Loading...
HomeMy WebLinkAboutSW8021013_COMPLIANCE_20021216STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW -v- �/%i%i ItAl)l� DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE 1V/,Y1��l�p YYYYMMDD Compliance Inspection Report Permit: SW8021013 Effective: 12/16/02 Expiration: 12/16/16 Owner: Joy Cranidiotis Project: Belville Point Office Park County: Brunswick NC 133 Region: Wilmington Contact Person: Joy Cranidiotis Title: Directions to Project: SW corner of NC 133 and SR 1551 in Belville Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Brunswick River) (03-06-17) ( SC) On -Site Representative(s): Related Permits: Inspection Date: 05/29/2013 Entry Time: 11:45 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: E Other (See attachment summary) Leland NC 28451 Phone: 910-371-5450 Exit Time: 12:00 PM Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8021013 Owner -Project: Joy Cranidiotis Inspection Date: 05/29/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site not constructed. deeds extension letter. Other Comment: Yes No NA NE Page: 2 State of North Carolina Department of Environment and Natural Resources Wilmington,.RegionalOffice l� `Di'vision flf"Land Resources . ,�,� ' Land Quality Section 1 Michael F. Easley, Governor William G. Ross Jr., Secretary October 8, 2002 NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN Ms. Joy Cranidiotis 1008 Thistle Downs S.E. Leland, NC 28451 Dear Ms. Cranidiotis: This office has received a soil erosion and sedimentation control plan for the project listed below which was submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 113A-57(4)). Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of said land -disturbing activity (NCGS 113A-54(d)(4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30 day period will be deemed approval of the plan if the submitted plan is complete. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion & sediment control plan is a violation of the Act. A copy of any erosion and sediment control plan which could involve the utilization of ditches for the purpose of dewatering or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that you contact the Division of Water Quality at (910) 395-3900 if any ditches shown on your plan will lower the water table. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result,in disapproval of your plan. The approval `of an erosion and sediment control plan is condition on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions or need additional information, please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Carol N. Miller, CPESC Assistant Regional Engineer CNM/bfr cc: Joseph S. Hill & Associates; Joseph S. Hill & Associates PROJECT NAME: Belville Point Office Park PROJECT NO.: BR-03088 LOCATION: NC Highway 133 - Brunswick County RIVER BASIN: Cape Fear SUBMITTED BY: Joseph S. Hill & Associates DATE RECEIVED BY L.Q.S.: October 8, 2002 127 North Cardinal Drive, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer UNITED STATES Asa DEPARTMENT OF THE INTERIOR soot GEOLOGICAL SURVEY 78 ° 00' gi.nw-r s iT9 k➢A waP.DS CJR:vwR au. ��� F7�7Il rl DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1021013.WK1 PROJECT #: SW8 021013 REVIEWER: L. Lewis PROJECT NAME: Belville Point Office Park DATE: 16-Dec-02 Receiving Stream: UT Brunswick River Class: SC Drainage Basin: CPF Index No. CPF17 18-77 Site Area 1.45 acres Drainage Area < :...:634.:, square feet Area = 1.45 acres IMPERVIOUS AREAS Rational C Buildings 7824.00 square feet Parking & SW 34200.00 square feet square feet square feet square feet square feet TOTAL 4202400`i square feet Rational Cc= 0.07 SURFACE AREA CALCULATION J % IMPERVIOUS 66.51 % SAIDA Ratio 5,76% Des. Depth 4 Req, SA 3637 sf TSS: 90 Prov. SA `..........<.5895'< sf VOLUME CALCULATION Rational ?* Des. Storm >.......::.... 17:7.: inches Rv= 0.65 Bottom 6 msl Perm. Pool .....:..:..:::.::.....1r,;D.O msl ............. Design Pool 10.8 msl Design SA 6713 sf Req. Volume 3415; cf Prov. Volume .........::>.. 5043 cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.38 ft 0.020 cfs 0.008 cfs ......;....0..7.5 weir H x W >..... days * place a "1" in the box if Rational is used Perm. Pool Volume= 17735 Req. Forebay Volume= 3547 Provided Volume= 3578.00 Percent= SA @ _ Elevation= Q2 Area = 0.95 sq. in. Q5 Area = 0.38 sq. in. Orifice Area 0.44 sq. in. Q= 0.009 cfs :::..... i n x COMMENTS Surface Area , Volume and Orifice are within Design GuidelineE in BELVILLE POINT OFFICE PARK BRUNSWICK COUNTY STORMWATER MANAGEMENT CALCULATIONS September 2002 RECEIVED OCT 0 8 2002 DWQ PROD # sw F Z ro 13 Prepared By: JOSEPH S. HILL, JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 Harbour Drive Wilmington, [forth Carolina 28401 (910)799-1544 Beivilie Point Office Park Stormwater Management Calculations TABLE OF CONTENTS 1. Detention Pond Calculations 2. Forebay Calculations BPOP.SIWTR CALC.doc Page 2 of 14 Belville Point Office Park Stormwater Management Calculations BELVILLE POINT OFFICE PARK Stormwater Detention Pond Calculations Stormwater runoff from the project will be retained in a wet detention pond. This pond will store the runoff generated by 1 inch of rainfall. The stored runoff will be discharged over a period of 4.4 days. The pond area required to remove 90% of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina coastal regions. Runoff Calculations Impervious Surfaces - Buildings, walks streets, parking = 42,024 SF Total Area 63,184 SF Total Pervious Area = 21,160 SF 1" Runoff from Impervious Surfaces = 0.0834' x 42,024 SF = 3,505 CF 1" Runoff from Pervious Surfaces = 0.2 x 0.0834' x 21,160 SF = 353 CF Total runoff to be stored in pond = 3,853 CF 28,934 Gal. Detention Pond Calculations Pond Surface area @ Temporary Pool Elev. O N 7' = 6,713 SF Pond Surface area @ Permanent Pool Elev. Of 10.0' = 5,895 SF ✓ Average Pond Surface Area = 6,304 SF Pond Storage Volume = 6,304 SF x 0.8' Depth = 5,043 CF 3,853 CF . 5,043 CF = 0.76' Pond Storage Depth Required (use 0.8') Total Watershed Area = 63,184 SF Impervious % = 42,024 SF = 63,184 SF = 67% Pond Depth = 4.0' BPOP.STWTR CALC.doc Page 3 of 14 Belville Point Office Park Stormwater Management Calculations SA/DA % required for 90% solids removal @ 4.0' Depth (see chart) = 5.8% 5.8% x 63,184 SF = 3,665 SF Pond surface area @ Permanent Pool Elev. Of 10.0' = 5,895 SF Pond is therefore adequate for 90% TSS removal. Orifice Discharge Rate Calculations`J°�,� Use 3/4" diameter orifice for outlet Calculate average discharge rate and time to lower orifice head from 0.8' to 0.7: 0.1' pond height x 6,304 SF average pond area x 7.5 ga/ft3 = 4,728 Gallons Storage Average head on orifice from 0.8' to 0.7' = 0.75' Average discharge rate @ 0.95' head: Q(GPM) = (449)c A 2gh Q(GPM) = Volume discharge in gallons per minute c = discharge coefficient = 0.6 A = orifice area in square feet g = gravity = 32.2 h = head above center of gravity Q(GPM) _ (449)(.6)(0.0031) (2)(32.2)(0.75} Q = 5.8 GPM Time required to lower pond 0.1' @ 0.75' average head: T='4,728 Gal. + 5.8 GPM = 815 5.8 GPM vs 815 minutes plotted on curve (see discharge curve). BPOP.STWTR CAIC.doc Page 4 of 14 Belville Point Office Park Stormwater Management Calculations Discharge rate and time to lower head from 07 to 0.6': Q = 5.4 GPM T = 41728 Gal. 5.4 GPM = 876 minutes 5.4 GPM vs 1,691 minutes plotted on curve. Discharge rate and time to lower head from 0.6' to 03: Q = 5.0 GPM T = 4,728 Gal. - 5.0 GPM = 946 minutes 5.0 GPM vs 2,636 minutes plotted on curve. Discharge rate and time to lower head from 0.5' to 0.4': Q = 4.5 GPM T = 4,728 Gal. - 4.5 GPM = 1,050 minutes 4.5 GPM vs 3,686 minutes plotted on curve. Discharge rate and time to lower head from 0.4' to 03: Q = 4.0 GPM T = 41728 Gal. 4.0 GPM = 1,182 minutes 3.4 GPM vs 4,868 minutes plotted on curve. Discharge rate and time to lower head from 0.3' to 0.2': Q = 3.4 GPM T = 4,728 Gal. = 3.4 GPM = 1,390 minutes 3.4 GPM vs 6,258 minutes plotted on curve. Discharge rate and time to lower head from 0.2' to 0.1': Q = 2.6 GPM T = 4,728 Gal. = 2.6 GPM = 1,818 minutes 2.6 GPM vs 8,076 minutes plotted on curve. Discharge rate and time to lower head from 0.1' to 0.0': Q = 1.5 GPM T = 4,728 Gal. . 1.5 GPM = 3,152 minutes 1.5 GPM vs 11,228 minutes plotted on curve. The outlet structure will discharge the total calculated runoff volume of 156,263 gallons in approximately 4.4 days (see Orifice Discharge Curve). ePOP.STWTR CALC.doc Page 5 of 14 Belville Point Office Park Stormwater Management Calculations SA/DA -- 85$ ..TSS RPMtJVAL WITS 34 ` rVSC3ATATIVB : FiiTE�t IMPZR' A-'3--AFT 3 _ SFT- 4,� 0E'T::4: 5FT 5: OF1' .5. 5n -6.0M 6, 5,'T 7. 0FT .7: 5FT 20$' 1:.7:. `.1:3,. :3,:2 "..-, 1,:;T:...:'1r.0: ' "' :9.,s ....:8 .7 .6 .5 :..:. 30% 2.5- 12'2 : 1;9 ..1:-8'.:: 1..6 Z 5'..; Z.3:T:2'.. '1:Or .9 40% ..3.4 . 3 0.' 2:6 2..4' .,2 1 `:1.9. 1:6.-.''Z-.4 ':'1:1 1.0 34. ':2:1 1;8:.. 1.5 I:3:= : 60% 5:'0 :.. 4-.5 . 3:8 3i.5 3'.2 2 9 2.6: 2.3, -,-2.0 1.'6 70$ 6:0 ..5.2 ;'A 5 °•:.4..1.. 3: ;...3.1::." -2 9... 2.5: 2.1 .: 1.8--.... 80%. fi.:8 5..2..:`. 4.'..:',4..2:::3:7 .-...6.0 ;. 3.2':.:..2:7 .: 2.2.: 2.0 90 $., 7.5 6.5; 5,: 8 :` :.:.5.3;::' ,..4 .:8 :, :: 4 .3:.; ;:.3". 8 3.3 .. 2 : 8 1: 3 100% 8.2. -:7..4 . ; 6.8.". '7 6.:2..:. 5'.,6 ' :.:S:B :...41';4.. .. 3,:8 :''3.2 " � .2.6 SA/DA .., .y..90% TSS Rffi10VAL :. FOR WET DETENTION ,' WiTfiK)DT VSGSTAT11M , FILTER IMPER. $3.0FT. 3. 5FT 4: OET 4 : 5FT .5'. OFT 5 : 5FT.: AFT 6.5FT- 7.OFT 7. 5FT 10V 1.3 ... 1.0 :. .8 :7 .6. :5- ..4: ' : .3 20% : 2 : 4 2.0 1-. 8 . 1. 7. 1:.'5 ' 1: 4 1: 2 1. 0 - .9 ., 6 30% - 3.5 3:0 .2.7 : 2-.5" 2:2 1.9 1:.-6 1.3 1.1 .. 8% 40% 4.5 - 4.0- 3:5' 3.1 2..8 ' 2.5 2.1- 1.8 1.4 1.1 50% 5.6 : 50 4.3 3.9 - 3.5 3.1 ''2:7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4:8 4.3 3:9 3.4' 2.9'. 2:.4 1.9 70% 1.1 7:0 6.Q 5.5 1.0 4.5 3.9 3.4 2:9 '2.3 80% 9..4 80 7.0 6'.4 '5.7 5.2. 4:6 4.0 3.4 2.8 90% 10.7 - 9.0 7.9 7..2 -6.5 5.9. 5.2 4 A- 3,. 9 3.3 100$ 12.0 10.0 8.8. $.1' 7.3 6..6 -5.8 5.1 e.3 3.6 .54/b,4 70 67 Po 1m06 Vrods = s 8 BPOP.STWTR CALC.doc Page 6 of 14 Belville Point Office Park Stormwater Management Calculations �y h <�9s r - _ 4Z, t:y It b tiu dCr £ ti 14 o top ! Q 1 ti p Q 4 p BPOP.SiWTR CALC.doc Page 7 of 14 Belville Point Office Park Stormwater Management Calculations Forebay Calculations Provide approximately 20% of Total Pond volume including area of forebay construction and temporary pool volume: Permanent Pool Volume: Permanent Pool Area @ Elev. 10.0' = 5,895 SF Pond Area @ Bottom Elev. 6.0' = 450 SF Pond Average Area -- 3,173 SF 3,173 SF x 4.0' depth = 12,692 CF Permanent Pool Volume Temporary Pool Volume = 5,043 CF Total Pond Volume = 17,735 CF Forebay Volume: Forebay Area @ Elev. 10.2' = 11485 SF Forebay Area @ Elev. 6.0' = 220 SF Forebay Average Area = 852 SF 852 SF x 4.2' Depth = 3,578 CF Forebay Volume 3,578 CF = 17,735 CF = 20.17% Forebay = 20.2% of Permanent Pond Volume BPOP,STWTR CALC.doc Page 8 of 14 JOSEPH S. HILL, JR. AND ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBOUR DRIVE WILMINGTON, NORTH CAROLINA 28401 TELEPHONE 910-799-1544 VAX 910-799-1551 October 7, 2002 Ms. Linda Lewis N.C.D.E.M. 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Stormwater Plan Belville Point Office Park Town of Belville Brunswick County Dear Ms. Lewis: Enclosed are three (3) copies of the stormwater plan and calculations for the subject project. Included is a completed permit application, application fee of $420.00, Wet Detention Basin Supplement Form, a color -coded plan showing drainage areas used in calculating pipe sizing, and a copy of the Erosion Control calculations showing pond outlet sizing and erosion protection. Please review this plan as soon as possible. Please do not hesitate to contact me if you have any questions or need additional information. JSH/pat Attachments BPOP. LEWIS.100202.doc Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES &r.' 5. Jo h S. Hill, Jr., P.E.