Loading...
HomeMy WebLinkAboutSW8050830_COMPLIANCE_20200616STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 C)5 3 DOC TYPE ❑ CURRENT PERMIT DOC DATE ❑ APPROVED PLANS ❑ HISTORICAL FILE �g COMPLIANCE EVALUATION INSPECTION Z.0zo0(."1(o DEPARTMENT OF THE NAVY ,n DBOML r'" ''•� OFFICER IN CHARGE OF CONSTRUCTION 91"51-2581 RESIDENT OFFICER IN CHARGE OF CONSTRUCTION FAX 910.451.5899 NAVAL FACILMIES ENGCNEERING COKMAND CONTRACTS av FZMT ■awe ra, 1005 MICHAEL ROAD N6247241-1)4075 CAMP LEMUNE, NC 2M7-2521 JAXIA7JkW 31 May 2007 State of North Carolina Department of Environment Health & Natural Resources Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Wilmington, NC 28405 Re: Contract No. N62472-02-D-3583 Task Order 0029, P-945 EOD Operations Facility, Marine Corps Base, Camp Lejeune, North Carolina Gentlemen: In accordance with your letter of May 4, 2006 (Permit No SW8 050830), it is herein certified that all work was accomplished in accordance with the approved plans and specifications. For further information contact the undersigned at 910-451-2581 ext. 245. Sincerely, K. H. LACY, P.E. Supervisory Assistant Officer In Charge of Construction Encl: Certification Copy: FW-Design EMD (David Balog) ;' fUAI t `u LY Quality Performance... Quality Results �`" State Stormwater Management Systems Permit No. §W§ Q50§30 P-945 EOD Operations Facii Stormwater Permit No. SW8 50830 CC# N62470-05-8-5011 Onslow County Designer's Certification I, A`�`� , as a duly registered ftofesslam) U Mn'l' in the State of North Carolina, having been authorized to obse nc icaliy ,gme) the construction of the project, ., a e-- I ► . ti /r (Project) for(40,0AfU/1 a (Project Owner) hereby state that, to the best of my abilities, dbe care nd diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number G / Y133 Date S d Page 6 of 7 SEAL 'iI SEAT. W 14433 �Y ra lC ,�l �°a:�aAv�� ♦P _y�, `y��' i9•�h: �S' JUN 16 2020 t State Stormwater Management Systems Permit No. SW8 050830 Certification Requirements: 1, The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. &3. All the built -upon area associated with the project is graded such that the runoff drains to the system. t64. Ali roof drains are located such that the runoff is directed into the system. The basin elevations are per the approved plans. . The basin is located per the approved plans. 0-7. A Trash Rack is provided on the outletlbypass structure. 8. The required number of landscape plantings has been provided and are correctly located In the basin per the approved plans. &9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. All required design depths are provided. 2. All required parts of the system are provided. P_�3. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office JUN 16 20a Page 7 of 7 a v C O cn m 7!VfMEi it 3 � JUN 16 2020 I; BY J Ln a U)