Loading...
HomeMy WebLinkAboutSW8010803_COMPLIANCE_20090312STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW QED GO1� v 3 DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 12, 2009 Mr. Micheal Tuton, President Hunter Development Corporation P.O. Box 1066 Jacksonville, NC 28540 NOTICE OF INSPECTION Marsh Oaks @ Brynn Marr Sec. I & 11 Stormwater Project NoASW87.0,108031, SW8 000517 Onslow County Dear Mr. Tuton: Dee Freeman Secretary Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on February 16, 2009 to determine compliance with Stormwater Permit Number SW8 010803, SW8 000517 issued on August 10, 2000 and March 20, 2002. As indicated in the attached inspection report the following deficiencies must be resolved: 1. Provide the maintenance necessary to all ponds in both sections as instructed in the attached inspection reports. 2. Provide the Engineers Certification for pond 4 in Section 11, and provide the Engineers Certification for both ponds in Section I. Please inform this Office in writing before April 12, 2009, of the specific actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action including the assessment of civil penalties of up to $10,000 per day. If a written plan of action is not submitted to this office by April 12, 2009 then DWQ staff will re- inspect the site and issue a Notice of Violation if the listed deficiencies have not been addressed. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 20405 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623.6748 Internet: www.ncwaterguality.org An Equal Opportunity ti Affirmative Action Employer NorthCarolina Natmally Compliance Inspection Report Permit: SW8010803 Effective: 06/26/03 Expiration: 06/26/13 Owner: Marsh Oaks at Brynn Marr Community Services Association Inc Project: Marsh Oaks, Section II at Brynn Marr County: Onslow End Of Pine Vly Region: Wilmington Jacksonville NC 28541 Contact Person: Sterling Osborne Title: HOA President Phone: 910-376-0713 Directions to Project: Turn onto Pine Valley Rd. from Country Club Road, go to end of the road. Project is on right. Type of Project: State Stormwater - HD - Detention Pond State Stormwater - Other Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 2 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 3 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 4 - (Northeast Creek) (03-05-02 ) ( SC;NSW) On -Site Representative(s): Related Permits: Inspection Date: 02/16/2009 Entry Time: 10:30 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Other Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: E State Stormwater (See attachment summary) Exit Time: 11:30 AM Phone: 910-796-7215 Inspection Type: Stormwater Page: 1 Permit: SW8010803 Owner - Project: Marsh Oaks at Brynn Marr Community Services Association Inc Inspection Date: 0211612009 Inspection Type: Stormwater Reason for Visit: Other Inspection Summary: Please address all maintenance issues listed in the comment sections of the inspection reports. Also provide the Engineers Certification for pond 4. Once all compliance issues have been resolved, then this office will proceed with the transfer of ownership to Marsh Oaks at Brynn Marr C.S.A. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: This office has not received the Engineers Certification for pond 4 Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: ■ n n n 0000 Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? Q ■ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to IDWO ❑ ❑ ❑ upon request? Comment: Pond 1 1. The pond was observed to be lacking permenant vegetation. 2. Trash and debris was observed in the pond. Pond 2 1. The pond was observed to be lacking in permenant vegetation. 2. Trash and debris was observed in the pond. Pond 3 1. The pond was observed to be lacking permenant vegetation. 2. Trash and debris was observed in the pond. Pond 4 1. Erosion on the slopes. Page: 2 DETENTION POND ANALYSIS FILENAME: G:IDATAIWPDATAIWQSIPOND1010803-4.WK1 PROJECT #: SW8 010803-4 REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks Section II @Brynn Marr DATE: 17-Jun-03 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area .30.0276 q9.> square feet Area = 7.10 acres Offsite Area= 4.6 acres IMPERVIOUS AREAS Rational C Buildings 12918.00 square feet 1.00 Street 14694.00 square feet 1.00 Parking 23940.00 square feet 1.00 SW 6275.00 square feet 1.00 Offsite 59923.00 square feet 1.00 Other 4545.00 square feet 1.00 TOTAL 22295b0,: square feet Rational Cc= 0.52 SURFACE AREA CALCULATION % IMPERVIOUS 39.54% Des. Depth 6 TSS: 90 SAIDA Ratio 2.08% Req. SA 6424 sf Prov. SA sf Vj-jV VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* 1 Des. Storm 14: inches Rv= 0.41 Bottom 3.00 msl Perm. Pool 9 00 msl Design Pool 11.00 msl Design SA 9164 sf Req. Volume :1330 cf Prov. Volume :::.:.1 a'< cf FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ _ Elevation= ORIFICE CALCULATION , 20040 4008 4026.00 Avg. Head = 0.97 ft Q2 Area = 2.33 sq. in. Flow Q2, cfs 0.077 cfs Q5 Area = 0.93 sq. in. Flow Q5, cfs 0.031 cfs Orifice Area 1.23 sq. in. No. of Orifices Q= 0.040 cfs Diameter, inches .1. 25.;: weir H x W in :... :: in Drawdown = 3 $; days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: S:1WQS\POND1010803-1.WK1 PROJECT#: SW8 010803-11 Pond' j f REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks, Section 11 at Brynn Marr DATE: 24-Jan-2002 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area square feet Area in Acre 4.18 IMPERVIOUS AREAS Rational C Buildings 16733.00 square feet 1.00 Huff Drive 19905.00 square feet 1.00 Parking 23823.00 square feet 1.00 SW 11512.00 square feet 1.00 square feet square feet TOTAL M!7.1973jq square feet Rational Cc= 0.52 SURFACE AREA CALCULATION % IMPERVIOUS 39-53% Des. Depth 5 TSS: 90 SA/DA Ratio 2,77% Req. SA 5047 sf Prov. SA ->5208'71 sf VOLUME CALCULATION * place a "'I" in the box if Rational is used i Rational ?* 1 Des. Storm ""1'4`00" inches Rv= 0.41 Bottom 1 msl Perm. Pool --,::6,00:: msl Design Pool 8.5 msl Design SA 7923 sf Req. Volume : 15173 cf Prov. Volume ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 1.22 ft 0.088 cfs 0.035 cfs or weir H x W days FOREB8 Perm. Pool Volume= 13436 Req. Forebay Volume= 2687.2 Provided Volume= 2796.00 Percent= Based on 1" over entire drainage area Elevation= Q2 Area = 2.38 in 2 Q5 Area = 0.95 in 2 Orifice Area 1.77 in 2 0.065 cfs in x ....... ... M COMMENTS Surface Area , Volume and Orifice are within Design Guidelines in DETENTION POND ANALYSIS FILE NAME: S:\WQS\POND1010803-2.WK1 PROJECT* SW8 010803-2 Pond 2 REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks, Section 11 at Brynn Marr DATE: 24-Jan-2002 Receiving Stream: Northeast Creek Class: SC Drainage Basin:_ White Oak Index No. Site Area 21.65 acres Drainage Area 175982 square feet Area in Acre 4.04 �,4 IMPERVIOUS AREAS Rational C Buildings 24374.00 square feet 1.00 square feet 1.00 Parking 45066.00 square feet 1.00 SW 10186.00 square feet 1.00 square feet square feet TOTAL :,75626 -00]square feet Rational Cc= 0.56 , SURFACE AREA CALCULATION % Il`,4PERVIOUS 4 52)5 % Des. Depth 6 TSS: - 90 SA/DA Ratio 2.41% Req. SA 4250 sf Prov. SA 356 4 : 1 sf VOLUME CALCULATION * place a "ll" in the box if Rational is used I Rational ?* 1 Des. Storm '00!�� inches Rv= 0.46 Bottom -1 msl Perm. Pool 5 00 rnsl Design Pool 7.7 rnsl Design SA 7051 sf Req. Volume c Prov. Volume ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flom,'Q5, cfs No. of Orifices Diameter, inches Drawdown = FORE AY Perm. Pool Volume= 12021 Req. Forebay Volume= 2404.2 Provided Volume= 2613.00 Percent= . .,.7% Based on 1" over entire drainage area Elevation= 1.32 ft Q2 Area = 0.085 cfs Q5 Area = 0,034 cfs Orifice Area Q .50: or weir H x W days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines 2.21 in' 0.88 inz 1.77 in' 0.068 cfs in x in DETENTION POND ANALYSIS - FILE NAME: S:1WQS\POND1010803-3.WK1 PROJECT #:SW8 010803-3 Pond 3 REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks, Section 11 at Brynn Marr DATE: 20-Mar-2002 Receiving Stream- Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area square feet Area in Acre 3.64 �: : IMPERVIOUS AREAS Rational C Buildings 22056.00 square feet 1.00 square feet 1.00 Parking 37715.00 square feet 1.00 SW 11038.00 square feet 1.00 square feet square feet TOTAL 7.0 8 0 =9.O 0 � square feet Rational Cc= 0.56 SURFACE AREA CALCULATION % IMPERVIOUS 44.66% Des. Depth 6 TSS: 90 SA/DA Ratio 2,38% Req. SA 3773 sf Prov. SA 4500'. sf I VOLUME CALCULATION * place a "I" in the box if Rational is used I Rational ?* 1 Des. Storm Q'Qinches Rv= 0.45 Bottom 0 msl Perm. Pool 6.00 �� m s I Design Pool 8.5 msl Design SA 7101 sf Req. Volume 21 cf Prov. Volume 11cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 1.22 ft 0.076 cfs 0.031 cfs or weir H x W days FOREBAY Perm. Pool Volume= 13032 Req. Forebay Volume= 2606.4 Provided Volume= 2460.00 Percent= Based on I" over entire drainage area Elevation= Q2 Area = 2.07 in2 Q5 Area = 0.83 in2 Orifice Area 1.77 in' Q= 0.065 cfs in x COMMENTS Surface Area , Volume and Orifice are within Design Guidelines in State Stormwater Management Systems Permit No. SW8 010803 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream/Index #: Classification of Water Body: Pond Number: Drainage Area, acres: Offsite Area entering Pond, ftz: Total Impervious Surfaces, ftz: r, Pond Depth, feet: Required Surface Area, W: Provided Surface Area, ftz: Required Storage Volume, ft3: Provided Storage Volume, ft3: Permanent Pool Elevation, FMSL: Temporary Storage Elevation, FMSL: Controlling Orifice (pipe): 11VISION OF WATER QUALITY ROJECT DESIGN DATA SHEET Marsh Oaks, Section II @Brynn Marr S W 8 010803 Onslow County Mr. Michael G. Tuton, President Hunter Development Corporation PO Box 1066 Jacksonville, NC 28541-1066 February 1, 2002 White Oak / Northeast Creek / 19-16-(0.5) "SC NSW" 1 2 3 4 4.18 4.04 3.64 4.4 None, per engineer 71,973 79,626 70,809 62,372 5 6 6 5.5 5,047 4,250 3,773 3,934 6,696 4,356 4,500 5,207 15,173 14,665 13,213 15,972 16,414 15,399 14,501 16,449 6 5 6 9 8.5 7.7 8.5 11.5 1.5" cP 1.511cp 1.5"cp 1.25"co 3 4'• DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1010803-1.WK1 PROJECT #: SW8 PROJECT NAME 010803-A f Pond') Marsh Oaks, Section it at Brynn Marr REVIEWER: L. Lewis DATE: 24-Jan-2002 Receiving Stream: Northeast Creek Class: Sc Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area 1820$1 00''square feet Area in Acre 4.18 IMPERVIOUS AREAS Rational C Buildings 16733.00 square feet 1.00 Huff Drive 19905.00 square feet 1.00 Parking 23823.00 square feet 1.00 SW 11512.00 square feet 1.00 square feet square feet TOTAL 1973'00, square feet Rational Cc= 0.52 SURFACE AREA CALCULATION % IMPERVIOUS 39.53% Des. Depth 5 TSS: 90 SA/DA Ratio 2.77% Req. SA 5047 sf Prov. SA 5208` sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm _1 1'OO: inches Rv= 0.41. Bottom 1 msl Perm. Pool 600' msl Design Pool 8.5 msl Design SA 7923 sf Req. Volume 151:73 cf Prov. Volume cf ORIFICE CALCULATION FOREBAY Perm. Pool Volume= 13436 Req. Forebay Volume= 2687.2 Provided Volume= 2796.00 Percent= Based on 1" over entire drainage area Elevation= COMMENTS Surface Area , Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: S:1WQS\POND1010803-2.WK1 PROJECT #:SW8 010803-2, Pond 2 REVIEWER: L. Lewis PROJECT NAME. Marsh Oaks, Section 11 at Brynn Marr DATE: 24-Jan-2002 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area square feet Area in Acre 4.04 IMPERVIOUS AREAS Rational C Buildings 24374.00 square feet 1.00 square feet 1.00 Parking 45066.00 square feet 1.00 SW 10186.00 square feet 1.00 square feet square feet TOTAL square feet Rational Cc= 0.56 SURFACE AREA CALCULATION % P,.APERVIOUS 45.25% Des. Depth 6 TSS: , 90 SA/DA Ratio 2.41% Req. SA 4250 sf Prov. SA ='4356 sf VOLUME CALCULATION * place a "'I" in the box if Rational is used I Rational ?* Des. Storm 100 inches Rv= 0.46 Bottom -1 msI Perm. Pool Design Pool 7.7 msl Design SA 7051 sf Req. Volume 4 Prov. Volume :-::5.1 5399:1 cf ORIFICE CALCULATION 0] Oki a -.T.,Vi Perm. Pool Volume= 12021 Req, Forebay Volume= 2404.2 Provided Volume= 2613.00 Percent= Based on 1" over entire drainage area Elevation= Avg. Head = 1.32 ft Q2 Area = 2.21 in' Flow Q2, cfs 0.085 cfs 05 Area = 0.88 in' Flov,+Q5, cfs 0.034 cfs. Orifice Area 1.77 in' No. of Orifices 0.068 cfs Diameter, inches or weir H x W in x in EMU = Drawdown . ......... days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: S:1WQSIPOND1010803-3.WK1 PROJECT #: SW8 010803-3 Pond 3 REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks, Section II at Brynn Marr DATE: 20-Mar-2002 Receiving Stream: Northeast Creek Class: Sc Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area 15.8558p0;1 square feet Area in Acre 3.64 IMPERVIOUS AREAS Rational C Buildings 22056.00 square feet 1.00 square feet 1.00 Parking 37715.00 square feet 1.00 SW 11038.00 square feet 1.00 square feet square feet TOTAL :70809.':00'. square feet ' Rational Cc= 0.56 SURFACE AREA CALCULATION % IMPERVIOUS 44.66% Des. Depth 6 TSS: 90 SAIDA Ratio 2.38% Req. SA 3773 sf Prov. SA 45a0 sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* 1 F_OREBAY Des. Storm 1OQ inches Perm. Pool Volume= 13032 IRv= 0.45 Req. Forebay Volume= 2606.4 Bottom 0 msl Provided Volume= 2460.00 Perm. Pool ....:.:6OQ msl Percent= Design Pool 8.5 msl Design SA 7101 sf Req. Volume 132 3' cf Based on 1" over entire drainage area Prov. Volume '145A1: cf Elevation= ORIFICE CALCULATION Avg. Head = 1.22 ft Q2 Area = 2.07 in' Flow Q2, cfs 0.076 cfs Q5 Area = 0.83 in Flow Q5, cfs 0:031 cfs Orifice Area 1.77 in2 No. of Orifices 1 Q= 0.065 cfs Diameter, inches 1 5fJ or weir H x W in x in Drawdown = 23' days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines A._J� NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Micheal Tuton, President Hunter Development Corporation P.O. Box 1066 Jacksonville, NC 28540 Division of Water Quality Coleen H. Sullins Director March 12, 2009 NOTICE OF INSPECTION Marsh Oaks @ Brynn Marr Sec. I & II Stormwater Project No.CSW8.010803; SW8 000517 Onslow County Dear Mr. Tuton: Dee Freeman Secretary Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on February 16, 2009 to determine compliance with Stormwater Permit Number SW8 010803, SW8 000517 issued on August 10, 2000 and March 20, 2002. As indicated in the attached inspection report the following deficiencies must be resolved: 1. Provide the maintenance necessary to all ponds in both sections as instructed in the attached inspection reports. 2. Provide the Engineers Certification for pond 4 in Section II, and provide the Engineers Certification for both ponds in Section I. Please inform this Office in writing before April 12, 2009, of the specific actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action including the assessment of civil penalties of up to $10,000 per day. If a written plan of action is not submitted to this office by April 12, 2009 then DWQ staff will re- inspect the site and issue a Notice of Violation if the listed deficiencies have not been addressed. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North CaroTna 28405 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 Internet: www.ncwaterqualit .org None rthCarolina Naturally An Equal Opportunity 1 Affirmative Action Employer Please be reminded that if any ownership or name change has occurred it is the permittee's responsibility to notify this office in writing. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 796-7215. Sincerely; r David`Cox Environmental Senior Specialist GDSldwc: S.\WQSIStormWater\INSPECT1010803.mar09 cc: Timothy Stewart, Parker & Assoc. LW it . gton.Regional-Office3 David Cox Central Files Page 2 of 2 Compliance Inspection Report Permit: SW8010803 Effective: 06/26/03 Expiration: 06/26/13 Owner: Marsh Oaks at Brynn Marr Community Services Association Inc Project: Marsh Oaks, Section II at Brynn Marr County: Onslow End Of Pine Vly Region: Wilmington Jacksonville NC 28541 Contact Person: Sterling Osborne Title: HOA President Phone: 910-376-0713 Directions to Project: Turn onto Pine Valley Rd. from Country Club Road, go to end of the road. Project is on right. Type of Project: State Stormwater - HD - Detention Pond State Stormwater - Other Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 2 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 3 - (Northeast Creek) (03-05-02 ) ( SC;NSW) 4 - (Northeast Creek) (03-05-02 ) ( SC;NSW) On -Site Representative(s): Related Permits: Inspection Date: 0211612009 Entry Time: 10:30 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Other Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: E State Stormwater (See attachment summary) Exit Time: 11:30 AM Phone: 910-796-7215 Inspection Type: Stormwater Page: 1 Permit: SW8010803 Owner - Project: Marsh Oaks at Brynn Marr Community Services Association Inc Inspection Date: 02/16/2009 Inspection Type: Stormwater Reason for Visit: Other Inspection Summary: Please address all maintenance issues listed in the comment sections of the inspection reports. Also provide the Engineers Certification for pond 4. Once all compliance issues have been resolved, then this office will proceed with the transfer of ownership to Marsh Oaks at Brynn Marr C.S.A. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: This office has not received the Engineers Certification for pond 4. Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment. Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ ❑.■❑❑ ■❑❑❑ ■ ❑ ❑ ❑ Yes No NA NE N ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑ ®❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑ ❑ ■ upon request? Comment: Pond 1 1. The pond was observed to be lacking permenant vegetation. 2. Trash and debris was observed in the pond. Pond 2 1. The pond was observed to be lacking in permenant vegetation. 2. Trash and debris was observed in the pond. Pond 3 1. The pond was observed to be lacking permenant vegetation. 2. Trash and debris was observed in the pond. Pond 4 1. Erosion on the slopes. Page: 2 DETENTION POND ANALYSIS FILENAME, G:IDATAIWPDATAIWQSIPOND1010803-4.WK1 PROJECT #: SW8 010803-4 REVIEWER: L. Lewis PROJECT NAME: Marsh Oaks Section II @Brynn Marr DATE: 17-Jun-03 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak index No. Site Area 21.65 acres Drainage Area 309276 square feet Area = 7.10 acres Offsite Area= 4.6 acres IMPERVIOUS AREAS Buildings Street Parking SW Offsite Other TOTAL SURFACE AREA CALCULATION Rational C 12918.00 square feet 1.00 14694.00 square feet 1.00 23940.00 square feet 1.00 6275.00 square feet 1.00 59923.00 square feet 1.00 4545.00 square feet 1.00 22t50'1 square feet Rational Cc= 0.52 % IMPERVIOUS 39.54% SAIDA Ratio 2.08% Des. Depth 6 Req. SA, 6424 sf TSS: 90 Prov. SA sf VOLUME CALCULATION Rational ?* 1 Des. Storm ;:,>:::::<;00> inches Rv= 0.41 Bottom 3.00 msl Perm. Poo! 9.iD:' msl Design Pool 11.00 msl Design SA 9164 sf Req. Volume Prov. Volume >.1.5;8 cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = * place a "1" in the box if Rational is used Perm. Pool Volume= 20040 Req. Forebay Volume= 4008 Provided Volume= 4026.00 Percent= SA @ _ Elevation= 0.97 ft Q2 Area = 0.077 cfs Q5 Area = 0.031 cfs Orifice Area 1=? Q= 1,2> weir H x W 38: days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines in 2.33 sq. in. 0.93 sq. in. 1.23 sq. in. 0.040 cfs x fr r MARSH OAKS, SECTION II AT $RYNN MARR ONSLOW COUNTY, NORTH CAROLINA RECEIVEDSTORMWATER DETENTION POND #4 APR 2 5 2003 ENGINEERING CALCULATIONS Revised November 8, 2001 Day Revised January 28, 2002 PROD # - S Ug03 REVISED APRIL 22, 2003 1. AREA Total Area Draining to Pond from Buildings, Drives, Parking Lot and Ashbrook Lane (including pond area)(Marsh Oaks II).......... _ Offsite area drainage to pond from Bay Meadows 1V = Total Drainage Area= Impervious Area: Building, Drives, Parking, Road, and Sidewalk (Marsh Oaks II) 62,372 S.F. _ Offsite Impervious Area from Bay Meadows IV Bay Meadows IV Lot BUA Lots 87-89 Drain to Pond 12 Lots X 3562 SF/Lot Baldwin Court and Sidewalk Total Offsite Impervious Area Total impervious Area 2.5 Acres 4.6 Acres 7.1 Acres 1.44 Acres 3562 SF/Lot 42,744 SF 17.179 SF 59,923 SF Or 1.37 Acres 1.44 Acres 1.37 Acres 2.82 Acres PercentImpervious = Impervious 2.B1 = 39.6 use 40% total 7.1 ENG - 2 2. PERMANENT POND SURFACE AREA From Chart 4 - Appendix E from D.E.M. Report 87-05, for 40% impervious (interpolate), 6.0 basin depth without Vegetative Filter (90% TSS Removal) Yields SAIDA = 2.1 % 7.1 acres x 2.1 % = 0.1491 acres or 6495 S.F. surface area required Top of permanent pond elevation is 9.0 Area at 9.0 elevation = 6716 S.F. provided 6716 S.F. provided > 6665 S.F.required 3. TEMPORARY DETENTION STORAGE VOLUME Retain 1" of runoff from area draining to pond Total Area = 7.1 Acres Total Runoff = (2.81 X 1 X 1.0) + (4.29 X 1 X 0.3) = 4.1 Acres - Inch Find Temporary Storage Volume 4.1 Ac.-In x 3,630 C.F. = 14,883 C.F. required Ac.-In. 4. TEMPORARY DETENTION STORAGE VOLUME Use 2.0 Ft. Temporary Pool Area at 9.0 elevation (permanent pond) = 6,716 S.F. Area at 11.0 elevation (temporary pond) = 9,164 S.F. Average Area = 7,940 S.F. Storage Vol. = 7,940 S.F. x 2.0 Height = 15,880 C.F. provided 15..880 C.F. provided � 14,883 C.F. required O.K. ENG - 3 5. RELIEVE TEMPORARY STORAGE VOLUME IN 2 TO 5 DAYS (Use Volume Required) Q = CD A 2gh (orifice equation) Q = 14,883 C.F. _ 2 days = 0.0861 CFS Q = 14,883 C.F. _ 5 days = 0.0345 CFS Cd = 0.60 g = 32.2 ftlsec h = 1.0 average height For 2 Day release Solve for A = Q = CD 2gh Solve for Orifice Diameter, D 0.0661 = 0.0179 S.F. (0.6) V(32.2) (1.0) A=0.0179S.F.=nR2 R = 0.0754 FT. = 0.9053 inch D = 1.8 inch For 5 Day Release Solve For A = Q = 0.0345. = 0.0072 S.F. CD 2gh (0.6) 2 (32.2) (1.0) Solve for Orifice Diameter, D A = 0.0072 S.F. = n Rz R = 0.0478 FT. = 0.57 inch D = 1.14 inch Use 1.25 inch diameter orifice ENG - 4 6. SIZE INLET RISER PIPE AND OUTLET PIPES TO HANDLE 10 YR. 1 HR. STORM A. Storm Flow Q = CiA A = 7.1 acres C = 0.5 1 = 2.88 inlhr - ten year, one hour Q = 0.5 (2.88) 7.1 =10.2cfs B. Inlet Riser Pipe Water height before topping pond = 12.0 - 11.0 = 1.0 Q = Cd A 2gh (orifice equation) Cd = 0.6 (typical value) H = 1.0 Q = 10.2 2g = 64.4 Solve For A = Q = 10.2 = 2.1184 S.F. CD 2gh 0. 6 2 (32.2) 1. 0 Solve for Riser Pipe Diameter, D A=2.1184S.F.=nR2 R = 0.82 ft. = 9.9 inches D = 19.7 inches Use 1-24" Pipe C. Outlet Pipe 1. Check Inlet Control Use reference Chart 5, Bureau of Public Roads Jan. 1963 ENG - 5 Setting invert of outlet pipe at 9.0 with top of pond at 12.0 Hw = 12.0 - 9.0 = 3.0 Assume 18" Diameter Hw = 3.0 = 1.5 D 1.5 Entrance Type 1 From chart, Q = 17 CFS > 10.2 CFS O.K. Use 1-18" pipe 7. 100 -YEAR FLOOD Q = CIA Composite C = 0.5 1100 = 4.15 inlhr for 1 hour duration flood A = 7.1 acres Q = 0.5 (4.15)(7.1) = 14.7 CFS Design to handle 100-yr flood through riser and outlet pipes prior to topping pond Top of pond = 12.0 A. Riser Weir Assume 24" pipe Q=CdA r2gh H = 12.0 - 9.0 = 3.0 A = [I R 2 = ri (2 .0)2 = 3.14 ft2 Cd = 0.6 Q = 0.6(3.14) 2(32.2)(3.0) Q=26.2CFS > 14.7CFS O.K. ENG - 6 B. Outlet Pipe Use Chart 5, Bureau of Public Roads, Jan. 1963 Hw = 12.0 - 9.0 = 3.0 Diameter = 18" HW = 3.0 = 1.5 D 1.5 From chart, Q = 17 CFS > 14.7 CFS O.K. ... Riser and outlet pipes will handle 100 yr. storm. No spillway required. 8. FOREBAY VOLUME Forebay Volume shall contain approximately 20% of the Total Basin volume. (Permanent Pool Volume) DETERMINE PERMANENT POOL VOLUME Area of Permanent Pool in Forebay - 2047 SF Area of Bottom of Forebay = 637 SF Average Area = (2047 SF + 637 SF) 12 = 1342 SF Forebay Volume = 1342 SF X 3 FT = 4026 FT Area of Permanent Pool in Main Pond = 4439 SF Area of Bottom of Main Pond = 900 SF Average Area - (4439 SF + 900 SF)/2 = 2669 SF Main Pond Volume = 2669 SF X 6.0 FT - 16,014 FT Permanent Pool Volume = 4026 FT + 16,014 FT = 20,040 FT FOREBAY VOLUME Forebay Volume = 4026 FT Forebay Volume 1 Permanent Pool Volume - 4026 FT3120,040 FT = 20.0 % O.K. c1.GRM. MarshOaksPond4.calcs.4.22.03 MARSH OAKS, SECTION II AT BRYNN MARR ONSLOW COUNTY, NORTH CAROLINA ST RMWATER DETENTION POND #1 ENGINEERING CALCULATIONS Revised October 9, 2001 1. AREA Total Area Draining to Pond from Buildings, Drives, and , Parking Lot (including pond area).......... 4.18 Acres Impervious Area: Building, Drives & Parking 71,973 S.F. = 1.65 Acres Percentlmpervious = Impervious _ 1.65 = 39.5 use 40 a total 4.18 2. PERMANENT BOND SURFACE AREA From Chart 4 - Appendix E from D.E.M. Report 87-05, for 40% impervious, 5.0 basin depth without Vegetative Filter (90% TSS Removal) Yields SA/DA = 2.8% 4.18 acres x 2.8% = 0.1170 acres or 5,099 S.F. surface area required Top of permanent pond elevation is 6.0 Area at 6.0 elevation = 5.208 S.F. provided 5,208 S.F. provided >,5.099 S.F. required 3. TEMPORARY DETENTION STORAGE VOLUME Retain 1" of runoff from area draining to pond Total Area = 4.18 Acres Total Runoff = 4.18 Ac.-In. RECEIVED Nov 0 2001 DWQ PR03 # ENG-2 Find Temporary Storage Volume 4.18 Ac.-In x 3,630 C.F. w 15,173 C.F. _required Ac.-In. 4. TEMPORARY DETENTION STORAGE VOLUME Use 2.5 Ft. Temporary Pool Area at 6.0 elevation (permanent pond) = 5,208 S.F. Area at 8.5 elevation (temporary pond) = 7,923 S.F. Average Area = 6,566 S.F. Storage Vol. = 6,566 S.F. x 2.5 Height = 16,415 C.F. provided 16,415 C.F.rov'ded > 15,173 C.F. required O.K. 5. RELIEVE TEMPORARY -STORAGE -VOLUME IN 2-TO 5 DAYS (Use Volume Required) Q = CD AFgh (orifice equation) Q = 15,173 C.F. - 2 days = 0.0878 CFS Q = 15,173 C.F. - 5 days = 0.0351 CFS Cd = 0.60 g = 32.2 ft/sec h = 1.25 average height For 2 Day release Solve for A = Q - 0.0878 = 0.0163 S.F. CD12gh (0.6) V2 (32.2) (1.25) Solve for Orifice Diameter, D A = 0.0163 S.F. = rz Rz R = 0.0721 FT. _ .865 inch D = 1.7 inch ENG-3 For 5 Day Release Solve For A = Q 0.0351 = Q.0065 S.F. CD 2gh (0.6)2 (32.2.) (1.25) Solve for Orifice Diameter, D A = 0.0065 S.F. = n R2 R = 0.046 FT. = 0.547 inch D = 1.09 inch Use 1.5 inch diameter orifice 6. SIZE INLET RISER PIPE AND OUTLET PIPES AND OUTLET PIPES TO HANDLE 10 YR. 1 HR . _STORM A. Storm Flow Q = CiA A = 4.18 acres C = 0.6 I = 2.88 in/hr - ten year, one hour Q = 0.6 (2.88) 4.18 = 7.2 cfs B. Inlet Riser Pi e Water height before topping pond = 10.0 - 8.5 = 1.5 Q = Cd A 2gh ( orifice equation) Cd = 0.6 (typical value) H = 1.5 Q = 7.2 2g = 64.4 Solve For A = Q - 7.2 - 1.2209 S.F. C 2gh 0.62 (32.2) 1.5 ENG-4 Solve for Riser Pipe Diameter, D A = 1.2209 S.F. = n R2 R = 0.62 ft. = 7.5 inches D=,15.0.inches Use 1-18" Pipe C. OutletPipe_ 1. Check inlet Control Use reference Chart 5', Bureau of Public Roads Jan. 1963 Setting invert of outlet pipe at 6.0 with top of pond at 1.0.0 Hw = 10.0 - 6.0 = 4.0 Assume 18" Diameter Hw = 4.0 = 2.7 D 1.5 Entrance Type 1 From chart, Q = 16 CFS > 7.2 CFS O.K. Use 1-18" pipe 7. 100 -YEAR FLOOD Q = CIA Composite C = 0.6 1100 = 4.15 in/hr for 1 hour duration flood A = 4.18 acre Q = 0.6 (4.15)(4.18) = 10.4 CFS Design to handle 100-yr flood through riser and outlet pipes prior to topping pond Top of pond = 10.0 A. Riser Weir Assume 1B" pipe Q = Cd A jf2 gh H = 10.0 - 6.0 = 4.0 ENG-5 A = 0 RZ = II (1.5/2) 2 = 1.77 ft2 Cd = 0.6 Q = 0.6(1.77) V2(32.2) (4.0) Q = 17.0 CFS > 10.4 CFS O.K. B. Outlet _Pip - Use Chart 5, Bureau of Public Roads, Jan. 1963 Hw = 10.0 - 6.0 = 4.0 Diameter = 18" HW = 4.0 = 2.5 D 1.5 From chart, Q = 16 CFS > 10.4 CFS O.K. Riser and outlet pipes will handle 100 yr. storm. No spillway required. 8. FOREBAY VOLUME Forebay Volume shall contain approximately 20% of the Total Basin volume. (Permanent Pool Volume) Permanent pool volume = 13,436 C.F. Forebay Volume provided: Area at elevation 6.0 = 1,512 S.F. Area at elevation 3.0 = 352 S.F. Total = 1,864 S.F. Average Area = 1,864 S.F./2 = 932-S.F. Multiply by 3.0' height= 932 x 3.0 Volume of forebay = 2,796 C.F. provided 2,796 C.F./13,436 C.F. = 20.8% O.K. c3:mydocs\grm\moakIIpond1.caI MARSH OAKS, SECTION II AT SRYNN MARK ONSLOW COUNTY, NORTH CAROLINA STORMWATER DETENTION POND #2 ENGINEERING CALCULATIONS Revised October 9, 2001 I . 'AREA Total Area Draining to Pond from Buildings, Drives, and Parking Lot (including pond area).......... 4.04 Acres Impervious Area: Building, Drives & Parking 79,626 S.F. = 1.83 Acres Impervious 1.83 Percent Impervious = _ = 45.3 use 45% total 4.04 2. PERMANENT PQND SURFACE AREA From Chart 4 -- Appendix E from D.E.M. Report 87-05, for 45% impervious, 6.0 basin depth without Vegetative Filter (90% TSS Removal) Yields SA/DA.= 2.4% 4.04 acres x 2.4% = 0.0970 acres or 4,224 S.F. surface area required Top of permanent pond elevation is 5.0 Area at 5.0 elevation = 4,356 S.F. provided 4,356 S.F. provided > 4,224 S.F. rggui.red 3. TEMPORARY DETENTION STORAGE VOLUME Retain 1" of runoff from area draining to pond Total Area = 4.04 Acres Total Runoff = 4.04 Ac.-In. RECEIVED NOV 2 0 2001 DWQ PROD # `l11111111110"it, CAROt /w•r :°��a ••�E5SIp�r••'Q r` 'vt !"y' o • a 1 25 ; 4 N R. !!l1lIIliLtjy111 ENG-2 Find Temporary Storage Volume 4.04 Ac.--In x 3,630 C.F. = 14,665.2 C.F. required 'Ac.-In. 4. TEMPORARY DETENTIONSTORAGE VOLUME Use 2.7 Ft. Temporary Pool Area at 5.0 elevation (permanent pond) = 4,356 S.F. Area at 7.7 elevation (temporary pond) = 7,051 S.F. Average Area = 5,704 S.F. Storage Vol. = 5,704 S.F. x 2.7 Height = 15,401 C.F. provided 15,401 C.F. provided > 14,665 C.F. required O.K. 5. RELIEVE TEMPORARY STORAGE VOLUME IN 2 TO 5 DAYS (Use Volume Required) Q = CD AFgh (orifice equation) Q = 14,655 C.F. - 2 days = 0.0848 CFS Q = 14,655 C.F. - 5 days = 0.0339 CFS Cd = 0.60 g = 32.2 ft/sec h = 1.35 average height For 2 Day release Solve for A = Q = 0.0898 =. 0.0152 S.F. C 2gh (0.6) V2 (32.2) (1.35) Solve for Orifice Diameter, D A = 0.0152 S.F. = ri R2 R = 0.0695 FT. _ .83 inch D = 1.7 inch ENG-3 or 5 Day Release Solve For A = Q = 0.0339 = 0.0061 S.F. C 2gh (0. 6) 2 (32.2) (1.35) Solve for Orifice Diameter, D A = 0.0061 S.F. = n Rz R = 0.044 FT. = 0.53 inch D = 1.06 inch Use 1.5 inch diameter orifice 6. SIZE INLET _RISER PIPE AND OUTLET PIPES AND OUTLET PIPES TO HANDLE la-YR.- 1 HR . STORM _ A. Storm Flow Q = CiA A = 4.04 acres C = 0. 6. I = 2.88 in/hr - ten year, one hour Q = 0.6 (2.88) 4.04 = 7.0 Cfs B. Inlet Riser Pipe Water height before topping pond = 9.0 - 7.7 = 1.3 Q = Cd A 2gh (orifice equation) Cd = 0.6 (typical value) H = 1.3 Q = 7.0 2g = 64.4 Solve For A = Q - 7.0 - 1.2751 S.F. C 2gh 0.6V2(32.2)1.3 f ENG-4 Solve for Riser Pipe Diameter, D A = 1.2751 S.F. = n Rz R = 0.64 ft. = 7.6 inches D =. 'I.S . 3 'inches Use 1-18" Pipe C. Outlet Pipe 1. Che-c-k_Inlet Control Use reference Chart 5, Bureau of Public Roads Jan. 1963 Setting invert of outlet pipe at 5.0 with top of pond at 9.0 Hw = 9.0 - 5.0 = 4.0 Assume 18" Diameter Hw = 4.0 = 2.7 D 1.5 Entrance Type 1 From chart, Q = 16 CFS > 7.0 CFS O.K. Use 1-18" pipe 7. 100 -YEAR FLOOD Q = CIA Composite C = 0.6 Iioo = 4.15 in/hr for 1 hour duration flood A = 4.04 acre Q = 0.6 (4.15)(4.04) = 10.1 CFS Design to handle 100-yr flood through riser_ and outlet pipes prior to.topping pond. Top of pond = 9.0 A. Riser Weir Assume 18" pipe Q= CdA 2gh H = 9.0 - 5.0 = 4.0 ENG-5 A = IT Rz = n (1.5/2)2 = 1.77 ft2 Cd = 0.6 Q = 0.6 (1.77) 2 (32.2) (4.0) Q = 17.0 CFS > 10.1 CFS O.K. B. Outlet Pipe Use Chart 5, Bureau of Public Roads, Jan. 1963 Hw = 9.0 - 5.0 = 4.0 Diameter = 18" HW = 4.Q = 2.5 D 1.5 From chart, Q = 16 CFS > 10.1 CFS O.K. Riser and outlet pipes will handle 100 yr. storm. No spillway required. 8. FOREB Y VOLUME Forebay Volume shall contain approximately 20% of the Total Basin volume. (Permanent Pool Volume) Permanent pool volume = 12,021 C.F. Forebay Volume provided: Area at elevation 5.0 = 1,429 S.F. Area at elevation 2.0 = 313 S.F. Total = 1,742 S.F. Average Area = 1,742 S.F./2 = 871 S.F. Multiply by 3. 0' hgight=_ 8,71, x 3.0 Volume of forebay = 2,613 C.F. prQvided 2,613 C.F./12,021 C.F. = 21.7% O.K. c3:mydocs\grm\moakIIpond2.ca1 1 2. 3. MARSH OAKS, SECTION II AT BRYNN MARR ONSLOW COUNTY, NORTH CAROLINA STORMWATER DETENTION POND #3 ENGINEERING CALCULATIONS Revised October 9, 2001 Revised January 28, 2002 AREA Total Area Draining to Pond from Buildings, Drives, and Parking Lot (including pond area).......... 3.64 Acres Impervious Area: Building, Drives & Parking 72,633 S.F. = 1.62 Acres FZ--a--'ArdF=49r�ras.- •_ I a r a PERMANENT POND SURFACE AREA From Chart 4 - Appendix E from D.E.M. Report 87-05, for 45% impervious, 6.0 basin depth without Vegetative Filter (90% TSS Removal) Yields SA/DA = 2.4% 3.64 acres x 2.4% = 0.0874 acres or 3,805 S.F. surface area required Top of permanent pond elevation is 6.0 Area at 6.0 elevation = 4,500 S.F. provided 4,500 S.F. provided > 3,805 S.F. required TEMPORARY DETENTION STORAGE VOLUME Retain 1" of runoff from area draining to pond Total Area = 3.64 Acres Total Runoff = 3.64 Ac.-In. �yteaaaaaaaa •Q��� CAROt s D - • SEAL RECEIVE 141 500 , ErON l FEB 0 :1 2002fu�+a+. PR03 # �j WQ� r ( ,O- r ENG-2 Find Temporary Storage Volume 3.64 Ac.--In x 3,630 C.F. = 13,213 C.F. required Ac.-In. 4. TEMPORARY DETENTION STORAGE VOLUME Use 2.5 Ft. Temporary Pool Area at 6.0 elevation (permanent pond) = 4,500 S.F. Area at 8.5 elevation (temporary pond) = 7,101 S.F. Average Area = 5,801 S.F. Storage Vol. = 5,801 S.F. x 2.5 Height = 14,502 C.F. provided 14,502 C.F. provided > 13,213 C.F. required O.K. 5. RELIEVE TEMPORARY STORAGE VOLUME IN 2 TO 5 DAYS (Use Volume Required) Q = 13,213 C.F. _ 2 days = 0.0765 CFS Q = 13,213 C.F. - 5 days = 0.0306 CFS Cd = 0.60 g = 32.2 ft/sec h = 1.25 average height For 2 Day release /Ir►1 « • �P�P-= w Solve for Orifice Diameter, D A = 0.0142 S.F. = n R2 R = 0.0673 FT. _ .81 inch D = 1.6 inch ENG-3 For 5 Day_ Release �47+ �• • • f .ram Solve for Orifice Diameter, D A = 0.0057 S.F. = n R2 R = 0.043 FT. = 0.51 inch D = 1.03 inch Use 1.5 inch diameter orifice 6. SIZE INLET RISER PIPE AND OUTLET PIPES TO HANDLE 10 YR. 1 HR. STORM A. Storm Flow Q = CiA A = 3.64 acres C = 0.6 I = 2.88 in/hr - ten year, one hour Q = 0.6 (2.88) 3.64 = 6.3 cts B. Inlet Riser Pipe Water height before topping pond = 10.0 - 8.5 = 1.5 Cd = 0.6 (typical value) H = 1.5 Q = 6.4 29 = 64.4 sta �R�`A= Q Cah O_ 2 (32-Z L5 r ENG-4 Solve for Riser Pipe Diameter, D A = 1.0683 S.F. = n R2 R = 0.58 ft. = 7.0 inches D = 14.0 inches Use 1-1811 Pipe C. Outlet Pipe 1. Check Inlet Control Use reference Chart 5, Bureau of Public Roads Jan. 1963 Setting invert of outlet pipe at 6.0 with top of pond at 10.0 Hw = 10.0 - 6.0 = 4.0 Assume 1811 Diameter Hw = 4.0 = 2.7 D 1.5 Entrance Type 1 From chart, Q = 16 CFS > 6.3 CFS O.K. Use 1-1811 pipe 7. 100 -YEAR FLOOD Q = CIA Composite C = 0.6 1100 = 4.1.5 in/hr for 1 hour duration flood A = 3.64 acre Q = 0.6 (4.15) (3.64) = 9.1 CFS Design to handle 100-yr flood through riser and outlet pipes prior to topping pond Top of pond = 10.0 A. Riser Weir Assume 1811 pipe H = 10.0 - 6.0 = 4.0 ENG-5 A = C[ R2 = 11 (1.5/2) 2 = 1.7'1 ft2 Cd = 0.6 � 0_6(1_773 2 (:32,-2) (4_0) Q = 17.0 CFS > 9.1 CFS O.K. B. Outlet Pipe Use Chart 5, Bureau of Public Roads, Jan. 1963 Hw = 10.0 - 6.0 = 4.0 Diameter = 18" HW = 4.0 = 2.5 D 1.'5 From chart, Q = 16 CFS > 9.1 CFS O.K. Riser and outlet pipes will handle 100 yr. storm. No spillway required. 8. FOREBAY VOLUME Forebay Volume shall contain approximately 20% of the Total Basin volume. (Permanent Pool Volume) Permanent pool volume = 13,032 C.F. Forebay Volume provided: Area at elevation 6.0 = 1,260 S.F. Area at elevation 3.0 = 380 S.F. Total = 1,640 S.F. Average Area = 1,640 S.F./2 = 820 S.F. Multiply by 3.0' height= 820 x 3.0 Volume of forebay = 2,460 C.F. provided 2,460 C.F./13,032 C.F. = 18.9% O.K. c:mydocs\grm\moakIIpond3.ca1 MARSH OAKS, SECTION II AT BRYNN MARR ONSLOW COUNTY, NORTH CAROLINA STORMWATER DETENTION POND #4 ENGINEERING CALCULATIONS Revised November 8, 2001 Revised January 28, 2002 1. AREA Total Area Draining to Pond from Buildings, Drives, Parking Lot. and Ashbrook Lane (including pond area).......... 4.4 Acres Impervious Area: Building, Drives, Parking, Road, and Sidewalk .......... 62,372 S.F. = 1.44 Acres t Jrdw=.&mP#ijK;--ikef1rd1P — s 2. PERMANENT POND SURFACE AREA From Chart 4 - Appendix E from D.E.M. Report 87-05, for 35% impervious, 5.5 basin depth without Vegetative Filter (90% TSS Removal) Yields SA/DA = 2.2% 4.4 acres x 2.2a'= 0.0968 acres or 4,217 S.F. surface area required Top of permanent pond elevation is 9.0 Area at 9.0 elevation = 5,207_S.F. provided 5,207 S.F. provided >_4,217 S.F. required 3. TEMPORARY DETENTION STORAGE VOLUME Retain 111 of runoff from area draining to pond Total Area = 4.4 Acres Total Runoff = 4.4 Ac. -In. •a°`"t� �'oj'�ry� CA �,1 O �by••cnon•• �f��>�.• RECEIVED°'.,`�' ' '1412 •o FEB 0 12002 DW � O-/- •• 1 11 9• �\ PRO /i101N 1i+�� ENG-2 Find Temporary Storage Volume 4.4 Ac.-In x 3,630 C.F. = 15 972_C.F. required Ac.-In. 4. TEMPORARY DETENTION STORAGE VOLUME Use 2.5 Ft. Temporary Pool Area at 9.0 elevation (permanent pond) 5,207 S.F. Area at 11.5 elevation (temporary pond) = 7,952 S.F. Average Area = 6,580 S.F. Storage Vol. = 6,580 S.F. x 2.5 Height = 16,450 C.F. provided 16_,450 C.F-provided_> 15,972 C.F. reecuir_ed O.K. 5. RELIEVE TEMPORARY STORAGE VOLUME IN 2 TO 5 DAYS (Use Volume Required) grw'r ga &� Q = 15,972 C.P. _ 2 days = 0.0924 CPS Q = 15,972 C.F. 5 days = 0.0370 CFS Cd = 0.60 g = 32.2 ft/sec h = 1.25 average height For,2 Day release �s - r� 4 • •1 Solve for Orifice Diameter, D A = 0.0172 S.F. = rI Rz R = 0.0739 FT. = 0.8870 inch D = 1.8 inch ENG-3 For 5 Day Release Solve for Orifice Diameter, D A = 0.0069 S.F. = n R2 R = 0.0468 FT. = 0.56 inch D = 1.12 inch Use 1.25 inch diameter orifice 6. SIZE INLET RISER PIPE AND OUTLET PIPES TO HANDLE 10 YR. 1 HR. STORM A. Storm Flow Q = CiA A = 4.4 acres C = 0 .' 6 I = 2.88 in/hr - ten year, one hour Q = 0.6 (2.88) 4.4 = 7.6 cfs B. Inlet Riser PipE Water height before topping pond = 12.5 - 11.5 = 1.0 C)-- (CZ!2a�ZE-- Cd = 0.6 (typical value) H = 1.0 Q = 7.6 2g = 64.4 •7.6 +4 CA15 t: • ^. • /1 • ENG-4 Solve for Riser Pipe Diameter, D A = 1.5784 S.F. = n Rz R = 0.71 ft. = 8.5 inches D = 17.0 inches Use 1-1.811 Pipe C. Outlet Pine 1. Check Inlet Control Use reference Chart 5, Bureau of Public Roads Jan. 1963 Setting invert of outlet pipe at 9.0 with top of pond at 12.5 Hw = 12.5 - 9.0 = 3.5 Assume 18" Diameter Hw = 3.5 = 2.3 D 1.5 Entrance Type 1 From chart, Q = 14 CFS > 7.6 CFS O.K. Use 1-18" pipe 7. 10 0 -YEAR FLOOD Q = CIA Composite C = 0.6 Iioo = 4.15 in/hr for 1 hour duration flood A = 4.4 acres Q = 0.6 (4.15)(4.4) = 11.0 CFS Design to handle 100-yr flood through riser and outlet pipes prior to topping pond Top of pond = 12.5 A. Riser Weir Assume 181, pipe IN H = 12.5 - 9.0 = 3.5 ENG-5 A R2 = n (1.5/2)2 = 1.77 ft2 Cd = 0.6 C 0.6 (L 2 (32.2) (3.S) Q = 15.9 CFS > 11.0 CFS O.K. B. Outlet Pipe Use Chart 5, Bureau of Public Roads, Jan. 1963 Hw = 12.5 9.0 = 3.5 Diameter = 1811 HW = 3.5 = 2.3 D 1.5 From chart, Q = 14 CFS > 11.0 CFS O.K. Riser and outlet pipes will handle 100 yr. storm. No spillway required. 8. FOREBAY VOLUME Forebay Volume shall contain approximately 20% of the Total Basin volume. (Permanent Pool Volume) Permanent pool volume = 14,158 C.F. Forebay Volume provided: Area at elevation 9.0 = 1,435 S.F. Area at elevation 6.0 = 315 S.F. Total = 1,750 S.F. Average Area = 1,750 S.F./2 = 875 S.F. Multiply by 3.0' height= 875 x 3.0 Volume of forebay = 2,625 C.F. provided 2,625 C.F./14,158 C.F. = 18.5% O.K. c:mydocs\grm\moakIIpond4.ca1 DETENTION POND ANALYSIS FILE NAME: S:\WQS\POND1010803-1.WK1 PROJECT#: SW8 010803-1 Pond 1 REVIEWER: L. Lewis PROJECT NAME- Marsh Oaks, Section 11 at Brynn Marr DATE: 02-Oct-2001 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres 0] ".1 5208T'0 Drainage Area square feet Area in Acre 4.18 IMPERVIOUS AREAS Rational C Buildings 16733.00 square feet 1.00 Huff Drive. 19905.00 square feet 1.00 Parking 23823.00 square feet 1.00 SW 11512.00 square feet 1.00 square feet square feet TOTAL 973::00 square feet Rational Cc= 0.52 SURFACE AREA CALCULATION % IMPERVIOUS 39.53% Des. Depth 5 TSS: 90 SA/DA Ratio 2.77% Req. SA 5047 sf Prov. SA VOLUME CALCULATION * place a "'I" in the box if Rational is used I xGlaw--y-AVA Perm. Pool Volume- 19028 Req. Forebay Volume= 3805.6 Provided Volurne= 3708.00 Percent= Based on 1" over entire drainage area Elevation= ORIFICE CALCULATION COMMENTS Surface Area , Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: S:\WQS\POND1010803-2.WK1 PROJECT#: SW8 010803-2 Pond 2 REVIEWER: L. Lewis PROJECT NAME. Marsh Oaks, Section 11 at Brynn Marr DATE: 02-Oct-2001 Receiving Stream: Northeast Creek Class: SC Drainage Basin: White Oak Index No. Site Area 21.65 acres Drainage Area 2JCQ square feet Area in Acre 4.04 IMPERVIOUS AREAS Rational C Buildings 24374.00 square feet 1.00 square feet 1.00 Parking 45066.00 square feet 1.00 SW 10186.00 square feet 1.00 square feet square feet TOTAL 7962fi'06 square feet Rational Cc= 0.56 SURFACE AREA CALCULATION % IMPERVIOUS 45,25% Des. Depth 6 TSS: 90 SA/DA Ratio 2.41% Req. SA 4250 sf Prov. SA VOLUME CALCULATION * place a "1" in the box if Rational is used I Rational ?* 1 FOREBAY Des. Storm I. .: inches Perm. Pool Volume= 14133 IRv= 0.46 Req. Forebay Volume= 2826.6 Bottom -1 rnsl Provided Volume= 2550.00 Perm. Pool Percent= 80% ` Design Pool 7.5 msI Design SA 7399 sf Req. Volume ;::.:4 Based on 1 over entire drainage area Prov. Volume :-::45411: �cf Elevation= ORIFICE CALCULATION Avg. Head = 1.22 ft Q2 Area = 2.30 in' Flow Q2, cfs 0.085 cfs Q5 Area = 0.92 in 2 Flow Q5, cfs 0.034 cfs Orifice Area 1.77 in 2 No. of Orifices Q= 0.065 cfs Diameter, inches weir H x W EEM= in x in Drawdown days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines tb' STORMWATER NARRATIVE MARSH OAKS, SECTION H AT BRYNN MARR JACKSONVILLE, NORTH CAROLINA August 2, 2001 The Marsh Oaks Section II project is a multi -family residential development consisting of 26 buildings (totaling 136 units) to be located in the Brynn Marr area of Jacksonville in Onslow County. The project will involve the construction of the paved parking and drive areas as well as the buildings. Stormwater will be collected throughout the development and piped to wet detention ponds. The project has been divided into four sub -basins, each containing its own stormwater pond. The portion of Huff Drive to be constructed will be drained to Stormwater Pond 41. The proposed public street accessing the site off of Pine Valley Road will discharge its stormwater into a 5:1 swale. Its built -upon area will be included in the lot BUA Calculations for future lots to be developed adjacent to this road, c:mydocumzn4slspecq�moaksii.swatemar TERN BIND CUM s4. - —4- INE VALLEY RR - ;. ARSI-I OAKS II AL LL.- i —4 L, JFF DR. '!` 4 -1 f\ ' • \ IL\\ IL �t'� IA \ �. v u 1 Midway Pa C 1995 BeLorme Yarmouth, fib 04096 —{1000 ft Beale: 1 : 31,250 Detail: 12-1 Datun: i6S84 Fc-c' ! m u 0 r I 8G.32' CONC. PATIO I I I I � m u---CONIC. PORCH ml?) DIMENSIONAL PLAN 4 UNIT BUILDING PLAN 5CALE: I "-40' 9G.GG' CONIC. 8, PATIO TYP. r I I , I I 8 `OI8 m I p I I CONIC. PORCH Cfl'P) DIMENSIONAL PLAN 6 UNIT BUILDING PLAN 5CALE: 1 '-4a MARSH OAKS II BUILDING DIMENSIONAL PLANS Parker & Associates, Inc. s g°r==p4a Consulting Engineers P.O. Box 978 - 2BS41-0978 ore - Land Planners 308 New Bridge street - 2N40 Land Surveyors iaclratmaille, North Carolina Phone (910) 4M-2414 - Fax (910) 455-3441 Permit No. (to be provided by DWQ) } State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM CURB OUTLET SYSTEM SUPPLEMENT FOR LOW DENSrrY DEVELOPMENT WITH CURB AND GUTTER This form maybe photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, a curb outlet system supplement, a low density supplement, design calculations, and plans and specifications showing all stormwater conveyances and curb outlet details. I. PROJECT INFORMATION Project Name: Marsh Oaks, Section II at Brynn Marr Contact Person: Michael G, Tuton Phone Number: 91 0 577 -1 441 Curb outlets to (check one): Swale 0 Vegetated Area II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been mef and supporting documentation is attached. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials GRM fr� a. Curb outlets direct flow to a swale or vegetated area. GRM (f b. Swales.or vegetated areas receiving curb outlet flow are designed to carry, at a minimum, the peak flow from the 10-year storm. GRM c. Flow velocity is non -erosive for peak flow from the 10-year storm event. GRM G� d. Longitudinal slope of the swale or vegetated area does not exceed 5%. GRM e. Side slopes of the swale or vegetated area are no steeper than 5:1 (horizontal to vertical). GRM f. Length of swale or vegetated area is > 100 feet. GRM g. The system takes into account the run-off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). i� GRM Co" h. Swales are located in recorded drainage easements. GRM Gr i. Grass type(s) for permanent vegetative cover specified on detail. GRM G" j, Swale detail provided on plans. ii S Ii gs PTTAc-14 ^, iN'r 1 . Form SWU-105 Ver 3.99 Pane I of 3 III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table I and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning.and Design Manual. I T r I aule 1 313 W a I C Uesign IniuTTnation Swale No . f,0 P Drainage Area` acy rvious ii V. F10 JAI 6P th I (Ps- 0.51 1, 14 OIG -7,1 3's- ),0 1,2. 2 3 4 5 6 7 8 9 10 11 12 13 14 15- 16 17 18 19 20 21 22 23 24 25 FormSWU-105 Ver3.99 Page 2 of 3 V -'' . . �,,- III. CURB OUTLET SYSTEM MAINTENANCE REQUIREMENTS Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time. 2. '.Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Michael G. Tuton President Address: P.O. Box 1066, Jacksonville, NC 28541 Phone: (91 0) 5 7 7 -1 4 41 Date: Note: The legally responsible party should not be a homeowners association unless more than 5017o of the lots have been sold and a resident of the subdivision has been named the president. yI c-ky 1 , ry-t-,* , a Notary Public for the State of iy� , County of On 'ez> I l9\A/ , do hereby certify' that M (' b" e I _ G - TU -D 0 personally appeared before me this -,t) 4-\ day of _ .� U ne, _._ a �?� , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, v My commission expires 9 _a I -ao0 Form SWU-105 Ver 3.99 Paoe 3 of 3 MARSH OAKS, SECTION II CURB OUTLET SYSTEM SUPPLEMENT ATTACHMENT I H. Swale located in property owned by project developer. Easement to be recorded when future development plans finalized for this area. c3:mydogAgrmlmoaksattach.I tr f ` 4 CITY OF JACKSONVILLE FINANCIAL,RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land -disturbing activity covered by the Jacksonville City Code, Chapter 22 and the North Carolina State Sedimentation Pollution Control Act, prior to the completion and filing of this form with the Engineering Division, Department of Public works, City of Jacksonville, North Carolina. (Please type or print and, if question is not applicable, place n/a in the blank.) 1. Project Name Marsh Oaks, Section 11 at Brynn Marr 2. Location of land -disturbing activity? At the end of Pine Valley_ Rd. on left side of road. 3. Approximate date land -disturbing activity will be commenced? July 2001 4. Purpose of development (residential, commercial, industrial, etc.)? Residential 5. Approximate acreage of land to be disturbed or uncovered? 18.5 6. Has an erosion and sedimentation control plan been filed? Yes X (enclosed) No 7. Land Owner(s) of Recorded (Use blank page to list additional owners): Hunter Development_ Corporation Name Name P.O. Box 1066 Current Mailing Address Current Mailing Address Jacksonville, NC 28541 City State zip� City State Zip (910) 577-1441 Telephone Number Telephone Number 8. Indicate Book, and Page where deed or instrument is filed (Use blank page to list additional deeds or instruments): Book 1521 Page 689 Book Page 9. Person(s),or. firm(s) who is financially responsible for this -land -disturbing activity. -Hunter Develo2ment_Corporation ..................................... Name of Person or Firm Name of Person or Firm P.O. Box 1 0 EZC?_----_.._..____ Mailing Address Mailing Address Jacksonville NC 28541 --------------__---------- -7 ----------------------------------- City State Zip City State Zip __( 91 0)_ 5 7 7_ 1 4 41 _---------------- - - ^-- --------------------- Telephone Telephone 10. Registered agent, if any, for the person or firm who is financially responsible: ------------------------------- -------------- Name City State- - Zip --------------------------- ------- ----------- Mailing Address Telephone The above information is true and correct to the best of my knowledge and belief and was provided by me while under oath. (This form must be signed by the financially responsible person if an individual and by an officer, director, partner, attorney -in -fact, or other person with authority to execute instruments for the financially responsible person if not an individual.) _ r - __ _ Michael G. Tuton Date--^ `L��"' �P`<<������ - Type or Print Name President -- �p�pRy•.� --------------------------------- Title or Authority coo ------------- Signature a Notary Public of the County of _QnSlow State of North Carolina, hereby certify that t_YI C kQel _�,_ 7U'FQn ___personnaly appeared before me this day and under oath acknowledge that the above form was executed by him. Witness my hand and notarial seal, this 1 3 A"h day of -dun-------------- � r4 a001 ----- v L ttLt4 Notary My Commission expires __Q=a1=_aOD3-,