HomeMy WebLinkAbout20210034 Ver 1_PreFiling 30-Day Clock Reached Email_20210205Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, February 5, 2021 12:02 AM
To: kthomas@cecinc.com
Cc: Hood, Donna
Subject: Pre -Filing Time Clock has been reached for ROBINSON ROAD / SHORT ROAD
CONNECTORS - 20210034 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for ROBINSON
ROAD / SHORT ROAD CONNECTORS that you submitted on 1/5/2021. The ID number for that project is 20210034,
Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses ore not monitored.
ID#* 20210034
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Donna Hood
Pre -Filing Meeting Request submitted 1/5/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Kevin Thomas
kthomas@cecinc.com
ROBINSON ROAD / SHORT ROAD CONNECTORS
City of Hickory: POC, Shawn Pennell
Catawba
Street Address
76 N. Center Street
Address Line 2
aty
Hickory
Fbstal / Zip Code
28603
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.
Site #1:
The City of Hickory Plans to construct approximately 1,907LF of
public roadway extending from the existing end of Eller Drive to the
existing end of Short Road in Catawba County, North Carolina. The
construction of the public roadway includes the construction of an
approximate 80' clear span bridge, crossing Muddy Creek , erosion
control measures (i.e. silt fence, etc.), roadway construction, utility
installation and drainage network installation. Equipment to complete
the installation of the above mentioned items include but not limited to
a mechanical dozer, track hoe, and compaction roller. This crossing
does not impact Muddy Creek.
Site #2:
The City of Hickory Plans to construct approximately 1,765LF of
public roadway extending from the existing end of Lutz Boulevard to
the proposed Short Road Extension (Site 1) in Catawba County,
North Carolina. The construction of the public roadway has proposed
impacts of approximately 145LF of an existing Tributary to Muddy
Creek. This impact includes two (2) 72"Diameter CMP culverts buried
1' below nominal streambed elevation with inlet headwall, rip rap
dissipater, erosion control measures (i.e. silt fence, skimmer basins,
pump around steam impact area, etc.), roadway construction, utility
installation and drainage network installation. Equipment to complete
the installation of the above mentioned items include but not limited to
a mechanical dozer, track hoe, and compaction roller.
Please give a couple of dates you are available for a meeting.
1 /7/2021
1 /8/2021
1 /12/2021
1 /13/2021
1 /14/2021
Please attach the documentation you would like to have the meeting about.
Robinson Startown Road Connectors WOUS
15.99MB
Report.pdf
303168-Robinson-Short Road Connectors
1.35MB
Preliminary Plans.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
"
Submittal Date 1/5/2021