Loading...
HomeMy WebLinkAboutSW8021117_COMPLIANCE_20030314STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD INFILTRATION BASIN ANALYSIS PROJECT NUMBER: 021117 PROJECT NAME: Dove Meadows DRAINAGE BASIN: Cape Fear RECEIVING STREAM: UT Greenfield Lake Index No.: CPF17 18-76-1 SITE AREA 2.24 acres IMPERVIOUS AREA CALCULATION BUILDINGS PARKING/ASPHALT CONCRETE Future TOTAL % IMPERVIOUS, 1= 54.3°/ ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS FILENAME: G:IDATAIWPDATAIWQSIINBASIN1021117.WK1 .>rr111 EaATFM1x REVIEWER: L. Lewis CLASS: C Sw If ORW, is site within the 575' AEC? DRAINAGE AREA: E777 SF FEET MSL ':«=f25; INCHES/HOUR or 0.000579 FPS Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 24 1160 25 1952 1556 1556 26 2816 2384 3940 TOP 27 3760 3288 7228 VOLUME ! DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES! DESIGN VOLUME 4709:> CUBIC FEET STORAGE MET AT ELEVATION 5 CUBIC FEET ELEVATION SPECIFIED ON PLANS ;;>.;>2Fi;3U€ FEET TIME TO DRAWDOWN 1.9 HOURS MUST BE <120 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CiA= 0.43 CFS Op through the bottom of the basin= 0.67 CFS Must be > Or 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min, event = 4903.41 CF < 4372 CF COMMENTS Volume and drawdown are (not) within Design Requirements. INFILTRATION BASIN ANALYSIS FILENAME: G:IDATAIWPDATAIWQSIINBASIN1021117.WK1 PROJECT NUMBER: 021117 DATE: 27-Jan-03 PROJECT NAME: Dove Meadows DRAINAGE BASIN: Cape Fear REVIEWER: L. Lewis RECEIVING STREAM: UT Greenfield Lake CLASS: C Sw Index No.: CPF17 18-76-1 If ORW, is site within the 575' AEC? SITE AREA 2.24 acres DRAINAGE AREA: SF IMPERVIOUS AREA CALCULATION Rational C BUILDINGS 20080 1 PARKING/ASPHALT 22790 1 CONCRETE 7980 1 Future 2030 1 TOTAL 5$$(3I C �6 Place a 1" here if Rational % IMPERVIOUS, I= 54,3°Iri RV= .05+.009 (I) .�i ELEVATION OF SEASONAL HIGH WATER TABLE 22 FEET MSL REPORTED INFILTRATION RATE :. ,:.:2�� INCHES/HOUR or 0.000579 FPS SURFACE AREAS AND ELEVATIONS Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 24 1140 25 1980 1560 1560 26 2900 2440 4000 TOP 27 3900 3400 7400 VOLUME ! DEPTH / DRAWDOWN CALCULATION DESIGN STORM, INCHES ......,I DESIGN VOLUME 4372 CUBIC FEET STORAGE MET AT ELEVATION 26 11>' CUBIC FEET ELEVATION SPECIFIED ON PLANS :26F3! FEET TIME TO DRAWDOWN .$:> HOURS MUST BE <120 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CiA= 0.47 CFS Qp through the. bottom of the basin= 0.66 CFS Must be > Or li 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches / hour Volume for 10 yr. 10 min. event = 5362.29 CF < 4372 CF COMMENTS Volume and drawdown are (not) within Design Requirements. .A 4 Date Design Andrew and Kuske Sh! et /6 3o az. Cc f 902 Market St. CONSULTING ENGINEERS, INC,Wilmington. N.C. 28401 O00 Check .fob For Job No. STol�n�\v�r�rc (TALC-s 'DOV6 ►\SEAOw,••s G2076 S 17-6 -0 A-rA ,4� Sr- s I r(2� q tz 6-' 2 •2 4- : 971 !N'\oux A-izLA T3LDCG5 O,dG 20,0aa PA V—KI+J<- a , S z 2-L/ -79 o S IJ7LS\vQ L ICS ut-j0a fi6,.,A7c'n 4-ro° 4,OS Z, 93o -To -rAL_ !,2/ s2 ggn 1 USE S3, 000 cG Tom 04 s1cni \v/aiE,2 ��ASflrrc/a—ro*.r - C^ Sw Irvl�l�-T2A—f,an.r Z3As,n! 47z o r lz6o'u voLur— �ti�ltilrlrllrllJ �.�'C00 ••,,i �..T-�E� SSIpN'•;9 '-, VOL 0-,� .a 9 E s� A F-C A yV SE AL =, C--r 't 10972 11 GOG �FrV F S NF ,.. ZG 2BZ'o Z 3 9 0.; 39 �a- fllrl4N� 27 37Go ?.Z¢o (z C'Y o 36r 7 2 (0. 3. v- ¢9¢0 47av cF oK I`Wr-'(-r1z4 -r/ov RA 7'�5 K= z5` s3 rr1�lfrz 5E6 !dyo, Ga,va�cr v,Ty A/�ro �G1� ;�C�IE�J RECEIVED C,? = 11,60 SP x 0, o 3S' F rti� 4 r FEB 2 8 2003 1)ftAk., r) otk,,v 47¢0 C F :� ¢ D DWQ f } '12 d /-�, &r PROD # 12A)6 U Z 1 j l 7 2,0 1-01-J C S per. O,K Date Design Andrew and Kuske Sheet 1 D o a z C� S 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N,C. 28401 Z Of Check Job For Job No, STvRI��,�. 4w G c.G1 DovE T�G-Aoows' Ozo7(Q PG —a l� r c.ov. 'ZA7�S PF,Gcc) t.rs-rnuC7.o+. 7ZuN0FF - )a Yrz-/ 15-- Ak N -T7-L) z^� z, 5 GF5 ALL0-/l T7Lc` TDlSC.14AKC e5 C,U = Z'S GFS PC,. 2 Of 7-4Y!)Rcac4ro [4LCs Ri 7Actjen SGDIri�. 17?A5i,.l C/-)LC�r T). A = Z, 4 Ac-fzo 0 a 7C A 330a 5r ti 32-00 Sr e 6L-&/ 26.3 V �&voo Crb.. x 2, - A L 43oo cr 5"0za cF L' 2- dl< PILu\leoe ou-r L`7 rao 7L`.c7.or✓ -vumtNr co.vsr,vcrv" "Rirg-,Ar' Dis;tJyATdrt (t're = -7' G C F! V a = 4- FYJ 13GLa•v TiEQn.�-NTI 1A�' CHAR-r it S'& CA = S' \v- 1.5"+ 04 cA �y �L S70n1�, 02076 DOVE MEADOWS DENR INFILTRATION 90-Yr Type III 24-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 1 HydroCAD® 6.10 s/n 000479 O 1986-2002 Applied Microcomputer Systems 2/17/03 Subcatchment S1: AREA TO POND #1 Runoff = 7.61 cfs @ 12.21 hrs, Volume= 0.554 af, Depth= 2.97" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Type III 24-hr Rainfall=7.00" Area fac) CN Description 2.240 72 1/8 acre lots, 65% imp, HSG A -- - _ Tc Length min) (feet) 15.0 Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) Direct Entry, Subcatchment S1: AREA TO POND #1 Hydrograph i .--- - - - - -- 61cs 12.21 hrs --- -a - - - - - - - - - - -------- - - - - -------- - - - - - - I I I t I I I I I I I -- - - - - - - - - -' --- - - - - ------ - - - - -- ----- - - -- -- '------- - - - - - - I I 1 I I I I I I I I 4 I I I I I I I I I 5-------------'------------------------- ------ - - - - -------- - - - - - - I I I I I I 1 1 I I I 1 4 _ ----------- --- - - - - - - I I 1 I I I 3 ----- - - - - - - I I I 1 I I 1 I I I I 2-- - - - - -- -'-------------------------A------------------------- I I I I I I I k r I I I 1 - I I I - - - - - - -- --- - - - - -- ---------------- ----- ----- ------ - - -- I I - I - - - - - - I I I I I I I I Time (hours) -• Runoff 02076 DOVE MEADOWS DENR INFILTRATION 10-Yr Type 11124-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 2 HydroCAD® 6.10 sln 000479 ©1986-2002 Applied Microcomputer Systems 2/17/03 Reach R1: VEGETATED FILTER TO CB @ STREET Inflow Area = 2.240 ac, Inflow Depth = 0.43" Inflow -- 2.52 cfs @ 12.44 hrs, Volume= 0.080 of Outflow = 2.52 cfs @ 12.44 hrs, Volume= 0.080 af, Atten= 0%, Lag= 0.4 min Routing by Star-Ind+Trans method, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Max. Velocity= 2.1 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.2 fps, Avg. Travel Time= 0.4 min Peak Depth= 0.22' Capacity at bank full= 39.29 cfs Inlet Invert= 26.30', Outlet Invert= 26.00' 5.00' x 1.00' deep channel, n= 0.024 Length= 30.0' Slope= 0.0100 T Side Slope Z-value= 3.0 7' Reach R1: VEGETATED FILTER TO CB @ STREET Hydrograph 1 2.52 cfs rs I I I I I I I I I I I I I I 1 1 I I I [ I I I I I I -------_-•-•--- --- --- ------- --------------------------------------- I I I l I I I I I I I I I I I I S I I I I i I I 1 I I I 1 I I I I I I I I I I I I I l I I I I I I I I I I I I I I I I I I I I I I I Y I I I I I I I I I I I I 4 I I I i e I 1 I I 1 I I I d Time (hours) Inflow Outflow 02076 DOVE MEADOWS DENR INFILTRATION 10-Yr Type 11124-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 3 H droCAD® 6.10 sln 000479 O 1986-2002 Applied Microcomputer Systems 2/17/03 Pond P1: INFILTRATION POND # P-1 Inflow Area = 2.240 ac, Inflow Depth = 2.97" Inflow = 7.61 cfs @ 12.21 hrs, Volume= 0.554 of Outflow = 4.62 cfs @ 12.44 hrs, Volume= 0.553 af, Atten= 39%, Lag= 13.7 min Discarded = 2.10 cfs @ 12.44 hrs, Volume= 0.473 of Primary = 2.52 cfs @ 12.44 hrs, Volume= 0.080 of Routing by Stor-Ind method, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Peak Elev= 26.83' Surf.Area= 3,597 sf Storage= 6,668 cf Plug -Flow detention time= 26.8 min calculated for 0.553 of (100% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 24.00 1,160 0 0 25.00 1,960 1,560 1,560 26.00 2,820 2,390 3,950 27.00 3,760 3,290 7,240 28.00 5,000 4,380 11,620 Discarded OutFlow Max=2.10 cfs @ 12.44 hrs HW=26.83' (Free Discharge) ' —2=Exfiltration (Controls 2.10 cfs) Primary OutFlow Max=2.52 cfs @ 12.44 hrs HW=26.83' (Free Discharge) L1=Sharp-Crested Rectangular Weir (Controls 2.52 cfs) # Routing Invert Outlet Devices 1 Primary 26.30' 2.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 2 Discarded 0.00' 0.036000 fpm Exfiltration over entire Surface area 02076 DOVE MEADOWS DENR INFILTRATION 10-Yr Type 11124-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 4 HydroCAD® 6.10 sln 000479 O 1986-2002 Applied Microcomputer Systems 2/17/03 Pond P1: INFILTRATION POND # P-1 Hydrograph --- - - - - -- 1 7.61 cs rs---------------- - ----- - - - - -------- - - - - -- I I I I I I -------------'- ---- u------'---------- ------------------ ------ - - 1 I I I I I I I I I ------------ --- 5 I I I I I I I I I I I -- - - - - - - - -- 4. .cs @ 12.44 rs-I------ - - - - --------- - - - - -------- - - - - - - I ti I I I I I I I I I - _ _ _ _ _ _ _ _ _ - 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - - I I I I I I I C s rs $ 2.44 hrs I I I -- - - - - -- -'1- - .I -_----------I----------' I I I I I I I 1 I 1 I I I i i I I 1 0 Time (hours) a d 02076 DOVE MEADOWS DENR INFILTRATION 50-Yr Type 11124-hr Rainfall=9.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 5 H droCAD(D 6.10 sin 000479 © 1986-2002 Applied Microcomputer Systems 2/17/03 Subcatchment S1: AREA TO POND #1 Runoff = 11.07 cfs @ 12.20 hrs, Volume= 0.800 af, Depth= 4.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Type III 24-hr Rainfall=9.00" Area (ac) CN Tc Length min) (feet) 15.0 i 1 N V 3 0 LL Description 1/8 acre lots, Slope Velocity (ftlft) (fUsec "/o Imp, HZ5oU A Capacity Description (cfs) Direct Entry, Subcatchment S1: AREA TO POND #1 Hydrograph 1 _ _ _ _ _ _ — _ _ _ _ _I_ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ — — _ _ _ _ _ y _ _ _ _ _ _ _ _ — _ _ _ y _ _ — _ _ _ _ _ _ _ _ _ 11.07 cfs @ 12.20 hrs I I I —— — — — — — — — — — —I——---———————I—————— — — — — ———————— — — — — ——————.—— — — — — — — I I I I I l 1 I 1 - - - - - - - - - - - -I— — _ — — — — — — — —I— — — — — — — — — — — — - — — — — — — — — — — — — - — — — — — — — — — — — I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I t e 1 —— -—---I— — — — — — — —————— I -— — — — — —— — — -— -a— — — — —— — — — — I I I I I I I 0 11 12 13 1d 15 V Time (hours) -• Runotf 4. 02076 DOVE MEADOWS DENR INFILTRATION 50-Yr Type III 24-hr Rainfall=9.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 6 HydroCADO 6.10 sin 000479 @ 1986-2002 Applied Microcomputer Systems _ 2/17/03 Reach R1: VEGETATED FILTER TO CB @ STREET Inflow Area = 2.240 ac, Inflow Depth = 1.21" Inflow = 5.90 cfs @ 12.35 hrs, Volume= 0.226 of Outflow = 5.90 cfs @ 12.35 hrs, Volume= 0.226 af, Atten= 0%, Lag= 0.3 min Routing by Stor-Ind+Trans method, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Max. Velocity= 2.8 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 0.3 min Peak Depth= 0.35' Capacity at bank full= 39.29 cfs Inlet Invert= 26.30', Outlet Invert= 26.00' 5.00' x 1.00' deep channel, n= 0.024 Length= 30.0' Slope= 0.0100 '/' Side Slope Z-value= 3.0 7' Reach R1: VEGETATED FILTER TO CB @ STREET Hydrograph I I I I cfs hrs I I I ----- - - - - -------- - - - - -- ------------'-------------- 1 I I 1 1 i I I I I i I I I 1 I r I I I 1 I I I I I I I I i I I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' - - - - - - - - - - - I I I I I I I I I I I I I I I I ____I_ _ _ 1_____-_ _ _ _ _ _ F- _ _ _--.-___ ___I_ _ _ ___------_. I I I l I I I I I 1 I I I I l I I I I I I I V I I 1 I I - - - - - - - - - - - -1- - - - - - - - - - - 1 - - - - - - - L - - - - - - - - -I- - - ! I I I I I I I I I I I I I 11 12 13 14 is 11 Time (hours) Inflow Outflow 02076 DOVE MEADOWS DENR INFILTRATION 50-Yr Type 11124-hr Rainfall=9.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 7 HydroCADO 6.10 s/n 000479 O 1986-2002 Applied Microcomputer Systems 2/17/03 Pond P1: INFILTRATION POND # P-1 Inflow Area = 2.240 ac, Inflow Depth = 4.29" Inflow = 11.07 cfs @ 12.20 hrs, Volume= 0.800 of Outflow -- 8.26 cfs @ 12.35 hrs, Volume= 0.792 af, Atten= 25%, Lag= 8.6 min Discarded = 2.36 cfs @ 12.35 hrs, Volume= 0.566 of Primary = 5.90 cfs @ 12.35 hrs, Volume= 0.226 of Routing by Stor-Ind method, Time Span= 11.00-16.00 hrs, dt= 0.01 hrs Peak Elev= 27.23' Surf.Area= 4,042 sf Storage= 8,236 cf Plug -Flow detention time= 25.6 min calculated for 0.792 of (99% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq ft) (cubic -feet) (cubic -feet) 24.00 1,160 0 0 25.00 1,960 1,560 1,560 26.00 2,820 2,390 3,950 27.00 3,760 3,290 7,240 28.00 5,000 4,380 11,620 Discarded OutFlow Max=2.36 cfs @ 12.35 hrs HW=27.23' (Free Discharge) t--2=Exfiltration (Controls 2.36 cfs) Primary OutFlow Max=5.90 cfs @ 12.35 hrs HW=27.23' (Free Discharge) Z-1=Sharp-Crested Rectangular Weir (Controls 5.90 cfs) # Routing Invert Outlet Devices 1 Primary 26.30' 2.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 2 Discarded 0.00' 0.035000 fpm Exfiltration over entire Surface area 02076 DOVE MEADOWS DENR INFILTRATION 50-Yr Type/1/ 24-hr Rainfall=9.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 8 H droCAD® 6.10 sln 000479 Q 1986-2002 Applied Microcomputer Systems 2/17103 Pond P1: INFILTRATION POND # P-1 Hydrograph >_ - - - - - - - - - - - - - - - - - - - - -" - -I- - - - - - - - - - - - * - - ` ` - - - - - - - ------------- 11,07 c s 2 12.20 hrs I I I 1-------------t-- ---------I------------------------------------- I I V I I I I I -- - - -- - - - -+ - - _ - - - - - - - -I- - - - - - _ - - - - - ------- - -- - - - -I- - - - - - - - - - - - I I I I ! I I 8 _ _ _ _ _ _ _ __I_ _ _ _ _ _ _ _ _ _ _ _ y _ _ - _ _ - _ _ _ _ _ _I_ _ _ _ _ _ _ _ - - - - I i I 1 I I I cs, r$ _______.,_-_____ --_________--__ __ _____-I- _____t_- --____ I I 1 I ! I I rj- _ _ _ _ _ _ _I_ _ _ _ _ _ _ _ _ _ _ _ .t _ _ _ _ _ _ _ _ _ _ _ _I_ _ _ _ - - _ _ _ _ - - I I I I I I I c rs 1 I I i I I I I ! I a 1 1 17 1'1 i d 1 S Time (hours) M 4 Lj 02U74 LAwGIBB �Raun August 5, 2002 Mr. Greg I-lyson New Dawson Limited Partnership 1101 30th Street Northwest 4th floor Washington, D.C. (District of Columbia) 20007 Subject: HYDRAULIC CONDUCTIVITY TESTING PROPOSED DOVE MEADOWS DEVELOPMENT WILMINGTON, NORTH CAROLINA PROJECT NO.31000-2-1613 Dear Mr. Hyson: RECEIVED AUG G 5 2009 ANDREW AND KUSIE Law Engineering and Environmental Services Inc. (LAW) is pleased to provide you with the attached in -situ conductivity testing results. This scope for LAW Proposal No. 31099-0-0000 phase 491 covers the performance of hydraulic conductivity tests at locations designated by Mr. Larry Sneeden, the infiltration tests results are attached along with a corresponding site map. Three hand auger borings were advanced below the water table at the proposed Dove Meadows site to determine the approximate water table below land surface (BLS) and to log the existing soils (Appendix A). At Boring No. I-1 the water table was approximately 7.5 feet BLS, 1-2 was at 7.8 feet BLS and 1-3 was at 10.95 feet BLS. All soils were logged and are found in Appendix A. All soils were found to be fine to medium sands with varying amounts of clay and silt. We appreciate the opportunity to work with you on this project and we look forward to working as your consultant on this and future projects. Please feel free to contact us if you have any questions concerning this report. Respectfully submitted, LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. Daniel E. Atkinson Construction Services Manager Staff Geologist J. Chris Pruneau, L.G. Principal I-lydrogeologist DEAIJCPIdea Attachments BY �- WITHPERMISSION RECEIVED NOV 2 0 2002 DW PROD # 50 OIL I I ( ,� LAW Engineering and Environmental Services, Inc. 5710 Oleander Drive • Wilmington, NC 28403 910-452-1185 • Fax: 910-791-1338 n AMOOZEMETER DATA SHEET Date: 7130102 Water level in hole Job Name: Dove Meadows (31000-2.1613) initial: 68 cm Horizon: NIA final: 64 cm Location I-1 Hole Depth (cm): 77 cm Distance (bubble tube to soil surface): NIA Water Depth (in hole): 13 CHT Tube(s) setting: NIA Chamber(s).used: small Conversion Factor (20.0 cm2) both X (105.0 cm) Change -Level Calculations; K = QA K = Hydraulic Conductivity Q = Steady -State rate of Water Flow A = Glover Coefficient Q = 8.1cm x 105.0 cm210.017 hours = 50029.41 cm31 hour K = 50029.41 cm31 hour x 0 .00 1436 1 cm2 = 71.84 cm I hour _ 71.84 cm 1 inch = 28.28 in 1 hour hour 12.54 cm Notes: Head Settings 60cm Hole Diameter = 5cm A = 0.0014361 cm2 Fine to Medium SAND material Calculated By: DEA Checked By : DCS Calculations; K = QA K = Hydraulic Conductivity Q = Steady -State rate of Water Flow A = Glover Coefficient Q = 8.1cm x 105.0 cm210.017 hours = 50029.41 cm31 hour K = 50029.41 cm31 hour x 0 .00 1436 1 cm2 = 71.84 cm I hour _ 71.84 cm 1 inch = 28.28 in 1 hour hour 12.54 cm Notes: Head Settings 60cm Hole Diameter = 5cm A = 0.0014361 cm2 Fine to Medium SAND material Calculated By: DEA Checked By : DCS I AMOOZEMETER DATA SHEET Date: 7I30102 Water level in hole Job Name: Dove Meadows (31000-2-1613) initial: 59.5 cm Horizon: NIA final: 67.5 cm Location I-2 Hole Depth (cm). 71 cm Distance (bubble tube to soil surface): Water Depth (in hole): 13.5 CHT Tube(s) setting: NIA Chamber(s) used: small Conversion Factor (20.0 cm2) NIA both X (105.0 cm2) Change in Water Level ��' Elapsed Time O. K = Hydraulic Conductivity Q = Steady -State rate of Water Flow A = Glover Coefficient Q = 6.36cm x 105.0 cm210.017 hours = 39282.35 cm31 hour K = 39282.35 cm3 l hour x 0.001359 1 cm2 = 53.38 cm I hour Conversion: 53.38 cm 11 inch = 21.02 in 1 hour hour 12.54 cm Head Settings 60cm Hole Diameter = 5cm A = 0.00, 3591 cm2 Fine to Medium SAND material Calculated By: DEA Checked By : DCS I AMOOZEMETER DATA SHEET Date: 7130102 Job Name: Dove Meadows (31000-2-1613) Horizon: NIA Location 1-3 Bole Depth (cm): 72 cm Distance (bubble tube to soil surface): NIA Water Depth (in hole): 13 cm CHT Tube(s) setting: NIA Chamber(s) used: small Conversion Factor (20.0 cm) Water level in hole initial: 63 cm final: 59 cm both X (105.0 cm2) Level (cm) ®®® I 1 ®® 1 1 K=QA K = Hydraulic Conductivity Q = Steady -State rate of Water Flow A = Glover Coefficient Q = 7.4cm x 105.0 cm210.017 hours = 45705.88 cm31 hour K = 45705.88 cm3 / hour x 0.0014361 cm2 = 65.63 cm 1 hour 65.63 cm 1 inch = 25.83 in 1 hour hour 12.54 cm Head Settings 60cm Hole Diameter = 5cm A = 0.001436 / cm2 Fine to Medium SAND material Calculated By: ❑EA Checked By : DCS LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. SOIL BORING LOGS PROJECT NUMBER: 31000-2-1613 PROJECT NAME: Dove Meadows BORING NUMBER: 1-1 SITE LOCATION: Wilmington, NC ELEVATION NA GWL: 7.54' bis GEOLOGIST: Bill Mabie DATE STARTED: 7/30/02 DRILLING METHODS: Hand Auger DATE COMPLETED: 7/30/02 SAMPLE BLOWS ON REC USCS REMARKS DEPTH SAMPLER (IN) DESCRIPTION SYMBOL (FT) PER 6 IN. NA NA 0-1.0' Black to orange fine to medium sand with some organic NA moist - NA NA 1.0-2.0' Orange to tan fine to medium sand NA moist - -5 - NA NA 2.0-7.0' Orange to tan to dark brown tine to medium sand NA wet - NA NA 7.0-8.0' Dark brown fine to medium. sand with some silt NA sat. -10 Boring terminated at 8.0' - Water table encountered at 7.45' bls - -15 - -20 - NOTES: bls = Below Land Surface LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. SOIL BORING LOGS PROJECT NUMBER: 31000-2-1613 PROJECT NAME: Dove Meadows BORING NUMBER: 1-2 IGWL: SITE LOCATION. Wilmington, NC ELEVATION (FT): NA 7.75' bis GEOLOGIST: Bill Mabie DATE STARTED: 7/30/02 DRILLING METHODS: Hand Auger DATE COMPLETED: 7/30/02 SAMPLE BLOWS ON REC USCS REMARKS DEPTH SAMPLER (IN) DESCRIPTION SYMBOL (FTj PER 6 IN. - NA i NA 0-1.0' Black fine to medium sand with organics and debris NA moist - - NA NA 1.0-3.0' Yellow to tan to light brown tine to medium sand NA moist - - NA NA 3.0-4.0' Black fine sand with some silt and organics NA moist - -5 NA moist - NA NA 4.0-6.0' Black silty fine sand NA NA 6.0-7.0' Dark brown fine sand with some silt NA wet - NA NA 7.0-8.5' Dark brown to brown fine to medium sand NA sat. Boring terminated at 8.5' - - Water table encountered at 7.75' bls - -15 - -20 NOTES: Us Below Land Surface LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. SOIL BORING LOGS PROJECT NUMBER: 31000-2-1613 PROJECT NAME: Dove Meadows BORING NUMBER: 1-3 SITE LOCATION: Wilmington, NC ELEVATION FT : NA GWL: 10.95' bis GEOLOGIST: Bill Mabie DATE STARTED: 7/30/02 DRILLING METHODS: Hand Auger DATE COMPLETED: 7130/02 SAMPLE BLOWS ON REC USCS REMARKS DEPTH SAMPLER (IN) DESCRIPTION SYMBOL (FT) PER 6IN. NA NA 0-1.0' Dark brown to orange fine to medium sand with debris NA moist - NA moist - NA NA 1.04.0' Orange fine to medium sand - -5 moist - NA NA 4.0-7.0' Yellow fine to medium sand NA NA NA 7.0-8.5' Yellow to tan fine to medium sand NA moist -10 NA NA 8.5-11.5' Yellow to light brown fine to medium sand NA sat. - Boring terminated at 11.5' - -15 Groundwater encountered at 10.95' bis -20 - ENOTES::bls = Below Land Surface A k AA y EL IRON PIPE rOON 0,67, WEST OF LOIE I \ \ t / Horan Lwc \ \ 1.1a' r— .—TY LINE TO E a am eox mal. •\ 4 ` C Aro R N :P `A'p / PROPERTY CORNER TO LINE Or DEED BOOR 1161. Q0P LEGEND — — PROPERTY LINE — — — — AD, CENT PROPERTY LINE OR R\W LINE — _ -- E%ISTMC 6ANITMv SCWER LWE -—— C%16YING WAIEN LINE EXISTING ORAIT—C -E .dam ZONING LINE B-4' ouxowo I PONE �L(0 13 INrILTRANON TEST V IGNT FB SHIPYARD p —D M1GER TESTS GRAPHIC SCALE - IN FEET 0 60 120 (SITE MAP DOVE MEADOWS WILMINGTON, NORTH CAROLINA 5710 OLEANER DRIVE SUITE 110 WILMINGTON. NORTH CAROLINA DRAWN: WBM JOB: 31000-2-1613 APPROVAL: DEA DATE: 8105/02 SCALE: AS SHOWN FIG: 1 6mlerm 6oils Pimiled Post Office Box 10161 Wilmington, North Carolina 28404 RECOVER Tel/Fax: (910) 686.9868 consulting Environmental Scientists SEP 4 1 6 2002 ANDREW AND K11SKE September 11, 2002 Mr. C. Lawrence Sneeden, Jr., PE Andrew & Kuske Engineers, Inc. 902 Market Street Wilmington, North Carolina 28401 SUBJECT: Estimation of Seasonal High Water Table for Stormwater Basin Dove Meadows Project Site Adams Street Wilmington, North Carolina ESL Project No. 02-118 Dear Mr. Sneeden: Thank you for the opportunity to assist you with this project. The results of our study are presented the following report. Introduction A housing project for elderly residents is planned for the subject site. Regulations require the construction of a collection facility for stormwater infiltration. The purpose of this study was to observe the site soils with respect to their properties influencing permeability and the depth to the seasonal high water table (SHWT). Vince Lewis, DWQ Regional Soil Scientist, Larry Sneeden, PE, of Andrew & Kuske and Bill Dunlop, ESL soil scientist met on the project site on the morning of September 06. Hand auger borings were made for the purpose of observing soil conditions to estimate the depth to the S1 WT and to estimate the soil permeability. Two borings, one each in two locations, were made to a depth of about 84 inches. The borings were made in the location of the proposed stormwater infiltration basin (boring location 1) and near the northeast corner of the property (boring location 2). Dove Meadows Project ,r Page 2 Observations The project site is the former location of an apartment/housing complex. The top 18+/- inches of the soil were disturbed by the construction and demolition of the buildings. The soil material was black organic sand and dark gray sand (apparently fill material) mixed with concrete, gravel, and asphalt debris. The building material debris is from the former building foundations and driveways. From a depth of 18 to 36 inches the soil was loose, light gray sand. A layer of black and/or very dark brown slightly cemented sand was observed at a depth of 36 to 48 inches. This was apparently a spodic horizon. From 48 to 84 inches the soil was loose, light gray to gray sand. The depth to the SHWT was estimated to be approximately 72 inches in boring location 1 and 66 inches in boring location 2. Conclusions Both locations appeared to be suitable for a stormwater infiltration basin, the depth regulated, of course, by the depth of the SFIWT and the required separation of the basin bottom from it. - Mr. Lewis recommended the excavation of the spodic soil layer because its slower permeability. We estimate the permeability of the natural soil material, excepting the spodic layer, to be 6 in/hr or greater. The soil survey maps of the proposed project area indicated that the soils in the project area was Baymeade or Kureb. The soil we observed more closely resembled a Leon sand. If you have any questions, please call us. Sincerely, W. R. (Bill) Dunlop, Jr., LSS NC Licensed Soil Scientist #1095 EASTERN SOILS LIMITED P.O. Box 10161 Wilmington, NC 28404 q STORMWATER SYSTEM NARRATIVE DOVE MEADOWS ELDERLY HOUSING For NEW DAWSON LIMITED PARTNERSHIP 1101 30" STREET NW, 4T" FLOOR WASHINGTON, DC 20007 (202) 333-8447 RECEIVED Nov 2 0 2002 DWQ pROJ ``Yµ� rnr►r,r� C / 4/ �.I 'k-1 • 1 st AL �• 10972 0. Fyn f �, `,'•l err Yy//j�•�..UI November 2002 Prepared by: ANDREW 8r KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 — (Fax) E-mail: office@andrewandkuske.com A & K Project No. 02076 0 �r NARRATIVE DESCRIPTION The site is a 2.24 acre tract on the east side of Adams Street 400 feet south of Southern Boulevard in Wilmington, New Hanover County. It was formerly a part of the Dove Meadows housing project that was demolished over the past year. The site is relatively flat, with Kureb sandy soils and grass and weed vegetation. There are no wetlands or watercourses on the site. The project includes construction of 20 elderly housing units in 7 buildings, parking, sidewalks, utilities, and stormwater management measures. The construction will disturb 2.3 acres, and a state erosion control permit application has been submitted. Total built -upon area is 1.21 acres, or 54% of the site. Construction is scheduled to begin upon receipt of permits. STORMWATER MANAGEMENT MEASURES: The stormwater runoff from impervious surfaces will be directed to a grassed infiltration basin. The basin is designed to accommodate this site at 54% impervious area lot coverage and provide storage and infiltration of the runoff from the first inch of rain. Rainfall in excess of the one inch will overflow to a 30-foot vegetated filter. The basin bottom is two feet above the seasonal high water table. Measured infiltration rate is 25 inches per hour and drawdown time is 2 hours. The collection system utilizes Cultec contactor chambers in lieu of solid pipe. These chambers will allow exfiltration into the site soils but are not a part of the state stormwater management system permit and may be revised to solid. pipe at some point prior to construction. The contractor will provide maintenance during construction. The owner will maintain the system upon completion. 2