HomeMy WebLinkAboutSW8010431_CURRENT PERMIT_20200806STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO. SW �(/((�-/ l/
DOC TYPECURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Direaur
August 6, 2020
Commanding Officer
MCB Camp Lejeune
c/o Neal Paul, Deputy Public Works Officer
Bldg. 1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Envirm atental Quality
Subject: Permit Renewal
Stormwater Permit No. SW8 010431
Bachelor Enlisted Quarters Jackson Street
High Density Project
Onslow County
Dear Mr. Paul:
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal
Application for the subject project on. The Division is hereby notifying you that permit SW8 010431 has been
renewed on August 6, 2020, and shall be effective until January 10, 2027. For your records, please find enclosed
a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this perrrtit on file at
all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it
merely restates some of the previous terms to provide you with a better understanding of your obligations under
the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with
the terms and conditions of this state stormwater permit. The plans originally approved on August 8, 2001 and
most recently revised on October 25, 2013, will remain in full force and effect in accordance with the regulations
set forth in Title 15A NCAC 2H.1000.
This hermit is subject to the conditions and limitations as specified therein. Please pay special attention to the
coridtttons listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to
establish an adequate system for operation and maintenance of the stormwater management system, to record
deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Daniel Sams in
the Wilmington Regional Office, at (910) 796-72 l5 or dan.sams@ncdenr.gov.
Sincerely, ,
..JZ, Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/dan:111Storm).+•irtcr.Permits & Froiccls',2001%010431 4- M020 08 permit 010431
cc: Wilmington Regional Office Stormwater File
®� IQ N
uparH Chad-iNa
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
0ipw11wA10 5 0 Q.M\
910.796.7215
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
USMCB Camp Lejeune
Bachelor Enlisted Quarters Jackson Street
Jackson Street, Camp Lejeune, Onslow County
FOR THE
construction, operation and maintenance of 2 infiltration basins and 2 bio-retention
areas in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to
as the "stompwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved.by
the Division and considered a part of this permit.
This permit shall be effective from the date of issuance until January 10, 2027, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
controls include two infiltration basins which discharge the design storm volume
to the two bio-retention areas. Systems 1 & 2 have been designed to handle the
runoff from 116,187 and 113,693 square feet of impervious area, respectively.
The excess design storm overflow from each system must pass through a 50'
vegetated filter prior to discharge.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.6
of this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
The following design criteria have been provided in the infiltration basins and bio-
retention areas and must be maintained at design condition:
a. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Infiltration Basin Depth, feet:
e. Infiltration Bottom Elevation, FMSL:
f. Infiltration Bottom Surface Area, ft2:
g. Infiltration Bypass Weir Elevation, fmsi
h. Infiltration Storage Volume, ft3:
i. Type of Soil:
j. Expected Infiltration Rate, in/hr:
k. Seasonal High Water Table, FMSL:
I. Orifice size to bio-retention area:
m. Bioretention Surface Area, ft2:
n. Bioretention Bottom Elevation, fmsl:
o. Bioretention Storage Elevation, fmsl:
p. Bioretention Volume, ft3:
q. Number of Trees:
r. Number of Shrubs-
S. Time to Draw Down, hours:
t. Receiving Stream/River Basin:
U. Stream Index Number:
V. Classification of Water Body:
li. SCHEDULE OF COMPLIANCE
System #1 System #2
4.19
9.85
182,516
212,137
0
0
116,187
113,693
1.513.65
1.5
1.8
1.6
8.53
11.02
6,576
7,352
10.27
12.6
14,486
14,715
Silty Sand
Silty Sand
1.7
1.7
6.47
9.0
1.25"0
1.25"0
8,500
8,900
7.05
10.07
7.80
10.82
6,375
6,675
49
51
147
154
15
14
Courthouse
Bay/ WOK
WOK02 19-36
"SA HQW"
The permittee is responsible for verifying that the proposed built -upon area for
the entire project does not exceed the allowable built -upon area. Built upon area
includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone,
slate, coquina and parking areas, but does not include raised, open wood
decking, or the water surface of swimming pools.
2. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface..
3. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
functions at the design condition. The approved Operation and Maintenance
Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas_
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at ail times.
Page 2 of 7
State Stormwater Management Systems
Permit No_ SW8 010431 Mod.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the work and what actions were taken.
5. The facilities shall be constructed, operated and maintained in accordance with
the provisions of this permit, the approved plans and specifications, and the
supporting documents attached to this permit and on file with the Division.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
7. If the stormwater system BMP is used as an Erosion Control device during
construction, more frequent maintenance will be required during construction to
maintain functionality. Once the drainage area is stabilized and prior to
occupancy of the facility, the BMP must be fully restored to design condition.
8. Access to the stormwater facilities shall be maintained via appropriate recorded
easements at all times.
9. All stormwater collection and treatment systems must be located in public rights -
of -way, dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such required rights -of -way, common areas
and easements, in accordance with the approved plans.
10. No person or entity, including the permittee, shall alter any component shown in
the approved plans and specifications. Prior to the construction of any
modification to the approved plans, the permittee shall submit to the Director,
and shall have received approval for modified plans, specifications, and
calculations including, but not limited to, those listed below. For changes to the
project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate
DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of
size including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage
area.
c. Further development, subdivision, acquisition, lease or sale of any, all or
part of the project and/or property area as reported in the approved plans
and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing
of any component of the approved SCIVI(s), the stormwater collection
system and/or vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public
trails, or landscaping material to be considered a permeable surface that
were not included in the approved plans and specifications.
g. Other modifications as determined by the Director.
11. A copy of this permit, the permit application documents, the approved plans and
specifications shall be maintained on file by the Permittee for the life of the
permit.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
12. Prior to transfer of the permit, the stormwater facilities will be inspected by
DEMLR personnel. The facility must be in compliance with all permit conditions.
Any items not in compliance must be repaired or replaced to design condition
prior to the transfer. Records of maintenance activities performed to date will be
required.
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
1. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves a permit transfer request. Neither the sale of the
project in whole or in part nor the conveyance of common area to a third party
shall be considered an approved permit transfer request.
3. Current Permittee Name or Address Changes: The permittee shall submit a
completed "Permit Information Update Application Form" (available on the
Division website) tote Uivision within 30 days to making any one or more of the
following changes:
a. A name change of the current permittee;
b. A name change of the project;
C. A mailing address change of the permittee;
4. Permit Transfer: This permit is not transferable to any person or entity except
after notice to and approval by the Director. The permittee shall submit a
completed and signed "Permit Transfer Application Form" (available on the
Division website) accompanied y the required tee and supporting
documentation as listed on the form, to the Division at least 60 days prior to any
one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in
the case of an individual lot sale that is made subject to the recorded
deed restrictions and protective covenants;
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS
55-14-05 or NCGS 57D-6-07 and 08;
C. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
5. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request. Neither the sale of the
project, in whole or in part, nor the conveyance of common area to a third party
constitutes an approved transfer of the stormwater permit.
6. Any individual or entity found to be in noncompliance with the terms and
conditions of a stormwater management permit or the stormwater rules is subject
to enforcement action by the Division, in accordance with NCGS143 Article 21.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
7. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
8. The permittee grants Division Staff permission to enter the property during
normal business hours for the purpose of inspecting all components of the
permitted stormwater management facility.
9. The permit issued shall continue in force and effect until the permittee files a
request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any permit conditions.
10. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
11. The application form, supplement forms, approved plans and specifications for
this project are incorporated by reference and are enforceable parts of the
permit.
12. A permit renewal request must be submitted at least 180 days prior to the
expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
Permit modified, updated and reissued this the 6th day of August 2020.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
ror brian vvrenn-�-tang uire=r
Division of Energgy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
Bachelor Enlisted Quarters Jackson Street
Stormwater Permit No. SW8 010431
Onslow County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 010431 Mod.
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
CC' NCDENR-DEMLR Wilmington Regional Office
Page 7 of 7
ur_rvtLr1 vot v14L.1
Date 52ceived IFee
Paid
I Permit Number
og0
cf 0t0q,3 t SO
1 3609 00 V
NC DEG Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2N.1045 3 , the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session taw 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 010431
2. Project name: BB149
3. Project street address: XXX
City: MCB Camp Leleune _ County. Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted? I_/A,
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at. https://deg.nc.gov/abouUdivisions/energv-
mineral-land-resourceslenergy-mineral-land-rules/stormwater-programloost-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at. hitps:i/deg•nc.gov/about/divisions/energy-mineral-land-
resourM/energy_mineral-land-rules/stormwater-program/host-construction. State Stormwater Permits do not
automatically transfer with the safe of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leleune
2, Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
'.• 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd.
City: MCB Camp Leleune State: NC
ZIP : 28547-2521
5. Street Address:
City: , State: ZIP
Phone; (910) 451-2213 Email: neal.paul@usmc.mil
BY'
Stormwater Permit Renewal Form Page 1 013 May 11, 2018
t
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEQ.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. It the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. (IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https,,//www.sosnc.gov/online services/search/by title/ Business Registration
i .SUN
' Stormwater Permit Renewal Application Form Page 2 of 3 May 11. 2018
D. PERMITTEE'S CERTIFICATION
I, 1 0)te� P. 4,�' the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the 0&M Agreement and approved plans. I agree to notify DEML.R of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All' or tion provided on this permit renewal application is, to the best of my
knowledge, orrecl corn I e.
Signature: Date: 1d
NQTA I
I, J a Notary Public for the State of
Count y of 0�7, do hereby certify
that Rpersonally appeared before me
this the (0 day of , 202_, and acknowledge the due
execui
my hand and official seal,
JUN 020 ,
BY:
Stormwater Permit Renewal Application Form age 3 of 3 May 11, 2018
F
r
,f
L
t
.
PF. 16, -;- 1 - -7
IF'I� A i
- mw