Loading...
HomeMy WebLinkAboutSW8021013_CURRENT PERMIT_20021216STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW l9m DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD W-- --`pia QG r Ms. Joy Cranidiotis 1008 Thistle Downs SE Leland, NC 28451 Dear Ms. Cranidiotis: - -Michael F. Easley, Governor - - -- William G. Ross,'Jr., Secretary _North -Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director - Division of Water Quality _ -- - Wilmington Regional Office-' _ December 16, 2002 Subjcct: Permit No. SW8 021013 Belville Point Office Park High Density Stormwater Project Brunswick County The Wilmington Regional Office received a complete Stonnwater Management Permit Application for Belville Point Office Park on October 8, 2002. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 211.1000. We are forwarding Permit No. SW8 021013 dated December 16, 2002, for the construction of Belville Point Office Park. This permit shall be effective from the date of issuance until December 16, 2012, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the fonn of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and: filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611'-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. - -- � - Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:1WQSISTORMWATIPERMIT1021013.DEC cc: Joseph Hill, P.E. Delaney Aycock, Brunswick County Building Inspections Linda Lewis Wilmington Regional Office Central Files NCDENR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-523-7748 - - -- - - - ---- - State Stonr�water lvlanaaement Svstems - Permit No. SWS 021013- STATE OF NORTH CAROLINA DEPARTMENT -OF ENVIRONMENT AND NATURAL RESOURCES- - - DIVISION F:WATER QUALITY STATE STOR1'IWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ms. Joy Cranidiotis Belville Point Office Park Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H J000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 16, 2012, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system -has been approved- for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 42,024 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showin , all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No.-SW8 021013 - - - - — _ DIVISION -OF NV TER QUALITY - PROJECT DESIGN DATA SHEET Project Name: - - .Belville Point Office Park Permit Number: _ . ---.SW8 021013 Location_ Brunswick County Applicant: Ms. Joy Cranidiotis Mailing Address: 1008 Thistle Downs SE Leland, NC 28451 Application Date: October 8, 2002 Receiving Stream/River Basin: Cape Fear / UT Brunswick River Stream Index #: CPF17 18-77 Classification of Water Body: "SC" Drainage Area, acres: 1.45 Onsite, ft2: 1.45 Offsite, ft2: 0 Total Impervious Surfaces, ft2: 42,024 Pond Depth, feet: 4' TSS removal efficiency: 90% (no filter is required) Permanent Pool Elevation, FMSL: 10 Permitted Surface Area, ft2: 5,895 `@Permanent Pool Permitted Storage Volume, ft3: 5,043 Temporary Storage Elevation, FMSL: 10.8 Controlling Orifice: 0.75"cp pipe (drawdown in 2-5 days) Permitfed'Forebay Volume, ft3: 3,578 I - --- - - - - - - --- - .. - -- --- - — - - State Stor nwater Maiiagement Systems - Permit No. SWS 02-1013' - - -- I1. SCHEDULE OF COMPLIANCE 1. The stornnvater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be -kept to a minimum and any eroded areas of the'. system will be repaired immediately. _ _ _ _ _ 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stonnwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. S. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. S. If the stormwater system was used as an Erosion Control device, it must be restored to -- -- design condition prior to operation -as a stor nwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. I 10 State Stormwater Management Systems -Permit No.-SW8 021013 The permittee shall submit final site layout and grading plans for.any permitted future ... _ areas shown on the approved plans, prior to construction. if the proposed BUA exceeds - the -amount permitted under this permit, a modification -to the permit must be submitted and approved prior to construction._ 11. _ A copy of the approved .plans and specifications shall be maintained on file by the Pennittee for a minimum of ten years from the date of the completion of construction. 12. Prior fo the sale or lease of any portion of the property, the permittee-shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS 1. This permit is not transferable. 1n the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit transfer request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. Th_c issuance of this permit does not preclude the Permittee from complying with any and all statutes, riles.- iegulations, or ordiriarices which -maybe imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. to the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property.during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. i T - - - - State Stonnwater Managenent Svstems - Permit No. SWS 021013 -: 7. Unless specified elsewhere, pennanent-seeding requirements for the stornwater control must follow the guidelines established in.the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project.are incorporated by reference and are - enforceable parts of the permit. 9. The pennittee shall notify the Division any name; ownership or mailing address changes within 30 days. Permit issued this the 16th day of December, 2002. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,t .i. nit.' Alan W. Klimek, P.E., Director —� Division of Water Quality By Authority of the Environmental Management Commission I State Stormwater Management Systems - - - Permit N6.-SW8 021013 Belville Point Office Park Stonnwater-Permit-No SW8,021013-- - - - Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Prof ect) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number -- SEAL 7 State Stonnwater Management Systems Pen -nit No. SWS'021013 Certification Requirements: Tlit drainage area to the system contains approximately the permitted acreage. --- -" 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. G. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Delaney'Aycock, Brunswick County Building Inspections I it State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): .for Cranidiotis 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): ,1ov C'ranidiotis - Chrner/Develo ver 3. Mailing Address for person listed in item 2 above: 1008 Thistle Dolrirs .V Cit}': Leland State: Y C' Zip: 28431 Telephone Number: (910)371- 4 50 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): BehWle Point Office Park 5. Location of Project (street address): 133 Cite: Belyille Count': Brrrtrsirick 6. Directions to project (from nearest major intersection): S11' corner of -VC 133 am/,SR 1551 in Beeville 7. Latitude: 34014,581, 581, Longitude:. 77* 59' 20" of project 8. Contact person who can answer questions about the project: Name: .1ov Crwlidiotis Telephone Number: (910)371-5430 IL PERMIT INFORMATION: 1. Specifr whether project is (check one): _1` Ne-ty Renewal Modification BPOP.Form SWU-101 Ver 3,99.doc Pagel of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) ! 3. Specify the type of project (check one): Lon- Density .X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major _ - X Sedimentation/Erosion Control 404/401 Permit I NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748, III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Wet detention pond 2. Stormivater runoff from this project drains to the _ Cape Fear- _ River basin. 3. Total Project Area: 1.45 acres 4. Project Built Upon 67 % 5. How many drainage areas does the project have'? I 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area I Drainage Area 2 Receiving Stream Name U.T. Brunswick River Receiving Stream Class �r-$Ltr 5L Drainage Area 63,184 SF Existing Impervious" Area O.OSF Proposed Impervious* Area 42,024SF Impervious* Area (Total) 67% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -Site Buildings 7824 On -Site Streets On -Site Parking > 34,200 On -Site Sidewalks Other On -site Off -Site Total: 41,014 Total: *Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. BPOP.Form 5WU-101 ver 3.99.doc Page 2 of 4 7. How was the off -site impen ious area listed above derived`? Bit jj&jjg�.' - calculated fijnU scciled ineasm:�Ijients: streets, parking, walks, - planimeter IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. -The following covenants are intended to ensure ongoing compliance ivith state stormwater 1?1C111Cr1.;ement pei-snit number cis issued by the Division of ' Water OtralioJ These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of the project area shall be covered by structures or impervious materials. Impervious materia s include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Storwmater and General Permits Units at (919)733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU- l 07 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement nPORForm SWU-101 Ver 3.99.doc Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): Jose h S. Hill Jr. and Associates Mailing Address: 1602 Harrow- Drive City: Wilmilsgton _ State: N.C. Zip: 28401 Phone: (910)799-1544 FAX: (911,1)799-1 51 VIII. APPLICANT'S CERTIFICATION (print or type name ofperson listed in General Information, item 2) .k)j, Cranidioti.s , certify that the information included on this permit application form is, to the best of my knowledge. correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2<a.1000. $ignatu BPOPTorm SWU-l01 Ver 3.99.doc Page 4 of 4 Date: Permit No. �1 6& to 13 (to be provided br DIT 01 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Belville Point Office Park Contact Person: JoyC'ranidiotis Phone Number: (910)371-5450 For projects with multiple basins, specify which basin this worksheet applies to: N/A elevations Basin Bottom Elevation 6.0' ft Permanent Pool Elevation 10.0' ft. (floor of the basin) (elevation of the orifice) Temporary Pool Elevation 10.8' ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 5,895 sq. ft. (water surface area at the orifice elevation) Drainage Area 63,184 ac. (on -site and off -site drainage to the basin) Impervious Area 41.024 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 12,692 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 5,043 cu. ft. (volume detained above the permanent pool) Forebay Volume 3,578 cu. ft. (approximately 20% of total volume) Other parameters SA/DA' 5.8 (sub face area to drainage area ratio. from DWQ table) Diameter of Orifice 0.75 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1.0 in. Design TSS Removal2 90 % (minimum 85% required) BPOP.Form SW U-102 Rev 3.99.b.doc Pagel of 4 Footnotes: When using the division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-standard table entries. z In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. lt. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. plicants Initials J. k. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail) Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right-of- way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. I1. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does does not This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. BPOP.Form SWU-102 Rev 3.99.b.doc Page 2 of Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e, catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) -dR Permanent Pool Elevation 10.0' Sediment Bottom El. 7.0' 60' 1/ 25% Sediment Removal Elevation 7.0' Bottom Elevation 60' FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. BPOP.Form SWU-102 Rev 3.99.b.doc Page 3 of 4 7. All components of the wet detention basin shall be maintained in good working order. 1 acknowledge and agree by my signature that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name: Jnv (.rcinidiotis_ __.___ _ __- Title: flouter Address Phone: Signature: Date: 1008 Tlri stic Dotirrrs :SE _Lekirrcl, N(: 28451 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, I Sl'Yi.(`c a Notary Public for the State of _I1 uA (ako It na—, County of i� , do hereby certify that i ��1 �ka n1 Gt1(�7_s personally appeared before me this day of , "dnd acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEA My commission expires BPOP.Form SWU-102 Rev 3.99.b.doc Page 4 of 4