Loading...
HomeMy WebLinkAboutSW8021042_COMPLIANCE_20030424STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�� DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE �Y YYYYMMDD WET DETENTION POND ANALYSIS FILE NAME PROJECT #: SW8 021042 PROJECT NAME: Shallotte Villas G:\DATA\WPDATA\WQS\POND\021042.WK1 REVIEWER: L. Lewis DATE: 24-Apr-03 Receiving Stream: Shallotte River Class: SC HQW Drainage Basin: Lumber Index No. LBR59 15-25-2-(7.5) Site Area 4.61 acres Drainage Areaf?0812>40 square feet Area in Acres 4.61 IMPERVIOUS AREAS Buildings Parking Sidewalks TOTAL r SURFACE AREA CALCULATION % IMPERVIOUS 47.39% Des. Depth 4 TSS: 90 Rational C 41983.00 square feet 43152.00 square feet 10026,00 square feet square feet square feet square feet 95.1 1 00 square feet Rational Cc= 0.11 SA/DA Ratio 4.09% Req. SA 8215 sf Prov. SA VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm ! 0 ...... inches Rv= 0.476 Bottom 17.38 msl Perm. Pool 2 i 38 msl Design Pool 22.5 msl Storage met @elev 22.28 msl Req. Volume 974: cf Vol. Prov. at DP :.::.:9936.1 cf ORIFICE CALCULATION FOREBAY Perm. Pool Volume= 26217.5 Req. Forebay Volume= 5243.5 Provided Volume= 5337.50 Percent= Elevation Area Inc. Vol. Acc. Vol. 21.38 8636.00 0.00 22.50 9096.00 9929.92 9929.92 Avg. Head = 0.53 ft Q2 Area = 1.89 sq. inches Flow Q2, cfs 0.046 cfs Q5 Area = 0.76 sq. inches Flow Q5, cfs 0.018 cfs Orifice Area 1.23 sq. inches No. of Orifices - ............:....:1.;', Q= 0.030 cfs Diameter, inches ; ...,1.25' weir H x W in x :......: ... in Drawdown = 3 ;days Surface Area @DP = 9096 sq. ft. Falling Head Drawdown = 5.3 days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSWICK COUNTY, NC Permanent Pool Bottom Elevation — 17.38 �� C E IVE D Normal W.S.E. = 21.38 APR 0 l 2003 Average Depth = 4.0' l?yw� �o�# SGucyGZIG¢Z Surface Area = 8636 sf % Impervious — 47.39% (95,161 sf Impervious Area, 200,812 sf Total Area) SA/DA = 4.091 = 0.041 (90% TSS Removal - No Vegetated Filter Required) Allowable DA = 8636/0.041 — 210,634 = 4.84 ac Actual Area = 4.61 ac, therefore, 4.84 > 4.61 OK 1"Runoff Pool Permanent Pool W.S.E Runoff Volume (RV) Volume Drainage Area 1" Storage W.S.E. = 21.38 0.05 + 0.009(% IMP) 0.05 + 0.009 (47.39) = 0.48 in/in Design Runoff * RV * Drainage Area = V * 0.48 * 4.61 * (1 / 12) = 0.184 ac-ft Use 0.20 ac - ft = 8712 cf 0.20/((1 ")(0.48)(1/12)) — 5.00 ac > 4.61 ac OK 22.50 (volume = 8866.1 cf> 8712 cf) OK (See Stage -Storage Table for Wet Detention Pond) ..µ,�ssice._..rr. _ a , .. 4•• � H E; may` 1\�plea••°•°•ty`� S •°• ' ° L i 3�3 r•��J`�EIC'4i�N�,` i, SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSWICK COUNTY, NC Drainage To Pond Design Pond wl Allowable Capacity of 4.61 ac of Drainage Area @ 47.39% impervious tc = 5.0 min I(10yr15min) = 6.93 in/hr Impervious Area = 47.39%, C = 0.95 Pervious Area = 52.61 %, C = 0.30 Cc = 0.608 Q10 = Qp = CIA = 0.608 * 6.93 * 4.61 = 19.42 cfs SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSW ICK COUNTY, NC P = 4.2 CN = 80 S = (10001CN) = 2.5 Q* — ((P-0.2S)^2)1(P+0.8S) = 2.21 in Tp = Voll(1.39Qp) _ ((2.21 *4.61 ac)/(1.39* 19.42))/((1 ft/l 2 in)(43560 sflac) (1 min160 sec)) — 22.65 min I SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSWICK COUNTY, NC Stage -Storage Table for Wet Detention Pond Surface Incr Accum Contour Area Volume Volume Stage CSD (C-D (S) (cfl (Z) (ft) 17.38 4635 0 0 0 18.38 5532 5083.5 5083.5 1 19.38 6506 6019 11102.5 2 20.38 7544 7025 18127.5 3 21.38 8636 8090 26217.5 4 22.50 9096.2 8866.1 35083.6 5.12 b = ln(S2/S1)/ln(Z2/Z1) = 1.18 Ks = S2/(Z2^b) — 5107 Si — Ks*Zi^b S (Temporary Pool Elevation) — 5107(5.12A1.18) = 35,083.6 of (22.50' = Z=5.12') Therefore the storage between the Temporary Pool Elevation and the Permanent Pool Elevation = 35083.6 - 26217.5 = 8,866.1 of SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSWICK COUNTY, NC Stage -Storage Table for Wet Detention Pond Forebay Surface Incr Accum Contour Area Volume Volume Stage (ffi ss 0 Cf S c (Z) (ft) 17.38 927 0 0 0 18.38 1434 1180.5 1180.5 1 19.38 2051 1742.5 2923 2 20.38 2778 2414.5 5337.5 3 b ln(S21S 1)/]n(Z21Z 1) = 1.37 Ks = S2/(Z2^b) = 1185 Forebay Volume at the Vegetated Shelf = 5337.5 cf = 20.36% of the Total Permanent Pool Volume of 26,217.5 cf SHALLOTTE VILLAS - WET DETENTION POND SHALLOTTE, BRUNSWICK COUNTY, NC Orifice Size Calculation: Q = Cd(A)((2gh)^0.5) use l .25" Cd = 0.60 A = 3.1416((1 in/ (1.25 ft/ 12 in))^2)/4 w 0.0085 sf g = 3 2.2 ft/sec^2 h = 1.1272 = 0.56' Q = 0.6(0.0085)((2*32.2*0.56)^0.5) = 0.0306 cfs Time to drain 8866.1 cf = 8866.1/0.0306 = 289,742 sec 80.5 hr 48 < 80.5 < 120 OK . %%tra l c h r. ' "P 1 4" �,�A�' C4Rp `l rtrt eo Ap •'�i �gyY�e �S(L �JIO �, ' � � , S tf�a� 90B�I; s SHALLOTTE VILLAS - STORMWATER NARRATIVE The purpose of this project is to develop an elderly housing facility in Shallotte, North Carolina, on White Street. The site will be stripped and graded as depicted on the subject plans. The approximate disturbed area is 4.1 acres. See limits of construction on the project on the subject plan. Drives, parking areas & drainage construction will be in accordance with standards of the NCDOT and the Town of Shallotte. Public water and sanitary sewer will be provided by the Town of Shallotte. Site Description The topography of the site has slight sloping grades from north to south. Runoff will be handled by one 1 basic storm drainage system which is a piped system which runs along the western portion of the site and discharges directly to the wet -detention pond. The subject area to be disturbed is presently cleared lands with undergrowth. The site is bordered on the west, north and east by vacant lands and sparse development, and on the south by White Street. The US Conservation Soil Survey maps classify the soils as follows; (1) The subject site appears to be covered by Fo (Foreston Loamy Fine Sand). The slopes of this specific area are typically - nearly level. This moderately well drained soil is on slightly convex interstream areas. Permeability is moderately rapid and the available water capacity is moderate. Planned Erosion and Sediment Control Features (1) Temporary gravel construction pads will be used at the areas shown on the subject plans. (2) Silt fencing will be used as deemed necessary during development of the project. (3) Drainage swales with appropriate liners will be used as shown on the subject plans. (4) Temporary Block Inlet Protection, sediment traps, rock dams, swales and wet detention ponds will be used to collect runoff as shown on the subject plans. (5) Drainage outfalls will have outlet stabilization as shown on the subject plans (6) Seeding of all disturbed areas will be accomplished as phases of construction are completed. RECEIVED APR 0 7 2003 DWQ PRod # Drainage Area and Respective Stormwater Management Features Drainage Area #1 Wet -Detention Pond Area #1 incorporates only drainage from the entire site. The drainage will be captured in catch basins and routed to the wet -detention pond; and by a diversion berm along the front and along the eastern boundary of the site. The wet -detention will will be constructed with a Riser/Barrel assembly to pass the 10 year-5 min storm event. An emergency spillway will be provided that will pass the remainder of the 100 year - 5 min storm, that is not passed through the Riser/Barrel assembly. Due to the nature of the site topography, proposed development, a four (4) foot Permanent Pool Depth was utilized. All requirements outlined in Form SWU-102 have been adhered too. See Form SWU-101 for Drainage Basin information. Please note that a landscaping berm will be developed along the western property boundary to direct offsite drainage to an existing ditch at the northwestern corner of the subject site. SHALLOTTE VILLAS - STORMWATER NARRATIVE The purpose of this project is to deveiop an elderly housing facility in Shallotte, tiTorth Carolina, on White Street. The site will be stripped and graded as depicted on the subject plans. The approximate disturbed 'r::a is 4.1 acres. See limits of construction on the project on the subject plan, Drives, parking areas & drainage construction will be in accordance with standards Of the NCDOT and the Town of Shallotte. Public water and sanitary sewer will be provided by the Town of Shallotte. Site Description The topography of the site has slight sloping from north to south. Runoff will be handled by three 3) basic storm drainage systems: one i is a piped system which runs along the western oomon of the site anti eis .+acres. directly to the wet -detention pond, two f 2 is a swale in the central eastern portion of the site, three 3 is a swale in the southeastern portion of the sit;,. The subject area to be disturbed is presently cleared lands with undergrowth. The site is bordcred on the west, north and east by vacant lands and sparse development, and on the south by White Street. The US Conservation Soil Survey maps classifv the soils as follows: (1) The subject site appears to be covered by Fo (Foreston Loamy Fine Sand). The slopes of this specific area are typically - nearly level. This moderately well drained soil is on slightly Convex in: 7stream areas. Permeability is moderately rapid and the available water capacity is moderate. Planned Erosion and Sediment Control Features (1) Temporary gravel construction pads will be used at the areas shown on the subject plans. (2) Silt fencing will be used as deemed necessary during development of the project. { �) Drainage swales with appropriate iiners will be used as shown on the subject plates. (4) Temporary Block Inlet Protection, sediment traps, rock dams, swales and wet de€ention ponds will be used to collect runoff as shown on the subject plans. (�) Drainage outfalls will have outlet stabilization as shown on the subject plans (6) Seeding of all disturbed areas will be accomplished as phases of construction are completed. Drainage Area #1 Wet -Detention Pond Area # l incorporates offsite drainage from the west and western half of the subject site. The drainage will be captured in catch basins and routed to the wet -detention pond, The wet - detention will will be constructed with a Riser/Barrel assembly to pass the 10 year-5 min storm event. An emergency spillway will be provided that will pass the remainder of the 100 year - 5 min storm, that is not passed through the Riser/Barrel assembly. Due to the nature of the site topography, proposed development, a four (4) foot Permanent Pool Depth was utilized. All requirements outlined in Form SWU-102 have been adhered too. See Form SWU-101 for Drainage Basin information. Please note that a landscaping berm will be developed along the western property boudary. Drainage Area #2 (Swale) Area 42 incorporates the central and eastern portion of the site. The drainage will be captured in a swale :and discharged to the wet. -detention pond. See Form SWU-101 for Drainage Basin information. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Division of Land Resources Land Quality Section Michael F. Easley,Governor William G. Ross Jr., Secretary October 14, 2002 :jiJ Q /0 7 L NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN Shallotte Villas Association Ltd. Partnership Mr. James B. Smith 3800 Raeford Road Fayetteville NC 28304 Dear Mr. Smith: This office has received a soil erosion and sedimentation control plan for the project listed below which was submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 1 13A-57(4)). Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of said land disturbing activity (NCGS 1 13A- 54(d)(4)). The act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30 day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. A copy of any erosion and sediment control plan which could involve the utilization of ditches for the purpose of dewatering or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that you contact the Division of Water Quality at (910) 395-3900 if the ditches shown on your plan will lower the water table. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions, please do not hesitate to contact this office appreciated and we look forward to working with you on this project. Sincerely, Carol N. Miller, CPESC Assistant Regional Engineer CNM/bfr cc: Harvey Allen, P.E.; Allen -Allen & Associates, P.A. WiRO-LQS PROJECT NAME: Shallotte Villas PROJECT NUMBER: BR-03098 LOCATION: White Street - Brunswick County RIVER BASIN: Lumber SUBMITTED BY: Allen -Allen & Associates, P.A. DATE RECEIVED BY LQS: October 11, 2002 Your cooperation in this matter is 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 a Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer . li STORMW ATER MANAGEMENT FLAN ''VET DETENTION POND OPERATION & MAINTENANCE SHALLOTTE VILLAS SHALLOTTE, BRUNSWICK COUNT Y, NC OCI'OBER, 2002 DETENTION POND OPERATION AND MAINTENANCE: The purpose of this section is to provide the owner with guidelines to help maintain the permanent wet detention pond. Wet detention ponds must be maintained by the property owner as needed to ensure there proper functioning. Periodic inspections and maintenance are key factors in preserving the functionalit), of wet detention ponds. Detention ponds are not self maintaining systems, and over time the efficiency of the pond to remove pollutants will diminish. Trapped sediments and other pollutants can potentially reduce the volume and treatment capacity of the pond. Besides inspecting and maintaining the pond components pertaining to water quality, attention must also be paid to the structural components which sustain the hydraulic functionaliry of the pond as well. Maintenance is also important to prevent the decline in the appearance of the pond Unhealthy conditions (such as noxious vegetation, trash, etc.) may occur within and around the pond. which may affect the aesthetics and economic value of the surrounding property. VEGETATIVE GRowrH: Trees and other woody vegetation are not permitted on the top slopes or dam embankments. Large root systems from woody vegetation can weaken the dam structure and provide seepage pathways. Thick vegetative cover can also provide a haven for burrowing animals such as the groundhog. These animals can create a network of burrows in the dam embankments that can significantly weaken the dam. by creating seepage paths, which may eventually lead to dam failure. The earthen embankment should at all times maintain a healthy grass cover, which is free of brush. This type of cover, if properly maintained, will prevent erosion of the embankment and provide an easv surface for inspection. Good grass cover should also be maintained around the pond perimeter to prevent excessive sediment from entering the pond. Grass should be properly fertilized even, March and October (or as required) to ensure a substantial grass stand is continuously present. Grass mowing, brush cutting and removal of weed vegetation will be necessary for the proper maintenance of the embankment, The embankment slopes and spillway should be mowed when the grass exceeds eight (8) inches in height. Mowing of the dam embankments should occur, at a minimum, once every 6 months to prevent woody vegetation growth and cover for burrowing animals. Acceptable methods include the use of weed whips, power brush cutters and mowers. All rip -rap areas should be treated with a herbicide as required to control any plant materials that may develop. The embankment and adjacent slopes of the pond should be periodically (at least once every two years) limed, fertilized and re -seeded in the fall after the growing season. Consult the North Carolina State Cooperative Extension Service of the local Soil &. Water Conservation district office to determine the appropriate lime and fertilizer requirements. Trees and other woody vegetation should not be allowed to grow on the earthen pond embankment. Anv vegetation, which inhibits the operation of the pond, should be removed. PAGE 2 All erosion gullies noted during the growing season should be backfilled with topsoil, re -seeded and protected until the vegetation is established. Proper care of these areas is required to prevent more serious damage to the embankment. All bare areas and pathways in the embankment should be properly seeded and protected in order to eliminate the potential for erosion. All animal burrows noted during the mowing operation should be backfilled and compacted, iIMeasures should be taken to eliminate animals from the area. Trash and vegetative floatables (grass clippings, leaves, limbs, etc.) should be cleaned from the pored surface and surroundings periodically to promote a healthy, aesthetically pleasing environment. and to prevent blockage of the pond outlets. Studies have shown that people are less likely to litter ponds that are aesthetically pleasing and support wildlife. EROSION: Unsuitable fill material, inadequate compaction, and/or poor stabilization of earth structures can result in accelerated erosion where high runoff velocities exist. High velocities usually occur on steep pond embankments, at pond inlet and outlet discharge areas, and where the water is constricted to channel floe'. The entire pond area should be inspected quarterly for signs of erosion, paying special attention to the following areas. Embankments: if pond embankments are not kept well vegetated with grasses, rill erosion (small channels formed in the embankment due to poor grass cover) may occur. Rill erosion can be repaired by filling the small channels with suitable soil, compacting, and seeding. It may be necessary to install temporary erosion control (such as excelsior matting) along heavily eroded areas to allow the repaired areas to stabilize. It is especially important to inspect for and immediately repair any erosion on the dam embankments. Pipe Inlet and Outlet areas: Where erosion causes the undercutting of the dow-rtstream end of pipe. the undercut should be stabilized immediately to prevent the end pipe section from "breaking" off. Eroded areas should be filled with good compatible soil and covered with geotextile and riprap. Open Channel Flow: Eroded areas should be seeded and protected with temporary matting. If erosion continues, a more robust lining (riprap) should be used. SEEPAGE: The dowristcam side of the embankment should be inspected for evidence of significant seepage at least quarterly. Seepage can emerge anywhere below the normal pool elevation, including the downstream slope of earth dams, areas beyond the toe of the dam, and around the spillway or pond outlet pipe. Indications of significant seepage include areas where the soil is saturated or where there is a flowing "spring" or leak. If "sinkholes" in the dam embankment are notice, or if constant flowing water is noticed on the downstream side of the dam, then seepage has become excessive and professional engineering advice should be sought immediately to avert a major structural problem or a failure of the dam. PAGE 3 The entire embankment should be inspected for cracks. Pronounced cracks on the embankment surface indicate the first stages of potential dam failure Short isolated cracks are usually not significant. but larger, and well-defined cracks indicate a serious problem that may eventually lead to slope failure such as sliding or sloughing. There are two types of potential cracks: Transverse cracks appear crossing the embankment and indicate the differential settlement within the embankment. Any area experience excessive settlement (greater than six (b) inches) should be restored to the original elevation. A large amount of settlement .within a small area could indicate serious problems in the foundation or the lower part of the embankment. Settlement accompanied by cracking often proceeds failure. Longitudinal cracks run parallel to the embankment and may signal the early stages of a slide Slides are serious threats to the safety of an embankment. Arch shape cracks are indications that slides are slipping or beginning to slip. These cracks soon develop into large scraps in the slope at the top of the slide. If excessive seepage of significant cracks is detected, the embankment could experience failure. A geotechnical or civil engineer should be immediately consulted regarding the origin of these problems and to ascertain the appropriate solution for correcting the situation. SEDIMENT ACCUMULATION: To preserve the pond's pollutant removal capability, sediment must be removed in areas where the capacity of the design sediment storage volume has been exceeded. The forebay helps to improve the removal efficiency of the pond system by trapping the majority of coarser suspended solids behind the submerged weir. When sediment deposition in the forebay exceeds the designed sediment storage capacity, the forebay must be dredged. An indication of when the forebay sediment capacity is exceeded is when sediment bars are visible near the inlet discharge or when the sediment level at the inlet to the pond is less than one foot below the normal pool water surface. Typically, forebays will need to be dredged every 5 to 10 years. Depth measurements relative to the normal pool water surface elevation (bottom of the low flow orifice) should be taken at several locations around the pond. This pond is designed with a normal depth of 3- feet, The sediment is to be removed when the measured depth is less than the design permanent pool depth. If the forebay is regularly dredged, the frequency of dredging the entire pond could be greatly reduced BLOCKAGE OF OUTLETS: Wet extended detention ponds are designed for the water to exit the pond through the low flow orifice, the principal spillway, and the emergency spillway. It is important to check all three outlets for blockage that would impair the pond's water quality and hydraulic functionality. Low Flow Orifice: The low flow orifice utilizes an inverted orifice to prevent clogging. When the orifice becomes clogged the water level rises to the principal spillway elevation and the benefits associated with temporary storage and its gradual release are lost. To preserve "extended detention" the low flow orifice should be inspected for blockage twice a month and after large storms. PAGE 4 Principal and Emergency Spillways: Principal and emergency spillways are designed to safely convey larger than one -inch storms that produce runoff, which exceed the water quality volume of the pond. if these spillways are blocked so they do not operate at full capacity, the risk of dam overtopping or other uncontrolled releases may result. To ensure the hydraulic capacity of the spillways. the spillways should be inspected for blockage twice a month and after large storms. Vegetative growth in the riser should be removed promptly so that the design capacity of the spillway is maintained. The outlet area where the barrel projects from the fill should be clear of tree limbs, sediment accumulation, etc. The pond also has an emergency drain with a valve located within the principal spillway riser structure. The operation of this valve should be checked on a bi-annual basis by simply opening and shutting the valve. MAINTENANCE CHECKLIST Perform inspections and maintenance of the pond on a regular basis and after large storm events Record and file inspections and maintenance activities. An Inspection and Maintenance Report is aitached for use in documentation. PAGE �J DETENTION POND INSPECTION & MAINTENANCE REPORT ,1 X1 1 J1�5 INSPECTED BY. ALLJg(kDATE OF INSPECTION: INSPECTION ITEM MAINT. NEEDED? (yCSJ lo} ENTIRE DRAINAGE AREA OF POND CORRECTIVE ACTIVITIES I COMMENTS Am�as where bare earth is Re -seed areas; take temporary measures a exposed or scarce grass cover? to prevent erosion until vegetation is reestablished. htlets to storm drainage clear Clear debris to preserve capacity. of debris? r I VEGETATIVE GROWTH Check vegetative growth on Mow grass when higher that 8-in. embankment and adjacent Fertilize at least bi-annually, Remove slopes. clippings, leaves, etc. from pond area. Check for unwanted vegetative Remove brush, trees and other woody growth and animal burrows. vegetation from embankment. Fill burrows, eliminate animals. } EROSION Check pond embankments for Re -vegetate bare earth with strong rooted bare earth and eroded areas. grasses; repair eroded areas. ai Check for pipe undercut at Fill eroded areas with good compactable inlet and outlet discharge soil, overlay with filter fabric and rip rap areas. Cneck for erosion downstream Seed eroded areas and protect with temp. I of pipe discharge areas erosion protection (e.g. matting); if i erosion persists may need rip rap lining. SEEPAGE l Check the toe of the The dam may have seepage problems. downstream dam embankment Contact the City and a dam engineer for "springs" or wet spots. immediately to inspect. Check embankments and crest Contact the City and a dam engineer for pronounced cracking or immediately to inspect. slope failures. SEDIMENT ACCUMULATION Check sediment in forebay area. Check sediment in the main portion of the pond (once eves. 5 years) FUNCTIONALITY OF POND OLITLETS Sediment should be removed from the forebay when level is less than I -ft below normal water surface elevation. Remove sediment when sediment exceeds design storage volume. I Check for blockage in low Remove blockage; if blockage persists, no", orifice, principal and consider modifying trash guard j emergency spillways. Check pond drain operation. Periodically open and close the pond drain to keep operational i PAGE 6