Loading...
HomeMy WebLinkAboutSW8051065_HISTORICAL FILE_20060314STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 D 5 16 (o 5 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 7.o6(oo314 YYYYM M DD Update Contact Information --Raiford Trask, III Subject: Update Contact Information --Raiford Trask, III From: "Lisa Thompson" <lisa@capefearcommercial.com> Date: Tue, 13 Feb 2007 09:44:45 -0500 To: <noelfe.lutheran@ncmail.net> Noelle, I believe I have the wrong number for your office, but I need to speak with you regarding an address change for Raiford Trask. After speaking with Jim Spangler yesterday, we understand you have a copy of the 401 water quality certification and also an invoice from the EEP for Research Park that we never received. _ Raiford's new contact information is as follows: Raiford G. Trask, III 1051 Military Cutoff Road Suite 200 Wilmington, NC 28405 Please resend these documents to our new address and also reply via email or phone to confirm that you received the updated contact information. If you have any questions at all, please do not hesitate to contact me directly. Regards, Lisa M. Thompson Associate Director of Marketing Cape Fear Commercial, LLC 1051 Military Cutoff Road, Suite 200 Wilmington, NC 28405 P: 910.332.4114 x114 F: 910.332.4145 M: 910.262.0404 Email: lisa ca efearcommercial.com www.capefearcommercial.com 1 of 1 1 2/13/2007 11:52 AM vme i STATE OF NORTH CAROLINA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 FM;E ACCESS RECORD SECTION TIME/DATE NAME L_qL4t REPRESENTING ULS Cop& 9 ^2 3q Z_ Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records i_u our custody readily available to the public for review and copying. We also Dave the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the fallowing guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:001)rn. Viewing time ends at 4:45pm. Anyone arrivinE without au appointment may view the Files to the_ extent that time and staff supervision is available. 2. You must specify files you want to review by faci.li_ty name. The number of files that you may review at one tithe will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is .2.5 cents for ALL copies if you make more than 25 copies. There is no charge fax 25 or less copies. Payment may be made by check, money order, or cash at the reception desk Copies can also be invoiced for Your convenience. 4. FELES MUST BE KEPT IN ORDER YOU FOUND TI3EM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases lame totes, etc. are permitted in the file review area. S. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME 2.4u'5—/ 3. Q51U _ P -..i� `3� 2nd LAL t'Z nc 4. qu o 8 i E le_. C�r�rr .; nt B1r� S. pl(L22 +,cam K"4'; r\+- C- 1 rD5, ' ature and ame of F Business Date Please Lirach a business card to this form COPIES MADE PAID Time In INVOICE COUNTY 1� �r �l tl Tune Out Oa Uq d',I;�n S �ieaf ckc w res A W P4 EnglneemgResources Group, LLC 5265 Providence Road, Suite 202 Virginia Beach, VA 23464 Ph. (757) 961-6215 Fs (757) 961-7244 October 13, 2006 Mr. Cameron Weaver NCDENR 127 Cardinal Dr. Wilmington, NC, 28405 Re: Revisions to Approved BMP for: FSRG Operations & Maintenance Facilities P-1 148 2" d LAR Armory ERG Proj, No. 1200410.0 Dear Mr. Weaver: We arc submitting for your review and approval revised drawings for the approved BMP at the above mentioned facility. This revision is to repair the forebay berm in the BMP, and does not change the overall BMP design and functionality. During construction, it has been brought to our attention that the forebay berm has been breached due to the occurrence of several large storm events.. The attached documents of the plan view and the cross section of the BMP show how we are proposing to revise the approved design to provide reinforcement to the forebay berm by the use of geogrid fabric and riprap. Please notify us at your earliest convenience if these revisions meet your standards so we may notify the contractor to begin this repair work. Sincerely, PFreAatkins, Jr., P.E. Vice President fwatkins@ergroup.net a A4 � N 0 �r I Yo LUG M� • 72.02' 0 n1 �f Michael 1'. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 14, 2006 CDR. Laurence Readal, Public Works Officer United States Marine Corps 1005 Michael Road Camp Lejuene, NC 28547 Subject: Stormwater Permit No. SW8 051064 FSRG Operations & Maintenance Facility, 2"d LAR Armory High Density Project Onslow County Dear Commander Readal: The Wilmington Regional Office received a complete Stormwater Management Permit Application for FSRG Operations & Maintenance Facility, 2nd LAR Armory on March 10, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 051065 dated March 14, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until March 14, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Robert Gordon, or me at (910) 796-7215. Sincer ry, Edward'Beck Regional Supervisor Surface Water Protection Section ENBlydg: S:IWQSISTORMWATIPERMIT1051065.mar06 cc: Fred Watkins, PE, Engineering Resources Group Myra Jones, PE, Haskell Architects & Engineers Robert Gordon Wilmington Regional Office Central Files Mr`thCarolin❑ Xattira!!!l North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1.877-623-6748 Wilmington Regional Office Wilmington, NC 28405 Fax (910) 350-2004 Internet: www.newatcrqualilL- An Equal OppertunitylAifirmative Action Employer — 50% Recycledll0% Post Consumer Paper r ,*' � 4'' State Stormwater Management Systems Permit No. SW8 051065 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO United States Marine Corps FSRG Operations & Maintenance Facility, 2nd LAR Armory McHugh Blvd & 0 Street, Camp Lejuene - Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 14, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 106,722 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. There is no built -upon area available for future development in this permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 051065 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO United States Marine Corps FSRG Operations & Maintenance Facility, 2nd LAR Armory McHugh Blvd & O Street, Camp Lejuene - Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 14, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 106,722 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. There is no built -upon area available for future development in this permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 051065 CA The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, 9cres: 4.36 Onsite, ft : 189,922 Offsite, ftz: 0 b. Total Impervious Surfaces, ftz: 106,722 G. Design Storm jnches: 1 d. Pond Depth, feet: 4.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 14.0 g. Permanent Pool Surface Area, ftz: 9,890 h. Permitted Storage Volume, ft3: 15,752 i. Temporary Storage Elevation, FMSL: 15.4 j. Controlling Orifice: 1.5" O pipe k. Permitted Forebay Volume, ft3: 4,916 I. Receiving Stream/River Basin: Cogdels Creek 1 White Oak M. Stream Index Number: 19-23 n. Classification of Water Body: "SC;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance, must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 051065 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 118 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown'on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 051065 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership; or a name change, the permittee must submit a.formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance With North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 14`h day of March, 2006. NORTH GAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION — (� ZZL-'t'G-1 - for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 051065 FSRG Operations & Maintenance Facility, 2nd LAR Armory Stormwater Permit No. SW8 051065 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 051065 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. .14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. _15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 7 of 7 WI IITE OAK RIVER BASIN Name of Stream Subbasin Stream Index Number Map Number Class Burnt House Branch WOK02 19-10-2 H29SW9 SC;NSW Cabs Creek WOK05 21-35-3 132NE4 SA;ORW Caggs Creek WOK05 21-35-7-34-1 I33NW4 SA;ORW Caleb Branch (City Weeks Branch) WOK01 20-23-3 H30SE7 SA;HQW Calebs Creek WOK01 20-15 H309WS' C Cales Creek WOKol 20-22 H30SE7 SA;HQW Calico Creek WOK03 21-32 I32NW1 SC;HQW Cartwheel Branch WOK01 20-26-1 I30NW3 SA;HQW Catfish Lake WOK01 20-9-1 H30NE4 C Catherine Lake WOK02 19-17-1-1 H28SE5 B;NSW Catherine Lake Creek WOK02 19-17-1 H26SE5 C;NSW Cedar Creek WOK04 21-35-7-3-3-1 H33SW3 SA;HQW Cedar Inlet WOK05 21-35-7-6 H33SE4 SA;ORW Cedar Swamp Creek WOK03 21-7 H31SW9 C Chadwick Bay WOK02 19-39-4 I29SE7 SA;HQW Chainey Creek WOK02 19-10 H29SW8 SC;NSW Charles Creek WOK02 19-39-4-1-2 I29SW6 SA;HQW Chinkapin Branch WOK01 20-3-2 H29NE7 C Clay Bank Branch WOK02 19-41-5-2 I29SE3 SA;HQW Codds Creek WOK05 21-35-7-33 I33NW4 SA;ORW Cogdels Creek (Coglin Creek) WOK02 19-23 129NE7 SC;NSW Core Creek (Intracoastal waterway Adams Creek NEU10 21-24 H32SW8 SA;HQW Canal► Core Creek (Intracoastal Waterway Adams Creek WOK03 21-24 H32SWB SA;HQW Canal) Core Sound WOK04 21-35-7i H33NE8 SA;ORW Core Sound WOK05 21-35-7 H33NEB SA;ORW Courthouse Bay WOK02 19-36 129SEI SA;HQW Cow Channel WOKO1 19-41-15 130NW9 SA;ORW Cowford Branch WOK02 19-2 H28NE4 C;NSW Cowhead Creek WOK02 19-24-2 I29NE8 SC;NSW Cowhorn Swamp WOK02 19-4 H29NW7 C;NSW Crab Point Say WOK03 21-30 I32NW1 SA;HQW Crabbing Creek WOK04 21-35-1-3 H32SWG SA;HQW Cypress Drain WOK03 21-2-2 H31SW5 C Davis Bay (Cheney Bay) WOK04 21-35-1-11 I32NE1 SA;HQW Deep Creek WOK03 21-11 H31SE4 C Deep Creek WOK04 21-35-1-2 H32SE4 SA;HQW Deep Gully Creek (Elizabeth Lake) WOK02 19-9-1 H29SW9 SC;NSW Deep Run WOK02 19-17-2 128NE2 C;NSW Deer Creek WOK03 20-36-1 I30NE5 SA;ORW Deer Pond WOK05 21-35-7-27 133NW2 SA;ORW Dennis Creek (Demkis Creek) WOK01 20-34 I3CNW6 SC Dicks Creek WOK01 19-41-16-5 I30NW9 SA;HQW Ditch Cove WOK04 21-35-7-22-2 H33SW4 SA;ORW Dubling Creek WOK01 20-30 I30NE4 SA;HQW Duck Creek WOK02 19-25• I29SE1 SC;NSW East Prong Broad Creek WOK03 20-36-7-2 I31NW2 SA;HQW East Prong Gales Creek WOK03 20-36-8-1 I31NW3 SA;HQW East Prong Jasons Branch WOK03 21-3-5-1 H31SWS C East Prong Sanders Cr. WOK03 20-36-6-1 I31NW1 SA;HQW Eastman Creek WOK03 21-24-1 H32SW5 SA;HQW Eastmouth Bay WOK04 21-35-1-12-3.5 I32NE6 SA;HQW Edwards Creek WOK02 19-13 I29NW2 SC;HQW,NSW Ellis Cove WOK02 19-33 I29SW3 SA;HQW Everett Creek WOK02 19-32 I29SW5 SA;HQW Fannie Creek WOK02 19-34 I29SW6 SA;HQW Page 2 of 7 TopoZone - The Web's Topographic Map Page 1 o f 1 Opp ione 4 1 I df �► ♦ f _ *4F* \& 7- fS� 1 3i`�q �'� r�••t '�`'� H e` ��i' u rha�'�'�i�'.r • 1�=+ '� �"r�'� ��`5,� `'�'' +fix cr ^ x san s'.s>-5,�;� :h�•N.Y.•,J-;r y,..t.''r�Y i...:i. s=r.M�' �"` 't yrJ _r hA )IC 0 0.1 0.2 0.3 0.4 0.5 km 0 0.09 0.18 0.27 0.36 0.45 mi Map center is 340 39' 26"N, 770 20' 20"W (WGS84/NAD83) Camp Lejeune quadrangle mW-9,483 Projection is UTM Zone 18 NAD83 Datum G--1.331 http://www.topozone.com/print.asp?z=18&n=3837519.99978912&e=285663.999944819&... 1 /18/2006 ErlgMC07rlgResourees Group, LLC 5265 Providence Road, Suite 202 Virginia Beach, VA 23464 Pha (757) 961-6215 F= (757) 961-7244 March 9, 2006 Mr. Cameron Weaver NCDENR Express Permitting Coordinator 127 Cardinal Dr. Wilmington, NC, 28405 Re: Express Permit Application for: FSRG Operations & Maintenance Facilities P-1148 2"d LAR Armory ERG Proj. No. 1200410.4C Dear Mr. Weaver: Per the request for additional information and clarification and our telephone conversation with Mr. Rob Gordon resulting from his last review of the referenced project, we are submitting revised sheets for slip sheeting into the Plans. Kindly remove and replace Sheets C-130 and C-530 from the two sets of previously submitted Armory Plans and insert the herein provided plans in their place. Kindly remove and replace the Application Form and the Wet Detention Basin Form in the previous Application and Design packages for the site, AFTER removing the original signature sheets for the. Application Form and the Wet Detention Basin Supplement. We are resubmitting two sets of the Permit Application and Design Package for the site. Please insert the original signature sheets (page 4 of the Application and page 4 of the Wet Detention Basin Supplement) into the new packages. Also please remove the BMP Design calculations and Pre and Post Drainage Maps in the previously submitted sets and replace with the new sheets. We have addressed and coordinated the review comments from Mr. Gordon in this submittal based on our telephone conversation with him. The following responses are our understanding of the results of that conversation: a. The 1" rain event rise is elevation 14.90 and is used only to calculate the orifice drawdown as required by the regulations. The 15.40 elevation is the top of the outfall structure, determined by physical structure dimensions and is the elevation used in relation to the temporary pool volume in all calculations. b. The overall site is 5.28 acres. 4.36 acres of the project drain to the BMP while the remaining 0.92 acres bypasses the BMP and continues on downstream. The additional information regarding the bypass area has been added to the application form and the drainage area numbers have been revised accordingly. c. The square footage for streets draining into the BMP was initially shown as part of the parking square footage. It has been shown separately for clarification and all numbers verified accordingly. b �. � i - � � ti ' `I ..... � .. ,. �� � ,- r ' t � r ' < � .., '' ���. r J • •.J r _ _ .i � . .' � '=t- �. J' � f ' r � _ � � � � Engineering Resources Group, LLC Mr. Cameron Weaver March 9, 2006 P 148 — 2ad LAR Armory, Camp Lejeune, NC Page 2 d. The 51 % project built upon area percentage was including the BMP as impervious area. The number has been revised without the BMP, showing a new percentage of 48.1%. e. The impervious areas between the application and the supplement have been verified and revised as needed. f. The 1" temporary pool volume in the supplement and calculation has been revised based on the structure elevation of 15.40. g. The permanent pool volume has been revised and verified on the supplement and calculations with the stage -storage chart based on the structure elevation. h. The forebay volume has been revised and verified with the stage -storage chart. i. The numbers for Section 111 (4) of the supplement have been revised as directed. Round - off problems have been corrected j. The orifice diameter and design rainfall have been revised in the supplement. We anticipate that these responses are sufficient for your prompt approval of this project. The additional Resubmittal Fee of $1,000 is submitted herewith. Should you have any questions regarding this submittal please contact this office. Sperely,ins, Jr., P.E.dent fwatkins@ergroup.net cc: Mr. Gary Walo — The Haskell Company Ms. Myra Jones — The Haskell Company .. ,. �. � _ f�' Y• , �' � r ... ., �� �� � 1 'ti • � � ! � ' - .. - - �/ .. . f 1. . ' ' . ~iT R , � � r .. 1 .. P. 1 FILE MODE 333--MEMORY TX COMMUNICATION RESULT REPORT ( MAR. 9.2006 9:52AM ) TTI NCDENR WIRO ---OPTION---------------ADDRESS -(GROUP)--------- -- R£L� PAGE 917579617244 - ----- r OK----------P.-3/3 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER E--2) BUSY E-4) NO FACSIMILE CONNECTION FAX COVER SHEET Date: March 9, 2006 No. of Pages: 3 To: Fred Watkins, PE From: Robert Gordon Co Express permitting section Company: Engineering Resources Group FAX # 910-350-2004 FAX #: 757-961-7244 Phone 9 910-796.7303 DWQ Stormwater Project Number: SW8 060301 Project Name: FSRG Operations & Maintenance Facility p-1148 -- 2nd LAR Armory MESSAGE: Attached is the request for additional information the FSRG Operations & Maintenance Facility P-1148 — 2nd LAR Armory. The original will be mailed to the applicant and a copy will also be mailed to you. Please call if you have any questions. FAX COVER SHEET Date: March 9, 2006 No. of Pages: 3 To: Fred Watkins, PE From: Robert Gordon P0 Express permitting section Company: Engineering Resources Group FAX # 910-350-2004 FAX #: 757-961-7244 Phone # 910-796-7303 DWQ Stormwater Project Number: SW8 060301 Project Name: FSRG Operations & Maintenance Facility P-1148 — 2nd LAR Armory MESSAGE: Attached is the request for additional information the FSRG Operations & Maintenance Facility P-1148 — 2nd LAR Armory. The original will be mailed to the applicant and a copy will also be mailed to you. Please call if you have any questions. 'a Michael F, I-asiey, Governor O�OF WAT•F9 pG March 9, 2006 CDR. Laurence Readal United States Marine Corps 1005 Michael Road Camp Lejuene, NC 28547 \k)' liam G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.F. Director Division o€' Water Quality Subject: Request for Additional Information Stormwater Project No. SW8 051065 FSRG Operations & Maintenance Facility P-1148 — 2nd LAR Armory Onslow County Dear Commander Readal: The Wilmington Regional Office received a Stormwater Management Permit Application for FSRG Operations & Maintenance Facility P-1148 — 2nd LAR Armory on March 1, 2006. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: There are still discrepancies/inconsistencies in figures listed between the application, narrative, plans and calculations. Several have been Wed below; but please verify all elevations, volumes, surface areas and other figure'§Xtsted in the application package. a. The calculations and narrative list the " s age elevation at 14.9. The drawing detail and supplement list the elevation 154 b. The DA map and calculations list the dra'Cipplement ea for the pond at 4.36 acres the application shows 5.28 acres and th shows 4.31. C. There are no streets listed on the �apgli ation, but the DA map clearly shows portions of O Street and MacHugh lvd. Ining to the system. d. The project built upon area liste on ction III (4) of the application appears incorrect. e. The impervious area listed on rfedon ment is different than what is listed on the application f. The temporary pool (1 ") volume the supplement is much more than is listed on the calculations. g. The permanent pool volume is fist differently on the calculations and supplement; neither are suppo d by the stage -storage chart provided on sheet C-130. h. The stage -storage chart doe support the forebay volume listed on the calculations and supplement. i. The figures in Section Ill (4) of the et Detention supplement are depths, not elevations (the basin diagram �e ow requires elevations, not depths). Note — have made the correction to "Y (for the forebay) and "3,37" (for the main pond). Additional fees, not to exceed 50% of the original permit application fee, may be charged for subsequent reviews due to the insufficiency of a permit application, as specified by Section 11.4A of S.L. 2003-284. nc North Carolina JUaturally North Carolina Division of Water Quality 127 Cardinal Drivc Extension Phone (910) 796-7215 Customer Service 1.877-623-6748 Wilmington Regional Office Wilmington, NC 28405 Fax (910) 350-2004 Internet: +a+aw.ttc+taferqualit�.ora An Equal OpportunitylAttirmative Action Employer — 50% Recycled110% Post Consumer Paper FRG Operations & Maintenance Facility P-1148 — 2"d f_AR Armory March 9, 2006 Stormwater Permit # SW8 051065 => This application is not consistent with the expectations and standards of the express review program. The last Request for Additional Information dated February 21, 2006 required all items to be complete upon resubmittal or.the project would be removed from the express program. Because the application still has several inconsistencies/ deficiencies, a resubmittal fee of $1,000 will be required in order for this project to remain in the express program. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 6, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date. by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7303. Sincerely, Robert D. Gordon Environmental Engineer II ENBIRDG: S:IWQSISTORMWATERIADDINFO120061051065mar9 cc: Fred Watkins, PE, Engineering Resources Group Robert D. Gordon Enoee 7gResolmes Group, LLC 5265 Providence Road, Suite 202 Virginia Beach, VA 23464 Ph (757) 961-6215 Fa: (757) 961-7244 February 28, 2006 Mr. Cameron Weaver NCDENR Express Permitting Coordinator 127 Cardinal Dr. Wilmington, NC, 28405 Re: Express Permit Application for: FSRG Operations & Maintenance Facilities P-1148 2"d LAR Armory ERG Proj. No. 1200410AC Dear Mr. Weaver: Per the request for additional information and our several telephone conversations resulting from a preliminary review of the referenced projects by Mr. Robert Gordon, we are submitting revised sheets for slip sheeting into the Plans. Kindly remove and replace Sheets C-130 and C-530 from the two sets of previously submitted Armory Plans and insert the herein provided plans in their place. Kindly discard the previous Application and Design packages for the site AFTER removing the original signature sheets for the Application Form. We are resubmitting two sets of the Permit Application and Design Package for the site. Please insert the original signature sheet (page 4 of the Application) into the new packages.. We have addressed and coordinated your review comments in this submittal and attached a Response Sheet for your use and information. The Application Fees were previously submitted. Should you need additional information please contact this office. Sincerely, Fred Watkins, Jr., P.E. Vice President fwatkins@ergroup.net RECEIVED MAR 01 2006 ,. -. _ 5 .. �. i+� rF 1 J . 1 �, � � � ,Y,i 4 � .. , . .1, .' a � _. 'I �r 1 � 1 � f 4� Response to DENR Letter February 21, 2006 P114�8 2" LAR Armory 1. Numbers have been verified and revised as needed. 2. Volume adjusted. Previously reported permanent pool volume was from water surface elevation to top of bank of BMP. 3. Orifice calculation with estimated time of drawdown has been shown. 4. Cleanout elevations were reversed. They have been corrected. 5. Original Signature is supplied herein. 6. Receiving stream identification has been corrected. 7. Numbers converted to square feet and revised as needed. 8. The top of bank, elevation of 18.50, has been dimensioned. 9. The invert pipe has been adjusted as directed. 10. Normal water elevation is 14.00. The top of the outfall structure is 15.40. This is the temporary pool elevation and all documents have been revised to show this as the temporary pool elevation and the height of the 1" rise. 11. A stage -storage chart has been added to the grading sheet. P. 1 FILE MODE OPTION ---------------------------- 970 MEMORY TX COMMUNICATION RESULT REPORT ( FEB.21.2006 10:41RM ) TTI NCDENR WIRO ADDRESS (GROUP) RESULT PAGE ------------------------_------------------------------------------------ 917579617244 OK P. 3/3 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER E-2) BUSY E-4) NO FACSIMILE CONNECTION FAX COVER SHEET Date: February 21, 2006 No, of Pages: 3 To: Fred Watkins, PE From: Robert Gordon 0- Express permitting section Company: Engineering Resources Group FAX # 910-350-2004 FAX #: 757461.7244 Phone # 910-796-7303 DWQ Stormwater Project Number; SW8 051065 Project Name: Camp Lejuene FSRG O&M Facilities P-1148 2"d LAR Armory MESSAGE: Attached is the request for additional information for Camp Lejuenes 210 LAR Armory. The original will be mailed to the applicant and a copy will also be mailed to you. Please call if you have any questions, Thanks. FAX COVER SHEET Date: February 21, 2006 No. of Pages: 3 To: Fred Watkins, PE From: Robert Gordon Express permitting section Company: Engineering Resources Group FAX # 910-350-2004 FAX #: 757-961-7244 Phone # 910-796-7303 DWQ Stormwater Project Number: SW8 051065 Project Name: Camp Lejuene FSRG O&M Facilities P-1148 2"d LAR Armory MESSAGE: Attached is the request for additional information for Camp Lejuenes 2nd LAIR Armory. The original will be mailed to the applicant and a copy will also be mailed to you. Please call if you have any questions. Thanks. �QF \NA Michael F. Easley, Governor O G William G. Ross, Jr., Secretary r North Carolina Department of Environment and Natural Resources Alan W. Khmek, P.E. Director Division of Water Quality February 21, 2006 CDR Laurence J. Readal, Public Works Officer US Marine Corps - Camp Lejuene 1005 Michael Road Camp Lejuene, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 051065 Camp Lejuene FSRG O&M Facilities P-1148 2"d LAR Armory Onslow County Dear Commander Readal: The Wilmington Regional Office received a Stormwater Management Permit Application for Camp Lejuene FSRG O&M Facilities P-1148 2nd LAR Armory on February 13, 2006. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review. 1. There are many discrepancies in figures between the application, supplement and calculations. Please make sure figures on these three documents are consistent. 2. The temporary pool volume is the pond volume from the permanent pool to the spillway outlet structure. It does not include the permanent pool volume. Please correct on the supplement. 3. Please show an actual drawdown alc/drawdown A 1" orifice appears to draw the 1" storage volume down in >5 days. orifice should draw the 1" volume in 2- 5 days. 4. On the supplement, the sediment cleanout elevations are incorrect. The 75125 ration appears to be reversed. Also note that the sediment cleanout elevation in the forebay cannot be above the designated inlet pipe invert elevation. 5. The supplement AA`o'es not contain an original signature of the applicant. 6. The (immediate) dr�age area appears to be Cogdels Creek, not the New River. Please correct. 7. Please convert section III (6) f e application to square feet, not acres. Please note that the pond itself is not cons dered impervious. 8. Please dimension the entire permanent pool, not just the main bay on the drawings. 9. The permanent pool (NWL) should be drawn at the bottom of the invert pipe (on the outlet structure detail), not the top. 10. It is not clear what the temporary pool elevation is. The 1" rise on the BMP cross- section is 14.9, the spillway elevation on the outlet structure is 15.5 and the supplement lists the temporary pool at 15.4. Please clarify. Norlh Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1 -877-823-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX {910) 350-2004 Internet: h2o.enr.state nc.us One NorthCarollina An Equal OpportunitylA(firmative Action Employer— 50% Recycled110% Post Consumer Paper Nati -ally Camp Lejuene FSRG O&M Facilities P-1148 2nd LAR Armory February 21, 2006 Stormwater Permit # SW8 051065 11. Please provide a stage -storage chart for the pond and forebay. This chart should show surface area and volumes at regular intervals from the bottom elevation to the 1" water quality volume elevation in the pond. It is used to verify forebay volume, permanent pool volume and the water quality volume of the BMP. => Several of the above items were requested in the previous request for additional information dated January 18, 2006. All of the above items must be addressed in the next resubmittal or the project will be removed from the express program. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 3, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a. construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7303. Sincerely, Robert D. Gordon Environmental Engineer II ENB/RDG: S:IWQSISTORMWATERIADDINFO120061051065feb21 cc: Fred Watkins, PE, Engineering Resources Group, LLC Robert D. Gordon Eagmeawg Resources Group, I LC 5265 Providence Road, Suite 202 Virginia Beach, VA 23464 Ph (757) %1-6215 Fx: (757) 961-7244 February 9, 2006 Mr. Cameron Weaver NCDENR Express Permitting Coordinator 127 Cardinal Dr. Wilmington, NC, 28405 Re: Express Permit Application for: FSRG Operations & Maintenance Facilities P-1148 2"d LAR Armory ERG Proj. No. 1200410.0 Dear Mr. Weaver: We are resubmitting for your review and approval two (2) originals of a Storm Water Management Permit Application for the referenced with two (2) sets of Plans and attachments. Also included is a check for $1,000.00 (Check #60680) for the processing fee for the second submittal. We have included resolution to your preliminary review comments in this submittal and appreciate your assistance in this completion. Should you need additional information please contact this office. Sin' , red Watkins, Jr., P.E. Vice President fwatkins@ergroup.net CEIVED FEB Y s 2006 BY: .- � � - �, •j , �' , •. �, � ,. , �. � .. a E. _ � Sl ,, i i Camp Lejeune--?? Subject: Camp Lejeune--?? From: Cameron Weaver <Cameron.Weaver@ncmail.net> Date: Wed, 25 .Tan 2006 15:45:28 -0500 To: Robert Gordon <Robert.Gordon@ncmail.net>, Paul Bartlett <Paul.Bartlett@ncmail.net> Hi guys. There appears to be some confusion about the Camp Lejeune projects. Fred received Rob's add info request of January 18 and the subject refers to: * P-1151 Building Addition to O&M Bldg.* with a* SW8 051065* permit number. This letter was your list of 20 items and indicates that a resubmittal fee of $1000 is required because we held the 1st meetings with Myra and then Fred has been down as well. I saw the copy of this in the file here. The r� cblem_ is that this /site name/ is listed as PAUL'S project in your SW spreadsheet but with an *SW8 991204 * permit number and Paul has put down in the spreadsheet that he issued this plan revision on January 18, presumably with,a copy to Myra because Fred says P-1151 is not his project. So, assuming that this is correct, the proper site name for the add info request Rob sent to Fred should have been: *P1148 - 2nd LAR Armory, **FSRG Operations & Maintenance Facilities, SW8 051065. *As an aside, Fred indicated that he will be putting the other two P-1149 projects in the mail to us soon for those reviews, as well. Let me know if this is not correct. Thanks! Cameron Cameron Weaver <Cameron.Weaver u,ncmai1.net> One -Stop Permitting/ Express Permit Coordinator NC DENR Customer Service Center - Wi RO 1 of 1 1/25/2006 4:11 PM Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 18, 2006 Commander L.J. Readal United states Marine Corps 1005 Michael Road Camp Lejuene, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 SW8051065 FSRG Operations & Maintenance Facilities, P1151- Bldg. Addition to O&M Bldg Onslow County Dear Commander Readal: The Wilmington Regional Office received a Stormwater Management Permit Application for FSRG Operations & Maintenance Facilities, P1151- Bldg. Addition to O&M Bldg on January 10, 2006. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. It appears page 2 of the application was for a different Camp Lejuene project. All site data appears incorrect. Please resubmit. 2. The top portion of the entire application (not the supplement) was cut off (bad copy?). Please resubmit a complete application. 3. Please include the applicants title on section 1 (2) of the application. 4. Please use square feet on Section 111 (6) of the application, not acres. 5. Please submit 2 drawing sets, only one was received. 6. The calculations must be PE stamped and signed. 7. Please hand initial section 11 of the wet detention supplement. 8. The sediment removal elevations listed in the operation & maintenance section of the wet detention supplement are incorrect. 9. The applicant must sign both the application and supplement. The supplement (page 4) was not signed by the applicant. 10. A project area must be defined and dimensioned on the plans. This area must correspond to the project area listed on the application. For an area (such as Camp Lejuene) where there is no defined parcel, any area may be used as long as it contains all proposed improvements. Please note this area will provide the distinction between on -site and off -site drainage area in section III (6) of the application. 11. The proposed impervious area listed on the application, supplement and calculations are not consistent. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1 -877-623-6748 One Wilmington Regional Office Wilmington, NC 26405-3845 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us IVorthCaroli na An Equal Opportunity/Affirmative Act+on Employer - 50% Recycied110% Post Consumer Paper Nay jmall y FSRG Operations & Maintenance Facilities, P1151- Bldg. Addition to O&M Bldg January 18, 2006 Stormwater Permit # SW8 051065 12. Please show the dimensions of the permanent pool for the proposed pond. 13. The wet detention pond is required to have a 3:1 length:width ratio. Only about 2:1 is provided. The flow path of the pond may be aincreased by reconfiguring the pond, specifying baffles or providing a weir in the forebay (or any combination of the above). 14. The elevations listed in the project narrative are not consistent with the drawings, calculations or the supplement. 15. The 1" required storage volume appears incorrect (the runoff coefficient appears off a decimal). Please recalculation the runoff volume. 16. Please provide the following stage -storage information for the pond: forebay (from bottom to permanent pool) & the entire pond (from the bottom to the 1" storage elevation). 17. Please show the forebay berm elevation on the detail. 18. Please add a note specifying all roof drains from the building will be directed to the permitted wet detention pond. 19. Please provide detail of the proposed trash rack. It must have a max opening size of 4". 20. The bottom elevations listed on the two pond details are not consistent. => Additional fees, not to exceed 50% of the original permit application fee, may be charged for subsequent reviews due to the insufficiency of a permit application, as specified by Section 11.4A of S.L. 2003-284. => Because the application has significant deficiencies, in spite of several pre - application meetings, a resubmittal fee of $1,000 will be required for this project in order to remain in the express review program. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 2, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. F,SRG Operations & Maintenance Facilities, P1151- Bldg. Addition to O&M Bldg January 18, 2006 Stormwater Permit # SW8 051065 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. -Copies are not acceptable. if you have any questions concerning this matter please feel free to call me at (910) 796-7303. Sincerely, Robert D. Gordon Environmental Engineer II ENB/RDG: S:IWQSISTORMWATERIADDINFO120051051065jan18 cc: Fred Watkins, PE, Engineering Resources Group Edward Beck, Wilmington Regional Office Robert D. Gordon Engrtle07M'Resources Group, LLC 5265 Providence Road, Suite 202 Virginia Beach, VA 23464 Ph (757) 961-6215 Fa: (757) 961-7244 January 6, 2006 Mr. Cameron Weaver NCDENR Express Permitting Coordinator 127 Cardinal Dr. Wilmington, NC, 28405 Re: Express Permit Application for: FSRG Operations & Maintenance Facilities P-1148 2nd LAR Armory ERG Proj. No. 1200410.0 Dear Mr. Weaver: I z JAN 1 0 2006 BX: �- �� We are submitting for your review and approval an original and one (1) copy of a Storm Water Management Permit Application for the referenced with Plans and attachments. Also included is a check for $4,000.00 (Check #54302) for the processing fee. We have included resolution to your preliminary review comments in this submittal. Should you need additional information please contact this office. Si cerely, Fred 4Watkins, Jr., P.E. Vice President fwatkins@ergroup.net r VENDOR NUMBERA9109 INVOICE DATE AMOUNT DISCOUNT NET DESCRIPTION SDV111605 11/16/05 4,OMOU7 R B 4,000.00 6804921 WB EC-11EIVED JAB! 1 0 2006 HASK ELL Amerka's Deslgn-Bulld Leaded' CHECK TOTAL AMOUNT 44,000.00 DATE CHECK NO. AMOUNT 11/17/05 00054302 $****.*4,000.00 70-1558 719 PAYFOUR THOUSAND AND 00l100***'*************"`**`***"`*•••••`•••*••,••`•••••`••••••,•, TO THE ORDER OF ,North Carolina Dept. of environmental < /l and Natural Resources —4 �L u�l-- Harris N.A. Roselle, Illinois Ln n Amount > $23000.00 requires 2 signatures ip Ujucne FSRG N-ojCM r] Subject: Camp Lejuene FSRG Projects I1rom: Jones, Myra W <rnyra.lones ci.thcliaskcllco.com> 1� Date: Fri, 23 Sep 2005 10:56:02 -0400 4'o: "Cameron Weaver" <Can]ci-orl.WeaverCl nciiiail.net> rr CC: "Walo, Gary R." <gary.walo@thehaskellco.com>, "Willis, Larry W." <Larr-y.Willis cr thehaskellco.com>, "Gillum, Paul E." <paul.gillum@thehaskelleo.coni>, "Bush, Jim W." <jim.bush@thehaskelleo.com>, "Salem, Charlie"<clharlie.salem@thchaskelleo.com> Cameron, Good morning! I apologize that it has taken this long to get this information to you. I have been trying to find out about the wetland information and who would be the applicant for the Marines. I have filled out the forms as per my phone conversation with Bobby Canady of Camp Lejuene's ROICC office this morning. I have attached 4 different PDF's for the different projects. I have been in contact with Dean Hunkley regarding the DENR Sewer extension permits. He stated that I needed to contact Marie Doklovic in the Raleigh office. I have left a message with her yesterday. Have not heard back as of this time. Dean also stated that I should contact Debra Benoy regarding the DENR Water extension permits. I have left a message with her yesterday. Have not heard back as of this time. Please let me know what time you have set the meeting for gesday, Septemb 7 My flight gets in late morning so early afternoon would be great for me. Thanks agar for or all of y ur assistance. I look forward to meeting every n Tuesday. Thanks again and hope you have a great weekend. Myra O -��F-- «P-1151,p�Cf?> « -1148 p d f > «P-1149a.pdf <'-1149v.pdf» Myra W. Jonts, �._..� 1 �(: Senior Civil Engineer The Haskell Company 111 Riverside Avenue Jacksonville, Florida' 32202 P: 904/791-4666 F: 904/791-4699 _. Content -Description: P-1151.pdf P-1151.pdf i Content -'Type: appIicat] or -/octet -stream Content -Encoding: basc64 _.. _.. - - ;1 .P-1148.pdf Content -Description: P-I148.pdf I of 2 9/23/2005 1:07 PM New Camp Lejuene Projects Subject: NcNv Camp Lejuene Projects ]� 1� ✓ From: "Jones, Myra W" <myra.Jones@thehaskellco.com> t l 1 Date: Tue, 20 Sep 2005 17:12:49 -0400 �) 2— To: <cameron.weaver@ncmail.net> l I� CC: "Salem, Charlie" <Charlie.salem@thehaskellco.com>, "Walo, Gary R." f <gary.,A,alo@thchaskellco.com>, "Willis, Larry W." <Larry.Willis@tliehaskellco.com>, "Gillum, Paul E." <paul.gillum@thehaskellco.com>, "Bush, Jim W." <jim.bush@thehaskellco.com> Cameron, Good afternoon! I have spoken Paul Bartlett on September 15, 2005, regarding the NCDENR process and requirements in brief. We are interested in doing the express permitting for our projects. Please forward the forms required for me to start that process. I will be in Jacksonville, NC Tuesday, September 27, 2005 and would like to schedule the pre -application meeting with you early afternoon. Please let me know what time will be acceptable with you. I have attached projectlocations. pdf with the project location topo maps, aerials, and proposed plans. Even though we are under one contract, we are required to submit each site as a separate permitting package regarding stormwater. Below is a brief description of each project... P-1148 P-1148 will be 2nd LAR Armory building with associated parking located in a partially cleared area. The cleared area contains tennis courts and a shelter, both to be removed. A small portion of the area is treed. There are preliminary plans for a BMP, which will discharge into an existing swale to the south of the project area. P-1149 ;, P-1149 contains two different buildings and two different building locations. The first building will be 1BN/9 Armory building with associated parking located in a grassed area between existing buildings. This area has existing stormwater inlets, which we had planned to discharge directly into the inlets. I'm not sure is there is an existing permit for this area or not. The second building will be a VMF building with associated parking located in a grassed area that is currently a ballpark and obstacle course. There are preliminary plans for a BMP, which will discharge into the existing roadway swale to the west of the project area. P-1150 P-1150 will be a small addition to building A66. This building addition will be within an impervious area. Looking at the record drawings, I believe this area has been permitted but I'm not for certain. Please review the attached, forward me the required forms, and a time to meet with you on the 27th. I do greatly appreciate your time and consideration in the matter and look forward to meeting/working with you on the projects. Thanks and hope you have a great day. Myra O of 2. 9/2 1/2005 11.08 AM Map Output Page 1 of 1 Enter Title Tue Sep 20 11:08:26 EDT 2006 •Twin wo n MTj� - Tvcvw ihr111111 KC. Fkmdplaln Mappinp Mtformallon Syslen Oa-Uno Mapping AppIkatf+a Pmvkkd h M. North Carollna !-laa/plaia Kappiall pnwr Difclmi—v TNs k no a lauiiy bk4-g (FIfi1Al Food hsvuwa Rasa kbp and snocM na ba usad aF Fuob, a ' http://149,168.101.8/servletleom.esri.esrimap.Esrimap?5erviceName=locator&ClientVersi... 9/20/2005 Priint Map .. Page I of I Map for GIS User Location of My Location 1.-36,037 Camp Lejeune 7.5-rnjnute Quadrangle Index map http://gis.enr.state.nc.us/topoviewer/gispr-intjsp 9/2012005 r..glu ..p.e M ,Prwp — Saun A II71211Ni xxn t "*MvYiio WSJ uLL Pm* is-u lm-i * r011d NOo11 N.AJ 1, ��I ��! �r i p 3 n—um /M 117i11I7113 oIIY SL'I3s[fl]=y I'HlS\'EJ �a II: LE-u I Gil-dn 7/iG'v'B +tl013 i ' lilt 1 1 1 1 1 I 1 LW, I — T I 1 I 1 I- 1 I I I I I SS'li •'U W 711- 5rvinaWGiS i yno I r y...o+K\/n..ursw/1 Rt .tll/1%.-�Y .ynyAUVe'p,.l\I..•N �'.�r4V/./ \rtill�W ��\I./ �� Wml1O4 `P..I -K/ 1.M W-i • .i .•.tl.���J4_v.\M�..�NA�in.lr. .o /.o./ro-i��s .vwan�.wa/r\�.. w....-�waw ovn.gio-•aa.l R. Yt.u.Ol-. • W.��Ky� W\�In nw.rfM.O O1IM.1�0../.� PHnt Map Page I of I Map for GIS User Location of My Location V&14 1:12,012 Camp Lejeune 7.5-minute Quadrangle Index map http://gis.enr.state.nc.us/topoviewer/gisprint.jsp 9/20/2005 ��.w'yyjj� wtiw •�,ti 5Y / ' r L: t � w � I i�. ,r J�a�n , 7��i Y •,� iJ r 1-' R �� ' w • t f+ J , -. 1 tom, I . X fa. � •` p "" r i ��q , y jr2 s ,J �c r "y I- i ,G I !N• (�• l•7 %Y.-'� ' - d.. I � f - r f f% -'�^ '�:Yt � � }! ';, �.♦ t � ° � t l :-,' � r, [ ?ems Sy �_c. 14 14 :�.3 j ^i �::? ? ,. a- _�';:•�:�'5�1. ii •fi.: . s''� .:,'eui=e'p' 3 . %': ��.��a�"�''t .���.r:.='i. Ng7 tit H i ,�s i 5 A i� w �r ti" w - '•i 1 5^1! iY - r:_ ^!� s� ` FS ti i i t+ .ti ..w.w e�,.�• wi .1.N..Y.j,7 .norT-.Toino74Y H�. >!Z �.—Tram wry 3M OWWOO 3Nn ■➢Ill11AVJ i011YM1iMfIM1 y tllWStltl?i0 Otld r 11FF1 1pI ,1 '' q MONON3 (INV Ma'Ui31Y TZOW 1, rZ T� tr• R IY WOYn1LV.Y0�+\,..-Fw wf..iawo N���h A�Fw M,. w•n..v-.���v,w„ �,\RV"mauLl,A•ai..w.iIRO'!4\Ye, lfhOl-,u Yw�.�rr1J1 �urar,FV.OALLir« __'V4bn n�f,� a '��-1 Print Map Page I of I Map for GIS User Location of My Location Ul dPP 10 V • I Y: J1. ti: 0 1:12,012 Camp Lejeune 7.5-minute Quadrangle Index map http://gis.eiir.state.nc.us/topoviewer/gisprini..isp 9/20/2005 �.»oiny ,.nn..r 3T19 WN0.'1 9N{Wil '�'N old MEXIDN3 ¢NY UALIHAV IMM lfu wY Y��►u � = NPDN "AA •+. ». muov ++,.r - fou w w d.,�a ++. w..".. s,-�u.nnrmr,n.u.�• Pftnt Map Page I of I 1:12,012 Camp Lejeune 7.5-minute Quadrangle Map for GIS User Location of My Location -N - MZ Index map http://gis.enr.statc.nc.us/topoviewer/gisprint.jsp 9/20/2005 Quadrangle View Page I of I T-# q e) ra Zoomln (to 1:4,004) Map C Zo.o m Out (to 1: 3 6,03 7) Controls: C ZOOM-ToScale 2-400-0 C Zoom FullE-xten-t--of.Ou-ad N w 3 (' Re.-c. e nter- reap C Refresh -map C r7 USGS quadrang! boundaries 1998 DOOGs Image base: I--- - S ,.Save oor lnaig Camp Leje Glossary http://gis.eiir.state.ne.us/topoviewer/quadmap,isp?Cmd=Pan&Dir--E 9/20/2005 PHnt Map Page I of I 1:36,037 Sixads Ferry 7.5-minute Quadrangle Map for GIS -User Location of My Location Index map http://gis.ctir.slate.nc.us/topoviewer/gisprint.jsp 9/20/2005 • W...h �tYQ�L��F�tti .wri w o-n• 1r .a a.s - �.Yn M1�1 .^ a.. ■ I�Q� °a 9 � Nit, �.4ilji R 711i Jil- EI 81 j611 4 CAy ■ 3 jig 94 cg rA m , • 1 9'' ap .. ev�— RI 5 Will! p nn [ mMtn 10 i a s T} gR t f O ee loll HASIELAacxlnclsAND E riveeu f Frog YOON rRo.i■an fnN. n40 .,■ nn I■R9 OrCUnON■ A hANWMWW R ►AOLME■ e[ LL I ►Al3Y fa —� � 1 f�[� U.■. YAIUNE CbRH WE a.c.. ouex.ni. i..o..• tr.+ u+RaC .urw .+.a-rn.•+ Pfint Map Page I of I 1:12,012 Sneads Ferry 7.5-minute Quadrangle Map for GIS User Location of My Location Index map http://gis.cnr.sLate.nc.us/topoviewer/gisprint.jsp 9/20/2005 ' .�-'� irk +1s'',i � M Wl: � ��l w- �'• WDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive. Wilmington NC 28405 (910) 796-7307 FAX (91C) 350-2004 Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s), FAX or email to Cameron. Weavef@ncmail.net along with a narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name Lt. Commander John Anderson, Officer in Charge Company Marine Coro, Came Le eune Address 1005 Michael Road City/State Camp Leieune, NC Zip 28547 County Onslow Phone 9101451-2581 Fax 910I451-5889 Email canadvbd c( leieune.efdlant.navfac.navy.mil PROJECT Name FSRG Ooerations & Maintenance Facilities — P-1149 --1 BNl9 Armo PROJECT SYSTEM(S) TRIBUTARY TO (STREAM NAME) New River RIVER BASIN White Oak ENGINEER/CONSULTANT Myra W. Jones—P.E. Company Haskell Architect & Engineers Address 111 Riverside Ave. City/State Jacksonville, Fl. Zip 32202 County Duval Phone 904/791-4666 Fax 904/475-7887 Email myra,'ones@thehaskelico.com State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑ Yes ❑ No ❑ STREAM ORIGIN Determination; # of stream cads; Stream Name ® STORMWATER ❑ Low Density ❑ High Density -Detention Pond ® High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site ® COASTAL ® Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ® Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY ® Erosion and Sedimentation Control Plan with 1.6 Ac +I- to be disturbed. WULANDS (401) Wetlands on Property ❑ Yes ® No Isolated Wetlands on Property ❑ yes ® No Check all that apply Wetlands Will Be Impacted ❑ Yes ® No Wetland Impacts: N/A Acre(s) Wetlands Delineation has been completed ❑ Yes ® No ® Buffers Impacted: NIA Acre(s) USACOE Approval of Delineation completed ❑ Yes ® No 404 Application in process wIUSACOE ❑Yes ®No l Permit received from USACE ❑Yes ®No 401 Application required ❑Yes ® No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS $ 401 $ Total Fee Amount $ 050550jj�SRG Operations and Maintenance Facilities, MCB Camp Lejeune, NC :onduit r-k 3. SITE ANALYSIS under tha5j` ��° , lily? and tlr: Existing Site Conditions ;'Site locations are indicated on the RFP drawings. Existing site locations are indicated on the RFP drawings and reference drawings included with this solicitation. The photographs the following pages are intended to covey a general understanding of the existing sites Jified under-,° _gin ;character, features and conditions. A general characterization of each site is as follows: const�uct�p a' IoT'nd LAR lru1)dinS75 ig struCtur and subrriit';' :h structurat>%'; The existing 2°' LAR Complex is located in and around Building 575, as indicated on 'O' the RFP drawings, off McHugh Boulevard near Street. A portion of renovation/ e structurj:'�: .., , s alteration work lies inside and immediately adjacent to Building 575. An existing truck loading dock with ramp and apron shall be filled under this contract and paved posed to'4ep; to sustain Company storage access inside Building 575. penings ans�-. load -bearing'' The new 2"' LAR Armory, 'Echo' Company's tactical vehicle parking area, and a POV :s:,,. door jarntsE,of ;4 parking area shall be located on a partially wooded site immediately to the northwest ,ings wiftUt=J. Building 575. This site is relatively flat and bordered to the south by a deep ditch. - -upants. A small weapons cleaning shelter and slab (S733), two paved athletic courts, concrete pole -mounted lights, fences, and a short cellphone tower are located on the existing of t site, and shall be demolished under this contract. Drainage shall be accomplished by providing; F and adding: . collecting all surface water and piping via catch basins, curb inlets and underground for analyzing L piping to a new BMP, or stormwater retention pond, to be located at the southwest ti' ; , corner of the site, with outfall to the existing ditch. Existing utilities for this site are making:alii indicated partially upon the RFP drawings, and the reference drawings for existing the existing; 4 if �;< Building 575 included under Part Six of this RFP. There are no known wetland areas ,ure walls.; the exteriaF' ;': delineated at the edge of the ditch immediately adjacent to the site. r': that was r14t ed to submit". { Pro ect P-1149, V, BN/9 Armory and Vehicle/Electronic Communications =ndations fOor- G.... s'„ arntenance necessary shall be ,;r ;; The 1" BN/9 Vehicle/Electronic Communications Maintenance Facility shall be ng used shelters:';=":, y constructed on a relatively clear site located next to existing Building HP237 in the Hadnot Point area, as shown on the RFP drawings, along 'F' Street, and extending r west to Julian C. Smith Drive. The site gently slopes downward from 'F' Street south toward 'C' Street. Existing features to be demolished under this contract include a ballfield with pole -mounted lighting, a judo pit, and an obstacle course. The Contractor shall coordinate with the Camp Lejeune Facilities Planning Department to determine disposition of existing judo pit and obstacle course equipment. The site i5 bordered closely to the rear by a natural, wooded area leading to a deep ravine and wetland area that shall remain undisturbed. An existing ballfield to the south at 'G' Street shall remain undisturbed. Drainage shall be accomplished by collecting all y surface water a��d piping via catch basins, curb inlets and underground piping to a PROJECT PROGRAM FSRG Operations and Maintenance Facilities, MCB Cam Lejeune, NC 05055023 ' p 1 r _- F5 C. new 6MP, or stormwater retention pond, to be located along the south side of the site, v%,ith outfall to an existing ditch at Julian C. Smith Drive. Existing utilities for this site are indicated partially upon the RFP drawings and the reference drawings for existing Building HP-237 included under Part Six of this RFP. The 1" BN/9 Armory shall be constructed on a clear, near -flat site located in th, middle of an enlisted personnel barracks complex off of 'C' Street in the Hadnot Poin area, as shown on the RFP drawings. This site is surrounded by four existing three story barracks. There are few significant features of site demolition; however, th, Contractor must create a vehicle entrance to the site at an existing 90-degree turn it the existing driveway. This area is encumbered by a large number of POV's ant pedestrians. Existing underground steamlines also cross this site. It shall necessary to elevate the Armory floor slab above existing grade in order to cre4 positive drainage around the site. Drainage shall be accomplished by collecting of surface water and piping via catch basins, curb inlets and underground piping to the existing underground storm drainage structures. Existing utilities for this site ari indicated partially upon the RFP drawings and the reference site drawings for thi existing Enlisted Barracks complex included under Part Six of this RFP. iz The medical wing Addition for 2" FORCE RECON shall be located in a relatively f! paved area in front of existing Building A66. The existing heavy-duty pavement sh be carefully sawcut, removed and patched in order to facilitate the work. An existi 8-inch diameter, underground waterline must be relocated to outside the propos Addition's footprint. It is anticipated that a piled foundation for all new exterior wa and load -bearing elements shall be provided for the medical wing Addition, matchi the existing building's foundation. Underground utility distribution to existing Shelters SA67 and SA68 shall be requi€ and the Contractor shall carefully sawcut, remove and patch existing heavy_. pavements to facilitate the work. Cafe shall be exercised at this site to conduct all construction operations in way so as to minimize disruption of the 2n' FORCE RECON's ongoing opera the Building A66 complex. 3.2 Site Development Requirements The RFP drawings include conceptual site layouts intended to delineate acceptabl appropriate design solutions. Although the RFP site layouts are not intended definitive, the Contractor and its Architect -Engineer should avoid deviations supported by justifying field data or considered by the Government to enhance the pr PROJECT PROGRAM Page 10 Ph all Co Map Output Page 1 of l Enter Title Tue Sep 20 11:08:26 EDT 2006 Ic P-tty9 •N t' • 1 AT y 4.- t ;Y Elm 0 SOLIMA !I sc�.s popnuv�o Tor.ra.pn.0 M.C. fkmw l ItappMp ► ar"UKian 9YOW Or•LJoe K.PP Apprmob ii Prw.N.h t►. N.r6 C-roh-li F6-dpL- K+PrM P-Wp eiscww! TYrs is". I-Wr drdrp(F IRM) Flood "Urw oe R7r. MV ud lhQYW ra[ b. w.d .s such. http:// l 49.168.101.8/serviet/corn.esri.esrimap.Esrimap?ServiceName=locator&ClientVersi... 9/20/2005 w+..n�wa•avw+no-.+m.� I...,+ •.,... M s ]L IM - f. R M n. Ism .yjj 5 a s ggg9 a �� �F�����SsFaaiFi SA ;AAA N wane a.ruri-....r�+••as..+r•w�...�•�-�ow..w. u. +��.c-ou �ao.rn�-+�•.+.r-.a[na.on�u.an .lr1r e ••r.��w .� ta• �iu.9aKWwune ec.s+�.w .•�n�aw��vwrn. ni-.aNrwn al �•u o 0 o.mrw-.-.w .+.�.n�*md.nfuir� n` a I4 1 9 j. g M ! stun a ONG • I L 1 1 -� 2 :7Cm auuwG p rtv-I r� I I I I Oc A I r 1 Hume AecnMM AOD Exc NUXI a t I(t OM9 MOOT P(4 6 f MM �1i ACI MR 7Z [ fiRO O/4Ml1OKi a rwxr�f[Iwce r�a+unAs _ t j�!!111 ul au l i,f li I J.D. iW11NE C011ri LLL[ �u d �I 1 1 • ov LL.P•s �[�+ erlw nlr.�.,�,...,r..w... Print Map, Page I of I Map for GIS User Location of My Location 1:12,012 Camp Lejeune 7.5-minute Quadrangle Index map http://gis.erir.state,nc.us/topoviewer/gisprintjsp 9/20/2005 r , A s y_ fc.. i"ai �".. e • K� Y�,r-a," F [ rx } r s 3 �=.. � � � r F 1 f fit, ije s � � � F�.�•" 4p"; yy���pJr.'1.�.. ��r�. VA ; + 'n'.. ` � � �•! ��yJ� 'vim M 1.4' S t i s l CTI.� "11�3Pt Rp'. i 1''"*' f- c rs4r'' i � 'tip fir �1� 41 �. k �. f •4 1. tf Zrn rJ 'w. ryi4r I t r' ��. [ ' ✓ r F - [ ' I� �'i / y,,.Yr i. AT 3-7� J NCDENR� North Carolina Department of Environment and Natural Resources 127 Cardinal Drive, Wilmington NC 28405 (910) 796-7307 FAX (910) 350.2004 Request for Express Permit Review FILL-IN all information below and CHECK required Permit($). FAX or email to Cameron. Weaver(d)ncmail.net along with a narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name Lt. Commander John Anderson Officer in Charge Company Marine Corp, -Camp Leieune Address 1005 Michael Road City/State Camp Leieune, NC Zip 28547 County Onslow Phone 9101451-2581 Fax 910/451-5889 Email canadybd@le'eune.efdlant.navfac.payy.mil PROJECT Name FSRG Operations & Maintenance Facilities — P-1151 Buildina Addition to 0 & M Buildin PROJECT SYSTEM(S) TRIBUTARY TO Courthouse Bay (STREAM NAME) New River RIVER BASIN White Oak ENGINEER/CONSULTANT Myra W. Jones, P.E^ Company Haskell Architects & Engineers Address 111 Riverside Ave. City/State Jacksonville, FL Zip 32202 County Duval Phone 904/791-4666 Fax 904/475-7887 Email myra.lones@thehaskellco.com State or National Environmental Policy Act (SEPA, NEPA) -- EA or EIS Required ❑ Yes ❑ No ❑ STREAM ORIGIN Determination; # of stream calls; Stream Name ® STORMWATER ❑ Low Density ❑ High Density -Detention Pond ® High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT . Z Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY Z Erosion and Sedimentation Control Plan with 0.3 Ac to be disturbed. WETLANDS (401) Wetlands on Property ❑ Yes ® No Isolated Wetlands on Property ❑ yes ® No Check all that appi Wetlands Will Be Impacted ❑ Yes ® No Wettand Impacts: NIA Acre(s) Wetlands Delineation has been completed ❑ Yes ® No ® Buffers impacted: N/A Acre(s) USA COE Approval of Delineation completed ❑ Yes ® No 404 Application in process w1USACOE ❑Yes ®No I Permit received from USACE []Yes ®No 401 Application required []Yes ® No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS .$ 401 $ Total Fee Amount $ FSRG Operations and Maintenance Facilities, 1ACB Camp l.ejeurie, NC 05055023 C. new BMP, or stormwater retention pond, to be located along the south side of the site, with outfall to an existing ditch at Julian C. Smith Drive. Existing utilities for this site are indicated partially upon the RFP drawings and the reference drawings for existing Building HP-237 included under Part Six of this RFP. The 1" BNl9 Armory shall be constructed on a clear, near -flat site located in the middle of an enlisted personnel barracks complex off of 'C' Street in the Hadnot Point. area, as shown on the RFP drawings, This site is surrounded by four existing three story barracks. There are few significant features of site demolition; however, the: Contractor must create a vehicle entrance to the site at an existing 90-degree turn in the existing driveway. This area is encumbered by a large number of POV's and; pedestrians. Existing underground steamlines also cross this site. It shall bi�l necessary to eEevate the Armory floor slab above existing grade in order to create: positive drainage around the site. Drainage shall be accomplished by collecting all'r surface water and piping via catch basins, curb inlets and underground piping to the: existing underground storm drainage structures. Existing utilities for this site are!; indicated partially upon the RFP drawings and the reference site drawings for th, existing Enlisted Barracks complex included under Part Six of this RFP. The medical wing Addition for 2" FORCE RECON shall be located in a relatively paved area in front of existing Building A66. The existing heavy-duty pavement s be carefully sawcut, removed and patched in order to facilitate the work. An exis 8-inch diameter, underground waterline must be relocated to outside the prope Addition's footprint. It is anticipated that a piled foundation for all new exterior w and load -bearing elements shall be provided for the medical wing Addition, matcl the existing building's foundation. Underground utility distribution to existing Shelters SA67 and SA68 shall be repui and the Contractor shall carefully sav,Icut, remove and patch existing heavy-� pavements to facilitate the work. Care shall be exercised at this site to conduct all construction operations in way so as to minimize disruption of the 2" FORCE RECON's ongoing operati the Building A66 complex. 3.2 Site Development Requirements The RFP drawings include conceptual site layouts intended to delineate acceptable. appropriate design solutions. Although the RFP site layouts are not intended td definitive, the Contractor and its Architect -Engineer should avoid deviations Lin supported by justifying field data or considered by the Government to enhance the prof PROJECT PROGRAM Page 10 FSI pn, Map Output Page i of 1 Enter Title Tue Seo 20 11:08:26 EDT 2006 Or or h lr .i ���•Aialalry w��tii •�4On.*-era L� ilk —AaIDOFI#ATJW �M jW KC.FR)odplMn M.ppkV MmmuLkm gm n.{I.. Marw Mrk•w. P - 66 &* tJ.. North Caroun. f7..dplaY. Mahlwj Arwa a Di s cli"r. This is na � a kpmv q (YIRK flood in=nos Ras MM wW ih.tid na1 be u &d a$ such. httn://149. i 68.101.81servlet/corn.esri.esrimap.Esrimap?ServiceName=locator&ClientVersi... 9/20/2005 1 �'Irrr 4f � •! I �� �� IY>td YboM Fl30JlCT� Fi4a. niR anf hf1 RplO 01ENR10Na IL A�WH7[fwrCE rACIJlT'Id 1f.. H11ML Airm ITEMMD ILmu !!RS �41.LL fJ �+ sae Has�lr;L L'S. MnINE CORPS dl"E w Le a..,c...yr..-..• Print Map ' ' Page I of 3 1:12,012 Sneads Ferry 7.5-minute Quadrangle Map for GIS User Location of My Location Index map httn://eis.erir.state.nc.us/tonoviewer/eisDrint.iSD 9/20/2005 I NtDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive, Wilmington NC 28405 (910) 796-7307 FAX (910) 350-2004 Request for Express Permit Review FILL-111 all information below and CHECK required Permit(s). FAX or email to Cameron. Weaver@ncmail.net along with a narrative and vicini map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name Lt. Commander John Anderson Officer in Charge Company Marine Corp, Camp Le'eune Address 1005 Michael Road City/State Camp Leieune, NC Zip 28547 County Onslow Phone 910A51-2581 Fax 910/451-5889 Email canadybd�ieieune.efdla_nt.navtac.navY.m_ iI PROJECT Name FSRG Ooerations & Maintenance Facilities — P-1149 — 1 BN19 VMF PROJECT SYSTEM(S) TRIBUTARY TO (STREAM NAME) New River RIVER BASIN White Oak ENGINEER/CONSULTANT Myra W. Jones P.E, Company Haskell Architects & Engineers Address 111 Riverside Ave. City/State Jacksonville, FL Zip 32202 County Duval Phone 904/791-4666 Fax 904/475-7887 Email myra.iones@thehaskelleo.com State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑ Yes ❑ No ❑ STREAM ORIGIN Determination; # of stream calls; Stream Name ® STORMWATER ❑ Low Density ❑ High Density -Detention Pond ® High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site ® COASTAL ® Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ® Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY ® Erosion and Sedimentation Control Plan with 3.2 Ac +I- to be disturbed. WETLANDS (401) Wetlands on Property ® Yes ❑ No Isolated Wetlands on Property ❑ yes ® No Check all -that aA�1y , Wetlands Will Be Impacted ❑ Yes ® No Wetland Impacts: NIA Acre(s) Wetlands Delineation has been completed ❑ Yes ® No ® Suffers Impacted: NIA Acre(s) USA COE Approval of Delineation completed ❑ Yes ® No 404 Application in process w1USACOE ❑Yes ®No I Permit received from USACE [—]Yes ®No 401 Application required ❑Yes ® No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DFNR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS $ 401 $ Total Fee Amount $ __ 05055044Wf5RG Operations and Maintenance Facilities, MCB Camp Lejeune, onduit ri b SITE ANALYSIS under it lily} and the 3.1 Existing Site Conditions :: Site locations are indicated on the RFP drawings. Existing site locations are indicated on -the RFP drawings and reference drawings included with this solicitation. The photographs �ified and on the following pages are intended to covey a general. understanding of the existing sites' e proposed ' 'character, features and conditions. A general characterization of each site is as follows: -onstructi 48,2n_dBARPe'w1k"'`^� g�--,•�r - .7 ig structu5ir:n — — _ and submit` The existing 2'� LAR Complex is located in and around Building 575, as indicated on _h structurl the RFP drawings, off McHugh Boulevard near 'O' Street. A portion of renovation/ e struCtdi1 alteration work lies inside and immediately adjacent to Building .575. An existing ' truck loading dock with ramp and apron shall be filled under this contract and paved to sustain Company storage access inside Building 575. )osed to-ii penings and`` load-bearings'parking -';' The new 2" LAR Armory, 'Echo' Company's tactical vehicle parking area, and a POV hoar jams area shall be located on a partially wooded site immediately to the northwest ings withOLttx; ,` - • 'of Building 575. This site is relatively flat and bordered to the south by a deep ditch. A small weapons cleaning shelter and slab (S733), two paved athletic courts, concrete :upants pole -mounted lights, fences, and a short cellphone tower are located on the existing "r of providirig� ~` site, and shall be demolished under this contract. Drainage shall be accomplished by ; and adding` collecting all surface water and piping via catch basins, curb inlets and underground or analyzingr� piping to a new BMP, or stormwater retention pond, to be located at the southwest 1 making ail^_ ,.. ;;•:. corner of the site, with outfall to the existing ditch. Existing utilities for this site are the existii� g4° indicated partially upon the RFP drawings and the reference drawings for existing ure vtralls.:� Building 575 included under Part Six of this RFP. There are no known wetland areas the exteriors: delineated at the edge of the ditch immediately adjacent to the site. hat was not' to submi#'' } Project P-1 149, 1 ° BN/9 Armor an Vehicle/Electronic Communications ed �ndations fajP i Maintenance Facilit ,: necessary shall be �'�� .. � .r;:.• The 1' BN19 Vehicle/Electronic Communications Maintenance Facility shall be n g Shelters'. ;. constructed on a relatively clear site located next to existing Building HP237 in the used Hadnot Point area, as shown on the RFP drawings, along 'F' Street, and extending west to Julian C. Smith Drive. The site gently slopes downward from 'F' Street south toward 'G' Street. Existing features to be demolished under this contract include a ballfield with pole -mounted lighting, a judo fit, and an obstacle course. The Contractor shall coordinate with the Camp Lejeune Facilities Planning Department to ' determine disposition of existing judo pit and obstacle course equipment. The site is bordered closely to the rear by a natural wooded area leading to a deep ravine and <;• _ wetland area that shall remain undisturbed. An existing ballfield to the south at 'G' r ' Street shall remain undisturbed. Drainage shall be accomplished by collecting all JN _.,>-` �•;.. surface water and piping via catch basins, curb inlets and underground piping to a PROJECT PROGRAM FSRG Operations and Maintenance Facilities, MCB Camp l_ejeune, NC 05055023 FS C. new BMP, or stormwater retention pond, to be located along the south side of the : ' sit site, with outfah to an existing ditch at Julian C. Smith Drive. Existing utilities for this site are indicated partially upon the RFP drawings and the reference drawings for,;, or,..°:.to existing Building HP-237 included under Part Six of this RFP. h, The I' BN/9 Armory shall be constructed on a clear, near -flat site located in then middle of an enlisted personnel barracks complex off of 'C' Street in the Hadnot Point ::J area, as Shown on the RFP drawings. This site is surrounded by four existing three=_, :. r story barracks. There are few significant features of site demolition; however, the;h �:.. Contractor must create a vehicle entrance to the site at an existing 90-degree turn ing ra all the existing driveway. This area is encumbered by a large number of POWs an&t' E pedestrians. Existing underground steamlines also cross this site. It shall necessary to elevate the Armory floor slab above existing grade in order to create_::r`sp1 positive drainage around the site. Drainage shall be accomplished by collecting alf:� to;surface water and piping via catch basins, curb inlets and underground piping to the,, existing underground storm drainage structures. Existing utilities for this site ar indicated partially. upon the RFP drawings and the reference site drawings for th! s., existing Enlisted Barracks complex included under Part Six of this RFP. .r= The medical wing Addition for 2"' FORCE RECON shall be located in a relatively fl paved area in front of existing Building AGG. The existing heavy-duty pavement sh be carefully sawcut, removed and patched in order to facilitate the work. An existi 8-inch diameter, underground waterline must be relocated to outside the propos Addition's footprint. It is anticipated that a piled foundation for all new exterior wa and load -bearing elements shall be provided for the medical wing Addition, match'i the existing building's foundation. Underground utility distribution to existing Shelters SA67 and SA68 shall be requ and the Contractor shall carefully sawcut, remove and patch existing heavy - pavements to facilitate the work. Care shall be exercised at this site to conduct all construction operations in way so as to minimize disruption of the 2" FORCE RECON's ongoing operas the Building AGG complex. 3.2 Site Development Requirements The RFP drawings include conceptual site layouts intended to delineate acceptable'. appropriate design solutions. Although the RFP site layouts are not intended to, definitive, the Contractor and its Architect -Engineer should avoid deviations uri. supported by justifying field data or considered by the Government to enhance the prof' PROJECT PROGRAM Pagel 0 Map Output Page 1 of 1 Enter Title rpu� Coo rMA110 IOeKJa kal r<i Waslndian SWOr On -Line J4 -pp 6 Appkaliw P s m WeJ bV tY. Nwth Carekwa F4 41Nw PO-s p — s Peefra Nnls ,: 1!e's a m a lep by b+drp kTIRF+) Flood hsanve Rate hUp and shoJa nea l» wed as «roh. e http:// 149.168.101.8/serviet/com.esri.esrimap.Esrimap?ServiceName=locator&ClientV crsi... 9/20/2005 ;_, ._—C _,Ql am olaas aN�ww o e a �r#tj;'!�1 ,4 � sgUn tiw 20WWN91Nrf1Y a SMOLLYH10 DkMd sr�aKl9xa awr SL�a1fo7EV 7fn1PvH �' l9u taus as U 'asu,r IL BrO d Nww ",V 1i a.� a.aa a, o..... 1 1{ ' E v�i� 6 P i Ott �� 1 •`a�c "YlFQ�����r �a�a°�v� �jig� i �k 6a Xe aaElE�9lo'AI r � ;_:t yy_Qp7q Gas N- � lti :� � _ •� r ., off /// r������� L no uw,r-w-w. !•vnar,,y.y,M.,�r.w. ��u.su evn•��:_o--r.. 1 � +a a�.c.+w», - m� v R n::-a .r. .r.,.+�s:iyuwsn.mna: .cf. rs,n-a•. �+�.ert:µyesrvr.-,� �..•rio.c cww�,�rr-:..... .c: .�o.+i _o�.-r• �...a.�,t,`cV.su.,ls+r r...-rna.c Me.:+:-w-n•r. Print Map Page 1 of I ,6ul 1:12,012 Camp Lejeune 75-minute Quadrangle Map for GIS User Location of My Location 11,111=144,19i D� Index map %*1 http://gis.enr.state.nc.us/topov1ewer/gisprint.jsp 9/20/2005 �,lyd f'VE, �• +_� � :a �Ky� "5 4 &�'"_. �; [r�e,:.`. �su�iW i }f °�a' . IM ` 1 ��iZF pA 1 Y' r,t`.s � s'S' k~�.y��Q'ja i rs '"1`�' -•l�d '. p, tit' �x �_+ � .cC'• � ., a i "•� ! r r ,c i � � -;• �^c y�f `<' ✓i •" � � sr� r�-tt`...dks�f r��F, : r • S� 3 I it i '� � ^�. % $ rN e s" ..* �rl•'k• _ }� f� [ � : "y { yr'�Y' � i IsF'� ti ,� g, r. ` * z is nr- # �+� ;�. � � ; ' �` � •". ��! r` ' Syr ` . ,. _ 5 . '� .ilk l7E,t,, f .6 .'a. �� fr dry_.. s •� � .. is N 1 t V eh c-`- It V NC®ENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary 10/26/2005 LETTER OF RECEIPT FOR AN EROSION CONTROL PLAN EXPRESS REVIEW C� USMC Cdr. L. J. Readal, Public Works Officer 1005 Michael Road Camp Legeune, NC 28547 RE: Project Name: 2nd LAR Armory Operations & Maintenance Facilities FSRG Project ID: Onslo-2006-112 County, Street: Onslow, McHugh Blvd & "O" Street River Basin: White Oak Submitted By: Haskell Archetcts & Eng. Date Received by LQS: October 25, 2005 Plan Type: NEW Dear Cdr. Readal: This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The review period for an express review is three days of receipt of a complete plan. If additional information is requested, it must be submitted within five working days of receipt. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have' performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted_ before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Carol N. Miller Assistant Regional Engineer cc: Ms. Myra W. Jones, P.E., Haskell Architects & Engineers LQS-WiRO; 5WS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-395-39001 FAX: 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECT NAME: 2nd LAR Armory_Oper._&_Main. Fac. FSRG DATE: 1012512005 PROJECT NO.: Onslo-2006-112 COUNTY. Onslow To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below. To meet our review schedule, any additional information should be received by this office no later than November 1, 2005 . Failure to meet this schedule may result in disapproval of your plan. The following items shall be incorporated with respect to specific site conditions, in an erosion and sediment control plan: LOCATION INFORMATION Project location (roads, streets, landmarks) North arrow and scale GENERAL SITE FEATURES (Plan elements) Legend: North arrow, scale, etc. Property lines Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label) Planned and existing building locations and elevations Planned & existing road locations & elevations Lot and/or building numbers Geologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. Easements and drainageways Profiles of streets, utilities, ditchlines, etc. Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shah be considered separate land -disturbing activities and must be permitted either thru the Sedimentation PolIution ControlActas a one -use borrow site or through the Wring Act, Required Army Corps 404 permit and Water Quality 401 certification (e,g. stream disturbances over 150 linear feet) EROSION CONTROL MEASURES (on plan) Legend Location of temporary measures Location of permanent measures Construction drawings and details for temporary and permanent measures Maintenance requirements of measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project) Method of determination of and calculations for Acreage of land being disturbed Size and location of culverts and sewers Soil information: type, special characteristics Soil information below culvert storm outlets Name and classification of receiving water course (only where stormwater discharges are to occur) Comments: See Attachment. STORMWATER CALCULATIONS Pre -construction runoff calculations for each outlet from the site (at peak discharge points) Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients of the site) Design talcs of culverts and storm sewers Discharge and velocity calculations for open channel and ditch flows (easement & right-of-ways) Design talcs of cross sections and method of stabilization of existing and planned channels (include temporary linings) Design talcs and construction details of energy dissipators below culvert and storm sewer outlets (diameters & apron dimensions) Design talcs and dimension of sediment basins Surface area and settling efficiency information for proposed sediment traps and/or basins VEGETATIVE STABILIZATION Area & acreage to be vegetatively stabilized Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates NOTE: Plan should include provisions for groundcover on exposed slopes within 15 working days or 30 calendar days (whichever is shorter), following completion of any phase of grading; permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM Completed, signed & notarized FRIO Form Accurate application fee ($50.00 per acre rounded up the next acre with no ceiling amount) Certificate of assumed name, if the owner is a partnership Name of Registered Agent (if applicable) Copy of the most current Deed for the site NOTE: For the Express Permitting Option, inquire at the local RegionalOffice for availability. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature and purpose of the construction activity Construction sequence related to erosion and sediment control (ind udi ng installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized) Bid specifications related only to erosion control Continuation of Erosion and Sedimentation Control Plan Preliminary Review Checklist: Project Name: 2nd LAR Armory Operations & Maintenance Facility FSRG Project # Onslo-2006-112 Please respond by: November 1, 2005 1. Please provide maintenance schedule for the silt sacks proposed for drop inlets. 2. Replace hay bales with rock check dams in swales. 3. Denote all proposed site improvements in darker lines (to distinguish from existing features) and/or label. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, NC 28405 Phone: 910-395-3900 Fax: 910-350-2004