford, EIT (Wash) DATE: 4--08_ DRILLING METHOD: Mud Rotary 8 DEPTH TO WATER - INITIAL'.' -:E; 7' AFTER 24 HOURS, CAVtNG> L a c J wn N a m E es rj Description �, m z a m m EL y 3 CO m a z` o `' TEST RESULTS Plastic Limit H Liguid Limit Moisture Content- o N•Vatue - 10 20 30 40' 50 60 70 p p 7 10 10 10 12 2 6-inches of TOPSOIL. 1 2g ,5 a ; "' ' D.3 Tan -Gray, moist, Clayey SAND (SC), loose Li ht Gray, moist to wet, 2 g _ y poorly graded fine to medium SAND (SP� SM) with sill to poorly graded fine to medium SAND] (SP), loose to medium dense With medium to coarse'sand from 6 to 8 feet': - Wet from 7-feet' 'Light Tani from ':,,-V,: �1.r7. xl `r K;(P '�,: r r 2 18 Ss s 5 5 7 ,s ,n 3 24 ss e 4 24 ss s 5 5 15 ss 4.8-feet 7 Boring terminated at 10 ft. t5' .5 9 25 30 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = an Auger Sample 8S = Bulk Sample, . ThP "n ' 1 rn tp ra Ln f e 'n it r l r" r e — h ( mma PAGE 1' of 1 Standard Penelralion Tests were performed in the field in general accordance with AS TM D 1586: KEY TO SYMBOL Symbol. Description Strata.symbols Topsoil Silty. sand Clayey sand f77i Fat clay f Poorly graded sand `5l:s. with -silt Poorly graded sand mean clay Poorly- graded. clayey silty sand MisC: S ols Water .table during drilling Depth to caving 11 Notes I1. Exploratory borings were drilled on 478-08 using a 4'.-inch diameter continuous flight power augek. �2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing-f eatur.es and elevations extrapolated from the final desig'n.schematic plan. �4. These logs are subject to the limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on the Logs. APPENDIX III - GENERALIZED SOIL PROFILE T El EYdT10.Y l.�'f££Y Z � � O 7 CA W ur _ y LL < O EL> W D. LLJ ¢ o a U _Nm a W f-� zLLJ O 1-4 LLI cc O U V e+� n w P a a Y+ ✓i N ivn s{n cP nvi 3 E •'E H� i 2� N NI v�i W W �'fv vP ID •• I T U m fjf I . #iEI v N v i C n a O N ca U min a LL a 3 i _ .rght N! A'Of1F-.i373 _ -J_KEY TO SYMBOLS Symbol. ,Description Strata symbols Topsoil Silty Sand. Clayey Sand r T/� Fad: Clay Poorly` graded Sand wi.th�. Silt. Leazi, Clay M . Misc. Symbols Wder table°,during a drilling, i. Exploratory borings; were arilie.d on..4-8-Q8. using a 41-inch.-diameter continuous flight power auger: 1 2. No free water' was. encountered at the time of drilling or' when -re -checked the.following day. I3. Boring locations were taped from existing features and ielevations extrapolated from the final design schematic plan. �4. These logs are subject to the limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on the logo. LIJ LLI LU LL 0 L5 LL ;gym W -� VC) >� LU 0 ......... LU coo N cs u z 0 _j < LJ z � b .......... P-4 00 L) U. ......... .. ............. .. ................. ............ . ......... ........................... ............ .......... 'P ........... .... ..... .................... ................ ............ * t ................. ri . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .......... ....... ...................... ...... ........... IL LA 0. 3 L) 6 q- t.'cerr rran� ry FF�r P ti 6 .2 x W 3 6 EO m. W w f Z w � Q :D O LL u. J o aU ur l 0> P N � (n fffL zL a o LLIa 410 u0 bh d^ i j O W' z <n C*LLI LJ h ��5i Uij O' V i. w N O ' �Y 1 q n N' ul ID bl � n f•I IM La T a m — g � A TY 9 a V V C n O D r 4 N P- 3 U FIM 1333 A7 NO11Yd373 ' KEY TO SYMBOLS Symbol Description Strata symbols .,° Topsoil JY Poorly graded'Saad Silty Sand Poorly graded Sand with Silt Clayey Sand Fad Clay Silty Cl.ayey' Sand. Misc. Svmbols sz _ Water table during drilling. . I1. Exploratory borings were drilled on 4-$-08' using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re=checked the following day. I3: Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. I4. These logs are subject to the limitations, conclusions, and Ij recommendations in this report. 5. Results of tests conducted on samples recovered are: reported on the logs. APPENDIX IV - SUMMARY OF CBR TEST DATA v SUMMARY OF CBR TEST DATA Semple Number CBR-1 CBR-2 CBR-3 Sample Depth 1 to 1 to 1 to (ft.) 2-feet 2-feet 2-feet Unified Soil Classification SM SC-SM SC Syipbol AASHTO' Classification, A7-4(0)- A4(0) A74(0) Symbol Nkbeai Moisture 11.0 9.0. 7.0 Content A terlaerg Limits NP 21/ 4/Z 22/1418' L/PL/PI %:;Passing 36.0 42:7 '45.0 #200 Sieve. Maxim'urri .D�y Density,'pcf° 1 11.6; i 09.5 11 5:2 Optimum Mo1sture.% ,. 1 1,.5 12 S i D.8: SoakedCBR 15.1 13.4 9.1. Resiliency, Factor . 31.0 2`.5 2.5 Swell.% Q:00 0.40 0.80 Project; Combat Aircraft Loading Area Expansion (Task 1.); Project No: EC08-172G Client: C. Allan Barnforth Jr. Date: Mav 14, 2003 Moisture Density Reiati.ons.hip (Proctor Curve) 118 I I'. 1 1 11 1 I 1 I I 1 71 7171 1 ? 11$ I I ZAV for 2.7 1'14 Ar I I I I _ .1 I:h , 1I1 ,;.2 I 1 • . � ..1 I ! 1 I 110 :... I .f:... I , I. 1 III I.1 _I.I I 77 108 ! I 5 7 9. 11, 13 15 1.7 Water•con(6nt, Test specification: ASTM D 698-00a Meihod A Siandard: Elev/ Depth Classification Nat. Moist: Sp.G. LL PI No.4 -No_200 USCS AASHTO 1-2 ft: SC' A11(0) 7 22 8 0.0 45 TEST RESULTS' MATERIAL DESCRIPTION. Maxiinuin dry density = 115.2 pcf. Optimum moisture = 10.8 % Tan, Clayey SAND Project No. ECOS-172T Client: C. Allan Bamforth, 1r. Project: CALA Expansion & ARFF Trainer Relocation o Location: CBR-3 (See Plans) Remarks: C13R-3 Sample Obtained 4/8/08 Soaked CBK Value=9.1 Resiliency.Factor=-2.5; Swell=0.8% Figure 3 Moisture Density Relationship (Proctor Curve) GET SenLUioMNS IN . I Moisture Density relationship (Proctor Curve) 114 1I I I I I I I I I I I I I II I I_ I - I I I 112 I I I I I I IIII � y WW 1013 I I 106 d. I I i I I 104 ! 3.5 6.0 15; 11.0 13.5 -16.0 18.5 Water content; % test specification: ASTM'D 698-60a Method A Standard 7AV for Sp.G. 2.7 Elev! Depth; Classification Nat, Moist Sp.G. LL PI % >:%< No.4. No.200 USCS AASHTO 1-2 f. SM A 4(0) 11` NP. NP- off 36' TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 111.6 pcf Brown, Silty SAND Optimum moisture = 11.5 % Project No. ECOS-172T Client: C. Ailan Barnfarth, Jr. Remarks: Project: CALA Expansion & ARFF Trainer Relocation CBR-1 Sample Obtained 4/8/09 o Location: CBR-1 (See Plans) Soaked CB Value=15.1 ResilinccyFactor=3:0; No Swell Moisture Density Relationship (Proctor Curve)) GET SOLUTIONS, ANC. Figure 1 Moisture Density Relationship (Proctor Curare) 113 I I I I I I I I I I 111 i I I I I I I I I I for P G. ! f I I I I 2.7 I I - , 109 11 i1TI I. is I . -17 U a 7; — Nk7 I . I I 107 l�� f .A 1 . I I� 1 _ I I 4 ! 105 I. td-11 ... I, I I I III F I f I I 10.3 13 1.5 .17` 19 Water content, °!o Test speciilcation:. �STM D 698-O6a Method A Standard', Elev1 Depth Classification Nat. Moist: Sp.G: LL P1 % > No,4 No.200 USCS AASHTO 1.-2 ft. SC-SM. A-4(0) .9 21 7 0.0 423 TEST.RESULTS' MATERIAL DESCRIP11ON Mahimuhi dry density = .109,5 pcf Optimum moisture = 12.5 Tan. Silty, Clayey SAND Projecf No. -ECOS-172T Client: C. Allan Bamforth, Jr. Project: GALA Expansion & ARF'F Trainer Relocation o Location: CBR-2 (See Piaris) Remarks: CBR-2- Sample Obtained 4/8/08 Soaked CBR Value-13.4 Resiliency Factor=2.5;Swell=0.4%. Figure 2 Moisture Density Relationship (Proctor Curve) GET SOL.0 IONS INC. APPENDIX V - SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET o 0 o a o o a o 0 0 a> ra o L7 = # ca a 3 o`'f o 05 a a o a CD L 0 N Z i iii O CD a O a O O 4 n O C L CL i O O O 6 o O O O C] of i tq A m = m 0 v ` } (9 a .� O CDC C Lo m3 WFV COU � A NC = u O U c0 Z m Lu E ro m Z' (0 o CD 0 ro 0 CD 0 (D 0 CD 0 CD 0 (D o oar` _ a) >' �, - --Si X C) w w w w W, w w w w Z U) ~ C -O ca (D U z w u> (n uZ rn v Ln n V r> 0 d v v v v v V v m m m rOn c S O C z LU O p y # O O O O O O O O M cn VJ U fY •E ; Y o o 0 0 0 0 0 0 0(D 0 0 0 0 0 o a F it a o 0 0 0 0 0 0 0 }- Z Z U @ CD co o rocl� (D (n co (D co (n m (a w cn m Q Z.cc CL 0 0 0 0 0 ci 0 o U) a, O C P X (p U o f w� y U J ti (9 = 6 E E E E ❑ (� CO h [O ht— Mr co Cl) Co Q O N m UD m Ui to tL i' N r M T' r r rO �— r F C N p = U CO A C:3 11! m O m y Q (� 00 O ` LU Q 'DE w - a E— 6i E ..... }��g+ Q C Cp N V h 3 N Q Q) Cl G> S' 10 CO 7ti CO r- QL]. U+� r r � •' U) w r o ci r o r ri r a r o r 0 o a o aj ch N CA }Lh G .—I O O 4 O ii U U U Q Q d R Q Q w co O O to M M r (D LP O M [C> r- N O V Ouj N H a, U N 4> Q 0 O v to p 1!'> O r N M C? C a; (C r N N N L4 •'� r r r U) 'y Q L O _D D ci U E U QA '— (�9 W +' •� ~ r' 2 C L (n 0 0 o U +�+ Q a � o C7 u�" U �y U cq ao ttikW'� n N O O O O m 0 co 0 r+ O to O U7 i U rW� V �Lu r r O •N •� .X E (4 O O [� _ 0 O (Q li � Z � L� o a in � 3 U QUy .O C •C O M •C C .0 C .0 - x K - O > O D D my m D_ m m Q] 43 Z I•- N °�` M O V O 'V• P P O CO Q M O r— CD (7 0)0 r r Q O lJ � 1 _ cis Wr a _ 'N cV � O to N � N Lq P Lq rn V' rn V In 0 O 'V uz Q i 0 0 0 � 0 O Z W _c 0 0 0 0 O U N a) C O .. O O v _ W w C v (n ° i •C N Z: coCU , O O p O h O U) 7 3 ° 0 p N •� U .R N zi w Lf) d - M M M M n M M R ?+ a CO N mN _C - Q1 O ^ + w 9 'o Q M O r ° U cc -0 N ° Z c6 w° 0 U ° v h! n a ,��a������� aQ�' E s O n U o w 0 w 0 w 0 w 0 0 w o a w o w 1 m Z r- _. ,- Qy '- m Lu uJ ,w in N q M CM M 2U Y N rn O IA T' .0 ; 1 U} Cj M M I7 ('7 M (`') z LU - p.,8S N N N N N N N r N N N N N O N r N p Cis (15 aa co N , U iY Ft. y. � O O O 0 O 0 O p O b .O 0 O 0 O 0 O O O s Z z U 4 ZCL 0 .�. (0° (OD (Op 0 M (D (0° 0 0 Y 0 FL m E, 0 'C O N N Q CL U Cl d .r I.C'1 M M m O Lr7 N uU-)M rQ 0 Lo m 6 cri o Iez V V' Q; to a T i c) o LU o m ro N CD ... CL Fes- ID rn m ❑'' m ❑ U - r r O p O O O N C 0 0 O O O O Ch 0 S ? O m m r=n E cri U N Z y •� �, N U _ r� acc 0 ii Cs di CL ci a n cL a a a a a a E w U CD u) m V 0 V -t N r U i3 2 m N O O •• O (V O V O n O r` O co cp CDr r r M r .mod. _ -6 J Q �... .'r' 'T -cr V V V ' V d Ny E o �. E W E u ° J ( M r 'V1 O CD 0 0 CD O CD O O CD O O O O O O r- r- r r 0 7 o cn C° Z a cu o � o 0 0 0 0 0 0 0 0 0 W CD �" w O N O r 0 r- (O uO � M N •.+ Vl 10 V @ ` D •Ili ° ' v1 r Z o Z rn❑❑ a�i ccu >L' J E a U L CD ` 3 `o zm C m C m C 0 `! a U a y Qy C Lo 3 ff in W m W z { y U) 4 O O a0 O O CD m CY) O o C' V' m V' n �Y M Nr m C�1 p 5 O b z .o?i X LO v 3 O O N e a BFri u i CO r� V M ui CS r- V u) M r� V' un M I t V m O z N i L v --ir O m O O {77 O Cf7 O d O? p = O CU 0- N ' Z �, " N r N (V N N 0 v O N d ._ (J) o_ z fn O CD + w U r' r N r r I� r f• r f� U -o O � C •o m -,a-� 4 CO C6 V co T a ro m m ro a? co p U y m -0 N O F' O U 7 p O O U LE II U SUP ''•,`-Cy M O M O C"� O C7 O M O [h [") O M O C7 d co W L b r N Q = W a Qy - Y m W w w W Ll W Lb W W W Y a) D U .y t i T r r — T Ci I Zp t m o oQ 00 CO O Do O O co O co O d ado O CD coo O O o Y a z x ¢ a U z zz C ro CY k ` M n ti Co C7 r~ C] t- t— co M rn ti CR M N t— F Q L: Z0. a� n ti coo n coo coo m 0 0 N N N N Y J U j"n U E .OJ U N F Q Q/ CD • O U O ui u N tiri N o F Q C m U o a cl7 � cl� M ll� C? C', r` 1? ❑ pQ c7 � o 0 0 0 4 ci o 0 0 „� _ u a ro m y co LU O o ID W Q CY yr Q (v w a �. cn v ❑ ❑ C'4 N CN\t Cm\3 IN CCN ' y w. O d O O O O O O O ¢ (n QLn �' m m N V R1 ri ro ro UU p �- r, p0 d Q LL }U CL R a ci m a a a n. a U N 'to7 o N N [�'� LOL) A N Q = O o0 o O O O O NO d O J O E-•. •— N N N T N N N N N N c0 Ih Q L� �i m 0 E E t y o 0 co ° O 0 O 0 O O O O O O O 0 O 0 O 0 O O 19 n+w m U [[.�r-. co Z Q O ''mn N U m m G O Cl O C. O Co O O O O O O O 0 O 0 O O O C> W U Qj •• L O N cT co t- r (o r to r V' r M r N r T N � O O 6_ cc h O tn ro U LL_ °� x z z 0 ❑ x J E O O U O CA c w+ CA tT c cm C m C > R K O A. inj Ell m IM Z •w APPENDIX VI - CLASSIFICATION SYSTEM FOR SOIL EXPLORATION lot GET Crrtrd>eira' • T:�,,. meme,u.! � Trs,irSQ Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757) 564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Standard Penetration Test (SPn. N-value Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler, The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring fogs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESNE SOILS . (SILT, SAND, GAVEL and Combinations) Relative Density Very Loose 4 blows/ft. or less Loose 5 to 10 bloves/ft, Medium Dense 11 to 30 blows/ft. Dense 31 to 50 blows/fL Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 itch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium 1/2 to i inch diameter Fine 1/4 to 112 inch diameter Sand Coarse 2.00 rem to 1/4 inch (diameter of pencil lead) Medium 0.42 to 2.00 mm (diameter of broom straw) Fine 0.074 to 0.42 min (diameter of human hair) Silt 0.002 to 0.074 mm (cannot see panicles) CLASSIFICATION SYMBOLS ASTM D 2487 and D 2488 Coarse Grained soiI,3 More than 50% retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM - Well -graded Gravel w/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w,'Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Weil -graded Sand SP - Poorly graded Sand SW-SM - Well -graded Sand w/Silt SW -SC -Well-graded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine- ra' ed Soils 5D% or more passes the No. 200 sieve CL - Lean Clay CL-NIL - Silty Clay ML - Silt OL- Organic Clay/Silt Liquid Limit 50%or greater CH - Fat Clay MH - Elastic Silt OH - Organic Clay/Silt Highly Organic Soils PT - Peat COHESIVE SOILS (CLAY, SILT and CombInadOnS) Consistency Very Soft 2 blows/h, or less Soft 3 to 4 blows/ft. Medium Stiff, 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/h. Hard 31 blows/ft. or more Relative Proportions Descriptive Term Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readines Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swalrs, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring du al symboLs 60 Plasticity Chart MENEEMM. Sol MEMO Wgrmm sm Page i of 1 GET Revb1on 12112107 0 ID 20 30 40 53 6D 70 80 DD 100 LIQUID LIMIT (LL) (%) 4 ,. :v DWQ USE ONLY. Date Received fee Paid Permit Number Applicable Rules: - ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph I I - Post Construction (select all [lint apply) ❑ Non -Coastal SW- HQV/OIZW Waters ❑ Universal Stormwater Management PIan ❑ Other WQ M mt flan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forty luny be photocopied for use as an original 1. GENERAL INFORMATION I. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ordnance Loading Area Addition 2. Location of Project (street address): City:MCAS New River, Camp Lejcune County:Onslow 7ip:28547 3. Directions to project (from nearest major intersection): ]"Fast on Douglas Rd. from Rt. 17. Turn right on Canal Street. Turn left on Perimeter Street 4. Latitude:34° 42' 10.08" N 11. PERMIT INFORMATION: l,ongitude:77° 27' 11.16" W of the main entrance to the project. 1. a. Specify whether project is (check one): ❑New . ®Modification b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 080945 , its issue date (if known)November 6, 2008 , and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* 'provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted) as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the Stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 19.5 ac of Disturbed Area ❑NIIDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: ]corm SWU-101 Version 073un2010 Page 1 of 6 i?FVEO OCT 0 7 Z011 �Y: III. CONTACT INFORMATION I,a, Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project); Applicant/Organization:Comitiandii)g Officer, Marine Corps Base, Camp Lejeune Signing Official & Title:Mr. Carl 1-I. Baker, Ir., P.F., Deputy Publiic Works Director b.Contact information for person listed in item I above: Street Address:1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if aliplicable):1005 Michael Road City:CB Camp Lejeune Phone: (9.10 _ ) 451-2213 ) mail:carLh.bakerOusnic.mil State:NC 7_ip:28547 Fax: 910 451-2927 Please check the appropriate box. The appiicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, ite►n 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and con-iplete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person fisted in item 2a above: Street Address: City: State: Z Mailing Address (if applicable): City: State: Z Phone: { ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project. Other Contact Person/Organization: Mr. David'1'owler Signing Official & Title:Mr. Carl H. Baker, Jr., P.E., Deputy Pubhic_Works Director b.Contact information for person listed in item 3a above: Mailing Address Public Works Division, Building 1005, Civil Design Branch City:MCB Camp Lejeune State:NC Phone: (910 ) _451_3238 dxt. 3284 Fax: f-,iiiail:david.towlei-@usiiic.mil 4. Local jurisdiction for building permits: N/A - Federal Property Point of Contact: Phone #: Forin SWU-101 Version Mu112o10 Page 2 of 6 Z i p:28547 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will drain via overland flow and an inlet and piging system to underground concrete sedimentation and sandfilter BMPs. The BMPs dischar e to existing drainage ditches. 2, a. if claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designee{ in accordance with: ❑ Coastal SW - 1995 ❑ Ph lI - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 19.5 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = `i'otal Project Area+:19.5 acres + 'Total project area shall be calculated to exclude tlae following: the normal pool of imporrrrded structures, the area betzoecrr the barrlrs of streams rind rivers, the area below the Noraual High Water (NHW) lure or Mean High Water (MHVQ lure, and coastal zoellands landward frorrr the NHW (or MHW) line. 11re resultant project area is rased to calculate overall percent built rapou area (BUA). Non -coastal wetlands landward of the NHW (or MHM lure rnny be included in the total project area. $. Project percent of impervious area: (Total Impervious Area / 'Total Project Area) X 100 = 39.7 % 9. How many drainage areas does the project have?'14 (ror hfgh densily, count I for each proposed engineered stornazoater BMP. For loco densihj and other projects, rrse 1 for the whole properhj area) . 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an'additional sheet with the information for each area provided in the same format as below. Bashi Information Drainage Area A = DrainagejArea. E11 Drainage Area' _ 'A2' Drainage Area . A3 Receiving Stream Name New River New River New River New River Stream Class * SC Sc Sc SC Stream Index Number * 19-7 19-7 19-7 19-7 Total Drainage Area (so 21,431 22,805 22,805 22,805 On -site Drainage Area (so 21,431 22,805 22,805 22,805 Off -site Drainage Area (so 0 0 0 0 Proposed Impervious Area so 13,983 17,985 17,985 17,985 % Im ervious Area** total 65.3 78.9 78.9 78.9 Im. ervious" Surface Area Drama e Area A: Draina e Area B. Draina e Aiea C Drainage Area D On -site Buildings/Lots (so 0 0 0 0 On -site Streets (so 0 0 0 0 On -site Parking (sf) 0 0 0 0 On -site Sidewalks (so 0 0 0 0 Other on -site (so 13,983 17,985 17,985 17,985 Future (so 0 0 0 0 Off -site (sf) 0 0 0 0 17xisting BUA*** (SO 0 0 0 1 0 Total (so: 13,983 17,985 17,985 '17,985 Stream Class and Index Number carr be determined at: lrttp://portal.ncite nr.oi:0veh/tog/ps/csrr/class i rcatinrrs * Im rervious area is defined as the buill uport area including, but not limited to, buildings, roads, l r�rrs�� -�E� sir ezuolks, gravel areas, etc. roan SWU-101 Version 07Jun2010 Paoe 3 of OCT 0 7 2011 BY: Section 111, Project Information, no. 8 `Basin information H,'uDraina a Area., B ' Receiving Stream Name New River Stream Class SC Stream Index No 19-7 Total Drainage Area sf 83,343 On -site Drainage Area sf 83,343 Off -site Drainage Area sf 0 Proposed Impervious Area sf 72,972 % Impervious Area total 87.6 .1m ernous 5urface'Area Draina e Area $ _,•,,,��..., ..� On -site Buildings Area sf 0 On -site Streets Area (sf) 0 On -site Parkin Area sf 0 On -site Sidewalks Area sf 0 Other On -site sf 72,972 Off -Sites 0 Total (so 72,972 Basin Information _ — - "' braina� e,Afea' C ,_. Receiving Stream Name New River Stream Class SC Stream Index No 19-7 Total Drainage Area sf 74,275 On -site Drainage Area sf 74,275 . Off -site Drainage Area sf 0 Proposed Im ervtous Area sf 65,760 % Impervious Area total 88.5 -.... _ Impeivious Surface.Aii a On -site Buildings Area sf 0 On -site Streets Area (sf) 0 On -site Parkin Area sf 0 On -site Sidewalks Area s{ 0 Other On -site (sf) 65,760 Off -Site sf 0. Total sf 65,760 ".Basin:'lhformation'=� ReceiLn2 Stream Name New River Stream Class SC Stream Index No 19-7 Total Drainage Area sf 67,495 On -site Drainage Area (qfL 67,495 Off -site Drainage Area sf 0 Proposed Impervious Area (sf) 56,324 % Impervious Area total 83.4 dr envious Surface'Area:, • `, _ Draina a Area D :"r_ On -site Buildings Area (sf) 0 On -site Streets Area s 0 On -site Parkin Area (sf) 0 On -site Sidewalks Area_(sfl 0 Other On -site sf 56,324 Off -Site (sf) 0 Total (sfl 56,324 RECEIVED OCT 0 7 2011 $Y: w. Basin Information: Draina e Area E Receivin2 Stream Name New River Stream Class SC Stream Index No 19-7 Total Drainage Area sf 23,328 On -site Draina e Area sf 23,328 Off -site Drainage Area (sf) 0 Proposed Impervious Area sf 13,155 % Impervious Area total 56.4 On -site Buildings Area sf 0 On -site Streets Area sf 0 On -site Parking Area sf 0 On -site Sidewalks Area sf 0 Other On -site sf 13,155 Off -Sites 0 Total sf 13,155 'i?�'".Basin'Infoi=mationwa;;: "".w_. - . _..-ram. ..,. ,. .....Draina e'Area E-1 Receiving Stream Name New River Stream Class 5C Stream Index No 19-7 Total Drainage Area sf 11,980 On -site Drainage Area sf 11,980 Off -site Drainage Area sf 0 Proposed Impervious Area sf 7,450 % Impervious Area total 62.2 'Im ervious•Surface Area,- ,- On -site Buildings Area sf 0 On -site Streets Area sf 0 On -site Parkin Area (sf) 0 On -site Sidewalks Area sf 0 Other On -site sf 7,450 Off -Site (sf)0 Total (sf) 7,450 ..:'a;'Basin'Information �.. _' _ Draina e.Ai-ea E72 . -_-_'-� Receiving Stream Name New River Stream Class SC Stream Index No 19-7 Total Drainage Area sf 11,980 On -site Drainage Area sf 11,980 Off -site Drainage Area sf 0 Proposed Impervious Area st 7,450 % Impervious Area total 62.2 ' , ", "_ Im eniious Surface"'Area ° On -site Buildings Area (sf) 0 On -site Streets Area sf 0 On -site Parkin Area (sfj 0 On -site Sidewalks Area sf 0 Other On -site sf 7,450 Off -Site sf 0 Total (sf) 7,450 RECEIVED OCT 0 7 Z011 BY: Basin Information ` _ " " ..":: ' ' ""`"" ' Drainage AFda 'E-3 ^.. Receiving Stream Name New River Stream Class Sc Stream Index No 19-7 Total Drainage Area (sf) 11,980 On -site Drainage Area sf 11,980 Off -site Drainage Area sf 0 Impervious Area (sf) 7,450 .Proposed Im ervious Area total 62.2 j Impervious Surface Aregr Draina e'Area E-3 �.. , On -site Buildings Area (sf) 0 On -site Streets Area sf 0 On -site Parkin Area (sf) 0 On -site Sidewalks Area sf 0 Other On -site sf 7,450 Off -Site sf 0 Total (sf) 7,450 Inform6ti6n 7 '" -.-Drainage Area E 4 ReceivingTStream Name New River Stream Class Sc Stream Index No 19-7 Total Draina e Area sf 12,980 On -site Drainage Area(!if) 12,980 Off -site Drainage Area sf 0 Pro osed Im ervious Area sf 8,058 % Impervious Area total 62.1 Im erviousSurface Area _ _ Draina e'Areai E=4 - Y , .. On -site Buildings Area sf 0 On -site Streets Areas 0 On -site Parkin Area sf 0 On -site Sidewalks Area sf 0 Other On -site sf 8,058 Off -Site sf 0 [Total (sf) 8,058 Basin lnfo7matiori-';,', k r 3"Draina e+Area: F: E;` Receiving Stream Name New River Stream Class Sc Stream Index No 19-7 Total Drainage Area sf 57,079 On -site Drainage Area sf 57,079 Off -site Drainage Area sf 0 Impervious Area sf 30,561 .Proposed Impervious Area total 53.5 .;IrSi"ervioiis'SurfaceArea,a On -site Buildings Area sf 0 On -site Streets Areas 0 On -site Parkin Area sf 0 On -site Sidewalks Area (sf) 0 Other On -site sf 30,561 Off -Site sf 0 Total sf 30,561 OCR 0 7 2011 9� Existing Sand Filter - Permit no. SW 8080945 I - . -'Basin Inf6rmation! Drainage'Arda (1) Receiving Stream Name Now River Stream Class Sc Stream Index No 19-7 Total Drainage Areas 160,895 On -site Drainage Area (sf) 160,895 Off -site Drainage Areas 0 Proposed Impervious Area (sf) 159,895 % Impervious Area (total) 99.0 'I i6u-s Surface &66�'; Z rnpery -',,--,",Drahade'A�ba (1)--4- On -site Buildings Area (sf) 0 On -site Streets Area (sf) 0 On -site Parking Area (sf) 0 On -site Sidewalks Area (sf) 0 Other On -site (sf) 159,895 Off -Sites 0 Total (sf) 159,895 OCT 0 7 Z011 ""Report only thaf antonnI of existing BLIA that will reinain after developtncrrt. Do not report any existing BLIA that is to be reruoved and which will be replaced by new BLIA. 11. How was the off -site impervious area listed above determined? Provide documentation. No off -site impervious a Promectsin Union County: Contact DI1Q Centr-:rl0fli-ce stafito check if the projcct is Iocated sritlun a 7hrc7rcncd �.0 Endangered Species Italershed that maybe subject to more stringetrf .slortm+ater requirements as per ACAC 0 B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management perinit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncden.r.org web/wc�Jws/su/bmy-manual. V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of lVater Quality (DY1'Q). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from does. The complete application package should'be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at httk: portal.ticclennorg/kveb/wq/ws/sit/rnaps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htt L)ortal.ncdenr.orgweb we ws su state forms dots. Initials 1. Original and one cops/ of the Stormwater Management Permit Application Form. AL8- 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N/A Form_ (if required as per Part VII beloro) 3. Original of the applicable Supplement Forrn(s) (sealed, signed and dated) and O&M AL,6 agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCD! NR. (For an Express review, refer to AID htt�/f w�vw.cnvhc]p.org/pages/0nestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and'to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor A L8 the project. This is required in addition to the brief summary provided in the Project Information, item 1. G. A USGS map identifying the site location. If the receiving stream is reported as class SA or the AL -a receiving stream drains to class SA waters within 1/4- mile of the site boundary, include the 1/4- mile radius on the map. 7. Sealed, signed and dated calculations. Aga 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, €- dated), including: 1}Lb a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation ol* impounded structures, the banks of streams or rivers, and the MHW (or NNW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Detaiis of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. _ i�ED 1'ornlSWU-101 Version 07]un2010 Page 4ofb EOCT 0 7 2011 B n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated 51-11NT elevations (Please identify _�1L(' elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x'11" copy of tine NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visil for DYVQ to verifiy fire SNIA17'17rior to subauiffrtl, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A N/A H. For corporations and limited liability corporations (LLC): Provide documentation from the NC N/A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item -la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or Ll-C must be listed is an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://wivw,secretary.sta te.iic.us/Corporations/CSea rcii.aspx V11. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and fu lure development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BIJA allocations vary, a table listing each lot number, Iot size, and the allotivable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htt //portal_ncdenr.org/<vcb/��ct/ws1su/statestiv/Norms flocs_ Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed oil the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot he changed or deleted without concurrence from the NC DYVQ and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUThIORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm).so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Anna,Lee Bamforth, P.E., I_..S., LEED AP Consulting Firm: C. Allan l3amforth lr., Engineer-Survevor, Ltd, Mailing Address2207 Nameton Boulevard City:Norfolk w �� Phone: (757 _ ) 627-7079 hmail:albf1 babmforth.com Sta te: V A Zip:23517 Fax: 757 625-7434 IX. PROPERTY OWNER AUTHORIZATION (if Cott tact lrrfor•inatutrt, item 2 has been filled out, cotrtplete this scction) 1, (print or type frame of person listen in Contact Inforiuntion, item 2a) w _ , certify that I own the property identified in this permit application, and thus give permission to (print or hype name of person listed in Cotrtnct 11001-rufltiall, itelu M) with (print or type untrue of or-auization listen in C01110d hIf01'1l101i0ta, uteri! 1(7) to develop the project as currently proposed. A copy of the lease agreernent or pending property sales contract has been provided %vith the submittal, which indicates the party responsible for the operation and maintenance Of the StOTMwater SVstem. F2ECEI.VED OCT 0 i 2011 Form SNVU-101 Version 07Jun2010 Paoe 5 of 6 BY: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Dorm within 30 days; otherwise I Nvill be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 1.43-215.6. Signature: Da 1, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this _day of , and acknowlcdge the duc exccution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICA'rION 1, (print or type n mfe of person Iisled in Contact Information, item In) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1 .1000, SL 2006-246 (Ph. 11 - Post Construction) or SL 2008-211, Signature: Date: 1, a Notary Public for the State of _ County of do hereby certify that personally appeared before me this — day of I , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires, Form SWU-101 Version 071un2010 Page 6 of 6 RECEIVED OCT 0 7 2011 BY: MEMORY TRANSMISSION REPORT FILE NO. 502 DATE 11.21 08:42 TO 8 919104512927 DOCUMENT PAGES 8 START TIME 11.21 08:42 END TIME 11.21 08:44 PAGES SENT STATUS 0� *** SUCCESSFUL, TX NOTICE L.b atd` s AO - J -a TIME :11-21-Ill 08:44 FAX NO.1 :910-350-2004 NAME :DENR Wilmington kkk wt �.(ara ssKMld O .cta�a a.s�td � 7.,�......o� �:��tr d M�t..•a .or O t...�/i.n O v00{•Os E -0 L 6 51tt-96,-OC6 90vOC ^Jw '✓a19�lunlM Ira �p IeVPis� L�� v00{•Os E -0 L 6 51tt-96,-OC6 90vOC ^Jw '✓a19�lunlM Ira �p IeVPis� L�� MEMORY TRANSMISSION REPORT FILE NO. 603 DATE 11.21 08:54 TO : 8 917576257434 DOCUMENT PAGES 8 START TIME 11.21 08:54 END TIME 11.21 08:56 PAGES SENT STATUS OK SUCCESSFUL TX NOTICE TIME FAX NO.1 NAME XJ»i S r7 � Via• �C7� S �d � -� � �'i`J�y� :11-21- 11 08:56 :910-350-2004 :DENR Wilmington .a;urwwra7 • -JaA—a .—ka O R;draa C7 LD ^^ _ •y rod LD auenrra S� { :r •ard �`_, L�� :armed l � � ✓� S yid -t-'�`.-ad .wO�� '0.�3 ,01 :+Dut-o5c-a 6 �—s � Central Files: APS_ SWP_ 11/18/11 Permit Number SW8080945 Permit Tracking Slip Program Category Status Project Type State SW Active Major modification Permit Type Version Permit Classification State Stormwater 1.10 Individual Primary Reviewer linda.lewis Coastal SW Rule Coastal Stormwater - 2008 Permitted Flow Facility Name CAIA Ordnance Loading Area Addition Location Address Perimeter St Camp Lejeune Owner NC 28542 Permit Contact Affiliation Major/Minor Region Minor Wilmington County Onslow Facility Contact Affiliation Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl H. Baker Deputy Ofc Public Works Building 1005 Michael Rd Dates/Events Camp Lejeune NC 28547 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 11/06/08 10/07/11 11 /17/11 11 /17/11 11 /06118 Regulated Activities Requested/Received Events State Stormwater - HD - Sand filters Deed restriction requested Deed restriction received Additional information requested 10/18/11 Additional information received 10/25/11 Additional information requested 10/28/11 Additional information received 11 /14/11 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin u r c vw 31103NNS ONI033S 'SJNIMVNQ 30 X30NI S31111I0V3 114I831NI 83NIVU 3HI3 (INV VIVO ON 'HDAIN M3N NOUV1S 6V Sd800 3NIHVW "� N Q _ 31t121N55 'JiIiQ335 - am 30HNI3 013NVllV-0IW PVdAVN Z_ 0 Y7 W LL LU W Y g w o u in Z cc Pliv Lu w�aax�as cr 0 a cc =woW �w LU Z �c�++ca#jao cr all txil� > I g %3 �ln �ro'O Z n3. r�3 � CS z I � �` wLU __ =ei 9 gig GiibyES a gI "xsx ��£PP�5 5x5 5x5x §§ r8'�oi�` 15 �Po'$ PHA RIM ZS....,55555555 ..., tnhH tT,sg��ffi8�88i8 t3888Y3 F3 Y3 Y3I �3 Y3 Y3 Yi88888538£3 E3���J,�� s!�i �aWwf313 t31a F3 ��iw J