Beach Assembly of God
Forebay Calculations
East Coast Engineering Company, PA
DFC
TOTAL POND VOLUME at PERMANENT POOL
5' depth, 6:1 slope for 10 ', then 3:1 slope
ELEVATION
(FT MSL
SURFACE
AREA (SF)
INCREMENTAL
VOLUME CF
ACCUMULATIVE
VOLUME (CF)
31
433
686
686
32
939
1547
2233
33
2154
2593
4825
34
3031
3780
8605
35
4528
5541
14145
36
6553
227vf
SO-1 3
20% OF PERMANENT POOL VOLUME = 2829.000
FOREBAY VOLUME at PERMANENT POOL
2:1 slope
ELEVATION
FT MSL)
SURFACE
AREA (SF)
INCREMENTAL
VOLUME CF)
ACCUMULATIVE
VOLUME (CF)
33
637
751
751
34
864
991
1741
35
1117
1255
2996
36
1393
t Sl c'l rp
Jr AL
IRTVi—
Aso
RECEIVED
JAN 14 2003
DWQ
PROD' # O2 /Oz5
Revision 10/9/02
Q U
a LL
a;
C
O
U
C
C
LU
O
U
y
ro
LU
m
(4
U
Gco
OO
Q
19
�_
O
L
L
L
n
h
V
O
0
4—
U)
L .
U)
4—
U)
4—
U
L .
U)
��
Ul
4 -
U
4'^
U)
4.
U
4—
U
4—
U
U
U
.0
U
I-
1-
Ln
O
m
r
O
I,-
CD
M
LO
w
Imo.
I,-
I~
m
tD
m
to
O
(D
GD
CD
CD
(M
M
O
O
LO
a
M
O
GO
CD
q
O
m
GO
N
(D
CDto}T
W
T
r
T
f•
O(n
4n
(f)
of
Nt
—
N
GOO
CA
O0O
T
O
I--
�-
CD
O
O
i`
O
C?r-
00
CD
tC)
CV
O
O00)
CD
hO
C7Go0O
'1
NCV
OO
C7co6
O
N
O
�
�•
4i
CD
Q
CL5
0
p 0
x
N
U)
O
4 x
-p
t1
N
O
D
CL
x
>
a
r
r
�-
_�
L
x
x
(D
T
XCO�?
cn
N)
7
7
Q)
CL
r
II
j
v
7
m
4f)
II
n
o
Q C
>
Q
N
ro
ro
LO
r.
cm c
.(
�-
Q
❑
+ r
W
CV
Cn
0
U)
0
i
N
��
N
E
CZ
m
K
U) II
Omo
C
R)
4_
O
m
�
-
-G
-
C
X
UU
X
y
v
Q
cz'II
v`
(n
L
L
{j
E
C
j
C
C
r
U7
V
II
Q
It
I!
II
II
as
0
�rY>O
D O
S
¢t
U
¢
Q
4
4
p
CD
n,
—
b
C,
(D
a
mm
i
CV
LO
U
vy
U
II
II
0
m
m
0
O
m
0
+.
C
C
6d
O
O
oro.o�--
ab��
ao
IML
o
11L
ti
c�
From°'
��It
5
a�
3
°°
as
co
I� m
(aj
ro
m�
a
C
m
rom
L
O?
¢
S
3
m
ces
c
°�)
mo
a
r
r
m
o �'-.
vej
y
acx
m
y'
4-
O
c
N
m
b
N
N
a�a,
Hsu)
roa
ro�
2
m
ro
�..
O
�a�
m
m
s�o(D
o
m
m
C)m
m
in
ro
a
m
a�
mUm6aamm
o
a
>
m
m
7
i
ro
ro
cp
a
cU
-Q
m
CN
C
O
O
.0
¢¢
O
O
CL
�
� ��
4vali�
OC1U2
U
SOU
13
Q
ID
Qtiti
OL
C'1
W��
L
Q
DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1021025.WK1
PROJECT NAME: Beach Assembly of God
DATE: 10-Jan-03
Receiving Stream: Shallotte River Class: C Sw HQW
Drainage Basin: Lumber Index No. LBR59 15-25-2-(1)
Site Area 5.50 acres
Drainage Area 4 2877 QO square feet Area = 4.80 acres
IMPERVIOUS AREAS
Rational C
Building 16117.00 square feet
Parking 69696.00 square feet
Sidewalks 4792.00 square feet
square feet
square feet
square feet
TOTAL 9060'; square feet Rational Cc= 0.11
SURFACE AREA CALCULATION
% IMPERVIOUS 43.38%
Des. Depth 5
TSS: 90
SAIDA Ratio 3.04%
Req. SA 6342 sf
Prov. SA ...:.:::...:: ;.:$� .3 < sf
VOLUME CALCULATION ' place a "'I" in the box if Rational is used
Rational ?* FOREBAY
Des. Storm 1:,04> inches Perm. Pool Volume = 14145
Rv= 0.44 Req. Forebay Volume= 2829
Bottom 31 msl Provided Volume= 2996.00
Perm. Pool :0€ msl Percent=2°4'
Design Pool 37.17 msl
Design SA 8073 sf
Req. Volume 766 cf
Prov. Volume cf
ORIFICE CALCULATION
SA @ _
Elevation=
Avg. Head =
0.56
ft
Q2 Area =
1.77
sq. in.
Flow Q2, cfs
0.044
cfs
Q5 Area =
0.71
sq. in.
Flow Q5, cfs
0.018
cfs
Orifice Area
0.79
sq. in.
No. of Orifices
:::'7:'
Q=
0.020
cfs
Diameter, inches
1..
weir H x W
, ..:,, , :>
in
x
:......:.: .:..: in
Drawdown =
..:`....... _
days
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
4
NARRATIVE RECEIVED
for OCT 2 2 2002
Beach Assembly of God
Brunswick County, NC DWQ
DESCRIPTION PROJ # _ ..,..
The project area is 5.08 acres of the total 5.41-acre site located in Brunswick
County, NC, near Grissettown. It is located on the west side of US Highway 17 about '/4
mile north of the intersection with NC Highway 904. The proposed development on the
site is a church with associated paved drive and onsite parking. The site is cleared with
sandy topsoil and grades ranging from 0.5% to 2.0%. The site will be graded to
accommodate the proposed development. Construction is scheduled to begin as soon as
all permits and approvals are obtained.
STORMWATER MEASURES
The stormwater will be treated with low -density stormwater features. The total
proposed impervious area constitutes 43% of the disturbed area. The stormwater runoff
from the site was estimated using the rational method for a 25-year event using published
historical rainfall data for the area. The stormwater run-off from the impervious surface
will be directed to the onsite pond by overland flow. The stormwater will flow through
ten (10) curb cuts located along the periphery of the parking lot into two grassed swales
located on either side of the impervious surface. The swales will route the stormwater to
a wet detention basin utilizing a vegetated littoral shelve to accomplish water quality
treatment of storm drainage. Discharge from the pond will be to an existing off -site ditch.
A small portion of the lot will continue to drain to the existing NCDOT right -of way.
EROSION CONTROL MEASURES
The perimeter of the project boundary will bE
fencing. Vegetation will be established quickly in
detention basins. Excelsior erosion protection will be
eliminate soil erosion. The grading contractor and
maintenance for the erosion control measures.
CONSTRUCTION SEQUENCE
protected from erosion with silt
the swales and around the wet
used temporarily in the swales to
the developer will provide the
The Contractor will install silt fence prior to beginning any clearing and grading
operations. The wet detention basins will be constructed and runoff will be directed to
the basins during grading operation of the lots and the swales. The roadway will be
rough graded. The swales will be established and protected with excelsior. The water and
sewer utilities will be installed. The storm drainage features will be installed and inlet
protection will be established. The disturbed areas will be landscaped and seeded upon
completion, and as soon as possible. The wet detention basin will be restored to design
specifications after completion of all other construction.