HomeMy WebLinkAboutSW8010431_HISTORICAL FILE_20131025STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 o I o+ 3 I
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
ZI D -Z.5
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Tracy E. Davis, PE, CPM Pat McCrory, Governor
Director John E. Skvaria, III, Secretary
October 25, 2013
Commanding Officer
MCB Camp Lejeune
c/o Neal Paul, Deputy Public Works Officer
Bldg. 1005 Michael Road
Camp Lejeune, NC 28547
Subject: Stormwater Permit No. SW8 010431 Modification
Bachelor Enlisted Quarters Jackson Street
High Density Project
Onslow County
Dear Mr. Paul
The Wilmington Regional Office received a complete, modified Express Stormwater
Management Permit Application for Bachelor Enlisted Quarters Jackson Street on October 11,
2013. Staff review of the plans and specifications has determined that the project, as proposed,
will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are
forwarding modified Permit No. SW8 010431 dated October 25, 2013, for the construction,
operation and maintenance of the built -upon areas and BMP's associated with the subject
project.
Effective August 1, 2013 the State Stormwater program has been transferred from the Division
of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All
previous references to DWQ will remain in older stormwater permits issued prior to August 1,
2013 until they are modified. Please note that the updated pages in this permit now reference
DEMLR as the Division responsible for issuance of the permit
The modifications covered by this permit include the addition of 753 square feet of new built -
upon area to DA-1 for the purpose of adding a boiler building as part of the Base -wide steam
decentralization project P-1449. An analysis of the existing infiltration basin #1 shows that there
is sufficient capacity to accept the additional runoff without enlarging the basin. No changes are
proposed to Basin #2. This modification is approved as a minor modification under the 2008
rules. The approved plan sheets showing the location, grading and size of the P-1449 boiler
building addition are to be added to the previously approved plans.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any
development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of
the General Statutes, which is current and valid at any point between January 1, 2008, and
December 31, 2010. The law extends the effective period of any stormwater permit that is set to
expire during this time frame to three (3) years from its current expiration date. On August 2,
2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four
(4) years extension.
Accordingly, this permit, which was set to expire on January 10, 2015, shall now be effective
from the date of issuance until January 10. 2019,which includes all available extensions, and
shall be subject to the conditions and limitations as specified therein. Please pay special
attention to the conditions listed in this permit regarding the Operation and Maintenance of the
BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing
ownership, transferring the permit, and renewing the permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system, to record deed
restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in
future compliance problems.
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28406 Phone: (910) 796-7215 / Fax: (910) 350-2004
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
i
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing by filing a written petition with the Office of
Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North
Carolina General Statutes. Per NCGS 143-215(e) the petition must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions
regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714
Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their
website at www.NCOAH.com. Unless such demands are made this permit shall be final and
binding.
If you have any questions, or need additional information concerning this permit modification,
please contact Linda Lewis at (910) 796-7215, extension 7343.
Sincer ly,
0 '
� Tra y Davis, Director
Division of Energy, Mineral and Land Resources
GDS/arl: G:1WQ1Shared\StormwaterlPermits & Projects120011010431 HD1201310 permit 010431
cc: David Towler, MCB Camp Lejeune
Carolina Matiz, CH2MHill
Wilmington Regional Office Stormwater File
Page 2 of 8
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Commanding Officer MCB Camp Lejeune
Bachelor Enlisted Quarters Jackson Street
Jackson Street, Camp Lejeune, Onslow County
FOR THE
construction, operation and maintenance of 2 infiltration basins and 2 bio-retention
areas in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to
as the "stormwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by
the Division and considered a part of this permit.
This permit shall be effective from the date of issuance until January 10, 2019, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
controls include two infiltration basins which discharge the design storm volume
to the two bio-retention areas. Systems 1 & 2 have been designed to handle the
runoff from 116,187 and 113,693 square feet of impervious area, respectively.
The excess design storm overflow from each system must pass through a 50'
vegetated filter prior to discharge.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.6
of this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 3 of 8
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
[:
The following design criteria have been provided in the infiltration basins and bio-
retention areas and must be maintained at design condition: - i
a. Drainagge Area, 9cres:
Onsite, ft .
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Infiltration Basin Depth, feet:
e. Infiltration Bottom Elevation, FMSI�:
f. Infiltration Bottom Surface Area, ft :
g. Infiltration Bypass Weir Elevation, fmsl
h. Infiltration Storage Volume, ft
i. Type of Soil:
j. Expected Infiltration Rate, in/hr:
k. Seasonal High Water Table, FMSL:
I. Orifice size to bio-retention iea:
M. Bioretention Surface Area, ft
n. Bioretention Bottom Elevation, fmsl:
o. Bioretention Storage Elevation, fmsl:
p. Bioretention Volume, ft
q. Number of Trees:
r. Number of Shrubs:
S. Time to Draw Down, hours:
t. Receiving Stream/River Basin:
U. Stream Index Number:
V. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
System #1 :;System #2
4.19
9.85
182,516
212,137
0
0
116,187
113,693
1,513.65
1.5
1.8
1.6
8.53
11.02
6,576
7,352
10.27
12.6
14,486
14,715
Silty Sand
Silty Sand
1.7
1.7
6.47
9.0
1.25"0
1.25"0
8,500
8,900
7.05
10.07
7.80
10.82
6,375
6,675
49
51
147
154
15
14
Courthouse
Bay 1 WOK
WOK02 19-36
"SA HQW"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structures must be available at all
times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DEMLR. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
Page 4of8
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
5. The facilities shall be constructed in accordance with the conditions of this
permit, the approved plans and specifications and other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained at all times.
9. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
C. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
d. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
11. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
Any person or entity found to be in noncompliance with the conditions and
limitations contained in this stomwater management permit or with the stormwter
rules, is subject to enforcement action in accordance with North Carolina
General Statute 143, Article 21.
2. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
3. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by the Division, such as the construction of
additional or replacement stormwater management systems.
Page 5 of 8
State Stormwater Management Systems
Permit No. SW8 010431 Mod. ;
4. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
5. This permit is not transferable to any person or entity except after notice to and
approval by the Director. The permittee shall submit a completed and signed
Name/Ownership Change Form, accompanied by the supporting documentation
as listed on the form, to the DEMLR at least 60 days prior to any one or more of
the following events:
a. An ownership change including the sale or conveyance of the project area in
whole or in part, except in the case of an individual lot sale that is made
subject to the recorded deed restrictions;
b. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of Session Law 2011-256;
c. Bankruptcy;
d. Foreclosure;
e. Dissolution of the partnership or corporate entity;
f. A name change of the current permittee;
g. A name change of the project;
h. A mailing address change of the permittee;
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall submit a permit renewal application and fee to the Division at
least 180 days prior to the expiration date of this permit.
Permit modified and reissued this the 25th day of October 2013.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
I racy L. Davis, F'.E. Uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 6 of 8
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
Bachelor Enlisted Quarters Jackson Street
Stormwater Permit No. SW8 010431
Onslow County
Designer's Certification
I , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 7 of 8
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
4
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DEMLR Wilmington Regional Office
Page 8 of 8
DWQ USE ONLY
Hate Received
Fee Paid Permit Number
0
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction
(select all that apply) ❑ Nan -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
EE !'\ ` E State of North Carolina
� Department of Environment and Natural Resources
OCT 1 1 Li 113 Division of Water Quality
gr. - - STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
BEQ Couthouse Bay Ig l g g f y B' Fe 14 1
2. Location of Project (street address):
Jackson Street
City:MCB Camp Lejeune _ County:Onslow Zip:28547
3. Directions to project (from nearest major intersection):
From the intersection of Marines Rd and Hwy 172 at the entrance to Courthouse Bay, south 1500 feet on
Marines Rd (Aka Horns Rd), East on Grace Lane 1400 feet. Project on the right.
4. Latitude:34° 35' 12.27" N Longitude:77° 21' 55.75" W of the main entrance to the project.
II. PERMIT INFORMATION: / f lbw
1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt
tRenevals with modifications also requires SKU-102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number SW8 010431 its issue date (if known) August 8, 2001, Modified January 10, 2005
and the status of coristruction: ❑Not Started ❑Partially Completed*
® Completed* *proMe a designer's certification
2. Specify the type of project (check one):
❑Law Density ®High Density ❑Dfains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as thi ;'Y s— Jt of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the stormwater project number, if
assigned, and the 'pievious name of the project, if different than currently
proposed, '
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
❑NPDES Industrial Stormwater
®Sedimentation/Erosion Control: 0.31 ac of Disturbed Area
❑404/401 Permit: Proposed Impacts
b, If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number,
issue date and the type of each permit:Pending
5. Is the project located within 5 miles of a public airport? ®No ❑Yes
If yes, see S.l.. 2012-200, Part Vl: 1-ittp:/112ortal.ncdenr.org/web/wg/ws/su/stateswh-ules laws
Form SWU-101 Version 06Aub2012 Page 1 of
1� T
Itf �
�lo F
e
a
.tisri
,f
�' M* i' bivs
- —_
"III. CONTACT INFORMATION
1. a. Pririt Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/ Organization:Commandine OfficerLMCB Camp Leieune
Signing Official & Title:Neal Paul, Deputy Public Works_ _
b.Contact information for person listed in item 1a above:
Street Address:1005 Michael Rd
City:Camp Lejeune _ State:NC Zip:28547
Mailing Address (if applicable):
City:
Phone: (910 450-5803
EmaiI:neal.paul@usmc.mil
State: Zip:
Fax: (910 T ) 451-2927
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organization: __ ^
Signing Official & Ti
b. Contact information for person listed in item 2a above:
Street Address:
City:
Mailing Address (if applicable):,
City:
Phone: ( 1
Ema
State: Zip:
State: Zip:.
Fax: ! 1
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization: David Towler, El/ Public Works
Signing Official & Title:Neal Paul, deputy Public Works
b.Contact information for person listed in item 3a above:
Mailing Address:1005 Michael Rd
City:Camp Lejeune State:NC Zip:28547
Phone: (910 ) 450-5803
Email: david.tow ler a@usmc.miI
4. Local jurisdiction for building permits:
Fax: 910 451-2927
Point of Contact: Phone #:
Fonn SWU-101 Version 06Aug2012 Page 2 of 6
4:
JV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff will be treated within existing BMP.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the White Oak River basin.
4. Total Property Area: 9.06 acres 5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area':9.06 acres
+ Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHM Iine. The resultant project area is used to
calculate overall percent built upon area (BETA). Non -coastal wetlands landward of the NHW (orMHW) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 5.28/ 9.06= 58.2 _%
9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area 2
Drainage Area
Drainage Area
Receiving Stream Name
Courthouse Bay
Courthouse Bay
Stream Class *
SA
SA
Stream Index Number *
WOK0219-36
WOK0219-36
Total Drainage Area (so
182,516
212,137
On -site Drainage Area (so
182,516
212,137
Off -site Drainage Area (so
0
0
Proposed Impervious Area** (so
116,187
113,693
% Impervious Area** total
63.7%
53.6%
impervious" Surface Area
Drainage Area 1
Drainage Area 2
Drainage Area _
Drainage Area
On -site Buildings/Lots (so
640
On -site Streets (so
On -site Parking (so
On -site Sidewalks (so
Other on -site (sf)
113
Future(so
Off -site (so
Existing BUA*** (so (1--to -05
115,434
113,693
Total (so:
116,187 /2.67 ac
113,693/2.61ac
* Strearrt Class and Index Nairuher can be determined at: htt j.Z&7ortal.ncclenr.or oeb w ycsu classi cations
Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
*** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BUA.
Form SWU-101 Version 06Aug2012 Page 3 of 6
4
1'
J �1C
' f
��..a�.-
ir` ��
' .1 � f1G 'i I:'
.t:� �.EJ� . .
_,s3' :,
.. ... t L .. ..
' �i�. .T
.+. .
� �.
.31. How was the off -site impervious area listed above determined? Provide documentation. N/A
Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened c&
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NC4C 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at htt ortii.ncdenr.or webJ w ws su ma s.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from ht ortal.ncdenr.or web w ws su statesw forms does.
Initials
1. Original and one copy of the Stormwater Management Permit Application Form.
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per fart VII below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
http://www.envhelp.org/pa%�es/onestopexl2ress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'/z
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to 85' x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
Form SWU-101 Version 06Au« 012 Page 4 of
1.9
Copy of any applicable soils report with the associated SHWT elevations (Please identify
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit far DWQ to verify the SHW'I' prior
to submittal, (970) 796-7378.)
A copy of the most current property deed. Deed book: Page No:
For corporations and limited liability corporations (LLC): Provide documentation from the NC _
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
hqp://www.secretary.state.nc.us/Cor]2orations/CSearch.aspx
V1I. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparceis, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from
http://portal.ncdenr.org/web/wn/ws/su/statesw/forms dots. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:
Consulting Firm:_
Mailing Address:_
City:
Phone:
Ern
State:
Fax: ( }
Zip:
IX. PROPERTY OWNER AUTHORIZATION (if Contact IlIfornlation, iteni 2 has been filled out, cottiplete this
section)
I, (print or type name of person listed in Contact Information, item 2a) , certify that I
own the property identified in this permit application, and thus give permission to (print or hjpe name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-101 Version 06Aug2012 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DWQ Storinwater permit reverts back to
me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a
completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature: Date:
I, , a Notary Public for the State of . County of
do hereby certify that personally appeared
before me this _ day of , and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission expires
X. APPLICANT'S CERTIFICATION
I, (print or hipe name of person listed in Contact Information, item 1a)
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwoq rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements.
Signatu
I,
Date:
a N tary Publicj'or the State of _ County of
_W , do hereby certify that J
before me this 2b day of
a stormwater permit. Witness my hand and official
KELLEY VANDECOEVERING
NOTARY PUBLIC
ONSLOW COUNTY
STATE OF NORTH CAROE.INA
SEAL
au l I personally appeared
and acknowleliz the due exe on of t
My commission expires 1.1 � M Q
Fonn SWU-101 Version 06Aug2012 Page 6 of 6
:i!�r.�'.'L�i � I t�'
lye Central Files: APS_ SWP—
[[�� "" 10/25/13
Permit Number SW8010431 Permit Tracking Slip
Program Category Status Project Type
State SW Active Minor modification
Permit Type Version Permit Classification
State Stormwater 1.20 Individual
Primary Reviewer
linda.lewis
Coastal SW Rule
Coastal Stormwater - 1995
Permitted Flow
Permit Contact Affiliation
Facility
Facility Name Major/Minor Region
BEQ P 159A N62470-99-R-9127 Jackson Street Minor Wilmington
Location Address County
Jackson St Onslow
Camp Lejeune NC 285420004 Facility Contact Affiliation
Owner
Owner Name
Commanding Officer Marine Corps Base Camp Lejeune
Dates/Events
Scheduled
Orig Issue App Received Draft Initiated Issuance
08/08/01 10/11 /13
Regulated Activities
State Stormwater - HD - Infiltration
Outfall NULL
Owner Type
Government - Federal
Owner Affiliation
Neal Paul
1005 Michael Rd
Camp Lejeune NC 285472521
Public Notice Issue Effective Expiration
10/25/13 10/25/13 01/10/19
Reauested/Receiived Events
Deed restriction requested
Deed restriction received
Additional information requested 10/17/13
Additional information received 10/22/13
Waterbody Name Stream Index Number Current Class Subbasin
f
MEMORY TRANSMISSION REPORT
,-f
FILE NO.
618
DATE
10.25 15:52
TO
:n 919104512927
DOCUMENT PAGES
9
START TIME
10.25 15:52
END TIME
10.25 15:54
PAGES SENT
9
STATUS
OK
TIME
FAX NO.1
NAME
`SUCCESSFUL TX NOTICE'
'
:10-25-2013 15:54
State nt' Norm Carollon
l3opar9ment oir irc"wi nmant anA Naturwl Rasooreaw
Wu.nln�tnn RnQionat Ofriec
Pa! Mcr_}ory, Governor FAX C4316r7:1pL SKI IEVir N—tary
ns1e: O No_ Pngee (oxcl_ cover):
-
Nax: ��� ` —� �/ / Fax: (91O) 350-2004
127 Ca.ai..al ",iva la.+cnelan. WilminJK—. NC 26403 + (910)'196-72tS + An P_q-1 t.]ppo. —ity A1Ti—ftfivo A 11— 13mploy—
State of North Carolina
Department of Environment and Natural Resources
Wilmington Regional Office
Pat McCrory, Governor FAX COVER SHEET John E Skvarla III, Secretary
Date: Z-� No. Pages excl. cover):
To: /l/��C� / /U Cr r/ �Q�' F om: Jo Casmer
Co: � �E�Ev.� Phone: (910) 796-7336
Fax: % �f%' '7 —"9 Z / Fax: (910) 350-2004
127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer
i
MCB Camp Lejeune Courthouse Bay
Post -Development
Building Existing Permit
BB147A 5W8 010431
Basin pt Water Quality Volume Required for Existing Impervious Area • Simple Method
R, - 0.05-0.9'1,,
V = 3630'R6'R, A
On-sne Impervious-
2.06 ac Land use breandaKn horn calculations signed by Avolis Engineering, P.A. dated Nov 10. 2004, Appendix A
Off -site Impervious.
059
Pervious.
1,54 ac
Totals
4.19 ac
R,=
0.05 0.9 ((2.65-0.59)14.19)
R,-
0619
Ro=
1.5 in
VE.
3630 1.5 0.746 4,19
VE-
14.127 ct
Basin 91 Water "Illy Volume Provided
VP -
14.487 cf From calculations signed by AvoliS Engineering, PA. dated Non 10, 2004, Appendix A
Water Quality Volume Required for Additional Impervious Area • Simple Method
Impervious Area-
753 sf
R,-
0.05 + 0.9 (753l753)
R
0.95
Ito -
3,65 in
V-
3630 3,65 0416
V.
218 cl
Total Water quality Volume Required
V,-
VE a V
V,-
14,127 + 218
V,a
14,345 of < VP
'3.65=1 year 24-hour design storm
3,84
Therefore no additional basin capacity needed.
E
Fj�E 2 2 20 v 10 43 _.
. X\A CARO"
Q��ESSr �q�y,
A
%Q ^'G1NE. -
N NQ
N11
Qi
N
I
O
L
O E
U t2
O
C >
N
Q) �
Q) c`n
.J 0
CL
L
U
V0
a
i
rn
v
?
LO
N
co
Ic
LL
�f
Vl
+
W
C?
N G �14to
Go
p
00
P
C,
O
Ex
E
11 11 11 II II 11 II
ot1P>
d
II II
j
d
11
�
'5
E
mw
a
E
88
d V
d
T
r
lf7
Y CO
N
:
Z
U)
ll
y
w
m
d
m
m
c ti
v �t
�7 m
C1 CD
E
ZZ
LO
v
ti
p
O
li7
to
r
> N V
C7
00
I+ IL)
O
O
M
V
II II II
0�
II II 11
> >
7
!1 II 11
> > >
a
d
E
z
a
a
d
�� a4�-)A
INFILTRATION BASIN ANALYSIS
FILENAME G:1WQ1SharedlPermits & Projects120011010431 HD12013 10 excel_113 1 010431
PROJECT NUMBER: 010431 DATE: 17-Oct-13
PROJECT NAME: Batchelor Enlisted Quarters Replacement
DRAINAGE BASIN: White Oak REVIEWER: Lewis
RECEIVING STREAM: Courthouse Bay CLASS: SA
Index No.: 19-36 If ORW, is site within the 575' AEC?
SITE AREA 9.85 acres DRAINAGE AREA: 182516 SF
IMPERVIOUS AREA CALCULATION
GRAVEL
3920
BUILDINGS
20909
PARKING/ASPHALT
54450
SIDEWALK
10454
October 2013 building addition
753
OFFSITE
25700
TOTAL
116186
• IMPERVIOUS, 1= 63.2% RV= .05+.009 (1) _
• impervious, I, new onl 100.0% RV= .05+.009 ( I) _
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
Elev. (ft) Meters Area
BOTTOM 8.53 2.6
9,84 3
10.99 3.35
STORAGE MET AT ELEVATION
VOLUME / DEPTH / DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN STORM, INCHES
1.5" Design Volume
3.65" Design Volume
DESIGN VOLUME
Storage Elevation
Volume Available at Storage Elev,
TIME TO DRAWDOWN
25 YEAR 24 HOUR STORM
Intensity, i = .33 inches / hour
Qr=CiA=
Op through the bottom of the basin:
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches / hour
Volume for 10 yr. 10 min. event =
Volume available =
4.19 acres
0.8
0.95
0.9
0.9
P-1449 steam decentralize
0.95
0.62
0.95
6.47 FEET MSL
1.7 INCHES/HOUR
Inc. Vol, Acc, Vol
6576
9058 10240, 27 10240.27
10636 11324.05 21564.32
10.23
1.5 (applies to 115433 sf only)
3.65 (applies to 753 new only)
14127 cf - 14486 was previously permitted.
218 cf
14345 CUBIC FEET
10.31 fmsl
14868 CUBIC FEET
16.0 HOURS MUST BE <120
0.00 CFS
3.11 CFS
0.00 CF
14868,36 CF
COMMENTS
Volume and drawdown are (not) within Design Requirements.
Must be > Or
115¢33
� 00
Rv-
Ro
v- 3G30 x .Co�R2� ! JS
Lewis,Linda
From: Lewis,Linda
Sent: Thursday, October 17, 2013 6:43 PM
To: carolina.matiz@ch2m.com
Cc: Towler GS03 David
Subject: SW8 010431 Minor Mod.
Carolina:
I want to apologize up front. I'm not sure how this occurred, but for this particular modification, the original 1.5"
minimum design volume in the permit somehow got mixed up with and labeled as the provided volume in the
basin (14,486 cubic feet). It was not meant to imply that 14,486 was the minimum volume required. However,
based on the old calculation sheets in the file, it is understandable how you came to that conclusion.
I always rerun and check the numbers, and when I did, I discovered that the minimum required 1.5" volume is
14,127 cubic feet. I'll check it again later just to be sure. For whatever reason (probably user error — mine!) the
provided volume somehow also got reported as the minimum required volume. In reality, it appears that no
change to the existing infiltration basin elevation is required because the new total required volume that I
calculate is 14,345 cubic feet, still less than the current provided volume of 14,486 cubic feet.
Please let me know how you would like to handle. Do you want to continue with the proposed changes? If we
do that, future changes may be easier to do since there will be excess volume in the basin. Or do you want to
provide revised calculations for the minimum required 1.5" volume and keep the current basin as is?
Linda Lewis
Environmental Engineer III
Division of Energy, Mineral and Land Resources
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Main Office — 910-796-7215
Direct Line — 910-796-7343
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
CH2MHILL
TRANSMITTAL
To: Marine Corps Base From: CH2M HILL
Public Works Division • - M. Carolina Matiz Pardo
1005 Michael Road - 4' 1000 Abernathy Road
Camp Lejeune, NC 28547.L, .- `-':- Suite 1600
Atlanta, GA 30328
Attn: David Towler J, Date: August 8, 2013
Re: Energy Efficiency Improvements at Courthouse Bay — NCDENR Permit Modification —
SW8 010431
We Are Sending You: Method of shipment: FedEx
0 Attached Under separate cover via
Shop Drawings 0 Documents Tracings
Prints Specifications Catalogs
Copy of letter Other:
Quantity Description
1 Stormwater Management Permit Application Form - for signatures
1 Signed arid'sealed Infiltration Basin Supplement - Basin 1
1 Infiltration BasiNgperations and Maintenance — for signature
1 Stormwater M `t ement Narrative'
1 Signed and Seto mwater Management Calculations
1 USGS Map
1 MRCS Soils Map'
1 Soils Report
2 Signed and seal 2xPerm�ttirlg�Plans.
If the material received is not sllis,ad*please rtotrfy us at,once. 678.530.4778 or
carolina.matiz@ch2m.com., '
X., IECEIVE
Thank you, h.
Carolina Matiz `'i+'
6l
8Y:
E:1MY DOCUMENTSICAMP LEJEUNEICOURTHOUSE BAYISTORMWATER PERMIT APPLICATIONILOT2013-8-8.DOCATUE:IMY DOCUMENTMCAMP
LEJEUNEICOURTHOUSE BAYISTORMWATER PERMIT APPLICATICNILOT2013-8-8.DOC 1
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
't
CH2MH1
Stormwater Management Narrative BB147A
PREPARED FOR: NAVFAC Mid-Atlantic/USMC NC IPT
PREPARED BY: Carolina Matiz, P.E.
COPIES: File
DATE: August 6, 2013
PROJECT NUMBER: 460598
PERMIT NUMBER: SW8 010431
The project proposes the construction of one equipment building (BB147A) located behind the
existing Bachelors Enlisted Quarters. The 18' x 30' building and 5'x7' transformer pad will be
placed to ensure that the stormwater runoff generated by the new structures will drain into the
existing Pond #1 and ultimately to the bioretention pond.
The stormwater runoff will sheet flow over grassed areas prior to being collected in the infiltration
basin.
The original stormwater management system was designed to retain and treat the runoff generated
by a 1.5" rainfall event. The runoff from larger storm events is bypassed at the smart weir control
structure and discharged to the Courthouse Bay. The system was enhanced in 2005 by adding two
bioretention ponds. A decanting structure was added at the infiltration ponds to drawdown the
system at a faster rate and discharge into the bioretention areas. The stormwater runoff generated
by the new structures was calculated using the 1-year-24 hour storm event (3.65 inches from the
NOAA database) in accordance with the direction received at the June 12, 2013 scoping meeting.
In order to provide treatment for the additional runoff, the decant structure in Pond 1 will be raised
0.48 inches. No other changes or modifications to the existing system are proposed with this Permit
Modification. The stormwater management system will continue to operate as currently permitted.
The C value for drainage area 1 was recalculated and is 0.64. It was originally permitted as C=0.63.
The orifice size for the decanting structure is still valid. The volume left after 5 days would be 641
cf, from the original permit, plus the added 218 cf from the new structures, for a total depth in Pond
#1 of 859cf/6572 sf = 0.13 ft.
Erosion and sediment control measures will be implemented during the construction phase to
ensure no sediment laden is discharged from the project area.
JECEIVE',
OCT 1 11 2013
BY:
s
MCB Camp Lejeune Courthouse Bay
Post -Development
Building Existing Permit
BB147A SWB 010431
Water Quality Required for Additional
Impervious Area
Impervlous Area-
753.00 sf
Treatment Required (cf) •
753.00 sf
Treatment Required (cf) •
217.59 cf
0.0050 ao-fl
z 0.95 H 3.65 in •3.65=1 year 24-hour design storm
12 in
Permitted Stormwater Retention Quantity 14,487 cf
0.333 ac-ft
Required Stormwater Retention Quantity • 0.333 no-R + 0,0050 ao-ft
• 0.34 oo-R
Total B-In Ara. taco:.) •
1.07
Basin Stage Storage
Total Ares
Cum, Total
Ele ation
Maranon Volume
Volume
Volume [aao-lceS)
Volume Volume
Vdume
Cu..
Vdume
{ar sa)
Area (acres)
(FMSL)
(feel) lecralcel)
(auo-lcel)
{a -fast) (aav faet)
(acro-teel)
(arse - fem)
Total Project
A
a
C
B E
0.15
0.06
0,01
002 0.0020
E.)Top of Basin
0.25
1.07
11.06
0,06 001
0,00
000
0.00 0.0001
0.02
0.51
0.)
0.24
0.62
10.99
0.72 0,11
0.04
0.01
O.00e
0.17
c_60
C.) Treatment W.Ir
0.22
0.56
t(l.27
0.43 0,07
0.02
0.00
0.09
0,33
g.)
0.21
0.36
9.8e
111 0.20
a.04
A.) Bottom of basin
1.15
0.15
Le.53
0,00
0,00
Required Stormwater Retention Quantity =
0.34 ac-R
which occurs at elevation
10.31 tt
Raise weir bry
0.04 It
0.4B inch
Basin Orawdown =
1.78 8
1
2.41 incheslhour =
8 88 hour drawdevm time
Storage Surface Area • 0.23 ac
9,912 sf
,1 tl 111 if rl7�
H CAR
F�S51Q0
���i9"'
EA -
6
PiCEIVE
I�
OCT 11 2M
EY:
ti
Z
W
W
J
a
Q
m
C al
O O IA
N U
U O b
c0i cc N
0 O, m T !9
0--a N a)U
E N b
N E
w E
m
c 'a
m m
w
0
� 4! E � O
> r O L
a O N a F
C C N
o 7. b C
}. Ate. 'O N
0.0
E m m >
E Q'E `°
C L
O C
o c m ~ � O �
C
(A N CD
E
C oy -0E t
U y
t6 y m .
uwEn0
Q
cz
O
Ul
al
L
Q
co
E
U
N
y
0
N
N
N
7G
n
m
L
o
O r
N
@ U
{p
u O
N O
N
n
� y
C
al
77
7 N b
N
ti
O UN Ln
3
N00 L
U
IG C M
j.
c
C��
0
b m
Z
U wW
@2o v
�
C N
0-0—N
O itl
N G]
> a)
67 N
Eo
mad
L
��omm
N
O
N
A
fn O
:o m o
m m
[p J
Z a
(n 71 G U
y ¢ O C
lC N
m n m@ w
C N
CL
0-2
L C O
N lb
5 Uj
L
3 cm m N
V b
i4
07
p Q Q O
U
0O C
•_ V
o
ci.m m
d 41
>
0 0 0
rn R: U
M
2 a'o ¢ o
f-
o
O
�
U
Z
L
O b N
3 c o
N
^
ft
N L O
o
N
O
L E N
0 Y
y
r
L O
3 c
z a
a
y c
c y
}. Q7
U)
4
12 CD
O V
IL
a
7
p
o_
o
41
E T�
U C:y
n
m 0 E a
O
N
w U)m
h
C N
b
y
3
O m
67 C, N
O
D
y
t m c m
l6
(
O N O N
E
bb
.0 0
a1°i
Q
w
m
o
O 'O n
N 0Y
Q)
d W N w
C
Q
O b U
7 T
fn O
03
E E0
N
d
O.
O .Q cm (0
E m E
U) co
o
U) o
ac�.r
FL- o.E o
N
m
N
C
10
n
LU
a
LL
N
U
t
m
T
m n 0 o
[A
C
a
m
C
w
E
=
m
m
u
m
'o
V
o o
�_ �y
L
CL
tV
C 4 m
O r Q $
N U] i
V
m
N
w
C m
ro
m
{(J
O U
W
0
d
C
Y.Ri
l
�i1D o 4CL
m
m
®
q+ U
CD
-
u
i
O
rn
O
cn
=
O
C
n
m
N
n
Vl
D
ELa
E
m
CL
a
O
O
o
c
n
m
c
a
(u
c
a
en
m
m
d
3
d
n❑
a
Q
0.
o.
u`
o
O
O
4 yj
m m
c
O
O
!n
m
n
m N y
D O
m¢
fn
cn
cn
LL 3
c m
O
m
�. N
U V
7 E
C� C7
'a N
-j �
G
g
m
U m
m
Y
�
m
C
rn
T
c
vi
m
w
m V
in vi V)
m
C
o,
�
Q�y�
oN�l$�
oX
�
���
>+:•:
� A Ik
nCl)
y -3
4�
a m
o
n
C)
O
0
w
Z
Soil Map--Onslow County, North Carolina
Map Unit Legend
MCB Camp Lejeune _ NCDENR
Permitting
Onstow County, North Carolina (NC133)
Map Unit Symbol
Map Unit Name
Acres in AOI
Percent of AOI
BaB
Baymeade fine sand, 0 to 6
percent slopes
2.0
6.6%
Mac
Marvyn loamy fine sand, 6 to 15
percent slopes
9.6
31.6%
Mk
Muckalee loam
4.0
13.2%
Pa
Paetolus fine sand
3.3
10.9%
W
Water
2.1
6.7%
WaB
Wan do fine sand, 1 to 6 percent
slopes
9.4
30.9%
Totals for Area of Interest
30.5
100.0%
M_PE VE
OCT 1 1 2013
unm Natural Resources Web Soil Survey 817/2013
a Conservation Service National Cooperative Soil Survey Page 3 of 3
its
A,
ik
('
V'
4?
LC
r
O
QtC
zea
J 9 '" f
.,
€
1191HX3 dVW Od01 ,,S$Osn `
$nOV93lw l/I
Lill
m
Xtl1NVl1V-OIW
n
ri-ri-s
.elan usrw xss aaa auxsi
�I
[l-[I-S
M]N3tl N�Ii30 YWl a0a QL651
a ��t
AV9 3snOHidnooFs
NOI1VZIIVH1N3o34 WV31S
tlNNO>HIbON
— ONVVMOO ONIH33NION3 SEIIIIIOVJ IVAVN
JI,5,
tl�
CD
A
' �-'..�
s lire to�K �
t�
O � � 0'
OI„HSD 1•r"a
11NY1 SNP
W
t(I��rt.-,� ad4'a
ai ,``
1 1.7
♦ Yes t�. � � � r �r p4
♦♦, lit r � C.; k t �� I ��� .c...�'ks�-�as a .,�,� * ``L
♦ `/yam`
♦ �I� t �}jf i, �Q 4 _�
):+"� ,�✓ :.''" �.`,.\�Y y'" a- / y "- � i�°' ,�%q ,�C"•T". Its 3lc dam,&'�C{ j�ah�iw` d' /i
�z
^y^
LLI
W
Ni```;
g
co
LU
CL
LU
cn
Ui
LO
m Q
01043 f MckJ-
Carolina Department of Environment and
Natural Resources
Request for Express Permit Review
For DENR Use ONLY
Reviewer; L—J—
Submit: t7 ` t L
Time: 4 _ G ', 2�0
Confirm:
FILL-IN all the information befrw-and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the
Permit Coordinator along with a completed DETAILED narrative, site elan (PDF file) and vicinity map (same items expected in the application
aA ckaQe of the project location. Please include this form in the application package.
• Asheville Region -Alison Davidson 828-296-4698;alison.davidson(mncden►.gov PermitsofRepuest
• Fayetteville or Raleigh Region -David tee 919-791-4203; david.lee(a>ncdenr.gov
• Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or Patrick.groganAncdenr goy SW 020611
• Washington Region -Lyn Hardison 252-948-3842 orlyn.hardisonAncdenr.-go v SW 010431
SW 030720
• Wilmington Region -Janet Russell 910-796-7302 or ianet.russeA(o)ncdenr.gov 5W
• Wilmington Region -Cameron Weaver 910-796-7303 or came►on.weaverOncdenr.aov SW
NOTE: Project application received after 12 noon will be stamped in the following work day. fyy1% tt � /� , I /�- _ r
Project Name: COURTHOUSE BAY STEAM DESCENTRALIZATION County: ONSLOW !N N� C f -I�{`� V 1
Applicant: Company: MARINES CORPS BASE CAMP LEJEUNE I- �U �� M e ,
Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE , State: NC Zip: 28547-� I`
Phone: 910-451-3238, Fax: _-_-_, Email: david.towler@usmc.mil
Physical Location:COURTHOUSE SAY
Project Drains into WHITE OAKICOURTHOUSE SAY waters - Water classification SA (please visit here to look up stream classification)
Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within Y2 mile and draining to class SA waters Y. or within 1 mile
and draining to class HQW waters? N E C E I V E , R,
Engineer/Consultant: CAROLINA MATIZ Company: CH2MHILL E C E I �I E
Address: 1000 ABERNATHY RD City: ATLANTA, State: GA Zip: 30328
Phone: 678-53OA778, Fax: _ _ Email: carolina.matiz@ch2m. OCT 11 2013 SEP 19 2W
SECTION ONE: REQUESTING A SCOPING MEETING ONLY BY. /f M�� I
❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: /`T' fly:
SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING
❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
ElIntermittentlPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or acres)
❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance
® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other
❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales [:1 Off -site [SW (Provide permit #)]
ElHigh Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration — #Treatment Systems
❑ High Density -Bio-Retention _ # Treatment Systems ElHigh Density -SW Wetlands _ # Treatment Systems
® High Density -Other # Treatment Systems / ® MOD:❑ Major ® Minor ❑ Plan Revision ❑ Redev. Exclusion SW 010431 (Provide permit)
❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
❑ Land Quality ® Erosion and Sedimentation Control Plan with 1.5 acres to be disturbed.(CK # (for DENR use))
SECTION THREE —.PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request)
Wetlands on Site ❑ Yes ® No
Wetlands Delineation has been completed: ® Yes ❑ No
US ACOE Approval of Delineation completed: ® Yes ❑ No
Received from US ACOE ® Yes ❑ No
Buffer Impacts: ® No ❑ YES: _acre(s)
Isolated wetland on Property ❑ Yes ® No
404 Application in Process wl US ACOE: ❑ Yes ® No Permit
For DENR use only
Fee Split for multiple permits: {Check # 1 Total Fee Amount $
SUBMITTAL DATES
Fee
SUBMITTAL DATES
Fee
CAMA
$
Variance (❑ Maj; ❑ Min)
$
SW (❑ HD, ❑ LD, ❑ Gen)
$
401:
$
LQS
$
Stream Deter,_
$
NCDENR EXPRESS June 2011
t
HILL
Stormwater Management Narrative BB147A
PREPARED FOR: NAVFAC Mid -Atlantic/ USMC NC 1PT
PREPARED BY: Carolina Matiz, P.E.
COPIES: File
DATE: August 6, 2013
PROJECT NUMBER: 460598
PERMIT NUMBER: SW8 010431
The project proposes the construction of one equipment building (BB147A) located behind the
ti _ezisngLBachel6rs Enlisted ' Quarters. Xl7cd J8' x 30' building and 5'x7' transformer pad will be
rplaced to ensure thatithe stormwater runoff; generated by the new structures will drain into the
exishng Poridj#1 and ultimately to the bioretention pond.
The stormwater runoff will .sheetflow.. over' grassed areas prior to being collected in the infiltration
basin.
The original stormwater management system was designed to retain and treat the runoff generated
by a 1.5" rainfall event. The runoff from larger storm events is bypassed at the smart weir control
structure and discharged to the Courthouse Bay. The system was enhanced in 2005 by adding two
bioretention ponds. A decanting structure was added at the infiltration ponds to drawdown the
system at a faster rate and discharge into the bioretention areas. The stormwater runoff generated
by the new structures was calculated using the 1,year-24 hour storm event (3.65 inches from the
NOAA database) in accordance with the direction received at the June 12, 2013 scoping meeting.
In order to provide treatment for the additional runoff, the decant structure in Pond 1 will be raised
0.48 inches. No other changes or modifications to the existing system are proposed with this Permit
Modification. The stormwater management system will continue to operate as currently permitted.
The C value for drainage area 1 was recalculated and is 0.64. It was originally permitted as C=0.63.
The orifice size for the decanting structure is still valid. The volume left after 5 days would be 641
cf, from the original permit, plus the added 218 cf from the new structures, for a total depth in Pond
#1 of 859cf/6572 sf = 0.13 ft.
Erosion and sediment control measures will be implemented during the construction phase Jo
ensure no sediment laden is discharged from the project area.
r
IN;
c"
I
Z �i
$
gq
f
'
- 3
a
�'3rm
33
Wd 3 S
a=
!
g�6
a
r U
i
V
[IKIy
ILllr �1, F
sr
flKiy
on 6L,m m vea
. ,\
,.
AVG 3snoHl8noo
VWXRrn KLWN NOIIVZI1Va1N3030 VVV31S Sum
xo'aweskw.aaw sa
4'1NbllV' (3QIV4W-pNVINWO��NIy33Nl']N3531L11'�Vl �Vn�
I it
1
r /
s
Nc HIGFM1AYAT2
j
I F� N
Z
W
Cb o
W
i%}� � •� � k:3 u
lu�y
Y3�
14
OOTT u ; d
0
o
CL
d K d d
y-/
vx
23�
W
. alp I
U
O
� 0
m
w
q
I
z
i
o
r
-------------
z 3
W
�
FZ
W
Z
J
CL
LU
u CJ m ' Q
u WM—%. III .L� —I—I —.mowM " r
2
(f)
F-
z
Bachelor Enlisted Quarters Jackson Street
Stormwater Permit No. SW8 010431
Onslow County
Designer's Certification
Stake Stormwater Management Systems
Permit No, SW8.010431 Mod.
ssq
LAc" , as a duly registered Er ° eySfaA -in the
State of North Carolina, having been authdrized to observe periodically
+m&) the construction of the project,
Tov 4-ion (o o ir f& vs e A N
(Project)
for Mot,'It Ze evgf (Project Owner) hereby state that, to the
best of my abiliti s, due cafe and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
H CARO(j�,
c SSfn�°a.'�
4 SEAL
p
Signature $%�,�F�'�FyGItiv Pv�
��3+.e��ry N
Registration Number `fY3•aee���•.
Date
ECEIVE
SEP 19 2W
Page 6 of 7
. _ i
e.`1.
1
��
t
a � j
. �.
}
State Stormwater Management Systems
Permit No: SW8 010431 Mod.
Certification Requirements:
�1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
�4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved .plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
r/ 12. All required design depths are provided.
1i 13. Ali required parts of the system.are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Page 7 of 7
STATE OF NORTH CAROLINA
Department of Environmental and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
(910)796-7215
FILE ACCESS RECORD
SECTION
TMEIDATE _ �}t�h 2 `1 _
NAME V et&I-, Pr-tj
REPRESENTING elan e�
Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in
our custody readily available to the public for review and copying. We also have the responsibility to the
public to safeguard these records and to carry out our day-to-day program obligations. Please read
carefully the following guidelines signing the form:
1. Due to the large public demand for file access, we request that you call at least a day in
advance to schedule an appointment to review the files. Appointments will be scheduled
between 9:00am and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an
appointment may view the files to the extent that time and staff supervision is available.
2. You must specify files you want to review by faciliq name. - The number of files that you
may review at one time will be limited to five.
3. You may make copies of a file when the copier is not in use by the staff and if time permits.
Cost per copy is .05 cents for copies. There will he no fee if the total calculated charge is
less than $5.00, Payment may be made by check, money order, or cash at the reception
desk. Copies can also be invoiced for your convenience.
4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from
the. office. To remove, alter, deface, mutilate, or destroy material in one of these files is a
misdemeanor for which you can be fined up to $500.00. No briefcases lama totes etc. are
permitted in the file review area.
5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and
collected for checks on which payment has been refused.
FACILITY NAME
COUNTY
1. 5 LJ15 010471 k tea! C Q f is`S E `1 st,3a+\ st
2.
3.
4.
Time In
Please anwh a business card to this form
COPIES MADE PAID INVOICE
S:Admin.ftle access
Time Out
`1 ',I` IL-' `
STATE OF NORTH CAROLINA
Department of Environmental and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
(9 2 0) 796- 7215
FILE ACCESS RECORD
SECTION tAj
TRAE/DATH
NAIv1E
REPRESENTING
ci 522--253 L
Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in
our custody readily available to the public for review and copying. We also have the responsibility to the
public to safeguard these records and to carry out our day-to-day program obligations. Please read
carefully the following guidelines signing the form:
1. Due to the large public demand for file access, we s egnest that you tail at least a day in
advance to schedule an appointment to review the files. ApLILintments will be scheduled
between 9:00am and 3:00 In. Viewing time ends at 4:45pzn. An one a rrivint without an
appointment ma view the files to the extent that time and staff supervision is available.
2. You must specify files you want to review by fiedity uatne. The number of files that you
may review at one time will be limited to five.
3. You may make copies of a file when the copier is not in use by the staff and if time permits.
Cost per copy is 2.5 cents for ALL copies if you make more than 25 copies. There is no
charge for 25 or less copies. Payment may be made by check, money order, or cash at the
reception desk Copies can also be invoiced for your convenience.
4. F ❑,ES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from
the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a
misdemeanor for which you can be fined up to $500.00. No o briefcases,,_ large totes, etc. are
permitted in the file review area.
S. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and
collected for checks on which payment has been refused.
FACILITY NAME COUNTY
1. Q) Q 1 �) q 4, La8 C Q u-r t . P) t�_�{_}'. EC, -S (g ns 10 w' a 2_0 69
2. L�P LLr o USz 7) ft"rZcc-\ + �'�� _ f W�.� U
4.
and Name of Fir ..Business Date Time In Time Out
Please artoch a business card to rhis form
COPIES MADE PAID INVOICE