Loading...
HomeMy WebLinkAboutSW8051065_CURRENT PERMIT_20000709STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW8 OS 1 v (p 5 DOC TYPE N CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2_000 07o t YYYYMM DD r >: OFFICE USE ONLY ,; o Date Received Fee raid Permit Number ObU36 Z ur DS1 L�6 7s�i3�bl� r`Stte of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Marine Corps, Camp Lejeune c/o CDR Laurence J. Readal, Officer in Charge 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): CDR Laurence J. Readal 3. Mailing Address for person listed in item 2 above: 1005 Michael Road City: Camp Lejeune Telephone Number: ( 910 } 451-2581 State: NC Zip. 28547 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): FSAG Operations & Maintenance Facility, 2nd LAR Armory 5. Location of Project (street address): Corner of McHugh Boulevard & "O" Street City: Jacksonville, NC County: Onslow 6. Directions to project (from nearest major intersection): Corner of McHugh Boulevard & "O" Street 7. Latitude: 34-39'-26" N� _ Longitude: 77-20'-21 " W of project 8. Contact person who can answer questions about the project: Name: Engr. Resources Group c/o Fred Watkins Telephone Number: ( 757 } 961-6215 IL PERMIT INFORMATION: 1. Specify whether project is (check one): X New FormSWU-let Version3.99 Page I of Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number N/A and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop Generale Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major Sedimentation/Erosion Control 404/401 Permit X NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. Ill PROJECT INFORMATION 1. In the space provided below, sumniarize how storrnwater will be treated. Also attach a detailed narrative (one to two pages) describing storrnwater management for the project . The storm water generally flows across the site from north west to south east. It will be intercepted by a series of inlets, and transferred to a BMP at the southwest corner of the site. After processing through the BMP it will outfall to an existing ditch that outflows to the south east. 2. Storrnwater runoff from this project drains to the White Oak 3, 'total Project Area: 5.28 acres 4. Project Built. Upon Area: 5. I -low many drainage areas does the project. have? 2 River basin. 48.1 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the sarne format as below. TV S"11:1 1111PA $S Basin Information Drainage Area I " 'Drainage Area 2 Receiving Stream Narne Cogdels Creek Receiving Stream Class SC 5G Drainage Area 4.36 acres O.C12, AC_ Existing Impervious* Area 39.640 SF Proposed lmpervious*Area 106,722 SF 3 W % Impervious* Area (total) Impervious* Surface Area . Drainage Area I Drainage, Area 2 .. On -site Buildings 11,326 SF On -Site Streels 13,001 SF I&(OWL �Z_P On-sile Parking 75,290 SF On-sile Sidewalks 7,105 SF `Z Other on -site - Off -site Total: 106,722 sf = 2.45 acres Total: 3-1,. I Slr = O.CqAc_ * Impervious area is defined as the built upon area including, but riot limited to, buildings, roads, parking areas, sidewalks, gravel areas. etc. Form SWU-101 Version 3.99 Page 2 of 4 How was the off -site impervious area listed above derived? BY best assumption and use of CADD Automated area calcutation IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions. outparcels and future development prior to the sale of any lot. if lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number WA as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than N/A square feet of any lot shall he covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-109 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3,99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form 542, • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of442&(payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features. collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Engineering Resources Group c/o Fred Watkins, P.E. Mailing Address:- 5265 Providence Road, Suite 202 City: Virginia Beach State: VA Zip. 23464 Phone: L757 ) 961-6215 Fax: ( 757 961- 7244 VIII. APPLICANT'S CERTIFICATION 1, (print or type name of rson listed in Ge. certify that the infbr a on included on that the project will ns ucted in cc and protective cov n ill be recort�l NCAC 2H. 1000., ' , f tion, item 2) CDR Laurence J. Readal application form is, to the best of my knowledge, correct and ,vith the approved plans, that the required deed restrictions the proposed project complies with the requirements of 15A Form S W U-101 Version 3.99 Page 4 of 4 Date: v k, o� Permit No. �-+ �� 6 5) D U 5 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATI:R MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form rrtay be photocopied for use as an original DWQ Stormwater Management Plan Review_ A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECTINFORMATION Project Name: FSRC Operations & Maintenance Facility, 2nd LAR Armory Contact Person: Fred Watkins, P.E. Phone Number: (757) 961-6215 For projects with multiple basins, specify which basin this worksheet applies to: NA elevations Basin Bottom Elevation 9.50 ft. Permanent Pool Elevation 14.00 ft. Temporary Pool Elevation 15.40 ft. areas Permanent Pool Surface Area ^ 9,890 sq. ft. Drainage Area 4.36 ae. Impervious Area 2.45 ac. volumes Permanent Pool Volume 23,926 cu. ft. Temporary Pool Volume 15,752 cu. ft. Forebay Volume 4,916 cu. ft. Other parameters SA/DAJ Diameter of Orifice Design Rainfall Design TSS Removal 2 Form SWU-102 Rev 3.99 (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -.site and off=site drainage to 111L' basin) (combined volume of stain basin crud forebay) (volume detained above the permanent pool) (approximately 20% of total volume) 4.80 (surface area to drainage area ratio from DWQ table) 1.5 in (2 to 5 day temporary pool draw -down required) 1 in. 85 % (mininluln 85% required) Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%, TSS removal. The NCDENR 13MP manual provides design tables for both 85% TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department ol' Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008, Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials it. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. if required, it 3046ot vegetative filter is provided at the outlet (include non -erosive flow calculations) F. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with it slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. 111. WILT DETENTION BASIN OPERATION AND MAINTENANCE: AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does V does not incorporate a vegetated filter at the outlet. This system (check one) A.,does 0 does not incorporate pretreatment other than a forebay. Form S W U-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: l . After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.37 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 14.00 Sediment R\Ele,,.ition al t31. 9.00 5% ------------- -- Sediment Removal Elevation 10.63 759 13U[tom R.00 25%--------------------------------------------- ------- 13onom Elevation 9.50 25 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form S W U-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, t -�/>� , a Notary Public for the State of��J"� County of _ 1'Li? .� ^, do hereby certify that 4 personally appeared before me this _ � = day of Q G , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SWU-102 Rev 3.99 Page 4 of 4 DESIGN REPORT Project: FSRG Operations & Maintenance Facility 2 nd LAR Armory Marine Corps Base Camp Lejeune, NC 4 Prepared For: The Haskell Company I I I Riverside Avenue Jacksonville, FL 32202 Submitted By: =*FEB 13 2006�D BY: Engineering Resources Group, LLC November 19, 2005 Revised February 1, 2006 FngineenngResources Croup, IYC 5265 Providence Road, Suite 202 Virginia Bcach, VA 23464 Ph: ( ) 961421S F. (757) 961-72" Drainage Narrative FSRG Operations & Maintenance Facility P-1 148 2n`i LA R Armory at . Camp Lejeune Our findings are based on the items that could be verified by the Topographic Survey provided by Johnny J. Williams Land Surveying PC. Since no existing storm sewer calculations could be provided, all items as shown on the survey were assumed true. The existing site ranges in elevation from 20.0 feet in the northwestern portion of the site to elevation 15.0 in the southwestern portion of the site. The stormwater runoff from the site sheet flows from the northeast to the existing drainage ditches adjacent to the western edge of the site, which then outfalls to the south. The site is naturally wooded with two hard surface slabs for recreational use (tennis courts, etc.). The proposed development includes stone systems, swales, and a retention facility to accommodate runoff from the proposed parking lot and building. The proposed site ranges in elevation from 21.48 feet adjacent to an existing roadway to 8.50 feet at the bottom of the retention facility. The majority of the area to be developed will be collected in the on -site storm system and carried to the proposed forebay and retention facility where it will be treated and released into the existing ditch adjacent to the developed area at a rate less than that of the 10 year pre -development flow. A minor portion of the site will bypass the proposed storm system and run off into the existing ditch and adjacent sites. The required 85% pollutant removal efficiency has been achieved utilizing swales and the retention facility. The Preliminary Report of Subsurface Exploration and Geotechnical Engineering Evaluation has shown the ground water table to be at elevation 8.50 feet. The proposed retention facility with forebay is sized for quality and quantity. The bottom elevation extends 4.5 feet below the normal water level at a 3:1 side slope. The retention facility will rise to elevation 14.90 feet with a I" rainfall and elevation 18.10 feet with a 6" rainfall. ] Of 1 EnglmeenmgResourees Group, -11,C 5265 Providence Road, Suite 202 Virp= Be ,h, VA 23464 Ph (777) 961-6713 Pc (757)%1-7?A4 Project Name: 2nd LAR Armory Project Number: 1200410.4C Date: 21-Feb-06 r BMP Bypass Areas within Developed Area Byp1 Acres "c" CA Pervious = 0.90 0.30 0.27 Impervious = 0.02 0.90 0.02 Total Area = 0.92 0.29 Byp2 Acres "c" CA Pervious = 0.00 0.30 0.00 Impervious = 0.00 0.90 0.00 Total Area = 0.00 0.00 Byp3 Acres "c" CA Pervious = 0.00 0.30 0.00 Impervious = O.00 0.90 0.00 Total Area = 0.00 0.00 Byp4 Acres "c'. CA Pervious = 0.00 0.30 0.00 Impervious = 0.00 0.90 0.00 Total Area = 0.00 0.00 Byp5 Acres "c" CA Pervious = 0.00 0.30 0.00 Impervious = 0.00 0.90 0.00 Total Area = . 0.00 0.00 Total Bypass Area = 0.92 Ac "c" post = 0.31 "C post = 0.31 "c" post = #DIVIO! "c" post = #DIVIO! "c" post = #DIVIO! "c" post = #DIVIO! Erojwenl7gResouwcs Group, .UC 5265 Providence Road, Suite 202 Virginia Bk ch, VA 23464 Ph (757) 761-6215 V.: (757) 761-7244 Project Name: 2nd LAIR Armory Project Number: 1200410.4C Date: 21-Feb-06 Drainage Areas to BMP 1 Acres " c , CA Pervious = 0.07 0.30 0.02 Impervious = 0.24 0.90 0.22 Total Area = 0.31 0.24 2 Acres IV' CA Pervious = 0.05 0.30 0.01 Impervious = 0.24 0.90 0.22 Total Area = 0.29 0.23 3 Acres "c'. CA Pervious = 0.22 0.30 0.07 Impervious = 0.32 0.90 0.29 Total Area = 0.54 0.35 4 Acres 1.0 CA Pervious = 0.06 0.30 0.02 Impervious = 0.13 0.90 0.12 Total Area = 0.19 0.14 5 Acres "c" CA Pervious = 0.05 0.30 0,01 Impervious = 0.28 0.90 0.25 Total Area = 0.33 0.27 6 Acres "c" CA Pervious = 0.62 0.30 0.19 Impervious = 0.29 0.90 0.26 Total Area = 0.90 0,44 7 Acres "c" CA Pervious = 0.09 0.30 0.03 Impervious = 0.31 0.90 0.28 Total Area = 0.40 0.31 " C" post = ..c" post = 0.76 M "c" post = 0.65 "c" post = 1.c" post = 0.71 0.82 "c" post = 0.49 "c" post = 0.77 r' Engrneerrng Reso=ff Gmup, L - 5265 Providmcc Road, Suitc 202 Virginia B=6, VA 2-UM PR (757)961.6215 Pr. (15T)961.72" 8 Acres "c" CA Pervious = 0.26 0.30 0.08 Impervious = 0.51 0.90 0.45 Total Area = 0.76 0.53 9 Acres "C" CA Pervious = 0.28 0.30 0.08 BMP = 0.23 1.00 0.23 Impervious = 0.13 0.90 0.12 Total Area = 0.64 0.43 Total BMP Area = 4.36 Ac "c" post = 0.67 "C" post = "C" post = 0.70 Engh7eerxrrgResources Gm up, LfC 5265 Providence Rind, Sulu 202 Wrgi 6ech, VA 23464 rn: p»j �t.aau tk qs� Ant.i7�a Project Name: 2nd LAR Armory Project Number: 1200410.4C Date: 21-Feb-06 Stormwater Flows for Developed Area 1 Developed Area - Pre -Development Acres I.c" CA Pervious = 4,37 0.30 1.31 Impervious = 0.91 0.90 0.82 Total Area = 5.28 2.13 2 Developed Area - Post -Development A Post -Developed Area - Bypass Acres "c" CA Pervious = 0.83 0.30 0.25 Impervious = 0.09 0.90 0.08 Total Area = 0.92 0.33 B Post -Developed Area - To BMP Acres ..c" CA Pervious = 1.69 0.30 0.51 BMP = 0.23 1.00 0.23 Building = 0.26 0.90 0.23 Impervious = 2.19 0.90 1.97 Total Area = 4.36 2.94 3 Size BMP Outfall Pipes A Size Orifice Pipe for Draw Down B Size Outfall Pipe Orifice Dia = 1.5 in h1 = 1" Rainfall Elev = 14.9 ft h2 = Perm. Pool Elev = 14 ft 1" Rainfall Volume = 9696 sf h3 = Avg Elev = 14.45 ft Q = 0.6A(2g(h3-h2))^0.5 Q = 0.0396 cfs t= VIQ t = 244738.6 sec t = 2.83 days = 6.00 in Q pre = 12.79 cfs Q post bypass = 1.98 cfs Q min BMP out = 10.81 efs Q = 0.6A(2gh)^0.5 11.06 = 0.6A(2-32.2-0.75)^0.5 A = 2.592916 sf Req'd Outfall Dia = 10.90 in Use: 10 in outfall pipe tRc y, Fi7g7nccm2gRest9wres Croup, IJC 5265 Providence Road, Suite 202 Wrenn Beach, VA 23464 Plc o!n 963di!] Pc: (i]1J 96I.TdM Project Name: 2nd LAR Armory Project Number: 1200410.4C Date: 21-Feb-06 BMP Sizing Calculations 1 Surface Area Required For Water Quality: A Site Information S Total Area to BMP = 4.36 Acres d 0 Impervious Area To BMP(s), IA = 2.68 Acres Percent (%) Impervious Area = 0.61 or 61 % Pond Depth = 4.50 ft B Required BMP Surface Area at Normal Water Level (NWL) From NCDENR Stormwater BMP Table 1.1, SAMA Ratio = 4,80 % Required Surface Area = 0.21 acres = 9,121 sf 2 Volume Required Above NWL For Water Quantity A Runoff Coefficient Rv = 0.05 + (0.009'1) = 0.60 intin B Required BMP Volume Design Rainfall = 1,00 Inch Per Impervious Acre - 1.00 in 1 ft 4.36 ac 43,560 sf Rv 12 in 1 ac - 9,536 cf 3 Proposed BMP A Water Quality Provided Surface Area = 9,890 sf > Required Surface Area = 9,121 sf @ Elevation = 14.00 B Water Quantity - 1" Rainfall Provided Storage Volume = 15,752 cf > Required Storage Vol = 9,536 cf @ Elevation = 15,40 C Water Quantity - 6" Rainfall Provided Storage Volume = 58,882 cf > Required Storage Vol = 57,215 cf @ Elevation = 18.20 4 Forebay A Total Forebay Volume Provided = 4,916 cf B Total BMP Volume Provided = 23,926 cf C Forebay Volume Percentage of Total Vol = 21 % V p U � ,C Vl v w 0 7 C pM O O O N N N C) U) co 4l C_ J [� O Z N U) m U) Fm v F O U) Uj co u-y a 0 U O d Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) (ft) (ft) (ft) NO. 1 ST2-ST1 21.79 30 c 91.0 8.34 8.34 0.000 14.00' 14.26' 0.38 End 2 ST3-ST2 2.24 18 c 188.5 11.25 11.82 0.302 14.64" 14.73' 0.02 1 3 ST6-ST2 18.41 30 c 93.0 8.34 8.53 0.204 14.64' 14.83" 0.33 1 4 ST5-ST6 11.25 24 c 119.6 13.19 13.55 0.301 15.16 15.40 0.32 3 5 ST9-ST5 7.98 18 c 63.0 13.55 13.74 0.302 15.72' 16.09" 0.16 4 6 ST10-ST9 5.14 18 c 63.0 13.74 13.93 0.302 16.25" 16.40* 0.13 5 7 ST7-ST6 2.61 18 c 138.8 13.49 13.91 0.303 15.16 15.23 0.04 3 8 S78-ST6 4.07 18 C 48.0 13.49 13.63 0.292 15.16' 15.23' 0.08 3 Project File: stermsys-site.stm Number of lines: 8 Run Date: 02-24-2006 NOTES: c = circular; e = elliptical; b = box; Return period = 10 Yrs.; ` Indicates surcharge condition. HydraFlow Storm Sewers 2003 Q m c h FN- FM- FM- 1m F H N o N > o � r_ C) 46 (D � N E v r cfl r co r r� r h r T (c O CCL.'k' M M r O U( m N (O 3 �: �: (lp C 9 W (Ip• 7 N (6 (0 w r r r r r r r r J x _ _ 0. r r r r r r r r co LO N m Lq n 7 V C d ❑ CS M m - - - !iJ co w - O a a > Q N Li R M M ,^" 00 m LO h m m (p � r o0 z o. O o C. 0 0 0 o rn O o O M N C3 M M M N Q 0 0 0 0 0 0 0 Q 'a a N 0 co O N O w m — — — N V (N h O to m { O M M N N Q ^ m O h Ul) V h h m h U 3 O O t~ 06 T ti h fn U M M U3 Lo Lf) O p F N CV r h U-) N V L L ti h h O V (!] h h N �n C M m m m 6'> 6 ai m } O N � >� to O (6 (6 V O O O r II N r- W) w LO LO LO ui (D U H � a O O O O O o 0 o m a C 0 L6 (n to V-) 0 LO (6 3 a U R M V O V M fh 0 (!] N O N c0 M N V: � x H N O N r O O O O O a M L Q42- C7 O CO O N N N O O O O O O O O C3 V N L a ti � Q0 h OD ( h Oh opV + d' V O O O O O C. Cl O N U N O (D U M O E .. aj (q h CN N { h C] m a H M O M r O O O rn d C co m G C M N (n — 00000000 (nLO II O U[ co O (f7 O O W O N w J —M W r C OMS r (MD (M6 V d IV 4 _0 LL C C [a O ,r W r r M V M m Cl)a o Cn Y F- �n a J r N Cl) V LO (6 h CO Z Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------- ------- 10.52 ------- 12.64 14.16 16.15 17.61 19.15 Existing Site 2 Rational ------- 18.54 ------- 22.02 24.54 27.82 30.22 32.78 Proposed Site Conditions 3 Reservoir 2 ------- 0.00 ------ 0.00 0.00 0.00 0.00 0.00 Proposed Site Routing Proj. file: site4c-06-0221.gpw Friday, Feb 24 2006, 11:10 AM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 14.16 1 15 12,744 ---- ------ ------ Existing Site 2 Rational 24.54 1 8 11.780 ---- ------ ------ Proposed Site Conditions 3 Reservoir 0.00 1 0 0 2 14.82 40,218 Proposed Site Routing site4c-06-0221.gpw Return Period: 10 Year Friday, Feb 24 2006, 11:10 AM Hydraflow Hydrographs by Intelisolve K� Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday, Feb 24 2006, 11:10 AM Hyd. No. 1 Existing Site Hydrograph type = Rational Peak discharge = 14.16 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 5.280 ac Runoff coeff. = 0.4 Intensity = 6.705 in/hr Tc by User = 15.00 min OF Curve = wilmington-nc-2005-hydragraphs.IDF Asc/Rec limb fact = 1/1 Q (cfs) 15.00 12.00 9.00 6,00 0.00 -Y 0.0 0.1 Hyd No. 1 Hydrograph Volume = 12,744 cult Existing Site Hyd. No. 1 -- 10 Yr 0.2 0.3 0.3 0.4 Q (cfs) 15,00 12.00 M 3.00 —X- 0,00 0.5 Time (hrs) C! Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday, Feb 24 2006, 11:10 AM Hyd. No. 2 Proposed Site Conditions Hydrograph type = Rational Peak discharge = 24.54 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 4.310 ac Runoff coeff. = 0.67 Intensity = 8.499 in/hr Tc by User = 8.00 min IDF Curve = wilmington-nc-2005-hydragraphs.IDF Asc/Rec limb fact = 111 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 Proposed Site Conditions Hyd, No. 2 -- 10 Yr Hydrograph Volume = 11,780 tuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4,00 0 00 0.0 0.1 0.2 0.3 0.3 Time (hrs) Hyd No. 2 Hydrograph Plot Hydraflcw Hydrographs by tntelisolve Friday, Feb 24 2006, 11:10 AM Hyd. No. 3 Proposed Site Routing Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 14.82 ft Reservoir name = Proposed BMP Max. Storage = 40,218 cult Storage Indication method used. Wet pond routing start elevation = 14.00 ft. Hydrograph Volume = 0 tuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 1 1 i�������� w Q (Cfs) 28.00 24.00 20.00 16.00 12.00 wl 4.00 RO"A 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report Hydraflow Hydrographs by intelisolve Friday, Feb 24 2006, 11:10 AM Pond No 1 - Pro osed BMP p Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 8.00 05 0 0 0.50 8.50 2,361 592 592 4.00 12.00 5,027 12,929 13,521 6.00 14.00 9,890 14,917 28,438 10.50 18.50 18,926 64,836 93,274 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 1.50 0.00 0.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 1.50 0.00 0.00 0.00 Crest El. (ft) = 15,40 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0,00 Invert El. (ft) = 14.00 0.00 0,00 0.00 Weir Type = Riser --- --- Length(ft) = 2.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.20 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0,00 0.00 Multi -Stage = n/a No No No Exfiltration = 0.000 inft (Contour) Tailwater Elev. = 14.00 ft Stage (ft) 12.00 10.00 8.00 6.00 4.00 2,00 000 Note: CulvertlOrifice outflows have been analyzed under inlet and outlet control. Stage 1 Discharge Stage (ft) 12.00 10.00 8.00 6.00 4.00 2.00 000 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Total 0 Discharge (cfs)