Loading...
HomeMy WebLinkAboutSW8050830_HISTORICAL FILE_20080804STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 S o5oszb DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zyog O8 2001 YYYYMMDD Central Files: APS SWP 08/04/08 Permit Number SW8080508 Permit Tracking Slip Program Category Status Project Type State SW Active New Project Permit Type Version Permit Classification State Stormwater 1.00 Individual Primary Reviewer aisha.lau Permitted Flow Permit Contact Affiliation Facility Facility Name Major/Minor Region P1224 EOD Building FC292 Addition Minor Wilmington Location Address County McHugh Blvd Onslow Jacksonville NC 28540 Facility Contact Affiliation Owner Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl Baker, Dir Psc Box 20004 Camp Lejeune NC 285420004 Dates/Events Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 08/04/08 05/07/08 08/01/08 08/04/08 08/04/08 08/03/18 Regulated Activities Rp-auested/Received Events State Stormwater • HD - Bioretention Deed restriction requested ••• Deed restriction received Additional information requested 07/17/08 Additional information received 07/28/08 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin August 4, 2008 Mr. Carl Baker, Deputy Public Works Officer Commanding Officer MCB Camp Lejeune 1005 Michael Road Camp Lejeune, NC 28542 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality 44jqrge� ''?n„J �I I Subject: State Stormwater Permit No. SW8080508 do P-1224 EOD Building FC292 Addition High Density Bio-Retention Project Onslow County Dear Mr. Carl Baker: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for P-1224 EOD Building FC292 Addition on May 7, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-146 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8080508 dated August 4, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until August 3, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional contact 'sha Lau, or me at (910) 796-7215. Sin rely, Edward Beck Regional Supervisor Surface Water Protection Section information concerning this matter, please ENB/ ahl: S:IWQSISTORMWATERIPERMIT1080508.aug08 cc: Jason Frick, PE, NAVFAC MidAtlantic Onslow County Building Inspections Wilmington Regional Office Central Files 127 Cardinal Chive Extension, Wilmington, North Carolina 28405.3845 Phone: 9--79P215 J ax 91=4004 / Internet F2c.enr.state.nc us vortn -arouna ;Vaturallbl An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 permit#SW8080508 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer MCB Camp Lejeune P-1224 EOD Building FC292 Addition McHugh Blvd., MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 3 bioretention basin(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 3, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 80,034 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in Section 1.7 of this permit, and per the application documents and as shown on the approved plans. The built -upon area for the future development is limited to 0 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2of8 State Stormwater Management Systems Permit No. SW8 Permit#SW8080508 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the bioretention basins and must be maintained at design condition: Bioretention #1 Bioretention #2 Bioretention #3 a. Draina a Area, acres: 0.64 2.15 0.92 Onsite, ft: 27,791 93,618 39,988 Offsite, ft : 0 0 0 b. Total Impervious Surfaces, ft: 12,953 61,253 5,828 Onsite, ft: 12,953 61,253 5,828 Offsite, ft : 0 0 0 c. Design Storm, inches: 1.5 1.5 1.5 d. Max. Ponded Depth, inches: 9 9 12 e. Seasonal High Water Table, fmsl: 24.52 24.36 22.10 f. tinMedia Depth, feet: 2 2 2 g. Basin Dimensions, feet: 125.7 X 21 216.00 x 50.85 66 x 21 h. Bottom Elevation, fmsl: 26.65 26.38 25.5 i. Top Surface Area, ft: 2,300 10,322 1,098 j. Permitted Storage Volume, ft: 1,631 7,476 906 k. Bypass 1 Storage Elevation, fmsl: 29.40 29.13 28.50 I. Predevelopment 1 year 24 hour, cfs: 0.38 1.27 0.54 m. Post development 1 year 24 hour, cfs: 1.92 8.32 1.43 n. Drawdown Time, hours: 2.9 4.09 4 o. Underdrain Diameter, inches: NIA NIA NIA Total number of plantsprovided: sod sod sod q. Receiving Stream/River Basin: Cogdels Creek 1 White Oak River Basin 19-23 SC; NSW r. Stream Index Number: s. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the basin and outlet structure must be available at all times. Page 3of8 State Stormwater Management Systems Permit No. SW8 permit#SW8080508 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 permit#SW8080508 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 germit#SW8080508 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 4t�vffay of August, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen-H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 permit#SW8080508 P-1224 EOD Building FC292 Addition Stormwater Permit No. SW8080508 Onslow County Designer's Certification I, , , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 eermit#SW8080508 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. .5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. _7. Trash rack is provided on the outlet/bypass structure. $. The system is planted with permanent vegetation, per the approved vegetation plan. 9. Vegetated slopes are no steeper than 3:1. _10. The inlets are located per the approved plans and do not cause short- circuiting of the system. _11. The permitted amounts of surface area and/or volume have been provided. _12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. _14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. _15. The required system dimensions are provided per the approved plans. CC' NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 AP NCDENR Permit Number: 540 OK v 5 (to be provided by DWQ) OF waTfR Op y r P 't STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This fora must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 11. PROJECT INFORMATION Project name P-1224 EOD ADDITION TO BUILDING FC292 Contact name JASON FROCK Phone number 757-322-4293 Date July 21, 2008 Drainage area number B-1 II. DESIGN INFORMATION Site Characteristics Drainage area 27,791.00 ft2 Impervious area 12,953,00 ft2 Percent impervious 46.6% % Design rainfall depth 1.50 inchr`' Y Peak Flow Calculations JUL 1-yr, 24-hr runoff depth 3.68 in ti 4i� 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr peak flow 5.94 in/hr 0.38 ft3lsec Post -development 1-yr, 24-hr peak flow 1.92 ft3lsec PrelPost 1-yr, 24-hr peak control 1.54 ft3lsec Storage Volume: Non -SR Waters Design volume 1,631.00 ft3 Storage Volume: SR Waters Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hrrunoff ft3 Minimum volume required 0.00 ft3 Volume provided It Cell Dimensions Ponding depth of water 9.00 inches OK Ponding depth of water 0.75 ft Surface area of the top of the bioretention cell 2300.00 ftz OK Length: 125.69 ft OK Width: 21.00 ft OK -or- Radius ft Soils Report Summary Drawdown time, ponded volume 2.90 hr OK Drawdown time, to 24 inches below surface 7.74 hr OK Drawdown time, total: 10.64 hr In -situ soil: Soil permeability 3.10 inlhr OK Planting media soil: Soil permeability 2,00 in/hr OK Soil composition % Sand (by weight) 86% OK % Fines (by weight) 10% OK % Organic (by weight) 4% OK Total: 100% Form SW401-Bioretentlon-Rev.3 Paris I and II. Design Summary, Page 1 of 2 Permit Number. ✓ 4Y O V/ it 0 S/ (to be provided by DWO) Phosphorus Index (P-Index) Basin Elevations Temporary pool elevation Planting elevation (top of the mulch) Bottom of the cell Planting depth Depth of mulch SHWT elevation Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required Distance from bottom to SHWT Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with treesishrubs? Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side scopes equal to or less than 3:1? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3-5 ft of grass) Grassed swale Forebay 15 (unitless) OK 29.40 fmsl 28_65 fmsl OK 26.65 fmsl 2.00 ft 2.00 inches OK 24.52 fmsl OK N (Y or N) 0 ft 26.65 fmsl 2.13 ft OK Y (Y or N) OK N (Y or N) Y (Y or N) OK Y (Y or N) OK 30 ft 0 (Y or N) Enter Data Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK NA (Y or N) Insufficient ROW location. 0.20 fVsec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK OK X W4 -0, Form SW441-Sioretention-Rev.3 Pads I and II. Design Summary, Page 2 of 2 Permit No: 5t�'�no� v O (lo be assigned by OWQ) Iff: REQUIRED ITEMS.CHECKLIST 0 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplote submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met, If the applicant has designated an agent, the agent may initial below. It a requirement has not been met, attach justification. 6E Pagel Plan Sheet No. loZ �-1p2fL-!off Plans (1' - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement, 5a3 2, Plan details (1' = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. -5'3 729ZZ3 e—eo t 3. Section view of the bioretention cell (1' = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and P-index. 5. A detailed planting plan (1' = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including underdrain calculations, if applicable). 6. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Bioretention-Rev,3 Part 111, Page 1 of 1 • Permit Number: S wVaC/0 ✓ o Y (to he provided by DIVQ) Drainage Area Number: B-I Bioretention Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. -- Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is dogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable), Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention I&M-Rev.2 Page 1 of 4 • • A BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible, Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting; or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying, problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum de th of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible, An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention I&M-IRev.2 Page 2 of 4 • • • BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or re lace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioreteiidon I&M-Rev.2 Page 3 of 4 Permit Number: 0/0- (to he provided by b WQ) • I acknowledge and agree b signature below that I am responsible for the g g Y m Y� p performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: P-1224 EOD Addition to Building FC292 BMP drainage area number: IM Print name: Carl Baker Title: De u Public Works Officer Addres Phone: Signati Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of County of do hereby certify that personally appeared before me this day of df- , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, ALICE A SONNETTE 14101MY Public Onstow County SIWO of North Caragno My COmrnlsalon Expires Oct 23. 201 SEAT, My commission expires 02 Form SW401-Bioretention 1&M-Rev. 2 Page 4 of 4 q,yy44tC.» A 1311# �i1tly� vr>wsay� VhMSi(>.^,. W01MOU QriiiOla• f�llpi� to OWN! i}iiS .CS !3O ap�lge3 (rp13^i �R � y"l: , • • • Permit Number: 5)VOW YO6.1) • (to be provided by DWQ) of wnrFR AGIM NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name P-1224 EOD ADDITION TO BUILDING FC292 Contact name JASON FRICK Phone number 757-322-4283 Date April 16, 2008 Drainage area number B-2 II. DESIGN INFORMATION Site Characteristics Drainage area 93,618.00 fe Impervious area 61,253.00 ft' Percent impervious 65.4% % Design rainfall depth 1.50 inch Peak Flow Calculations 1-yr, 24-hr runoff depth 3.68 in 1-yr, 24-hr intensity 5.94 inlhr Pre -development 1-yr, 24-hr peak Flow 1.27 ft3lsec Post -development 1-yr, 24-hr peak flow 8.32 ft3lsec PrelPost 1-yr, 24-hr peak control 7.05 ft3lsec RECEIVED Storage Volume: Non -SR Waters Design volume 7,476.00 ft' JUL 2 8 gn0p Ltj U Storage Volume: SR Waters Pre -development 1-yr, 24-hr runoff ft' / BY. Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0.00 ft, Volume provided f;3 Cell Dimensions Ponding depth of water 9.00 inches OK Ponding depth of water 0.75 ft Surface area of the top of the bioretention cell 10322.00 ft2 OK Length: 216.00 ft OK Width: 50.85 ft OK -or- Radius ft Soils Report Summary Drawdown time, ponded volume 4.09 hr OK Drawdown time, to 24 inches below surface 10.90 hr OK Drawdown time, total: 14.99 hr In -situ soil: Soil permeability 2,20 lnlhr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 86% OK % Fines (by weight) 10% OK % Organic (by weight) 4% OK Total: 100% Form SVV401-Bloretention-Rev.3 Parts I and 11. Design Summary, Page 1 of 2 •r Permit Number: J )'/V O u z o (to be provided by DWO) Phosphorus Index (P-Index) Basin Elevations Temporary pool elevation Planting elevation (top of the mulch) Bottom of the cell Planting depth Depth of mulch SHWT elevation Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required Distance from bottom to SHWT Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 21 Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (B'inches gravel followed by 3-5 It of grass) Grassed swale Forebay 15 (unitiess) OK 29.13 fmsl 28.38 fmsl OK 26.38 fmsl 2.00 ft 2.00 inches OK 24.36 fmsl OK N (Y or N) 0 ft 26.38 fmsl 2.02 ft OK Y (Y or N) OK N (Y or N) Y (Y or N) OK Y (Y or N) OK 30 ft 0 (Y or N) Enter Data Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK NA (Y or N) insufficient ROW location. 1.00 fYsec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK OK X Form SW401-Bioretenlion-Rev.3 Paris I and 11. Design Summary, Page 2 of 2 Permit No; wqD rdn"' (to be assigned by DW4) 111. REQUiRED.ITEMSCHECKLIST• x1 ,irl Please indicate the page or plan sheet numbers where the supporting documonlation can bo found. An incomplete submittal package will • result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. • Pagel Plan lni t Sheet No. L' 1D2o U°? S I' 101_ 0 1. Plans (1" - 50' or larger) of the entire silo showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Clean out pipe locations, . Overflow device, and Boundaries of drainage easement. G Sd3 2. Plan details (1" = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. (-Sd-q —60 I 3. Section view of the bioretention cell (1" = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, pending depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), 457 stone, underdrains (if applicable), SHWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and P-index. 5. A detailed planting plan (1" = 20' or farger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including underdrain calculations, if applicable). 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if (equired), Form SW401-Bioretention-Rev.3 Part III, Page 1 oS 1 • Permit Number:5V �a O (to he provided by DWQ) Drainage Area Number: B-2 Bioretention Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). -- Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide Iime and a one-time fertilizer application. The inlet device: pipe,. The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-13ioretention 1&M-Rev.2 Page I of 4 • BMP element: Potentialproblems: How 1 will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading, Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion 2roblems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices, to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible, An annual soil test shows that Dolomitic time shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention I&M-Rev.2 Page 2 of 4 • • �J $MP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401.Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention 1&M-Rev.2 Page 3 of 4 P. - s Permit Number: 5yyoy ' O< (lo he provided by DWQ) I acknowledge and agree b signature below that I am responsible for the g Y m Y g p performance of the maintenance procedures listed above. t agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: P-1224 EOD Addition to Building FC292_ BMP drainage area number: B-2 Print name: Title: Deputy Public Works Officer Address: 1005 Michael Road, Camp Lejeunc, NC 28542 Phon Sign, Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, AIXe /C/ �j� , a Notary Public for the State of County of/rs/�� , do hereby certify that Lz' i personally appeared before me this day of fl?Z/ and acknowledge the due execution of the forgoing biorctention maintenance requirements. Witness my hand and official seal, ALICE A TfE "aft pulft sk" of North Camum My Commlulon Exokm tiet 23_ oat SEAL My commission expires Form SW401-13ioretention I&M-Rev. 2 Page 4 of 4 • r WWfIalau fAtil.af OCI 37, Soll) vam Ol mot;t; COL0111,a7 VP401A vl3t+G VnCE v eta Avifialk is • • DWQ USE ONLY Date Received Fee Paid Permit Number ` State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forin may be photocopied for use as an original I. GENERAL INFORMATION A 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer MCB Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl Baker, Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: 1005 Michael Road City:_ Camp Lejeune _ State: NC Zip: 28542 Phone: ( 910 ) 451-2213 Fax: { ) N/A Email:_ N/A 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-1224 EOD Building FC292 Addition_ 5. Location of Project (street address): MCB Camp Lejeune, NC McHugh Blvd. City:_ _ _ lacksonville County: Onslow 6. Directions to project (from nearest major intersection): From main gate: Holcomb _Blvd., t_akea_left onto Sneads Ferry Road, turn right onto McHugh Blvd -1000 ft on right hand side of road. 7. Latitude: 34"39' 08" N Longitude: 77018'49" W of project 8. Contact person who can answer questions about the project: Name: lason Frick PE Telephone Number: ( 757 ) 322-4283 ];mail: jas6n.frick@navy.mill 9 II. PERMIT INFORMATION: Form SWU-101 Version 8.07 Page I of 5- 7-09 1. Specify whether project is (check one): ®New ❑Renewal ❑Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of7i8h 'ct (check orl) -7/ 11j� ❑Low Density Density ❑Redevelop ®General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how Stormwater will be treated. AIso attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runoff will be handled through overland flow, vegetative swales and Bioretention Basins. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Site Area: 3.71 acres 4. Total Wetlands Area: N/A acres 5. 100' Wide Strip of Wetland Area: N/A acres (not applicable if no wetlawls exist oil site) 6. Total Project Area**:3.77 acres 7. Project Built Upon Area:49.6 % 8. How many drainage areas does the project have?3 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Cogdels Creek Cogdels Creek Stream Ciass & Index No. Sc; NSW Sc; NSW Drainage Area (so 27,791 sf (0.64 ac) 93,618 sf (2.15 ac) Existing Impervious* Area (so 0.00 0.00 Proposed Impervious*Area (so 12,953 sf (0.297 ac) 61,253 sf (1.406 ac) % Impervious* Area (total) 46.6 65.4 Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 0 sf (O.Oac) 3,944 sf (0.91 ac) On -site Streets (so On -site Parking (so 12,176 sf (0.28 ac) 57,221 sf (1.314 ac) On -site Sidewalks (so 777 sf (0.018ac) 88 sf (0.002 ac) Other on -site (so Off -site (sf) Total (so: 12953 sf (0.297ac) 61,253 sf (1.406 ac) Impervious area is de ned as the built upon area including, but not linuted to, buildings, roads, parking Areas, side -walks, gravel areas, etc. Form SWU-101 Version 8.07 Page 2 of 4 Basin Information Drainage Area 3 Receiving Stream Name Co dels Creek Stream Class & Index No. Sc: NSW Drainage Area (so 39,988 sf (0.92 ac) Existing Impervious* Area (so 0.0 Proposed Impervious* Area (so 5,828 sf (0.134 ac) % Impervious* Area total 14.6 Impervious* Surface Area Drainage Area 3 On -site Buildin s st 3,944 sf (0.091 ac) On -site Streets(sf) 0.0 On -site Parking (so 1,586 sf (0.036 ac) On -site Sidewalks (so 298 sf (0.007 ac) Other on -site (so 0.0 Off -site (SO 0.0 Total (so: 5,828 sf (0.134 ac) • • • **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above derived? Field Survey IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions . Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions' Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401 -Off-Si te System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401 -Wetl and Form SW401-Grassed Swale Form SW401-Sand Filter Form SWU-101 Version 8.07 Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Page 3 of 4 ., A V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htti):flh2o.enr.state.iie.us/sti/iiisi_aiw,;.Iitni) Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each SMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) ►�/� [e1 ►�11:11110: to] R rAF.V41118101 If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Jason M. Frick, PE, _NAVFA_C MidAtlantic Mailing Address: MCNC IPT 6506 Hampton Blvd. City: Norfolk State: VA Zip: 23508 Phone: ( 757 ) 322-4283 Fax: ( 757 322-8280 Email: mason.frick®navy.mil VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) _cl�� Du it certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be report nd that the proposed project complies with the requirements of 15A NCAC 2N .1000. E /1 Signature: Date: — ,�1� Form SWU-101 Version 8.07 Page 4 of 4 STORMWATER SUBMITTA. REQUIREMENTS lN1 rILT tAT N/E-XFIL-TRAT OON,.SYST-EM _ ,' o re.�� H T r a 4 Basins and Trench Objective A. Collect all runoff from all BUA (proposed and/or existing and/or offsite) as the case may be, by any means including piping or swales, and direct it to the infiltration system. B. Check the proposed basin/ trench design to make sure it meets or exceeds the minimum design criteria for design storm, volume and drawdown. 11. What makes up a corn to infiltr*ion basin,/ trerh pplipt�package? A. Two sets o seale f ned &1' ate�t & radin plans with appropriate details. 9 Yo 9 g p B. Completed 1cation (SWU-101) with supplement(s), SW-401-oltration Basin, SW-401- Infiltration Trench, SW-401-Level Spreader, and inspection and maintenance agreen,99' . *E. Deed restriction document, if applicable. (subdivisions & projects with out parcels)��Sealed, signed & dated calculations. A soils report containing information in regard to the soil type, boring locations, seasonal high water table elevation and expected infiltration rate. Ill. BIMS entry (for DWQ use only) Enter & track application acknowledged date, review date, add info requested/received dates, permit issue dates, and drainage area and stream/waterbody info. Best done after the add info letter is written and before sending permit up for signature. IV. Shell documents (for DWQ use only) Permit shells: s:lwqslstormwaterlshelllshighcominbasin S:lwqslstormwaterlshellslhighcomintrench s:lwqslstormwaterlshellslhighsubinbasin s:lwqslstormwaterlshellslhighsubintrench Calculations: sAwgslstormwaterlexcel spread sheetslinbasin s:lwgslst�or;w&tter\Ne)jce1 s re sheetslintrench V. Review rocedureu look consis nc eetween t e various elements of the acka e- a licationYpackage- application, plan and calculations. A. APPLICATION /� ✓j Original signatures are required. Photocopied signatures cannot be accepted. ,�u�✓ ✓2. A completed infiltration basin or infiltration trench supplement, one for each proposed system. A signed, dated and notarized Inspection and Maintenance Agreement for each proposed system with an original signature. 3 rQ 3. The elevations, areas and volumes reported on the supplement match up to the 3 S numbers used in the calculations and shown on the plan details. �� • 1/4. Built -upon areas are reported in square feet in Section 111.9. V5. Receiving stream name and classification. ✓6. Section IIl.9 is filled in -cannot be left blank. One column must be filled in for each proposed infiltration basin or trench. 7. If the applicant is a corporation, partnership or LLC, look it up on the Secretary of State Corporations Database. Make sure corporation is spelled correctly (capitalization and punctuation matter) and that the person signing the application is at least a vice- president in the corporation, a General Partner in the partnership, a member in a member -managed LLC, or the manager of a manager -managed LLC. Need documentation to support if the Articles of Incorporation do not list the members or managers of the LLC. If an agent signs, then a letter of authorization is needed from the president, vice president, general partner, member or manager. 8. For subdivided projects, a signed and notarized deed restriction statement must be provided. 9. Soils report with the SHWT, Soil type and expected infiltration rate. , Infiltration Basin & Trench, cont. B. CALCULATIONS 1. The basin or trench must draw down within 5 days. Spray irrigation is not acceptable as the sole means of drawdown. 2. The design storm is 1.5" if the project is subject to Phase II oris sited within '/z mile of and draining to SA waters. Otherwise, use 1" design storm. 3. For Phase I projects that are within'/2 mile of and draining to SR waters, the difference in runoff from the predevelopment and post -development conditions for the 1 year 24 hour storm must be controlled and treated. 4. Report the bottom surface area. 5. Report the surface area at the *overflow elevation. 6. Show the calculation for the minimum required volume. 7. Provide a table of elevations, areas, incremental volumes and accumulated volumes to demonstrate that the minimum required volume has been provided. 8. Calculations are signed, sealed & dated. 9. Report the Drainage Area and Built -upon area for each basin or trench. 10. The seasonal high water table must be at least 24" below the proposed bottom elevation, of the system. For Phase II projects, at least 12" of this must be in naturally occurring soils. ' 11. All runoff in excess of the design storm must bypass to a vegetated filter prior to entering the basin or trench. If the system is designed to store a larger design storm (generally 2- 3 times the minimum), the requirement for an offline bypass can be waived. Please contact the Division to determine what design storm is appropriate for the project. Page 8 of 12 Project name Contact name Phone number Drainage area number State of North Carolina Department of Environment and Natural Resources Division of Water Duality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell P-1224 EOD Building FC292 Addition Jason Frick, P.E. (757)322-4283 B-1 Desi n Variable Variable Equation Value Units Volume to Treat: Nan -SR Waters Volume to Treat, Reported 71 VReponed I - 1,631.00 ft3 Volume to Treat, Required VR,.!fed I=3,630'RD'Rv'ATot31 1,630.90 It Adequate design volume used? yes - Drainage area ATotal 27,791 fl2 Drainage area ATotal 0.64 acres Impervious area Aimp 12,953 1 It Percent Impervious la =A1mpAT0ta1 0.47 (unitless} Design Storm RI) 1.5 in Runoff Coefficient 1Rv 1 =.05+.9(I4) 0.47 (unitless) Volume to Treat: SR Waters Volume to Treat, Reported VRepurted - 0.00 ft3 Volume to Treat, Required VRequ1rw =(1-yr, 24-hr depth, inches)( 12 infft)(Drainage Lea, ft2 0.00 ft3 Adequate design volume used? yes - Surface Area Required Surface Area, Reported lAsufaceReportw 2,3DD.DD ft2 Surface Area, Calculated Aswfacecakulamad =VRequlrw Dpond 2,174.53 f12 Adequate surface area provided? yes - Ponding Depth Dpu a D.75 It Approximate Dimensions: Check the Plan's Dimension Lengths to Ensure Lon Enou h If Square Sioretention Cell: Len th=Width 47 ft It Round Sioretention Celt: Radius 26 fi Underdrains, Note: Underdrains are needed if the water accumulates in the cell faster than it drains from the cell. The driving variable controlling this is permeability. The BMP manual says that "typically" underdrains are needed if the in -situ soil is less than 2 inthr. This is not a requirement. However, if the water can not exit the cell expediantly, then underdrains are needed because the drawdown requirements will not be met. Use the following quick check to see 4 the cell will drain as fast or faster than water will accumulate in it. Underdrains needed? No Permeability, planting media Kplant,gMedla 0.00 linthr Permeability, in -situ soil Klo-snu 3.10 inthr Drawdown Times Drawdown times: Calculated value, ponded volume tOrawdownealculated,Ponded =VPd dedlflMed�'(minlfi0 sec)'(hd60 min) #DIV10! hr Calculated value, 24-inches below soil 1DrawdownCalculate0.241nche5 =Vsal 24.1nehegQMedla'(minl60 sec)'(hr160 min) #DIV1O! hr Total Calculated Drawdown Time: tDrawdawnCaku1ated.Tota1 =10nnvdmnCalculated,ponded+ tDrawdownCakutated,241nches #D1V/0! hr Adequate 48-hr drawdown time calculated? #DIVIO! - Reported value, ponded volume torawdmnReported.Ponded 2.90 hr Reported value, 24-inches below soil tDrawdownReponnd,241nrhes 7.74 hr Total Reported Drawdown Time: tD,awdnwnReponed,Total =tDrawdownReponed,Porwed+ t0rowdownReponed,z41%hes 10.64 hr 48-hr drawdown time reported is within 48-hr range? yes - 12-hr drawdown lime reported is within 12-hr range? yes Correct 48-hr drawdown reported? #DIV/o! - Correct 12-hr drawdown reported? #DIV/O! - 1I3 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review; Bioretentlon Celt rrofect lnrormauon Project name P-1224 EOD Building FC292 Addition Contact name Jason Frick, P.E. Phone number (757) 322-4293 Drainage area number B-1 Drawdown Calculations Drawdown Rate (into planting media): QMeoia =Kh+antevmgdia"Asurfacecalanated•(HIL.$)`(fU12in)' (hr160min)`(min160sec) 0.0000 ft'/sec Height of water above the gravel layer Hseif Hso'a Lseu, Ratio (Hsn;,lLs01,) is assumed to be -1 ft ft "Thickness" of the soil L soil Permeability, planting media KPIantinnMedla 0.00 1 inlhr Planting soil drainable porosity n T ical Range is 0.25-0.50. Enter Here. unitless Volume of water ponded on top of planting media VPor>ded -ASurfscecalculated* DPorw V Required 1,630.90 f13 Volume of water in the top 24 inches of soil Vso;l,24.lnches =ASurfaCeCalmlatedW(21 0 0 Drawdown Rate (into in -situ soil): Q; �s, 'Kir Situ*ASurfaceCalculated*(OFil,/LSoll)"(ft!121n)` (hrl60min)'(minl605ec) 0.1560 ft Isec Permeability, in -situ soil Kio-sdu 3.10 in/hr Depth of fill material DF;;; DFaI`Lsnd, Ratio (DF;IIIL$e„) is assumed to be -1 ft "Thickness" of the soil Lsoil It Internal slope of drawdown pipe S Approximately 0.5%. Enter 0.005 here. unitless Manning Roughness Coefficient nManninp Approximately 0.0105 for either 4 or 6 inch smooth walled plastic pipes. (unitless) Safety Factor Fsalety Vary between 2 & 10. 10 is a potentially unstable watershed (potential sediment), and 2 is most stable. 0 (unitless) Drawdown Rate (into planting media) with safety factor. QMedla wah safety Facmr =QMedia"Fsarefy 0.00 ft3/sec Diameter of drawdown pipe needed DDmwdownPipe =16`tQMediawitnsaret Facer nmanrtin 1(Sa5)1"(3I8} #DIVIOi in Adequate drawdown pipe provided? Compare D orax do vnFipe with The Table Below (Hunt, 2007): D Dra Mown Pipe <(inches) #4" Pipes D nrawdownAipe C(inches) #6" Pipes 5.13 2 7.84 2 5.95 3 9.11 3 6.66 4 10.13 4 T22 5 tOthe'r Variables Is the temporary pool at the level equal to the surface of the cell plus the pending depth? yes - Temporary Pool Reported 29.40 lfmsi Temporary Pool Calculated 29.40 fmst Sheet Flow: This spreadsheet does not verity sheet flow. Check engineer's calculations. PrelPnst Develonment Prak Flow Peak Flow, 1yr, 24hr Storm (developed) Q1y24hr,Developed =CRepoded,Developec!IW41hr,CalculaleoATotal "(ft112in)`(hrl60min)`(minl60sec) =Q1y24hr,ca1cu19ted 0.000 ft3/sec Peak Flow, 1 r, 24hr Storm (pre -development) Y (P P ) Q iy24hr,PreDev¢bpment =CReperted,Pre-Davebpmentllyr24hr,calcnlatedATotal • ft112in ' hrl60min min160sec -Q ( ) ( )•( ) — 1Y24hr,Calrulated 0.000 ft3lsec Peak Flow, Amount to Control QSy24hr,C0r9MlAr10unl 'QIy24hr,Developed'QIy24hr,Pr Devebpmenl 0.000 ft'/sec Adequate peak flow controlled? Always Check Rational C Coefficient for the developed project CReported. Deveoped =CRepohed (unitless) Rational C That Should be Used (C�St.cabmalea), Calculation below: 0.00 (un'dless) Adequate Post -Development C Used? OK Rational C Coefficient for the pre -development CReported, Pre -Development (unitless) Rational C That Should be Used (Cpr�Cal�rlated) Calculation below: 0.00 (unitless) Adequate Pre -Development C Used? OK Rainfall intensity (pre and post), reported IReportetl / 5.94 inthr Drainage area IATotal 27.791 ftz 2i3 1� State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bloretention Cell Protect Information Project name Contact name Phone number Drainage area number Pre -Developed P-1224 EOD Building FC292 Addition Jason Frick, P.E. (757) 322-4283 B-1 Project Rational C Determination Land Uses on Plan Submitted % of Drainage Area (Enter Data from Plan Below Rational C %impervious Unimproved Areas 0.35 As haft 0.95 0.0% Concrete 0.95 0.0% Brick 0.85 0.0% Roofs, inclined 1.00 0.0% Roofs, flat 0.90 0.0% Lawns, sandy soil, flat <2% 0.10 Lawns, sandy soil, average 2-7% 0.15 Lawns, sandy soil, steep >7% 0.20 Lawns, heavy soil, flat <2% 0.15 Lawns, heavy soil, average 2-5% 0.20 Lawns, heavy soil, steep 57% 0.30 Wooded areas 0.15 0.0% Does not total 100%. Alter yellow cells above. 0.0% Post -Developed Project Rational C Determination Land Uses on Plan Submitted % of Drainage Area (Enter Data from Plan 13elow Rational C %Impervious Unimproved Areas 0.35 Asphalt 0.95 0.0% Concrete 0.95 0.0% Brick 0.85 0.0% Roofs, inclined 1.00 0.0% Roofs, flat 0.90 0.01/ Lawns, sandy soil, flat <2% 0.10 Lawns, sandy soil, average 2-7°! 0.15 Lawns, sandy soil, steep >7% 0.20 Lawns, heavy soil, flat <2% 0.15 Lawns, heavy soil, average 2-5% 0.20 Lawns, heavysoil, steep>7% 0.30 Wooded areas 1 0.15 0.0% Does not total 100%. Alter yellow cells above. 0.0% The percent impervious reported is: 46.6% Does this value correspond to the land uses above? no, check decimals 3/3 Project name Contact name Phone number Drainage area number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretenlion Cell P-1224 EOD Building FC292 Addition Jason Frick, RE. (757) 322-4283 B-2 Desi n Variable Variable Equation Value Units Volume to Treat: Non -SR Waters Volume to Treat, Reported 71 VReported 7,476.00 ft' Volume to Treat, Required IVRequired =3,630`RD'RV'A%ta1 7,476.05 ft 3 Adequate design volume used? no, check decimals Drainage area ATotai 93,618 ft' Drainage area Arota� 2,15 acres Impervious area Aimp 61,253 ft2 Percent Impervious IA =A,mpATolai 0.65 (unitless) Design Storm RD 1,5 in Runoff Coefficient 1Rv =.05+.9(IA) 0.54 (unitless) Volume to Treat: SR Waters Volume to Treat, Reported VReported I - 0.00 ft, Volume to Treat, Required VRenuired =(1-yr, 24-hr depth, inches)( 12 inlft)(Drainage Lea, ftz 0.00 ft3 Adequate design volume used? yes - Surface Area Required Surface Area, Reported JAsurfac Reponed 10,322.00 ft' Surface Area, Calculated lAsurlaceCalmtated =VRe,u,red/DPord 9,968.Ofi ft2 Adequate surface area provided? yes - Ponding Depth DPard 0.75 ft Approximate Dimensions: Check the Plan's Dimension Lengths to Ensure Long Enough If Square Bioretention Call: 1Length=Width 100 ift If Round Bioretention Cell: I Radius 56 1 ft Underdrains. Nola: Underdrains are needed If the water accumulates in the cell faster than it drains from the cell. The driving variabla controlling this is permeability. The BMP manual says that "typically" underdrains are needed if the in -situ soil is less than 2 in/hr. This is not a requirement, However, if the water can not exit the cell oxpediantly, then underdmins are needed because the drawdown requirements will not be met, Use the following quick check to see if the cell will drain as fast or faster than water will accumulate in it. Underdrains needed? No Permeability, planting media KP1antinpMedia 2.00 lnihr Permeability, in -situ soil Km-sdu 2.20 in/hr Drawdown Times Drawdown times: Calculated value, ponded volume torawdowncaieulated.Ponded =VPondedlQMedfa (min160 sec)'(hrf60 min) 4.50 hr Calculated value, 24-inches below soil tDrawdawnca1ee1a1ed,241nches =Vsoa,24-1.chedOMedia*(min/60 sec)'(hrf60 min) 0,00 hr Total Calculated Drawdown Time: t❑rawdownCatcuiatm,Totai =t❑rawdowncalcwated.Pcnded+ t❑rawdowncalculatwf,20nches 4.50 hr Adequate 48-hrdrawdown time calculated? yes - Reported value, ponded volume tDrawdownReoorted.Ponded 4.09 hr Reported value, 24-inches below soil t❑rawdownReported,241eches 10.90 hr Total, Reported Drawdown Time: t❑rawdaw Repone,Total =tDrawdownReported,Ponded+ torawdm Reponed,241ncttes 14.99 hr 48-hr drawdown time reported is within 48-hr range? yes - 12-hr drawdown time reported is within 12-hr range? yes - Correct 48-hr drawdown reported? yes Correct 12-hr drawdown reported? no check decimals 113 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell Project name P-1224 EOD Building FC292 Addition Contact name Jason Frick, P.E. Phone number (757) 322-4283 Drainage area number B-2 Drawdown Calculations Drawdown Rate (into planting media): QMedla =KPlamireMea*'"surfaceCaWlatep'(H/LEoil)'(fU12in)' (hr160min)"(min/60sec) 0.4615 ft3/sec Height of water above the gravel layer Hsd HSofiLsou Ratio (HspiJLsoil) is assumed to be -1 ft "Thickness" of the soil L Sall ft Permeability, planting media • Kpiantnamedia 2.00 inlhr Planting soil drainable i n Typical Range is 0.25-0.50. Enter Here. unitless Volume of water ponded on top of planting media VPorlded "ASurfa CalcuteledADPond —V Requimd 7,476.05 ft3 Volume of water in the top 24 inches of soil VSM.24.lnches �Asurfacecaiculated*n'(2ft) 0 ft3 Drawdown Rate (into in -situ soil): Qlrrsdu —Kio-situ'Asunacecah,,,lated'(DrllllLsoiq'(f /i2in)' (hr/60min)*(min/60sec) 0,5076 ft'/sec Permeability, in -situ soil Kln-Srlu 2.20 inlhr Depth of fill material Drill Drug-L�;i, Ratio (DrllllLsuil) is assumed to be -1 ft "Thickness" of the soil Lsgil ft Internal slope of drawdown pipe S AporoximatelyO.5%. Enter 0.005 here. unitless Manning Roughness Coefficient nManninp Approximately 0.0105 for either 4 or 6 inch smooth walled plastic pipes. (unitless) Safety Factor Fsafoy Vary between 2 & 10. 10 is a potentially unstable watershed (potential sediment), and 2 is most stable. 0 (unitless) Drawdown Rate (into planting media) with safety factor: QMedia,wilh safety Factor =QMedla'Fsarety 0.00 ft3lsec Diametef of drawdown pipe needed DDrawdownPipe =16'[QMediawrlhsafet arxor nmann; ! Sos}]^(318) NDIVi01 lin Adequate drawdown pipe provided? Compare D Dr Wo"fte with The Table Below (Hunt, 2007): DD(awdcwnPlpe<{inches) #4"Pipes Dorareawnppe<(inches) #6"Pipes 5.13 2 7.84 2 5.95 3 9.11 3 6,66 4 10.13 4 7.22 5 Other Variables Is the temporary pool at the level equal to the surface of the cell plus the ponding depth? yes - Temporary Pool Reported 29.13 fmsl Pool Calculated 29.13 1 fmsl —Temporary Sheet Flow. This spreadsheet does not verify sheet flow. Check engineer's calculations. Pre/Post Development Peak Flow Peak Flow, 1 r, 24hr Storm (developed) y ( p ) Q ty24hr,Devebped =CrReported,Deveiopedltyrzahr,caiculatedATotal *(ft/1 2in' hrl6ominl (minl605ec -Q 0.000 ft3lsec Peak Flow, t r, 24hr Storm re develo ment Y (p p ) Q ty24hr,Pre.Developmem =CReported,Pre-Develcpmentl1y24hr,cakulatedATotal • ft1l2in ' hr160min minl60sec Q { } ( )�( ) -— 1y24hr,Cakvlated 0.000 ft3lsec Peak Flow, Amount to Control Q 1yr24hr,Can1mlAmurn —Qt 2411r.Developed-Q ty24hr,Pre-Devebpment 0.000 ft3lsec, Adequate peak flow controlled? Always Check Rational C Coefficient for the developed project CRepuded.oevelopw �CReported (unitless) Rational C That Should be Used (Cmst-calculated). Calculation below: 0.00 (unitless} Adequate Post -Development C Used? OK Rational C Coefficient for the pre -development CReported, Pre -Development (unitless) Rational C That Should be Used (Cp,e.cakutated), Calculation below: 0.00 (unitless) Adequate Pre -Development C Used? OK Rainfall intensity (pre and post), reported (Reported 5.94 inlhr Drainage area ATotal 93,618 1 ftz 213 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell Project Information Project name Contact name Phone number Drainage area number Pre -Developed P-1224 EOD Building FC292 Addition Jason Frick, P.E. (757) 322-4283 B-2 Project Rational C Determination Land Uses on Plan Submitted % of Drainage Area (Enter Data from Plan Below Rational C %Impervious Unim roved Areas 0.35 Asphalt 0.95 0.0% Concrete 0.95 0.0% Brick 0.85 0.0% Roofs, inclined 1.00 0.0% Roofs, flat 0.90 0.0% Lawns, sandy soil, flat <2%q 0.10 Lawns, sand soil, average 2-7% 0.15 Lawns, sandy soil, steep >7% 0.20 Lawns, heavy soil, flat <2% 0.15 Lawns, heavX soil, average 2-5% 0.20 Lawns, heavy soil, steep >7% 0.30 Wooded areas 1 0.15 0.0% Does not total 100%. Alter yellow cells above. 0.0% Post -Developed Project Rational C Determination Land Uses on Plan Submitted of Drainage Area (Enter Data from Plan Below Rational C %Impervious Unimproved Areas 0.35 Asphalt 0.95 0.0% Concrete 0.95 0.0°% Brick 0.85 0.0% Roofs, inclined 1.00 0.0% Roofs, flat 0,90 0.0% Lawns sandy soil, flat <2%a 0.10 Lawns, sandy soil, average 2-7%u 0.15 Lawns, sandy soil, steep >7%, 0.20 Lawns, heavy soil, flat <2%0 0.15 Ed Lawns, heavy soil, average 2-5% 0.20 Lawns, heavy soil, steep >7% 0.30 Wooded areas 0.15 0.0% 00e5 not total 100%. Alter yellow Cells above. 0.0% The percent impervious reported is: 65.4% Does this value correspond to the land uses above? no, check decimals 313 Project name Contact name Phone number Drainage area number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell P-1224 EOD Building FC292 Addition Jason Frick, P.E. (757)322-4283 B-3 Desi n Variable Variable Equation Value Units Volume to Treat: Non -SR Waters Volume to Treat, Reported VRononed 906.00 ft, Volume to Treat, Required VReQuired =3,630'R0'Rv'AT,14 905.57 f13 Adequate design volume used? yes - Drainage area ATotal 39,98B ft2 Drainage area AT0101 0.92 acres Impervious area A1mp 5,828 ft2 Percent Impervious Iq =Ail ,,IAT01a1 0.15 (unitless) Design Storm RD 1.5 in Runoff Coefficient IRv =.05+.9(10 0.1B (unitless) Volume to Treat: SR Waters Volume to Treat, Reported VReponed 0.00 ft3 Volume to Treat, Required VRequire =(1-yr. 24-hr depth, inches)( 12 inlft)(Drainage 0.00 ft2 area ft2 Adequate design volume used? yes - Surface Area Required Surface Area, Reported AsurfaceReperted 1,098.00 ft2 Surface Area, Calculated Asurfacecalarlated =VRequiredlDPord 905.57 ft2 Adequate surface area provided? yes - Pending Depth DPond 1.00 ft Approximate Dimensions: Check the Plan's Dimension Lengths to Ensure Long Enough If 5 care Bioretention Cell: l.en th= Width 30 ft If Round Bioretention Cell: lRadjus 17 ft Underdrains, Note: Underdrains are needed if the water accumulates in the cell faster than it drains from the cell. The driving variable controlling this is permeability. The BMP manual says that "typically" underdrains are needed if the in -situ soil is less than 2 inlhr. This is not a requirement. However, if the water can not exit the cell expediantly, then underdrains are needed because the drawdown requirements will not be met. Use the following quick check to see J the cell will drain as fast or faster than water will accumulate in it, Underdrains needed? No Permeability, planting media KP1anG gMedia 2.00 1 inlhr Permeability, in -situ soil I Kln-sou 3.00 inlhr Drawdown Times Drawdown times: Calculated value, ponded volume tDrawdownCalculaled,Portded =VPondedlQMedia*(min160 sec)'(hr160 min) 6.00 hr Calculated value, 24-inches below soil tDraudawncabAaled,241mhes =VS0,24-Inchdo Media*(min/60 sec)'(hr160 min) 0.00 hr Total Calculated Drawdown Time: tDrawdownCalculated.Total =torawdownCalculated.Puded+ t0rawdownCa1cu1ated,241nches 6.00 hr Adequate 48-hr drawdown time calculated? yes - Reported value, ponded volume torawdownReponed.Ponded 4.00 hr Reported value, 24-inches below soil t0rawdawnReported.24inches 8.00 hr Total Reported Drawdown Time: tprawdownReported,Tatal =tDrawdownRewrlW Ponded+ tDrawdawnReported,241ncrtes 12.00 hr 48-hr drawdown time reported is within 48-hr range? yes 12-hr drawdown time reported is within 12-hr range? yes Correct 48-hr drawdown reported? yes - Correct 12-hr drawdown reported? no. check decimals 113 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell Project.informatlon Project name P-1224 EOD Building FC292 Addition Contact name Jason Frick, P.E. Phone number (757) 322-4283 Drainage area number B-3 Drawdown Calculations Drawdown Rate {into planting media): QMeela =KPiantinuMedia*ASurfaceCalculated*(H/Lsoii )* (ft/ 12in )' (hr160min)`(min160sec) 0.0419 3 ft lsec Height of water above the gravel layer Hsoi; HSall`L�p ,Ratio (Hsa;;ILsO11) is assumed to be -1 ft "Thickness" of the soil L soil ft Permeability, iantin media PlantirmMDdO 2.00 inihr Planting soil drainable porosity n TXpical Range is 0.25-0.50. Enter Here. unitless Volume of water ponded on top of planting media VPonded =Asvrlacecalwlated+DPond =VRKaured 905.57 ft3 Volume of water in the lop 24 inches of soil Vsa;;,24-inches 2Asudaceea1cu1ated*n*(2f1) 0 ft3 Drawdown Rate (into in -situ soil): Qio-seu =Kio-stu'Asurfacecalwlatm*(DrlldLsoil)'(fUl2in)' (hd60min)'(minl60sec) 0.0629 ft3lsec Permeability, in -situ sell Kin-srtu 3,00 inlhr Depth of fill material DF;I; DFm-Lso;;, Ratio (DF;;;ILso;;) is assumed to be -1 It "Thickness" of the soil Lsuil ft Internal slope of drawdown pipe S Approximately 0.5%. Enter 0.005 here. unitless Manning Roughness Coefficient nManni q Approximately 0.0105 for either 4 or 6 inch smooth walled plastic pipes. (unitless) Safety Factor Fsafety Vary between 2 & 10. 10 is a potentially unstable watershed (potential sediment), and 2 is most stable. 0 (unitless) Drawdown Rate (into planting media) with safety factor: QMedia,wan salety Factor =QMedia*Fsafety 0.00 ft3lsec Diameter of drawdown pipe needed DDrawdownPipn 7 =16'tQMedia Wdhsafel Fnctor*nmanni t(8' 5)j^(318) #DIVl01 In Adequate drawdown pipe provided? Compare D ora,tivn pipe with The Tahle Below (Hunt, 2007): D DrarW .pipe <(inches) #4" Pipes D D_._pipe <(inches) #6" Pipes 5.13 2 7.84 2 5.95 3 9.11 3 6.66 4 10,13 4 7,22 5 Other Variables Is the temporary pool at the level equal to the surface of the cell plus the ponding depth? yes - Temporary Pool Reported 28.50 1 fmsl Temporary Pool Calculated 28.50 fmsl Sheet Plow. This spreadsheet does not verify sheet flow. Check engineer's calculations. PrelPost Development Peak Flow Peak Flow, 1yr, 24hr Storm (developed) 01y24hr,Developed _CReported,neveiopedlfyrVhr,calwlaiwArotal '(ftl12iR)'(hr/6omin)'(minl6osec)=Q1yr24hr.calurlated 0.000 ft'/sec Peak Flow, 1yr, 24hr Storm (pre -development) Qlyr14hr,Pre-Development _CReported,Pre-DevelopmerdIlyr24hr.CalculatedATotal '(ft112in)'(hr160min)'(minl60sec)=Q1y24hr,Calculated n.000 ft3lsec Peak Flow, Amount to Control 5Iy20r,ContmlAmount =Qtyr24hr,Developed-Q1y24hr,Pr -Development 0,000 ft'/sec Adequate peak flow controlled? Always Check Rational C Coefficient for the developed project C Reported, Developed `CReported (unitless) Rational C That Should be Used (Cppst-calculaled). Calculation below: 0.00 (unitless) Adequate Post -Development C Used? OK Rational C Coefficient for the pre -development CReported, Pre-Oevelop meni (unitless) Rational C That Should be Used (Cprr calwlaled). Calculation below: 0.00 (unitless) Adequate Pre -Development C Used? OK Rainfall intensity (pre and post), reported IReported 5,94 inlhr Drainage area IATotal 39,988 ft2 2l3 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGMENT PERMIT APPLICATION Regional Review: Bioretention Cell Project Information Project name Contact name Phone number Drainage area number Pre -Developed P-1224 EOD Building FC292 Addition Jason Frick, P.E. (757) 322-4283 8-3 Project Rational C Determination Land Uses on Plan Submitted % of Drainage Area (Enter Data from Plan Below Rational C %Impervious Unimproved Areas 0.35 Asphalt 0.95 0.0% Concrete 0.95 0.0% Brick 0.85 0.0% Roofs, inclined 1.00 0.0°% Roofs, flat 0.90 0.0% Lawns, sandy soil, flat <2% 0,10 Lawns, sandy soil, averse 2-7% 0,15 Lawns, sandy soil, steep >70/6 0,20 Lawns, heavy soil, flat <2% 0.15 Lawns, heavy soil, averse 2-5% 0,20 Lawns, heavy soil, steep >7% 0.30 Wooded areas 0,15 0.0% Does not total 100%. Alter yellow ceils above. 0.0% Post -Developed Project Rational C Determination Land Uses on Plan Submitted of Drainage Area (Enter Data from Plan Below Rational C %Imperious Unimproved Areas 0.35 Asphalt 0,95 0.0% Concrete 0.95 0.0% Brick 0.85 0.0% Roofs inclined 1.00 0.0% Roofs, flat 0.90 0.0% Lawns, sandy soil, flat <2% 0.10 Lawns, sandy soil, averse 2-7% 0.15 Lawns, sandy soil, steep >7% 0.20 Lawns, heavy soil, flat <2% 0.15 Lawns, heavy soil, averse 2-5% 0.20 Lawns, heavy soil, steep >7% 0.30 Wooded areas 0.15 0.0% Does not total 100%. Alter yellow cells above. 0.0% The percent impervious reported is: 14.6% Does this value correspond to the land uses above? no, check decimals 3/3 Transmittal DATE: 25 July 2008 To: NCDENR-Division of Water Quality Attn: Aisha Lau Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7215 Naval Facilities Engineering Command NAVFAC MID -ATLANTIC JUL 2 8 2008 . ally From: Naval Facilities Engineering Command — Mid -Atlantic Marine Corps North Carolina IPT Jason Frick (757) 322-4283 RE: P-1224 EOD Building FC292 Addition RFl Responses Copies Date Description 2 7/25/2008 Res onses to RFI (Revised drawings and calculations) Remarks: Distribution: NAVFAC - Tom Mullen SW8 080508 ' July 24, 2008 ' North Carolina Department of Environment and Natural Resources ' Division of Water Quality Wilmington Regional Office RECEIVED 127 Cardinal Drive Extension JUL 2 $ ZQ08 ' Wilmington, North Carolina 28405-3845 Re: Stormwater Project No. SW8 08 508 ' J 0 P-1224 EOD Addition to Building FC292 r eProjects No.: 561713 Onslow County ' Ms. Lau, Please find enclosed two sets of revised permit application documents for the above, based 1 on your Request for Additional Information dated July 17, 2008. The following is our response to your comments. ' 1. A note has been added to the Grading and Drainage plan sheets C-105 & C-106 indicating that "No wetlands have been identified within the proposed site 1 development". 2. The construction drawings that are required to be submitted have been designed in 1 metric units. NAVFAC policy requires the use of metric units for all MCON/MILCON projects. The existing EOD Building, which was permitted and constructed in 2006, was performed using metric units, therefore this project was required to use metric units. If there are specific dimensions or elevations that you would like to see in duel units (English & Metric), please let me know. I have included a few English units for the bioretention basin elevations and. detail. 3. The SHWT elevations for Bioretention Basin #2 have been revised to reflect the elevations provided in the ECS soils report. Bioretention Basin #1 had existing elevations around 9.0m (29.52 ft). The ECS soils report showed SHWT elevations 60 inches below existing grade, so the SHW-F elevation used was 7.47m (24.52 ft). Page 2 SW8 050830 Bioretention Bann #2 had existing elevations around 8.95m (29.36 ft) in the area,,; of the soil borings. The ECS soils report showed SHWT elevations ranging 34 inches to 60 inches below existing grade. Since all of the others borings on site averaged 60 inches below existing grade, we assumed that this would be the appropriate SHWT elevation to use, and would be more consistent with the site characteristics. So a SHWT elevation of 7.42m (24.36 ft) was used. Bioretention Basin #3 had existing elevations around 8.26m (27.10 ft). The ECS soils report showed SFIWT elevations 60 inches below existing grade, so the SFIWT elevation used was 6.74nt (22.10 ft). 4. The Bioretention basins have been revised, and now have the required 2 feet of separation between the SHWT and the bottom of the device. 5. The bituminous pavement symbol in the legend has been revised to coordinate with the bituminous pavement shown on the layout plans. Also, the gravel symbol in the legend has been removed, since it is not used. The inlet protection symbol has been deleted, and a symbol for Outlet Protection has been inserted in its place. -A tree line symbol has also been added. 6. Revisions to the Bioretention Basin #1 elevations have been incorporated in the revised drawings and calculations provided. Please find attached revised Bioretention Cell Supplements, routing calculations and revised drawings C-001, ' C-105, C-106 and C-503. ' Upon your review of the enclosed revised documents, please let me know if you need any additional information. Your prompt attention to this submittal would be greatly appreciated. ' I can be reached at (757) 322-4283, or e-mail jason.frick@navy.mil ' Sincerely, Jason M. Frick, PE ' Civil Engineer MCNC IPT Enc.: Revised Drawings and Bioretention Cell Calculations ' Blind copy to: David Jackson, P.E., MCNC IPT Civil Supervisor 1 EOD Building FC292 Addition Section C: CALCULATIONS DESIGN PARAMETERS MCB Camp Lejeune Jacksonville, North Carolina The Rational method was used to calculate peak flows and the Simple method was used to calculate the runoff storage volume from the first 1- 1/2 inch. TR-55 was used to complete the time of concentration values. The 1-yr, 24-hr storm runoff was estimated to be 3.68-inches taken from the NOAA Point Precipitation Frequency chart for Sneads Ferry, NC. The I -yr, 24-hr storm rainfall intensity, in inches per hour, was also taken from NOAA's chart for Sneads Ferry, NC. See the following pages for the Sneads Ferry, NC IDF chart and for tabulated results of the calculations. Refer to Section F for plans of the proposed drainage design. 6 STORMWATE R MANAGEMENT CALCULATIONS 1'-122d EOD BUILDING FC292 ADDITION RICH CAMP LEJEU\E,.IACKSONVILLE, SC 1 RATIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm References: Rainfall intensity - taken from NOAA Precipitation Intensity Estimates (Sneads Ferry, NC was used) for the 1 -yr, 24-hr storm BIORETENTION BASIN 81 - (PRE -DEVELOPED) _ _ 0.638 Acres _ 27,791 sf PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area 0.000 Acres 0 sf 1 1 1 1 1 1 DRAIN. DESIGNATION AREA (sq. ft.) DRAIN. RUN-OFF AREA COEFF. (ac) •Tc TIME hr) RAIN FALL (in. ! hr) RUNOFF "Q" cfs PRE -DEVELOPED 27,791 �___2_6_38_j 0.15 15.00 3.95 0.38 Value of Runoff Coefficient "C" for Rational Formula C WOODLANDS 0.15 GRASSED, Good Condition 0.15 ASPHALT = 0.95 BUILDING = 0.95 CONCRETE = 0,95 Post Dev. Allowable Discharge DESIGNATION BUILDING ASPHALT WOODLANDS CONCRETE GRASS AREA WT. "C" s.q. f.t. s.q. Lt. s.q. f.t. s.q, I'A. s.q. f.t. acres PRE -DEVELOPED 0 0 j 27,791 1 0 0 1 0.63$ 1 0.15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD ADDITION TO BUILDING FC292 MCB CAMP LE,IEUNE, JACKSONVILLE, NC 13IORETENTION AREA SIZING NCDENR STORMWATER BMP MANUAL, July 2007 1310RE.TENTION ARE -,A NO. B-1 Impervious Area -New EOD Addition Building 0 sf 0.000 Acres Access Drive 0 sf 0.000 Acres Sidewalks 777 sf 0.018 Acres Parking 12,176 sf 0.280 Acres Other 0 sf 0.000 Acres Total 12,953 sf 0.297 Acres DEVELOPMENT AREA "C" TYPE ACRES FACTOR C x Arca (sl) IMPERVIOUS (Ai) 0.297 095 12,305 PERVIOUS 0.341 0,15 2,228 TOTAL (A) 0.638 0.52 14,533 1310RETENTION AREA SIZE PERCENT IMPERVIOUS ( I ) = Ai/A = 0.297 / 0.638 46.58'%, VOLUMETRIC RUNOFF COEFFICIENT (Rv) Rv=0.05+0.009 x Rv = 0.05 + (0.009 x 46.58%) = 0.4692 INAN DESIGN RAINFALL (P) = 1.5 INCH WATER QUALITY VOLUME (WQv) WQv = [ (P) (Rv) (A) ] / 12 WQv = [ (1.5) (0.4692) (0.638) } / 12 = 0.0374 AC -FT WQv = 43,560 SF/AC-FT x 0.0374 = 1,631 CF 1 STORM WATER MANAGEMENT CALCULATIONS P-1224 EOD ADDITION TO BUILDING FC292 MCB CAMP LEJEUNE, JACKSONVILLE, NC SURFACE AREA OF BIORETENTION BASIN REQUIRED (TO HOLD ENTIRE 1.5" FIRST FLUSH) PONDED DEPTH (D) = 9 INCHES A= WQv/D= 2,175 Sr PONDING DEPTH BASIN SIZE Elcv Elev Area Area Ieic. Vol Accum (m) (fl) (m2) (sty (of) Vol (CO 8.73 28.65 l 85 1,992 0 0 8.77 28.77 195 2,093 235 235 8.81 28.89 204 2,196 267 502 8.84 29.02 214 2,300 290 782 8.88 29.13 223 2,404 . 278 1,060 K92 29.27 233 2,510 322 1,382 9,96 29,40 269 2,892 354 1,737 CIIECK BIORETENTION SIM DESCRIPTION REQ-D PROVIDED SURFACE" AREA 2,175 SF 2,300 SF "Average" PONDED VOLUME 1,631 CF 1,737 CF 2 P-1224 BOD Post-Dev Bioretention B1 Rational Rainfall Ourafion=5 min, Inten=5.94 in/hr Sumrnary for Subcatchment 1S: Bioretention Basin #1 ' Runoff = 1.92 cis @ 0.08 hrs, Volume= 0.014 of, Depth= 0.26" Runoff by Rational method, Rise/Fall =1.011.0 xTc, Time Span= 0,00-24.00 hrs, dt= O.Oi hrs Rainfall Duration=5 min, Inten=5.94 inlhr ' Area (ac) C Description 0-297 0.95 0.341 0.15 0.638 0.52 Weighted Average ' 0.638 Pervious Area Tc Length Slope Velocity Capacity Description ' -_(min) (feet) (Riff) (R1sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Bioretention Basin #1 Hydrograph 1 I I I 1 I I I -J__ i,.�J,.-3-,i,.-L.-L•_J--J-_1-- IT- _L-_L-_L_J_-J--1..-i_-L__,L -L .. J__ 0.4•.roR 1.92 cf$ 1 1 1 1 I 1 I 1 I I ! I 1 I I 1 I I 1 I I 1 1 I I I I I I I I 1 I 1 I I 1 I I I I I I IR�ir�fa�t 1 I 1 I I 1 I 1 I i I I 1 I I I l I I 1 1 I , I I I I I I I I I 1 I I I qur�t�on=� mill, 1 I 1 I I I I I I I I I I I I I ' I I I I I 1 I I 1 I I I 1 I I 1 I(rtten`6f94 irilFir i I f I I I 1 I I 1 I 1 t I I I I I ! I I I I I I 1 I 1 I I I I ! I 1 I I I I 1 I 1 I I 1 ! I I I I I I I 1 I I I I I I 1 I 1 1 I I ! I 1 I I I I 1 I 1 I Runof�IVplum,G;O. 1�i alf 1 - r--k---1---1--T--r--r--r--i---i--r-r--r--r--r-1--��(--r--r--r--r--r-�-- I I I I 1 I 1 I I I 1 1 I I Run Vff:Dd th T0.26.1 W I I I I 1 I 1 I I I 1 I I I I I i 1 I jC 6.,b t'I 1r1iI�r� I I I I I 1 I 1 I I I I 1 I I I I I 4 I I 1 I 1 I 1 I I I I 1 I I 1 I I i I 1 ! 7 I I I I I I 1 I 1 I I 1 I I I I I 1 I I I I i I 1 I I I I I I I I I 1 I I I I I 1 I I I I 1 I 1 I I I I 1 I 1 I I 1 I I I I I 1 I I I I I 1 I I I I 1 I 1 I I 1 I I 1 I I I I I I I I 1 I 1 I 1 I I 1 1 I I 1 I I 1 I I 1 I-- I l 11 iZ 13 ,6 ,5 S6 17 iN 19 2] :1 23 -A TWO (houni 1 0 1 I I 0 I P-1224 EOD Post-Dev Bioretention B1 Rational Rainfall Duration=5 ruin, lnten=5.94 Whr Hydrograph for Subcatchment 1 S: Bioretention Basin #1 Time (hours) Runoff (cfsj Time (hours) Runoff Ofs) Tune i:hours) Runo.f (cfs} ODD 0.00 9M 0.BO 15.0D 0.00 0.20 0.00 9.20 0.D0 18.20 0.00 0.40 0.00 9AD 0.DO 18.AD 0.03 O.eA O.OD 9.e4 0.00 18,90 0.00 0.90 0.00 MID 0.00 18.60 OLD 1.00 O.DD 10,G3 0.00 19.00 0.00 1.20 O.OD 10.20 0,00 19.20 0.00 1.4D 0.00 10.40 0.00 19.40 0.00 1.80 0.00 wto 0.00 19.60 0.00 1.80 OAO 10.80 0.00 19.80 0.00 2.0D D.00 11.DD 0.00 20.OD 0.00 2.20 OAO 11.20 0.110 20,20 0.00 2.40 0.00 11.40 0.DO 20,40 0.00 2.e,D 0.00 11.e7 0.00 20.OD 0.00 2.80 0.00 11.6o D.00 20.80 0.00 3.DO O.OD 1100 0.00 21.00 0.00 3.20 O.OD 12.20 0.00 21.20 0,00 3.40 O.OD 12.40 0.00 21,40 0.00 3to MD 12.e-0 0.00 21.80 O.OD 3.20 0.OD 1180 0.00 21.60 0.00 4-DO 0.100 13.013 0.00 22.09 0.00 4.20 D.00 13.20 0.00 22.20 0.00 4.40 OAD 13.40 0.00 22.40 0130 4.CO 0.00 13.60 0.00 22.60 0.00 4.eO D.00 13.60 0.00 22.60 0.00 5. DO 0.00 14.OD 0.00 23.00 0,00 5.20 O.OD 14.20 OM 23.20 0.00 5.411 0.OD 14AD 0.00 23.40 0.00 5.50 0.00 14,rO 0.00 23.60 0.00 5.80 O.OD 14.eD DAD 23.60 0.00 8.00 0.00 15.DO 0.00 24.00 0.00 6.20 0.00 15.20 0.00 8.40 0.00 15A0 0.00 B.CO 0.00 15.60 0.00 0.80 D.OD 15.e0 0.00 7.00 D.OD 18.00 0.00 7.20 D.OD 18.20 0.00 7.40 0.0D 1BAO 0.00 7.80 0.00 IBM 0.00 7.80 0.00 16.20 0.00 8.00 0.00 17.DO 0.00 6.20 O.IJO 17.20 0.00 BAD 0.00 17-40 0.00 B.CD 0.00 17.M 0.00 8.60 0.00 17.80 0.00 I I 1 I 1 P-1224 EOD Post -De►► Bioretention B1 Rational Rainfall Duration=5 min, lnten=5.94 iM1r Summary for Pond 2P: Bioretention Basin##1 Inflow Area = 0.638 ac, 0.000r6 Impervious, Inflow Depth = 0.26' Inflow = 1.92 cts @ 0.08 hrs. Volume= 0.014 of OutFlow - 0, 16 cis @ 0.16 hrs, Volume= 0.014 at, Atten= 92%, Lag= 4.7 min Discarded = 0.16 cis @ 0.16 hrs, +lolume= 0.014 of Primary = 0.00 cis @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 28.90' @ 0.16 hrs Surf.Area= 0.050 ac Storage= 0-0f2 of Plug -Flow detention time= 28.5 min calculated for 0.014 of (100°% of inflow) Center -of -Mass det. time= 28.5 min (33.5 - 5.0 ) Volume _ _ _Invert A;ail.Storage Storage Description #1 28.65' 0.040 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.StOre Cum.Store (feet) (acres) (acre-feet) (acre-feet) 28.65 0.046 0.000 0.000 26.77 0.048 0.006 0.006 28.89 0.050 0.006 0.012 29.02 0.053 0.007 0.018 29.13 0.055 0.006 0.024 29.27 0.058 0.008 0.032 29.40 0.066 0.008 0.040 Device Routing Invert Outlet Devices #1 Primary 29.40' 106.0' long x 3.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0-60 0.80 IM 1.20 1.40 1.60 1-80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32 #2 Discarded 28.65' 3.100 inlhr Exfiltration over Surface area Discarded OutFlow Mox=0.16 cts @ 0.16 hrs H'N=28.89' (Free Discharge) 2=Exfiltration (EAltration Controls 0.16 cfs) Primary OutFlow PA3x=0.00 cfs @ 0.00 hrs HW=28.65' (Free Discharge) t-1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) P-1224 EOD Post-Dev Bioretention 61 Rational Rainfall Duration=5 min, tnten=5.94 in/hr 1 Hydrograph for Pond 2P: Bioretention Basin#1 ' Time Inflow Storage Elevation Outflow Discarded Primary (hours) (cfs) (acre-feet) (feetl - (cfs) (cfs) " _ (cfs) - 0.00 0.00 0,000 M69 0,00 0100 0,00 1.00 0,00 0.001 2&68 0.15 0.15 0.00 2.0.3 0.DO O.ODO 28.d5 0.00 0.00 0.00 3.00 0.00 0.ON 28.d5 0.00 0.00 0.00 4.00 0.00 O.ODO 28.85 0.00 0.00 0.00 5.00 O.OD 0,000 28.65 0.00 0.00 0.00 &W O.OD O.ODO 28.55 DAM 0.00 0.00 7.00 O.OD 1) ODD 28.55 0.00 0.00 OLD 8.DO 0.00 O.ODO 28.e5 DAM 0.00 0,00 9.DO 0.00 [).ODD 28.65 0.00 0.00 IN 10.OD 0.00 MOD 28.65 0.00 0.00 0.00 11.OD 0.00 0.000 28.135 0.01) 0.00 0.00 12.00 0.00 O,ODO 2845 0.00 0.00 0.00 ' 13.D0 O.DD 0,000 28.65 0.00 0.00 0.00 14.00 0.00 0,600 28.85 0.00 0.00 0.00 15.00 0.01) O.ODO 28.d5 0.00 0.00 0.00 MOO 0.00 0.000 28.d5 0.00 O.OD 0.00 17.00 0.0D D.ODO 28.e5 0.00 O.OD 0.00 ' 18.DO 0.0G 0.000 28,C5 0.00 0.06 0.00 19.00 0.00 O,OGO 28,85 0.00 O.OD 0.00 20.00 O.OD O.ODO 28.e•5 0.00 0.00 0.00 21.00 OLD O.ODO 28.C5 0.00 0.00 0.00 ' 22.00 0.00 0.000 28.e5 0.00 0,DO 0.00 23.00 0.00 DAM 28.e5 0.00 0.00 0.00 24.00 0.00 0.000 28.C5 0.00 0.00 0.00 STORMWATER MANAGEMENT CALCULATIONS P-1224 P:O[] BUILDING FC292 ADDITION MC13 CXMP LF,.IFIII I ISON %I[I NC RATIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm References: Rainfall intensity - taken from NOAA Precipitation Intensity Estimates (Sneads Ferry, NC was used) for the 1-yr, 24•hr storm BIORETENTION BASIN B2 - PRE -DEVELOPED 2.149 Acres 93,618 si PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area 0.000 Acres 0 sf DRAIN. DESIGNATION AREA (sq. ft.) DRAIN. RUN-OFF AREA COEFF. (ac) 'Tc TIME (hr) RAIN FALL (in. I hrj RUNOFF cfs PRE -DEVELOPED 93.618 2,149 0,15 15.00 3.95 1.27 Value of Runoff Coefficient "C" for Rational Formula C WOODLANDS 0.15 GRASSED, Good Condition 0.15 ASPHALT = 0,95 BUILDING = 0.95 CONCRETE = 0.95 Post I Allowable Discharge DESIGNATION BUILDING ASPHALT WOODLANDS CONCRETE GRASS AREA WT. "C" S.q. f.t. S.q. f.t. S.q. f.t. ll f.t. S.q. f.t. acres PRE -DEVELOPED 0 0 93,618 I 0 0 2.149 0.15 1 1 1 1 1 1 1 1 1 J 1 1 1 1 1 1 1 i STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD ADDITION TO BUILDING FC292 MCB CAMP LEJEUNE, JACKSONVILLE, NC BIORETEN'TION AREA NO. B-2 Impervious Area -New LOD Addition Building Concrete Pavement Sidewalks Total 3,944 sf 0.091 Acres 57,221 sf 1.314 Acres 88 sf 0.002 Acres 61,253 sf 1.406 Acres DEVELOPMENT AREA .C,# TYPE ACRES FACTOR C x Area IMPERVIOUS (Ai) 1.406 0.95 58,190 PERVIOUS 0.743 0.15 4,855 TOTAL (A) 2.149 0.67 63,045 BIORETENTION AREA SIZE PERCENT IMPERVIOUS ( I ) 1=Ai/A=0.768/ 1.214 VOLUMETRIC RUNOFF COEFFICIENT (Rv) Rv=0.05+0.009 x 1 Rv = 0.05 + (0.009 x 65.43%) — DESIGN RAINFALL (P)= 1.5 INCH WATER QUALITY VOLUME (WQv) WQv = [ (P) (Rv) (A) ] 112 WQv = [ (1.5) (0.6389) (2.149) 1 / 12 = WQv = 43,560 SF/AC-FT x 0.0627 = 65.43% 0,6389 IN/IN 0.1716 AC -FT 7,476 CF L 0 1 STORMWATER MANAGEMENT CALCULATIONS P-1224 I:OD ADDITION TO 13UILDING FC292 MCB CAMP LEJEUNE, JACKSONVILLE, NC ' SURFACE AREA OF BIORETENTION BASIN REQUIRED (TO HOLD ENTIRE 1-1/2" FIRST FLUS1-1) PONDED DEPTH ( D)= 9 INCHES A = WQv / D = 9,968 SF PONDING DEPTH BASIN SIZE Elev Elev Area Area Inc. Vol Accum (m) (110 (m) (so (cf) Vol (CO 8.65 28.38 906 9,753 0 0 8.69 28.50 924 9,942 1,103 1,163 8.73 28.63 942 10,132 1,317 2,480 8.76 28.75 959 10,322 1,241 3,722 8.80 28.88 977 10,514 1,333 5,055 ' 8.84 29.00 995 10,706 1,288 6,343 8.88 29.13 1,013 10,900 1,382 7,725 ' CHECK BIORETGI\TION AREA SIZE DESCRIPTION REQ'D PROVIDED t SURFACE AREA 9,968 SF 10,322 SF "Average" PONDED VOLUME 7,476 CF 7,725 CF I F 4 a 1 I P-1224 EOD Post-Dev Bioretention B2 Rational Rainfall Duration=5 min, inten=5.94 in/hr Summary for Subcatchment 1 S: B2 Runoff 8.32 cis @ 0.08 hrs, Volume= 0.059 af, Depth= 0.33" Runoff by national method, RiselFaH=1.011.0 xTc, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Rainfall Duration=5 min, Inten=5.94 inlhr Area (ac) C Description 1.406 0.95 Paved parking & roofs 0.743 0,15 50-75% Gross cover, Fair, HSG A 2.149 0,67 Weighted Average 2.149 Pervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (fttft) (ftlsec) (cfs) 5.0 Direct Entry, Estimated Subcatchment 1S: 62 Hy*WVh 1 I 1 I I 1 f 1 I I I i I I I I I I I� 1 -1 I 0 rl-,pprt 8-32 cfs I 41 all I , I I 1 I 1 1 I I 1 I I I I I , •j I 1 1 I 1 I I 1 t I I I I l 1 I 1 I I I ' I I 1 1 I i I I ! I 1 I 1 1 I ,r]tY L7F �•���- --r-�---r-i--r-T--r--r--i^--i^-T--r-r-^r--r--1- -I I 1 1 I I I I i 1 I I 1 lTf I I - �-y`-�--,--�--r--r--I - 1--ti--*--t--§Unoff VOIUM�e-rU.�59 of I ' -1 f I I I I I I I 1 I I I 1 i I I I I I I 1 I I 1 I I I I I I I I I I - r-�--y^-y--+--r--I,--r-1--1--+-^*--*--r'�Q11Ciffi{]� �f1iYD.33�� LL s. I I I I I = I I I I 1 1 I 1 I I 1 t I I I I 1 1 l I •1 1 '�� I I I 1 1 I I 1 I I 1 k I I 1 I I I I I 1 1 I 1 1 I 1 I I 1 I I i I I 1 I I 1 1 I I I 1 1 1 I 1 I I I I 1 I I I I I f 1 I I 1 I I I 1 1 I I 1 I I I I 1 k I I ( I I I I I I f I I I 1 1 I 1 I I I I 1 ! I I k I I I I 1 I 1 1 I 1 9 13 11 U 13 1c Time (he11RI 1 1 P-1224 EOD Post-Dev Bioretention B2 Rational Rainfall Duration=5 min, Infen=5.94 irtlhr Time (hours! O.DO Runoff {cfs} 0.00 Time {hours) Hydrograph Runoff {cfsj for Subcatchment 1S: B2 Tune Runafi i_hours) (cfsl 12.09 0.00 0.DO MO 0.20 0.00 9.20 0.00 12.20 0.00 0.40 0.0D 9.40 0.00 18.4D 0.00 O'M 0.00 MID 0.00 MOO 0.00 O.QO 0,00 9.20 0.00 16.80 0.00 1.00 0AO 10.00 0.00 19.00 0.00 1.20 0.00 1D.20 0.00 1920 (.DO 1.40 0.00 10.40 0.00 19.40 0.00 1.2A 0.00 loto 0.00 19.60 0.00 1.20 0.00 10.80 0.00 19.60 0.00 2.00 0.01) 11.00 0.00 20.00 0.00 2.20 0.00 11.20 0.00 20.20 0.00 2.40 O.OD 1 i A0 0.00 20.40 O.DO ' 2.eO 0.0D i 1.60 0.00 20.69 0.00 2.EO 0.00 11.80 0.110 20.60 0.00 3.D0 0.00 12.DD 0.00 21.00 0.00 3.20 O.OD 12.20 0.00 21.20 0.00 3.40 0.00 12.40 0.00 21.4D 0.00 3.50 0.00 12.M 0.00 21,00 0.00 3.80 0.00 12.80 0.00 21.60 0.00 4.00 0.00 13.00 0.00 22.00 0.00 4.20 0.00 13.20 0.00 22.20 0.00 4.40 0.00 2,40 0.00 22.40 0.00 4.CID 0.0D 13.60 0.00 22.60 0.00 4.60 0.00 13,BD 0.00 22.80 0.00 5.D0 0.06 14.00 0.00 22.00 0.00 5.20 0.00 14.20 0.00 23.20 0.00 5.40 5.60 0.00 0.00 14.40 14.eO 0.00 0.00 23.40 23.60 0.00 0.00 5.20 0.00 14.80 0.00 23.6D 0.00 8.00 0.00 15.DD 0.00 24.00 0.00 6.20 0.00 15.20 0.00 8.40 0.00 15.40 0.00 6.fo D.00 15M 0.00 0.80 O.OD 15.60 0.00 7.00 O.00 16.00 0.00 7.20 6.00 16.20 0.00 7.41) 0.00 10.40 0.00 7 ' M 0.00 16.60 0.00 ' M 7 O.OD 10.80 0.00 O.D0 0.00 17.00 0.00 6.20 0.00 17.20 0.00 8.40 0.00 17.40 0.00 8.80 0.00 17.e0 0.00 ' 8.80 0.00 17.80 0.00 n I 11 1 I 1 P-1224 EOD Post -Deg Bioretention B2 Rational Rainfall Duration=5 min, lnten=5.94 inlhr Summary for Pond 2P: Bioretention Basin 2 Inflow Area = 2.149 ac, 0.00% Impervious, Inflow Depth = 0.3Y Inflow - 8.32 cts @ 0.08 hrs, Volume= 0.059 of Outdlmw = 0.52 cfs @ 0.16 hrs, Volume= 0.059 af, Atten= 94%, Lag= 4.8 min Discarded = 0.52 cfs @ 0.16 hrs, Volume= 0.059 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Star -Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak EIev= 28.61' @ 0.16 hrs Surf.Area= 0.232 ac Storage= D.053 of Plug -Flow detention time= 38.2 min calculated for 0.059 at (100% of inflow) Center -of -Mass del. time= 38.2 nun ( 43.2 - 5.0 ) Volume Invert Avyil.Storage Storage Description #1 26.38' 0.176 of Custom Stage Data (Pyramidal) Listed below (Recatc) Elevation Surt.Area Inc.Store Cum.Store 'Net.Area (feet) (acres_ _ (acre-feet (acre-feet) (acres) 26.38 13.124 0.000 0.000 0.224 28.50 0.228 0.027 0.027 0.228 28.63 0.233 0.030 0.057 0.233 28.75 0.237 0.028 0.085 0.237 28.88 0.241 0.031 0.116 0.242 29.00 0.246 0.029 0.146 0.247 29.13 0.250 0.032 0.178 0.251 Device Routing Invert Outlet Devices if 1 Primary 29.13' 210.0' long x 3.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32 #2 Discarded 28.38' 2.200 inlhr Infiltration over Wetted area Discarded OutFlow Max=0.52 cfs [d 0.16 hrs H'N=26.61' (Free Discharge) L2=Infiltration (Extiltration Controls 0.52 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=26.38' (Free Discharge) L1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) u P-1224 EOD Post-Dev Bioretention 62 Rational Rainfall Duration=5 min, lnten=5.94 in/hr Hydrograph for Pond 2P: Bioretention Basin 2 ' Time Inflow Storage Elevation Ou:flox Discarded Primary (hours} cfs) acre-feet) ifeet} cfs feis (cfs 0.f'r0 0.00 0.000 28.38 0.00 0.00 0.00 9.D3 0.00 0.0i8 28.46 0.50 0.50 0.110 2.00 0.00 0.0DO 28.28 0.00 0.00 0.00 ' 3.DO 0.00 0.0DO 28.2.9 0.00 D.00 0,00 4.00 0.00 DAM 28.38 0.00 D.OD 0.00 5.DO 0.00 0.009 28.39 0.00 0.0D 0.00 6.DO 0.00 O.00O 28,38 0.00 0.00 0.00 7.D•O 0.00 DODO 28.38 0.00 O.OD 3.00 9.00 0.00 O.ODO 28.38 0.00 O.00 0.00 a.00 0.00 O.ODO 28.28 0.00 0.00 0.00 10.00 0.00 0.000 28.29 0.00 0.00 0.00 II.00 0.00 O.ODO 28.29 0.00 0.00 0.00 12.00 0.00 O.ODD 28.29 0.00 0.00 0.00 ' 13.D0 0.00 0.000 28.29 0.00 0.00 0.00 14.00 0.00 OAOO 28.29 0.00 0.00 0.00 15.00 O.OD 0.000 28.2E 0.00 0.00 0.00 MOO O.OD 0.000 28.2-5 0.00 0.00 0.00 17.00 O.OD D.000 28.38 O.OD 0.00 0.00 IS.DD O.OD DODO 28.39 0.00 0.00 0,00 IB.DO O.OD D.ODO 28.3E O.OD O.OD O.00 20.00 0.00 O.ODO 28.29 0.00 0.00 OM 21.00 0.00 0.000 28.29 0.00 0.00 O,OD ' 22.00 23.DO 0.00 O.OD 0.000 D.000 28.23 28.35 0.00 0.00 0.00 0.00 0.00 0.00 24.DO 0.00 0.000 28.2-8 0.00 0.00 0.00 I STORMWATER MANAGEMENT CALCULATIONS 1'-1224 EOD BUILDING FC292 ADDITION 11CIt CAMP LEJEUNE, JACKSONVILLE, NC RATIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm References: Rainfall intensity - taken from NOAA Precipitation Intensity Estimates (Sneads Ferry, NC was used) for the 1-yr. 24-hr storm BIORETENTION BASIN B3 -(PRE-DEVELOPED 0.918 Acres 39,988 sf PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area 0.000 Acres 0 sf DRAIN. DESIGNATION AREA (sq. ft.) DRAIN, RUN-OFF AREA COEFF. (ac) 'Tc TIME (hr) RAIN FALL in. I hr) RUNOFF "0" cfs I PRE -DEVELOPED 39,988 0.918 0.15 15.00 3.95 0.54 Value of Runoff Coefficient "C" for Rational Formula ' C WOODLANDS 0.15 GRASSED, Good Condition 0.15 ASPHALT = 0.95 BUILDING = 0.95 CONCRETE = 0.95 Post Dev. Allowable Discharge DESIGNATION BUILDING ASPHALT WOODLANDS CONCRETE GRASS AREA WT. "C" s.q. f.t. S.q. f.t. S.q. A. f.t. S.q. Lt. acres PRE-DEVELOPEDp 1 39,988 I �s.q.. � 0 0.918 0.15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD ADDITION TO BUILDING FC292 MCB CAMP LEJEUNE, JACKSONVILLE, NC RIORETENTION AREA NO. 13-3 Impervious Area -New EOD Addition Building 3,944 sf 0.091 Acres Concrete Pavement 1,586 sf 0.036 Acres Sidewalks 298 sf 0,007 Acres Tot I 5,929 sf 0.134 Acres DEVELOPMENT AREA tlCl TYPE ACRES FACTOR C x Area IMPERVIOUS (Ai) 0.134 0.95 5,537 PERVIOUS 0.784 0,15 5,123 TOTAL (A) 0.919 0.27 10,659 BIORETENTION AREA SIZE PERCENT IMPERVIOUS ( I ) I = Ai/A = 0.769 / 1.214 VOLUMETRIC RUNOFF COEFFICIENT (Rv) Rv=0.05+0.009 x I Rv = 0.05 + (0.009 x 14.58%) DESIGN RAINFALL (P)= 1.5 INCH WATER QUALITY VOLUME (WQv) WQv = [ (P) (Rv) (A) j 1 l2 WQv =I(1.5)(0.1812)(0.918)12= WQv = 43,560 SF/AC-FT.x 0,0208 = 5 14.58% 0,1912 IN/IN 0.0208 AC -FT 906 CF STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD ADDITION TO BUILDING FC292 MCB CAMP LEJEUNE, JACKSONVILLE, NC SURFACE AREA OF BIORETENTION BASIN REQUIRED (TO HOLD ENTIRE 1-1/2" FIRST I'LUSFI) PONDIrD DEPTH (D) = 12 INCHES A = WQv / D = 906 SF PONDING DEPTH BASIN SIZE Elev Elev Area Area Inc. Vol ACCUm (m) (ft) (m) (sl) (cf) Vol (cf) 8.38 27.49 82 882 0 0 8.43 27.66 88 947 150 150 8.48 27.82 95 1,022 162 312 8,53 27.99 102 1,098 174 495 8.58 28.15 109 1,173 186 672 8,63 28,31 116 1,248 199 870 8.68 28,48 124 1,334 212 1,082 CHECK BIORETEN7'lON AREA SIZE DESCRIPTION REQ-D PROVIDED SURFACE AREA 906 SF 1,098 SF "Average" PONDER VOLUME 906 CF 11082 CF 1 1 P-1224 EQD Post-Dev Bioretention B3 Rainfall Duration=5 min, Inten=5.94 in/hr Summary for Subcatchment 1 S: B3 Runoff - 1,43 cfs Q 0,08 hrs, Volume= 0.010 af, Depth= 0.13" Runoff by Rational method, RiselFall=1.011.0 xTc, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Rainfall Duration=5 min, Inten=5.94 infir Area (ac) C Description 0,134 0.95 Paved parking & roofs 0.784 0.15 50-7S% Grass cover. Fair, HSG A 0.918 0.27 Weighted Average 0.918 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftffl) (fusee) (cfs) 5.0 Direct Entry, Estimated Subcatchment 1S: B3 Hydrograph I I i I J1,43fg 1 I I I I I I 1 I 1 I 1 I I I t I F I I I ! I 1 I 1 I k I 1 I 1 1 I I 1 ! I I „1 1 I I 1 I 1 I 1 I 1 I I I I dur,,Ao6=t min, I 1 I 1 I 1 I 1 I I 1 I 1� I I I I _-L..J-_J__J_-L-L-_l--_V_J�-J-..1-..L..,L--L-..4._J_e-��..1..-1-_L_d� � � I I I I I I , I I I I I I I tin=5 �4 I�Ih'r •..l.-J-. � I � � � F E "� A r � I 1 I � I l"= r• 1 r �uI noIff1VpIlurne�1 I I0.�1� �If ; I 1 RUndff;DI�pth-I OJ13e' Ic-5., i V mi� I 1 I I 1 I I I I I I 1 1 I 1 I I ! I 1 1 I 1 1 I I 1 I 1 1 I 1 I 1 1 I I I l I I 0 1 3 A 5 6 7 B 9 13 11 12 13 14 15 16 17 19 19 23 21 .2 23 24 Th11e (hourit GE 1 'I I 11 P-1224 EOD Post -Deg Bioretention B3 Rainfall Duraficn=5 min, inters=5.94 in/hr Time Runoff (hours) (ofs) 0.DO 0.00 0.20 0.00 0.40 0.00 MID 0.00 0.80 0.00 1.DO O.OD 1.20 O.OD 1.40 0.00 1.eA D.OD 1.80 0.00 2.DO 0,00 2.20 0.00 2.40 0.00 2.60 0.00 IN 0.00 3.00 0.06 3.20 D.00 3.40 O.OD IN O.OD 320 O.OD 4.DO O.OD 4.20 0.00 4.40 0.00 4.n 0.00 4.e0 0.00 5.00 O.OD 5.20 0.00 5.40 O.OD 5.60 D-OD 5.eO 0.00 6.DO O.OD 0.20 O.OD 6.40 0.00 6.60 0.00 6.eO 0.00 7.00 0.00 7.20 0.00 7.40 O.OD 7.60 0.00 7.eO O.OD B.DO 0.00 8.20 0.00 8.40 0.00 B.eA 0.00 8.80 D.00 Hydrogral Time Runoff (hours) (cfs} 9.00 0.00 9.20 0.00 9.40 0.00 9.er3 0.00 9.80 0.00 10.00 0.00 10.20 O.00 1 D.40 0.00 10.ea 0.00 10.&D 0.00 11.DO 0.00 11.20 0.00 11.40 0.00 i1.V3 0.00 MeO 0.00 12.00 0.00 12.20 0.00 12.40 0.00 12.6D 0.00 12.eO 0.00 13.a3 0.00 13.20 0.00 13.40 0.00 13.e,O 0.00 13.eO O.00 14.DO 0.00 14.20 0.00 14.40 0.00 14.60 0.00 74,80 0.00 15.DO 0.00 15.20 0.00 15.40 0.00 15M 0.00 15.80 0.00 16.D0 0.00 3a.20 0.00 10.40 0.00 18.60 0.00 15.80 0.00 17.a0 0.00 17.20 0.00 17.40 0.00 17.e10 0.00 17.80 0.00 )h for Subcatchment IS: 93 Time Runoff (hours) (cfsi 16,00- 0.00 16.20 0.00 18.4D 0.00 1e.60 0.00 18.80 0.00 19.00 0.00 19.20 0.00 19.40 0.00 19.60 0.00 19.80 0.00 20.00 0.0.3 20.20 0.03 20.4D 0.110 20.BD 0.00 20.60 OAO 21.00 O.00 21.2D 0.00 21.40 0.00 21.00 0.00 21.60 0.00 22.00 0.00 22.20 0.00 22.40 0.00 22.60 0.00 22.50 0.0+0 2?.OD 0.00 23.2D 0.00 23.40 0.00 23.60 0.00 22.60 0.00 24.00 0.00 11 P-1224 EOD Post-Dev Bioretention 83 Rainfall duration=5 min, inten=5.94 in/hr Summary for Pond 2P: Bioretention Basin 3 Inflow Area = 0.918 ac, 0.00% Impervious, Inflow Depth = 0.13' Inflow - 1.43 cfs @ 0.08 hrs, Volume= 0.010 of outflow = 0.07 cfs @ 0.16 hrs, Volume= 0.010 af, Atten= 95%, Lag= 4.9 min Discarded T 0.07 cfs @ 0.16 hrs, Volume= 0,010 of Primary - 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 27.91' @ 0.16 hrs Surt.Area= 0.024 ac Storage= 0.009 of Plug -Flow detention time= 49.5 min calculated for 0.010 of (100% of inflow) Center -of -Mass det. time= 49.5 nun ( 54.5 - 5.0 ) Volume Invert Avoil.Storage Storage Description #1 27.49' 0.025 of Custom Stage Data (Pyramidal) listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store 114et.Area feet! acres acre-feet (acre-feet) (acres 27.49 0.020 0,000 0.000 0.020 27.66 0.022 0.004 0.004 0.022 27.82 0.023 0.004 0.007 0.023 27.99 0.025 0.004 0.011 0.025 28.15 0.027 0.404 0.015 0.027 28.31 0.029 0.004 0.020 0,029 28.48 0,031 0.005 0.025 0,031 Device Routing Invert Outlet Devices #1 Primary 28.50' 66.0' tong x 3.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1,40 1.60 1.80 2.00 2.50 3,00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32 #2 Discarded 27.49' 3.000 infhr Infiltration over Wetted area Qiscarded OutFlow Max=0.07 cfs @ 0.16 hrs hPA'=27.91' (Free Discharge) 2=11nfiltration (Exflltration Controls 0.07 cfs) Primary OutFlow Max=D.00 cfs @ 0.00 hrs HW=27.49' (Free Discharge) L-1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) P-1224 EOD Post-Dev Bioretention B3 Rainfall Duration=5 ruin, lnten=5.94 iNhr Hydrograph for Pond 2P; Bioretention Basin 3 Time Inflow Storage Elevation Guiflow Discarded Primary (hours) _(cfs)_ (acre-feet) ffeel) (cfs) fcfs) (cfs) 0.00 0.00 0.000 27.49 0.00 0.00 0.00 1.00 0.00 0.005 27.70 0.07 0.07 0.00 2.D0 0.00 0.00 27.49 0.00 0.00 0.00 3.D0 0.00 0.000 27.49 0.00 0.00 0.00 4.00 0.00 0,000 2749 O.D0 0.00 0.00 5.00 0.00 0.000 27.49 0.00 0.00 D.00 0.00 0,00 0,000 27.49 0.00 0.00 0.00 7.00 0.00 MOO 27 4a 0.00 0.00 0.00 9.00 OM 0,000 27.49 0.00 OM 0.00 9.00 0.00 0.000 27.49 0.00 0.00 0.00 10.D0 0.0D 0.000 27.49 0.00 0.00 0.00 i 1.00 0.OD 0.D00 27.49 0.00 0.00 0.00 12.D0 0.0D ().ODD 27.4? 0.00 D.DD 0.00 13.00 0.0D O,ODO 27.49 0.00 0,00 D.00 14.00 0.0D 0,OD0 27.49 0.00 0.00 0.00 15.DO O.D0 0.0DO 2749 0.00 0.00 0.00 18.00 0.00 0.000 27.49 0.00 0.00 0.00 17.00 0.00 0.OD0 27.49 0.00 0.00 0.00 15.D0 0.00 D.000 27.49 0.00 0.00 0.00 1a.00 O.OD 0.000 27.4a 0.00 0,00 0.00 20.00 0.00 0 DO 27.4a 0.00 0.00 0.00 21.DD 0.00 0.000 27.49 0.00 0.00 0.00 22.D0 0.00 O.ODO 27.49 0.00 0.00 0.00 23.DO 0.00 0.000 27.49 0.00 0.00 0.00 24.00 0.00 O,ODO 27,49 0.00 0.00 0.00 A TF9QG o � July 17, 2008 Carl Baker, Deputy Public Works Officer MCB Camp Lejeune 1005 Michael Road Camp Lejeune, NC 28542 Michael F. Easley, Governor William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural Resources Subject: Request for Additional Information Stormwater Project No. SW8 080508 P-1224 EOD Building FC292 Addition Onslow County Dear Mr. Baker: Coleen H, Sullins, Director Division of Water Quality The Wilmington Regional Office received a State Stormwater Permit Application for P- 1224 EOD Building FC292 Addition on May 7, 2008, A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. Please provide a copy of the signed wetlands delineation map. 2. Please show units on the plans that are consistent with the supplement materials to ensure consistency between the calculation, application, and plans. 3. The Seasonal High Water Table (SHWT) values that were provided on the supplement were not consistent with what was provided in the soils report. Please correct and/or provide clarification. 4. Bioretention devices require 2 feet of separation between the SHWT and the bottom of the device. At least one foot of this separation needs to be native soils, while the other foot may be provided by fill. 5. Please ensure that the legend covers all details trying to be shown on the plans. There are some areas where varying shadings and abbreviations have been used to depict something on the plans that is not being conveyed because the shadings are neither shown in the legend nor labeled. 6. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August 15, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. 127 Cardinaf Drive Extension, Wilmington, North Carolina 28405-3845 One Phone: 910-796-72151 Fax: 910-350-2004 / Internet: h2o.enr,state nc.us NorthCarolina An Equal Opportunity/A.firmative Action Employer - 50% Recycled110% Post Consumer Paper ;Vattirally Commanding Officer MCB Camp Lejeune July 17, 2008 Stormwater Application No. SW8.080508 If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not. acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at aisha.lau@ncmail.net. Sincerely, Aisha H. Lau Environmental Engineer ENBlahl: S:1WQSISTORMWATERIADDINF0120081080508jul.08 CC: Mr. Jason Frick, P.E., NAVFAC MidAtlantic Wilmingto_ n-Regional"Office Page 2 of 2 �I Naval Facilities Engineering Command NAVFAC M1D•ATUNT1C Transmittal;HE DATE: 23 April 2008 To: NCDENR-Division of Water Quality Wilmington Regional Office J'� ) 127 Cardinal Drive Extension ter Wilmington, NC 28405 qI Phone: (910) 796-7215 0.0 From: Naval Facilities Engineering Command - Mid -Atlantic Marine Corps North Carolina IPT Jason Frick (757) 322-4283 RE: P-1224 EOD Building FC292 Addition Stormwuter Management Permit Application 150 d D SC Copies Date Description 3 4/2/2008 1 Original and 2 copies of Permit Application I 1 Permit Application Fee Check in the amount of $505.00 Remarks: anon Fnc P.E. Distribution: NAVFAC - Tara Clark 0t�04, WAr�RpG i.JWI h Q Y Project Name• _P /Z L `l- Project No S/����y_ County:0/�.SLO��i�� .� The Wilmington Regional Office of the bivision of Water Quality received your Stormwater Permit Application A $505 fee on -5' " 7 Your project will be reviewed within 75 days of receipt A you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. If you have any questions, please contact any member of the Stormwater review staff in the Wilmington Regional Office at (910) 796-7215. Jo Casmer , Administrative Assistant dill ,., I����� I ° t�� 1,1.E :Itaw 000 102,685,770 7-7 �*az SNK VNKCO 6AJ DEFENSE FINANCE AND ACCOUNTING SERVICE 00250-00250 CLEV£LAND CENTER 07954631 Pay. to. 'che'order'ot NCDENR DIVISIONOF HATER QUALI NAVFar ATLANTIC, CODE FM112 Check No. 8522-07954631 FEB 21,2008 6506 HAMPTON BLVD $*****505*00 NORFOLK VA 23508-1278 VOID AFTER ONE YEAR MAN/,- I ' 1C NORFOLK N6247008LTAOOI I- STORMWATER MANAGEMENT PERMIT APPLICATION DOCUMENTS FOR P-1224 EOD BUILDING FC292 ADDITION MCB CAMP LEJEUNE JACKSONVILLE, NC OWNER: COMMANDING OFFICER MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA PREPARED BY: AN \I wvmc Naval Facilities Engineering Command NAVFAC MID -ATLANTIC May 7, 2008 NAVAL FACILITIES ENGINEERING COMMAND MID -ATLANTIC Marine Corps North Carolina IPT 6506 Hampton Blvd. Norfolk, VA 23508-1278 P-1224 EOD BUILDING FC292 ADDITION MCB Camp Lejeune Jacksonville, North Carolina TABLE OF CONTENTS Section Title Section A Stormwater Management Permit Application Form & Bioretention Supplemental Sheet Section B Project Narrative Section C Calculations Section D ' Maps Section E Department of Defense Exemption Letter from the NC Board of Registration for Professional Engineers and Land Surveyors Section F Project Construction Plans Section G Project Construction Specifications Section H Soils Report EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina Section A: STORMWATER MANAGEMENT APPLICATION EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina Section B: PROJECT NARRATIVE PROJECT DESCRIPTION This project consists of the construction of an addition to the existing Building FC292 Operations Facility Complex for the Explosive Ordnance Disposal Team at Marine Corps Base Camp Lejeune. The new Operations Facility will be a 7,888-sf (732 m2) free-standing, one- story brick on slab structure. The project will also consist of a 58,807-sf (5463 m2) concrete paved tactical vehicle parking lot and a 12,176-sf (l 131 m2) POV bituminous concrete paved parking lot. SITE DESCRIPTION The site for the new EOD Facility is located on the north side of McHugh Boulevard approximately 1,000 feet west of the intersection with Sneads Ferry Road in the French Creek area of Camp Lejeune. Building FC5 I, an Electronics and Communications Maintenance facility is located immediately to the east of the EOD site, facing Sneads Ferry Road. The existing EOD Building is located just south of the new EOD Addition site. EXISTING SITE DRAINAGE The stream classification of the outfall is SC; NSW as determined from the state stream classification database. The soil at the site is Baymeade fine sand (BaB) according to USDA Soil Survey ofOnslow County. This a well -drained sandy soil characterized by rapid infiltration and slow runoff. The hydrologic soil group is group "A". Soil borings performed at the site indicated the soil has a Unified Soil Classification System (USCS) classification of(SP-SM, SM, SP). Test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands. Groundwater was not encountered in the borings to the depths drilled, ten (10) feet. Due to the high sand content of the subsoil, the infiltration/permeability capability of these soils is high. The infiltration rates ranges from 2.2 to 4.2 inches per hour. The seasonal high water table was estimated to average around 60 inches below existing grade. The existing EOD building was designed and constructed in 2006 with bioretention as the BMP selection and the SHWT found to be around the 22.7 (6.91 m) elevation which was investigated and approved by NCDENR, please see attached Site Soils Investigation form from that project. 'Phis project has chosen bioretention as the selected BMP because of the in -situ soil characteristics and the success of the existing bioretention basins currently in use on site. POST DEVELOPMENT DRAINAGE EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina Runoff from the new development will be controlled through overland flow over sodded grassed areas, grass lined swales and bioretention areas to treat the first 1-1/2 inch of runoff from the developed areas. The runoff will be directed to sheet flow directly to proposed bioretention basins through a vegetative filter or will flow towards new vegetated swales and allowed to flow into the proposed grassed bioretention basins. Piping is only provided under the new gravel access drive crossing. The proposed bioretention basins are designed to hold the I-yr, 24-hr storm to 0.0 efs overflow. The overflow of high flows will spill over bioretention basin and sheet flow through newly sodded areas into the existing woodlands. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed off of the existing access road leading to the new building construction location. (NCSCC ESCM Std. 6.06). Land Grading: Grading will be required on approximately 2.10 acres. The building, parking lot, and access road will be located on the higher fill areas. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02). 3. Temporary Silt Fence. Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62), 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. 6. Outlet Stabilization Protection: Provided at new swale system outfall to prevent erosion by reducing the velocity of flow and dissipating the energy (NCSCC ESCM Std. 6.41). 7. Temporary Seeding. See Specifications CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around bioretention basins as indicated. 4 EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina 6. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 7. Finish slopes around building upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 8. Complete final grading for roadway, drives and stabilize with gravel. 9. Complete construction of new building and final grading for the building. 10. Complete final grading of the grounds, topsoil critical areas and permanently vegetate, landscape and mulch. 11. After site is stabilized, remove all temporary measures and install permanent vegetation on disturbed areas. MAINTENANCE PLAN 1. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 0.5-inch rainfall event. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the specifications in Section 32 92 19 Seeding. VEGETATIVE PLAN See specification Section 32 92 19 Seeding and 32 92 23 Sodding Prepar by: Ja.Xl. Civil tingincer MCNC IPT Na%al Facilities Engineering Command Mid -Atlantic 9742 Maryland Avenue Norfolk, VA 2351 1 1111 (757) 322-4283 jason.frick@navy.mil EOD Building FC292 Addition Section C: CALCULATIONS DESIGN PARAMETERS MCB Camp Lejeune Jacksonville, North Carolina The SCS method was used to calculate peak flows and the Simple method was used to calculate the runoff storage volume. TR-55 was used to complete the time of concentration values. An IDF chart for Sneads Ferry, NC was used and was obtained from the NOAA web site with a I-yr, 24-hr storm of 3.68 inches. See the following pages for the Sneads Ferry, NC IDF chart and for tabulated results of the calculations. Refer to Section F for plans of the proposed drainage design. RE: P,.1224 EOD Building FC292 Addition Subject: RE: P-1224 EOD Building FC292 Addition From: "Frick, Jason M C1V NAVFAC Lant" <jason.frick@navy.mil> Date: Tue, 6 May 2008 16:25:16 -0400 To: "Linda Lewis" <linda.lewis@ncmail.net> Linda, Please find below my responses to your comments and please find attached the revised calculations. Responses: 1. This is a new separate project with three new proposed bioretention basins. 2. I have completed one column for each BMP in Section III.9 and have attached in the pdf. 3. The average surface area was used and reflected on the provided calculations PDF. 4. The bioretention basins have been modeled and calculations provided. 5. SCS Method was used to provide Peak runoff rates, the 1-yr, 24-hr storm of 3.68" was used (taken from NOAA data station = Sneads Ferry). 6., No infiltration request will be needed. The infiltration Site Visit Request that was included in the application package was a document from the original EOD design. It was included to show what the SHWT elevation from the original EOD Building design was. Please let me know if you have any other questions. Jason Frick, P.E. Civil Engineer NAVFAC Mid -Atlantic Marine Corps North Carolina IPT Phone: (757) 322-4283, Fax: (757) 322-8280 Email: jason.'frick@navy.mil -----Original Message ----- From: Linda Lewis [ mailto: linda. lewis@ncmail. net] Sent: Tuesday, April 29, 2008 12:55 PM To: Frick, Jason M CIV NAVFAC Lant Subject: P-1224 EOD Building FC292 Addition Jason: The Division of Water Quality received an incomplete stormwater permit application for the subject project on April 26, 2008. A preliminary review of the application was conducted and the following items need to be addressed before the application can be accepted for review: 1. Is this a new separate project with 3 new proposed bioretention basins, or is this a modification to SW8 050830, to add 1 new bioretention basin to the previously permitted 2? 2. Please complete one column in Section IZI.9 of the application for each BMP (previously permitted plus new, if the project is a modification- or just proposed if the project is new.) 3. The required surface area should be provided at the "average" elevation, not the top elevation. 4. I do not see any outlet or orifice calculations to draw down the bioretention cells. 5. Why are you using 5.94 inches as the post development storm? In Phase of 2 5/7/2008 8:25 AM RE: P., 1224 EOD Building FC292 Addition II counties, such as Onslow, both pre -development and post -development runoff rates are calculated using the 1 year 24 hour storm, which is probably closer to 3" or 3.5". 6. The application included an Infiltration Site Visit Request. Generally, our Soils Scientist does NOT need to verify soils for proposed bioretention basins. If, however, you see that you are proposing infiltration basins, Vincent can meet with you on Monday, May 5th around 9-9:30 to verify the soils. Please let me know if you are proposing infiltration so I can get this on Vincent's schedule. If they are truly bioretention, then Vincent will not be meeting with you on that Monday. Linda Content -Description: P1224 EOD Revised Calcs.pdf P1224 EOD Revised Calcs.pdf Content -Type: application/octet-stream Content -Encoding: base64 2 of 2 5/7/2008 8:25 AM REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS P-1224 EOD ADDITION JACKSONVILLE, NORTH CAROLINA PREPARED FOR: MR WALTER MOORE, P.E. R. KENNETH WEEKS ENGINEER, LLC 2733 TIDEWATER DRIVE NORFOLK, VIRGINIA 23509 PREPARED BY: i LLP CAROL ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILVOINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 2213938 f WINSLQWBiGOINS. P.E. •e AL r = • 03371 .�y . N� ti • °�� � -1J q.; NC LICEI 5E�NO. 33751 APRIL 233, 2008 0 TABLE OF CONTENTS 0 1.0 EXECUTIVE SUMMARY..................................................................................................................I 2.0 PROJECT OVERVIEW......................................................................................................................2 2.1 Project Information............................................................................................................................2 2.2 Scope of Work...................................................................................................................................2 2.3 Purpose of Exploration.....................................................................................................................2 3.0 EXPLORATION PROCEDURES.......................................................................................................3 3.1 Subsurface Exploration Procedures...................................................................................................3 3.1.1 Soil Borings.......................................................................................................................... 3 3.1.2 Hand Auger Borings and Infiltration Test................................................................................. 3 3.2 Laboratory Testing Program..............................................................................................................4 4.0 EXPLORATION RESULTS................................................................................................................5 4.1 Site Conditions................................................................................................. ...........................5 4.2 Regional Geology.............................................................................................................................5 4.3 Soil Conditions..................................................................................................................................5 4.4 Groundwater Conditions...................................................................................................................5 4.5 Laboratory Test Results.................................................................................................................... 6 4.6 Infiltration Test Results...................................................................................................................6 5.0 ANALYSIS AND RECOMMENDATIONS.......................................................................................7 5.1 Excavation Conditions.... ............................................................................................................... 7 5.2 Engineered Pill ............................................................................................................................. 7 6.0 CLOSING..............................................................................................................................................8 APPENDICES APPENDIX A-FiGuREs APPENDIX B-sPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRFTION, AND TERMINOLOGY APPENDIX C-HAND AUGER BORING LOGS AND INFILTRATION TE5r RESULTS APPENDIX D-LABORATORY TEST RESULTS APPENDIX E-GENERALCONDwoNS APPENDIX F-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA sHEEPs AND SAMPLES C 11 • • 0 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13938 1.0 EXECUTIVE SUACMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina. At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. We understand that five bio-retention ponds will be constructed at the site. Additional project specific information was not available at the time this report was prepared. Minimal to 4 inches organic topsoil was reported by the drillers at the boring locations. Beneath the surface to a depth of 10 feet, the test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands (SP-SM, SM, SP). The infiltration rate at the ponds ranged from 2.2 to 4.2 inches per hour. The seasonal high water table ranged from 34 to 60 inches below current grades. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a `summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Winslow E. Goins, P.E. Project Engineer Reviewed By: Walid M. Sobh, P.E. Principal Engineer Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13938 2.0 PROJECT OVERVIEW 2.1 Proiect Information Our understanding of the proposed development is based upon our discussions with representatives of R. Kenneth Weeks Engineers, LLC and a review of the site plan provided to ECS by R. Kenneth Weeks Engineers, LLC. The proposed site is located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina. At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. We understand that five bio-retention ponds will be constructed at the site. Additional project specific information was not available at the time this report was prepared. 2.2S co a of Work The conclusions and recommendations contained in this report are based on the results of. • five soil test borings; • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field and laboratory findings with respect to the provided project information. 2.3 P oses of Exploration 0 The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. • 2 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13938 3.1 Subsurface Exaloratlon Procedures 3.1.1 Soil Test Borings The five soil test borings drilled on the site were performed using a track -mounted CME 450 drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler througb a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews,drill rigs, drilling procedures, and hammer rod -sampler assemblies) and prevent a direct correlation between SPT resistance value, or N-Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.1.2 Hand Anger Borings and Infiltration Tests On April 9, 2008, five hand auger borings were performed on the site. The purpose of the hand auger borings was to stratify the subsurface soils and estimate the seasonal high water table of the subsurface soils. Five infiltration tests were performed at the hand auger boring locations. We evaluated the subsurface soil and ground water conditions by drilling the hand auger borings to depths of approximately 108 inches below the existing ground surface at the approximate location indicated on the Boring Location Plan in Appendix A of this report. We visually classified the subsurface soils on site. The results are provided in Section 4.5 and in Appendix C. is Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22,13938 3.2 Laboratory Testing Prozram Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: 0 visual classifications of soil according to ASTM D 2487; index property testing included natural moisture content determinations (ASTM D 2216) and grain size analyses (ASTM D 1140). All data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this investigation will be retained at our Iaboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. • 4 Report of subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carotins ' ECS Project No.: 22.13938 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina. At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. 4.2 Regional GeoloQv The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest 'upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Soil Test Borings: Minimal to 4 inches organic topsoil was reported by the drillers at the boring locations. Beneath the surface to a depth of 10 feet, the test borings typically encountered intermittent layers of very Loose to dense slightly silty, silty and clean sands (SP-SM, SM, SP). Standard penetration test resistances (N-values) in these soils generally ranged from 3 to 33 blows per foot (bpi). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The Test Boring Records in Appendix B contain detailed information recorded at each of the boring locations and represent the geotechnicah engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the Test Boring Records represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. 4.4 Groundwater Conditions Groundwater observations were made after the completion of the drilling operations all boring locations. Groundwater was not encountered in the borings to the depths drilled. The highest groundwater observations are normally encountered in the late winter and early spring, and our current groundwater observations are expected to be near or representative of the seasonal maximum water table. Variations in the Location of the long -terns water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water Levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. Report of Subsurface Exploration and Geotecbnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13938 4.5 LaboratoKy Test RoWts Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples bad in -situ moisture contents ranging from 7 6.9 to 17.4 percent. - The grain size analyses of the tested samples indicated that the tested materials had 9.8 to 17.9 percent fines passing the number 200 sieve. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. 4.6 Infiltration Test Results Based on observations in the hand auger boring, the seasonal high ground water level is estimated to be 34 to 60 inches below existing grade. The infiltration tests were performed at a depth of 24 inches below present grade and the infiltration rate ranged from approximately 2.2 to 4.2 inches per hour (0.036 to 0.07 in/min). 0 • 6 Report of Subsurface Exploration and Qeotechnical Engineering Analysis P-1224 EOD Addition ® Jacksonville, North Caroline ECS P ECS Project No.: 22.13936 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Excavation Conditions We do not anticipate difficult excavation conditions in the upper 10 feet of soil. The site soils are OSHA Type B and C soils for the purpose of temporary excavation support. 5.2 Engineered Fill An examination of the soils recovered during our current exploration, and our previous experience in the area, indicates that the majority of the on -site soils will generally be suitable for re -use as engineered fill. However, it is expected that moisture conditioning of the fill soils will be required during placement to facilitate proper compaction. In some areas, substantial drying may be needed and it may not be feasible to attempt to reuse such materials as engineered fill. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface cultivated soils should be evaluated to determine if some of these soils will be suitable for reuse as engineered fill. Natural fine-grained soils classified as clays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 9 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13 93 8 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration., The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the .data outlined in this exploration should be reported to us for our evaluation. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site was beyond the scope of this geotechnical exploration. • • 0 d F z cullamwo q;JON '6111AUO"013r NOIIlaav 311:10Md mvmnsens am 11M-d DEPTH C) CD u DEED LL L L v v 14 X: (L C:) x (L C5 ❑ Lli (Y) I X IL CL c5 PCI C') oi LO PO 0 Oj x m O C:5 p I q Q) ❑ CL (L C5 t, C3 4D PQ Li 0 CD HicJ3CI Lki z U -J bi A < im u cL ci ci 0 Ld m LO P uj z z a_ Z 0 Z Cla 0 Li CA Z W < L) 0 V)�.- Z < z U CL Ljj L) < al Z J-- O� < Z MP V) X N Z " V) M: < C4 (F— 4 W Li LJ:D f— W < [3 F—Zmw :r > m z 14 cli cli e Is 0 9 • APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY 0 r� Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria GW Well -graded gravels and gravel- C = Dfi6/D10 Greater than 4 sand mixtures, little or no fines Cz = (D30)2/(D1.xD.) Between I and 3 GP Poorly graded gravels and gravel- 13 Not meeting both criteria for GW sand mixtures, little or no fines o Cn o w GM Silty gravels, gravel -sand -silt ° Atterb limits lot below `:4" line or P index less 4 mixtures [7 [V7 plasticity than � GC Clayey gravels, gravel -sand -clay a A limits lot above "A" line �� P mixtures and plasticity index greater than 7 SW Well -graded sands and gravelly 55��� . Cn = D601DIO Greater than 6 sands, little or no fines ? $ 73 C. = (D3c)2/(D10xD6) Between I and 3 d z SP Poorly graded sands and gravelly E 94 a: Z Not meeting both criteria for SW sands, little or no fines 1 \ � �' g� Atterberg limits plot below "A" line or SM Silty sands, sand -silt mixtures plasticity index less than 4 SC Clayey sands, sand -clay mixtures Z9 Atterberg limits plot above "A" line and plasticity index greater than 7 ML Inorganic silts, very fine sands, Note: U-Imereprmema epreximete aMw 1®a ofiL and F1 c=bhmdonv fbrndu M wile (fir delete. AST "7. rock flour, silty or clayey fine sands e0 CL Inorganic clays of low to medium A plasticity, gravelly clays, sandy s clays, silty clays, lean clays OL Organic silts and organic silty clays of low plasticity MH Inorganic silts, micaceous or >o diatomaceous fine sands or silts, m elastic silts CH Inorganic clays of high plasticitiy, fat clays OH Organic clays of medium to high plasticity ■..■■.RNM■. .■■■..■MPRO! .■...■NOW'■ .■■..EZ2314,.■ ..■.E.,.■illllll A mom SOMEONE ■ .■M.,■..■■■ MMI NEE..■ MM Se M to to m m A m oo too 1l0 UQum uQlr, u Plasticity chart for the classification of fine-grained soils. Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter•, will organic'soils char, burn, or glow -- --- ELF MAY 2006 PCB CAROWNAS� ill UNIFIED SOIL CLASSIFICATION SYSTEM- Reference Notes for Boring Loss 0 I. Drilling and Sampling Symbols: SS - Split Spoon Sampler RB - Rock Bit Drilling ST - Shelby Tube Sampler BS - Bulk Sample of Cuttings RC - Rock Core: NX, BX, AX PA - Power Auger (no sample) PM - Pressuremeter HSA - Hollow Stem Auger DC - Dutch Cone Penetrometer WS - Wash Sample Standard Penetration (B1owsXt) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 inch O.D. split spoon sampler, as specified in ASTM D-1586. The blow count is commonly referred to as the N-value. U. Correlation of Penetration Resistances to Soil Properties: Relative Density -Sands. Silts C.onsistencv of Cohesive Soils SPT-N Relative Density N-Values Consistency 0-4 Very Loose 0-2 Very Soft 5 - 10 Loose 3-4 Soft 11 - 30 Medium Dense 5-8 Firm 31 - 50 Dense 9-15 Stiff 51 or more Very Dense 16-30 Very Stiff 31-50 Hard 51 or more Very Hard III. Unified Soil Classification Symbols: GP - Poorly Graded Gravel ML - Low Plasticity Silts GW - Well Graded Gravel MR - High Plasticity Silts GM - Silty Gravel CL - Low Plasticity Clays GC - Clayey Gravels CH - High Plasticity Clays SP - Poorly Graded Sands OL - Low Plasticity Organics SW - Well Graded Sands OH - High Plasticity Organics SM - Silty Sands CL-NIL - Dual Classification SC - Clayey Sands (Typical) IV. Water Level Measurement Symbols: WL - Water Level BCR - Before Casing Removal WS - While Sampling ACR - After Casing Removal WD - While Drilling WCI - Wet Cave In DCI - Dry Cave in The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. MEW R. Kenneth Weeks Engineers JOB f 22-13938 1 BOMNG # B-1 SHEET 1 OF 1 ECTLLP PROJECT NAME ARCEITECT-ENGINEER P-1224 EOD Addition Walter Moore, P.E. SITE LOCATION MCB Cam Le'eune, Jacksonville, North Carolina -o- cmmu � Pffi O1 R 1 $ r. 4 a+ PI.AS1'IC HATER UQQID Lnar x CONTENT x rmr x x e ROCK gUA[rTst aERIaxArAON a• RBcovaRy -- -- 20lf�X-4 4OX-60Xr-8--8DfG--10 (D STAND D PENETRATION 10 20 so 40 50+ x DESCRIPTION OF MATERIAL ENGUSH UNITS BOTIOI[ OF CAM; LOSS OF CIRCUIIATION 100 z SURFACE ELEVATION 0 1 SS 24 24 TopsoI Depth 4" 3:L2-i-2-1) �2 3 3 ;�-1-2-2) Very Loose, Black, Slightly Silty, Fine to Medium SAND, (SP—SM) 2 SS 24 24 5 11.6 :7�(3_-�-s) 3 SS 24 24 Very Loose to Loose Tan Fine SAND, (SP) is.e 10 (5-s-s-s) 4 SS 24 24 Loose to Medium Dense, Light Brown, Silty, Fine SAND, (SM) 5 SS 24 24 7.9 16 (4-9�7-e) 1 � END OF BORING 0 10.0, 15 20 25 THE STRATIPICATim LINES REPRESENT THE APmxmTE BOUNDARY uNES BETWEEN S01L TYPES 1M-sm ne TRANSITION MAY BE GWUAL y*L •S OR 0 BOMHO SrARTKD 04 10 08 PL M) TT TAM) BORING COMP HM 04 1 0 08 QUE IN DEP'l'ti • �RL MO D-25 iroMAx RES DRILLING MUMD Auger • • 0 El' 4 CLIENT R. Kenneth Weeks Engineers JOB 0 22-1393A BORING B-2 SHEET 1 OF 1 gRLP PROJECT N IE ARC=CT—ENGINEE P-1224 EOD Additlon Walter Moore, P.E. cA1ZS?I_INAS SITE LOCATION MCB Cam Le eune, Jacksonville, North Carolina CALa A I PE�tlET�O1teTES 1 E 9 4 5+ PLAaftc WATER L%= LmT X CONTENT X Lam X x e ROCK QUALITY D1 ONATION rk HEMVEMY DESCRIPTION OF MATERIAL ffi+TGLISiL UNITS F BOTMM OF CASING UM OF CIR=T10N 100 � � � 20lf�4X-4 0X-6OX=B07fi-10 ® STANDARD PENETRATION SURFACE ELEVATION 10 80 so 40 50+ 1 SS 24 24 Topsoil Depth 4- 4 (�z-2�z) �: Very Loose, Brown, Silty, Fine 2 SS 24 24 to Medium SAND, (SIA) H 1 Loose to Medium Dense, Tan to (Sjgish Tan, S}tly, Fine SAND, 5 7 i 13. 17 3 SS 24 24 4 SS 24 24 16. 5 SS 24 24 1$ (2-$-e-11) 1 12'3 ' END OF BORING 0 10.0' 15 20 25 THE SmAnncATm LILIES REPRESENT THE APPFZ =ATE 8pl1NIIARY LINES BETVEEN wiL TYPES w-SITU THE TiLWS[ mN MAY BE GRADUAL .WWL AS OR ® BORMG &TAMED 04 1 0 08 QL.(BCR) TBI.(ACR) BORING COHPIETED 04 10 0$ cAva IN DEPtIi • :g"L LGG D-25 Lrom"N R E S DRUING 14MOD Auger CLIENT JOB f BORING SHEEP re.r R. Kenneth Weeks Engineers 22-13938 B-3 1 OF 1 Ec3LLP PROJECT NAME ARCHITECT -ENGINEER P-1224 EOD Addition Walter Moore, P.E. GARa7LIfVAS SITE LOCATIONceI�RATEO PlIN101�16R MCB Cam Le'eune, Jacksonville, North Carolina 1 8 '0 s PLASPIC WAM LIQUID IBM % CDNTliIVi' X tau $ % A ROCK QUALITY DESMNAMON a RECOVERY DESCRIPTION OF MATEMAL ENGUM UNITS � BOTTOM OF CMG IDSS OF CIRCUid'I`1ON t00 'off --- RQDXF� 20%r4 0X—fi0X�-8 8QXr--100 ® IITAN SURFACE ELEVATION 10 20 so 40 50+ Topsoil Depth 4" 1 SS 24 24 1 (!-4-7-14) Medium Dense to Dense, Gray, 2 SS 24 24 Silty, Fine to Medium SAND, :14.5 (io-t�14-12 33 (SM) 5 $'$ 12 (&4"-s) 3 SS 24 24 Medium Dense Tan Fine SAND (Sp) 7.0; ii (8-s-a-+1. 4 SS 24 24 Medium Dense, Tan to Orangish Tan, Slightly Silly, Fine SAND, (SP-SM) 12. 5 SS 24 24 15 (5-8-�7) 1 END OF BORING ® 10.0 6.2' 15 20 25 —I— THE STRATIMATMN LINES REPRESENT THE APPR070MTE BOUNDARY LDES BETWEEN SOIL TYPES a -SITU THE TRANSTTION MAY BE GWUAL vI Ira OR BDMKG s MMW 04 10 08 y1fL( m) TWL(ACR) BORING COliPLE= 04 1 0 08 ME w DEerx m 'TWL zG D-25 FoR>uN RES DRMUNG ImOD Auger r �J • 4 CLIENT JOB # BORING # 1 R. Kenneth Weeks En ineers 22-13938 B-4 1 of 1 ECTLLP PROJECT NAME ARCHITECT —ENGINEER P-1224 EOD Addition Walter Moore, P.E. CAM4QL.1 AS SITE LOCATION -d- ►T� MCB Camp Le eune, Jacksonvifle, North Carolina 1 E4. PLMC xATBR LIQUID U= X CON7' T x u3m x x n eocK QuAlirr Dt sIGNArION & RCCOVMY AESCRUMON OF MATERIAL ENGT.TgF1 UNITS 9 BOTTOM OF CASING I� OF CIRCOL nON 100 R00%— — 807G-1 2074-40%-60x-8 �p 6d 9UNDARD PCHMAIZON ® BUMP/. SURFACE ELEVATION lO ED 30 40 ED+ Topsoil Depth 4" 1 SS 24 24 10 (1-' 7) : Loose, Brown to Gray, Silty, Fine SAND, (SM) 9B 2 SS 24 24 17.4 5 3 SS 24 24 :7 (3-3-4-4) Medium Dense, Tan, Fine SAND, f6 4 SS 24 24 Ilo g 5 SS 24 24 19 (8�io-e-8) 1 1g:2 - END OF BORING 0 10.0' 16 20 26 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BMMARY LINES BETVEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL. us OR ® BORING sxAMW 04 10 08 "CR) ,TVI.(ACB) BORMG COIOPIErsO 04 1 0 08 CAVE IN DEPTH • 'Tn. RIG D-25 Fa=uN R E S WMING XOTI D Auger CUENT Jon # BORING # SHEET R. Kenneth Weeks Engineers 22-13938 . B-5 1 OF 1 ECTLLP PROJECT NAME ARCHITECT -ENGINEER P--1224 EOD Addition Walter Moore, P.E. GsarzoLIN.4S SITE LOCATION -0- CAIMRATE P URM MCB Camp Le'eune, Jacksonville, North Carolina 1 2 a 4. 5+ PUS W XATSR uQm 1110T % CONTENT N uWr x x n ROaC QUA11TP D€SIONASION & RBOOVERY g DFSCRUMON OF MATERIAL ENGLISH IINM $OTIOY OF CASING D— LOSB of CIRCULATION 10 20 X--40X 60X— 0Xr--100 SURFACE ELEVATION ® =MkARD FMRMTION 0 10 20 sow 40 50+ Topsoil Depth 4p ! SS 24 24 Loose, Brown, Silty, Fine SAND, {SM) 14.7 2 SS 24 24 :7 Loose, Tan, Fine SAND, (SP) 5 3 SS 24 24 :7 (8-4-�3-+) e 4 SS 24 24 9 (4-:5-4-5) .2 5 SS 24 24 8 (3-0--3-e) � s END OF BORING 0 10.0' 8.3 15 20 25 2-0-j- THE STRATIFICATION LINES REPRESENT THE APPRaMATE EauNDARY LINES BETWEEN SOIL TYPES DV-slTu THE TRANSITION MAY X GRADUAL VL WS OR 0 MMO srARM 04 10 08 TT(L( =) TWgACR) BORING COMPU ED 04 10 08 c"N IN DEng • :TL RIG D-25 Fomv" RES Olm-UNG 10MOD Auger • • • Infiltration Evaluation P-1224 EOD Addition Jacksonville, North Carolina ECS Project No. 22.13938 April 11, 2008 Location B-1 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 3.1 inches per hour (0.05 in/min). Location B-2 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 4.2 inches per hour (0.07 in/min). Location B--3 Seasonal High Water Table was estimated to be at 34 inches below the existing g grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 2.3 inches per hour (0.039 in/min). Location B-4 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 2.2 inches per hour (0.036 in/min). Location B-5 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 3.0 inches per hour (0.05 in/min). 0 w �:l d C C w I 0 IL .l C�! ti.. it 43 E 7 z m O a t7 w m cc E E N L C1 C vi C w `a a c a E z a a� U E c Egg O; �02 o U E E � °' m A O 9 N 7 OD Cr! &q CD aA LL Ln ro � T. O U) Liz eN— r a� LA C O 0. U c ca Or E J ((�} ��aa c?ELEL argi�c�r�� a tp rA Ln (h to (n N in Ln Cn to p, n w to co 0 cn N ON E NIL'IODN NOlT3l!]�� N 01C�N Co NrMt-L6 CommCV4 CV 11fr1CO3 Q (.-. r r r r r� oovq�Qo,00Qcac00000� a0 doc5c��o�odol��dd ccqq ccQ� cq cq oQ d�c�ga CA o 0 ONliE6'C N �tCD WOCV�CGMO 6Cp N fl-. rz rC%J (n Cn C? co to �rNSYl flJ q? f%1 C1C1 11]rN co Ch CA [+7 c 117r (b N Ch C] N CIO ll7 CfI CEO Cn z rrrrrNNNNNC')F1 L'9['i atlrbc$o�sl$o6o�l$abo�so6cbc�ab��a�� O � O O dl U Y (D m ENS fl0 = u c11 UZ) (n o • • • CI a2 J .c`� E U N C z R ~= tv .O o CO) L W Co 0 a N el n S. c m C �+ t,s E E 3 N 141 h C' b G Q qul A r d E E z z � m a o a a 111'll��ll�llllllll�' �IIIII�IIII�Y�I �'iIIIIIIINIIfl1111 �nnn�nn�nii �imniaimtiiuii� �'�riimnnu.i�uri �I����911��OII�IIIIIF ��9@IIINII1gl IIIII �����1111111A11111 j'� '� 1��0011111111111111 �_� �9�9�111111�1111111 `m om m m�tC7 e aLO =U0N II II II II '8aco 00 .g 00 QQ M 00 M z 0 In W �a+ W os 0 Ch 0000 kn v XkIssnd Juandad 0 o a m N I" 0 c .9 0 a a .y �� >1 a �b c pq rl I i • • • 0 O 001 000 t- h M N C .- �urssnd Jua�ad �J 0 I -ia 9 All 0 0 rn v �o c o N 0 o fcuissnd tuaarad t A • • • 0 O 0Q 000 O � � M N P O r-e 1wil �'�}ssnd;uaa,rad NO 00 o g c°' oN�o Gq 00 M � � a� z d o d ob d z� N --------------- ---- ----- II II II ----- a a ___ -_-- ----- ----- ----- ----- -- ----- ----- ----- ----- --------------- ----- ----- .. y •mil N ---- ----- ----- ----- ----- ----- _------- --— ----- ts ----- ----- ----- ----- --�--- --------------- ---------- a M �— -----QC ----- ----- ----- --------------- --- ----- O {� F .� rJ 15131 -- --- --- --- --- ---- --- ---- ---- -- --- M call 1 R z U O -- f6 O CQi 0�0 V�'1 M N C> O ~ �-- zutssnd lua-uad �J 0 • b O � coi O � 1iLn�1i � O 0 000 0 0 0 0 OM N 0 o .. 2rurssnj #uao raj o M pCl Do ip O z ti w A b 0 0 CD---- ----- ----- --- ----- _-__------------------------- ----------------------------------------------- ------------------ •^� a Cti • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � b V � � ----- ----- ----- ----- --------------- ----- ----- M O COi o00 M N1wil O O ,7utssn�j lua�.ra�j JNI i� IIp II U � • • �11 • C � A S o T o00 toCo o � O CD OC D Xcissnd �uaorvd 0 General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been. prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the caisson, foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, ,piles, caissons, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further investigation as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. �, I APPENDIX F PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES e • 0 0 Procedures R ardin 'eld Los Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation. engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and. test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then discarded unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the apparent strength of cohesive soil generally increasing the strength from what was originally. encountered in the field. Since they are then no longer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work. On the other hand, we are aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all, contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the information was obtained to the extent the contractor or subcontractor wishes. Results of the laboratory tests are generally shown on the boring logs or described in the extent of the report, as appropriate. The descriptive terms and symbols used on the logs are described on the attached sheet, entitled General Notes. 0 STORMWATER MANAGEMENT PERMIT is APPLICATION DOCUMENTS FOR P-1224 EOD BUILDING FC292 ADDITION MCB CAMP LEJEUNE JACKSONVILLE, NC OWNER: COMMANDING OFFICER MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA PREPARED BY: NAVFAC MID -ATLANTIC April 2008 NAVAL FACILITIES ENGINEERING COMMAND MID -ATLANTIC Marine Corps North Carolina IPT 6506 Hampton BNd. Norfolk, VA 23508-1278 �Ab P-1224 EOD BUILDING FC292 ADDITION MCB Camp LeJeune Jacksonville, North Carolina TABLE OF CONTENTS Section Title Section A Stormwater Management Permit Application Form & Bioretention Supplemental Sheet Section B Project Narrative Section C Calculations Section D Maps Section E Department of Defense Exemption Letter from the NC Board of Registration for 0 Professional Engineers and Land Surveyors Section F Project Construction Plans Section G Project Construction Specifications Section H Soils Report • EOD Building FC292 Addition MCB Camp Lejeune ,Jacksonville, North Carolina 0 Section A: STORMWATER MANAGEMENT APPLICATION 40 n • • u ` ONLY ,DWQ.USE'. Date Received Fee Paid Permit Number qki il State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer MC13 Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): _ Carl Baker, Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: 1005 Michael Road City: Camp Lejeune State: NC Zip: 28542 Phone: ( 910 ) 451-2213 Fax: ! ) N/A Email: N/A 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-1224 EOD Building_FC292 Addition _ 5. Location of Project (street address): MCB Camp Lejeune, NC McHugh Blvd. City: Jacksonville _ County: Onsiow d. Directions to project (from nearest major intersection): From main gate: Holcomb Blvd., take a left onto Sneads Ferry Road, turn right onto McHugh Blvd -1000 ft on right hand side of road. 7. Latitude: 34°39' 08" N Longitude: 77018'49" W of project 8. Contact person who can answer questions about the project: Name: lason Frick, PE Telephone Number: (757 ) 322-4283 Email: jason,frick@navy.mil II. PERMIT INFORMATION: Farm SWU-101 Version 8.07 Pagel of 4 • 1. Specify whether project is (check one): ®New ❑Renewal ❑Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ❑High Density ❑Redevelop ®General Permit ❑Universal SMI' ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing Stormwater management for the project. Stormwater runoff will be handled through overland flow, vegetative swales and Bioretention Basins. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Site Area: 3.71 acres 4. Total Wetlands Area: N/A acres 5. 100' Wide Strip of Wetland Area: N/A T�acres (not applicable if no wetlands exist on site) 6. Total Project Area**:3.71 acres 7. Project Built Upon Area:49.6 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. fi Basin iriformahon w {¢Y Drama e Area 1` { ='r Drama e Area•2" p Receiving Stream Name Cogdels Creek Stream Class & Index No, Sc; NSW Drainage Area (so 161397 sf (3.71 ac) Existing Impervious* Area (so 0.00 Proposed Impervious*Area (so 80,034 sf (1.837 ac) % impervious* Area (total) 49.6 r, Impervious*,Surface-Area Draina a Area I . _ , . g ; ` " : Draina e Area,2 S On -site Buildings (so 7,888 sf (0.181ac) On -site Streets (so On -site Parking (so 70,983 sf (1.63ac) On -site Sidewalks (so 1,163 sf (0.027ac) Other on -site (so Off -site (50 Total (so: 80,034 sf (1.837ac) ' Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidezoalks, gravel areas, etc. Form SWU-101 Version 8.07 Page 2 of 4 **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 40 10. How was the off -site impervious area listed above derived? Field Survey _ • • IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions , Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions' Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). • A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http:i!h2o.enr.stateme.us/suhnsi maps.htm) L�] • Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water fine - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Jason M. Frick, PE, NAVFAC MidAtlanHc Mailing Address: MCNC IF r 6506 Hampton Blvd. City: Norfolk State: VA Zip: 23508 Phone: ( 757 } 3224283 Email:—jason.frick@navy.mil VIII. APPLICANT'S CERTIFICATION Fax: ( 757 ) 322-8280 I, (print or type name of person listed in General Information, item 2) __ { z,G (ju b,C certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recor nd that the proposed project complies with the requirements of 15A NCAC 21-1 .1000. ` /� Signature: Date: — ,�/� Form SWU-101 Version 8.07 Page 4 of 4 • • • Permit Number: 51 1(O Y0§7 / (to he provided by DWQ) Drainage Area Number: B-I Bioretention Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. Heavy equipment will NEVER be driven over the bioretention cell. Special care will betaken to prevent sediment from entering the bioretention cell. Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than LO inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems- How I will remediate the problem, The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention I&M-Rev.2 Page I of 4 • BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices, to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum de th of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Fonn SW401-Bioretention I&M-Rev.2 Page 2 of 4 • EJ BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if a licable The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tlet. 733-1786. Page 3 of 4 Form SW401-Bioretention I&M-Rev.2 Pen -nit Number: Sv cz( 0V0 (to be provided by DWQ) I acknowledge and agree b m signature below that I am responsible for the g g Y Y g p performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project 17ame. P-1224 EOD Addition to Building FC292 BMP drainage area number: B-1 Print name: Carl Baker Title:__ Deputy Public Works Officer Address: 1005 Michael Road Cam Lejeune NC 28542 Phone Signat Date: L Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of f � -r l) , do hereby certify that &Z�iAi personally appeared before me this day of , and acknowledge the due execution of the forgoing biorctention maintenance requirements. Witness my hand and official seal, ALICE A SONNEM NOtQry Public Onslow County Elate of North Carolina My ContmhnIon Expires Oct 23, 201 SEAL My commission expires p22 Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 E r.� Permit Numbers Ll/ 7 o0� O 6 D (to be provided by DWQ) Drainage Area Number: 13-2 Bioretention Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will betaken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed, remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer aEFlication. The inlet device: pipe,. The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. Irhe pipe is cracked or Replace the pipe. otherwise damaged (if _applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Fonn SW401-Bioretention I&M-Rev.2 Page I of 4 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading._ Search for the source of the Sediment has accumulated to a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting, can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention 1&M-Rev.2 Page 2 of 4 • A • BMP element: Potentialproblems: How 1 will remediate the problem. The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tl et. 733-1786. Form SW401-Bioretention I&M-Rev.2 Page 3 of 4 • Permit Number: (to he provided by DWQ) 1 acknowledgeand agree b m signature below m responsible a � y y s gn b o that I a For the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: P-1224 EOD Addition to Building FC292 BMP drainage area number: B-2 Print name: Carl Baker Titic: Depu!y Public Works Officer Address: 1005 Michael Road, Camp Lejeune, NC 28542 Phone Signat Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president, 1, 4e , a Notary Public for the State of o47 ��� �, , County of �1s/wi , do hereby certify that � (_4-/ f personally appeared before me this c,�4/rd� day of %0`.11 _ , ���� , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, ALICE A 10f* ETN Notary rublle Onstow County :tat• of Nodh CM*Una My COmml:alOn Exp498 Oct 23, 201 SEAL My commission expires ' Zo (Ve/ Fonn SW401-Bioretention [&M-Rev.2 Page of 0 Permit Number: fDj'ib 0b C?5y-S (to he provided by DWQ) Drainage Area Number: B-3 Bioretention Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shalI.be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable), sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future probiems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. a licable). Form SW401-Bioretention I&M-Rev.2 Page I of 4 • t Y BMP element: Potentialproblems: How 1 will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area, allies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment, - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if ossible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped.or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention I&M-Rev.2 Page 2 of 4 • BMP element: Potentialproblems: How 1 will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Re air or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention 1&M-Rev.2 Page 3 of 4 • Permit Number: (to be provided by D[VQ) 1 acknowledgeand a signature below m responsible t agree gee by my sign e ow that l ibl a p s c for o he performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: P-1224 EOD Addition to Building FC292 BMP drainage area number: B-3 Print name: Carl Baker Title: Deputy Public Works Officer Address: 1005 Michael Road, Camp Leieune, NC 28542 Phon Sign; Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, A 1 t e c H ne—1 , a Notary Public for the State of h r`v�Gv ,County of � ��� , do hereby certify that, Let- personally appeared before me this —/ day of M.t. , �, and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, MICE A 13omEtrE Notary Public Onslow County State of North Carolina My Commission ExPires Oct 23,.2010 SEAL My commission expires_ Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 s • 0 EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina Section B: PROJECT NARRATIVE PROJECT DESCRIPTION This project consists of the construction of an addition to the existing Building FC292 Operations Facility Complex for the Explosive Ordnance Disposal Team at Marine Corps Base Camp Lejeune. The new Operations Facility will be a 7,888-sf (732 m2) free-standing, one-story brick on slab structure. The project will also consist of a 58,807-sf (5463 m2) concrete paved tactical vehicle parking lot and a 12,176-sf (1131 m2) POV bituminous concrete paved parking lot. SITE DESCRIPTION The site for the new EOD Facility is located on the north side of McHugh Boulevard approximately 1,000 feet west of the intersection with Sneads Ferry Road in the French Creek area of Camp Lejeune, Building FC51, an Electronics and Communications Maintenance facility is located immediately to the east of the EOD site, facing Sneads Ferry Road. The existing EOD Building is located just south of the new EOD Addition site. EXISTING SITE DRAINAGE The stream classification of the outfall is SC; NSW as determined from the state stream classification database. The soil at the site is Baymeade fine sand (BaB) according to USDA Soil Survey of Onslow County. This a well -drained sandy soil characterized by rapid infiltration and slow runoff. The hydrologic soil group is group "A". Soil borings performed at the site indicated the soil has a Unified Soil Classification System (USCS) classification of (SP-SM, SM, SP). Test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands. Groundwater was not encountered in the borings to the depths drilled, ten (10) feet. Due to the high sand content of the subsoil, the infiltration/penneability capability of these soils is high. The infiltration rates ranges from 2.2 to 4.2 inches per hour. The seasonal high water table was estimated to average around 60 inches below existing grade. The existing EOD building was designed and constructed in 2006 with bioretention as the BMP selection and the SHWT found to be around the 22.7 (6.91m) elevation which was investigated and approved by NCDENR, please see attached Site Soils Investigation form from that project. This project has chosen bioretention as the selected BMP because of the in -situ soil characteristics and the success of the existing bioretention basins currently in use on site. EOD Building FC292 Addition MCB Camp Le.jeune Jacksonville, North Carolina • • 0 POST DEVELOPMENT DRAINAGE Runoff from the new development will be controlled through overland flow over sodded grassed areas, grass 1 ined swales and bioretention areas to treat the first 1-1 /2 inch of runoff from the developed areas. The runoff will be directed to sheet flow directly to proposed bioretention basins through a vegetative filter or will [low towards new vegetated swales and allowed to flow into the proposed grassed bioretention basins. Piping is only provided under the new gravel access drive crossing. Overflow of high flows will spill over bioretention basin and sheet flow through newly sodded areas into the existing woodlands. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES Temporary Gravel • Construction Entrance/Exit: A temporary gravel construction entrance will be installed off of the existing access road leading to the new building construction location. (NCSCC ESCM Std. 6.06). 2. Land Grading: Grading will be required on approximately 2.10 acres. The building, parking lot, and access road will be located on the higher [ill areas. All cut and fill slopes will be 3: l or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02). Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std, 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. 6. Outlet Stabilization Protection: Provided at new swale system outfall to prevent erosion by reducing the velocity of flow and dissipating the energy (NCSCC ESCM Std. 6.41). 7. Temporary Seeding: See Specifications CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 4 EOD Building; FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina 5. Install temporary silt fence around the site and around bioretention basins as indicated. Is C. Rough grade site, stockpile topsoil, construct swages, culverts and storm dram system. 7. Finish slopes around building upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 8. Complete final grading for roadway, drives and stabilize with gravel. 9. Complete construction of new building and final grading for the building. 10. Complete final grading of the grounds, topsoil critical areas and permanently vegetate, landscape and mulch. 11. After site is stabilized, remove all temporary measures and install permanent vegetation on disturbed areas. MAINTENANCE PLAN I. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 0.5-inch rainfall event. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. ® 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep Lit the fence. The sediment fence will be repaired as necessary to maintain a barrier. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the specifications in Section 32 92 19 Seeding, VEGETATIVE PLAN See specification Section 32 92 19 Seeding and 32 92 23 Sodding. Prepared by: Jason M. Frick, P.E. Civil Engineer MCNC IPT Naval Facilities Engineering Cornntand — Mid -Atlantic 9742 Maryland Avenue Norfolk, VA 23511 PH (757) 322-4283 jason.frick@navy.mil 5 EQD Building FC292 Addition MCl3 Camp Lejeune Jacksonville, North Carolina • 0 • Section C: CALCULATIONS DESIGN PARAMETERS The Rational method was used to calculate peak flows and the Simple method was used to calculate the runoff storage volume. TR-55 was used to complete the time of concentration values. An IDF chart for Sneads Ferry, NC was used and was obtained from the NOAA web site. Grassed areas were assigned a "C" factor value of 0.15 and paved areas were assigned a value of 0.95. See the following pages for the Sneads Ferry, NC IDF chart and for tabulated results of the calculations. Refer to Section F for plans of the proposed drainage design. 0 Permit No: (to be assigned by DWO) III jjREQUIRED;ITEMSI,CHECKLISTd �(,- E ,i •kl ... .. .. IN , w�Yr�, F 1 • Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan ! ' ' Sheet No. '! / (-1021L-W 3 Zx- t. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. �03 2. Plan details (1 " = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. ' S13 4i& C-ea f 3. Section view of the bioretention cell (1 " = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, pending depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT leve!(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and P-index. 5. A detailed planting plan (V = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including underdrain calculations, if applicable). 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Bioretention-Rev.3 Part III, Page 1 of 1 • s JMF P-1224 EOD Addition Developed Conditions for Drainage Area B1 Onslow County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time -------------------------------------------------------------------------------- (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) B1 SHEET 96 0.0120 0.011 0.021 SHALLOW 37 0.0050 0.050 0.009 Time of Concentration 0.1 WinTR-55, Version 1,00.06 Page 1 4/22/2008 10:57:40 AM • OPEN CHANNEL FLOW CALCULATIONS P-1224 EOD BUILDING FC292 ADDITION NICB CAMP I.EJEUNE, JACKSONVILLE, NC MANNINGS EQUATION: where: V = average velocity in the charnel in fVsec 1.49 n = Manning's roughness coefficient, based upon the lining of the channel v X S 2 / 3 X R I / 2 R = hydraulic radius, wetted cross -sectional areahvefted perimeter in ft )7 S = slope of the channel in ftlft O = flow in the channel in cis A = cross -sectional area of flow within the channel in ft^2 Q �V V = average velocity in the channel in fVsec DESIGN STORM: 10yr frequency storm DRAINAGE AREA 132 SOUTf]WEST OF TACTICAL VEHICEL PARKING AREA, COLLECTS RUNOFF FROM BUILDING AND CONCRETE PARKING AREA TO THE PROPOSED RIORETENTION BASIN #2 PERVIOUS AREA TO S W ALE - 0.784 ACRES IMPERVIOUS ARFA TO SWALE-0.097 ACRES WF.IGI[TED RUNOFF COEFFICIENT(C) (NC E&SC FIG 8.03a) COVER AREA CC CzA PERVIOUS 0.145 0.150 0.022 IMPERVIOUS 0.806 0.950 0.766 TOTALS 0.951 0.828 0.787 WEIGHTED C - 0.83 TIME OF CONCENTRATION - IS MINUTES RAINFALL INTENSITY ( 1 ) - 6.54 IN/11R (NC E&SC TABLE 8.03c) RUNOFF -Q-CIA Q - 0.93 X 6.54 IWIM X .806 ACRES - 4,375 CFS Q 10 = 1.44 cfs r. T - f Proposed channel grade = 0.006 ft 1 ft Proposed vegetation = Bermuda Sod d Permissible Velocity = 5.0 ftls "(Table 14-2) n = 0,035 G---b--- e Channel Dimensions: B. = 2.0 D = 0.8 Z = 3.0 A = 3.52 sf R = 0.50 VELOCITY = 2.11 fps < 5.0 OK CAPACITY = 7.42 cfs > 4.375 OK REFERENCES: NC BMP Manual, July 2007(Tablo 3.9) NC BMP Manual, July 2007 Depth @ 1.44 cfs = = 0.62 ft Velocity @ 1.44 cfs =1 1.83 fps • OPEN CHANNEL FLOW CALCULATIONS P-1224 EOD BUILDING FC292 ADDITION NIC11 CAAIP LE,IEUNI?„1,1C:KSONVII,LIs, NC MANNINGS EQUATION: where: V = average velocity in the channel in fllsec 1.49 n = Manning's roughness coefficient, based upon the lining of the channel VX S 213 X R 1/2 R = hydraulic radius, welted cross -sectional arealwetted perimeter io It y1 S = slope of the channel in fVtt 0 = flow in the channel in cls A = cross -sectional area of flow within the channel in R^2 Q = AV V = average velocity in the channel in ftisec DESIGN STORM: 10yr frequency storm DRAINAGE AREA B3 NORTHEAST OF BUILDING, COLLECTS RONO}•T FROM BUILDING AND GRASSED AREA BEHIND BUILDING TO THE PROPOSED BIORETEN7ION BASIN #3 PERVIOUS AREA TO S W ALE = 0.784 ACRES IMPERVIOUS AREA TO S W ALEi = 0.097 ACRES WFIGHr'ED RUNOFFCOEITICIENT( C) (NC E&SC FIG 8.03a) COVER AREA CxA PERVIOUS 0,784 0.150 0.118 IMPERVIOUS 0.134 0,950 0.127 TOTALS 0.918 0.245 WEIGHTEDC=0.24 TIME OF CONCENTRATION = 15 MINUTES RAINFALL INTENSITY ( 1) = 6.54 INIHR (NC E&SC TABLE 8.03c) RUNOFF= Q = C I A Q = 0.24 X 6.54 INIHR X 0.918 ACRF_S = 1.44 CFS 010 = 1.44 cfs Proposed channel grade = 0.010 ft 1 it Proposed vegetation = Bermuda Sod a Permissible Velocity = 5.0 ills "(Table 14-2)- n = 0,035 —b —_ �• e Channel Dimensions: B = 2.0 D = 0.8 Z = 3.0 A = 3.52 sf R = 0.50 VELOCITY = 2.68 fps c 5.0 OK CAPACITY 9.43 cfs > 1.44 OK REFERENCES: NC BMP Manual. July 2007{Table 3.9) " NC BMP Manual, July 2007 Depth ® 1.44 cfs = 0.31 ft Velocity @ 1.44 cfs = 1.59 fps Precipitation Frequency Data Server Page I of 2 POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 SNEADS FERRY, NORTH CAROLINA (31-8037) 34.55 N 77.4 W 49 feet from "Preciprtauon-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D, Martin, R. Lin, T. Parzyhok, AI.Yekla, and U. Riley NOAA. National Weather Service, Silver Spring, Maryland, 2004 Extracted: Fri Apr 18 2008 `. Confidence,Limits Seasorlahty41;ocatlon"Maps 5� � zOther Info s �� GlS data �; Mays I Help �r Docs, Precipitation Intensity Estimates (in/hr [ARI* (ycars) 5 min 10 mm W [jJ130 mm 60 min 120 3 hr 6 hr 12 hr 24 hr ������W�❑ 48 hr 4 day 7 day 10 day 2fl day 30 day 45 day fi0 day min � These precipitation frequency estimates are based on a ap rtial duration ri . ARI is the Average Recurrence Interval. f `', kl ; �Y27(tave rsion,,^.of'Stabie' '; �4 Please refer to the documentation for more information, NOTE: Formatting forces estimates near zero to appear as zero. ARI 5 10 l5 34 fi0 120 3 fi 12 24 M48 4 [day][day 7 10(ycars) min min min min min min hr hr hr hr day day day day day 0 6.41 5.I2 4.2E 292 1.$2 i.]0Eo 861491 0.29 0.l7 0.I0 aas OF041 OF031 0.02 0.01 OAI 0.01 100 13.14 10.44 $.$0 6.74 4,64 3.17 2.39 1.49 0.91 0.52 0.31 0.16 0.10 0.07 0.04 0.03 0.03 0.02 200 14.16 11.22 9.44 7.35 5.15 3.58 2.72 1.71 1.04 0.60 0.36 0.18 0.1 l 0.08 0.05 0.04 0.03 0.03 500 I 15.48 12.24 I0.27 8.17 5.86 4,17 3.23 2.03 1.25 0.73 0.4E 0.22 0.13 0.10 0.06 0.04 0.04 0.03 1000 16.57 13.04 10.92 8.84 6.45 4.67 3.66 2.31 1.43 0.83 0.50 0.25 O.15 0.l 1 0.06 0.05 0.04 0.03 The upper bound of the confidence interval at 90%confidence level is the value which 5% of the simulated quantile values for a given frequency are greater than. " These precipitation frequency estimates are based on a peal dur?fign series. ARI is the Average Recurrence Interva4. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) 11 30 60 120M 48 4 7 10 20 30 45 60 4K[;;UF710E-15 min min min min min M [12 M24 hr day day day day day day day I ' 15.53 4.42 3.6$ 2.52 1.57 0.96 0.70 0.42 0.24 0.14 0.08 0.04 0.03 0.02 0.02 O.OI O.0 1 0.01 0 G.55 5 274 4.39 3.03 1.90 1. f 8 0.85 0.51 Efl Efl 0.10 Efl 0.04 0.03 0.02 0.02 0.01 0.01 �nnnnnnnnnnnnnnnnnn littp:/Ihdsc,nws.noaa.gov/cgi-bin/hdsc[buiIdout.perl'?type=idf&units=us&series=pd&statenainc=NORTH+,.. 4118/2008 • Precipitation Frequency Data Server Page 1 of 4 � W11 POINT PRECIPITATION { FREQUENCY ESTIMATES FROM NOAA ATLAS 14 y..,,,'eV SNEADS FERRY, NOR'm CAROLINA (31-8037) 34.55 N 77.4 W 49 feet From "Precipitation -frequency Atlas of the Unitcd States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzyhok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 _ Extracted: Fri Apr 18 2008 `•r...5.��r.,o�.. h �-,� ".."_'S -1 f -w t ;- ..�,,. ;:. �,..- _.._,�,...- w�-•--.�r r. .. _ ,t Confldence'l,ifnits I Seasonality, �I� LocationMapsy`�,�1, Other�lnfo �t.fiGlSidata, Ik Maps+�i^Help'I#lDocs=�; T UPS Map,; tation Frequency Estimates (inches) ARI* 5 15 30 60 120 4 7 10 20 30 45 60 years) irs) min min min min min min 3 hr 6 hr 12 hr 24 hr 48 hr da da da da da da da 2 0.49 0.79 n 1.35 1.69 2.06 2.23 2.72 3.21 3-68� 4I 28 44 75� 55 6�� 7�� 9�9 112.33� i C] 10 0.59 0.94 0.69 I.10 0.77 ! .22 1.18 1.63 2.04 2.52 2.72 3.31 3.91 4.48 5.17 5.75 6.60 7.27 9.49 11.64 14. 00 LE 1.39 1.97 2.53 3.20 3,47 4.25 L55 2.24 2.92 3.77 4.12 5.04 5.04 5.79 6:65 7.31 8.30 9.01 11.55 14.00 17.43 20.80 6.01 6.91 7.9 ] 8.60 9.70 10.44 13.23 15.88 19.75 23.34 These precipitation frequency estimates are based on a pa arti { durat'on series. ARI is the Average Recurrence Inlerval. lText versfonW of 'table ,: please refer to the documentation for more informal on. NOTE: Formatting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 Z6O(years) minnmnmin minmin hr hr hr hr hr day day day day day day 0.85 L07 1.4- 1.82 2.2! 2.39 2.94 3.52 4.05 4.75 5.27 6.03 6.67 8.67 10.56 13.45 16.09 0 0.63 l .0l 1.27 1.75 2.20 2.70 2.92 3.59 4.28 4.93 5.76 6.38 7.25 8.01 10.32 12,54 15.91 19.01 0 0.74 1.18 l.49 2.12 2.72 3.43 3.72 4.59 EE 6.35 Efl ED 9.11 1 9.90 12.54 E6 19-02 22.41 10 0.82 1.32 1.67 2.41 3.14 4A4 4.41 5.45 6.56 7.SS 8.78 9.52 10.63 11.46 14.34 17.09 21.56 25.11 25 0.93 1.48 1.88 2.78 3.70 4.88 5.39 6.68 8.09 9.35 10.88 11.57 F12.78 13.68 16.89 Ej8 25. 55 28.82 50 JIEEdg4E07KdF5.59 6.24 7.75 9.43 10.9 U.74 HE 14.64 15.56 19.00 22.16 28.04 3 i .76 l00 i .09 l .74 2.20 3.37 4.64 6.35 7.16 8.41 10.9 I ! 2.59 14.79 15.24 16.63 17.56 21.28 24.47 31.07 34.72 200 1.18 L87 2.36 3.67 S. I S 7.16 8.18 10.22 12.57 ] 4.51 17.14 17.36 18.78 19.75 23.68 26.89 34.18 37.84 500 1.29 2.04 2.57 4.09 5.86 8.34 9.69 12.l5 15.09 17.41 20.69 20.87 22.04 22.99 27.19 30.30 3$.67 42.14 11i00 1.38 2.17 2.73 4.42 6.45 9.33 10.99 13.81 17.29 19.98 23.83 23.99 24.78 25.66 30.00 32.99 42.34 45.53 l he upper bound of the contidence interval at 901/. conliclence level is the value which 5% of the simulated quantlle values for a given frequency are greater than. " These precipitation frequency estimates are based on a partial durationseries. ARI is the Average Recurrence Interval. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. l * Lower bound of the 90% confidence interval L Precipitation Frequency Estimates (inches) WMo 1530 60 120Fhr 6 Fhr] 24 48 4 7 10 20 30 45 60 min min min min minFhrhr hr day day day day day day day l 0.46 0.74 0.92 1.26 1.57 1.93 2.09 2.53 2.95 3.38 3.88 4.30 5.00 5.55 7.37 9.13 11.4! 13.98 1__ J 0.55 0.87 1.10 L52 1.90 2.35 2.55 3.07 3.58 4. I l 4.69 5.21 6.03 6.6E 8.77 10.86 13.49 ! 6.49 �nnnnnnnnnnnnnnnnnn littp://hdsc.iiws.tioaa.gov/cgi-bin/hd,,c/buildout.perl?type=pf&units=us&series=pd&statename=NORTH+C... 4/19/2008 EOD Building t' C292 Addition MCB Camp Lejeune Jacksonville, North Carolina �� Section D: MAPS Goldzboro To nztnn Oovcr ow Bern Tcr,ca+aro TrenSan OAK GROVE Seven ° CHERRY POINT / Springs Polldcksville M,. 411ve Havelock wa� Fink Corntort Aloynvllla r Hi11 ! f Richldhds eau1.0 + S' otahead Ci,y �r K'onyow / Baultivlllo `. dacksonvillo Magr+olia wan; eo Rosehill!P P Dixon CO Wallace Folk,wr� '. Hoy ivdge Barra. Words Corner mpstcad � a t Hill vP 14c me Delco Wilmington ', Bolton t elnrld l Nr VICINITY MAP EASTERN NORTH CAROLINA 7 EOD Building FC292 Addition MCI3 Camp Lejeune Jacksonville, North Carolina • • • Section D: MAPS (continued) PROJECT SITE LOCATION MAP MARINE CORPS AIR_ STATION CHERRY POINT G01l Building FC292 Addition MCII Camp Le,jeune Jacksonville, North Carolina 0 Section E: NORTH CAROLINA P.E. EXEMPTION LETTER The following pages outline the exemption of the use of the P.E. stamp on projects prepared by U.S. Government personnel for work done on government owned works and projects. • 0 EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina • NORTH CAROLINA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS 5 X FORKS ROAD March 30, 1993 3620 RALEIGM N.0 N.C. 49191761-9499 19191 781-9547 R. LARRY GREENS RLS C.MAMAN wILL,AMI T. sTEUER,PE, RLS Mr. James E. Butler, PE V¢c�wuwran BOBBY M. LONG. RLS Department of the Navy - Atlantic Division s" "� "" Naval Facilities Engineering Command RAY C. ANDER5, RLS J. ALeCRT BASS, JR. PE RLS 1510 Gilbert Street J. RICHARD COTTINGHAM, PC RLS Norfolk, Virginia 23511-2699 HELEN W. MERRITf. Puauc MEMBER DANA H. RUCKER, PC RLS FRANK L TURNER, PUBUC MEMBER Dear Mr. Butler: JERRY T. CARTER E.ccum Sccrcr. In accordance with your written request of March 25, 1993, I am enclosing for your information a copy of The North Carolina Engineering and Land Surveying Act, G. S. 89C. I will refer your attention to G. S. 89C-25 which provides limitations on the application of the Statute. Paragraph 6 specifically exempts "Practice by members of the armed forces or employees of the government of the " United States while engaged in the practice of engineering or land surveying solely for said government on government -owned works and projects." This exemption should not be construed as to allow engineering services to be provided to the Department of the Navy by non -registered contract employees. For any such circumstance, a North Carolina registrant would need be in responsible charge of any engineering services to be provided for a North Carolina project, I trust this information will be of some service and ask that you contact me if this office can be of further assistance. JTC/jsa Enclosures • Sincerely, J ry T. Carter Executive Secretary rt EQD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina R mydeem sufficient. reissue a certificate of registration or aut» nation, provided that a majority of the members of " Board vote in favor of such issuance. (1921, c. 1, s.10; C.S.. s.60550); 1939, c.218, s.2; 1951, c.1084, s.1; 1953. c. t 0a 1, s.10; 1957. c.1060, s.5; 1973. c.1331, s.3; 1975, c.681, s.1; 1981, c.789; 1989, C.669, s.1.) ii 89C-23. Unlawful to practice engineering or land surveying without registration; unlawful use of title or terms; penalties; Attorney General to be legal adviser. -Any person who shall practice, or offer to practice, engineering or land surveying in this State without first being registered in accordance with the provisions of this Chapter, or any person, firm, partnership, organization, association, corporation, or other entity using or employing the words 'engineer' or 'engineering' or 'professional engineer' or professional engineering' or 'land surveyor' or 'land surveying,' or any modification or derivative thereof in its name or form of business or activity except as registered under this Chapter or in pursuit of activities exempted by this Chapter, or any person presenting or attempting to use the certificate of registration or the seal of another, or any person who shall give any false or forged evidence of any kind to the Board or to any member thereof in obtaining or attempting to obtain a certificate of registration, or any person who shall falsely impersonate any other registrant of like or different name, or any person who shall attempt to use an expired or revoked or nonexistent certificate of registration, or who shall practice or offer to practice when not qualified, or any person who falsely claims that he is registered under this Chapter, or any person who shall violate any of the provisions of this Chapter, in addition to injunctive procedures set out hereinbefore, shall be guilty of a misdemeanor, and may, upon conviction, be sentenced to pay a fine lof) not less than one hundred dollars ($100.00), nor more than one thousand dollars 01,000), or suffer imprisonment for a period not exceeding three months, or both, in the discretion of the court. In no event shall there be representation of or holding out to the public of any engineering expertise by unregistered persons. It shall be the duty of all duty constituted officers of the State and all political subdivisions thereof to enforce the provisions of this Chapter and to prosecute any persons violating same. The Attorney General of the State or his assistant shall act as legal adviser to the Board and render such legal assistance as may be necessary in carrying out the provisions of this Chapter. The Board may employ counsel and necessary assistance to aid in the enforcement of this Chapter, and the compensation and expenses therefor shall be paid from funds of the Board. (1921. c. 1, s. 12; C. S., s. 6055(n); 1951, C. 1084, s. 1; 1975, c.681, s. 1.) 11 89C-24. Corporate or partnership practice,. of engineering or land surveying. -A corporation or partneiship may engage in the practice of engineering or land surveying in this State, provided, however, the person or persons connected with such corporation or partnership in charge of the designing or supervision which Constitutes such practice is or are registered as herein required of professional r engineers and registered land surveyors. The same exemptions shall apply to corporations and partnerships as apply to individuals under this Chapter, provided further, that all corporations hereunder shall be subject to the provisions of Chapter 558 of the General Statutes of North Carolina {1921, c. 1, s. 14; C. S., s. 6055(p); 1951, C. 1084, s. 1; 1969, c. 718, s. 18; 1975, c. 681, s. 1.) I 89C-25. Limitations on application of Chapter. -This Chapter shall not be construed to prevent or affect: The practice of architecture, landscape architecture,. or Contracting or any other legally recognized profession or trade; or The practice of professional engineering or land surveying in this State or by any person not a resident of this State and having no established place of business in this State when this practice does not aggregate more than 90 days in any calendar year, whether performed in this State or elsewhere, or involve more than one specific project; provided, however, that such person is legally qualified by registration to practice the said profession in his own state or country, in which the requirements and qualifications for obtaining a certificate of registration are satisfactory to the Board; in which case the person shall apply for and the Board will issue a temporary permit; or The practice of professional engineering or land surveying in this State not to aggregate more than 90 days by any person residing in this State, but whose residence has not been of sufficient duration for the ' Board to grant or deny registration; provided, however, such person shall have filed an application for registration as a professional engineer or registered land surveyor and shall have paid the fee provided for in G. S. 89C-14, and provided that such a person is legally qualified by registration to practice professional engineering or land surveying in his own state or Country in which the requirements and qualifications for obtaining a certificate of registration are satisfactory to the Board, in which case the person shall apply for and the Board will issue a temporary permit; or Engaging in engineering or land survaying as an employee or assistant under the responsible charge of a professional engineer or registered land surveyor or as an employee or assistant of a nonresident professional engineer or a non resident registered land surveyor provided for in subdivisions (2) and (3) Of this section, provided that said work as an employee may not include responsible charge of design or supervision; or The practice of professional engineering or land surveying by any person not a resident, of, and having no established place of business in this State; as-a-Consultingassociate of a professional engineer or registered land surveyor registered under the provisions of this Chapter; provided, the nonresident is qualified for such professional service in his own state or country; or Practice by members of the armed forces or employees of the government of the United States while engaged in the practice of engineering or land surveying solely for said government on government owned works and projects; or EOD Ituilding 1±C292 Addition MCB Camp Le,jeune {acksonville, North Carolina 0 Section F: PROTECT CONSTRUCTION PLANS s Ell 12 EOD Building FC292 Addition MCI3 Camp Lejeune ,Jacksonville, North Carolina IDSection G: PROJECT CONSTRUCTION SPECIFICATIONS 40 • 13 STORMWATER MANAGEMENT PERMIT 0 APPLICATION DOCUMENTS FOR P-1224 EOD BUILDING FC292 ADDITION MCB CAMP LEJEUNE JACKSONVILLE, NC OWNER: COMMANDING OFFICER MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA PREPARED BY: NAVFAC MID -ATLANTIC April 2008 NAVAL FACILI'I IES I?NGINEERING COMMAND MID -ATLANTIC Marine Corps North Carolina 1PT 6506 Hampton Blvd. Norfolk, VA 23508-1278 is • • 0 P-1224 EOD BUILDING FC292 ADDITION MCI3 Camp Lejeune Jacksonville, North Carolina TABLE OF CONTENTS Section Title Section A Stormwater Management Permit Application Form & Bioretention Supplemental Sheet Section B Project Narrative Section C Calculations Section D Maps Section E Department of Defense Exemption Letter from the NC Board of Registration for Professional Engineers and Land Surveyors Section F Project Construction Plans Section G Project Construction Specifications Section H Soils Report EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina 0 Section A: STORMWATER MANAGEMENT APPLICATION Ll� • EOD Building FC292 Addition NICB Camp Lejeune Jacksonville, North Carolina • Section B: PROJECT NARRATIVE PROJECT DESCRIPTION This project consists of the construction of an addition to the existing Building FC292 Operations Facility Complex for the Explosive Ordnance Disposal Team at Marine Corps Base Camp Lejeune. The new Operations Facility will be a 7,888-sf (732 m2) free-standing, one-story brick on slab structure. The project will also consist of a 58,807-sf (5463 m2) concrete paved tactical vehicle parking lot and a 12,176-sf (1131 m2) POV bituminous concrete paved parking lot. SITE DESCRIPTION The site for the new EOD Facility is located on the north side of McHugh Boulevard approximately 1,000 feet west of the intersection with Sneads Ferry Road in the French Creek area of Camp Lejeune. Building FC51, an Electronics and Communications Maintenance facility is located immediately to the east of the EOD site, facing Sneads Ferry Road. The existing EOD 0 Building is located just south of the new EOD Addition site. EXISTING SITE DRAINAGE The stream classification of the outfall is SC; NSW as determined from the state stream classification database. The soil at the site is Baymeade fine sand (BaB) according to USDA Soil Survey of Onslow County. This a well -drained sandy soil characterized by rapid infiltration and slow runoff. The hydrologic soil group is group "A". Soil borings performed at the site indicated the soil has a Unified Soil Classification System (USCS) classification of (SP-SM, SM, SP). Test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands. Groundwater was not encountered in the borings to the depths drilled, ten (10) feet. Due to the high sand content of the subsoil, the infiltration/permeability capability of these soils is high. The infiltration rates ranges from 2.2 to 4.2 inches per hour. The seasonal high water table was estimated to average around 60 inches below existing grade. The existing EOD building; was designed and constructed in 2006 with bioretention as the BMP selection and the SHWT found to be around the 22.7 (6.91m) elevation which was investigated and approved by NCDENR, please see attached Site Soils Investigation form from that project. This project has chosen bioretention as the selected BMP because of the in -situ soil characteristics and the success of the existing bioretcntion basins currently in use on site. 3 EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina r-� I ' I POST DEVELOPMENT DRAINAGE Runoff from the new development will be controlled through overland flow over sodded grassed areas, grass lined swales and bioretention areas to treat the first 1-1/2 inch of runoff from the developed areas. The runoff will be directed to sheet flow directly to proposed bioretention basins through a vegetative filter or will flow towards new vegetated swales and allowed to flow into the proposed grassed bioretention basins. Piping is only provided under the new gravel access drive crossing. Overflow of high flows will spill over bioretention basin and sheet flow through newly sodded areas into the existing woodlands. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES . Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed off of the existing access road leading to the new building construction location. (NCSCC ESCM Std. 6.06). 2. Land Grading: Grading will be required on approximately 2.10 acres. The building, parking lot, and access road will be located on the higher fill areas. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02). 3. Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5, Sod: Provided in all new ditches and swales to maintain bank stability. 6. Outlet Stabilization Protection: Provided at new Swale system outfall to prevent erosion by reducing the velocity of flow and dissipating the energy (NCSCC ESCM Std. 6.41). 7. Temporary Seeding: See Specifications CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 4 EOD Building; FC292 Addition MCB Camp Le,jeune Jacksonville, North Carolina 5. Install temporary silt fence around the site and around bioretention basins as indicated. 6. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 7. Finish slopes around building upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 8. Complete final grading for roadway, drives and stabilize with gravel. 9. Complete construction of new building and final grading for the building. 10. Complete final grading of the grounds, topsoil critical areas and permanently vegetate, landscape and mulch. 11. After site is stabilized, remove all temporary measures and install permanent vegetation on disturbed areas. MAINTENANCE PLAN I. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 0.5-inch rainfall event. A rain gauge shall be installed to measure rain events. Needed • repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the specifications in Section 32 92 19 Seeding. VEGETATIVE PLAN See specification Section 32 92 19 Seeding and 32 92 23 Sodding. Prepared by: Jason M. Frick, P.E. Civil Engineer MCNC IPT Naval Facilities Engineering Command - Mid -Atlantic 9742 Maryland Avenue Norfolk, VA 23511 PH (757) 322-4283 jason.frick@navy.mil 5 EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina • • • Section C: CALCULATIONS DESIGN PARAMETERS The Rational method was used to calculate peak flows and the Simple method was used to calculate the runoff storage volume. TR-55 was used to complete the time of concentration values. An OF chart for Sneads Ferry, NC was used and was obtained from the NOAA web site. Grassed areas were assigned a "C" factor value of 0.15 and paved areas were assigned a value of 0.95, See the following pages for the Sneads Ferry, NC IDF chart and for tabulated results of the calculations. Refer to Section F for plans of the proposed drainage design. an 0 i a 4� a . r a,� 1 STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD BUILDING FC292 ADDITION 1IC13 CAAIP LEJEUNE, JACKSONVILLE, NC W *qAL METHOD: DESIGN STORM: 10-yr frequency storm PROJECT DISTURBED AREA 3.66 Acres 159,553 sf TOTAL SITE DRAINAGE AREA 3.71 Acres 161,397 sf PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped _ Total Impervious Area 0.000 Acres 0 sf POST -DEVELOPED SITE IMPERVIOUS AREA Asphalt Pavement 0.280 Acres 12,176 sf Concrete Pavement 1.350 Acres 58,807 sf Concrete Sidewalks 0.027 Acres 1,163 sf New Building 0.181 Acres 7,888 sf Total Impervious Area 1.837 Acres 80,034 sf PERCENT IMPERVIOUS AREA = 1.84 Acres = 49.6% 3.71 Acres • STORMWATER MANAGEMENT CALCULATIONS P-12241 EOD BUILDING FC292 ADDITION MCH CAMP LEJF.UNF, JACKSONVILLE, NC 0TIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm i DRAINAGE AREA B1 0.64 Acres 27.791 PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area 0.000 Acres 0 sf POST -DEVELOPED SITE IMPERVIOUS AREA Asphalt Pavement 0.280 Acres 12,176 sf Concrete Pavement 0.000 Acres 0 sf Concrete Sidewalks 0.018 Acres 777 sf New Building 0.000 Acres 0 sf Total Impervious Area PERCENT IMPERVIOUS AREA = 0.30 Acres = 46.6% 0.64 Acres 0.297 Acres 12,953 sf t ,ti DESIGNATION A A , DRAIN r ,DRAIN C x A C x A Tc RAIN RU AREA a i INCR I ACCUM TIME • FALL V jsq' A . ,, + R 1 4',r' �: COEOFF�i ",, . '' .....{ .. r 3." ..., :, .., , F.S,:.. {hr}.! . LL.. FF,, ac , . cfs PRE -DEVELOPED 27,791 0.64 0.15 0,10 0.10 15.00 3.95 0.38 POST -DEVELOPED 27,791 0.64 0,52 0.33 0.33 1 5.00 5.94 2.00 Value of Runoff Coefficient "C" for Rational Formula C WOODLANDS 0.15 GRASSED, Good Condition 0.15 ASPHALT = 0.95 BUILDING = 0.95 CONCRETE = 0.95 DESIGNATION BUILDING ASPHALT WOODLANDS CONCRETE ` GRASS` ''°AREA" WT. "C A C „ s.q. f.t.; ,=,,s:q: f t.., :, s:q. f.t.lo LL'.", s:q.rfA, acres PRE -DEVELOPED 0 0 27,807 0 0 0.64 0.15 0,10 POST -DEVELOPED 0 12.176 0 777 14,838 0.64 0.52 0.33 0 References: Rainfall intensity - OF ter Wilmington was used, TatAe 8.03c. STORMWATER MANAGEMENT CALCULATIONS P-1224 EOD BUILDING FC292 ADDITION MCIS CAMP LEJEUNE, JACKSONVILLE, NC &TIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm L DRAINAGE AREA B2 2.15 Acres 93,618 sf PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area POST -DEVELOPED SITE IMPERVIOUS AREA 0.000 Acres 0 sf Asphalt Pavement 0.000 Acres 0 sf Concrete Pavement 1.314 Acres 57,221 sf Concrete Sidewalks 0,002 Acres 88 sf New Building 0.091 Acres 3,944 sf Total Impervious Area 1.406 Acres 61,253 sf PERCENT IMPERVIOUS AREA = 1.41 Acres = 65.4% 2.15 Acres BRAIN . DRAIN RUN-OFF C x A C x A Tc y `'RAIN, ,, RUNOFFj C. �IOESIGNATION + „g��yftr+'i AREA�t}I'''r�'-,`AREA,"' ' i t I �I '�INCR.�� I 'ACCUM. � ''TIME" :FALL�� { ) x_, .+ �, r .i" ' I ' ° l {hrj';";:. ,(in. hhr)f r.,., sg. ft. 4 ac COEFFf J+1 < ,i PRE -DEVELOPED 93,618 2.15 0.15 0.32 0.32 15.00 3.95 1.28 POST -DEVELOPED 93,618 2.15 0.67 1.45 1.45 5.00 5.94 8.67 Value of Runoff Coefficient "C" for Rational Formula C WOODLANDS 0.15 GRASSED, Good Condition 0.15 ASPHALT = 0.95 BUILDING = 0.95 CONCRETE = 0.95 --" DE_51GNATION, BUILDING_'TT ASPHALT WOODLANDS 'CONCRETE r GRASS AREA 'WT;".0 A C ,,, �rl ,,n; , ' + s.q. f.t. w> I F S!wf.t. ;0 , `1r' s:q. f.t. " s.q., ` s.q s f.t. PRE -DEVELOPED 0 0 93,618 0 0 2.15 0.15 0.32 POST -DEVELOPED 3,944 0 0 57,309 32,365 2.15 0.67 1.45 References: Rainfall intensity - IDF for Wilmington was used, TaNe 8,03c. STORMWATER MANAGEMENT CALCULATIONS P-1224 LOD BUILDING: FC292 ADDITION MCII CAMP LEJEUNE, JACKSONVILLE, NC 0TIONAL METHOD: DESIGN STORM: 1-yr, 24-hr frequency storm C_ DRAINAGE AREA 133 0.92 Acres 39.988 sf PRE -DEVELOPED SITE IMPERVIOUS AREA Project Site is Undeveloped Total Impervious Area POST -DEVELOPED SITE IMPERVIOUS AREA 0.000 Acres 0 sf Asphalt Pavement 0.000 Acres 0 sf Concrete Pavement 0.036 Acres 1,586 sf Concrete Sidewalks 0.007 Acres 298 sf New Buildinq 0.091 Acres 3,944 sf Total Impervious Area 0.134 Acres 5,828 sf PERCENT IMPERVIOUS AREA = 0.13 Acres = 14.6% 0.92 Acres 11 l , j 1111'4 DRAIN 1 , DRAIN'd� , ' RUN OFF R{ja' k': C x A 'i C! x A `Tc RAIN­7 —RUNOFF DESIGNATION }r, AREAt i ri«AREA � r' 'a,1�C0EFF �} t ' INCR ' � fACCUM TIME" FALL I iQ ' (sgft.}, PRE -DEVELOPED 39,988 0.92 0.15 0.14 0.14 15.00 3.95 0.55 �0,24 POST -DEVELOPED 39,988 0.92 0.27 0,24 10,00 4,74 1.17 Value of Runoff Coefficient "C" for Rational Formula C WOODLANDS 0,15 GRASSED, Good Condition 0,15 ASPHALT = 0.95 BUILDING = 0.95 CONCRETE = 0.95 W7 ADESIGNATION BUILDIN0',"AHT lWOODLANDS CC „.s. 4'1SgfL �OsN. qRf.Et:Tr E G�A55-REA, cres, I"rs.f. na, PRE -DEVELOPED 0 0 39,988 0 0 0.92 0.15 0.14 POST -DEVELOPED 3,944 0 0 1,884 34,160 0,92 0,27 0.24 is References: Rainfall intensity - OF for Wilmington was used, Table 8,03c. El • JMF P-1224 ECD Addition Pre -Developed Conditions Cnslow County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time -------------------------------------------------------------------------------- (ft) (Et/ft) (sq ft) (ft) (ft/sec) (hr) Existing SHEET 100 0.0260 0.400 C.272 SHALLOW 130 0.0260 0.050 0.014 Time of Concentration .286 9 WinTR-55, Version 1.00.08 Page 1 4/22/2008 9:30:53 AM 9 11 3MF P-1224 ECD Addition Developed Conditions for Drainage Area B1 Onslow County, Forth Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time -------------------------------------------------------------------------------- (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) B1 SHEET 98 0.0120 0.011 0.021 SHALLOW 37 0.0050 0.050 0.009 Time of Concentration 0.1 (a WinTR-55, Version 1.00.08 Page 1 4/22/2008 10:57:40 AM JMF P-1224 EOD Addition Developed Conditions for Drainage Area H2 Onslow County, North Carolina Sub -Area Time of Concentration Details Sub -Area Fiow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time --------------------------------------------------------------------------------- (ft) (ft/ft) (sq ft) (Et) (ft/sec) (hr) S2 SHEET 100 0.0120 0.011 0.021 SHALLOW 182 0.0120 0.025 0.023 Time of Concentration 0.1 Ci7 isWinTR-55, Version 1.00.08 Page 1 4/22/2008 10:59:05 AM • �1J JMF P-1224 EOD Addition Developed Conditions for Drainage Area B3 Onslow County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time -------------------------------------------------------------------------------- (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) B3 SHEET 25 0.0220 0.240 0.064 CHANNEL 345 1.590 0.060 Time of Concentration .124 40 WinTR-55, Version 1.00.08 Page 1 4/22/2008 11:04:34 AM OPEN CHANNEL FLOW CALCULATIONS P-1224 EOD BUILDING FC292 ADDITION NICIS CANIP LEJEUNE, JACKSONVILLE, NC 0 MANNINGS EQUATION: where: V = average velocity in the channel in ftlsoc 1.49 n = Manning's roughness coefficient, based upon the lining of the channel v — X +S 2 / 3 X R 1/2 R = hydraulic radius, wetted cross -sectional arealwetted perimeter in ft 17 S = slope of the channel in flIft Q = flow in the channel in cfs A = cross -sectional area of flow within the channel in f 12 Q = AV V a average velocity in the channel in ftlsec DESIGN STORM: IOyr frequency storm DRAINAGE AREA B2 SOUT1IWFSC OF TACTICAL VF.1110EL PARKING AREA, COLLFCTS RUNOFF FROM BUILDING AND CONCRETE PARKING AREA TO THE PROPOSED BIORETENTION BASIN H2 PERVIOUS AREA TO SWALE — 0,784 ACRES IMPERVIOUS AREA TO SWALE - 0.097 ACRES WEIGHTED RUNOFF COEFFICIENT{ C) (NC E&SC FIG 8.03a) COVER AREA C C z A PERVIOUS 0.145 0.150 0.022 IMPERVIOUS 0.806 0.950 0.766 TOTALS 0.951 0.828 0.787 WEIGHTED C -0.83 TIME OF CONCENTRATION - IS MINUTES RAINFALL INTENSITY (1) — 6.54 INRIR (NC E&SC TABLE 8.03c) RUNOFF- Q - C I A Q - 0.83 X 6.54 INII I R X .806 ACRES - 4,375 CPS Q 10 = 1.44 cfs 4. T Proposed channel grade = 0.006 ft 1 k Proposed vegetation = Bermuda Sod d Permissible Velocity, = 5.0 ftls "(Table 14-2) n = 0,035 �--- -- b Channel Dimensions: B = 2.0 D = 0.8 Z = 3.0 A = 3,52 sf R = 0.50 VELOCITY = 2.11 fps < 5.0 OK CAPACITY = 7.42 cfs a 4.375 OK REFERENCES: ® NC T3MP Manual, July 2007Table 3-9) " NC BMP Manual, July 2007 Depth @ 1.44 cfs = 1 0.62 It Velocity @ 1.44 cfs =1 1.83 fps J OPEN CHANNEL FLOW CALCULATIONS P-]224 EOD RIJILDING FC292 A DDITION NICK CAMP LEJF,UNE_IACKS(INVILLE, NC MANNINGS EQUATION: where: V = average velocity in the channel in ft/sec 1.49 n = Manning's roughness coefficient, based upon the lining of the channel V X s2 / 3 X R 1/2 R = hydraulic radius, wetted cross -sectional area/welted perimeter in h )2 S = slope of the channel in Rift Q = flow in the channel in cfs A = cross -sectional area of flow within the channel in ftA2 Q = AV V = average velocity in the channel in ft/sec DESIGN STORM: 10yr irequency storm DRAINAGE AREA 133 NORTHEAST OF BUILDING, COLLECI'S RUNOFF FROM BUILDING AND GRASSFI) AREA BEIIIND BUILDING TO THE PROPOSED BIORIII7?N'IION BASIN p3 V2R VIOUS ARIiA TO SWALE = 0.784 ACRES IMPERVIOUS AREA10 SWALE=0.097 ACRES WEIGHTED RUNOFF COEIl;IC11?N7(C ) (NC E&SC FIG 8.03n) COVER AREA Cj PERVIOUS 0.784 0.150 IMPI.RVIOUS 0J34 0.950 'I OTALS 0.918 WEIGH''( --.I) C = 0,24 itMl? OF CONCENTRATION = 15 MINUTES RAINFALL INTENSITY ( I ) = 6.54 ENIHR RUNOFF, =Q=CI A Q=0.24 X 6.54 IN1HR X 0.919 ACRES= 1.44 CFS CxA 0.118 0.127 0.245 INC F &SC TABLE 8.03c) 010 = 1,44 cfs r — Proposed channel grade = 0.010 ft I ft I I Proposed vegetation = Bermuda Sod d Permissible Velocity = 5.0 ftls "Jable 14-2) i� z - f n = 0.035 Channel Dimensions: B = 2-0 D = 0.8 Z = 3.0 A = 3.52 st R = 0.50 VELOCITY = 2.66 fps < 5,0 OK CAPACITY = 9.43 cfs > 1.44 OK REFERENCES: NC BMP Manual, July 2007(Tab4e 3 9) "' NC BMP Manual, July 2007 Depth @ 1.44 cfs = 0.31 ft Velocity @ 1.44 cfs = 1.59 fps Precipitation Frequency Data Server Page I of 2 POINT PRECIPITATION ,,'�'A� FREQUENCY ESTIMATESr FROM NOAA ATLAS 14 SNEADS FLRRV, NORTH CAROLINA (31-8037) 34.55 N 77.4 W 49 feet Irons "Precipitation -Frequency Atlas of dfe United States' NOAA Atlas t4, Volume 2, Version 3 G.M. Bunnin, 6. Marlin, 13. Lin, T. Parrybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Fri Apr IH 2O09 Confidence Limits Seasonality Location Maps Other Info. GIS data 11 Maps j Help li Demons 1 U. p ARIA` I S I 10 years) main min 5.94 4,74 �n 7.03 5. 22 Precipitation Intensity Estimates (in/hr) 30 [11-1�2Ornin min hr hr hr dak day day day day day ..71 L69 1.03 0.74 0.45 0.27 j Efl 0.09 0.05 0.03 0.03 0.02 O.OI 0.01 i.25 2.04 1.26 0.91 0.55 0.32 0.19 0.11 07067 0.04 0.03 0.02 0.02 0.01 5 i 8,22 16.59 5.55 3.95 2.53 1.60 1.16 -71 0.42 0.24 0.14 0.08 O.05 D.04 0.02 0.02 0.02 O.OI l0 9.18 7.34 6.19 4.49 2.92 L88 1.37 0.84 0.50 0.29 0.16 4.09 O.OG 0.04 0.03 0.02 0.02 0.02 25 14.39 8.28 7.00 5.18 3.45 2.28 1.68 1.04 0.62 D.36 0.20 O.l I D.07 0.05 0.03 0.03 O.D2 0.02 5U l l .29 8.99 7.59 5.71 3.87 2.fi l 1.95 1.20 0.72 0.42 0.24 0.13 0.08 0.06 - 0.03 0.02 0.02 100 12,22 9.70 8.18 1 6.26 4.31 2,97 2.23 1.38 0.84 0.48 0.2$ 0.14 O.D9 0.07 0.04 4.03 0.03 0.02 2f1U 13.13 10.40 K5j 6.81 4.78 Efl EE I.S9 0.96 0.56 0.32 O.16 0.10 0.07 EE 0.03 0.03 0.02 500 l4.30 I1.31 9.49 7.55 5.42 3.88 3.O1 1.88 1.15 0.66 0.39 0.20 0.12 O.D9 0.05 D.04 D.03 0.03 10U(1 15.2fi 12.02 lO.Ofi 8.15 595 4.33 3,41 2.14 1.32 0.76 0.44 0.22 0.13 0.10 0.06 0.04 0.04 0.03 Text version of table These precipitation frequency estimates are based on a partial duration series, ARI is the Average Recurrence Interval. Please refer 10 the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. Adbk inn 1.95 t.7 I 60 ' Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI * 15 30 48 4 3} 45 60 ff r hhrh dy02(years) min r day day day day day PIT 12 4,2fi 2.92 1.82 1. l0 0.80 0.49 0.29 0. l 7 0.10 0.05 0.04 0.03 0.02 0.01 0.01 0.0 f 7.57 fi.06 5.08 3.5 12.20 1.35 0.97 0.60 0.35 0.21 0. ! 2 0.07 U.04 4.03 0.02 0.02 0.01 0.01 8.84 7.09 5.98 4.24 2.72 1.71 1.24 477 0.46 FO 26]EE O 08 0.05 0.04 0.03 0.02 4A2 0.02 1[1 9.88 7.90 6.66 4.82 3. 14 2.02 1.47 0.91 0.54 0.3 I 0. ! 8 0.10 O.U6 O.OS 0.03 0.02 0.02 0.02 25 I I.iS 8.$8 7.50 5.56 3.70 2.44 1.8(1 1.12 D.67 D.39 0.23 D.12 O.68 0.06 0.04 O.U3 0.02 OA2 50 l2. ! 2 9.65 8. ! 97 6. ! 4 EE 2.79 2 O9 Efl E7fl 0.45 0.27 0. l4 OA9 0.06 0.04 0.03 0.03 0.02 lU0 13.14 10.44 8.80 fi.74 4.64 3.17 2.39 1.49 0.91 0.52 0.31 0.1fi 0.10 0.07 0.04 0.03 0.03 0.02 9.44 7.35 5. 15 FE 2.72 1.71 1.04 O.fiD 10.36 0. l 8 0. l 1 0.08 0.05 0.04 0.03 0.03 500 15.48 12.24 10.27 8.17 5.86 4.17 3.23 2.03 1.25 0.73 0.43 0.22 0.13 0. I D 0.06 0.04 D.04 D.03 1000 16.57 13.U4 ] 092 8.84 6.45 4.67 3.66 2.31 1.43 0.83 0,50 0.25 0. ] 5 D.1 1 O.OG D.OS 0.04 0.03 ne upper Mund of the cennaence interval at ao r commence revel 4 the value wnicn 5i or the simulated quantire values for a given frequency are greater tnan. "These precipitation frequency estimates are based an a partial duration series. AM is the Average Recurrence Interva4. Please refer to the doccumentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Lower bound of the 90 % confidence interval Precipitation Intensity Estimates (in/hr) 3(}60 120MF6 12 24 48 4 7 10 20 3U 45 6(1[�2,-10i"-15-, min min min min min r hr hr hr day day day day day day day l 5.53 4.42 3.68 2.52 [E5fl 0.96 0.70 0.42 0.24 0.14 0.08 I 0.04 0.O3 0.02 I 0.02 0.01 0 01 0.01 G.55 5.24 4.39 3.03 1. 00 Kfl 0.85 I ED EEI 0.17 I 0.10 I El 0.04 1 EE 0.02 D.02 0.01 OAI �nnnnnnnnnnnnnnnnnn http://Iidse.tiws.noaa.gov/cgi-bin/hdsc/buiIdout.perl?type=idf&units=us&series=pd&statenarne=NORTH+... 4/ 18/2008 Precipitation Frequency Data Server Page 1 of 4 POINT PRECIPITATION EN FREQUENCY ESTIMATES FROM NOAA ATLAS 14 SNEADS FERRY, NORTH CAROLINA (31-8037) 34.55 N 77.4 W 49 feet from "Precipilation-Frequency Atlas offhc United Slates" NOAA Atlas I4, Votumc 2, Version 3 G.M. ©unnin, 1). Martin, 13. Lin, T. Parzyhok. M.Ycktu, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Exlrarcted: Fri Apr 18 2(X)8 Confidence Limits Seasonality Location Maps Other Info. G! d to Maps Help Precipitation Frequency Estimates (inches) ARI* 5 10 15 30 60 [2"47 10 20 30 45 60 n 3 hr(years) min min mm min min in - day day day day d_ay day day L.. 10.49 0.79 0.99 1.35 1.G9 2.06 2.23 2.72 3.21 3.68 4.28 4.75 5.48 6.0G 7.98 9.79 12.33 14.95 0 0.59 0.94 1.18 1.63 2.04 2.52 2.72 Ej 3.91 4.48 5.17 5.75 6.60 7,27 9.49 1 1.64 14.60 17.63 0 0.69 E0 E9 E7 2.53 3.20 3.47 4.25 5.04 5.79 Efl 7.3 l 8.30 9.01 1 1.55 14.00 17.43 20.80 1[I 0.77 k.22 EE 2.24 2.92 3.77 4FI-2-1 5.04 6.01 6.91 7.9I KU 9.70 10.44 13.23 15.E 19.75 23.34 25 Q 87 1.38 1.75 2.59 3.45 4.57 5.05 6.20 7.44 8.5E 9.82 ]0.49 l 1.72 12.50 15.62 18.48 23.01 26.80 50 0.94 1.50 V 90 2.86 3.87 5.22 5.85 7.19 8.69 9.98 171 .49 12.09 13.41 14.21 17.58 20.57 25.66 29.52 t0U I .U2 1.62 2.04 3.13 4.31 593 6.7 l 8.29 10.07 1 ! .56 13.34 13.83 15.22 E4 19.64 22.69 28.40 32.28 20[I 1.09 ] .73 2. l 9 3.4 ! 4.78 6.69 7.66 9.44 11.61 13.32 15.41 15.72 17.17 Fig .00 2 l .82 24. 88 31.26 35.07 5[IO 1.19 1.89 2.37 3.78 5.42 7.77 Ej 11.28 13.91 15.94 HE18.80 19.99 20.80 24,88 27.88 35.22 38.84 10[10 1.27 2.00 2.52 4.D7 5.95 8.G6 10.23 12.79 15.91 18.19 21.26 21.44 22.32 23. l i 27.34 30.22 38.38 41.74 Text version of table These precipitation frequency estimates are based on a partiai duration Series, ARI is the Average Recurrence Interval. Please refer to the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. Ask Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** [4FIO�FBIPO 6{1 120 3 6 12 24 48 4 [QF170F27 304560(years) min min in min min hr hr hr hr hr day day 11 day ILLayjl day 11 day �'_J 0.53 0.85 1.07 1.46 1.82 2,21 2.39 2.44 3.52 4.05 4.75 5.27 I 6.03 6.67 8.67 V0,56 13.45 16.09 1.27 1.75 2,20 2.70 2.92 3.59 4.28 4.93 5.76 6.38 7.25 8.61 l0.32 E54 FE1 19. 11 0.74 1.18 l .49 2,12 2.72 3.43 3.72 4S9 5.49 C.35 7.38 8.10 9. I 1 9.90 12.54 EgEgEj1 lU 0.82 l .32 I.67 2.4 t 3. ! 4 4.04 4.4 I 5.45 6.56 7.55 8.78 9.52 170 .63 1 1,46 I4.34 17.09 21.56 25.1 1 25 0.93 1.48 EE 2.78 3.70 4.88 Efl 6.68 8.09 9.35 10.88 11.57 12.78 13.68 16.89 19.88 EN28.82 51) 1.01 I .f., 12.04 3.07 4.16 5.59 6.24 7.75 9.43 10.89 12.74 13.3 I 14.64 15.5-IF-09.0 22.16 28.04 31.76 10[1 1.09 1.74 2.20 3.37 4.64 6.35 7.16 8.9 I ] 0.91 12.59 14.79 15.24 16.63 17.56 21.28 24.47 31,07 34.72 20[I 1.18 1.87 2.36 3.67 5.15 7. i 6 8. l 8 i 0.22 12.57 14.5 i 17. 14 17.36 l 8.78 l 9.75 23.68 26.89 34.18 37.84 SOU 1.29 2.04 2.57 4.09 5.86 8.34 9.69 12. i 5 15.09 17.41 20.69 20.87 22.04 22.99 27. l9 30.30 38.67 42.14 l[10[1 1.38 2.17 2,73 4.42 6.45 9.33 10.99 13.8i 17.29 19.98 23.83 23.99 24.78 25.66 3D.D0 32.99 42.34 45.53 The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantlle values for a given frequency are greater than. " These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to the documentation for more information NOTE Formatting prevents estimates near zero to appear as zero. Lower bound of the 90% confidence interval Precipitation Freauencv Estimates (inches) 5 111 15 30 fi0 12U 3 24 [4�8fl[�J;JFWJO 203U45 60in min min minmin hr[�F2 hr day day day day day 0.46 0.74 0.92 1.26 1.57 1.93 2.09 2.53 2.95 3.38 3.88 4.30 S.DD 5.55 7.37 9. [ 3 11.41 13.98 0.55 0.87 1.10 1.52 l.90 2.35 2.55 3A7 3.58 4.11 4.69 5.21 6.03 6.65 8.77 ]0.86 13.49 16.49 nnnnnnnn�nnrnin�nrn�ninin�n Docs JF U.S. Map http:llhdsc.nws.noaa.govlcgi-binlhdsc/buildout.perl?type=pf&units=us&series=pd&statename=NORTH+C... 4/ 18/2008 EOD Building; FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina 9 C: I is i ` Section D: MAPS Gold*oro ,o Kinston Dover a Bern Tuecdlord Tran;on OAK GROVE even ' CHERRY POINT Springs Polldrk7vitle mt. Oliver Springs wo Pink Comfort maysvilia HIM 'f Richlands �' eauiart� f Wornow S orehedd City r BsulavilloIf Jackaanvill won; on; oro r� Varcn RosahNl Dixon C' Q Wallaco Folkom Ho y Ridge r�urgn• Words Corner " U mpatcnd ti art Mill k me Delta Wilmington a Bottom Leland I. � VICINITY MAP EASTERN NORTH CAROLINA 7 EOD Building FC292 Addition MCB Camp Le,jeune Jacksonville, North Carolina u • Section D: MAPS (continued) PROJECT SITE LOCATION MAP MARINE CORPS AIR STATION CHERRY POINT e • EOD Building FC292 Addition MCB Camp Le,leune Jacksonville, North Carolina Section E: NORTH CAROLINA P.E. EXEMPTION LETTER The following pages outline the exemption of the use of the P.E. stamp on projects prepared by U.S. Government personnel for work done on government owned works and projects. 9 EOD Building FC292 Addition MC8 Camp Lejeune .Jacksonville, North Carolina (0 NORTH CAROLINA STATE BOAROOF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS XFOK March 30, 1993 36RALEIGM NRC 2R7609 491917819499 19191 781-9547 R. LARRY GREENS, RLS CMMIIMAX WILLtAMTSTEUER.PE,RLS Mr. James E. Butler, PE BOBBY M. LONG. RLS Department of the Navy - Atlantic Division $""`IAW Naval Facilities Engineering Command RAY E. ANDERS. RLS Gilbert Street J. ALMS r BA55, JR. PE, RLS 1510 J. RICHARD COTTINGHAM. PE, RLS Norfollc, Virginia 23511-2699 HEL£N W. MERRITT. Pu BUC MEMBER OANA H. RUCKER PE. RLS FRANK LTURNER, PUBLIC MEMBER Dear Mr. Butler: JERRY T. CARTER lcxccw MStc*KTA" In accordance with your written request of March 25, 1993, 1 am enclosing for your information a copy of The North Carolina Engineering and Land Surveying Act, G. S. 89C. I will refer your attention to G. S. 99C-25 which provides limitations on the 0 application of the Statute. Paragraph 6 specifically exempts 'Practice by members of the armed forces or employees of the government of the United States while engaged in the practice of engineering or land surveying solely for said government on government -owned works and projects.' This exemption should not be construed as to allow engineering services to be provided to the Department of the Navy by non -registered contract employees. For any such circumstance, a North Carolina registrant would need be in responsible charge of any engineering services to be provided for it North Carolina project. I trust this information will be of some service and ask that you contact me if this office can be of further assistance. JTC/jsa Enclosures i Sincerely, T• 4i&- J ry T. Carter Executive Secretary to EOD Building FC292 Addition MCB Camp Lejeune Jacksonville, North Carolina of registration or Carolina (1921, c. 1, s. 14; C. S., s. 60551p1; 1951, c. 4 may deem sufficient, reissue a certificate avetwn:anon, provided that a malonty of the members of 10$4, s. 1; 1969, c. 718, s. 18; 1975, c. 681, s. 1.1 the Board vote in favor of such issuance. 11921, c.l, s.10; C.S.. s.605501; 1939, c.218, s.2; 1951, c.1084, s.1; i 89C-25. Limitations on application of Chapter. -This 1953, c.1041, s.10; 1957. e.1060, s.5; 1973, c.1331, Chapter shall not be construed to prevent or affect: s.3; 1975, c.681, 5.1; 1981, c.789; 1989, c.669, s.t.l 1. The practice of architecture, landscape i 89C-23. Unlawful to practice engineering or land architecture,. or contracting or any other legally sswveying without registration; unlawful use of title or recognized profession or trade; or terms; penalties; Attomey General to be legal adviser. -Any 2. The practice of professional engineering or land person who shall practice, Or offer to practice, engineering surveying in this State or by any person not a or land surveying in this State without first being registered resident of this State and having no established in accordance with the provisions of this Chapter, or any place of business in this State when this practice person, firm, partnership, organization, association, does not aggregate more than 90 days in any corporation, or other entity using or employing the words calendar year, whether performed in this State or 'engineer" or "engineering" or "professional engineer' or elsewhere, or involve more than one specific 'professional engineering" or 'land surveyor" or "land project; provided, however, that such person is surveying," or any modification or derivative thereof in its legally qualified by registration to practice the name or form of business or activity except as registered said profession in his own state or country, in under this Chapter or in pursuit of activities exempted by which the requirements and qualifications for this Chapter, ar any person presenting or attempting to use obtaining a certificate of registration are the certificate of registration or the seal of another, or any satisfactory to the Board; in which case the person who shall give any false or forged evidence of any person shall apply for and the Board will issue a kind to the Board or to any member thereof in obtaining or temporary permit; or attempting to obtain a certificate of registration, or any 3. The practice of professional engineering or land person who shall falsely impersonate any other registrant of surveying in this State not to aggregate more like or different name, or any person who shall attempt to than 90 days by any person residing in this State, use an expired or revoked or nonexistent Certificate of but whose residence has not been of sufficient registration, or who shall practice or offer to practice when duration for the ' Board to grant or deny not qualified, or any person who falsely claims that he is registration; provided, however, such person shall registered under this Chapter, or any person who shall have filed an application for registration as a violate any of the provisions of this Chapter, in addition to professional engineer or registered land surveyor injunctive procedures set out hereinbefore, shall be guilty of and shall have paid the fee provided for in G. S. a misdemeanor, and may, upon conviction, be sentenced to 89C-14, and provided that such a person is pay a fine (ofI not less than one hundred dollars 1$100.00), legally qualified by registration to practice nor more than one thousand dollars 151,0001, or suffer professional engineering or land surveying in his imprisonment for a period not exceeding three months, or own state or country in which the requirements both, in the discretion of the court. in no event shall there and qualifications for obtaining a Certificate of be representation of or holding out to the public of any registration are satisfactory to the Board, in engineering expertise by unregistered persons. It shall be which case the person shall apply for and the the duty of all duly constituted officers of the State and all Board will issue a temporary permit; or political subdivisions thereof to enforce the provisions of 4. Engaging in engineering or land surveying as an this Chapter and to prosecute any persons violating same. employee or assistant under the responsible The Attorney General of the State or his assistant shall charge of a professional engineer or registered act as legal adviser to the Board and render such legal land surveyor or as an employee or assistant of a assistance as may be necessary in carrying out the nonresident professional engineer or a non provisions of this Chapter. The Board may employ counsel resident registered land surveyor provided for in and necessary assistance to aid in the enforcement of this subdivisions (2) and 13► of this section, provided Chapter, and the compensation and expenses therefor shalt that said work as an employee may not include be paid from funds of the Board. 0921, c. 1, s. 1 2; C. S., responsible charge of design or supervision; or s. 60551n1; 1951, c. 1084, s. 1; 1975, c.681, s. 1.) 5. The practice of professional engineering or land surveying by any person not a resident. of, and i 89C-24. Corporate or partnership practice.. of having no established place of business in this engineering or land surveying. -A corporation or partnership State; as-a-consutting associate of a professional may engage in the practice of engineering or land surveying engineer or registered land surveyor registered in this State, provided, however, the person or persons under the provisions of this Chapter, provided, connected with such corporation or partnership in charge of the nonresident is qualified for such professional the designing or supervision which constitutes such practice service in his own state or country; or is or are registered as herein required of professional 6. Practice by members of the armed forces or n engineers and registered land surveyors. The same employees of the government of the United exemptions shall apply to corporations and partnerships as States while engaged in the practice of apply to individuals under this Chapter, provided further, engineering or land surveying solely for said that all corporations hereunder shall be subject to the government on government -awned works and provisions of Chapter 55B of the General Statutes of North projects; or • EOD Building FC292 Addition MCB Camp Le,jeune Jacksonville, North Carolina Section F: PROJECT CONSTRUCTION PLANS 12 REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS P-1224 EOD ADDITION JACKSONVILLE, NORTH CAROLINA PREPARED FOR: MR. WALTER MOORE, P.E. R. KENNETH WEEKS ENGINEER, LLC 2733 TIDEWATER DRIVE NORFOLK, VIRGINIA 23509 PREPARED BY: I❑ ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.13938 � Q ; • I �i 1 e AL . 0337 1 �'f sz�ow E NC LICVA� NO.33751 APRIL 23, 2008 0 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY........................................................................... 2.0 PROJECT OVERVIEW......................................................................................................................2 2.1 Project information...........................................................................................................................2 2.2 Scope of Work.................................................................................................................................2 2.3 Purpose of Exploration......................................................................................................................2 3.0 EXPLORATION PROCEDURES.......................................................................................................3 3.1 Subsurface Exploration Procedures...................................................................................................3 3.1.1 Soil Borings............................................................................................................................. 3 3.1.2 Hand Auger Borings and Infiltration Test................................................................................3 3.2 Laboratory Testing Program ............................... :............................................. ................................. 4 4.0 EXPLORATION RESULTS................................................................................................................5 4.1 Site Conditions............................................................................................................................ 5 4.2 Regional Geology..............................................................................................................................5 4.3 Soil Conditions ........................................................................................................................ 5 4.4 Groundwater Conditions...................................................................................................................5 4.5 Laboratory Test Results....................................................................................................................6 4.6 Infiltration Test Results.....................................................................................................................6 5.0 ANALYSIS AND RECOAMENDATIONS.......................................................................................7 5.1 Excavation Conditions....................................................................................................................... 7 5.2 Engineered Fill........................................................................................................................... 7 6.0 CLOSING..............................................................................................................................................8 APPENDICES APPENDIX A-FIGuu s APPENDIX B-SPT BORING DOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION, AND TERMINOLOGY APPENDIX C-HAND AUGER BORING LOGS AND INFILTRATION TEST RESULTS APPENDIX D-LABORATORY TEST RES ULTS APPENDIX E-GENERALcoNmrioNs APPENDIX F-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES 0 0 �I I 0 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOB Addition 3ackson"lle, North Carolina ECS Project No.: 22.13938 1.0 EXECUUVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. We understand that five bio-retention ponds will be constructed at the site. Additional project specific information was not available at the time this report was prepared. Minimal to 4 inches organic topsoil was reported by the drillers at the boring locations. Beneath the surface to a depth of 10 feet, the test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands (SP-SM, SM, SP). The infiltration rate at the ponds ranged from 2.2 to 4.2 inches per hour. The seasonal high water table ranged from 34 to 60 inches below current grades, Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Winslow E. Goins, P.E. Walid M. Sobh, P.E. Project Engineer Principal Engineer Report of subsurface Exploration and Geotechnical Engineering Analysis P4224 EOD Addition Jacksonville, North Carolina ECS Project No,: 22.13938 2.0 PROJECT OVERVIEW 2.1 Proiect Information Our understanding of the proposed development is based upon our discussions with representatives of R. Kenneth Weeks Engineers, LLC and a review of the site plan provided to ECS by R. Kenneth Weeks Engineers, LLC. The proposed site is located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina. At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. We understand that five bio-retention ponds will be constructed at the site. Additional project specific information was not available at the time this report was prepared. 2.2 Scone of Work The conclusions and recommendations contained in this report are based on the results of: • five soil test borings; • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field and laboratory findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. 0 2 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.: 22.13938 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The five soil test borings drilled on the site were performed using a track -mounted CMB 450 drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140 pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod -sampler assemblies) and prevent a direct correlation between SPT resistance value, or N-Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil. test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.1.2. Hand Auger Borings and Infiltration Tests On April 9, 2008, five hand auger borings were performed on the site. The purpose of the hand auger borings was to stratify the subsurface soils and estimate the seasonal high water table of the subsurface soils. Five infiltration tests were performed at the hand auger boring locations. We evaluated the subsurface soil and ground water conditions by drilling the hand auger borings to depths of approximately 108 inches below the existing ground surface at the approximate location indicated on the Boring Location Plan in Appendix A of this report. We visually classified the subsurface soils on site. The results are provided in Section 4.5 and in Appendix C. 0 Report of Subsurface Exploration and Geoteclmical Engineering Analysis P-1224 EOD Addition 3acksonville, North Carolina ECS Project No.: 22.13938 3.2 Laboratory Testing Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; • index property testing included natural moisture content determinations (ASTM D 2216) and grain size analyses (ASTM D 1140). All data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this investigation will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. r� L • 4 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina EC5 ProjectNo.: 22.13938 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located off of McHugh Boulevard at the MCB Camp Lejeune in Jacksonville, North Carolina. At the time of our field exploration, the site consisted of partially wooded areas and grassy areas. The site is relatively level. 4.2 Re2 Tonal Geoloev The site is located in, the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, sballow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations 'in precipitation. 43 Soil Conditions Sail Test Borings: Minimal to 4 inches organic topsoil was reported by the drillers at the boring locations. Beneath the surface to a depth of 10 feet, the test borings typically encountered intermittent layers of very loose to dense slightly silty, silty and clean sands (SP-SM, SM, SP). Standard penetration test resistances (N-values) in these soils generally ranged from 3 to 33 blows per foot (bpi). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The Test Boring Records in Appendix -B contain detailed information recorded at each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration The stratification lines on the Test Boring Records represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. 4.4 Groundwater Conditions Groundwater observations were made after the completion of the drilling operations all boring locations. Groundwater was not encountered in the borings to the depths drilled. The highest groundwater observations are normally encountered in the late winter and early spring, and our current groundwater observations are expected to be near or representative of the seasonal maximum water table. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff; and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. r� u Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No. : 22.13938 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture contents ranging from 7 6.9 to 17.4 percent. The grain size analyses of the tested samples indicated that the tested materials had 9.8 to 17.9 percent fines passing the number 200 sieve. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. 4.6 Infiltration Test Results Based on observations in the hand auger boring, the seasonal high ground water level is estimated to be 34 to 60 inches below existing grade. The infiltration tests were performed at a depth of 24 inches below present grade and the infiltration rate ranged from approximately 2.2 to 4.2 inches per hoar (0.036 to 0.07 in/min). • • 0 Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina is ECS Project No.: 22.13938 5.0 ANALYSIS AND RECOMNMNDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Excavation Conditions We do not anticipate difficult excavation conditions in the upper 10 feet of soil. The site soils are OSHA Type B and C soils for the purpose of temporary excavation support. 5.2 Engineered Fill An examination of the soils recovered during our current exploration, and our previous experience in the area, :indicates that the majority of the on -site soils will generally be suitable for re -use as engineered fill. However, it is expected that moisture conditioning of the fill soils will be required during placement to facilitate proper compaction. In some areas, substantial drying may be needed and it may not be feasible to attempt to re -use such materials as engineered fill. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface cultivated soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine-grained soils classified as clays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnicai engineer at the time of construction to determine their suitability for use as engineered fill. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. Report of Subsurface Exploration and Geotechnical Engineering Analysis P-1224 EOD Addition Jacksonville, North Carolina ECS Project No.; 22.13938 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our evaluation, The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site was beyond the scope of this geotechnical exploration. • • Nt i', R'r r LU 9, co ice- I I ITINI-M. FITH, If 2 cn i 1. : .;V.A 13ullOJOD WON '8111AU06408Ir �� NOI.LlaGV MWOMd a03 VZU-d sovcmnsons DEPTH CD I,+ ► lu= OEM ix y CS CJ LeJ V, a L X: CI- 0 (4 ................. .. . = C5 Lli x IL 0- C3 (Y) I Oj 9Q Lli C:5 ........... . . ........... (2) v In in r� OD o Li LL z CIL IL M 0 W 0 177.TIM R7 p2l 0 LLJ C D CD Hic]3CI LLJ z LLJ LLI 0 < u C3 o Cl) u 0 0� LL. w � M b LLI z z (L 0 Z ly 13 V) Lo 0 U Z LL) M W 'Z3 i-- �-- pq V) < LJ 4 F- z lo- X Lj LLI CL Lj _j Z U 00 <E Z < C) �<F- 13, LjJ PQ Z �-1 P V) N w D I- LLI <0 a: > Z M Q� z -4 (Ij M 9 • • 0 APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY • Unified Soil Classification System (ASTM Designation D-2487) Major Division (iroup Symbol Typical Names Classification Criteria rj 0 GW Well -graded gravels and gravel- Ca = D&/Dtp Greater than 4 sand mixtures, little or no fines a CL = (D3D)Z/(DloxD6J Between 1 and 3 GP Poorly graded gravels and gravel- Not meeting both criteria for OW sand mixtures, little or no fines o &n En o W V 9 GM Silty gravels, grave] -sand -silt `t r� Atterberg limits lot below "N' line or g • P mixtures C0.7 t7 plasticity index less than 4 IP GC Clayey gravels, gravel -sand -clay c Atterberg limits plot above "A" line mix •2 and plasticity index greater than 7 SW Well -graded sands and gravelly 5�� •� Ca— DbofDta Grier than 6 sands, little or no fines 0 C, - (D30)2/(DtoxD60) Between 1 and 3 SP Poorly graded sands and gravelly sands, little or no fines Not meeting both criteria for SW o ,E V'l Atterberg limits plot below "A" line or SM Silty sands, sand -silt mixtures plasticity index less than 4 SC Clayey sands, sand clay mixtures ,��° Atterberg limits plot above "A" line N and plasticity index greater than 7 ML Inorganic silts, very fine sands, Note U-linengvmtaap}vvximmeapperrm2kofILmdPlmmbindm rock flour, silty or clayey fine rar aetard t0a't"'Pl�d" . AnM4n2487. sands 10 CI. Inorganic clays of low to medium plasticity, gravelly clays, sandy s as clays, silty clays, lean clays OL Organic silts and organic silty clays of low plasticity MH . Inorganic silts, micaceous or diatomaceous fine sands or silts, 20 elastic silts ,e CH Inorganic clays of high plasticitiy, fat clays OH Organic clays of medium to high plasticity ..■■■■MEM■. ■■■■.■■MOR! NNOMEN MEN ■■■.N.,.■MMA ■EEMPOSE 0� �aLtsr e 10 90 m 40 so W le N 00 ,W „0 LIQUID UHrr. LL Plasticity chart for the classification of fine-grained soils. Tests made on fiaction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter, will organic'soils char, burn, or glow EBLUP 0 MAY root► 4019LMOULWQ. AM PCB CARCE wad tl.! UNIFIED SOIL CLASSIFICATION SYSTEM • Reference Notes for Boring Loes I. Drilling and Sampling Symbols: SS - Split Spoon Sampler RB - Rock Bit Drilling ST - Shelby Tube Sampler BS - Bulk Sample of Cuttings RC - Rock Core: NX, BX, AX PA - Power Auger (no sample) PM - Pressuremeter HSA - Hollow Stem Auger DC - Dutch Cone Penetrometer WS - Wash Sample Standard Penetration (Blows/Ft) refers to the blows per foot of a 1401b. hammer falling 30 inches on a 2 inch Q.D. split spoon sampler, as specified in ASTM D-1586. The blow count is commonly referred to as the N-value. it. Correlation of Penetration. Resistances to Soil Properties: Relative Density -Sands. Silts Consistency of Cohesive Soils SPT-N Relative Density - ues Consistency 0-4 Very Loose 0-2 Very Soft 5 - 10 Loose 3-4 Soft 11 - 30 Medium Dense 5-8 Firm 31 - 50 Dense 9-15 Stiff 51 or more Very Dense 16-30 Very Stiff 31-50 Hard 51 or more Very Hard IR Unified Soil Classification Symbols: GP - Poorly Graded Gravel ML - Low Plasticity Silts GW - Well Graded Gravel MH - High Plasticity Silts GM - Silty Gravel CL - Low Plasticity Clays GC - Clayey Gravels CH - High Plasticity Clays SP - Poorly Graded Sands OL - Low Plasticity Organics SW - Well Graded Sands OH - High Plasticity Organics SM - Silty Sands CL-ML - Dual Classification SC - Clayey Sands (Typical) iV. Water Level Measurement Symbols: WL - Water Level BCR - Before Casing Removal WS - While Sampling ACR - After Casing Removal WD - While Drilling WCI - Wet Cave In DCI - Dry Cave In The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. 0 C1dEEN'r R. Kenneth Weeks Engineers i JOB # 22-13938 BORINGf B-1 SFD;ET 1 OF 1 LON LLP PROJECT NAME ARCHITECT -ENGINEER P-1224 EOD Addition Walter Moore, P.E. �ARoLANAIS SITE LOCATION Cam Le eune, Jacksonville, North Carolina -¢ CALMAT D PPNET6OlO�M TONSMCB 1 E. 3 4 8+ PLASTIC WAM LIQUID LDQT % CONTENT x LAOT x x e iR� QUA[iTY D=GNATION a REOOYERY RQD%— — — REC.X 20X--4O%-6OX-8OKr-100 ® STANDARD PENETRATION BLM/FT. DESCRIPTION OF ][ATERiAI. SNGLL9H UNITS BOTTOW OF CASING W- LOSS OF CIRCULATION 100 z R SURFACE ELEVATION 0 10 EO So 40 50+ 1 SS 24 24 Topsoil Depth 4" 3:J1-2-1) ry Loose, Black, Slightly2 Fine to Medium SAND,2 LSV'11t�y. 2 3:(-t-2-1) SS 24 24M) 5 :7 (s-�-5) 3 SS 24 24 VeryLoose to Loose Tan Fine1.®� SAND, (SP) 15.8 f0 (s S`5-s) ; 4 SS 24 24 Loose to Medium Dense, Light Brown, Silty, Fine SAND, (SM) 7.2 5 SS 24 24 16 (4-97-e) 1 16.1 END OF BORING 0 10.0 15 20 25 so — THE STRATIFICATION LWES REPRESENT THE APPROXIMATE BOUNDARY LMS BETWEEN Sob TYPES DI-SM THE TRANSCRON NAY BE CilMUO%L gvL •s OR ® BORD)IG BfiANM 04Z 10 08 ITYLOM) ITUACR) BOFMG COMPLETED 04 1 0 08 WE m DEPT'A R girl RIG D-25 mmm RES 10II1ING MEWOD Auger • • a CIdm R. Kenneth Weeks Engineers JOB # BOR 6 f Elm 22-13938 1 B-2 1 OF 1, 9§LLPi PROJECT NAME ARCHITECT —EN! RUM P-1224 EOD Addition Walter Moore, P.E. CAROE_IIVA3 SITE LOCATION CALHUT M MCB Camp Le eune, Jacksonville, North Carolina 1 2 a 4 s+ PLASTIC HATER uQ= ImT x CONTENT x LUM x x � ROCK QUAIJTY DESIGNATION & RNOVRRY DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING a— IM OF C11MIATION 10 2UO6x 40%em—sox —100 SURFACE ELEVATION ® STANDARD PENETRMON 0 10 20 So 40 6D+ Topsoil Depth 4" ! SS 24 24 4 (2-2-22) Very Loose, Brown, Silty, Fine to Medium SAND, (SM) 8; 2 SS 24 24 Loose to Medium Dense, Tan to 3 SS 24 24 5 Orangish Tan, Silly, Fine SAND, (SM) .7 !$ (5-7-e-9) Y3. 4 SS 24 247 (s-s s-e) 15. 5 SS 24 24 !BWTI 1 '` END OF BORING 0 10.0 15 2D 25 THE STRATIRCATM LINES REPRESENT THE APPRMXWATE BpINMMY LINES BETVMN SOIL TYPES IN -SITU T11 TRANSIUW P(AY BE {GRADUAL �,�• es OR ® 130RWG srdR= 04 1 0 08 VL(BCR) TNI.(ACR) BORDIG cOld'ISTSD 04 1 0 08 CAVE w DEPTH • :gWL RIG D-25 FOREMAN RES DRUJING Mum Auger cLUI+rT R. Kenneth Weeks En ineers rbH f 22-13938 GORING # B-3 sfn�i' 1 of 1PROJECT jEce LLP NAME ARCiI TECT-ENOMM P-1224 EOD Addition Walter Moore, P.E. CAi20L_lh1A8 SITE LOCATION -0-- ce[�► �� MCB Camp Le'eune, Jacksonville, North Carolina 1 $ 9 4 5+ PLASTIC WATER LIQUID Laur x CONTENT x T x x n ROCK QUALM DESIGNATION do RECOVERY RECA RQDX-4 --- -6 —8 2ax<---4ox—sOxr--eO%-1oo ® STANDAM PENETRATION BIMM0 w z £ DESCRIP170N OF MATERIAL ENGLiSH UNITS HOTTOI[ OF CASING LOSS OF CIRCULATION too �' � � SURFACE E EUATION °�JI !Q EO s0 40 60+ 1 SS 24 24 Topsoil Depth 4" 1 (i--7-1+ Medium Dense to Dense, Gray, Silty, Fine to Medium SAND, {SM) :14.5 (�o-�a-t�-�x 33: 2 SS 24 24 5 B'g 12 (6-6-6-5) 3 SS 24 24 Medium Dense Tan Fine SAND (Sp) 7'� 11 {6-s-e-4� 4 SS 24 24 Medium Dense, Tan to Orangish Tan, Slightly Silly, Fine SAND, (SP-SM) 12 5 SS 24 24 15 (s-e-7�7) 1 • END OF BORING @ 10.0 15 20 25 3 THE STRATIFICATION LINES REPRESENT THE APPROXXATE BOUNDARY LINES BETIIEEN SOIL TYPES IN-SrrU THE TRANSITION MAY BE GRADUAL Rs OR 0 BORING srARrED 04Z 1 0 08 Tlr OCR) TRL(ACR) BORING COYPL= 04 1 0 08 WE IN DEPTH • :gwL BIG D— 2 5 iromaN R E S DRILLING KMOD Auger • • L CLIENT JOB # BORING # 1 SIMT R. Kenneth Weeks Engineers 22-13938 B-4 1 OF 1 IEC:iL�Lp PROJECT NAME ARCHITECT --EN( RUM P--1224 EOD Addition Walter Moore, P.E. csaRcaLll+Ip.B SITE LOCATION -o- CALMRAT� 1(ER �4 MCB Camp Le eune, Jacksonville, North Carolina 1 e Is+ PUUMC TAM UQUM I= x CONTENT x UMT x x a ROCK QUMM DE9 X&TION & MOOMY DESCRIPTION OF MATERIAL ENGU-9H UNITS Ir BDPI'Oli OF CASING � LOSS OF CU{CUIdTION I04 ZpQ4pX-- BQXr— OXr-1 ® BI' ePF��HSIR. ATION BLOV SURFACE ELEVATION 0 10 E0 so 40 W Topsoil Depth 4" 1 SS 24 24 10 Loose, Brown to Gray, Silty, Fine SAND, (SM) 9D 2 SS 24 24 17.4 5 3 SS 24 24 .7 (- ) Medium Dense, Tan, Fine SAND, 1 4 SS 24 24 (SP) :6 (s-B-B-Li) 10.9 5 SS 24 24 19 (8�io-e-e) 1 19.2 END OF BORING ® 10.0, 15 20 25 30 — — THE STRATIFICATION LINES REPRESENT THE APPRMINATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSI'TIOM MAY DE GRADUAL. :gvL VS OR to BOMgG WAM= 04 10/08 "CR) TWL(ACI) BOMG COMMMM 04 10 0s WE IN DIm . �WL II0 D — 25 FOI3 ux R E S I)FZMa MMOD Auger CLIENT JOB ORING SHI= R. Kenneth Weeks Engineers 22--13938 B--5 1 b8 1 EC3L LP PROJECT NAME A.RCHITEGT-ENGW= P-1224 EOD Addition Wafter Moore, P.E. CAROL_f1VAS SITE LOCATION MCB Camp Le'eune, Jacksonville, North Carolina 1 2 s 4 6+ K ASnC WAnM ugtw I]10T X CONTENT % LDaI' X X G ROCK QUALM DESIGNA210N & RECOVERY DESCRIPTION OF MATERIAL ENGLISH UNITS l so4'i m OF CASING W- LOSS OF aRCUTATION 10 20X-4OX-60XrGaolf_100 SURFACE ELEVATION a ® ASP ON 0 10 SO so 40 60+ Topsoil Depth 4" I SS 24 24 5 (2-2-S 3) Loose, Brown, Silty, Fine SAND, (SM) 1©.7 2 SS 24 24 :7 ;19.9 ' Loose, Tan, Fine SAND, (SP) 5 3 SS 24 24 :7 (0-4L3-4) 8 4 SS 24 24 9 (4-�5-4-5) 5 SS 24 24 1 END OF BORING @ 10.0' 8' 15 20 25 3 — — THE STRATIFICATEN LINES REPRESENT THE APPROXIMATE EOUNWY LINES BETWEEN SM TYPES IN -SITU THE TRANSITION MAY RE GWUAL 'vYI. xS 0R C0 BORING STARTED 04/ 1 0 08 :gWL(EM) TlgAM) Imo Goy 04 10 08 CAW IN Dmnu • ::*L RIG D — 25 F'°mAN R E S »RUJJNG WmOD Auger C� is I I 0 APPENDIX C HAND AUGER BORING LOGS • 0 Infiltration Evaluation P-1224 EOD Addition Jacksonville, North Carolina ECS Project No. 22.13938 April 11, 2008 Location B-1 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 3.1 inches per hour (0.05 in/min). Location B-2 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 4.2 inches per hour (0.07 in/min). Location B-3 Seasonal High Water Table was estimated to be at 34 inches below the existing g grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 2.3 inches per hour (0.039 in/min). Location B-4 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 2.2 inches per hour (0.036 in/min). Location B-5 Seasonal High Water Table was estimated to be at 60 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below grade. At that depth, the infiltration rate was 3.0 inches per hour (0.05 in/min). 0 El APPENDIX D LABORATORY TEST RESULTS II� 0 00 cri MMM •'i e- E E 0 Z L a nr U � E � mo ME U E E 0 m $ m • a m � as rD r; N in pi cc w ao I+ r• (a 0. a 6- T r r r e^w m c � E _ ::3 a 'm� 3 E vZ3 J CO0,a. � g�aa cn awwwwww�wwd.u)En rn N co d � yC� Nu70DNrTl+n[OC'94DOOr7N00 o ~ �O?01N O CD T T r T r T T r r T T r oo00 a000�000040CD0 a � as a aag��aa M-6 O CAI w co v W'd O N `t w� O (V %r co O m CD� E E rNf+'Sq'TNM CI) N (n fly co 6Q. (�J fh � L9rN['9 (o (b t J (b r NC7 Ch VJ fA lfJ f� �Z �.G �-rLi-r1r1N-iiN1 [V SNiN[--'171CbC--L7L�__'11)M-11�_11 CO U U II ((I! D a J U O to U a U �aVL (0 2 o C) EI II • W g G .Q E L c L c ,aj N fJ� •� zz W CD 7..6 W CL 0 o C ~ a U w ,g co eh c w T a zz S o 0 a a` I�VINI In IIIIIIIIIIIIIYIIII �999111NIIII IIII� ����NlAllll�llll �0@IIIIIIIIIINIIII � IIIII�II c m o `m mt� (U E0Ua z�a(n zc�o� O, OHO O b vQy � M N O O �utssn� Juaara,� M S d 9 Cy a a 1� W r. pa o z� �Ln ■■p_M rl l fl -�IqqI U 4, o � � rid C � w U • • • • b d �-r g S (2) 000 0 b (D 4 M N O O .� ,�'u�ssnd �uaarad ON 00 n Gko � qt Xwssnd;uaolad M N O> • • 0 • • • G N � 0 p O p bOi �op W M LM IV 33uFssn� tuaa.�ad S p1 00 t- %D Vq q ffurssvd luaarad ccn N .� O • • • • n IL � 000 voi Nr M cov r, Yurssv j;uaodad C. _Q v 0 0 4 •w a R rloi � � o .� M bi o0c0 a kc O M N O Zurssnd IU.?Ddad L 11 • • • C <D Cd C> a C. v M N O C~ � �utssnd;ua�.rdd APPENDIX E GENERAL CONDITIONS • • ® General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may he required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the caisson, foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that ail work in connection with foundations, piles, caissons, compacted fills and other elements of the, foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further investigation as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. 0 APPENDIX F PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES • s e Procedures Regarding )Field Logs, Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then discarded -unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the apparent strength of cohesive soil generally increasing the strength from what was originally encountered in the field. Since they are then no longer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work. On the other hand, we are�aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the information was obtained to the extent the contractor or subcontractor wishes. Results of the laboratory tests are generally shown on the boring logs or described in the extent of the report, as appropriate. The descriptive terms and symbols used on the logs are described on the attached sheet, entitled General Notes. 0