HomeMy WebLinkAboutSW8030108_CURRENT PERMIT_20030703STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
o2(�J�i)�iJ�i
YYWMMDD
1 1
O� WATF9 Michael F. Easley, Governor
O� pG William G. Ross Jr.. Secretary
North Carolina Department of Environment and Natural Resources
- Alan W. Klimek, P.E.,Director
0 Division of Water Quality
Coleen H. Sullins, Deputy Director
Division of Water Quality
July 23, 2003
Mr. Jimmy Hatcher, Member Manager
Perimae & Associates, LLC
P.O. Box 15242
Wilmington, NC 28408
Subject: Permit No. SW8 030108
Smith Creek Village
High Density Stormwater Project
New Hanover County
Dear Mr. Hatcher:
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Smith Creek Village on July 15, 2003. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 030108
dated July 23, 2003, for the construction of Smith Creek Village.
This permit shall be effective from the date of issuance until July 23, 2013, and shall be subject
to the conditions and limitations as specified therein. Please pay special attention to the
Operation and Maintenance requirements in this permit. Failure to establish an adequate system
for operation and maintenance of the stormwater management system will result in future
compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following
receipt of this permit. This request must be in the form of a written petition, conforming to
Chapter l 50B of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact
Laurie Munn, or me at (910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Regional Supervisor
RSS/:Ism S:IWQSISTORMWATIPERMIT1030108.ju103
cc: Charles Cazier
New Hanover County Building Inspections
Beth E. Wetherill, New Hanover County Engineering
Laurie Munn
Wilmington Regional Office
Central Files
N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service"
Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NCDENR
State Stormwater Management Systems
Permit No. SW8 030108
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Perimae & Associates, LLC
Smith Creek Village
New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data as attached
and on file with and approved by the Division of Water Quality and considered a part of this
permit.
This permit shall be effective from the date of issuance until July 23, 2013, and shall be subject
to the following specified conditions and limitations:
L DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described on page 3 of this permit, the Project Data Sheet. The stormwater control has
been designed to handle the runoff from 184,215 square feet of impervious area.
The tract will be limited to the amount of built -upon area indicated on page 3 of this
permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this project must
be directed into the permitted stormwater control system. A permit modification must be
submitted and approved prior to the construction of additional built -upon area from
outside of the approved drainage area.
State Stormwater Management Systems
Permit No_SW8 030108
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
i Receiving Stream/River Basin:
Stream Index Number:
Classification of Water Body:
Drainage Area, acres:
Onsite, sq. ft.:
Offsite, sq. ft.:
Total Impervious Surfaces, sq. ft.:
Pond Depth, feet:
TSS removal efficiency:
Permanent Pool Elevation, FMSL:
Permitted Surface Area, sq. ft.:
Permitted Storage Volume, cubic ft.:
Temporary Storage Elevation, FMSL:
Controlling Orifice:
Permitted Forebay Volume, cubic ft.:
Smith Creek Village
SW8 030108
New Hanover County
Mr. Jimmy Hatcher, Member Manager
Perimae & Associates, LLC
P.O. Box 15242
Wilmington, NC 28408
July 15, 2003
Spring Branch / Cape Fear
18-74-63-1
"C Sw"
9.72
423,403
none, per engineer
184,215
6.5
90% (no filter is required)
27.0
11,265@Permanent Pool
18,372
NMI
1.75" � (drawdown in 2-5 days)
8,048
3
State Stormwater Management Systems
Permit No. SWS 030108
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stonnwater system functions at optimum -efficiency. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Re(;ords of maintenance activities must be kept and made available upon request to
authorized personnel of DWQ. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the-stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall
become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior- to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications
rnLt:yt be noted on the Certification. A modification may be required for those deviations.
If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occuparicy of the facility.
The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
C. Further subdivision, acquisition, or sale of all or part of the project area. The
project area is defined as all property owned by the permittee, for which
Sedimentation and Erosion Control Plan approval or a CAMA Major permit was
sought.
V. Tilling in, altering, or piping of any vegetative conveyance shown on the approved
plan.
4
State Stormwater Management Systems
Permit No. SW8 030108
10. The permittee shall submit final site layout and grading plans for any permitted future
areas shown on the approved plans, prior to construction. If the proposed BUA exceeds
the amount permitted under this permit, a modification to the permit must be submitted
and approved prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by the
Permittee for a minimum of ten years from the date of the completion of construction.
12. At least 30 days prior to the sale or lease of any portion of the property, the permittee
shall notify DWQ and provide the name, mailing address and phone -number of the
purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be
granted in favor of the permittee if access to the stormwater facilities will be restricted by
the sale or lease of any portion of the property.
13. The permittee must maintain compliance with the proposed built -upon area and ensure
that the runoff from all the built -upon is directed into the permitted system.
14. The Director may notify the permittee when the permitted site does not meet one or more
of the minimum requirements of the permit. Within the time frame specified in the notice,
the permittee shall submit a written time schedule to the Director for modifying the site to
meet minimum requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
15. The permittee must maintain the current permitted drainage area. No additional runoff
from outside of the permitted drainage area boundary may enter the permitted stormwater
facilities without first applying for and receiving a permit modification.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director. 'In the
event of a change of owership, or a name change, the permittee must submit a formal
permit transfer request to the Division of Water Quality, accompanied by a completed
name/ownership change form, documentation from the parties involved, and other
supporting materials as may be appropriate. The approval of this request will be
considered on its merits and may or may not be approved. The permittee is responsible
for compliance with all permit conditions until such time as the Division approves the
transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may subject the
Penmittee to enforcement action by the Division of Water Quality, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement
stonmwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal business
hours for the purpose of inspecting all components of the permitted stormwater
management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and reissuance or termination does not
stay any permit condition.
State Stormwater Management Systems
Permit No. SW8 030108
Unless specified elsewhere, permanent seeding requirements for the stormwater control
must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address changes
within 30 days.
Permit issued this the 23rd day of July, 2003.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
lei
State Stormwater Management Systems
Permit No. SW8 030108
Smith Creek Village
Stonnwater Permit No. SW8 030108
New Hanover County
Designer's Certification
as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the project,
(Project)
for (Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
7
State Stormwater Management Systems .
Permit No. SWS 030108
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
-2. The drainage area to the system contains no more than the permitted amount of
built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of
the system.
10. The permitted amounts of surface area and/or volume have been provided.
11.. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
14. The overall dimensions of the system, as shown on the approved plans, are
provided.
cc, NCDENR-DWQ Regional Office
New Hanover County Building Inspections
0
' 1 i
State Stormwater Management Systems
Permit No. SW8 030108
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Perimae & Associates, LLC
Smith Creek Village
New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H A000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data as attached
and on file with and approved by the Division of Water Quality and considered a part of this
permit.
This permit shall be effective from the date of issuance until July 23, 2013, and shall be subject
to the following specified conditions and limitations:
I. DESIGN STANDARDS
I . This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described on page 3 of this permit, the Project Data Sheet. The stormwater control has
been designed to handle the runoff from 184,215 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of this
permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this project must
be directed into the pennitted stormwater control system. A permit modification must be
submitted and approved prior to the construction of additional built -upon area from
outside of the approved drainage area.
2
h
c ,
State Stormwater Management Systems
Permit No. SW8 030108
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
Receiving Stream/River Basin:
Stream Index Number:
Classification of Water Body:
Drainage Area, acres:
Onsite, sq. ft.:
Offsite, sq. ft.:
Total Impervious Surfaces, sq. ft.:
Pond Depth, feet:
TSS removal efficiency:
Permanent Pool Elevation, FMSL:
Permitted Surface Area, sq. ft.:
Permitted Storage Volume, cubic ft.:
Temporary Storage Elevation, FMSL:
Controlling Orifice:
Permitted 1~orebay Volume, cubic ft.:
Smith Creek Village
SW8 030108
New Hanover County
Mr. Jimmy Hatcher, Member Manager
Perimae & Associates, LLC
P.O. Box 15242
Wilmington, NC 28408
July 15, 2003
Spring Branch 1 Cape Fear
18-74-63-1
"C Sw"
9.72
423,403
none, per engineer
184,215
6.5
90% (no filter is required)
27.0
11,265@Permanent Pool
18,372
28.5
1.75" � (drawdown in 2-5 days)
8,048
3
State Stormwater Management Systems
Permit No. SW8 030108
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at optimum efficiency. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
c. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
C. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DWQ. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall
become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications
must be noted on the Certification. A modification may be required for those deviations.
If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
9. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
C. Further subdivision, acquisition, or sale of all or part of the project area. The
project area is defined as all property owned by the permittee, for which
Sedimentation and Erosion Control Plan approval or a CAMA Major permit was
sought.
f Filling in, altering, or piping of any vegetative conveyance shown on the approved
plan.
4
State Stormwater Management Systems
Permit No, SW8 030108
10. The permittee shall submit final site layout and grading plans for any permitted future
areas shown on the approved plans, prior to construction.'If the proposed BUA exceeds
the amount permitted under this permit, a modification to the permit must be submitted
and approved prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by the
Permittee for a minimum of ten years from the date of the completion of construction.
12. At least 30 days prior to the sale or lease of any portion of the property, the permittee
shall notify DWQ and provide the name, mailing address and phone number of the
purchaser or leasee. An access/maintenance casement to the stormwater facilities shall be
granted in favor of the permittee if access to the stormwater facilities will be restricted by
the sale or lease of any portion of the property.
13. The permittee must maintain compliance with the proposed built -upon area and ensure
that the runoff from all the built -upon is directed into the permitted system.
14. The Director may notify the permittee when the permitted site does not meet one or more
of the minimum requirements of the permit. Within the time frame specified in the notice,
the permittee shall submit a written time schedule to the Director for modifying the site to
meet minimum requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
15. The permittee must maintain the current permitted drainage area. No additional runoff
from outside of the permitted drainage area boundary may enter the permitted stormwater
facilities without first applying for and receiving a permit modification.
Ill. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director. In the
event of a change of owership, or a name change, the permittee must submit a formal
pen -nit transfer request to the Division of Water Quality, accompanied by a completed
name/ownership change form, documentation from the parties involved, and other
supporting materials as may be appropriate. The approval of this request will be
considered on its merits and may or may not be approved. The permittee is responsible
for compliance with all permit conditions until such time as the Division approves the
transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to enforcement action by the Division of Water Quality, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement
stormwater management systems.
5. The pertnittee grants DENR Staff permission to enter the property during normal business
hours for the purpose of inspecting all components of the permitted stormwater
management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and reissuance or termination does not
stay any permit condition.
State Stormwater Management Systems
Permit No. SW8 030108
Unless specified elsewhere, permanent seeding requirements for the stormwater control
must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address changes
within 30 days.
Permit issued this the 23rd day of July, 2003.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Alan W. Klimek, P.E., Director
1--011 Division of Water Quality
By Authority of the Environmental Management Commission
6
State Stormwater Management Systems
Permit No. SW8 030108
Smith Creek Village
Stormwater Permit No. SW8 030108
New Hanover County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the project,
(Project)
for
(Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
7
State Stormwater Management Systems
Permit No. SW8 030108
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of
built -upon area.
3. All the built -upon area associated with the project is graded"such that the runoff
drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
G. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of
the system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
14. The overall dimensions of the system, as shown on the approved plans, are
provided.
cc: NCDENR-DWQ Regional Office
New Hanover County Building Inspections
Date Received Fee Paid I Permit Number
Ito- 03 11311 L9D3 0119P
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
T his form may be photocopied jar use as an original
1. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Perimae & Associates LLC
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Mr. Jimmy Hatcher Member mono er
3. Mailing Address for person listed in item 2 above:
P.O. Box 15242—
city: Wilmington_ _ _ State: NC Zip: 28408
Telephone Number: 910-313-0198
4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
_Smith Creek Village
5, Location of Project (street address):
2700 if north on Kerr Ave. from the intersection of Market Street and Kerr Avenue.
City: Wilminglon County: New Hanover
G. Directions to project (from nearest major intersection):
Project is located on east side of Kerr Ave 2700 If north from the intersection of Market Street and Kerr
Avenue.
7. Latitude : N 34015' 00" Longitude: W 77053' 30" of project
8. , Contact person who can answer questions about the project:
Name: Charles D. Cazier Telephone Number: 910-763-5100
11. PERMIT INFORMATION:
1. Specify whether project is (check one)
X New
Renewal Modification
Form SWU-10t Version 3.99
Pagel of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density X High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control 404//401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
wet detention
2. Stormwater runoff from this project drains to the Cape Fear River basin.
3. Total Project Area: 9.72 acres 4. Project Built Upon Area: 43.5 %.
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
BasinJnformatiom
:: ;£'Drainage Basin I
'Drainage Basin 2
Receiving Stream Name
Unnamed trib. to Spring Branch
Receiving Stream Class
C-SW
Drainage Basin Area
9.72 ac
Existing Impervious * Area
-
Proposed Impervious * Area
4.23 ac
% Impervious* Area (total)
43.5 %
j
.Impervious * Surface`Area'
.__.. .., Drainage Basin V., ',
-Drainage Basin._2
On -site Buildings
56,167 sf
On -site Streets
107,219 sf
On -site Parking
-
On -site Sidewalks
20,749 sf
Other on -site
-
Off -site
-
Total:
?=184,215 sf
E_
* Impervious area is defined as the baill upon area including, but not limited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
.Z,
How was the off -site impervious area listed above derived? NA
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
1. The fallowing covenants are intended to ensure ongoing compliance with state stormwater management permit
number as issued by the Division of Water Quality. These covenants mm,
not be changed or deleted without the consent of the State.
2. No more than square feet ofany lot shall be covered by structures of impervious materials.
impervious materials include asphalt, gravel, concrete, brick, stone, .slate or similar material but do not include wood
decking or the water surface ofswimming pools.
3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings.
4, Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior
to construction.
5. All permitted runoffftom outparcels or future development shall be directed into the permitted stornnvater control
system. These connections to the stormwater control ,system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stonnwater management permit supplement form(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Fonn SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Fonn SWU409
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of
Vt. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Applicant's Initials
• Original and one copy of the Stormwater Management Permit Application Form Cam,
• One copy of the applicable Supplement Form(s) for each BMP 0Y.
• Permit application processing fee of $420 (payable to NCDENR) CM
• Detailed narrative description of stormwater treatment/management /1�L
• Two copies of plans and specifications, including:
Development/Project name
Engineer and firm
- Legend
- North arrow
- Scale
- Revision number and date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): TrippEngineering,P.C.
Mailing Address: 419 Chestnut Street
City: WilminLaon State: NC Zip:
Phone: (910) 763-5100
VtII. APPLICANT'S CERTIFICATION
Fax: _ �(910) 763-5631
29401
1, (print or type name ofperson listed in General Information, item 2) Mr. Jimmy Hatcher
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be r corded, and that the proposed project complies with the requirements of 15A
NCAC .100 7"'2
Signature:
Date:
Form SVVU-101
Version 3.99
Page 4 of 4