FILE NAME: G:IDATAIWPDATAIWQSIPOND1021205.WK1
PROJECT #: SW8 021205 REVIEWER: L, Lewis -
PROJECT NAME: Strick's LP Gas DATE: 28-Feb-03
Recei' i'ng Stream:
UT Prince George Creek
Class:
CS w,L
Drainage Basin-
Cape Fear
Index No.
CPF23 18-74-53
ry Site Area 2.00 acres
Drainage Area 87.12Q 00 square feet Area in Acres 2.00
IMPERVIOUS AREAS
Rational C
Building
4000.00
square feet
Parking
17276.00
square feet
Existing grave
4036.00
square feet
Concrete
2127.00
square feet
square feet
TOTAL
2 A ,:I O
square feet
square feet Rational Cc= -0:14
SURFACE AREA CALCULATION
% IMPERVIOUS
31.50%
SAIDA Ratio
2.82%
Des. Depth
4
Req, SA
2456 sf
TSS:
90
Prov. SA
5572: sf
VOLUME CALCULATION
Rational ?*
Des. Storm
OQ:
inches
Rv=
0.333
Bottom
90.9 msl
Perm. Pool
.::,»::94.00'
msl
Design Pool
95.7 msl
Storage met @elev 95.29 msl
Req. Volume
.., 2421; cf
Vol. Prov. at DP
k cf
* place a "1" in the box if Rational is used
Perm. Pool Volume=
Req. Forebay Volume=
Provided Volume=
Percent=
Elevation
Area
94.90
5572.00
95.70
6717.00
11744
2348.8
2468.00
Inc. Vol. Acc. Vol.
0.00
4915.60 4915.60
ORIFICE CALCULATION
Avg. Head =
0.38
ft
Q2 Area
0.68
sq. inches
Flow Q2, cfs
0.014
cfs
Q5 Area =
0.27
sq. inches
Flow Q5, cfs
0.006
cfs
Orifice Area
0.44
sq. inches
No. of Orifices
Q=
0.009
cfs
Diameter, inches
....... ;ti 75:
weir H x W
x
in
Drawdown =
31:
days
Surface Area @DP =
6717 sq. ft.
Falling Head Drawdown =
8.6 days
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
• . ,
2/19/2003
CDC
Strick's L.P. Gas
Stormwater Calculations
02096
Total Drainage Area
s . ft. acres
87,120 2.00
Impervious Area
Land Use
sq. ft.
acres
building
4,000
0,09
asphalt
17,276
0,40
existing ravel
4,036
0.09
concrete
2,127
0.05
Total
27,439
1 0.63
Stormwater Calculations:
Time of Concentration'.
Hydraulic Length (L) = 350 ft.
hange in Height (H) = 2 ft.
Tc = (L' IH)"" 1 128
5.19 min.
Flow for 10 year, 6 hour Storm (Q10):
QPRE '- (CPRE) x (110) x (Area)
= 3.15 cfs
QPOST - (CPOST) x (I10) x (Area)
= 6.05 cfs
Detention Pond Design:
Pond Size:
Elevation
ft.
Surface Area
(sq. ft.)
Normal Pool
94.90
5,572
Flood Pool
95.70
6,717
Top of Bank
98.00
10,583
Bottom of Pool
90.90
300
Total Provided Storage Volume:
Vol. _ [(Normal pool SA + Flood Pool SA) / 21
x (F.P. elev. - N.P. elev.)
4,916 cu, ft.
RECEIVED
FEB 2 0 2003
DWQ
PROJ # 1(A);F0Z12U5 _
02096POND
% impervious = 0.315
= 31.5%
say 32.0%
CPRE = 0.25
CPOST = (% imp.)(,95)+(1-% imp.)(.25)
0.48
110 = 6.30 in/hr
150 = 7.79 in/hr
Flow for 50 year, 6 hour Storm (Q50):
QPRE - (CPRE) x (I1o) x (Area)
3.90 cfs
QPosT = (CPosT) x (110) x (Area)
7.48 cfs
State Surface Area Reauirement at normal pool:
Pond side slopes = 3 :1
Depth below N.P. = 4 ft.
SA/DA = 0.0286
(Chart for 90% TSS Removal for Wet Detention
Pond without Vegetative Filter
Required SA = (SA/DA) x (Total Drainage Area)
= 2,492 s . ft.
State Volume Reauirement for Storaae of first 1" runoff:
Vol. _ [(1/12) x (DA) x (% imp.)] +
1(1/12) x (DA) x (1-% imp.) x C]
C = 0.2
3,281 cu. ft.
oF�SSib
y..9 '
aQ SEAL?
17374 P.
����IOREGIO�,,`��O`
1 of 2
2/19/2003
CDC
Pond Volume:
Strick's L.P. Gas
Stormwater Calculations
Bottom SA = 300 sq. ft.
Normal Pool SA = 5,572 sq. ft.
Vol. = [(N.P. SA + Bottom SA) / 21 x (N.P. el. - Bottom el.)
= 11,744 cu. ft.
Forebay_:
Required Volume
Vol. = 20% of storage volume
2,349 cu, ft.
Provided Volume
Bottom SA = 135 sq. ft.
Normal Pool SA = 1,510 sq. ft.
Vol. = [(N.P. SA + Bottom SA) / 21 x (N.P. el. - Bottom el.)
2,468 cu. ft.
depth = 3 ft.
Outlet Structure Design:
Flow for 2-day drawdown:
for 1st 1" of stormwater,
Q = Required Vol. / 172,800 sec. (2-days)
0.019 cfs
Reauired Area of Pipe for 2-dav drawdown:
A= Q/[Cd xSQRT(2xgxh)]
Cd = 0.6
g = 32.2 ft./s2
h = (F.P. elev.- N.P. elev.) /2
0.4 ft.
A = 0.0062 sq. ft.
Diameter of Pipe for 2-dav drawdown:
DIA. = SQRTI(A x 4) / pi)
— 0.0891 ft.
= 1.07 in.
Use. 75" orifice
Outlet Structure Check:
Using a 4' x 4' Basin
Perimeter L = 16 ft.
Q = CIA
C = (% imp.)(.95) + (1-% imp.)(.25)
0.48
1 = 6.30 in, for a 10 yr. Storm
A = 2.00 Acres
6.05 cfs
Flow for 5-day drawdown:
for 1st 1" of stormwater,
Q = Required Vol. 1432,000 sec, (5-days)
0.008 cfs
Keoulrea Area of Hoe Tor 5-aav araWdOWn:
A= Q/(Cd xSQRT(2xgxh)]
Cd = 0.6
g = 32.2 ft./52
h = (F.P. elev. - N.P. elev.) / 2
= 0.4 ft.
A = 0.0025 sq. ft.
Diameter of Pipe for 5-day drawdown:
7= SQRT[(A x 4) / pi]
= 0.0564 ft.
0.68 in,
Q= CwxLxH
H = IQ / (Cw x L)]2f3
Cw = 3
= 0.25 ft.
Peak elevation = flood pool elevation + H
= 95.95 ft.
WZY1
02096POND 2 of 2
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28ZI01
Phone: (910) 763-5100 • FAX: (910) 763-5631
RIF,
DFC
December 4, 2002
NCDENR 1`
Division Water Quality
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Ms. Linda Lewis
Re: Strick's L.P. Gas
New Hanover County, NC
TE 02096
Dear Linda:
Enclosed please find two (2) sets of plans, one (1) signed original and one (1)
copy of the application form with narrative, one (1) wet detention basin supplement, two
(2) sets of calculations and one check for the application fee.
Please review for approval and contact us with any questions or comments.
Thank you.
Sincerely,
Tripp Engineering, P.C.
jwv�f �01pu
Jennifer Rohde
JLR:dcb
Enc.
December 4, 2002
Stormwater Narrative
Strick's L.P. Gas
New Hanover County, NC
TE 02096
Strick's LR Gas is an existing 2.0 acre vacant tract of land. A commercial retial building
and asphalt parking area are proposed. The building of 4,000 sf and parking area of
23,139 sf total 27,139 sf or 31.2% impervious area.
A wet detention pond is designed to treat both the State's 1" requirement and New
Hanover County's 25-year pre -post requirement. Outflow from the pond will be routed to
and unnamed tributary of Denny's Creek, classification C-SW.