Loading...
HomeMy WebLinkAboutSW8060110_HISTORICAL FILE_20060202STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 11 C) DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 010 oz b Z YYYYM M DD �OF WATF9Q Michael F. Easley, Governor O G William G. Ross, Jr., Secretary CIO y North Carolina Department of Environment and Natural Resources o r Alan W, Klimek, P.E. Director Division of Water Quality February 2, 2006 Mr. Carl Baker, Director MCB Camp Lejeune Design Branch Public Works Division 1005 Michael Road Camp Lejeune, NC 28547 Subject: Stormwater Permit No. SW8 060110 BEQ French Creek P-1150 & P-1155 CC# N62470-01 -D-1 141 High Density Project Onslow County Dear Mr. Baker: The Wilmington Regional Office received a complete Stormwater Management Permit Application for BEQ French Creek P-1150 & P-1155 on February 1, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060110 dated February *, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until February 2, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings,, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215. Sincerely, Edwardeck Regional Supervisor Surface Water Protection Section ENBlarl- S:1WQSISTORMWATIPERMIT1060110.feb06 cc: David Boyette, P.E., Stewart Engineering Linda Lewis <Wilmington--Regional=0ffice�1 Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Servicel-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2o,enr.slate.nc.us Q11e NorthCarolina An.Equal OpportunitylAHirmalive Action Employer — 50% Recycledl10%Post Consumer Paper Alaturally State Stormwater Management Systems Permit No. SW8 060110 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl H. Baker & MCB Camp Lejeune BEQ French Creek P-1150 & P-1155 CC# N62470-01-D-1141 P-1150 at Gonzales & Julian; P-1155 at McHugh & Gonzales, MCB Camp Lejeune Onslow County FOR THE construction, operation and maintenance of 6 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "Stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 2, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in the table in Section 1.5 on page 3 of this permit. The stormwater controls have been designed to handle tLge runoff as follows: Pond A @60,674 ft2; Pond B @68,509 ft2; Pond C @55,321 ft , Pond D @33,688 ft2; Pond F @82,253 ft2; and Pond G @144,997 ft . 3. The tract and each drainage area will be limited to the amount of built -upon area indicated on page 3 of this permit, and per the approved plans. This permit makes no allotment for any future built -upon area. 4. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 060110 5. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Pond A Pond B Pond C Pond D Pond F Pond G a. Drainage Area, acres 1.97 3.11 3.04 1.24 3.95 4.91 Onsite, ft2: 85,813 135,472 132,422 54,014 172,062 213,880 Offsite, ft : 0 0 0 0 0 0 b. Total BUA, ft2: 60,674 68,509 55,321 33,688 82,253 144,997 c. Design Storm, inches: 1.0 1.0 1.0 1.0 1.0 1.0 d. Pond Depth, feet: 6.0 6.0 5.5 5.0 5.5 6.0 e. TSS Removal Rate: 90% 90% 90% 90% 90% 90% f. Permanent Pool Elev., fmsl: 13.0 9.0 11.0 9.0 10.0 8.0 g. Permanent Pool Area, ft2: 3,425 3,928 3,557 2,404 5,201 8,153 h. Temporary Design Volume, ft3: 5,140 5,882 4,816 2,819 6,894 12,048 i. Temporary Design Elev., fmsl: 14.25 10.25 12.15 10.0 11.15 9.30 j. Controlling Orifice Diameter, in: 1 1 1 0.75 1 1.5 k. Forebay Volume, ft3: 1,636 1,691 1,555 888 2,462 4,794 I. Receiving Stream: Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek m. Stream Index Number: WOK02 19-23 WOK02 19-23 WOK02 19-23 WOK02 19-23 WOK02 19-23 WOK02 19-23 n, Classification of Water Body: SC NSW SC NSW SC NSW SC NSW SC NSW SC NSW II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 060110 4. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in any of the ponds is 1/8th horsepower. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for maintenance and inspection shall be provided. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 060110 13. The Director may notify the permittee when the permitted site does not meet one'or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership.change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 2nd day of February 2006. NORTH-CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Tor Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 060110 BEQ French Creek P-1150 & P-1155 CC# N62470-01 -D-1 141 Stormwater Permit No. SW8 060110 Onslow Count Designer's Certification I, - , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. . The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 060110 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2.' The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 7 of 7 r� t1t WET DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1060110.WK1 PROJECT * SW8 060110 REVIEWER: L. Lewis PROJECT NAME: BEQ's French Creek P-1150 & P-1155 Orig.Run Date0111812006 PuS5 jso Last Modified: 31-Jan-06 Pond A Pond B Pond C Pond D Pond F Pand G Receiving Stream: Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek Cogdels Creek Classification: SC NSW SC NSW SC NSW SC NSW SC NSW SC NSW Index Number: WOK02 19-22 WOK02 19-22 WOK02 19-22 WOK02 19-221 WOK02 19-22 WOK02 19-2 Onsite DA, sf= 85813.00 135472.00 132422.00 54014.00 172062.00 213880.00 Offsite DA, sf = 0.00 0.00 0.00 0.00 0.00 0.00 Total Drainage Area: 85813,00 135472.00 132422.00 54014.00 172062.00 213880.00 Built -Upon Area Buildings/Lots, sf= 0.00 23694.00 21559.00 0.00 21560.00 2128.00 Streets/Parking, sf= 60251.00 35269.00 30780.00 30355.00 56204.00 132878.00 Sidewalk/Concrete, sf= 423.00 5303,00 1259.00 3333.00 4489.00 9991.00 Other, sf= 0.00 4243,00 1723.00 0.00 0.00 0.00 Offsite, sf= 0.00 0.00 0.00 0.00 0.00 0.00 Total Built -upon Area: : 60674.00 1 68509.00 55321.00 33688.00 82253.00 1 144997.00 Surface Area impervious ­70.70% 50.57% 41.78% 62.37% 47.80% 67.79% Design Depth, ft: 6.00 6.00 5.50 5.00 5.50 6.00 TSS (85% or 90%): 90 90 90 90 90 90 SA/DA ratio 3.95% 2.74% 2.61 % 4.47% 2.97% 3.79% Req. Min. SA, sf: 3389 3712 3452 .2412 5107 8105 Volume Calculations Design Storm, inches: 1 1 1 1 1 1 Rational Cc= 0.73 0.59 0.52 0.67 0.56 0.71 Rational Volume, cf: 5222 6610 5723 3006 8062 12632 Rv = 0.686 0.505 0.426 0.611 0.480 0.660 Min. Req. Volume= 4908 5703 4701 2752 6886 11766 Bottom Elevation= 7,00 3.00 5.50 4.00 4.50 2.00 Permanent Pool Elev= 13.00 9.00 11.00. 9.00 10.00 8.00 Perm Pool Area= 3425.00 3928.00 3557.00 2404.00 5201.00 8153.00 Design Pool Elevation= 14.25 10.25 12.15 10.00 11.15 9.30 Design Pool Area= 4640.00 5303.00 47C0.00 3234.00 6643.00 10094.00 Total Volume Prov. = 5041 5769 4748 2819 6810 11861 Forebay Volume Permanent Pool Vol.= 7448.00 8172.00 7776,00 4266.00 12310.00 23971.00 Req. Forebay Volume= 1489.6 1634.4 1555.2 853.2 2462 4794.2 Prov. Forebay Volume: 1636.00 1691 1704 888.00 2708.00 5257.00 Percent= (22>%>18) 22% 21% 22% 21% 22% 22% Pond A Pond B Pond C Drawdown OrificelWeir Avg. Head, ft = 0.60 0.60 0.55 Average Flow Q2, cfs 0.028 0.033 0.027 Average Flow Q5, cfs 0.011 0.013 0.011 Q2 Area, sq. in. = 1.09 1.27 1.00 'Q5 Area, sq. in. = 0.44 0.51 0.44 No. of Orifices 1 1 1 Orifice Diameter, in.= 1 1 1 Orifice Area, sq. in. = 0.785 0.785 0.785 Weir Height, inches= Weir Length, inches= Weir C = 9.389 12.090 11.774 Weir U, eff. length= -0.038 0.004 -0.111 Avg. Flowrate, Q, cfs = 0.020 0.020 0.020 Drawdown, days = 2.8 3.2 2.8 Pond D Pond F Pond G 0.48 0,55 0.62 0.01E 0.040 0.068 0.006 0.016 0.027 0.68 1.60 2.59 0.27 0.64 1.04 1 1 1 0.75 1 1.5 0.442 0.785 1.767 7,608 10.738 9.801 -0.097 -0.111 -0.124 0.010 0.020 0.046 3.1 4.1 2.9 L` (t STEWART TO FROM Linda Lewis David Boyette NCDENR Express Permitting Unit Civil Department 127 Cardinal Drive Extension (919) 380-8750 x (166) Wilmington, NC 28405 DATE ebruary 01, 2006 SENT VIA Hand Delivery 0%-- v -1� . PROJECT NUMBER PROJECT NAME C5039 Camp Leieune BEQ — French Creek P1150/1155 COPIES DATE DESCRIPTION 2 02-01-06 Revised Sh. CG502 & Sh. CG503 1 Page 1-of Pond D Supplement For approval For review & comment Returned for corrections Far your use Approved as submitted Returned after review As requested Approved as noted Resubmit copies for approval COMMENTS Linda, Please find the revised detail sheets. The drawdown orifice pipe invert for Pond G has been changed to 8.0 and the detail for each riser structure has been revised to remove the 'slot'. The note for each drawdown pipe has also been revised. Please let me know if you need anything further. Thank you. Dave Boyette SIGNE C�✓` oo7,-,,-- David Boyette COPIED TO ENGINEERING. INNOVATION. SOLUTIONS- 26C TOWN HALL DR MORRISVILLE,NC T919,380.8750 SUIIEC 27560 r919.3110.8752 STEWART LETTER OF TRANSMITTAL TO FROM Linda Lewis i David Boyette NCDENR Express Permitting Unit Civil Department 127 Cardinal Drive Extension (919) 380-8750 x (166) Wilmington, NC 28405 DATE SENT VIA January 30, 2006 Hand Delivery PROJECT NUMBER PROJECT NAME C5039 Camp Le)eune BEQ - French Creek P1150/1155 COPIES DATE DESCRIPTION 2 01-24-06 Revised Construction Drawings those that changed) 1 01-24-06 Revised Supplemental forms 2 01-24-06 Revised Storm Drainage Calculations 1 01-24-05 Response Letter For approval For review & comment Returned for corrections For your use Approved as submitted Returned after review As requested Approved as noted Resubmit copies for approval COMMENTS Linda, Please find the attached documents for your continuation of the review of this permit. Please let me know if you need anything further or have any questions. Thank you, Dave Boyette SIG r,_, -,V� 0 David Boyette P COPIED TO Carl Baker ENGINEERING. INNOVATION, SOLUTIONS.` 260 TOWN HALL OR MORRfSV1LLE. NC T 019.380.6750 SUITE C 27560 f 919.380.8752 STEWART ENGINEERING, INC. PROWACHOVIA 16960 GENERAL ACCOUNT =Q4.2% 260 TOWN HALL DR. SUITE C 66-16ZJ531 MORRISVILLE, NC 27560 CHECK DATE January 27, 2006 (919)380-8750 PAY One Thousand and 001100 Dollars AMOUNT $1,000.00 TO NCDENR 127 Cardinal Drive Extension E Wilmington NC 28405-2845 , r3�Q P -116 D t P-1155 1o(170110 rh_Qal 00 ENGINEERING, INC. GENERAL ACCOUNT 16960 Invoice Number�� L D.Boyette Check R 'ate �1'125106 Voucher [ 0014923 Amount � 1,D00.00 Discounts � Previous Pay Net Amount 1,000.00— NCOENR ,a 26 � Totals—� _ — 1,000.00 - - - —� 1,000.00 — JAN 3 0 2006 Qv• 0 1 1 1 1 1 Stormwater Impact Analysis NCDENR Stormwater Permit For the proposed MCB Camp Le]eune - Batchelor Enlisted Quarters, French Creek - P1150/P1155 N62470-01-D-1141 Jacksonville, North Carolina Prepared for Clark Nexsen Architecture & Engineering Prepared By Stewart Engineering, Inc. 0($) STEWART January 18, 2006 Revised January 24, 2006 RECEIVED JAN 3 0 2006 owe *'noi # fs o (00 �V � �FESS/p� ' Q ' _ SEAL 02259 1 c~ _ � 1 ,, �... 4 � � � .a_�1i r� ? � fir} �, ',� ±`1 � � � � . 1 Y t �. \ � :� Storm Impact Analysis For MCB Camp LeJeune - Batchelor Enlisted Quarters French Creek - P1150/P1155 Jacksonville, North Carolina Prepared for: Clark Nexsen Prepared by: Stewart Engineering, Inc. 260 Town Hall Drive, Suite C Morrisville, NC 27560 919.380.87S0 Stewart Project No. C5039 January 24, 2006 ' STORMWATER IMPACT ANALYSIS MCB CAMP LE]EUNE - BATCHELOR ENLISTED QUARTERS ' WILMINGTON, NORTH CAROLINA EXECUTIVE SUMMARY ' This Stormwater Impact Analysis has been prepared specifically to address the requirements of Section 15A NCAC 02H .1005 of the North Carolina ' Administrative Code as it pertains to the stormwater requirements for coastal counties. The project site does not drain to Outstanding Resource Waters nor is it within one-half mile of SA waters or unnamed tributaries of SA water. Therefore, stormwater management must be in accordance with Rule .1005 (3). Site Information The Camp LeJeune Batchelor Enlisted Quarters - French Creek P1150/P1155 site is located at the corner of McHugh Blvd and Gonzales Blvd on the campus of Camp LeJeune Marine Corps Base. The sites lie within the White Oak River Basin t and are outside of any stream buffers and Water Supply Watersheds. The sites do however encompass areas below the 100-yr flood elevation as defined by FIRM 3720530200J as well as wetlands certified by the Army Corps of Engineers. No ' land disturbance activities will take place below the elevation of the 100-yr Flood Elevation or within areas defined as wetlands. Both sites are previously undeveloped wooded areas that have been logged by Camp LeJeune. They currently exist as cut -over woodlands. The sites drain from east to west to tributaries of Cogdels Creek which is a tributary of the New River. The overall drainage patterns will remain the same in the proposed condition. Proposed Improvements ' The project area consists of two sites, P1150 & P1155. Each site will consist of two Batchelor Enlisted Quarters buildings, a mechanical building, and associated ' parking areas. Recreation amenities will also be included on each site along with a sanitary sewer lift station located on Site P1155. The total site area and impervious area for P1150 are 14.11ac and 5.00ac (35.4%), respectively where as the total ' site area and impervious area for P1155 are 13.24ac and 5.22ac (39.4%), respectively. Stormwater for the proposed sites will be managed using wet detention ponds. Site P1150 will have four (4) ponds that capture runoff from all proposed impervious surface while Site P1155 has two (2) ponds. Design Requirements ' Per Section 15A NCAC 02H .1005 (3) of the North Carolina Administrative Code for sites that are not with 575 ft of Outstanding Resource Water or within 0.5 miles of SA waters the State Stormwater Regulations mandate that the runoff from 1 1 the first inch of rainfall be captured and released over a period of 2 to 5 days. The treatment devices proposed for this development are wet detention ponds. Each pond will be designed to remove 90% Total Suspended Solids and will not incorporate a grassed Swale at its outlet. Design Procedure First, the drainage area to each wet detention pond was delineated. The total area and impervious area for each drainage area was then determined. An Exhibit map for each site has been is included that shows the proposed drainage area for each proposed pond. Each wet detention pond has been sized to capture the runoff: from the first inch of rainfall for its entire drainage area and hold that runoff for 2 to 5 days. The required surface area for the ponds was determined by using the Surface Area to Drainage Area chart -for Coastal Counties. A length to width ratio of 3:1 is also required. For ponds not achieving a length to wide ratio of 3:1 wooden baffles have been added to ensure that the flow path is at least 3 times the wide of the flow channel. Overall Results / Summary Table 1 below shows the statistics for each wet detention pond. Each pond exceeds its required surface area for. 85% TSS removal and incorporates a vegetated Swale at its outlet; therefore treatment credit is assumed for the entire drainage area to each pond. ' Pond Data Table Pond A I Pond B Pond C Pond D Pond F Pond G A - Top of Dam 15.50 11.50 13.50 11.00 12.50 10.50 B. - Inv Main Pond 7.00 3.00 5.50 4.00 4.50 2.00 C - Top of Forbay Berm 13.50 9.50 11.50 9.50 10.50 8.50 D - Inv Forbay 8.00 4.00 6.00 5.00 5.00 3.00 E - Normal Pool Elev 13.00 9.00 11.00 9.00 10.00 8.00 Inv Emer. Spillway 14.25 10.25 12.15 10.15 11.25 9.30 Riser Elev 14.25 10.25 12.15 10.00 11.15 9.30 Drawdown Orifice Elev 13.00 9.00 11.00 9.00 10.00 8.00 Drawdown Orifice Size 1" 1" 1" 0.75" 1" 1.5" Conclusions ' Based on the results of this Stormwater Impact Analysis, the requirements of Section 15A NCAC 02H .1005 of the North Carolina Administrative Code as it pertains to the stormwater requirements for coastal counties have been met for the ' proposed project. Runoff from all new impervious area has been captured and treated in one of six (6) proposed wet detention ponds. 0 Ll 1 S ' SSEWART. Wet Detention Pond Sizing - Pond A (for 90% TSS removal) Project Camp Le]eune BEQ - P1150 Number C5039 Date 23-Jan-06 Required Surface Area Required Storage for 1st inch of runoff Total Drainage Area = 1.97 ac Simple Method Total Impervious Area = 1.39 ac Percent Impervious = 71% Rv = 0.05 + 0.009(I) I = % impervious = 71% Perm. Pool Depth = 6 ft SA/DA Ratio (Table 1.1) = 3.97 Rv = 0.69 in Surface Area Required = 3407 sf Volume = 4899 cf — 0.08 ac Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November 1995 I . ' 260 Town Hall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com ST E WA'R;T Water Quality Drawdown Calculations - Pond A - 1150 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 1.97 ac Pond Invert = 7.00 ft Total Impervious Area = 1.39 ac Normal Pool Elevation = 13.00 ft Percent impervious = 71% Next available Outlet = 14.25 ft Average Head = 0.63 ft Rv = 0.05 + 0.009(I) Avg Area (13 to 14) 3928 I = % impervious = 71% Avg Area (14 to 15) 4848 Rv = 0.69 in Depth above Nor. Pool to Runoff Vol. = 4,899 cf meet vol. requirement = 1.25 ft Storage Volume at Normal Pool = 7448 cf Storage Volume above Normal Pool = 5140 cf Temporary Storage Volume = 5140 cf Find orfice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) = 0.0297 cfs Q=Cp*A*(2*g*h)-(1/2) (Orfice Equation - solve for A (area)) A= 0.00781 ft' 1.12525 in' Orfice Size 2 day) = 1.20 in dia Find orfice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0119 cfs Q=Co*A*(2*g*h)A(1/2) (Orfice Equation - solve for A (area)) A= 0.00313 ft' 0.45010 in' Orfice Size 5 day) = 0.76 in dia Select orfice size between 2 and 5 day size Size selected = 1" 11 1 1 - - 0%, STEWA.RT. Volume Calculations - Pond A - 1150 Forbay Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 8 47 0 0 9 122 85 85 10 228 175 260 11 365 297 556 12 532 449 1005 13 730 1 631 1636 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 7 183 0 0 8 336 260 260 9 527 432 691 10 749 638 1329 11 1001 875 2204 12 1760 1381 3585 13 2695 2228 5812 Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 13 3425 0 0 14 4431 3928 3928 15 5265 1 4848 8776 Forbay Vol (NP) = 1636 cf Total Vol (NP)= 7448 cf Forbay equals 22.0% of total volume. C S� STE WA R:T Wet Detention Pond Sizing - Pond 6 (for 90% TSS removal) Project Camp LeJeune BEQ - P1150 Number C5039 Date 23-)an-06 Required Surface Area Re aired Storage for 1st inch of runoff Total Drainage Area = 3.11 ac Simple Method Total Impervious Area = 1.57 ac Percent Impervious = 50% Rv = 0.05 + 0.009(I) I = % impervious = 50% Perm. Pool Depth = 6 ft SA/DA Ratio (Table 1.1) = 2.7 Rv = 0.50 in Surface Area Required = 3658 sf Volume = 5694 cf — 0.08 ac Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November ,- Surface Areas,Pro� d."ed at' N J,__ ool — x3928 sf ' 260 Town Hall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com 1 1 ---'-------,-:-STEWART:: Water Quality Drawdown Calculations - Pond B - 1150 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 3.11 ac Pond Invert = 3.00 ft Total Impervious Area = 1.57 ac Normal Pool Elevation = 9.00 ft Percent Impervious = 50% Next available Outlet = 10.25 ft Average Head = 0.63 ft Rv = 0.05 + 0.009(I) Avg Area (9 to 10) 4496 I = % impervious = 50% Avg Area (10 to 11) 5543 Rv = 0.50 in Depth above Nor. Pool to Runoff Vol. = 5,694 cf meet vol. requirement = 1.25 ft Storage Volume at Normal Pool = 8172 cf Storage Volume above Normal Pool = 5881 cf Temporary Storage Volume = 5881 cf Find orfice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0340 cfs Q=Cp*A*(2*g*h)A(1/2) (Office Equation - solve for A (area)) A= 0.00894 ftz 1.28749 in2 Orfice Size (2 day) = 1.28 in dia Find office size for 5-day drawdown time Flow Rate : Volume (cf) / Time (sec) 0.0136 cfs Q=Cp*A*(2*g*h)A(1/2) (Orfice Equation - solve for A (area)) A= 0.00358 ft2 0.51500 inz orfice Size 5 day) = 0.81 in dia Select orfice size between 2 and 5 day size Size selected = 1" %TEW*Z-t-' Volume Calculations - Pond B - 11.50 Forbav Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 4 67 0 0 5 142 105 105 6 245 194 298 7 376 311 1 609 8 534 455 1064 9 720 627 1691 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 3 100 0 0 4 296 198 198 5 531 414 612 6 809 670 1282 7 1129 969 2251 8 2062 1596 3846 9 3208 2635 6481 Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 9 3928 0 0 10 5063 4496 4496 11 6022 5543 10038 Forbay Vol (NP) = 1691 cf Total Vol (NP)= 8172 cf Forbay equals 20.70/o of total volume. S; S T:E WART; Wet Detention Pond Sizing - Pond C (for 90% TSS removal) Project Camp E_eleune BEQ - P1150 Number C5039 Date 23-Jan-06 Required Surface Area Re uired Stora a for 1st inch of runoff Total Drainage Area = 3.04 ac I Simple Method Total impervious Area = 1.27 ac Percent Impervious = 42% Rv = 0.05 + 0.009(I) I = % impervious = 42% Perm. Pool Depth = 5.5 ft SA/DA Ratio (Table 1.1) = 2.62 Rv = 0.43 in Surface Area Required = 3469 sf Volume = 4701 cf = 0.08 ac Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November ,S,urface Area�PrOMLOALM mal PootWd" 3557 -sf "" 260 Town Hall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919.380.8752 www,stewart-eng.com .STEWk' Water Quality Drawdown Calculations - Pond C - 1150 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 3.04 ac Pond Invert = 5.50 ft Total Impervious Area = 1.27 ac Normal Pool Elevation = 11.00 ft Percent Impervious = 42% Next available Outlet = 12.15 ft Average Head = 0.58 ft Rv = 0.05 + 0.009(I) Avg Area (11 to 12) 4069 I = % impervious = 42% Avg Area (12 to 13) 4982 Rv = 0.43 in Depth above Nor. Pool to Runoff Vol. = 4,701 cf meet vol. requirement = 1.15 ft Storage Volume at Normal Pool = 7776 cf Storage Volume above Normal Pool = 4816 cf Temporary Storage Volume = 4816 cf Find orfice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) = 0.0279 cfs Q=Co*A*(2*g*h)A(1/2) (Orfice Equation - solve for A (area)) A= 0.00763 ft2 1.09914 in Orfice Size 2 day) = 1.18 in dia Find orfice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0111 cfs Q=Cp*A*(2*g*h)A(1/2) (Orfice Equation - solve for A (area)) A= 0.00305 ft2 0.43966 in' Office Size 5 da = 0.75 in dia Select orfice size between 2 and 5 day size Size selected = 1" Volume Calculations - Pond C - 1150 Forbay Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 6 92 0 0 7 143 118 118 8 241 192 310 9 347 294 604 10 551 449 1053 11 751 1 651 1704 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 5.5 221 0 0 6 1 378 150 150 7 1 615 497 646 8 797 706 1352 9 1080 939 2291 10 1839 1 1460 3750 11 2806 1 2323 1 6073 Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 11 3557 0 0 12 4580 4069 4069 13 5383 4982 9050 Forbay Vol (NP) = 1704 cf Total Vol (NP)= 7776 cf Forbay equals 21.9% of total volume. 1 1 1 1 1 5 1 S T;E W A.R T, ' Wet Detention Pond Sizing - Pond D (for 90% TSS removal) ' Project Camp LeJeune BEQ - P1150 Number C5039 Date 23-Jan-06 Required Surface Area Required Storage for 1st inch of runoff Total Drainage Area = 1.24 ac Simple Method Total Impervious Area = 0.77 ac Percent Impervious = 62% Rv = 0.05 + 0.009(I) I = % impervious = 62% Perm. Pool Depth = 5 ft SA/DA Ratio (Table 1.1) = 4.44 Rv = 0.61 in Surface Area Required = 2398 sf Volume = 2741 cf — 0.06 ac Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November 1995 1 260 Town Nall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919,380.8752 www.stewari-eng.com 1 Water Quality Drawdown Calculations - Pond D - 1150 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 1.24 ac Pond Invert = 4.00 ft Total Impervious Area = 0.77 ac Normal Pool Elevation = 9.00 ft Percent Impervious = 62% Next available Outlet = 10.00 ft Average Head = 0.50 ft Rv = 0.05 + 0.009(I) Avg Area (10 to 11) 2819 I % impervious = 62% Avg Area (11 to 12) 3589 Rv = 0.61 in Depth above Ivor. Pool to Runoff Vol. = 2,741 cf meet vol. requirement W 1.00 ft Storage Volume at Normal Pool = 4266 cf Storage Volume above Normal Pool = 2819 cf Temporary Storage Volume = 2819 cf Find office size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) — 0.0163 cfs Q=Ca*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.00479 ft' 0.68998 in2 Orfice Size 2 day) = 0.94 in dia Find orfice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0065 cfs Q=Co*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.00192 ft' 0.27599 in Orfice Size 5 day) = 0.59 in dia Select orfice size between 2 and 5 day size Size selected = 0.75 STf WART Volume Calculations - Pond D - 1150 Forbav Volume Contour (ft) Area (ft2) I ncr Vol (ft3) Accu m Vol (ft3) 5 43 0 0 6 107 75 75 7 199 153 228 8 320 260 488 9 481 401 8$8 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 4 105 0 0 5 229 167 167 6 390 310 477 7 580 485 962 8 1165 873 1834 9 1923 1544 3378 Volume above !Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 9 2404 0 0 10 3234 2819 2819 11 t754t. 3589 6408 Forbay Vol (NP) = 888 cf Total Vol (NP)= 4266 cf Forbay equals 20.8% of total volume. 1 S ' STEWART Wet Detention Pond Sizing - Pond F (for 90% TSS removal) Project Camp Leleune BEQ - P1155 Number C5039 Date 23-1an-06 Required Surface Area Required Storage for 1st inch of runoff Total Drainage Area = 3.95 ac Simple Method Total Impervious Area = 1.89 ac Percent Impervious = 48% Rv = 0.05 + 0.009(1) I = % impervious = 48% Perm. Pool Depth = 5.5 ft SA/DA Ratio (Table 1.1) = 2.98 Rv = 0.48 in Surface Area Required 5127 sf Volume = 6892 cf = 0.12 ac 1 Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November 1995 1 1 1 260 Town Hall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com S T<E WA<R T. Water Quality Drawdown Calculations - Pond F - 1155 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 3.95 ac Pond Invert = 4.50 ft Total Impervious Area = 1.89 ac Normal Pool Elevation = 10.00 ft Percent Impervious = 48% Next available Outlet = 11.15 ft Average Head = 0.58 ft Rv = 0.05 + 0.009(I) Avg Area (10 to 11) 5842 I = % impervious = 48% Avg Area (11 to 12) 7018 Rv = 0.48 in Depth above Nor. Pool to Runoff Vol. = 6,892 cf meet vol. requirement = 1.15 ft Storage Volume at Normal Pool = 12310 cf Storage Volume above Normal Pool = 6894 cf Temporary Storage Volume = 6894 cf Find orfice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) = 0.0399 cfs Q=Ca*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.01093 ft' 1.57353 in? orfice Size 2 day) = 1.42 in dia Find orfice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0160 cfs Q=Cp*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.00437 ft' 0.62941 in Orfice Size 5 day) = 0.90 in dia r ct orfice size between 2 and 5 day size Size selected = 1" S 5 T E WART, Volume Calculations - Pond F - 1155 Forbav Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 5 160 0 0 6 278 219 219 7 425 352 571 8 601 513 1084 9 805 703 1787 10 1037 921 2708 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 4.5 456 0 0 5 1 666 281 281 6 983 825 1105 7 1340 1162 2267 8 1732 1536 3803 9 2852 2292 6095 10 4164 3508 9603 Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 10 5201 0 0 11 6482 5842 5842 12 1 7554 7018 12860 Forbay Vol (NP) = 2708 cf Total Vol (NP)= 12310 cf Forbay equals 22.0% of total volume. Ll 1 1 1 S STEWART. Wet Detention Pond Sizing - Pond G (for 90% TSS removal) Project Camp LeJeune BEQ - P1155 Number C5039 Date 23-Jan-06 Required Surface Area Re uired storage for 1st inch of runoff Total Drainage Area = 4.91 ac Simple Method Total Impervious Area = 3.33 ac Percent Impervious = 68% Rv = 0.05 f 0.009(I) I = % impervious = 68% Perm. Pool Depth = 6 ft SA/DA Ratio (Table 1.1) = 3.8 Rv = 0.66 in Surface Area Required = 8127 sf Volume = 11770 cf - 0.19 ac Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, November 1995 ,� �� � � Surface {} mal Pool �8153 sfq'd ..ni:�,6�rLas.�C.� �, . ...�..wm.�—�'w...��}�cR�twr..�}EbnR�wu..:.neasW6.�v� �I . ..•a�P��ewr�a.MMw.M48s.rc.'� .alawYir¢6urYm��:i�dx I 260 Town Hall Drive, Suite C, Morrisville, NC 27560 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com S.T: E.WA R T Water Quality Drawdown Calculations - Pond G - 1155 (1st inch of rainfall) Storage Volume Required (Simple Method) Basin Characteristics Total Drainage Area = 4.91 ac Pond Invert = 2.00 ft Total Impervious Area = 3.33 ac Normal Pool Elevation = 8.00 ft Percent Impervious = 68% Next available Outlet = 9.30 ft Average Head = 0.65 ft Rv = 0.05 -+- 0.009(1) Avg Area (8 to 9) 8951 I = % impervious = 68% Avg Area (9 to 10) 10325 Rv = 0.66 in Depth above Nor. Pool to Runoff Vol. = 11,770 cf meet vol. requirement = 1.30 ft Storage Volume at Normal Pool = 23971 cf Storage Volume above Normal Pool = 12048 cf Temporary Storage Volume = 12048 cf Find orfice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0697 cfs Q=Cp*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.01796 ft2 2.58640 in Orfice Size 2 da = 1.81 in dia Find orfice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) = 0.0279 cfs Q=CD*A*(2*g*h)^(1/2) (Orfice Equation - solve for A (area)) A= 0.00718 ft2 1.03456 in Orfice Size 5 day) = 1.15 in dia Select orifice size between 2 and 5 day size Size selected = 1.5" I� 1 I 1 S T.E W.kR T Volume Calculations - Pond G - 1155 Forbav Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 3 506 0 0 4 694 600 600 5 901 798 1398 6 1135 1018 2416 7 1397 1266 3682 8 1754 1576 5257 Total Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 2 1246 0 0 3 1736 1491 1491 4 2216 1976 3467 5 2745 2481 5948 6 3389 3067 9015 7 4805 4097 13112 8 6399 5602 18714 Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 8 8153 0 0 9 9749 8951 8951 10 1 10900 1 10325 19276 Forbay Vol (NP) = 5257 cf Total Vol (NP)= 23971 cf Forbay equals 21.9% of total volume. I 'I s .- I -I 1 -I -I -I 0 0.3 0.6 0.9 1.2 1.5 km 0 0.2 0.4 0.6 0.8 1 mi Map center is UTM 18 285837E 3836466N (WGS84/NAD83) Camp Lejeune quadrangle M--9.482 Projection is UTM Zone 18 NAD83 Datum G=-1.329 4 It January 24, 2005 MCB Camp Le]eune Batchelor Enlisted Quarters French Creek — P115O/P1155 Stormwater Permit Number: SW8 96O123mod The following are the review comments and corrections for the above referenced plan: I. Please remove the elevations shown on the typical pond section detail and provide a table with the pertinent elevations and orifice size for each pond. Response: The elevations have been removed from the typical pond detail and a table with elevation information for each pond has been added. 2. The outlet structure details indicated that the orifice is being placed at the temporary pool elevation. Please revise these details so that the orifice invert is at the permanent pool elevation. The pond cannot draw down to the permanent pool elevation in 2-5 days if the orifice is located at the temporary pool elevation. Response: The detail for each outlet structure has been revised to show the orifice at the permanent pool elevation for each pond. 3. The outlet structure details also show the orifice located within a "slot" whose invert appears to be at the temporary pool elevation. The slot is OK as long as its invert is at the permanent pool elevation or higher, but the orifice should not be located in such a slot. The orifice must be the only outlet available at the permanent pool elevation. Response: The slot shown on each outlet structure detail is only shown as a means to insert the orifice pipe into the riser structure. As is indicated by a note on each detail, the slot is to grouted closed around the orifice pipe after the completion of construction. This will ensure that the only available outlet at the permanent pool elevation is the orifice. 4. A swale is not the same thing as a vegetated filter. Please design adequate filters based on the attached sketch. The flow spreader mechanism of the filter is placed on contour such that flow is evenly dispersed across the entire width of the filter. The filter itself is flat from side to side, with a longitudinal slope of 5% or less. The 30 foot is measured parallel with the flow. Response: All ponds have been revised to meet the requirements for 90% TSS removal in lieu of having a vegetated filter. The SAIDA ratio has been revised along with the pond depths and surface areas. All subsequent information has been updated and resubmitted. The ponds were revised to meet 90% TSS removal rather than incorporating a vegetated swale meeting the specified requirements because of space limitations. 5. Please show the location of and label each 30' vegetated filter on the plans. Additionally, please add a pond -specific detail of the filter showing the flow spreader mechanism, contours, and spot elevations for the filter. Response: Please see response to Comment No. 4. 6. Based on interpolating the surface area at the specified design pool elevation, from the area and volume tables provided in the calculations, each pond's 1" storage volume is deficient. Please provide sufficient storage for the 1" volume. r Page 2 Response: The calculations previously presented calculated the volume above the permanent pool based upon the Ks and b value for each pond. Based upon the comment above, this is not the preferred method. Calculations for the 1"storage volume for each pond have been done by interpolating the surface area between contours. The revised calculations are attached. 7. There is an error in the surface area design calculations for Pond C. At 42% impervious, a 4.0 design depth, and using the 85% TSS chart, the SA/DA ratio is 3.34%, not 2.74%. Please correct and revise the application and plans as necessary. Response: It appears that the SAIDA listed on the supplemental form and in the calculations for Pond Cis correct at 2.74%. The ratio for a 4.0' design depth at 40% impervious is 2.6 and is 3.3 at 50% impervious. By interpolating between the two values for 42% gives a SAIDA ratio of 2.74. However, due to the fact that each pond has been revised to treat to 90% TSS, the SAIDA for the pond have been revised as well. 8. At 17%, the forebay volume for Pond B is a little below the acceptable range of 18%-22%. Please provide more volume in this forebay such that it will fall in the acceptable range. Response: The forebay volume for each revised pond is now within the acceptable range of 18%-22%. 9. The supplement for Pond B indicates that the drainage area and built -upon areas are the same as for Pond A, which is incorrect. Please correct and revise the supplement. Response: The supplement form for each pond has been revised and resubmitted. 10.The orifice sizing calculations for Pond G indicate that the acceptable range of diameters for that pond are between 1.2" and 1.9", however, a 1" orifice has been chosen. Please choose a correct orifice size and revise the application and plans as necessary. Response: The orifice size for Pond G has been revised to 1.5" as to fall within the acceptable range. 11.Please remove Weeping Love Grass from the seeding schedule. This grass is not recommended for use in North Carolina as either a temporary or permanent ground cover. Response: Weeping Love Grass has been removed from the seeding schedule. 12.A detail sheet labeled for Ponds F & G has not been provided, however, there is a detail sheet for Ponds A and B under P-1155. Please relabel these ponds on this detail sheet to F & G to match up to the drainage area delineation, the application and the calculations. Response: The labels on the detail sheet have been revised. Page 3 13.Please provide dimensions for each line and arc of the permanent pool contour. Without this information, I am unable to make a determination regarding this project's compliance with the 3:1 L:W requirement. Response: In order to show compliance with the 3:1 length to width ratio, Exhibit Maps EX-3 and EX-4 have been added. These exhibit maps shown the normal pool contour of each pond along with dimensions for the average length and width for each pond. For ponds with baffles, the artificially created flow path is dimensioned along with the width of the flow path. The lines and arcs of the permanent pool contour have also been dimensioned as requested. 14. Please provide a separate pond section view for those ponds with baffles or other means to create an artificially longer flow path. The section view should show the distances to the baffle from established points and show the top elevation of the baffle. The top of the baffle must be at least as high as the temporary pool elevation. Response: A separate detail for each pond having baffles to create longer flow paths has been added to its respective Stormwater Management Plan Sheet (CG115 or CG124). Each detail shows the top elevation of the baffle. Coordinates have also been added to the ends of each baffle to ensure that the baffles will be constructed in the correct location. This information has been added to CG115 and CG124 as well. 15.Please add the nearest intersection of two major roads to a vicinity map. A major road is any 1, 2, or 3 digit NC, US or interstate highway. Ideally, the vicinity map should be geared toward driving to the site from Wilmington. Response: A vicinity map and location map have been added to Sheet CS100. 16.Please report the temporary pool elevation as that elevation above the permanent pool where the next outlet is available, not the elevation that equates to the 1" storage volume. For example, if the required i" storage volume is provided at elevation 13.5, but the next outlet above the permanent pool is at elevation 14, then the temporary pool should be reported as 14. If you place and overflow slot or pipe at elevation 13.5, then 13.5 should be reported as the temporary pool elevation. The same applies to the temporary pool volume -please report the volume provided at the specified temporary pool elevation. Response: The temporary pool elevation and storage volume have been revised accordingly for each pond. SW8 060110 BhQ's P-1 150 & P-I 155 Subject: SW8 060110 BEQ's P-1150 & P-1155 From: Linda Lewis <Iinda.Iewis@ncmail.net> Date: Wed, 18 Jan 2006 18:05:37 -0500 To: David Boyette <dboyette@stewart-eng.com> CC: Cameron Weaver <Cameron.Weavcr@ncmai1.net> David: Attached please find my letter requesting additional information for this project. Please note that this application is very inadequate, and due to this inadequacy, you must submit an additional re -application fee of $1000.00 to continue this review in the Express program. Hard copy will follow in the mail along with all referenced pages necessary for revision. Linda 110.jan06.doc Content -Type: application/msword Content -Encoding: base64 loft 1/20/2006 7:58 AM �pF WATF9Q Michael F. Easley, Governor p G William G. Ross, Jr., Secretary 65 r North Carolina Department of Environment and Natural Resources >_ p < Alan W. Klimek, P.E. Director Division of Water Quality January 18, 2006 Mr. Carl Baker, Director Design Branch, Public Works Division MCB-Camp Lejeune 1005 Michael Road Camp Lejeune, NC 26547 Subject: Request for Additional Information Stormwater Project No. SW8 060110 BEQ French Creek P-1150 & P-1155 CC# N62470-01 -D-1 141 Onslow County Dear Mr. Baker: The Wilmington Regional Office received a Stormwater Management Permit Application for BEQ French Creek P-1150 (Gonzales & Julian Smith) & P-1155 (Gonzales & McHugh) on January 17, 2006, with a scheduled Express review date of January 18, 2006. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please remove the elevations shown on the typical pond section detail and provide a table with the pertinent elevations and orifice size for each pond. 2. The outlet structure details indicate that the orifice is being placed at the temporary pool elevation. Please revise these details so that the orifice invert is at the permanent pool elevation. The pond cannot draw down to the permanent pool elevation in 2-5 days if the orifice is located at the temporary pool elevation. 3. The outlet structure details also show the orifice located within a "slot" whose invert appears to be the temporary pool elevation. The slot is OK as long as it's invert is the temporary pool elevation or higher, but the orifice should not be located in such a slot. The orifice must be the only outlet available at the permanent pool elevation. 4. A swale is not the same thing as a vegetated filter. Please design adequate filters based on the attached sketch. The flow spreader mechanism of the filter is placed on contour such that flow is evenly dispersed across the entire width of the filter. The filter itself is flat from side to side, with a longitudinal slope of 5% or less. The 30' foot is measured parallel with the flow. 5. Please show the location of and label each 30' vegetated filter on the plans. Additionally, please add a pond -specific detail of the filter showing the flow spreader mechanism, contours, and spot elevations for the filter. 6. Based on interpolating the surface area at the specified design pool elevation, from the area and volume tables provided in the calculations, each pond's 1" storage volume is deficient: Please provide sufficient storage for the 1" volume. Notch Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1-877-623.6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2oenr.state.nc.us An Equal OpportunitylAffirmative Action Employer— 50% Recycledf10% Post Consumer Paper NorthCaroklia Aatmratfil Mr. Baker January 18, 2006 Stormwater ApplicationNo. SW8.060110 7. There is an error in the surface area design calculations for Pond C. At 42% impervious, a 4.0 design depth, and using the 85% TSS chart, the SAIDA ratio is 3.34%, not 2.74%. Please correct and revise the application and plans as necessary. 8. At 17%, the forebay volume for Pond B is a little below the acceptable range of 18% - 22%. Please provide more volume in this forebay such that it will fall in the acceptable range. — - - 9. The supplement for Pond B indicates that the drainage area and built - upon areas are the same as for Pond A, which is not correct. Please correct and revise the supplement. 10. The orifice sizing calculations for Pond G indicate that the acceptable range of diameters for that pond are between 1.2" and 1.9", however, a 1" orifice has been chosen. Please choose a correct orifice size and revise the application and plans as necessary. 11. Please remove Weeping Love Grass from the seeding schedule. This grass is not recommended for use in North Carolina as either a temporary or permanent ground cover. 12. A detail sheet labeled for Ponds F & G has not been provided, however, there is a detail sheet for Ponds A and B under P-1155. Please relabel these ponds on this detail sheet to F & G to match up to the drainage area delineation, the application and the calculations. 13. Please provide dimensions for each line and arc of the permanent pool contour. Without this information, I am unable to make a determination regarding this project's compliance with the 3:1 L:W requirement. 14. Please provide a separate pond section view for those ponds with baffles or other means to create an artificially longer flow path. The section view should show the distances to the baffle from established points and show the top elevation of the baffle. The top of the baffle must be at least as high as the temporary pool elevation. 15. Please add the nearest intersection of two major roads to a vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway. Ideally, the vicinity map should be geared toward driving to the site from Wilmington. 16. Please report the temporary pool elevation as that elevation above the permanent pool where the next outlet is available, not the elevation that equates to the 1" storage volume. For example, if the required 1" storage volume is provided at elevation 13.5, but the next outlet above the permanent pool is at elevation 14, then the temporary pool should be reported as 14. If you place an overflow slot or pipe at elevation 13.5, then 13.5 should be reported as the temporary pool elevation. The same applies to the temporary pool volume -please report the volume provide at the specified temporary pool elevation. Due to the inadequacy of this application, the Division is requiring a re- application fee of $1000.00 to continue the review of this project in the Express program. Page 2 of 3 Mr. Baker January 18, 2006 Stormwater Application No. SW8 060110 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 1, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be revised and returned or new originals must be provided. Copies are not acceptable. If you' have any questions concerning this matter please feel free to call me at (910) 796-7404. Sincerely, Linda Lewis Environmental Engineer ENB/arl: S:IWQSISTORMWATERIADDINFO120061060110.jan06 cc: David Boyette, Stewart Engineering Linda Lewis Page 3 of 3 f ,r STEWART LETTER OF TRANSMITTAL `"`'✓ `j TO 41C' FROM Cameron Weaver David Boyette NCDENR Express Permitting Unit Civil Department 127 Cardinal Drive Extension (919) 380-8750 x (166) Wilmington, NC 28405 DATE SENT VIA January 17, 2006 Hand Delivery PROJECT NUMBER PROJECT NAME C5039 Camp Leleune BEQ - French Creek P1150/1155 COPIES DATE DESCRIPTION 2 01-16-06 Construction Drawings 1 01-17-06 Check in the amount of $5,400 for Review Fee & S&EC Fee 1 01-17-06 Signed 5tormwater Permit Application and forms 2 01-18-06 Storm Drainage Calculations incl. Exhibit Maps) For approval For review & comment Returned for corrections For your use Approved as submitted Returned after review As requested ❑ Approved as noted Resubmit copies for approval COMMENTS Cameron, Please find the attached submittal package for Stormwater Express Reviews. Please call (or have Carol call) me directly at (919) 380-8750 ext 166 if additional information is needed or if any questions are encountered. Thanks! SIGNED �( David Boyette COPIED TO ENGINEERING. INNOVATION. SOLUTIONS.` 260 TOWN MALL DR MORRISVILLE, NC T 319.380.8750 5WfEC 21560 r 919.SE0.9752 STEWART ENGINEERING, INC. FBI WACxoviA GENERAL ACCOUNT 260 TOWN HALL DR, SU ITE C 56-1621531 MORRISVILLE, NC 27560 (918)300-8750 PAY Five Thousand Four Hundred and 00/100 Dollars Mo. :]K CHECK DATE January 17, 2006 e AMOUNT $5 400.00 TO NCDENR LC 127 Cardinal Drive Extension Wilmington NC 28405-2845 /1 S � 0u C)1 �D STEWARTENGINEERING, INC, GENERAL ACCOUNT 16882 Invoke Number Date Voucher Amount Discounts Previous Pay Net Amount Permit Fee 1/17I06 0014801 5,400,00 5,400,00 NCDENR Totals 5,400.00 5,400.00 ,a RECEIVED JAN 1 7 2006 BY: • 1 1 \ ll\\ ------- ........ ....... . North Carolina Departmont of Environment and Nalural Resources r, ,p 127 Cardinal Drive, Wilmington NC 28405 (910) 395-390u FAX (910) 350-2004 5W C Request for Express Permit Review FILL -IN all information ,below and CHECK req{Aired Permit(s). FAX or email to Cameron. Weaver®nemail.net along with a narrative Bind vicinity map of the project location. Projects must be submitted by 9.00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name Camp LeJeune Madne Corps Erase Company _ Address: Gonzalez & McHugh Blvd City/State Camp LeJeune, NC ,Zip 28547 County Onslow Phone (910) 451.11113- _fax Emii l PROJECT Name__ _Camp LeJeune - B Q P1150/P1155__ PROJECT SYSTEM(S) TRIBUTARY TO Go reek (STREAM NAME:) White Oak RIVER BASIN ENGINEER/CONSULTANT Company _ Stewart Engineerin&inc. Address 260 Town Hall Drive City/State Mor lsville NC Zip 27560 County Wake Phone_ (919) 380-8750 _ _ _ —Fax (9191380-8752 Email dboyette®stewart-ena.com State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required[] Yes ❑ No ❑ STREAM ORIGIN Determination; # of stream calls; Stream (dame ® STORMWA TER ❑ Low Density ® High Den rity-Detention Pond [I High Density -Other Wetlands MUST be addressed bel w ❑ Low Density -Curb & Gutter ❑ ligh Density -infiltration ❑ Off Site ---- --- ---- ----------------------------------------------------------- ❑ COASTAL ❑ Excavation & Fill [] Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development [] Marina Development ❑ Urban Waterfront ---- - -.-. _ -- ----------------- ---- ® LAND QUALITY ® Erosion and Sedimentation Control Plan with '6.29 acres to be disturbed. WETLANDS (401) Wetlands on Property ® Yes ❑ No' Isolate Id Wetlands on Property ❑ yes ® No Check all that a0ly Wetlands Will Be Impacted ] Yes ® No Wetland Impacts: _0.4 Acre(s) Wetlands Delineation has beert completed ® Yes ❑ No ❑ Buffers Impacted: 0.0Acre(s) USACOE Approval of Delineation completed ® Yes [ ] No 404 Application in process w/U:iACOE ❑Yes ®No 1 'Permit received from USACE []Yes []No 401 Application required ❑Yes ® No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. SUBMITTAL DATES: SW CAMA LOS 401 For DENR use only Fee Split for multiple pem-lits: Total Fee Amount $ �.a acianac�r� OUT �ui�aaui�u� ��ema�s dLo:ao so oZ Daa PROJECT SUMMARY CAMP LEJELINE — BEQ P1150111155 CAMP LEJEUEN, NORTH CARO1_INA The proposed project includes the construction of four Bachelor Enlisted Quarters (BEQ) buildings on two adjacent sites on the campus of Camp LeJeune Marine Corps Base. The sites currently exii;t as logged woods land. Each site is approximately 15 acres in size with a toi:al disturbed area of 26 acres. US Army Corps of Engineers delineated wetliinds exist on both sites but will not be impacted by the proposed project. III addition to the four BEQ buildings, surface parking, and recreational amenities (basketball and volleyball courts) will be constructed on site. Stormwater will be treated using a combination of wet detention ponds and bioretention areas to meet the States stormwater regulations for development within coastal counties. The project site is not within 575 ft of ORW or 0.5 miles of SA waters. During construction the proposed wet detention pon Js will be used as sediment basins to meet sedimentation and erosion control regulations. g•d . ZSLBOBEGIG ouI 2UIJaaut9u3 qJemalS d90:00 SO 02 oaa r FAX TRANSMITTAL ti.iTM S T E W A R T TO I"ROM Cameron Weaver David Boyette Recipient Company Name .itewart Engineering F(910)350-2004 7 919.380.8750 x166 log NUMBER REFERENCE C5039 NCDENR Express, Review DATE NO. PAGES HARD COPY MAILED 12-20-05 3 (including cover sheet) NO COMMENTS Cameron, The Request for Express Permit Review for the project that is most critical to us is attached. As we dISCLIssed In our telephone conversation, we would like to schedule our pre submittal meeting on Mon0y, January 9th if at all possible. We have three projects that will be handled through Express Review and were hoping to have all pre submittal meeting at once on Ianuary 9th. If you cannot find time on the 9th do to all three, the Camp LeJeune project is most critical. I will fax you the request forms and narrative for the other two projects this afternoon. If the 9th does not work for the three projects, could we schedule the remaining two for January 16th? Please feel free to call me to discuss. (Our email is down today.) Thank you for making an effort to schedule us on the 9th. Thank you, Dave Boyette If there is a problem with this 1:ansmi5sion, or if you have rective6 this transmission in error, please call 919-380.8750. ENGINEERING, INNOVATION. SOLUTIONS.- 71010wu HALL UR HQRR14WiLL4r, NC , aiv 10n 87SO sJ11EC V56o r ll) S80.6757 • A -7r-, Onocc T 0 OUT 2u 1 Jaau 1 2ua jjemajS JLo : 20 go 02 oa❑