Loading...
HomeMy WebLinkAboutSW8020206_COMPLIANCE_20020815STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE _t! YYYYMMDD DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1020206.WK1 PROJECT #: SW8 020206 REVIEWER: L. Lewis PROJECT NAME: Coastal Equipment DATE: 15-Aug-02 Receiving Stream: UT New River Class: C NSW Drainage Basin: White Oak Index No. 19-(1) Site Area 2.44 acres Drainage Area 4fi10;7 Off square feet Area in AcreE 2.44 acres IMPERVIOUS AREAS Building Parking SW TOTAL SURFACE AREA CALCULATION % IMPERVIOUS 59.02% Des. Depth 5 TSS: 90 Rational C 30000.00 square feet 31160.00 square feet 1460.00 square feet square feet square feet square feet 62620 0>,': square feet Rational Cc= 0.08 SAIDA Ratio 4.22% Req. SA 4479 sf Prov. SA 15ti0: sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm .;:;1.,06inches Rv= 0.58 Bottom 36.65 msl Perm. Pool E'.1 65: msl ........... Design Pool 42.69 msl Design SA 5558 sf Req. Volume 139 cf Prov. Volume : ;:5230: cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = IG-ROT457TIVA Perm. Pool Volume= 12760 Req. Forebay Volume= 2552 Provided Volume= 2620.00 Percent= 205flfo. SA @ _ Elevation= COMMENTS Surface Area , Volume and Orifice are within Design Guideline, 1.26 my 0.50 my 0.79 my 0.019 cfs in x in i 6 RECEIVED Design Calculations Stormwater Treatment Facilities FEB 0 5 2002 for DWQ Coastal Equipment S(� Q ZU ZUCo located off PROD 0 Western Boulevard - Jacksonville, N.C. I 1. PROJECT DESCRIPTION The project consist of an office building 1 warehouse and associated sitework on a 2.44 acre tract located between Western Boulevard & Williamsburg Parkway in Jacksonville, N.C. Proposed construction will include a new building, parking lot and sidewalks. 2. COMPUTE POND AREA REQUIRED a. Compute Percent Impervious: Impervious Areas: On -Site Buildings On -Site Streets On -Site Parking On -Site Sidewalks Other On -Site Total Total Area Drainage to Pond: Percent Impervious = b. Compute Pond Surface Area 0 62,620 Total 30,000 SF 0 SF 31,160 SF 1,460 SF 0 SF 62,620 SF F-nnQ6�ft1;$ SF 0.590 or 59.0 % Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming ��'�' w�3' foot pond depth: SAIDA r,,M4 2 % (interpolated) Therefore: Surface Area = SAIDA x Drainage Area 4,477 SF say SF c. Compute Minimum Pond Dimensions x r is {•. , r'.; Y 2i If Assume rectangular shape with 3:1 Length (L) to Width (W) Ratio: Length = 116.19 feet Width = 38.73 feet 3. DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM Using Schuler "Simple Method": Rv = 0.05 + 0.009(1) where I = percent impervious Rv = 0.581 in/in Control Volume = Design Rainfall x Rv x Drainage Area Control Volume = 5,139 CF say CF 4. DETERMINE REQUIRED STORAGE DEPTH Assume: 3:1 side slopes solving for depth (d) by (trail and error) d = 1.04 S. DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day - 5 day period. Using orifice equation, solve for Diameter (D) that results in 3-112 day period: D = (Q 10.026 (h).5).5 Where: Q = (Control Volume 1 3.5 days x 86,400 seclday) 0.017 cfs h= d12 = 0.52 Solving for D: D = 0.96 Use 1.00 " pipe Actual Drawdown with actual drawdown pipe diameter (using orifice equation): Q= 0.019 cfs Draw Down Period = 3.21 days OK, < 5.0 S ' L' . a i . .. . i:. _ . ' � A y� i,, a . ... 'S_ . i� � - '�! 1. �e ... 1 `j :�.!. .- �!� . '� ' .<`, +_ _ � I r r •l. .1 ....� S:-...F .'i��l .: e� ..� .l.r .�./ 1.7 �. t•� .i 4. 'SKI %`�. �J r,.�+ !4� l j�' �.. r 6. SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of Q10 flow <1.0 feet: Using Rational Formula (Q=CIA) where: Cimper E f9 Cpery °t1 Al+;I Ccum = 0.70 110 = f.. inmr k . A = 2.44 ac Q 10 = 9.42 cis Assuming 112 circumference is used as weir and using Francis Formula (Q=3.33LH''6) to solve for L such that H = 1.Q. L = 2.83 Feet Use 24 inch diameter outlet structure 7. DETERMINE Q10 STAGE Q 10 = 9.42 cfs Using Francis Formula (Q=3.33LH'-s) solve for H: H 10 = 0.93 feet 8. DETERMINE Q100 STAGE (ELEV. OF EMERGENCY SPILLWAY) Using Rational Formula Ccum = 0.70 1100 = s;°n $t inmr .;w. A = 2.44 ac Q100 = 13.70 cfs Using Francis Formula (Q=3.33LH'*5) solve for H: H 100 = 1.20 feet 9. DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV.) Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm. Using broad crested weir equation H = (QICw x L)213 f •/ v "1 r i 'A'wFl F..�� 1,. r .`?�• YiR Lrr.� . .r .. wr .. � w�.7p ,��Y 1. .f'.. ..I1.• , - l r r where: Q = Q100 13.70 cfs Cw = 3.0 Length - #-{r°€{{} feet H = 0.59 feet 10. FOREBAY SIZING Size forebay to include approx. 20% of total volume: Approx. Total Volume = 13,131 CF (using average end method) Desired Forebay Volume = 2,626 CF ✓¢7wrhEr' ?7WU108 = 1.6ZO a {c.4tn9 avo,raJo � e.�/meThmr�} 11. SUMMARY Pond Dimensions: Length = 116.19 Width = 38.73 Pond Elevations: Top Berm (minimum) H= 0.59 100-Yr. Flood H100 = 1.20 10-Yr. Flood N10 = 0.93 1-inch Storage storage depth = 1.04 Permanent Pool Pond depth = 5 Pond Bottom Relative Actual 7.83 44.48 7.24 43.89 (emergency weir eleva`,iovl1 6.97 43.62 6.04 42.69 (primary weir elevation' 5.00 41.65 (invert out elevation) 0.,_<+ r where: Q = Q100 13.70 cfs Cw = 3.0 Length .<y<;r>:.x,#ya";feet R = 0.59 feet FQRESAY SIZING �� ��5ur1�5 TdEGij,V�•-UC.�'`�?� Size forebay to include approx. 20% of total volume: Approx. Total Volume = 13 131 CF (using average end method) Desired Forebay Volume = 2,626 CF 11. SUMMARY Pond Dimensions: Length = Width = Pond Elevations: Top Berm (minimum) 100-Yr, Flood 10-Yr. Flood RECEIVED JUN 2 7 2002 116.19 OWQ 38.73 PROJ 4 5wy 0 ZGZDC4 H= 0.59 H100 = 1.20 H10 = 0.93 1-inch Storage storage depth = 1.04 Permanent Pool pond depth = 5 Pond Bottom r F,�T'��.yt `,/ �/Z//`rG._,7-'i� .'.'Lz.==Jim'`-•�,%TZ;� .0 0, y, -7 1 Z ti, p Z-- I Relative Actual 7.83 . 44.48 7.24 43.89 (emergency weir eleva 6.97 43.62 6.04 42.69 (primary weir elevation 5.00 41.65 (invert out elevation) MOW t 1013 off`' ?'� Pcr RECEIVED Trial & Error Calculation of Required Storage Depth APR 2 2 2002 DWQ PROD # 5w-FG Zd��/_� d Al A2 VOLUME 0 4500 4,500.00 0 0.01 0 0.01 4500 4,509.30 45.04649 0.01 0 0,02 4500 4, 518.60 90.18605 0.01 0 0.03 4500 4,527.92 135.4188 0.01 0 0.04 4500 4,537.24 180.7448 0.01 0 0.05 4500 4,546.57 226.1641 0.01 0 0.06 4500 4,555.90 271.677 0.01 0 0,07 4500 4,565.24 317.2835 0,01 0 0.08 4500 4,574.59 362.9837 0.01 0 0.09 4500 4,583.95 408.7777 0.01 0 0.1 4500 4,593.31 454.6656 0.01 0 0.11 4500 4,602.68 500.6475 0.01 0 0.12 4500 4,612.06 546.7236 0.01 0 0.13 4500 4.621.45 592.894 0.01 0 0.14 4500 4,630.84 639.1586 0.01 0 0,15 4500 4,640.24 685,5178 0.01 0 0.16 4500 4,649.64 731.9715 0.01 0 0.17 4500 4,659.06 778.5199 0.01 0 0.18 4500 4,668.48 825.1631 0.01 0 0.19 4500 4,677.91 871.9012 0.01 0 0.2 4500 4,687.34 918,7343 0.01 0 021 4500 4,696.79 965,6625 0.01 0 0.22 4500 4,706.24 1012.686 0.01 0 0.23 4500 4,715.69 1059.805 0.01 0 0.24 4500 4,725.16 1107.019 0.01 0 0.25 4500 4,734.63 1154.329 0.01 0 0.26 4500 4,744.11 1201.734 0.01 0 0.27 4500 4,753.59 1249.235 0.01 0 0.28 4500 4,763.09 1296, 832 0.01 0 0.29 4500 4,772.59 1344.525 0.01 0 0.3 4500 4,782.09 1392.314 0.01 0 0.31 4500 4.791.61 1440.199 0.01 0 0.32 4500 4,801.13 1488.181 0.01 0 0.33 4500 4,810.66 1536.259 0.01 0 0.34 4500 4,820.20 1584.433 0.01 0 0.35 4500 4,829.74 1632.705 0.01 0 0,36 4500 4,839.29 1681.072 0.01 0 It 0.37 4500 4, 848.85 1729.537 0.01 0 0,38 4500 4,858.41 1773.099 0.01 0 0.39 4500 4,867.99 1826.757 0.01 0 0.4 4500 4,877.57 1875.513 0.01 0 0.41 4500 4, 887.15 1924.366 0.01 0 0.42 4500 4,896,75 1973.317 0.01 0 0.43 4500 4,906.35 2022.365 0.01 0 0.44 4500 4,915.96 2071.51 0.01 0 0.45 4500 4.925.57 2120.754 0.01 0 0.46 4500 4,935.19 2170.095 0.01 0 0.47 4500 4,944.82 2219, 534 0.01 0 0.48 4500 4,95446 2269.071 0.01 0 0.49 4500 4,964.11 2318.706 0.01 0 0.5 4500 4,973,76 2368.44 0.01 0 0.51 4500 4,983.42 2418.271 0.01 0 0.52 4500 4,99308 2468.202 0.01 0 0.53 4500 5,002.76 2518.23 0.01 0 0.54 4500 5,012.44 2568.358 0.01 0 0.55 4500 5,022.12 2618.584 0.01 0 0.56 4500 5,031.82 2668.909 0.01 0 0.57 4500 5,041.52 2719.333 0.01 0 0.58 4500 , 5, 051.23 2769.857 0.01 0 0.59 4500 5, 060.95 2820.479 0.01 0 0.6 4500 5,070.67 2871.201 0.01 0 0.61 4500 5,080.40 2922.022 0.01 0 0.62 4500 5,090.14 2972.943 0.01 0 0.63 4500 5,099.88 3023.963 0.01 0 0.64 4500 5,109.64 3075.083 0.01 0 0.65 4500 5,119.40 3126.304 0.01 0 0.66 4500 5,129.16 3177.624 0.01 0 0.67 4500 5,138.94 3229.044 0.01 0 0.68 4500 5,148.72 3280.564 0.01 0 0.69 4500 5,158.51 3332.184 0.01 0 0.7 4500 5,168.30 3383.905 0.01 0 0.71 4500 5,178,10 3435.727 0.01 0 0.72 4500 5.187.91 3487.649 0.01 0 0.73 4500 5,197.73 3539.672 0.01 0 0.74 4500 5,207,56 3591.796 0,01 0 0.75 4500 5,217.39 3644.02 0.01 0 0.76 4500 5,227.23 3696.346 0.01. 0 0.77 4500 5,237.07 3748.773 0.01 0 0.78 4500 5,246.92 3801.301 0.01 0 0.79 4500 5,256.79 3853.93 0.01 0 0.8 4500 5,266.65 3906.661 0.01 0 0.81 4500 5,276.53 3959.494 0,01 0 0.82 4500 5,286.41 4012.428 0.01 0 0.83 4500 5,296.30 4065.464 0.01 0 0.34 4500 5,306.20 4118.602 0.01 0 0.85 4500 5,316.10 4171.842 0.01 0 0.86 4500 5,326.01 4225.184 0.01 0 0.87 4500 5,335.93 4278.628 0.01 0 0.88 4500 5,345.85 4332.175 0.01 0 0.89 4500 5,355.78 4385.824 0.01 0 0.9 4500 5,365.72 4439.576 0.01 0 0.91 4500 5,375.67 4493.43 0.01 0 0.92 4500 5,385.63 4547.388 0.01 0 0.93 4500 5,395,59 4601.448 0.01 0 0.94 4500 5,405.55 4655.611 0.01 0 0.95 4500 5,415.53 4709.877 0.01 0 0.96 4500 5,425.51 4764.246 0.01 0 0.97 4500 5,435.50 4818, 719 0.01 0 0.98 4500 5,445.50 4873.295 0.01 0 0.99 4500 5,455.50 4927.975 0.01 0 1 4500 5,465.52 4982.758 0.01 0 1.01 4500 5,475.53 5037.645 0.01 0 1.02 4500 5,485.56 5092.636 0.01 0 1.03 4500 5,495,59 5147.731 0.01 0 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505,63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202,93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505,63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5, 505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202,93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505,63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505.63 5202,93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04 1.04 4500 5,505,63 5202.93 0 1.04 1.04 4500 5,505.63 5202,93 0 1.04 1.04 4500 5,505.63 5202.93 0 1.04